Boston University QUESTROM SCHOOL OF BUSINESS ADDITION 2 October 2015
Design Principles / Key Issues • Promoting a Seamless Connection Between Hariri and the Addition • The Building & Site: Finding Opportunities within the Constraints • A Thoughtful Response to Program: Existing and New • Creating Environments for Collaboration: Formal and Informal • Responding Creatively to the Context • Articulating a Future Proof Expression
Within IMP Level Connection to Hariri Meets Program Area Above Grade Reasonable Floor to Floor Height Possible Multiple Level Connections to Hariri
IMP SECTION
Within IMP Level Connection to Hariri Meets Program Area Above Grade Reasonable Floor to Floor Height Possible Multiple Level Connections to Hariri
2ND FLOOR BRIDGE CONNECTION
Within IMP Level Connection to Hariri Meets Program Area Above Grade Reasonable Floor to Floor Height Possible Multiple Level Connections to Hariri
MULTIPLE BRIDGE CONNECTIONS
Within IMP Level Connection to Hariri Meets Program Area Above Grade Reasonable Floor to Floor Height Possible Multiple Level Connections to Hariri
OPTIMIZED CONNECTION TO HARIRI
Existing Site
Lower Floors – Responsive to Context
Connector/Bridge
Upper Levels – Setback
Overall Massing: Context, Connection & Identity
PLANNING CONCEPTS
PLANNING CONCEPTS
Bay State Road
Narrower Setback
Bay State Road
Deeper Setback
Northeastern University
ATHLETIC RELOCATION 22 January 2016
S/ FICE Y OF ME T I S VAR L OF FA HAL GE
BRID
FIELDHOUSE/ FITNESS
LIFE/ ENT MS/ D U T S OO ICS ER R M LOCK ACADE TY I S R VA
THE MAT
LL ETBA BASK ENA AR
RENA
WS A
TION PETI COM OOL P “T” NEW AMP R / R STAI
OPTION 2 - PHASE 3 - BASKETBALL
SWIMMING AND DIVING
LOCKER ROOMS VARSITY ACADEMICS STUDENT LIFE ROWING CENTER
FIELDHOUSE PRACTICE COURTS STRENGTH AND CONDITIONING FITNESS
BASKETBALL ARENA CABOT REPLACEMENT/ATHLETIC PROGRAMMING STUDY
HALL OF FAME CONCOURSE VARSITY OFFICES
01.22.16
LEGEND MATTHEWS ARENA ENTRY
LEVEL 4 to 6
FIELDHOUSE/ CAGE SEATING/ CONCOURSE
LEVEL 3
VARSITY ACADEMICS STORAGE POOL VARSITY OFFICES
LEVEL 2
STUDENT LIFE PARKING MECH/RAMP
GROUND LEVEL
LOCKER/TEAM ROOM/STORAGE FITTNESS/ SPORTS MED/ ROWING PRACTICE COURTS
BELOW GRADE LEVEL -1
PEDESTRAIN ENTRY STAIRCASES & ELEVATORS
BELOW GRADE LEVEL -2 to -4
NORTHEASTER UNIVERSITY ATHLETIC PROGRAM
BELOW GRADE LEVEL -5
LEGEND Entry Practice Courts Fitness/ Sports Med
HUNTINGTON AVE
Varsity Academics
MASS. AVE
Pool Storage Existing Hockey Arena Mechanical
9,00
0 SF
ST. BOTOLPH STREET 3,30
PRA BEL CTICE COU OW R
Envelope SF
0 SF
GAINSBOROUGH STREET
Varsity Offices
TS 14,500 SF
Phase Boundary
5,200 SF
5,20
0 SF
POOL BELOW
FITNESS 4,800 SF
2,500 SF
18,000 SF
18,000 SF 20,000 SF
EXISTING HOCKEY ARENA
STORAGE 4,500 SF
SERVICE ROAD ACCESS ROAD 55’0’’ - 61’0’’
3.
VARSITY OFFICES
2.
VARSITY OFFICES
40’0’’ - 46’0’’ 15’0’’
76,000 SF
EXISTING MATTHEWS ARENA
35,000 SF
25’0’’ - 31’0’’
Align with 3rd Level of Basketball Arena
16’0’’
1.
CONCOURSE/ HALL OF FAME
Varies (Sloping Grade)
SERVICE ROAD
ST. BOTOLPH STREET
PHASE 2
EXTERIOR STAIR & RAMP
D. MATTHEWS ARENA SECTION
0
10’
CABOT REPLACEMENT/ATHLETIC PROGRAMMING STUDY
30‘
ALIGN WITH EXISTING CONCOURSE ELEVATION
60’
SECOND LEVEL
LEGEND
120’
01.22.16
Entry
CABOT REPLACEMENT/ATHLETIC PROGRAMMING STUDY 1.4.16 CABOT REPLACEMENT/ATHLETIC PROGRAMMING STUDY 01.22.16
Fieldhouse /Cage Seating/ Concourse
HUNTINGTON AVE
MASS. AVE
Varsity Academics Bridge Storage Pool Existing Hockey Arena
ST. BOTOLPH STREET
800 SF
00 S
3,30
F
0 SF
9,000 SF
Envelope SF
3,00
0 SF
9,300 SF
Phase Boundary MEC ROO H F
POOL BELOW
GAINSBOROUGH STREET
CONCOURSE
30,0
Varsity Offices
2,500 SF 18,000 SF
20,000 SF
BASKETBALL COURT BELOW
EXISTING HOCKEY ARENA
SERVICE ROAD ACCESS ROAD
76’0’’ PRESS BOX
BASKETBALL ARENA (3500 SEATS)
T/C
3
31’0’’ 12’0’’ 19’0’’ 19’0’’
CON
2
LOWER SEATS RETRACTABLE
CON
LOCKER
FITNESS
1
T/C
FITNESS & ROWLING
RAMP
MECH
•
LONG SPAN (TRUSS) OVER 3,500 SEAT BASKET BALL ARENA WITH A WOOD ATHLETIC FLOOR.
•
LOWER BOWL OF SEATING IS RETRACTABLE TO ALLOW FOR 2 CROSS COURTS AND OTHER SPORT CONFIGURATIONS. THE UPPER MEZZA NINE TO BE A MIX OF BLEACHER AND FIXED INDIVIDUAL SEATS (50/50)
•
LOCKER ROOMS FOR HOME, VISITORS AND OFFICALS. (TILE AND RUBBER FLOORS)
•
STORAGE AND FIEGHT ELEVATOR.
•
CONCOURSE INCLUDING CONCESSIONS AND TOILETING FOR SPECTATORS. (RETROPLATE CONCRETE)
•
GROUND LEVEL FITNESS AND ROWING CENTER, INCLUDING DEDICATED LOCKER ROOMS. (TILE & RUBBER FLOORS)
•
NEW MECHANICAL ROOMS TO SERVE MATTHEWS ARENA AND THE NEW BASKET BALL ARENA.
•
NEW RAMP/ACCESS POINT TO THE MATTHEWS ARENA ICE.
•
ALL ROOFING TO BE THERMAL PLASTIC MEMBRANE (SARNIFAL)
28’0’’ SERVICE ROAD
ST. BOTOLPH STREET
PHASE 3 - ARENA SECTION
ACCESS TO MATTHEWS ARENA
A. ARENA SECTION
CABOT REPLACEMENT/ATHLETIC PROGRAMMING STUDY
0
10’
30‘
60’
120’
01.22.16
76,000 SF
THIRD LEVEL
41,000 SF
18,000 SF
LEGEND Entry Student Life Fieldhouse /Cage
HUNTINGTON AVE
Seating/ Concourse
MASS. AVE
Envelope SF Roof Area
STUDENT LIFE
24,000 SF (GROSS)
STUDENT LIFE STUDENT LIFE
MEC ROO H F
91’0’’ 76’0’’ 61’0’’
46’0’’
STUDENT LIFE
5
STUDENT LIFE
4
STUDENT LIFE
15’ (TYPICAL)
3
15.5’
2
15.5’
1 -1 -2 -3
31’0’’
10’
ST. BOTOLPH STREET
VARSITY ACADEMICS (OFFICES)
SEAT SEAT
VARSITY ACADEMICS (OFFICES)
B. POOL SECTION
POOL POOL
STORAGE
•
LONG SPAN (TRUSS) 8 LANE COMPETITION SWIMMING AND DRIVING POOLS (TILE DESK)
•
1000 SEAT METAL BLEACHER WITH CONCOURSE AND TOILETING (RETROPLATE CONCRETE)
•
LOCKER FOR SWIMMING HOME AND VISITORS TEAMS. (TILE AND RUBBER FLOORS)
•
GENERAL LOCKER ROOMS AND TEAM LOCKER ROOMS AS WELL AS FACULTY LOCKER ROOMS. (TILE AND RUBBER FLOORS)
•
STUDENT LIFE AND ACADEMIC SPACES (STUDY ROOMS, CLASSROOMS) AND OFFICE SPACE( CARPETED FLOOR). (STEEL FRAME AND DECK CONSTRUCTION)
•
3 TO 5 LEVELS OF PARKING BELOW GRADE INCLUDING RAMPING ACCESS. (CONCRETE SLURRY WALL CONSTRUCTION)
•
ALL ROOFING TO BE THERMAL PLASTIC MEMBRANE (SARNIFAL)
LOCKERS
TEAM ROOMS PARKING
ACCESS ROAD
PARKING POOL MECH
PARKING
-4 -5
50’0’’
PHASE 1 - POOL SECTION
6
MEZZANENE SEATING
12,000 SF (GROSS)
ROOF
BASKETBALL COURT BELOW
MEZZANENE SEATING
SERVICE ROAD ACCESS ROAD
54,000 SF
38,000 SF
PARKING PARKING
0
10’
30‘
60’
120’
CABOT REPLACEMENT/ATHLETIC PROGRAMMING STUDY
CABOT REPLACEMENT/ATHLETIC PROGRAMMING STUDY
POOL ROOF
GAINSBOROUGH STREET
ST. BOTOLPH STREET FIEL CAG DHOUS E EB ELO / W
1.5.16
LEGEND
01.22.16
FOURTH LEVEL Entry
CABOT REPLACEMENT/ATHLETIC PROGRAMMING STUDY STUDY 01.22.161.4.16 CABOT REPLACEMENT/ATHLETIC PROGRAMMING
Student Life Envelope SF
HUNTINGTON AVE
MASS. AVE
Roof Area
24,000 SF (GROSS)
MEC ROO H F •
LONG SPAN (TRUSS) OVER FIELD HOUSE APPROX. 200M RUBBER TRACK WITH TURF INFIELD
•
LONG SPAN (TRUSS) OVER 3 COURT PRACTICE SPACE. (WOOD ATHLETIC FLOOR)
•
FITNESS AND SPORTS MEDICINE (2 LEVELS) (RUBBER FLOOR)
•
3 TO 5 LEVELS OF PARKING BELOW GRADE INCLUDING RAMPING ACCESS. (CONCRETE SLURRY WALL CONSTRUCTION)
•
ALL ROOFING TO BE THERMAL PLASTIC MEMBRANE (SARNIFAL)
66’-0’’ 10’ 35’-0’’
15’-6”
15’-6” ST. BOTOLPH 10’-0’’ TYP STREET
50’-0’’
PHASE 1 - FIELDHOUSE SECTION
FIELD HOUSE
25’0’’
3
31’-0’’
5’
2 FITNESS/SPORTS MED PRACTICE COURTS
1 FITNESS/SPORTS MED -1 -2 -3
ARENA ROOF
SERVICE ROAD ACCESS ROAD
PARKING 135 CARS PARKING 135 CARS PARKING 135 CARS PARKING 45 CARS
0
10’
30‘
60’
120’
CABOT REPLACEMENT/ATHLETIC PROGRAMMING STUDY
CABOT REPLACEMENT/ATHLETIC PROGRAMMING STUDY
BASKETBALL ROOF
PARKING 120 CARS
-4 -5
C. FIELDHOUSE SECTION
HURTIG HALL 24’0’’
GAINSBOROUGH STREET
ST. BOTOLPH STREET
01.22.16
1.5.16
FIFTH & SIXTH LEVEL
CABOT REPLACEMENT/ATHLETIC PROGRAMMING STUDYSTUDY 01.22.16 CABOT REPLACEMENT/ATHLETIC PROGRAMMING 1.4.16
Tufts University
ATHLETIC AND RECREATION MASTER PLAN 2 November 2015