Jonathan Dress - Selected Works - OOW

Page 1

S E L E C T E D P RO F E S S I O N A L WO R K O F

JONATHAN DRESS AIA, NCARB, LEED AP BD+C


STRYKER Location: 1901 Romence Road Parkway, Portage, MI Size: 125,000 Square Feet Completed: Autumn 2014 Role: Architecture Team Lead at Shive-Hattery

Having renovated one quad of the large Romence Road complex a few years earlier, the owner-client along with Stryker (Fortune 500 Medical Technology Firm) sought to expand their office space into a second quad of the building. Our main architectural challenge was how we could bring as much light as possible into an existing structure that has square footprint of 60,000+ square feet. By opening up the corner with a large curtain wall and placing two 30 foot by 30 foot skylights over two story lobbies, we dramatically changed the feeling of the interior.

2

Jonathan Dress | Selected Professional Work | March 2022


CREDIT: IMAGES AND/OR DESCRIPTION ARE FROM SHIVE-HATTERY

3


4

Jonathan Dress | Selected Professional Work | March 2022


5


6

Jonathan Dress | Selected Professional Work | March 2022


7


WALTON ISAACSON Location: 325 North LaSalle Drive, 5th Floor, Chicago, IL Size: 19,500 Square Feet Completed: Winter 2015 Role: Architecture Team Lead at Shive-Hattery

Walton Isaacson’s previous office was spread out across multiple floors, which made the staff feel disconnected. Therefore, Walton Isaacson sought to create a united workplace that supported internal engagement, collaboration, and encourage creativity for clients and team members. Known as “the planet’s most interesting agency,” it was important to reflect Walter Isaacson’s personality throughout the redesigned workplace. It was critical to learn about their workflow, as well as the experience they wanted to create in their new space. As a result, a single-floor space was designed with flexibility for growth. Diverse community nodes integrated within individual workspaces provide comfortable seating areas, tech community hubs and enclosed concentration zones.These spaces offer team members to choose a workspace that suits their workstyles and the tasks that need to be completed.

8

Jonathan Dress | Selected Professional Work | March 2022


© James Steinkamp Photography 01.08.16

3

CREDIT: IMAGES AND/OR DESCRIPTION ARE FROM SHIVE-HATTERY

1414-6DSC_21517Crop.tif Shive-Hattery Design Organization Walton Isaacson 1st Edit Proofs

9


© James Steinkamp Photography 01.08.16

ames Steinkamp Photography 01.08.16

1

5

1414-6_PanoramaDist.tif Shive-Hattery Design Organization Walton Isaacson 1st Edit Proofs

1414-6DSC_21636.tif Shive-Hattery Design Organization Walton Isaacson 1st Edit Proofs

10

Jonathan Dress | Selected Professional Work | March 2022


© James Steinkamp Photography 01.08.16

6

1414-6DSC_21700Aspect.tif Shive-Hattery Design Organization Walton Isaacson 1st Edit Proofs 11


© James

CROWE HORWATH Location: 225 West Wacker Drive, Suite 2700, Chicago, IL Size: 12,000 Square Feet Completed: Autumn 2015 Role: Architecture Team Lead at Shive-Hattery

Crowe Horwath was looking to consolidate staff from their Madison Street office into 225 West Wacker. To achieve this, we increased density by changing workstations from an orthogonal to 120 degree and offices from 150 sf to 120 sf. At the same time and equally important was increasing the amount of both open and enclosed collaborative spaces. This provided convenient enclosed workspace options when focus work or teaming space is needed. The additional open collaborative areas, critical in a denser workplace, reinforce socialization and knowledge sharing. Another goal was to create a more inviting lobby space which was accomplished with a lighter material finish palette.

12

Jonathan Dress | Selected Professional Work | March 2022


s Steinkamp Photography 07.24.15

CREDIT: IMAGES AND/OR DESCRIPTION ARE FROM SHIVE-HATTERY

1404-5_7337.tif

13


© James Steinkamp Photography 07.24.15

2

1404-5_7251.tif Shive-Hattery Design Organization Crowe Horwath 1st Edit Proofs

14

Jonathan Dress | Selected Professional Work | March 2022 1404-5_7307.tif

Shive-Hattery Design Organization Crowe Horwath 1st Edit Proofs


© James Steinkamp Photography 07

1404-5_7367.tif

15


ABBVIE Location: North Chicago, IL Size: 5,600 Square Feet Completed: Spring 2016 Role: Architecture Team Lead at Shive-Hattery

Having recently broken away from Abbot Pharmaceuticals, Abbvie was looking to refresh major office spaces on their corporate campus. An exciting part of the project was implementing and coordinating with Abbvie’s new branding standards.

16

Jonathan Dress | Selected Professional Work | March 2022


CREDIT: IMAGES AND/OR DESCRIPTION ARE FROM SHIVE-HATTERY

17


18

Jonathan Dress | Selected Professional Work | March 2022


19


VON MAUR Location: Oklahoma City, OK and numerous locations Size: 150,000 Square Feet Completed: Summer 2014 Role: Architectural Team at Shive-Hattery

The massive Von Maur department stores requires the collaboration of nearly 20 design team members. The high-end nature of these environments required clean and careful construction detailing. In order to achieve this high level of design, Jonathan was challenged with modeling and detailing some of the most sophisticated building elements for the Von Maur at the Quail Springs Mall, which included the central escalator lobby and roof cupola.

20

Jonathan Dress | Selected Professional Work | March 2022


CREDIT: IMAGES AND/OR DESCRIPTION ARE FROM SHIVE-HATTERY

21


22

Jonathan Dress | Selected Professional Work | March 2022


23


24

Jonathan Dress | Selected Professional Work | March 2022


25


1

3

2

G

4' - 3"

4' - 2 3/4"

4' - 1 7/8"

4' - 0 1/2"

3' - 10 5/8"

3' - 5"

3' - 8 1/8"

3' - 1 1/4"

2' - 8 7/8"

1' - 3 5/8"

2' - 3 7/8"

8 1/4"

COLUMN

1' - 10 1/8"

8

COLUMN

1' - 0" 1' - 0" 1' - 0" 1' - 0" 1' - 0" 1' - 0" 1' - 0" 1' - 0" 1' - 0" 1' - 0" 1' - 0" 1' - 0" 1' - 0"

8" 5/

2'

3

8" 1/

2'

8

8" 5/

3'

CE

G4 0

1/2

4" 3/

3'

4

4" 1/ 3'

7"

3'

9

4" 1/

3'

11

" 1/8

4'

0

2" 1/

4'

1

8" 5/

4'

F

2

8" 3/

4'

2

26' - 0"

7

4" 3/ 4'

3"

LENGTH - COLUMN WRAP TO COLUMN WRAP

1'

FILL SET

STL STRU

FIRS AND SEE

ES

F4

1

2

3

1" =

FACE ESC SUP

4

ACCESS COV

8.9

E 26' - 0"

G

4' - 3"

4' - 2 3/4"

4' - 1 7/8"

4' - 0 1/2"

3' - 10 5/8"

3' - 5"

3' - 8 1/8"

3' - 1 1/4"

2' - 8 7/8"

2' - 3 7/8"

1' - 3 5/8"

8 1/4"

COLUMN

1' - 10 1/8"

COLUMN

E1

WIDTH - COLUMN WRAP TO COLUMN WRAP

GROIN VAULT DIAGRAM 3/8" = 1'-0"

COLUMN

ANGLE, SHIM TRUSS BY E MANUFACTU

E4

COLUMN

ES

1" =

02 ADD CI3

1' - 0" 1' - 0" 1' - 0" 1' - 0" 1' - 0" 1' - 0" 1' - 0" 1' - 0" 1' - 0" 1' - 0" 1' - 0" 1' - 0" 1' - 0"

8" 5/

2'

3

2' - 3 1/2"

8" 1/

2'

8

8" 5/

3'

D

0

G4

CENTER COURT 1/2" = 1'-0"

4" 3/

3'

4

4" 1/ 3'

7"

3'

9

4" 1/

3'

11

8" 1/ -0 4'

2" 1/

4'

1

8" 5/

4'

F

2

8" 3/

4'

C

2

4" 3/ 4'

3"

D4

LENGTH - COLUMN WRAP TO COLUMN WRAP

7

26' - 0"

1'

ES

1/2

3/8" FLOOR TILE

T/ FLOOR SLAB

FILL WITH GROUT AFTER SETTING ESCALATOR STL PLATE AND ANCHOR SEE STRUCTURAL DWGS FIRST FLOOR SLAB AND ESCALATOR PIT SEE STRUCTURAL DWGS

F4

ESCALATOR CO 1" = 1'-0"

B

B4

ES

1/2

FACE OF ESCALATOR SUPPORT

ACCESS COVER

1' - 6"

E 26' - 0"

1"

ANGLE, SHIMS, AND TRUSS BY ESCALATOR MANUFACTURER

GROIN VAULT DIAGRAM 3/8" = 1'-0"

02 ADD CI3

8"

E4

ESCALATOR CO 1" = 1'-0"

A4 1

2

ES

1/2

3

Jonathan Dress | Selected Professional Work | March 2022

EQ B

QA

26

C:\shive\Revit_Local\3122851-A-2013Central_gdkiese.rvt 11/13/2013 4:01:09 PM

A

E1

1' - 11"

COLUMN

WIDTH - COLUMN WRAP TO COLUMN WRAP

10"

COLUMN


5

6

7

8.9

8

10.1

2' - 4" 10 3/4"

3/4"

3 3/8"

3/4"

3/4"

3/4"

2' - 4"

2' - 4"

11"

6"

2' - 4"

2' - 4"

5' - 2"

6"

11"

2' - 4"

T.O. STEEL 135' - 0"

5' - 2"

3/4" 1701 River Drive, Suite 200 | Moline, Illinois 61265 | 309.764.7650 | fax 309.764.8616 | www.shive-hattery.com

/4"

Iowa | Illinois | Missouri

11

7 1/2"

6"

5' - 2"

3/4"

2' - 4"

11"

2' - 4"

2' - 4"

3 3/8"

6"

5' - 2"

01

6 3/

CONSTRUCTION ISSUE #3

4"

NEW DEPARTMENT STORE

2' - 3 5/8" 3/4"

2' - 4"

2' - 3 1/2"

10 3/4"

G7 A4.23

10 3/4"

1' -

1/ 2"

4

10 3/4"

ENTER COURT CLERESTORY RAIL WALL ELEVATION

VON MAUR 2501 W MEMORIAL RD OKLAHOMA CITY, OK

3/4"

2" = 1'-0"

5/8" GYP BD COVE MOULDING SHIM

G7

CENTER COURT BALUSTER PANEL ELEVATION 1 1/2" = 1'-0"

GRG-B 8" TO FACE OF CONCRETE ACCESS COVER

1 9/16"

3/4"

12" ROJO ALICANTE DIAMONDS

5" 0' -

5"

4 1/2"

2" 1"

16" PORCELAIN TILE

T/ FLOOR SLAB

2' - 8"

1/2"

3/8" FLOOR TILE

5/8" CEMENT BOARD AT TILE

10"

1/16" JOINT TYP

L WITH GROUT AFTER TTING ESCALATOR

GRG-A GRG PROFILE 'A' SEE DETAIL 6B/A4.23

16" PORCELAIN TILE

ANGLE, SHIMS, AND TRUSS BY ESCALATOR MANUFACTURER

ST FLOOR SLAB D ESCALATOR PIT E STRUCTURAL DWGS

1"

GRG-C TO MATCH FORMGLAS 46002 GRG-D TO MATCH FORMGLAS 40712

6"

SEALANT AT JOINT

4"

GRG-B TO MATCH FORMGLAS 46005

ROJO ALICANTE BASE 6"x12"

PLATE AND ANCHOR SEE UCTURAL DWGS

GRG-E TO MATCH FORMGLAS 45603 1"1"1"

SEE SECTION ESCALATOR PIT

5"

GRG-F TO MATCH FORMGLAS 42206

8"

SCALATOR CONNECTION DETAIL - LOWER LEVEL

= 1'-0"

F6

TILE WAINSCOT DETAIL @ ESCALATOR

F7

1" = 1'-0"

GRG-G TO MATCH FORMGLAS 46001

GRG MOULDING 'A'

F8

1 1/2" = 1'-0"

GRG PROFILES 1" = 20'-0"

TEMPERED GLASS BALUSTRADE STAINLESS STEEL SLIDE STOP @ INTERSECTION OF UP/DOWN ESCALATOR STAINLESS STEEL ESCALATOR HANDRAIL DECK

8"

FLOOR SLAB

E7

1'-0" +/8 3/4"

ARRIS DETAIL 3" = 1'-0"

LOW PROFILE LIGHT FIXTURE

1' - 0"

8"

STEEL BEAM SEE STRUCT DWGS

GRG MOULDING

5/8" GYP BD ON 3 5/8" METAL STUD FRAMING

1"

FILL WITH GROUT AFTER SETTING ESCALATOR

2 1/4"

2"

ESCALATOR TRUSS FRAMING

GRG-B

MS, AND ESCALATOR URER

0'

1 9/16"

5 3/4"

OVER

CENTER POINT OF CROSS VAULT CEILING

3/8" FLOOR TILE

SUSPENDED 5/8" GYP BD 3 5/8" MTL STUDS @ 12" O.C.

HALF OF FLANGE WIDTH

SCALATOR CONNECTION DETAIL - UPPER LEVEL

E6

3/4" = 1'-0"

GRG-D

1' - 4"

8"

= 1'-0"

UNDERSIDE OF ESCALATOR

1' - 4"

CE OF CALATOR PPORT

2' - 0"

EQ B

BOTTOM OF SOFFIT 7' 6"

1' - 4"

EQ B

BOTTOM OF SOFFIT

PAINTED GYPSUM BOARD

EQ A

PAINTED GYPSUM BOARD

F6 A4.23

A

GRG-B

TYP

ROJO ALICANTE BASE

SCALATOR BASE WALL ELEVATION - BACK

D6

2" = 1'-0"

8"

FIRST FLOOR 100' - 0"

ESCALATOR BASE WALL ELEVATION - SIDE

TO BE 3/4" MARBLE SLAB. MARBLE SLAB TO MATCH MARBLE ROJO ALICANTE. PROVIDE SAMPLE FOR ARCHITECTS APPROVAL PRIOR TO INSTALLATION. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING DIMENSIONS AND SIZES. MARBLE SHALL BE POLISHED FINISH AND EDGES SHALL BE MITERED (CONTRACTOR PROVIDED AND INSTALLED).

2' - 0"

FIRST FLOOR 100' - 0"

1' - 4"

TY P

1' - 4"

ROJO ALICANTE BASE

NOTE: SEE SHEET 3A4.23 FOR GRG MOULDING INFORMATION. FOR FINISH DESIGNATIONS SEE SHEET F1.11N .

1' - 4"

" -0 1'

1' - 4" 3' - 2"

1' - 4"

VIF

ROJO ALICANTE DIAMONDS

6"

-0 TY P

1'

1' - 4" 3' - 2"

1' - 4"

TYP 6"

1' - 2 3/8"

P TY

1' - 4"

PORCELAIN TILE WITH WITH POLISHED MITERED EDGES OVER 5/8" CEMENT BOARD. OVER 3 5/8" MTL STUDS

PORCELAIN TILE

0"

P TY

0"

ROJO ALICANTE DIAMONDS

1'

PORCELAIN TILE

1'

"

8"

GRG-B

1' - 4"

FLUSH ACCESS PANEL WITH GYPSUM BOARD INLAY

F6 A4.23

1' - 4"

15' - 0"

2' - 0"

8"

EQ A

7' - 6"

1/2" = 1'-0"

GRG-E 3 1/2"

5/8" GYPSUM BOARD, TYP

DETAIL B 2' - 4 1/2"

2X6 WOOD BLOCKING 3' - 6 1/4"

3/4" MARBLE SLAB. SEE ABOVE NOTES.

NOTE: ALL DIMENSIONS SHOWN ARE EQUAL ON ALL 8 SIDES

WOOD FRAMING WRAPPED BY GYPSUM BOARD BEYOND 5 7/8"

2' - 4"

PORCELAIN TILE. SEE ABOVE NOTES.

5 7/8"

3 1/2"

7"

8 3/8" 11 3/4" 8 3/8"

C7

1' - 3 3/4"

6' - 8" +/-

WOOD PANEL

GRG-B

SECOND FLOOR CENTER COURT COLUMNS 1/2" = 1'-0"

BOTTOM OF SOFFIT VARIES

8 3/4"

1' - 0"

GRG-D

6"

GRG-B 6" METAL STUD FRAMING @ 16" OC 3 5/8" METAL STUD FRAMING @ 16" OC

1" 7 7/8"

5' - 5"

1' - 4"

3' - 11 1/2"

1' - 4"

RECESSED LIGHTING. SEE ELECTRICAL.

8 3/4"

METAL DECKING - SEE STRUCTURAL GRG-A

1' - 8 3/8" +/-

3' - 9" +/-

8" 1"

3/4" PLYWOOD

8"

5/8" GYPSUM BOARD

CORNER BEAD, TYP

1' - 4"

CLERESTORY BALUSTER & GRG DETAIL 3/4" = 1'-0"

13' - 6"

B6

GRG-B

SEALANT JOINT AT BOTH SIDE OF BASE

8"

11/15/2013 JED

APPROVED

GDK

ISSUED FOR

CONSTRUCTION (CI#3)

DATE

10-28-2013

FIELD BOOK

PROJECT NO.:

312285-1

2' - 4 1/2"

5 7/8"

3' - 6"

02

DRAWN

PORCELAIN TILE. SEE ABOVE NOTES. 3/4" MARBLE SLAB. SEE ABOVE NOTES.

CENTER COURT DETAILS

GRG-A GRG-B

4 1/4"

NOTE: ALL DIMENSIONS SHOWN ARE EQUAL ON ALL 8 SIDES

6" METAL STUD FRAMING @ 16" OC 3 5/8" METAL STUD FRAMING @ 16" OC

5 7/8"

6' - 1 1/2"

5/8" GYPSUM BOARD CORNER BEAD, TYP

SCALATOR SECTION - HORIZONTAL

A6

2" = 1'-0"

4

ADD CI3

TO BE 3/4" MARBLE SLAB. MARBLE SLAB TO MATCH MARBLE ROJO ALICANTE. PROVIDE SAMPLE FOR ARCHITECTS APPROVAL PRIOR TO INSTALLATION. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING DIMENSIONS AND SIZES. MARBLE SHALL BE POLISHED FINISH AND EDGES SHALL BE MITERED (CONTRACTOR PROVIDED AND INSTALLED).

8 3/8" 11 3/4" 8 3/8"

ANCHORS: 3/8" x 3" T BOLTS 18" O.C.

112' - 0"

1"

5' - 5"

8 3/4"

SEAL

NOTE: SEE SHEET 3A4.23 FOR GRG MOULDING INFORMATION. FOR FINISH DESIGNATIONS SEE SHEET F1.11N .

DETAIL B

ALUMINUM HANDRAIL BASE, W/.05" BRASS CLADDING. CARRY CLADDING DOWN BELOW FINISH FLOORING, NOTE: TOP OF BASE IS 4" ABOVE FINISHED FLOOR.

BOTTOM OF SOFFIT

4 1/4"

8"

PORCELAIN FLOOR TILE - SEE FLOOR FINISH DRAWINGS SECOND FLOOR 117' - 0"

PORCELAIN TILE WITH WITH POLISHED MITERED EDGES OVER 5/8" CEMENT BOARD. OVER 3 5/8" MTL STUDS

2' - 0"

GRG-A

A

1' - 4"

3' - 6 1/2"

1/2" CAP SCREWS 12" O.C. 3/4"x1" WOOD SETTING BLOCKS 3" LONG

RECESSED LIGHTING. SEE ELECTRICAL.

3' - 11 1/2"

1/2" CLEAR TEMPERED GLASS WITH POLISHED EXPOSED EDGES AND 3/8" NOMINAL SPACE @ VERTICAL JOINTS. 1/4" NEOPRENE SPACERS. FILL REMAINING VOID W/GROUT & APPLY BLACK SILICONE CONTINUOUS BOTH SIDES.

SECOND FLOOR 117' - 0"

8 3/4"

1/8" NEOPRENE SPACERS. CLEAR SILICONE (CONTINUOUS) BOTH SIDES.

1' - 4"

SOLID POLISHED BRASS TUBE HANDRAIL (3" ø .09" WALL THICKNESS). 3/4" WIDE x 1 1/4" DEEP GROOVE POLISHED FINISH.

1' - 4"

SCALATOR SECTION - SLOPED

2" = 1'-0"

5

DETAIL A

GLASS GUARDRAIL & GRG DETAIL

A7

3/4" = 1'-0"

6

7

FIRST FLOOR CENTER COURT COLUMNS 1/2" = 1'-0"

A4.23

8

27


PNC BANK Location: Fort Lauderdale, Florida Size: 2,500 Square Feet Completed: 2009 Role: Architecture Team at Gensler

Jonathan was fortunate to work at Gensler on the PNC Bank team, on about a dozen branches, all of which were LEED certified. While many of the branches were based on a prototype, there was one location that required a more intensive design phase. PNC challenged the team to design a net zero branch in Fort Lauderdale, Florida. With solar energy as the center of design, a solar canopy captures solar energy while providing shade inside and below for a more pedestrian friendly streetscape. Planted with all native Florida species, the site is traversed by a ¼ mile path, where the community can actively enjoy and explore the native habitat.

28

Jonathan Dress | Selected Professional Work | March 2022


CREDIT: IMAGES AND/OR DESCRIPTION ARE FROM GENSLER

29


30

Jonathan Dress | Selected Professional Work | March 2022


31


UNITED AIRLINES INFLIGHT DOMICILE Location: O’Hare Airport Size: 14,000 Square Feet Completed: Summer 2016 Role: Architecture Production Lead at Shive-Hattery

Among 100,000 SF of numerous United Airlines projects in Jonathan Dress’ experience, the Inflight domicile presented a unique challenge, to create highly functional and confortable atmosphere for flight attendant in between flights.

32

Jonathan Dress | Selected Professional Work | March 2022


33


THE CHICAGO CENTER HQ Location: 7366 N Lincoln Ave, Lincolnwood, IL Size: 10,000 Square foot Office + 15,000 square foot Warehouse Completed: 2020 Role: Principal Architect

The Jewish not-for-profit hired Life Studio to design their new headquarters, which involved gutting an existing furniture show room, managing a complex program, and bring the design from conceptual ideas through permit drawings and heavily involved construction administration.

7

6

1

LI 1 2 3 4 5 6 7 8 9

34

Jonathan Dress | Selected Professional Work | March 2022

N

C

O

LN

LOBBY ASSEMBLY ROOM CHESED KITCHEN CHESED WAREHOUSE RABBONIM OFFICE WING HEALTH CONSULT WING EXECUTIVE OFFICE WING CONFERENCE ROOM OPEN OFFICE WING

AV

EN

U


U

9

8

4

5

1 3

2

E CREDIT: IMAGES AND/OR DESCRIPTION ARE FROM LIFE STUDIO

35


VILLA HEALTHCARE HQ Location: 3701 N Lunt Lincoln Ave, Lincolnwood, IL Size: 50,000 Square Feet + Site Development Completed: In Construction Role: Architecture Team Lead at ML Group

The large nursing home company hired ML Group to design their new head quarters, which involved gutting an existing furniture show room, managing a complex program, and bring the design from conceptual ideas through permit drawings and heavily involved construction administration.

36

Jonathan Dress | Selected Professional Work | March 2022


EXISTING SITE CREDIT: IMAGES AND/OR DESCRIPTION ARE FROM ML GROUP

37


38

Jonathan Dress | Selected Professional Work | March 2022


39


WEST LUNT AVENUE

NEW GENERATOR LOCATION NEAR EXISTING TRANSFORMER WITH NEW ENCLOSURE TO PROVIDE MINIMUM SETBACK

EXISTING DUMPSTER LOCATION WITH NEW ENCLOSURE TO PROVIDE MINIMUM SETBACK EXISTING GREENSCAPE WITH LANDSCAPING BY PERIMITER

TOILET (8'-6" X 7'-0")

UTILITIES (20'-10" X 7'-0")

EXISTING LOADING (12'-0" WIDE)

18'-0"

FUTURE (12'-0" X 14'-7")

FUTURE (12'-0" X 14'-6")

TOILET (8'-6" X 7'-0")

TODD (21'-6" X 26'-0")

BEN (19'-5" X 26'-0")

MARK (19'-5" X 26'-0") LOUNGE (20'-10" X 26'-11") TOILET (6'-0" X 8'-6")

PARKING (60'-0" X 82'-7") 15 SPACES

FILES (12'-6" X 9'-7")

VESTIBULE (15'-3" X 10'-9")

TOILET (6'-0" X 8'-6")

CORRIDOR (5'-6" WIDE)

COATS / MAIL / STORAGE (23'-10" X 9'-8")

EXEC. ASSIST. (17'-4" X 10'-0")

TOILET (13'-0" X 6'-6")

EXISTING SIDEWALK

9'-0"

24'-0"

TYPICAL WIDTH

18'-0"

ABE (13'-0" X 15'-6")

COATS

FAMILY (7'-6" X 7'-2")

BOARD ROOM (15'-7" X 23'-7")

WOMEN (7'-6" X 7'-2") MEDIUM CONFERENCE (15'-0" X 23'-9")

LARGE CONFERENCE (36'-9" X 24'-3")

MEN (7'-6" X 7'-2")

GLASS FILM

GLASS FILM

CORRIDOR (5'-0" WIDE)

RECEPTION (20'-5" X 39'-3") MAIN VESTIBULE (18'-2" x 19'-2")

GALLERY (71'-3" X 16'-3")

FITNESS (19'-0" X 40'-8")

HOTEL (10'-4" X 9'-0")

MEN'S LOCKER (14'-0" X 22'-1")

HUDDLE (10'-4" X 8'-8")

HUDDLE (10'-4" X 9'-0")

HOTEL (10'-4" X 8'-8")

GLASS FILM

WOMEN'S LOCKER (14'-0" X 22'-1")

HUDDLE (10'-4" X 8'-8")

SERVER (12'-6" X 13'-5") JANITOR (8'-3" X 7'-10")

GLASS GLASS

STORAGE (9'-0" X 15'-1")

CORRIDOR (8'-0" WIDE)

OFFICE #19 OFFICE #18 OFFICE #17 (9'-0" X 12'-0") (9'-0" X 12'-0") (9'-0" X 12'-0")

ENGAGEMENT & HR

KAROLINA

NICOLE

SAM

OFFICE #27 (13'-2" X 13'-9")

APRIL

STRATEGIC PLANNING & MANAGED CARE 5-6 CUBES

BILLING 40-44 CUBES

JULIE

KEITH

OFFICE #28 (13'-2" X 13'-9")

FINANCE 40-54 CUBES

PRINT #2 (26'-0" X 7'-4")

I.T. (24'-10" X 32'-7") 12 WORKSTATIONS RECRUITMENT (18'-10" X 25'-3")

OFFICE #37 (16'-4" X 9'-0")

5 WORKSTATIONS

OFFICE #4 (13'-0' X 13'-7")

PLANTING ISLAND

MICHELLE SCHERWINSKI

TOMOKA

BENEFITS 5-6 CUBES

CLINICAL REIMBURSEMENT 4 CUBES

ED

OFFICE #29 (12'-5" X 9'-0")

OFFICE #3 (13'-0' X 13'-7")

OFFICE #5 (13'-0' X 13'-7")

OFFICE #6 (13'-0' X 13'-7")

OFFICE #7 (13'-0' X 13'-7")

OFFICE #8 (13'-0' X 13'-7")

OFFICE #9 (13'-0' X 11'-0")

KATE

STRATEGIC PLANNING & MANAGED CARE

OFFICE #36 (13'-4" X 9'-0")

ENGAGEMENT 4 CUBES

LISA

CLINICAL REIMBURSEMENT

ELI

CFO SUPPORT 2 CUBES

VRM (27'-0" X 43'-11") 15 WORKSTATIONS

OFFICE #2 (13'-0' X 13'-7")

OPEN OFFICE (115'-4" X 103'-7")

ANNA

FUTURE OFFICES

OFFICE #26 (13'-2" X 9'-0")

MARISSA

FINANCE

JOE

OFFICE #31 (12'-5" X 9'-0")

OFFICE #30 (12'-5" X 9'-0")

OFFICE #35 (13'-4" X 9'-0")

TONI

FUTURE VP

OFFICE #25 (13'-2" X 9'-0")

OFFICE #32 (12'-5" X 9'-0")

SR. VP BUSINESS & BILLING & VRM

FUTURE NURSING DIR.

FUTURE FUTURE FINANCE DIR. FINANCE DIR.

OFFICE #33 (12'-5" X 9'-0")

CMO

JAY

120 WORKSTATIONS

OFFICE #24 (13'-2" X 9'-0")

COO & SUPPORT

FUTURE BILLING DIR.

MARY

TAMMY

OFFICE #20 (14'-0" X 12'-0") FUTURE FUTURE ENGAGEMENT BILLING DIR. / HR DIR. OFFICE #34 (12'-5" X 9'-0")

DEPARTMENT LEGEND

CORRIDOR (8'-0" WIDE)

TRAINING (63'-9" X 26'-7") OFFICE #16 OFFICE #15 OFFICE #12 OFFICE? #14 OFFICE #13 OFFICE #11 (9'-0" X 12'-0") (9'-0" X 12'-0") (9'-0" X(?) 12'-0") (9'-0" X 12'-0") (9'-0" X 12'-0") (9'-0" X 12'-0")

PRINT #1 (7'-0" X 12'-0")

SMALL CONFERENCE (16'-4" X 13'-7")

11,832 SF

OFFICE #1 (13'-0' X 15'-6")

AVI

? (?)

CALANDRA

OFFICE #23 (8'-0" X 14'-7")

SMALL CONFERENCE (13'-3' X 12'-5")

STORAGE (9'-0" X 15'-1")

OFFICE #22 OFFICE #21 (9'-0" X 12'-0") (9'-0" X 12'-0")

CFO & SUPPORT

STEVE

BREAKROOM (41'-11" X 26'-7") MOTHER (8'-0" X 7'-6")

WELLNESS (8'-0" X 7'-6")

CNO & SUPPORT

STORAGE (15'-2" X 3'-6")

STORAGE (9'-0" X 3'-5")

STORAGE (8'-0" X 7'-6") WOMEN (19'-1" X 45'-0")

PRE-FUNCTION (64'-7" X 14'-8")

STORAGE (15'-2" X 3'-6")

STORAGE (9'-0" X 3'-3")

STORAGE (9'-0" X 3'-3")

MICHELLE SELF

MEN (19'-1" X 38'-5")

SMALL CONFERENCE (13'-3' X 10'-8")

18'-0"

RISK MANAGEMENT

DAVE

EMPLOYEE VESTIBULE (12'-0" X 7'-7")

FOUNDATION PLANTINGS

FOUNDATION PLANTINGS

18'-0"

TYPICAL

6'-5" 18'-0"

20'-0"

PLANTING ISLAND

9'-0"

9'-0"

TYPICAL

TYPICAL

EXTERIOR PARKING 145 SPACES

18'-0"

TYPICAL

18'-0"

OFFICE #10 (13'-0' X 16'-8")

PLANTING ISLAND

20'-0" 11'-4"

24'-0"

COATS (12'-0" X 8'-5")

I.T.

PLANTING ISLAND

EXISTING SIDEWALK

PARKING 21 SPACES

GLASS FILM

CORRIDOR (5'-9" WIDE)

FILE / STORAGE (16'-5" X 34'-10")

HUDDLE (10'-4" X 9'-0")

PLANTING ISLAND

PLANTING ISLAND

9'-0"

20'-0"

18'-0"

PLANTING ISLAND

10'-0"

PLANTING ISLAND

EXISTING DENSE TREES

PROPERTY LINE

SCHEMATIC DESIGN (REVISION #7) DATE: 07/04/2019

40

Jonathan Dress | Selected Professional Work | March 2022

PLANTING ISLAND


41


UIC ED & OR Location: 1740 West Taylor Street, Chicago, IL Size: 25,000 Square Feet Completed: 2018 Role: Architecture Production Lead at Shive-Hattery

The University of Illinois at Chicago’s (UIC) Hospital is located in the heart of the Illinois Medical District. We were tasked with fully renovating the Emergency Department (ED) and one of the Operating Rooms (OR).

42

Jonathan Dress | Selected Professional Work | March 2022


CREDIT: IMAGES AND/OR DESCRIPTION ARE FROM SHIVE-HATTERY

43


ADVOCATE LABORATORY Location: Bloomington, IL Size: 18,000 Square Feet Completed: 2015 Role: Architecture Team at Shive-Hattery

When the Advocate BroMenn Medical Center Laboratory built their new facility, they had in mind that they would transfer their existing laboratory to the new building.This move required to rethink their processes and envision how to make them as lean as possible. Jonathan’s role included developing the system for of organizing and scheduling 1000+ units of lab equipment.

44

Jonathan Dress | Selected Professional Work | March 2022


CREDIT: IMAGES AND/OR DESCRIPTION ARE FROM SHIVE-HATTERY

45


46

Jonathan Dress | Selected Professional Work | March 2022


47


SOUTH LOOP TOWERS Location: Chicago, IL Size: 1,000,000 Square Feet Completed: Conceptual Phase Only Role: Architecture Team Lead at Shive-Hattery

A broker from Vandon Forbes approached Jonathan with an exciting project. An investor from outside of Chicago was looking to develop a virtually vacant site with a new one millions square foot mixeduse project, that would include retail, a hotel, and condominiums. The following spreads are a collection from the presentation we prepared for the client. Unfortunately, the Alderman did not give our client a green light, tabling the project indefinitely.

48

Jonathan Dress | Selected Professional Work | March 2022


CONCEPTUAL DESIGN JUNE 2016

SOUTH LOOP

TOWERS

CREDIT: IMAGES AND/OR DESCRIPTION ARE FROM SHIVE-HATTERY

49


SOUTH LOOP

TOWERS For decades, the South Loop, Bronzeville, and surrounding neighborhoods have been supporting the Chicagoland community with manufacturing plants and warehouses. As the city continues to transform, it is clear that the South Loop is on the verge of dramatic urban development, integrating layers of housing and retail vibrancy. The South Loop Towers' concept is a vision in response to this trend. Understanding the deep cultural and aesthetic nature of the neighborhood, the building design relates to the surroundings with its strong contextual retail base. Rising from the lower levels streetscape, the setback hotel and condominium towers add a tasteful modern flavor to the community skyline with their beautiful curves sprouting from a lush roof park. By respecting the past and embracing the present, the South Loop Towers are designed to plant a seed in the community for powerful social, economic, and environmental growth in the future.

1 50

SOUTH LOOP TOWERS | CONCEPTUAL DESIGN: JUNE 2016 Jonathan Dress | Selected Professional Work | March 2022


E 26TH ST

STEVENSON EXPY

0 FT

650

E 29TH ST

1,300

NORTH

2,600

E 29 TH

E 2 6T H

I S M

CH

IG

AN

AV

0 FT

180

0 FT

150

300

600

ST

ST

E

S W NORTH

S MICHIGAN AVE

S WABASH AVE

S WABASH AVE

I-94 EXPRESS NORTH

S MICHIGAN AVE

E 26TH ST

AB

A

360

SH

AV

E

720

VANDON FORBES | SHIVE-HATTERY

2 51


BASIC MASSING The massing of the building is divided into three main forms. On the ground level, the retail-parking mass engages with the scale of the pedestrian traffic. The two towers separate the hotel and condominium / apartments occupancies.

MIXED-USE HOTEL CONDOMINIUMS / APARTMENTS RETAIL PARKING (EAST SIDE BASE)

FORM & ENTRY APPROACH The tower form is driven by functional sizes of living spaces scaling from a depth of 25 to 35 feet as the curve widens. The verticallity of the structure is emphasized by the illuminated / glass stair running up the towers. The towers spacing allows for two separate entries, one grand for the hotel and one modest, more private for the condos / apartments.

GREEN & PUBLIC SPACES While the building sits on a large lot, it is designed in a way that provides an immense amount of green and public space. This includes an urban plaza supporting the retail / restaurant spaces, a huge green roof park on top of the base building, green roofs on top of the towers, and a lookout restaurant and convention space about 30 stories high in the hotel.

3 52

SOUTH LOOP TOWERS | CONCEPTUAL DESIGN: JUNE 2016 Jonathan Dress | Selected Professional Work | March 2022


53


E

26

TH

ST

1 2

S

W

AB

1

AS

H

AV

E

HOTEL 750-900 KEYS MEETING HALLS SPA & GYM LOOKOUT BAR OFFICES

3

4

2

5

CONDOS / APARTMENTS 200–300 UNITS MEETING HALLS SPA / GYM OFFICES

LOOKING NORTHWEST 3

GREEN ROOF PARK POOL FOR EACH TOWER WALKING / JOGGING PATHS SEATING AREAS

1

2 4

RETAIL LOWER LEVELS OUTDOOR SEATING FOR RESTAURANTS ENTRY FROM STREET AND HOTEL LOBBY

5

PARKING FOUR LEVELS ON EAST SIDE BASE SEPARATE HOTEL & CONDO DROP-OFFS

3 5

E

26

TH

4

S

W

AB

AS

H

AV

ST

LOOKING SOUTHEAST

54

5

SOUTH LOOP TOWERS | CONCEPTUAL DESIGN: JUNE 2016 Jonathan Dress | Selected Professional Work | March 2022

E


E 26TH ST

CONDOS / APTS DROP-OFF & PARKING

2

BACK ALLEY

S WABASH AVE

4

1

3

HOTEL DROP-OFF NORTH

0 FT

30

60

120

5

VANDON FORBES | SHIVE-HATTERY

55

6


SURFSIDE Location: 5815 N Sheridan Ave, Chicago, IL Size: 13 Stories | 188 Units Completed: 2021 Role: Architecture Team Lead

Prior to the transformation of Surfside, the building was a run down condominium building. At best, it was a “Type C” level building. We were tasked to reposition the building as an apartment building, elevating the property to “Type B+”. Ultimately, the team was proud to transform the building aesthetically to an A level building, energizing the lobby, units, fitness center, and beach-side deck.

56

Jonathan Dress | Selected Professional Work | March 2022


CREDIT: IMAGES AND/OR DESCRIPTION ARE FROM ML GROUP

57


58

Jonathan Dress | Selected Professional Work | March 2022


59


CHICAGO MESIVTA Location: 6801 N Californica, Chicago, IL Size: 30,000 SF Completed: In Design Role: Principal Architect and Interior Designer

The Lubavitch Mesivta of Chicago is one of the top Chabad boys high schools in the world. Life Studio was hired to design the principal building and visioning for new campus.

60

Jonathan Dress | Selected Professional Work | March 2022


61


62

Jonathan Dress | Selected Professional Work | March 2022


63