Value stream mapping a

Page 1

Value Stream Mapping Management is Essential


The lean transformation should provide:   

Growth with improved margins Growth with minimal capital Growth without more employees


What are our main stumbling blocks?  

   

Years of bad habits Financial focus with limited cost understanding A lack of system thinking and incentives Metrics supporting a legacy model Limited customer focus Absence of effective operating strategies


How have these stumbling blocks been addressed? ď Ż ď Ż

Programs of the month (band aids) Meetings, meetings, meetings, meetings


If we could just start over…..with  

 

Activities aligned with our business strategy Efforts focused on NET improvements for the company Metrics supportive of fundamental change Simple, constant communication of our plans and achievements as an enterprise


Why not take the value stream perspective? •

“Whenever there is a product (or service) for a customer, there is a value stream. The challenge lies in seeing it.”

3 enterprise value streams:

Raw Materials to Customer – Manufacturing Concept to Launch – Engineerin Order to Cash - Administrative Functions

 


ď Ż

A Value Stream is the set of all actions (both value added and non value added) required to bring a specific product or service from raw material through to the customer.


Value Stream Improvement vs. Process Improvement Value Stream Process

Process

Process Customer

Stamping

Raw Material

Welding

Assembly Cell

Finished Product


Value Stream Mapping 

Follow a “product” or “service” from beginning to end, and draw a visual representation of every process in the material & information flow

Then, draw (using icons) a “future state” map of how value should flow



Levels of a Value Stream process level Start Here

single plant (door to door)

multiple plants across companies


Value Stream Managers Process 1

Process 2

Process 3 “Customer�

Kaizen

The Value Stream Manager


Using the Value Stream Mapping Tool Product/Service “Family�

current state drawing

future state drawing

plan and implementation

Understanding how things currently operate. Our Baseline!

Designing a lean flow. Our vision!

The Goal of Mapping


Current State Mapping  

Completed in a day Performed by a cross functional team of middle managers responsible for implementing new ideas Resulting in a picture (and team observations) of what we “see” when following the product


Future State Mapping  

Completed in a day with the same team Focused on:  Creating a flexible, reactive system that quickly adapts to changing customer needs  Eliminating waste  Creating flow  Producing on demand


Current State Value Stream Map


Future State Value Stream Map


Planning and Implementing  

Don’t Wait! You need a plan!    

Tie it to your business objectives Make a VS Plan: What to do by when Establish an appropriate review frequency Conduct VS Reviews walking the flow


Remember the other two value streams? 

Administrative activities are often a major percentage of the total throughput time Goal: 400% improvement in productivity over 10 years Modest opportunities on the plant floor; Untapped opportunities off the plant floor


Enterprise Perspective     

Engineer to Order Configure to Order Capital equipment manufacturers Small companies (<500 employees) Service Firms


We might begin in… 

Processes directly impacting the part production  

Engineering Quoting

Or, in value streams with direct customer contact  

Order entry Invoicing


Value Stream Mapping 

    

Helps you visualize more than the single process level Links the material and information flows Provides a common language Provides a blueprint for implementation More useful than quantitative tools Ties together lean concepts and techniques


Value Stream Management ď Ż ď Ż

The map is just a picture of ideas! The fundamental change is in how we choose to manage the value stream as an integrated system of decisions and tasks


Value Stream Management    

  

Use your strategic plan as a guide Find the gaps in necessary performance Improve value streams to meet the performance Create new metrics to support new ways of thinking and acting Understand true product family costs Manage operations by the value stream data Always have a future state


Critical Success Factors 

Management must understand, embrace, and lead the organization into lean thinking Value stream managers must be empowered and enabled to manage implementations Improvements must be planned in detail with the cross functional Kaizen teams Successes must be translated to the bottom line and/or market share


Putting it to Work! ď Ż

ď Ż

ď Ż

Continuously improving fundamentally flawed processes will yield limited results. Simply automating existing manual processes can also yield limited results. Seriously challenging old practices will provide the dramatic results desired.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.