Portfolio _ 2018 _ Jeanie Tang

Page 1

POR T FO L I O JEANIE TSZ LAM TANG MArch / BEnvs (Arch.)

1


1 2 3 4 5 6 7 8 Work The Living & Shaping Reference Waste Working in Urban Cathedral Tokyo Living

Other Projects

Turkish Commerical Other Projects Bathhouse High-Rise


01

PLOT TIMESTAMP: 08/11/2017 10:59:28 AM

Work Reference- D-Arc Architects 780

2290

TOWEL RACK & BIN

2980

HAIR/RUBBISH BIN 520

780

500

250

500

VANITY 500

520

245

500

495

SEATING

500

495

500

1510

245

SCL

SCL

AFFL3700

AFFL3700 PF3

PF3. EXPOSED CEILING TO BE PAINTED

PF3

PF3

WOODFORM 'CLICK ON' CEILING BATTEN SYSTEM TO MATCH LOCKER LAMINATE FINISH.

TOP OF TILE

TOP OF TILE

AFFL 2700

AFFL 2700

EQ CEILING

CL

CEILING

AFFL 2400

AFFL 2400

PF1

WT1 WT1

CUPBOARD/MIRROR

WT1

WT1

EQ

AFFL 2100

LF4

LF4

LF4

MR01

MR01

TV1

MIRROR ON BLACK POWDERCOATED FRAME

MR01

MR01

25

MR01

1200

EQ

950

25

LF4

675

CR1 HANGING RAILS

3 BM1

25

WT1

BANQUETTE SEATING REFER TO A83-002 FOR SIMILAR DETAIL TOUCH TO OPEN FIXINGS TO CUPBOARD DOORS

LM1

DIRECTION OF LAMINATE GRAIN

FLOOR LEVEL

AFFL

EQ

GRILLE FOR VENTILATION

Project 1 - EOTF Facility

5 Rider Bouvelard Rhodes, NSW 2138

D-ARC MELBOURNE SYDNEY

AFFL

EQ

SINGLE GPO AND USB CHARGER TO BE INSTALLED IN COMPLIANCE WITH AUSTRALIAN STANDARDSSERVICES TO ADVISE.

TYPICAL CHANGE ROOM FEMALE - ELEVATION A

2 A83-001

1 : 20

2100

780

2290

2980

AIRING CUPBOARDS

TOWEL

IRON/ HAIR

VANITY

HDr

HSt

HDr

HSt

HDr

HSt

TYPICAL CHANGE ROOM FEMALE 1 : 20

SD1 435

REVIT documentation of the End of Trip facility in a commercial building in Sydney. Refurbishment of both female and male change room and bike parking areas in A-grade quality. Assist in providing tender drawing package and marketing materials.

LM1

LM1

FLOOR LEVEL

OPENING FOR RUBBISH BIN BELOW

2

A83-001

BU1

RUBBISH BIN INSIDE CUPBOARD

A83-003

5

EQ

500

ALL HYDRAULICS TO BE CONCEALED WITHIN JOINERY

LM1

LM1

WT1

LM1

1430

LM1

100

LM1

LM1

850

JG-01

OPEN

450

LM1

BM1 SD1

ST1

50

200 AFFL 0100

SD1

ST1 OPEN

755 LM1

KICKER

BM1

SD1

DH1

2100

A83-003

300

EQ

LM1

TOWEL

BM1

BM1

BM1

AIRING

3

3 A83-001

HOLES CUT INTO STONE TO SUIT CABLES OF HAIRDRYER AND STRAIGHTENER. REFER SCHEDULE FOR SPECIFICATION

A83-003

CR1 HANGING RAIL

1

TV1

A83-003

CHANGE ROOM FEMALE_VANITY/HAIR STATION/AIRING CUPBOARD 1 : 20

LEVEL 11 63 EXHIBITION STREET MELBOURNE VIC 3000 PH +61 3 9663 7656 LEVEL 2 50 YORK STREET SYDNEY NSW 2000 PH +61 2 8235 4100 © COPYRIGHT 2017 D-ARC ARCHITECTS D-ARC.COM.AU

REV

A B C

DESCRIPTION

TENDER ISSUE FINAL TENDER DOCUMENTATION TENDER RFI

DATE

11.08.2017 29.09.2017 02.11.2017

BY

KEY PLAN

ADDRESS

DRAWN

JT THE CONTRACTOR MUST VERIFY ALL DIMENSIONS ON SITE PRIOR TO COMMENCING ANY WORK OR MAKING OF ANY SHOP DRAWINGS. FIGURED DIMENSIONS MUST BE USED IN PREFERENCE TO SCALING. SCALED DIMENSIONS MUST BE VERIFIED ON SITE. THIS DRAWING IS COPYRIGHT AND REMAINS THE PROPERTY OF THE ARCHITECT.

CLIENT

ALTIS PROPERTY PARTNERS

207 PACIFIC HIGHWAY ST LEONARDS

KH KH KH

STATUS

CHECKED

DR

FILE REF

DEVELOPMENT APPLICATION

P:\1610107 - ALTIS - SPACE 207\B -Drgs\B.1 Live Files\B1002 - ALTIS - SPACE 207 - EOTF.rvt

3

NORTH

PROJECT

SPACE 207


PLOT TIMESTAMP: 01/11/2017 12:24:41 PM

3 A83-001

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

SCL

SCL

AFFL2670

AFFL2670

PF1

PF1

OPEN

PF1

3 LM1

LM1

LM1

LM1

LM1

LM1

LM1

A83-001

LM1

LM1

LM1

LM1

LM1

LM1

LM1

LM1

LM1

LM1

LM1

LM1

LM1

LM1

LM1

LM1

LM1

LM1

LM1

FHR EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EXISTING FHR SCL

1450

AFFL2670

1 INTERLOC. WAVE LOCKER DOORS LOCKERS WITH SEATING. IL HIGH PLINTH CODE G. WITH LOCK INSTALLED AS PER SPECIFICATION

1 A42-002

1450

EQ SCL

500

AFFL2670

C1

PF1

300

LM1

LM1

LM1

LM1

LM1

LM1

LM1

LM1

LM1

LM1LM1

LM1

LM1

LM1

LM1

LM1

LM1LM1

LM1

LM1

LM1

LM1

LM1LM1

LM1

LM1

LM1

LM1

LM1

LM1

AFFL

FHR

1450

1450

EXISTING FHR

60

LM1

5 390

LM1

LM1

LM1

2800

A83-001

LM1 KICKER

AIRING CUPBOARD

TOWEL AIRING

CL

700

700

CL

700

700

65

CL

700

700

DEMOLISH EXISTING TENANCY WALL TO MATCH/ ALIGN TO OPENING OF THE TENANCY OPPOSITE. NEW LINTEL SUPPORT TO TOP OF OPENING. REFER TO STRUCTURAL ENGINEER'S DRAWINGS. SCOPE OF WORK TO BE PRICED SEPARATELY

A10-001 4

50 20

CL

700

50

620

AFFL2670

3

OPEN

PF1

EXTENT OF EXISTING TILE TO BE MAINTAINED. ALIGNED TO RECEPTION DESK KICKER. NOTE RADIUS AT RECEPTION COUNTER CNR.

10MM SHADOWLINE

SCL

IN-FILL PANELS

UNDER BENCH BAR FRIDGE, REFER FF&E SCHEDULE

M1

LM1

AFFL2670

1 : 20

BF1

1090

1 : 20

LM1

FLOOR LEVEL

AFFL

700

2

LOCKER DETAIL_SECTION

SCL

3 RIDER_LOCKER_ELEVATION A

1

LM1

AFFL 0100

50

A83-001

LM1

2800

C1 C5

A83-001

IN-FILL PANELS

LOCKER DETAIL_SECTION

NEW WALL TO MATCH / ALIGN OPENING OF THE TENACY OPPOSITE

PF1

1 : 20

BULKHEAD

BULKHEAD

AFFL2100

AFFL 2100

25

NOM. 2100. CHECK ON SITE.

5 5050

50

AIRING CUPBOARD

CL

700

700

CL

700

700

65

AP1

700

AP1

50

700

5050

5050

5050

DH1

AP1

AP1

AP1. FROST ACRYLIC PANEL WITH PRINTED GRAPHIC INSTALLED BEHIND THE MT1 PERFORATED METAL FINISH.

AP1

DH1

CLCL

5050

5050

KICKER

50

50

5050

AFFL 0100

CL

AP1. FROST ACRYLIC PANEL WITH PRINTED GRAPHIC INSTALLED BEHIND THE MT1 PERFORATED METAL FINISH.

5050

CLFLOOR LEVEL

5050

5050

TIMBER SLAT JOINERY TO PROVIDE SHOES RACK. SE EQUIPMENT SCHEDULE FOR SPECIFICATION.

CL

AFFL

50

CL

AP1

DH1

AP1

AP1

DH1

2 20 A83-001 1200

20

CLCL

AP1

AP1

DH1

3 RIDER_AIRING ELEVATION B

AP1

AP1

DH1

1 : 20

TIMBER SLATE JOINERY TO PROVIDE SHOES RACK. SEE EQUIPMENT SCHEDULE FOR SPECIFICATION. FLOOR LEVEL

AFFL

70

4

NOM. 4mm ACYLIC BACKING SHEET IN FROST FINISH

A83-001

DUCT. REFER MECHANICAL ENGINEER'S DRAWING. ENSURE BASE OF DOOR IS 100mm CLEAR OF FLOOR

FCL

DH1

NO VISIBLE FIXINGS TO FACE OF DOOR

A42-002

LM1

AFFL 0100

CR1

TYPICAL AIRING CUPBOARD DOOR DETAIL 1:5

ALL JOINERY INTERIORS TO BE WHITE

AP1

5 A83-001

PF2 TOWEL AIRING CUPBOARD_SECTION

1 : 20

Project 2 - Bike Parking Area & Office Lobby Refurbishment TIMBER SLAT JOINERY TO PROVIDE SHOES RACK. SE EQUIPMENT SCHEDULE FOR SPECIFICATION.

LM1

TIMBER SLATE JOINERY TO PROVIDE SHOES RACK. SEE EQUIPMENT SCHEDULE FOR SPECIFICATION.

AFFL 0100

3300

KICKER

ENSURE BASE OF DOOR IS 100mm CLEAR OF FLOOR

FLOOR LEVEL

DUCT. REFER MECHANICAL ENGINEER'S DRAWING.

AFFL

70

5 Rider Bouvelard Rhodes, NSW 2138 2

3

1 : 50

KICKER

ENSURE BASE OF DOOR IS 100mm CLEAR OF FLOOR

LEVEL 11 63 EXHIBITION STREET MELBOURNE VIC 3000 D-ARC PH +61 3 9663 7656 LEVEL 2 50 YORK STREET SYDNEY NSW 2000 3 RIDER_AIRING ELEVATION B MELBOURNE PH +61 2 8235 4100 © COPYRIGHT 2017 D-ARC ARCHITECTS SYDNEY D-ARC.COM.AU 1 : 20

REV

A B C

DESCRIPTION

TENDER ISSUE FINAL TENDER DOCUMENTATION TENDER RFI

DATE

11/08/2017 29/09/2017 01/11/2017

BY

KH KH KH

6500

INFILL PANELS WITH SAME HEIGHT AND FINISHES

A83-001

ALL JOINERY INTERIORS TO BE WHITE

GROUND FLOOR PLAN

CR1

3mm PERFORATED METAL IN SELECTED FINISH. REFER TO FF&E SCHEDULE

FLOOR LEVEL

AFFL

1

KEY PLAN

4 A83-001

TYPICAL AIRING CUPBOARD DOOR DETAIL GREAT NORTHERN RAILWAY

1:5

BUILDING 5

BUILDING 3

ADDRESS

CLIENT

ALTIS PROPERTY PARTNERS BOULEVARDAIRING CUPBOARD_SECTION 53 RIDER TOWEL

RHODES NSW A83-001 1 : 202138 DRAWN

CHECKED

DRAWING TITLE

JOINERY DETAILS - 3 RIDER CORRIDOR

EXISTING STONE WALL

EXISTING TILED WALL TO REMAIN NORTH

PROJECT

0

AFFL 0100

3mm PERFORATED METAL IN SELECTED FINISH. REFER TO FF&E SCHEDULE

AP1. FROST ACRYLIC PANEL WITH PRINTED GRAPHIC INSTALLED BEHIND THE MT1 PERFORATED METAL FINISH.

NOM. 25x25mm SHS TO JOINERS SPECIFICATION

CL 30

KICKER

NEW GRAPHIC FILM TO FACADE GLAZING OF MINIMUM 30% LUMNINANCE CONTRACT IN ACCORDANCE WITH AS1428.1 REQUIREMENTS. REFER TO WAYFINDING/ SIGNAGE PACKAGE FOR FILM GRAPHICS.

AP1

NOM. 25x25mm SHS TO JOINERS SPECIFICATION

AP1. FROST ACRYLIC PANEL WITH PRINTED GRAPHIC INSTALLED BEHIND THE MT1 PERFORATED METAL FINISH. JOINERY TO PROVIDE CLOTHES RAIL AND SECURITY HANGERS. SEE EQUIPMENT SCHEDULE FOR SPECIFICATION

30

AP1

NOM. 4mm ACYLIC BACKING SHEET IN FROST FINISH

A42-002

ENSURE BASE OF DOOR IS 100mm CLEAR OF FLOOR

INFILL PANELS WITH SAME HEIGHT AND FINISHES

MODIFY EXISTING DH1 DOOR WAY CLEARANCE ON LATCH SIDE TO MINIMUM 530mmCR1 TO MEET AS1428.1 REQUIREMENTS

NO VISIBLEPF1 FIXINGS TO FACE OF DOOR

25

BULKHEAD

CL

30 50

NOM. 25x25mm SHS TO JOINERS SPECIFICATION

AFFL 2100

30

NOM. 2100. CHECK ON SITE.

NOM. 25x25mm SHS TO JOINERS SPECIFICATION

SCL

AFFL2670

JOINERY TO PROVIDE CLOTHES RAIL AND SECURITY HANGERS. SEE EQUIPMENT SCHEDULE FOR SPECIFICATION

IN-FILL PANELS

20 1200

20

INDICATOR SIGNAGE ON WALL IN AP1. FROST ACRYLIC PANEL ACCORDANCE WITH CLAUSE D3.6. REFER WITH PRINTED GRAPHIC TO WAYFINDING INSTALLED BEHIND THE MT1PACKAGE FOR DETAILS. PERFORATED METAL FINISH.

620

AP1

OPEN

PF1

BULKHEAD

AFFL2100

BRAILLLE AND TACTILE EXIT AND LEVEL

50

CL

50

AP1

DH1

CR1

30

CL

700

AP1

DH1

50

CL

TOWEL AIRING

CL

A83-001

CL

30

IN-FILL PANELS

5050 2800

700

AP1. FROST ACRYLIC PANEL WITH PRINTED GRAPHIC INSTALLED BEHIND THE MT1 PERFORATED METAL FINISH.

SCL

AFFL2670

5050

CL

500

50 2800

FOXTEL, DATA & PHONE FOR SECURITY, REFER TO ELECTRICAL ENGINEER'S DRAWINGS

1 A42-003

A10-001

A83-001

FLOOR LEVEL

FC

LM1

50 20

1 : 20

INTERLOC. WAVE LOCKER DOORS LOCKERS WITH SEATING. IL HIGH PLINTH CODE G.

C4

LM1

AFFL

3

AFFL

1000

FLOOR LEVEL

C5

CT1

LM1

60

A83-001

AFFL 0100

3 RIDER_LOCKER_ELEVATION A

450

1

C3

10MM SHADOWLINE

C1 KICKER

INTERLOC. WAVE LOCKER DOORS LOCKERS WITH SEATING. IL HIGH PLINTH CODE G. WITH LOCK INSTALLED AS PER SPECIFICATION

FLOOR LEVEL

C5

60

60 LM1

390

LM1

C5

EXISTING MARBLE WALL TO BE RETAINED. CONTRACTOR TO ENSURE ADEQUATE PROTECTION DURING REFURBISHMENT

C1

LM1

INTERLOC. WAVE LOCKER DOORS LOCKERS WITH SEATING. IL HIGH PLINTH CODE G.

500 LM1

2X PC TOWERS BELOW BENCH

C1

CT1

PF1

450

PF1

PF2 GREY POWDERCOATED STRUCTURAL STEEL TO ENGINEER'S SPECIFICATION

C5

LM1

C5

PF1 OPEN

ACOUSTIC BLADES WITH CUSTOM THREEDIMENSIONAL PROFILES. FIXINGS TO MANUFACTURER'S SPECIFICATION

A42-001

FHR

LM1

PLOT TIMESTAMP: 01/11/2017 11:53:36 AM

PF1

GROUND FLOO 1 : 50


A

B

C

D

E

J-01

ARTWORK

J-01

TV2

UTILITY ROOM

C2

J-07

VOID TEA ROOM VOID BAR

C6

C6

C6

2

C5

C5

J-02

TV1

C4

TB3 C4

J-03 STORAGE

C4

MEETING ROOM 2 C4

C4 TV2

C4

WB

C4

C4

C4

C4

MEETING ROOM 3 TB3

C4

C4

C4

TV2

C4

WB

C4

C4

TB3

3

TV2

C3

C3

5

7

C3

C3

9

11

C3

C3

113

15

C3

17

C3

19

C3

2

4

C3

C3

WKS

6

8

C3

C3

WKS

10

12

C3

C3

WKS

14

16

C3

C3

TB4

C3

20

C3

23

ADJ.

ADJ.

CU

C3

C3

INTEGRATED FRIDGE 2 FD1B

INTEGRATED FRIDGE 1 FD1A

ADJ.

ADJ.

ADJ.

ADJ.

CU

24

C3

25

C3

ADJ.

ADJ.

ADJ.

ADJ.

ADJ.

ADJ.

ADJ.

PLANTING

L7

L7

L7

L7

SELECTED PENDANT. REFER TO LIGHTINGS SCHEDULE.

PF3 LM1

LM1

LM1

LM1

27

C3

C3

29

C3

31

LM1

DH2

LM1

6 A005 BUILT IN MICROWAVE MW

DH2

28

C3

C3

30

C3

32

4

PLANTING

WT1

BM1 CHILLED/ BOILING WATER & SINK MIXER

L6 LED STRIP LIGHTING

7 A005

LM1

BM2 KITCHEN SINK

BT1

BT1

DH2 LM1

D

WKS

26

LM1

DH2

DH2

D

LM1

D

DH2

LM1

20

D LM1

LM1

LM1

D

20

PF5

ADJ. FOOT PAD REQUIRED WITHIN EACH LEG (IN BLACK).

40

OPEN

40

BINS X 2 1 RECYCLE 1 WASTE

DS DISHWASHER

J-08 PLANTING

ISLAND BENCH

ADJ.

100

4

ADJ.

ADJ.

D

32 WORKSTATIONS

BINS

PF3

CU

LM1

MOBILE PEDESTAL FOR EACH WORK STATION

4100

10mm SHADOW LINE

3

WKS

22

EQ 500

C5

A007

WKS

18

EQ 600

RD BULKHEAD PLASTERBOA

GLASS TREATMENT

COPIER

21

EQ

A009

900

C3

WKS

EQ EQ

LINE OF CONCRETE SLAB

LM1 WKS

EQ

CU

J-04 BIN

C3

C5

2

MP2

STORAGE

COATS

J-04

EQ

DISHWASHER

2400

STORAGE

TB4

EXISTING TABLE TENNIS

C4

MP2

GLAZING FROM 2100mm TO 2600mm

1

C4

2950 EQ

C5 TV2

C4

COPIER COATS

C5

C4

MEETING ROOM 4

C4

MP2

C4

C5

80

3000

C4 C4

C5

600 MICROWAVE

AD LKHE D BU OAR TERB PF3 PLAS EX.

2

CU

80

C5 C5

WB

BIN

TB4

TB4

C5

C3

3

C5

760 FRIDGE 2

EQ

CU

C5

C5

TB4

MP1

C3

J-05

760 FRIDGE 1

50

MP1

4

C6

C6

STAFF LOUNGE

C1

RECEPTION DESK

A004

C6

PLANTING

TB2

COAT HOOKS WALL

CH

LOBBY

WINDOW SEAT

WAITING AREA

C1

C3

A005

J-06

CP2

C1

E 80

100

FHR

BH1A & BH1B. BROCHURE HOLDER

2

3

KITCHEN

PF5

LM1

40 LM2

PF5

GRAIN DIRECTION

PF5

590

LIFT

FRAMING 40X40 SQUARE STEEL SECTION. PF5 FINISHES.

PF5

OPEN

OPEN

PF5

PF5

180 40

LIFT

870

LIFT

600

5 A008

2400

C2

60

C2

PLOT TIMESTAMP: 02/03/2018 1:36:00 PM

C2

STAIR 2

26

C2

TB1 C2

FEMALE BATHROOM

740

MEETING ROOM 1

C2

EMERGENCY CORRIDOR

VOID

C2

930

C2

100

C2

740

C2

1

STAIR 1

CREDENZA

C2

50

1

2

CEILING LEGEND A010

A

B

C

D

REFER TO FURNITURE & LIGHTINGS SCHEDULE FOR LIGHT FITTING TYPES & SPECIFICATIONS.

XX XX AFFL

E

E1 ELEVATION - J-07 KITCHEN

1

FINISHES TO MATCH THE HEIGHT AS SHOWN

-

E2 ELEVATION - J-06 ISLAND BENCH

2 -

1 : 20

CS METAL BATTEN CEILING. REFER TO FINISH & FITTING SCHEDULE

1 : 20

NEW FLUSHED PLASTERBOARD CEILING NOTE: CONTRACTOR TO CONFIRM ALL DIMENSIONS ON SITE ALL CEILING WORKS TO BE IN ACCORDANCE WITH AS 2785, AS 2946 & AS/NZS 2588 AS/NZS 2589

PROPOSED FURNITURE PLAN

2 -

1 : 100

ADJ.

80

1520

80

600

EQ

A

B

C

D

80

EQ

EQ

LM1

EQ

BM1 CHILLED/ BOILING WATER & SINK MIXER

6 A005

E

SHELVES

2

2960

600

500

DISHWASHER

BINS

L6 LED STRIP. REFER TO LIGHTING SCHEDULE.

2

LIFT

LIFT

CHECKED

TEA ROOM

NORTH

FF

JT

D1

DEMOLITION PLAN & PROPOSED FURNITURE PLAN

D1

D1

L7

L7

L7

SCALE (@A1)

As indicated

2700 AFFL

PROJECT No.

A1016

EXPOSED CEILING TO SLAB TO BE SPRAYED IN PF4

PLASTERBOARD CEILING PAINTED IN PF1

80

KITCHEN 1 A005

L7

CEILING LIGHTING TO P:\A1016 - SINCLAIR BROOK- OFFICE REFURBISHMENT\B -Drgs\B.1 LiveEXISTING Files\A1016 - SINCLAIR BROOK & - OFFICE REFURBISHMENT_new.rvt REMAIN IN LIFT LOBBY

D1

NEW PLASTERBOARD BULKHEAD

OFFICE FITOUT REFURBISHMENT

FILE REF

2600 AFFL

LINE AHEAD CUPBOARD

VOID

PROJECT

L3

TR1

L3

L3

L3

L3

DRAWING No.

A001

J-06

2

REV

A

D2

L4

L1B

D2 L4

D2

D2

PLASTERBOARD CEILING IN PF1

EXISTING BULKHEAD OVER

BT1

BT1

EXISTING PERIMETER BULKHEAD TO REMAIN AND SPRAY IN PF4

D2 L3

L4

L3

L3

L3

10

2X

S ER AW DR DER UN

2X

S ER AW DR DER UN

2X

S ER AW DR DER UN

PF5

LM2

PF5

GRAIN DIRECTION

PF5

MITRE STONE JOIN BT1

ARISED CORNER FINGER PULL SLOT LM1

ABS EDGING

OPEN

L3

DRAWER/ DOOR LM1

2600 AFFL

D1

D1

D1

C6

D1

D2

D2

D2

D2

D2

C6

C6

C6

C6

C6

D2

3

3 3

EXISTING PERIMETER BULKHEAD TO REMAIN AND SPRAY IN PF3

STIC OUT

L2

L2

L2

L2

L2

L2

L2

L2

L2

L2

L2

L2 EXPOSED

L2

L2

L2

L2

L2

L2

L2

L2

L2

L2

L2

L2

L2

L2

L2

L2

L2

L2

L2

L2

TO BE

2600 AFFL

CEILING SPRAYE TO SLAB D IN PF4

4

A

2 -

EXISTING PERIMETER BULKHEAD TO REMAIN AND SPRAY IN PF4

B

C

D

-

REMOVE EXISTING ACOUSTIC TILE CEILING AND SPRAY OUT ALL SERVICES IN PF4

4

E

D-ARC MELBOURNE SYDNEY

FLOOR PLAN - KITCHEN BREAK OUT ZONE 4

1 : 20

-

LEVEL 11 63 EXHIBITION STREET MELBOURNE VIC 3000 PH +61 3 9663 7656 LEVEL 2 50 YORK STREET SYDNEY NSW 2000 PH +61 2 8235 4100 © COPYRIGHT 2017 D-ARC ARCHITECTS D-ARC.COM.AU

REV

A

DESCRIPTION

TENDER ISSUE

DATE

23.02.2018

BY

FF

E3 ELEVATION - J-06 ISLAND BENCH 1 : 20

KEY PLAN

5 -

E4 ELEVATION - COAT HOOK

ADDRESS

DRAWN

STATUS

-

CLIENT

SINCLAIR BROOK PTY LTD

LEVEL 1, 460 BOURKE STREET MELBOURNE 3000 JT

THE CONTRACTOR MUST VERIFY ALL DIMENSIONS ON SITE PRIOR TO COMMENCING ANY WORK OR MAKING OF ANY SHOP DRAWINGS. FIGURED DIMENSIONS MUST BE USED IN PREFERENCE TO SCALING. SCALED DIMENSIONS MUST BE VERIFIED ON SITE. THIS DRAWING IS COPYRIGHT AND REMAINS THE PROPERTY OF THE ARCHITECT.

7

1 : 20

CHECKED

FF

NORTH

SCALE (@A1)

Level 1, 460 Bourke Street, Melbourne 3000 CLIENT

SINCLAIR BROOK PTY LTD

DRAWING TITLE

DEMOLITION & PROPOSED REFLECTED CEILING PLAN

DRAWING TITLE

BREAK OUT ZONE ELEVATIONS & DETAILS

As indicated

1 : 100

ADDRESS

1:2

PROJECT

PROPOSED REFLECTED CEILING PLAN

LEVEL 1, 460 BOURKE STREET MELBOURNE 3000

DETAIL - J-07 KITCHEN BENCHTOP FRONT EDGE

OFFICE FITOUT REFURBISHMENT

FILE REF P:\A1016 - SINCLAIR BROOK- OFFICE REFURBISHMENT\B -Drgs\B.1 Live Files\A1016 - SINCLAIR BROOK - OFFICE REFURBISHMENT_new.rvt

Project 3 - Sinclair Brook Office Refurbishment KEY PLAN

1.5mm ARISED EDGE

BT1

ISLAND BENCH

D1 D2

1:5

SELECTED COAT HOOKS. REFER TO FINISHES & FITTING SCHEDULE.

CH

EQ

D1 2700 AFFL

DETAIL - SECTION THROUGH OVERHEAD CUPBOARD

4100

2600 AFFL

2400 AFFL

L7

LINE OF BULKHEAD OVER

DRAWING TITLETO SLAB EXPOSED CEILING TO BE SPRAYED IN PF4

CLIENT

SINCLAIR BROOK PTY LTD

6

PF2

10

7 A005

60

D1

J-07

1850

LIFT

DRAWN

D1

4 A007

L5

MAX. HOOK HEIGHT

ADDRESS

LEVEL 1, 460 BOURKE STREET MELBOURNE 3000

L5

1000

D1

BT1

L5

MIN. HOOK HEIGHT

D1

L5

OPE N

D1

KEY PLAN

SPRAY OUT ALL SURFACES OF EXISTING CEILING SLAB IN PF3 PRIOR TO INSTALLATION OF NEW CS METAL BATTEN CEILING

L5

1230

L5

900

L1A

ISLAND BENCH

L1A

MW BUILT-IN MICROWAVE

LM1

ALIGN

L1A

STAIR 2

FEMALE BATHROOM

EQ

VOID

WT1

26

EMERGENCY CORRIDOR

D1

BINS X 2 1 RECYCLE 1 WASTE

40

D1

DS DISHWASHER

FD1B INTEGRATED FRIDGE 2

700

1

STAIR 1 D1

FD1A INTEGRATED FRIDGE 1 100

1 CS METAL GRID CEILING IN BLACK. REFER TO FINISHES & FITTING SCEDULE.

350

EX. PLASTERBOARD BULKHEAD TO REMAIN

EX. PLASTERBOARD BULKHEAD TO REMAIN

50

BM2 KITCHEN SINK

L6 LED STRIP LOCATED BELOW JOINERY

5

PROJECT No.

A1016

DRAWING No.

A005

REV

A


02

THE WASTE CATHEDRAL This thesis project explores speculative architectural design responses to complex situation of Anglesea, Victoria, where is a post-mining seaside town on the Great Ocean Road. The site is surrounded by a rich biodiversity and this project provides a chance on proving how architecture can help in restoring the polluted environment and let human develop their own senses of awareness towards the environmental protections.

Anglesea has rich biodiversities that many animal species could be found, however, the development of previous coal mine excavations and power station nearby have created lots of undesirable problems and pollutions to the wildlife there.


7


1

Assigned contractors usually collect household wastes from street bins.

4

2

The collected waste will be transported by trucks to Angelsea, as a central collection point.

After sorting all the recyclable wastes in transfer stations, and the remaining non-recyclable wastes will be disposed into the Anglesea landfill nearby.

5

3

All wastes will be sorted based on their nature by hands in the transfer stations in Anglesea, especially recyclable wastes.

The collected recyclable wastes will be delivered to Geelong for further processes and be recycled into other resources after.

Current Waste Treatment in Anglesea


The waste cathedral is a prototype reinterpret waste collection and restore the landfill area in Anglesea; and where human can repent their sins through series of ritual engagements in the directive journey in order to turn into a sinless community in the future.

9


1 Contemplation Sort and dispose waste based on their nature; hanging magnet balls at the back can define whether the metal is ferrous or not.

2 Purification Rinse plastic bottles along the artificial river that collects rainwater from the umbrella structures, and be brought down for further treatments.

3 Enlightenment Research centres here investigate possible solutions of turning waste into new resources and minimize solid wastes to benefit the society.


4 Redemption Visitor sacrifice their energy, equivalent to the amount of waste they disposed, to ignite the incinerator to burn down the non-recyclable wastes by cycling.

5 Reincarnation All collected waste will undergo serious of treatments and will be given an entire new life as a new resouces.

6 Rewards An agricultural zone that greets with a cloud of mist and the fresh produces are here as rewards.

11


All the gathered food waste will be temporarily stored for sterilization and will then be crushed into smaller pieces by the blender. The water molecules in the small food waste particles will be removed by the spinning dehydrator in high speed. After filtered, the fine food waste particles will be transported to the garden through the sprinklers.

Metal can be distinguished by their nature into ferrous or non-ferrous, magnet balls will be a testing tools for people to find out their nature and dispose them correctly. The wastes will then moved to the anodized tank after crushed into small pieces for removing impurities. Smelter can further melt the metal waste into liquid forms and for later use.

Food Wastes

Metal Wastes


People will first rinse their plastic bottle wastes along the purification rive and then be brought down for further crushing into small pieces. The smelter will turn the plastic into liquid form under high temperature; it can be turned into two types of final products upon various usages, namely the plastic pellets and plastic filaments.

Not all waste can be recycled, so the non-recyclable waste is collected and burnt down by the incinerator. Visitors will have to cycle to ignite the incinerator and they have to generate the amount of energy that equivalent to the amount of waste they have produced, where there is an indicator aside to provide the data. The break-down waste will turn into a ring of smoke to remind people how much waste they have been produced.

Plastic Wastes

Non-Recyclable Wastes

13


03

Living & Working in Tokyo ARCHsharing Student Competition

Kaipai!

Crush the malt

Add hot water to remove sugar

Malt residues as animal feed

Boil & add Hops/ Flavorings

Collected hops use again as fertilizer

Move to fermentation tank with yeast

Residual yeasts added into baked goods

Filter the liquid

The design purpose is correspond to a typology combining living and working together within a skinny building in the heart of a city centre; and how to strike a balance between two major criterion through the distribution and relationship of internal spatial arrangement. So as to let the users/ owners of this building can truly engage in a work-live balance when especially the building locates in a business district with many programmatically-mixed buildings, which the combinations of office and living space are commonly found.


CRAFT BEER BREWERY 地ビ ー ル Private Courtyard

Flexible Meeting Space

Rooftop Bar + Brewery

Staff Platform

Beer Storage

Bedroom & Lounge

Manga Bunker

15


Beer Pipes

Beer Taps

G/F

Beer Tanks

Brew House

4/F 1/F

Staff Platform Bunk Area

3.5/F Beer Taps

3/F 2-2.5/F

Flexible Meeting Space

Flexible Meeting Space

Bunk Area

2.5/F 2/F

3/F

Bedroom 1

Owner Shared Space

3.5/F

Outdoor Area

1/F

4/F

Outdoor Area Bedroom 2

G/F

Outdoor

Outdoor Area Area


04

Shaping Urban Living Studio Project - 2016 Studio Leaders : Ben Duckworth & Mark Loughnan | Run by Hassell

This studio is about the research, testing and realising of rules in specific cities, i.e. Hong Kong, Sydney, San Francisco, Singapore and London, so as to understand the variations of different housing design standards across cities as well as to study the pros and cons of how the set rules affect the building designs. We exploit the opportunities and possibilities of resolving current urban situations and constraints through applying and reconsidering a new set of housing rules. So as to establish a rules-responsive and cohesive residential tower design. i) Tower - To create an unique and remarkable tower in sculptural features. ii) Podium - Encourage public engagement that possess clusters of shared activities. iii) Be “Green� - To provide sufficient green space/area for residents to connect with nature.

17


This residential tower encourages a self-­sustaining idea that the living place contains lists of activities to support their daily living and their needs. Unique features such as green balustrade, green open space and the green division help extend green space from flagstaff garden to each apartment.

Green Balustrade

Green Open Space

Green Division

Every unit is surrounded by greeneries, with the embedded planter on balustrade.

Green open space locates throughout the building, where mostly in the N-facing sides.

Green Division helps divide units along the panoramic balcony.


Apartment

1 Bedroom

3

Balcony

To achieve a co-exist and harmonious living environment by providing both green feature and numerous of activities to support residents livings. The major attraction is the co-existence of greenery and activities; to make the living spaces more vivid and sustainable. Panoramic view created by a walk-­around balcony of differing width that allow people to see both nature and cityscape with possibly uninterrupted view. Upper level offer sweeping views of the city and garden.

2 Living Room 19


Amenities

4 Outdoor Pool

5 Library

6 Market

7 Family Farm


05

Shenzhen Future Urbanism Shenzhen HK Bi-City Biennale for Urbanism & Architecture Studio Leaders : Alan Pert & Donald Bates & Justyna Anna Karaiewicz

21


06

Turkish Bathhouse Studio Project - 2015 Studio Leader : Rennie Liffen

The studio brief is to create an architecture of a new public bathhouse set on a detailed hypothetical site embedded in the central city of Cukurcuma, Istanbul. Learning how to incorporate the unique and local bathing experience by exploring on the composition of materiality, functional space and atmospheric environments, focus on the sensory profiles of architectural spaces using creative but disciplined drawing and model making as iterative investigative tools in order to create unique spatial experience and bathing journey in the final design outcome. Consideration of architectural space in the context of all five senses is the critical role of applying technology and materials in the production of the sensory profiles of architectural spaces.


The rising steam engulfs the room quickly and warms the space. Hot water is delivered all the way from ceiling to the bath through the exposed copper pipes. The mineral rich bath water drips comfortingly and leaves some rusty stains on the pipes as well as the rough concrete wall. The pleasant aroma from the mineral water calms and creates a pressure-free space for bathers. The sunlight creeps in through the gaps of timber screen and the heat inside protects bathers from the snowy weather outside.

Fire Bath

A fountain bath which jets water into the air to supply cleansing water. Playing on the concrete tiles, bathers can scoop and drink the bath water with the essence of minerals and the saltiness. The water from the fountain is actually filtered recycling bath water from the sound bath next to it, so the warmth retains in the fountain even it is an outdoor bath, bathers can enjoy a view of the surrounding houses.

The rising steam engulfs the room quickly and warms the space. Hot water deliver all the way from ceiling to the bath through the exposed copper pipes while the mineral rich bath water leaving some rusty stains on the pipes as well as the rough concrete wall. The pleasant aroma from the mineral water calms and creates a pressure-free space for Francesco. The sunlight creeps in through the gaps of timber screen and the heat inside protects bathers from the snowy weather outside.

Water Fountain 23



25


CURTAIN CURTAIN SHINGLE WALL WALL GLAZING

75o (summer noon)

30o (winter noon)

E

W

20o (winter morning)

07

N

N N

Commercial Highrise

SUN ORIENTATION INSTALLED POSITION OF PV GLASS MAXIMUM EXPOSURE OF SUNLIGHT PANEL

SOLAR RADIATION ANGLE

Applied Construction After initial design stages, we will have to consider series of construction technologies and practical methods in order to design a commercial multi-storey building; which then implement the optimal construction principles to form a technically coherent design. Have been trying to figure a design that with both active and passive system approaches, PV panels installed on facade in order to supply electricity to the building, and is installed at the top part with 15 degrees tilted to receive maximum sunlight. While the passive shingled facade system provides shading effect as the inclined 3D MODEL ILLUSTRATES THE POSITION OF PV help PANEL AND SHINGLE GLASS angle avoid direct sunlight.

ACTIVE SYSTEM APPROACH CURTAIN CURTAIN BUILDING INTEGRATED PHOTOVOLTAIC SHINGLE WALL WALL GLASS MODULES CAN ABSORB AND GLAZING DIRECTLY CONVERT THE SOLAR RADIATION ENERGY INTO ELECTRICITY WHICH ABLE TO SUPPLY BACK TO THE BUILDING AND THIS POTENTIAL IS ENDLESS

THE PV PANELS ARE INSTALLED MOSTLY AT THE TOP PART OF THE BUILDING FACING NW DIRECTION WITH 15o TILTED IN ORDER TO RECEIVE SUNLIGHT. ALSO, CAN MAKE GOOD USE OF THE UNUSED SURFACES OF THE BUILDING. SUN OR MAXIMU PASSIVE SYSTEM APPROACH SHINGLE FACADE SYSTEMS PROVIDES SHADING EFFECTS AS THE INCLINED ANGLE CAN AVOID DIRECT SUNLIGHT. USE SUNLIGHT WITHOUT ACTIVE MECHANICAL SYSTEM

N

PV GLASS PANEL

LAMINATED SHINGLE GLAZING

N

MULLION & TRANSOM

PV GLASS

LAMINATED GLASS

PV GLASS

GLASS-GLASS MODULE

PHOTOVOLTAIC GLASS MODULE MODULE WIDTH : MODULE LENGTH: POWER OUTPUT: AREA OF CELL: (ENTIRE ENVELOPE)

TEMPERED GLASS PV GLASS PANEL

SOURCE: OPTISOL SCREEN - www.scheuten.com

PV GLASS PANEL TEMPERED GLASS (LOW - E)

PV GLASS PANEL LOW - E GLASS

TEMPERED GLASS (LOW - E) PVB FOIL

1500mm 1200mm 249wp 4600 m2

LAMIN

PHYSICAL MODEL OF SHINGLE GLAZING (L) AND CURTAIN WALL (R)

APPLIED CONSTRUCTION ABPL90118 ASSIGNMENT 3 - ENVELOPE 3D MODEL ILLUSTRATES THE POSITION CHAU HEI TONG 383768 OF PV PANEL AND SHINGLE GLASS LEUNG CHI MEI MIMI 748422 PV3.2 GLASS TANG TSZ LAM 383512

SOURCE: O


BMU SPECIFICATIONS: “Scorpio” model ARM LENGTH: 20m max. WORKING HEIGHT: 280m MACHINE WEIGHT: 30 ton max.

POSITION IN OPERATING

POSITION IN PARKING

4000

ALUMINIUM ROOF CAPPING

Data from Secalt S.A.

ISOMETRIC DIAGRAM

DRAINAGE OVERFLOW BRING WATER OUT FROM THE ROOF

WATERPROOF MEMBRANE

PARAPET WALL

1000

250

STEEL STRUCTURAL FRAME

BMU CRANDLE FOR TWO MEN AT ONE TIME

EDGE BEAM

250mm CONCRETE SLAB

BMU CRADLE FOR TWO MEN AT ONE TIME

SHINGLE PV GLASS PANEL

STUMP

CEILING

LINE OF PARAPET

ENLARGED PARTIAL ELEVATION 1:50

8000

BMU MAXIMUM FORWARD REACH 20m LONG

CONCRETE TRAIL FOR BMU TRACKING AROUND THE PERIMETER OF ROOF

LAMINATED DOUBLE GLAZING WITH PHOTOVOLTAIC CELL

ROOF TRACKED BMU WITH LONG ARM REACH

LINE OF BUILDING BELOW LINE OF PARAPET

BMU SHED

EMERGENCY STAIRCASE

ENLARGED PARTIAL SECTION 1:50

LINE OF BMU TRACK

ROOF DRAINAGE (WITH 1:100 SLOPE)

ROOF PLAN 1:500

4.3

BMU PLAN 1:50

27


08

Other Projects

9-11 Canara Street, Doncaster East

Unit 1 9-11 Canara Street, Doncaster East Ground Floor

85.30 sqm

First Floor

84.50 sqm

Double Garage

40.10 sqm

Private Open Space

40.00 sqm

Unit 1

Ground Floor Plan

Unit 2

Unit 1

First Floor Plan

9-11 Canara Street, Doncaster East Ground Floor

77.30 sqm

First Floor

79.50 sqm

Double Garage

40.10 sqm

Private Open Space

40.00 sqm

Unit 2

Ground Floor Plan

Unit 3

Unit 2

First Floor Plan

9-11 Canara Street, Doncaster East Ground Floor

99.10 sqm

First Floor

81.90 sqm

Double Garage

40.10 sqm

Private Open Space

40.00 sqm

Unit 3

Ground Floor Plan

Unit 3

First Floor Plan


Cybercut Hair Salon Boxhill Shopping Centre, Boxhill

29


Thank you !


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.