POR T FO L I O JEANIE TSZ LAM TANG MArch / BEnvs (Arch.)
1
1 2 3 4 5 6 7 8 Work The Living & Shaping Reference Waste Working in Urban Cathedral Tokyo Living
Other Projects
Turkish Commerical Other Projects Bathhouse High-Rise
01
PLOT TIMESTAMP: 08/11/2017 10:59:28 AM
Work Reference- D-Arc Architects 780
2290
TOWEL RACK & BIN
2980
HAIR/RUBBISH BIN 520
780
500
250
500
VANITY 500
520
245
500
495
SEATING
500
495
500
1510
245
SCL
SCL
AFFL3700
AFFL3700 PF3
PF3. EXPOSED CEILING TO BE PAINTED
PF3
PF3
WOODFORM 'CLICK ON' CEILING BATTEN SYSTEM TO MATCH LOCKER LAMINATE FINISH.
TOP OF TILE
TOP OF TILE
AFFL 2700
AFFL 2700
EQ CEILING
CL
CEILING
AFFL 2400
AFFL 2400
PF1
WT1 WT1
CUPBOARD/MIRROR
WT1
WT1
EQ
AFFL 2100
LF4
LF4
LF4
MR01
MR01
TV1
MIRROR ON BLACK POWDERCOATED FRAME
MR01
MR01
25
MR01
1200
EQ
950
25
LF4
675
CR1 HANGING RAILS
3 BM1
25
WT1
BANQUETTE SEATING REFER TO A83-002 FOR SIMILAR DETAIL TOUCH TO OPEN FIXINGS TO CUPBOARD DOORS
LM1
DIRECTION OF LAMINATE GRAIN
FLOOR LEVEL
AFFL
EQ
GRILLE FOR VENTILATION
Project 1 - EOTF Facility
5 Rider Bouvelard Rhodes, NSW 2138
D-ARC MELBOURNE SYDNEY
AFFL
EQ
SINGLE GPO AND USB CHARGER TO BE INSTALLED IN COMPLIANCE WITH AUSTRALIAN STANDARDSSERVICES TO ADVISE.
TYPICAL CHANGE ROOM FEMALE - ELEVATION A
2 A83-001
1 : 20
2100
780
2290
2980
AIRING CUPBOARDS
TOWEL
IRON/ HAIR
VANITY
HDr
HSt
HDr
HSt
HDr
HSt
TYPICAL CHANGE ROOM FEMALE 1 : 20
SD1 435
REVIT documentation of the End of Trip facility in a commercial building in Sydney. Refurbishment of both female and male change room and bike parking areas in A-grade quality. Assist in providing tender drawing package and marketing materials.
LM1
LM1
FLOOR LEVEL
OPENING FOR RUBBISH BIN BELOW
2
A83-001
BU1
RUBBISH BIN INSIDE CUPBOARD
A83-003
5
EQ
500
ALL HYDRAULICS TO BE CONCEALED WITHIN JOINERY
LM1
LM1
WT1
LM1
1430
LM1
100
LM1
LM1
850
JG-01
OPEN
450
LM1
BM1 SD1
ST1
50
200 AFFL 0100
SD1
ST1 OPEN
755 LM1
KICKER
BM1
SD1
DH1
2100
A83-003
300
EQ
LM1
TOWEL
BM1
BM1
BM1
AIRING
3
3 A83-001
HOLES CUT INTO STONE TO SUIT CABLES OF HAIRDRYER AND STRAIGHTENER. REFER SCHEDULE FOR SPECIFICATION
A83-003
CR1 HANGING RAIL
1
TV1
A83-003
CHANGE ROOM FEMALE_VANITY/HAIR STATION/AIRING CUPBOARD 1 : 20
LEVEL 11 63 EXHIBITION STREET MELBOURNE VIC 3000 PH +61 3 9663 7656 LEVEL 2 50 YORK STREET SYDNEY NSW 2000 PH +61 2 8235 4100 © COPYRIGHT 2017 D-ARC ARCHITECTS D-ARC.COM.AU
REV
A B C
DESCRIPTION
TENDER ISSUE FINAL TENDER DOCUMENTATION TENDER RFI
DATE
11.08.2017 29.09.2017 02.11.2017
BY
KEY PLAN
ADDRESS
DRAWN
JT THE CONTRACTOR MUST VERIFY ALL DIMENSIONS ON SITE PRIOR TO COMMENCING ANY WORK OR MAKING OF ANY SHOP DRAWINGS. FIGURED DIMENSIONS MUST BE USED IN PREFERENCE TO SCALING. SCALED DIMENSIONS MUST BE VERIFIED ON SITE. THIS DRAWING IS COPYRIGHT AND REMAINS THE PROPERTY OF THE ARCHITECT.
CLIENT
ALTIS PROPERTY PARTNERS
207 PACIFIC HIGHWAY ST LEONARDS
KH KH KH
STATUS
CHECKED
DR
FILE REF
DEVELOPMENT APPLICATION
P:\1610107 - ALTIS - SPACE 207\B -Drgs\B.1 Live Files\B1002 - ALTIS - SPACE 207 - EOTF.rvt
3
NORTH
PROJECT
SPACE 207
PLOT TIMESTAMP: 01/11/2017 12:24:41 PM
3 A83-001
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
SCL
SCL
AFFL2670
AFFL2670
PF1
PF1
OPEN
PF1
3 LM1
LM1
LM1
LM1
LM1
LM1
LM1
A83-001
LM1
LM1
LM1
LM1
LM1
LM1
LM1
LM1
LM1
LM1
LM1
LM1
LM1
LM1
LM1
LM1
LM1
LM1
LM1
FHR EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EXISTING FHR SCL
1450
AFFL2670
1 INTERLOC. WAVE LOCKER DOORS LOCKERS WITH SEATING. IL HIGH PLINTH CODE G. WITH LOCK INSTALLED AS PER SPECIFICATION
1 A42-002
1450
EQ SCL
500
AFFL2670
C1
PF1
300
LM1
LM1
LM1
LM1
LM1
LM1
LM1
LM1
LM1
LM1LM1
LM1
LM1
LM1
LM1
LM1
LM1LM1
LM1
LM1
LM1
LM1
LM1LM1
LM1
LM1
LM1
LM1
LM1
LM1
AFFL
FHR
1450
1450
EXISTING FHR
60
LM1
5 390
LM1
LM1
LM1
2800
A83-001
LM1 KICKER
AIRING CUPBOARD
TOWEL AIRING
CL
700
700
CL
700
700
65
CL
700
700
DEMOLISH EXISTING TENANCY WALL TO MATCH/ ALIGN TO OPENING OF THE TENANCY OPPOSITE. NEW LINTEL SUPPORT TO TOP OF OPENING. REFER TO STRUCTURAL ENGINEER'S DRAWINGS. SCOPE OF WORK TO BE PRICED SEPARATELY
A10-001 4
50 20
CL
700
50
620
AFFL2670
3
OPEN
PF1
EXTENT OF EXISTING TILE TO BE MAINTAINED. ALIGNED TO RECEPTION DESK KICKER. NOTE RADIUS AT RECEPTION COUNTER CNR.
10MM SHADOWLINE
SCL
IN-FILL PANELS
UNDER BENCH BAR FRIDGE, REFER FF&E SCHEDULE
M1
LM1
AFFL2670
1 : 20
BF1
1090
1 : 20
LM1
FLOOR LEVEL
AFFL
700
2
LOCKER DETAIL_SECTION
SCL
3 RIDER_LOCKER_ELEVATION A
1
LM1
AFFL 0100
50
A83-001
LM1
2800
C1 C5
A83-001
IN-FILL PANELS
LOCKER DETAIL_SECTION
NEW WALL TO MATCH / ALIGN OPENING OF THE TENACY OPPOSITE
PF1
1 : 20
BULKHEAD
BULKHEAD
AFFL2100
AFFL 2100
25
NOM. 2100. CHECK ON SITE.
5 5050
50
AIRING CUPBOARD
CL
700
700
CL
700
700
65
AP1
700
AP1
50
700
5050
5050
5050
DH1
AP1
AP1
AP1. FROST ACRYLIC PANEL WITH PRINTED GRAPHIC INSTALLED BEHIND THE MT1 PERFORATED METAL FINISH.
AP1
DH1
CLCL
5050
5050
KICKER
50
50
5050
AFFL 0100
CL
AP1. FROST ACRYLIC PANEL WITH PRINTED GRAPHIC INSTALLED BEHIND THE MT1 PERFORATED METAL FINISH.
5050
CLFLOOR LEVEL
5050
5050
TIMBER SLAT JOINERY TO PROVIDE SHOES RACK. SE EQUIPMENT SCHEDULE FOR SPECIFICATION.
CL
AFFL
50
CL
AP1
DH1
AP1
AP1
DH1
2 20 A83-001 1200
20
CLCL
AP1
AP1
DH1
3 RIDER_AIRING ELEVATION B
AP1
AP1
DH1
1 : 20
TIMBER SLATE JOINERY TO PROVIDE SHOES RACK. SEE EQUIPMENT SCHEDULE FOR SPECIFICATION. FLOOR LEVEL
AFFL
70
4
NOM. 4mm ACYLIC BACKING SHEET IN FROST FINISH
A83-001
DUCT. REFER MECHANICAL ENGINEER'S DRAWING. ENSURE BASE OF DOOR IS 100mm CLEAR OF FLOOR
FCL
DH1
NO VISIBLE FIXINGS TO FACE OF DOOR
A42-002
LM1
AFFL 0100
CR1
TYPICAL AIRING CUPBOARD DOOR DETAIL 1:5
ALL JOINERY INTERIORS TO BE WHITE
AP1
5 A83-001
PF2 TOWEL AIRING CUPBOARD_SECTION
1 : 20
Project 2 - Bike Parking Area & Office Lobby Refurbishment TIMBER SLAT JOINERY TO PROVIDE SHOES RACK. SE EQUIPMENT SCHEDULE FOR SPECIFICATION.
LM1
TIMBER SLATE JOINERY TO PROVIDE SHOES RACK. SEE EQUIPMENT SCHEDULE FOR SPECIFICATION.
AFFL 0100
3300
KICKER
ENSURE BASE OF DOOR IS 100mm CLEAR OF FLOOR
FLOOR LEVEL
DUCT. REFER MECHANICAL ENGINEER'S DRAWING.
AFFL
70
5 Rider Bouvelard Rhodes, NSW 2138 2
3
1 : 50
KICKER
ENSURE BASE OF DOOR IS 100mm CLEAR OF FLOOR
LEVEL 11 63 EXHIBITION STREET MELBOURNE VIC 3000 D-ARC PH +61 3 9663 7656 LEVEL 2 50 YORK STREET SYDNEY NSW 2000 3 RIDER_AIRING ELEVATION B MELBOURNE PH +61 2 8235 4100 © COPYRIGHT 2017 D-ARC ARCHITECTS SYDNEY D-ARC.COM.AU 1 : 20
REV
A B C
DESCRIPTION
TENDER ISSUE FINAL TENDER DOCUMENTATION TENDER RFI
DATE
11/08/2017 29/09/2017 01/11/2017
BY
KH KH KH
6500
INFILL PANELS WITH SAME HEIGHT AND FINISHES
A83-001
ALL JOINERY INTERIORS TO BE WHITE
GROUND FLOOR PLAN
CR1
3mm PERFORATED METAL IN SELECTED FINISH. REFER TO FF&E SCHEDULE
FLOOR LEVEL
AFFL
1
KEY PLAN
4 A83-001
TYPICAL AIRING CUPBOARD DOOR DETAIL GREAT NORTHERN RAILWAY
1:5
BUILDING 5
BUILDING 3
ADDRESS
CLIENT
ALTIS PROPERTY PARTNERS BOULEVARDAIRING CUPBOARD_SECTION 53 RIDER TOWEL
RHODES NSW A83-001 1 : 202138 DRAWN
CHECKED
DRAWING TITLE
JOINERY DETAILS - 3 RIDER CORRIDOR
EXISTING STONE WALL
EXISTING TILED WALL TO REMAIN NORTH
PROJECT
0
AFFL 0100
3mm PERFORATED METAL IN SELECTED FINISH. REFER TO FF&E SCHEDULE
AP1. FROST ACRYLIC PANEL WITH PRINTED GRAPHIC INSTALLED BEHIND THE MT1 PERFORATED METAL FINISH.
NOM. 25x25mm SHS TO JOINERS SPECIFICATION
CL 30
KICKER
NEW GRAPHIC FILM TO FACADE GLAZING OF MINIMUM 30% LUMNINANCE CONTRACT IN ACCORDANCE WITH AS1428.1 REQUIREMENTS. REFER TO WAYFINDING/ SIGNAGE PACKAGE FOR FILM GRAPHICS.
AP1
NOM. 25x25mm SHS TO JOINERS SPECIFICATION
AP1. FROST ACRYLIC PANEL WITH PRINTED GRAPHIC INSTALLED BEHIND THE MT1 PERFORATED METAL FINISH. JOINERY TO PROVIDE CLOTHES RAIL AND SECURITY HANGERS. SEE EQUIPMENT SCHEDULE FOR SPECIFICATION
30
AP1
NOM. 4mm ACYLIC BACKING SHEET IN FROST FINISH
A42-002
ENSURE BASE OF DOOR IS 100mm CLEAR OF FLOOR
INFILL PANELS WITH SAME HEIGHT AND FINISHES
MODIFY EXISTING DH1 DOOR WAY CLEARANCE ON LATCH SIDE TO MINIMUM 530mmCR1 TO MEET AS1428.1 REQUIREMENTS
NO VISIBLEPF1 FIXINGS TO FACE OF DOOR
25
BULKHEAD
CL
30 50
NOM. 25x25mm SHS TO JOINERS SPECIFICATION
AFFL 2100
30
NOM. 2100. CHECK ON SITE.
NOM. 25x25mm SHS TO JOINERS SPECIFICATION
SCL
AFFL2670
JOINERY TO PROVIDE CLOTHES RAIL AND SECURITY HANGERS. SEE EQUIPMENT SCHEDULE FOR SPECIFICATION
IN-FILL PANELS
20 1200
20
INDICATOR SIGNAGE ON WALL IN AP1. FROST ACRYLIC PANEL ACCORDANCE WITH CLAUSE D3.6. REFER WITH PRINTED GRAPHIC TO WAYFINDING INSTALLED BEHIND THE MT1PACKAGE FOR DETAILS. PERFORATED METAL FINISH.
620
AP1
OPEN
PF1
BULKHEAD
AFFL2100
BRAILLLE AND TACTILE EXIT AND LEVEL
50
CL
50
AP1
DH1
CR1
30
CL
700
AP1
DH1
50
CL
TOWEL AIRING
CL
A83-001
CL
30
IN-FILL PANELS
5050 2800
700
AP1. FROST ACRYLIC PANEL WITH PRINTED GRAPHIC INSTALLED BEHIND THE MT1 PERFORATED METAL FINISH.
SCL
AFFL2670
5050
CL
500
50 2800
FOXTEL, DATA & PHONE FOR SECURITY, REFER TO ELECTRICAL ENGINEER'S DRAWINGS
1 A42-003
A10-001
A83-001
FLOOR LEVEL
FC
LM1
50 20
1 : 20
INTERLOC. WAVE LOCKER DOORS LOCKERS WITH SEATING. IL HIGH PLINTH CODE G.
C4
LM1
AFFL
3
AFFL
1000
FLOOR LEVEL
C5
CT1
LM1
60
A83-001
AFFL 0100
3 RIDER_LOCKER_ELEVATION A
450
1
C3
10MM SHADOWLINE
C1 KICKER
INTERLOC. WAVE LOCKER DOORS LOCKERS WITH SEATING. IL HIGH PLINTH CODE G. WITH LOCK INSTALLED AS PER SPECIFICATION
FLOOR LEVEL
C5
60
60 LM1
390
LM1
C5
EXISTING MARBLE WALL TO BE RETAINED. CONTRACTOR TO ENSURE ADEQUATE PROTECTION DURING REFURBISHMENT
C1
LM1
INTERLOC. WAVE LOCKER DOORS LOCKERS WITH SEATING. IL HIGH PLINTH CODE G.
500 LM1
2X PC TOWERS BELOW BENCH
C1
CT1
PF1
450
PF1
PF2 GREY POWDERCOATED STRUCTURAL STEEL TO ENGINEER'S SPECIFICATION
C5
LM1
C5
PF1 OPEN
ACOUSTIC BLADES WITH CUSTOM THREEDIMENSIONAL PROFILES. FIXINGS TO MANUFACTURER'S SPECIFICATION
A42-001
FHR
LM1
PLOT TIMESTAMP: 01/11/2017 11:53:36 AM
PF1
GROUND FLOO 1 : 50
A
B
C
D
E
J-01
ARTWORK
J-01
TV2
UTILITY ROOM
C2
J-07
VOID TEA ROOM VOID BAR
C6
C6
C6
2
C5
C5
J-02
TV1
C4
TB3 C4
J-03 STORAGE
C4
MEETING ROOM 2 C4
C4 TV2
C4
WB
C4
C4
C4
C4
MEETING ROOM 3 TB3
C4
C4
C4
TV2
C4
WB
C4
C4
TB3
3
TV2
C3
C3
5
7
C3
C3
9
11
C3
C3
113
15
C3
17
C3
19
C3
2
4
C3
C3
WKS
6
8
C3
C3
WKS
10
12
C3
C3
WKS
14
16
C3
C3
TB4
C3
20
C3
23
ADJ.
ADJ.
CU
C3
C3
INTEGRATED FRIDGE 2 FD1B
INTEGRATED FRIDGE 1 FD1A
ADJ.
ADJ.
ADJ.
ADJ.
CU
24
C3
25
C3
ADJ.
ADJ.
ADJ.
ADJ.
ADJ.
ADJ.
ADJ.
PLANTING
L7
L7
L7
L7
SELECTED PENDANT. REFER TO LIGHTINGS SCHEDULE.
PF3 LM1
LM1
LM1
LM1
27
C3
C3
29
C3
31
LM1
DH2
LM1
6 A005 BUILT IN MICROWAVE MW
DH2
28
C3
C3
30
C3
32
4
PLANTING
WT1
BM1 CHILLED/ BOILING WATER & SINK MIXER
L6 LED STRIP LIGHTING
7 A005
LM1
BM2 KITCHEN SINK
BT1
BT1
DH2 LM1
D
WKS
26
LM1
DH2
DH2
D
LM1
D
DH2
LM1
20
D LM1
LM1
LM1
D
20
PF5
ADJ. FOOT PAD REQUIRED WITHIN EACH LEG (IN BLACK).
40
OPEN
40
BINS X 2 1 RECYCLE 1 WASTE
DS DISHWASHER
J-08 PLANTING
ISLAND BENCH
ADJ.
100
4
ADJ.
ADJ.
D
32 WORKSTATIONS
BINS
PF3
CU
LM1
MOBILE PEDESTAL FOR EACH WORK STATION
4100
10mm SHADOW LINE
3
WKS
22
EQ 500
C5
A007
WKS
18
EQ 600
RD BULKHEAD PLASTERBOA
GLASS TREATMENT
COPIER
21
EQ
A009
900
C3
WKS
EQ EQ
LINE OF CONCRETE SLAB
LM1 WKS
EQ
CU
J-04 BIN
C3
C5
2
MP2
STORAGE
COATS
J-04
EQ
DISHWASHER
2400
STORAGE
TB4
EXISTING TABLE TENNIS
C4
MP2
GLAZING FROM 2100mm TO 2600mm
1
C4
2950 EQ
C5 TV2
C4
COPIER COATS
C5
C4
MEETING ROOM 4
C4
MP2
C4
C5
80
3000
C4 C4
C5
600 MICROWAVE
AD LKHE D BU OAR TERB PF3 PLAS EX.
2
CU
80
C5 C5
WB
BIN
TB4
TB4
C5
C3
3
C5
760 FRIDGE 2
EQ
CU
C5
C5
TB4
MP1
C3
J-05
760 FRIDGE 1
50
MP1
4
C6
C6
STAFF LOUNGE
C1
RECEPTION DESK
A004
C6
PLANTING
TB2
COAT HOOKS WALL
CH
LOBBY
WINDOW SEAT
WAITING AREA
C1
C3
A005
J-06
CP2
C1
E 80
100
FHR
BH1A & BH1B. BROCHURE HOLDER
2
3
KITCHEN
PF5
LM1
40 LM2
PF5
GRAIN DIRECTION
PF5
590
LIFT
FRAMING 40X40 SQUARE STEEL SECTION. PF5 FINISHES.
PF5
OPEN
OPEN
PF5
PF5
180 40
LIFT
870
LIFT
600
5 A008
2400
C2
60
C2
PLOT TIMESTAMP: 02/03/2018 1:36:00 PM
C2
STAIR 2
26
C2
TB1 C2
FEMALE BATHROOM
740
MEETING ROOM 1
C2
EMERGENCY CORRIDOR
VOID
C2
930
C2
100
C2
740
C2
1
STAIR 1
CREDENZA
C2
50
1
2
CEILING LEGEND A010
A
B
C
D
REFER TO FURNITURE & LIGHTINGS SCHEDULE FOR LIGHT FITTING TYPES & SPECIFICATIONS.
XX XX AFFL
E
E1 ELEVATION - J-07 KITCHEN
1
FINISHES TO MATCH THE HEIGHT AS SHOWN
-
E2 ELEVATION - J-06 ISLAND BENCH
2 -
1 : 20
CS METAL BATTEN CEILING. REFER TO FINISH & FITTING SCHEDULE
1 : 20
NEW FLUSHED PLASTERBOARD CEILING NOTE: CONTRACTOR TO CONFIRM ALL DIMENSIONS ON SITE ALL CEILING WORKS TO BE IN ACCORDANCE WITH AS 2785, AS 2946 & AS/NZS 2588 AS/NZS 2589
PROPOSED FURNITURE PLAN
2 -
1 : 100
ADJ.
80
1520
80
600
EQ
A
B
C
D
80
EQ
EQ
LM1
EQ
BM1 CHILLED/ BOILING WATER & SINK MIXER
6 A005
E
SHELVES
2
2960
600
500
DISHWASHER
BINS
L6 LED STRIP. REFER TO LIGHTING SCHEDULE.
2
LIFT
LIFT
CHECKED
TEA ROOM
NORTH
FF
JT
D1
DEMOLITION PLAN & PROPOSED FURNITURE PLAN
D1
D1
L7
L7
L7
SCALE (@A1)
As indicated
2700 AFFL
PROJECT No.
A1016
EXPOSED CEILING TO SLAB TO BE SPRAYED IN PF4
PLASTERBOARD CEILING PAINTED IN PF1
80
KITCHEN 1 A005
L7
CEILING LIGHTING TO P:\A1016 - SINCLAIR BROOK- OFFICE REFURBISHMENT\B -Drgs\B.1 LiveEXISTING Files\A1016 - SINCLAIR BROOK & - OFFICE REFURBISHMENT_new.rvt REMAIN IN LIFT LOBBY
D1
NEW PLASTERBOARD BULKHEAD
OFFICE FITOUT REFURBISHMENT
FILE REF
2600 AFFL
LINE AHEAD CUPBOARD
VOID
PROJECT
L3
TR1
L3
L3
L3
L3
DRAWING No.
A001
J-06
2
REV
A
D2
L4
L1B
D2 L4
D2
D2
PLASTERBOARD CEILING IN PF1
EXISTING BULKHEAD OVER
BT1
BT1
EXISTING PERIMETER BULKHEAD TO REMAIN AND SPRAY IN PF4
D2 L3
L4
L3
L3
L3
10
2X
S ER AW DR DER UN
2X
S ER AW DR DER UN
2X
S ER AW DR DER UN
PF5
LM2
PF5
GRAIN DIRECTION
PF5
MITRE STONE JOIN BT1
ARISED CORNER FINGER PULL SLOT LM1
ABS EDGING
OPEN
L3
DRAWER/ DOOR LM1
2600 AFFL
D1
D1
D1
C6
D1
D2
D2
D2
D2
D2
C6
C6
C6
C6
C6
D2
3
3 3
EXISTING PERIMETER BULKHEAD TO REMAIN AND SPRAY IN PF3
STIC OUT
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2 EXPOSED
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
TO BE
2600 AFFL
CEILING SPRAYE TO SLAB D IN PF4
4
A
2 -
EXISTING PERIMETER BULKHEAD TO REMAIN AND SPRAY IN PF4
B
C
D
-
REMOVE EXISTING ACOUSTIC TILE CEILING AND SPRAY OUT ALL SERVICES IN PF4
4
E
D-ARC MELBOURNE SYDNEY
FLOOR PLAN - KITCHEN BREAK OUT ZONE 4
1 : 20
-
LEVEL 11 63 EXHIBITION STREET MELBOURNE VIC 3000 PH +61 3 9663 7656 LEVEL 2 50 YORK STREET SYDNEY NSW 2000 PH +61 2 8235 4100 © COPYRIGHT 2017 D-ARC ARCHITECTS D-ARC.COM.AU
REV
A
DESCRIPTION
TENDER ISSUE
DATE
23.02.2018
BY
FF
E3 ELEVATION - J-06 ISLAND BENCH 1 : 20
KEY PLAN
5 -
E4 ELEVATION - COAT HOOK
ADDRESS
DRAWN
STATUS
-
CLIENT
SINCLAIR BROOK PTY LTD
LEVEL 1, 460 BOURKE STREET MELBOURNE 3000 JT
THE CONTRACTOR MUST VERIFY ALL DIMENSIONS ON SITE PRIOR TO COMMENCING ANY WORK OR MAKING OF ANY SHOP DRAWINGS. FIGURED DIMENSIONS MUST BE USED IN PREFERENCE TO SCALING. SCALED DIMENSIONS MUST BE VERIFIED ON SITE. THIS DRAWING IS COPYRIGHT AND REMAINS THE PROPERTY OF THE ARCHITECT.
7
1 : 20
CHECKED
FF
NORTH
SCALE (@A1)
Level 1, 460 Bourke Street, Melbourne 3000 CLIENT
SINCLAIR BROOK PTY LTD
DRAWING TITLE
DEMOLITION & PROPOSED REFLECTED CEILING PLAN
DRAWING TITLE
BREAK OUT ZONE ELEVATIONS & DETAILS
As indicated
1 : 100
ADDRESS
1:2
PROJECT
PROPOSED REFLECTED CEILING PLAN
LEVEL 1, 460 BOURKE STREET MELBOURNE 3000
DETAIL - J-07 KITCHEN BENCHTOP FRONT EDGE
OFFICE FITOUT REFURBISHMENT
FILE REF P:\A1016 - SINCLAIR BROOK- OFFICE REFURBISHMENT\B -Drgs\B.1 Live Files\A1016 - SINCLAIR BROOK - OFFICE REFURBISHMENT_new.rvt
Project 3 - Sinclair Brook Office Refurbishment KEY PLAN
1.5mm ARISED EDGE
BT1
ISLAND BENCH
D1 D2
1:5
SELECTED COAT HOOKS. REFER TO FINISHES & FITTING SCHEDULE.
CH
EQ
D1 2700 AFFL
DETAIL - SECTION THROUGH OVERHEAD CUPBOARD
4100
2600 AFFL
2400 AFFL
L7
LINE OF BULKHEAD OVER
DRAWING TITLETO SLAB EXPOSED CEILING TO BE SPRAYED IN PF4
CLIENT
SINCLAIR BROOK PTY LTD
6
PF2
10
7 A005
60
D1
J-07
1850
LIFT
DRAWN
D1
4 A007
L5
MAX. HOOK HEIGHT
ADDRESS
LEVEL 1, 460 BOURKE STREET MELBOURNE 3000
L5
1000
D1
BT1
L5
MIN. HOOK HEIGHT
D1
L5
OPE N
D1
KEY PLAN
SPRAY OUT ALL SURFACES OF EXISTING CEILING SLAB IN PF3 PRIOR TO INSTALLATION OF NEW CS METAL BATTEN CEILING
L5
1230
L5
900
L1A
ISLAND BENCH
L1A
MW BUILT-IN MICROWAVE
LM1
ALIGN
L1A
STAIR 2
FEMALE BATHROOM
EQ
VOID
WT1
26
EMERGENCY CORRIDOR
D1
BINS X 2 1 RECYCLE 1 WASTE
40
D1
DS DISHWASHER
FD1B INTEGRATED FRIDGE 2
700
1
STAIR 1 D1
FD1A INTEGRATED FRIDGE 1 100
1 CS METAL GRID CEILING IN BLACK. REFER TO FINISHES & FITTING SCEDULE.
350
EX. PLASTERBOARD BULKHEAD TO REMAIN
EX. PLASTERBOARD BULKHEAD TO REMAIN
50
BM2 KITCHEN SINK
L6 LED STRIP LOCATED BELOW JOINERY
5
PROJECT No.
A1016
DRAWING No.
A005
REV
A
02
THE WASTE CATHEDRAL This thesis project explores speculative architectural design responses to complex situation of Anglesea, Victoria, where is a post-mining seaside town on the Great Ocean Road. The site is surrounded by a rich biodiversity and this project provides a chance on proving how architecture can help in restoring the polluted environment and let human develop their own senses of awareness towards the environmental protections.
Anglesea has rich biodiversities that many animal species could be found, however, the development of previous coal mine excavations and power station nearby have created lots of undesirable problems and pollutions to the wildlife there.
7
1
Assigned contractors usually collect household wastes from street bins.
4
2
The collected waste will be transported by trucks to Angelsea, as a central collection point.
After sorting all the recyclable wastes in transfer stations, and the remaining non-recyclable wastes will be disposed into the Anglesea landfill nearby.
5
3
All wastes will be sorted based on their nature by hands in the transfer stations in Anglesea, especially recyclable wastes.
The collected recyclable wastes will be delivered to Geelong for further processes and be recycled into other resources after.
Current Waste Treatment in Anglesea
The waste cathedral is a prototype reinterpret waste collection and restore the landfill area in Anglesea; and where human can repent their sins through series of ritual engagements in the directive journey in order to turn into a sinless community in the future.
9
1 Contemplation Sort and dispose waste based on their nature; hanging magnet balls at the back can define whether the metal is ferrous or not.
2 Purification Rinse plastic bottles along the artificial river that collects rainwater from the umbrella structures, and be brought down for further treatments.
3 Enlightenment Research centres here investigate possible solutions of turning waste into new resources and minimize solid wastes to benefit the society.
4 Redemption Visitor sacrifice their energy, equivalent to the amount of waste they disposed, to ignite the incinerator to burn down the non-recyclable wastes by cycling.
5 Reincarnation All collected waste will undergo serious of treatments and will be given an entire new life as a new resouces.
6 Rewards An agricultural zone that greets with a cloud of mist and the fresh produces are here as rewards.
11
All the gathered food waste will be temporarily stored for sterilization and will then be crushed into smaller pieces by the blender. The water molecules in the small food waste particles will be removed by the spinning dehydrator in high speed. After filtered, the fine food waste particles will be transported to the garden through the sprinklers.
Metal can be distinguished by their nature into ferrous or non-ferrous, magnet balls will be a testing tools for people to find out their nature and dispose them correctly. The wastes will then moved to the anodized tank after crushed into small pieces for removing impurities. Smelter can further melt the metal waste into liquid forms and for later use.
Food Wastes
Metal Wastes
People will first rinse their plastic bottle wastes along the purification rive and then be brought down for further crushing into small pieces. The smelter will turn the plastic into liquid form under high temperature; it can be turned into two types of final products upon various usages, namely the plastic pellets and plastic filaments.
Not all waste can be recycled, so the non-recyclable waste is collected and burnt down by the incinerator. Visitors will have to cycle to ignite the incinerator and they have to generate the amount of energy that equivalent to the amount of waste they have produced, where there is an indicator aside to provide the data. The break-down waste will turn into a ring of smoke to remind people how much waste they have been produced.
Plastic Wastes
Non-Recyclable Wastes
13
03
Living & Working in Tokyo ARCHsharing Student Competition
Kaipai!
Crush the malt
Add hot water to remove sugar
Malt residues as animal feed
Boil & add Hops/ Flavorings
Collected hops use again as fertilizer
Move to fermentation tank with yeast
Residual yeasts added into baked goods
Filter the liquid
The design purpose is correspond to a typology combining living and working together within a skinny building in the heart of a city centre; and how to strike a balance between two major criterion through the distribution and relationship of internal spatial arrangement. So as to let the users/ owners of this building can truly engage in a work-live balance when especially the building locates in a business district with many programmatically-mixed buildings, which the combinations of office and living space are commonly found.
CRAFT BEER BREWERY 地ビ ー ル Private Courtyard
Flexible Meeting Space
Rooftop Bar + Brewery
Staff Platform
Beer Storage
Bedroom & Lounge
Manga Bunker
15
Beer Pipes
Beer Taps
G/F
Beer Tanks
Brew House
4/F 1/F
Staff Platform Bunk Area
3.5/F Beer Taps
3/F 2-2.5/F
Flexible Meeting Space
Flexible Meeting Space
Bunk Area
2.5/F 2/F
3/F
Bedroom 1
Owner Shared Space
3.5/F
Outdoor Area
1/F
4/F
Outdoor Area Bedroom 2
G/F
Outdoor
Outdoor Area Area
04
Shaping Urban Living Studio Project - 2016 Studio Leaders : Ben Duckworth & Mark Loughnan | Run by Hassell
This studio is about the research, testing and realising of rules in specific cities, i.e. Hong Kong, Sydney, San Francisco, Singapore and London, so as to understand the variations of different housing design standards across cities as well as to study the pros and cons of how the set rules affect the building designs. We exploit the opportunities and possibilities of resolving current urban situations and constraints through applying and reconsidering a new set of housing rules. So as to establish a rules-responsive and cohesive residential tower design. i) Tower - To create an unique and remarkable tower in sculptural features. ii) Podium - Encourage public engagement that possess clusters of shared activities. iii) Be “Green� - To provide sufficient green space/area for residents to connect with nature.
17
This residential tower encourages a self-Âsustaining idea that the living place contains lists of activities to support their daily living and their needs. Unique features such as green balustrade, green open space and the green division help extend green space from flagstaff garden to each apartment.
Green Balustrade
Green Open Space
Green Division
Every unit is surrounded by greeneries, with the embedded planter on balustrade.
Green open space locates throughout the building, where mostly in the N-facing sides.
Green Division helps divide units along the panoramic balcony.
Apartment
1 Bedroom
3
Balcony
To achieve a co-exist and harmonious living environment by providing both green feature and numerous of activities to support residents livings. The major attraction is the co-existence of greenery and activities; to make the living spaces more vivid and sustainable. Panoramic view created by a walk-Âaround balcony of differing width that allow people to see both nature and cityscape with possibly uninterrupted view. Upper level offer sweeping views of the city and garden.
2 Living Room 19
Amenities
4 Outdoor Pool
5 Library
6 Market
7 Family Farm
05
Shenzhen Future Urbanism Shenzhen HK Bi-City Biennale for Urbanism & Architecture Studio Leaders : Alan Pert & Donald Bates & Justyna Anna Karaiewicz
21
06
Turkish Bathhouse Studio Project - 2015 Studio Leader : Rennie Liffen
The studio brief is to create an architecture of a new public bathhouse set on a detailed hypothetical site embedded in the central city of Cukurcuma, Istanbul. Learning how to incorporate the unique and local bathing experience by exploring on the composition of materiality, functional space and atmospheric environments, focus on the sensory profiles of architectural spaces using creative but disciplined drawing and model making as iterative investigative tools in order to create unique spatial experience and bathing journey in the final design outcome. Consideration of architectural space in the context of all five senses is the critical role of applying technology and materials in the production of the sensory profiles of architectural spaces.
The rising steam engulfs the room quickly and warms the space. Hot water is delivered all the way from ceiling to the bath through the exposed copper pipes. The mineral rich bath water drips comfortingly and leaves some rusty stains on the pipes as well as the rough concrete wall. The pleasant aroma from the mineral water calms and creates a pressure-free space for bathers. The sunlight creeps in through the gaps of timber screen and the heat inside protects bathers from the snowy weather outside.
Fire Bath
A fountain bath which jets water into the air to supply cleansing water. Playing on the concrete tiles, bathers can scoop and drink the bath water with the essence of minerals and the saltiness. The water from the fountain is actually filtered recycling bath water from the sound bath next to it, so the warmth retains in the fountain even it is an outdoor bath, bathers can enjoy a view of the surrounding houses.
The rising steam engulfs the room quickly and warms the space. Hot water deliver all the way from ceiling to the bath through the exposed copper pipes while the mineral rich bath water leaving some rusty stains on the pipes as well as the rough concrete wall. The pleasant aroma from the mineral water calms and creates a pressure-free space for Francesco. The sunlight creeps in through the gaps of timber screen and the heat inside protects bathers from the snowy weather outside.
Water Fountain 23
25
CURTAIN CURTAIN SHINGLE WALL WALL GLAZING
75o (summer noon)
30o (winter noon)
E
W
20o (winter morning)
07
N
N N
Commercial Highrise
SUN ORIENTATION INSTALLED POSITION OF PV GLASS MAXIMUM EXPOSURE OF SUNLIGHT PANEL
SOLAR RADIATION ANGLE
Applied Construction After initial design stages, we will have to consider series of construction technologies and practical methods in order to design a commercial multi-storey building; which then implement the optimal construction principles to form a technically coherent design. Have been trying to figure a design that with both active and passive system approaches, PV panels installed on facade in order to supply electricity to the building, and is installed at the top part with 15 degrees tilted to receive maximum sunlight. While the passive shingled facade system provides shading effect as the inclined 3D MODEL ILLUSTRATES THE POSITION OF PV help PANEL AND SHINGLE GLASS angle avoid direct sunlight.
ACTIVE SYSTEM APPROACH CURTAIN CURTAIN BUILDING INTEGRATED PHOTOVOLTAIC SHINGLE WALL WALL GLASS MODULES CAN ABSORB AND GLAZING DIRECTLY CONVERT THE SOLAR RADIATION ENERGY INTO ELECTRICITY WHICH ABLE TO SUPPLY BACK TO THE BUILDING AND THIS POTENTIAL IS ENDLESS
THE PV PANELS ARE INSTALLED MOSTLY AT THE TOP PART OF THE BUILDING FACING NW DIRECTION WITH 15o TILTED IN ORDER TO RECEIVE SUNLIGHT. ALSO, CAN MAKE GOOD USE OF THE UNUSED SURFACES OF THE BUILDING. SUN OR MAXIMU PASSIVE SYSTEM APPROACH SHINGLE FACADE SYSTEMS PROVIDES SHADING EFFECTS AS THE INCLINED ANGLE CAN AVOID DIRECT SUNLIGHT. USE SUNLIGHT WITHOUT ACTIVE MECHANICAL SYSTEM
N
PV GLASS PANEL
LAMINATED SHINGLE GLAZING
N
MULLION & TRANSOM
PV GLASS
LAMINATED GLASS
PV GLASS
GLASS-GLASS MODULE
PHOTOVOLTAIC GLASS MODULE MODULE WIDTH : MODULE LENGTH: POWER OUTPUT: AREA OF CELL: (ENTIRE ENVELOPE)
TEMPERED GLASS PV GLASS PANEL
SOURCE: OPTISOL SCREEN - www.scheuten.com
PV GLASS PANEL TEMPERED GLASS (LOW - E)
PV GLASS PANEL LOW - E GLASS
TEMPERED GLASS (LOW - E) PVB FOIL
1500mm 1200mm 249wp 4600 m2
LAMIN
PHYSICAL MODEL OF SHINGLE GLAZING (L) AND CURTAIN WALL (R)
APPLIED CONSTRUCTION ABPL90118 ASSIGNMENT 3 - ENVELOPE 3D MODEL ILLUSTRATES THE POSITION CHAU HEI TONG 383768 OF PV PANEL AND SHINGLE GLASS LEUNG CHI MEI MIMI 748422 PV3.2 GLASS TANG TSZ LAM 383512
SOURCE: O
BMU SPECIFICATIONS: “Scorpio” model ARM LENGTH: 20m max. WORKING HEIGHT: 280m MACHINE WEIGHT: 30 ton max.
POSITION IN OPERATING
POSITION IN PARKING
4000
ALUMINIUM ROOF CAPPING
Data from Secalt S.A.
ISOMETRIC DIAGRAM
DRAINAGE OVERFLOW BRING WATER OUT FROM THE ROOF
WATERPROOF MEMBRANE
PARAPET WALL
1000
250
STEEL STRUCTURAL FRAME
BMU CRANDLE FOR TWO MEN AT ONE TIME
EDGE BEAM
250mm CONCRETE SLAB
BMU CRADLE FOR TWO MEN AT ONE TIME
SHINGLE PV GLASS PANEL
STUMP
CEILING
LINE OF PARAPET
ENLARGED PARTIAL ELEVATION 1:50
8000
BMU MAXIMUM FORWARD REACH 20m LONG
CONCRETE TRAIL FOR BMU TRACKING AROUND THE PERIMETER OF ROOF
LAMINATED DOUBLE GLAZING WITH PHOTOVOLTAIC CELL
ROOF TRACKED BMU WITH LONG ARM REACH
LINE OF BUILDING BELOW LINE OF PARAPET
BMU SHED
EMERGENCY STAIRCASE
ENLARGED PARTIAL SECTION 1:50
LINE OF BMU TRACK
ROOF DRAINAGE (WITH 1:100 SLOPE)
ROOF PLAN 1:500
4.3
BMU PLAN 1:50
27
08
Other Projects
9-11 Canara Street, Doncaster East
Unit 1 9-11 Canara Street, Doncaster East Ground Floor
85.30 sqm
First Floor
84.50 sqm
Double Garage
40.10 sqm
Private Open Space
40.00 sqm
Unit 1
Ground Floor Plan
Unit 2
Unit 1
First Floor Plan
9-11 Canara Street, Doncaster East Ground Floor
77.30 sqm
First Floor
79.50 sqm
Double Garage
40.10 sqm
Private Open Space
40.00 sqm
Unit 2
Ground Floor Plan
Unit 3
Unit 2
First Floor Plan
9-11 Canara Street, Doncaster East Ground Floor
99.10 sqm
First Floor
81.90 sqm
Double Garage
40.10 sqm
Private Open Space
40.00 sqm
Unit 3
Ground Floor Plan
Unit 3
First Floor Plan
Cybercut Hair Salon Boxhill Shopping Centre, Boxhill
29
Thank you !