242 Material Estimate & Procedure

Page 1

ARC242Montanari


3. Material List & Cost Analysis 4. Equipment Requirements 5. Project Detail (Filter Design) 6-14. Procedural Storyboard

2


Roof Components (Continued)

Foundation Item

Quantity

Price Per Unit

Total Price

8x8x16 CMU Block

4

$1.59

$6.36

<20 lbs Quikrete

1

$4.98

$4.98

5’ Sill Sealer

1

$4.69

$4.69

6” Anchor Bolts

4

$3.09

$12.37

Flooring Item

Quantity

Price Per Unit

Total Price

Item

Quantity

Price Per Unit

Total Price

2x4x8’ Wood

2

$2.84

$5.68

1”x6” Tongue & Groove Soffit Boards 25 sq. ft. Black Felt/Tar Paper

5

$3.57

$17.85

1

$14.20

$14.20

12’ Drip Edge

1

$4.69

$4.69

Water Runoff Item

Quantity

Price Per Unit

Total Price

Gutter Spikes

3

$3.66

$10.97

Downspout

1

$8.34

$8.34

>1’6” Wide Carpet 3/4"x4'x8' OSB

1 2

$6.24 $22.97

$6.24 $45.94

Elbow

3

$2.35

$7.05

Gutter Straps

2

$1.52

$3.04

Base Board 7’

1

$12.52

$12.52

8’ Gutter Length

1

$5.23

$5.23

Rebond Carpet Padding (Sq. Ft.)

6

$2.88

$17.28

4” Vinyl Gutter End Cap

1

$2.97

$2.97

Wall Components

Fasteners Item

Quantity

Price Per Unit

Total Price

Box of Nails

1

$2.48

$2.48

$63.15

Box of Roofing Nails

1

$7.97

$7.97

$16.17 $8.47

$32.34 $118.58

Box of Drywall Screws

1

$4.37

$4.37

Box of Finishing Nails

1

$1.48

$1.48

1

$43.96

$43.96

2 2

$13.30 $7.39

$13.30 $14.78

Price Per Unit

Total Price

15

$4.21

2 14

60 sq. ft. Tyvek/Vapor Barrier 35 sq. ft. Gypsum Board 2x10x8’ Wood Header

Item 2x6x8’ Wood (Frieze, Treated, Sill) ½x4x8’ Plywood Vinyl Siding

Quantity

Roof Components

Filter Item

Quantity

Price Per Unit

Total Price

1x4x8’ Wood

3

$2.04

$6.12

18” Slide Track & Roller

4

$7.49

$29.96

24x36 Glass

2

$13.00

$26.00

Item

Quantity

Price Per Unit

Total Price

2x8x8’ Rafters 25 sq. ft. Shingles

2 1

$5.72 $27.50

$11.44 $27.50

Subtotal

$595.32

Tax

X 8.25%

Soffit Vent

1

$1.49

$1.49

Total

$644.43

Totals

3


Hand Tools

Power Tools

Equipment

Framing Hammer

Drill + Bit Set

Safety Glasses

Screwdrivers - Basic Set

Miter Saw

Calculator

Adjustable Wrench

Circular Saw

Saw Horse

Combination Square

Nail Gun

50’ Extension Cord

Tin Snips

Compressor

Step Ladder

Utility Knife Hand Saw Speed Square Tape Measure Level Pliers

4


1: Construct the frame of the filter according to the dimensions of the wall opening. 2: Construct the wooden panels by cutting out slant pieces of a width of 1/2". Then attach them to a 3" wide frame. 3: Construct a mirror image of the wooden panel to create the second filter piece. 4: Attach the railing rollers to the filter frame in the wall opening. 5: Insert the wooden panels and glass panels in the railing systems to complete the filter.

5


6


1

(1) 4 CMU blocks are arranged in an “L� shaped pattern to form a base.

4

(4) A termite shield and sill sealer is rolled onto the CMU. The 2x6 sill plate is bolted down to the CMU. The sill plate should be offset 1/2� from the side of the CMU so that the sheathing will be flush.

3

2

(3) Before the Quikrete hardens, 5 anchor bolts will be placed into the cores of the CMU.

(2) Quikrete is poured into the CMU cores in preparation of the anchor bolts.

5

6

(5) 2x10 Headers are placed on top of the sill plate and toenailed down. The headers should be flush with the side of the sill plate.

(6) 2x6 joists are attached using 2 joist hangers. A rear header is attached to stabilize the joists.

7


7

8

9

(7) Attach žâ€? OSB Sheathing to Joist System.

(8) Construct the stud wall system. Attach the 2x6 studs to the sole plate according to the location of the wall opening. Construct the corner system as illustrated in the graphic. Construct the window frame and attach to the stud wall system.

(9) Attach the sole plate of the stud wall system to the floor sheathing.

8


10

11

(11) Attach Tyvek weather barrier to the exterior OSB wall sheathing.

(10) Attach ½” exterior OSB wall sheathing to the studs.

9


12

13

(12) Attach 2x8 rafter to the double header by cutting a birds mouth cut into the rafters where needed. Attach the 2x8 frieze board to the end of rafters. Attach 2x8 lookouts to the rafters where needed.

(13) Attach the 1x6 tongue and groove soffit boards and the soffit vent to the underside of the rafters. Attach 3/4� OSB roof sheathing to the top of the rafters.

10


14

(14) Attach vinyl panel siding to the exterior walls, and cover corner with edge trim piece.

15

(15) Attach 1x10 fascia board to frieze board. Attach gutter system using gutter spikes and brackets to the fascia board.

16

(16) Layer OSB roof sheathing with roofing felt. Attach composite asphalt shingles to the OSB roof sheathing through the roofing felt.

11


17

18

19

(17) Attach 2x4 ceiling joists to the double header and rafters.

(18) Attach the gypsum board to the interior wall studs and ceiling joists. Stretch the carpet pad and carpet to the floor OSB sheathing.

(19) Attach the base board/trim to the bottom of the interior walls.

12


20

(20) Construct wooden frame to the dimensions of the wall opening insert into wall opening.

23

22

21

(21) Attach interior filter rail system to the edge of the wall opening. Insert glass panels into railing system.

(22) Attach exterior filter rail system to the edge of the wall opening. Insert wooden filter pieces into the railing system.

(23) Attach 2x4 support post to the rear corner of the construction.

13


24

(24) Completed construction of wall section.

14


Jeff Montanari - Spring 2013 - Southern Illinois University


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.