Construction Design - Assignment 3 Jeff Qu Liu 977970

Page 1

ABPL30041 - Construction Design, Semester 1 - 2021 Blair Gardiner, Subject coordinator Catherine Woo, Senior Tutor Ivan Rakocevic, Tutor Jeff Qu Liu, 977970, 21st Mar, 2021 McKinnon Senior School, Tutorial no. 22 ASSIGNMENT 3 FINAL MODEL & PRESENTATION

Zone Allocated: N @at studio URL: https://at.studio/abpl30041_20s1_t22_ivan#model=d4158400-b73d-11eb-a484-4f7d518f413a


977970_Liu_Qu Jeff_ABPL30041_T22_Assignment 3

CAMBER

Overview: SE


977970_Liu_Qu Jeff_ABPL30041_T22_Assignment 3

Overview: SW


977970_Liu_Qu Jeff_ABPL30041_T22_Assignment 3

Overview: NW


977970_Liu_Qu Jeff_ABPL30041_T22_Assignment 3

Overview: NE


977970_Liu_Qu Jeff_ABPL30041_T22_Assignment 3

Elevation North: General loading bearing transfer

Elevation South: Front Facade Design


977970_Liu_Qu Jeff_ABPL30041_T22_Assignment 3

Roof Condensation Sarking, spacer & insulations

General Roof Content: Sarking, insulation, foil, unicell & safety net


977970_Liu_Qu Jeff_ABPL30041_T22_Assignment 3

Beam Failure on flexible Joint without bracing

Zoomed roof ontent under sheet. Thermal & Acoustic proof


977970_Liu_Qu Jeff_ABPL30041_T22_Assignment 3

General Drainage Flow Path

Roof Edge Detail: Gutter Moisture protection, Vapour & Sealing


977970_Liu_Qu Jeff_ABPL30041_T22_Assignment 3

Facade Fin Content: Thermal & Acoustic Proofing

Window Sill Design. Drain flow, Thermal break & glazings.


977970_Liu_Qu Jeff_ABPL30041_T22_Assignment 3

Bottom of Fin Sealent Plate

Roof Condensation Sarking, spacer & insulations

Masonry wall, Moisture Protection & Drain, etc.


977970_Liu_Qu Jeff_ABPL30041_T22_Assignment 3

Acoustic tiles & Cement boards

Interior Attachments on wall, impact resis-plasterboard & Reinforced window glass


977970_Liu_Qu Jeff_ABPL30041_T22_Assignment 3

Overview: NW Internal Main Load Bearing Structure

Overview: SE


977970_Liu_Qu Jeff_ABPL30041_T22_Assignment 3

Buckled

SCABBLE

Edge Beam, Slab connection to Shear Wall


977970_Liu_Qu Jeff_ABPL30041_T22_Assignment 3

Structural Intergrity difference. Original & Adopted slab edge HCS design


977970_Liu_Qu Jeff_ABPL30041_T22_Assignment 3

Suspended Slab Content (Typical) & Slab Edge Reinforcement

Quarter Bar 2nd Floor


977970_Liu_Qu Jeff_ABPL30041_T22_Assignment 3

Precast Chamfer Edge

Edge Beam Content (Typical), Shear Wall bottom connected to Stripe Footing

Precast Grouting Dowel Bars


977970_Liu_Qu Jeff_ABPL30041_T22_Assignment 3

Stair Precast connection to beam & Beam to Shear Wall

Waler Angle to Shear Wall


977970_Liu_Qu Jeff_ABPL30041_T22_Assignment 3

Overview: NW Foundation Slab General View

Overview: SE


977970_Liu_Qu Jeff_ABPL30041_T22_Assignment 3

Geotech Report: Soil perching water & Deflecting Force. Choices on slab & Slab base water proof


977970_Liu_Qu Jeff_ABPL30041_T22_Assignment 3

Stripe Footing & Blinding Concrete. Suspended Slab & Joint to Raft Slab

Dowels to Precast Shear wall end reinforced extension


977970_Liu_Qu Jeff_ABPL30041_T22_Assignment 3

Dowels to Precast Shear wall end reinforced extension

Suspended Slab Interior Content


977970_Liu_Qu Jeff_ABPL30041_T22_Assignment 3

Pad Footing 1, Stripe Footing 4, starter bar of Precast Installation and their connection


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.