PART 2 CV + PORTFOLIO
J E Ma rM A MCBRIDE chitecture student
info. jemma.mcbride@hotmail.com 07890713914 135 Blairbeth Road, Glasgow, Scotland, G73 5BU https://issuu.com/jemma__ehm https://www.linkedin.com/in/jemma-mcbride-10000184 https://www.instagram.com/jemma__ehm/
Who am I?
Education
Awards
Hello, I’m Jemma and I am 24 years old. I have completed a MArch course at the University of Dundee and I am currently working in the west end of Glasgow for CRGP Ltd.
University of Dundee: MArch Architecture with Distinction BA Arch (Hons) 2:1 to date.
‘Teacher’s Choice’ Outdoor Classroom Project, Ladybank Primary School
• I have studied and created multiple different projects throughout my time at university and hope to study Dundee and its redevelopment especially it’s retail, and hospitality sectors within the city’s centre.
Guildry Geddes Group Award for Best Urban Design. Architecture + Society Masters Unit
Discovering and learning through architecture is what drives me within the course and in life. I have keen eye for detail and content; thoroughly enjoying all parts of architecture that let me show that. I have taken a large interest in existing buildings and regeneration of them.
@ P A LI
• Groupwork is a main focus within my course which has allowed me to work alongside different personalities and time schedules.
I would love to work with you!
Experience Design Assistant Part 1: October 2014 – September 2015 + Part 2: June 2017 Present CRGP ltd. – www.crgp.co.uk Glasgow Responsibilities • Answering to Associates and Directors with administration and feasibility studies. • Worked with multiple types of software including Office, CAD, Photoshop. • Communicating with clients for enquiries and help. • Communicating with suppliers to enquire, order and give information on projects. • Speaking to multiple persons in an office to collate information and develop projects. Temporary Receptionist – September 2014 Graven Images - graven.co.uk/ Responsibilities: • Greeting clients for every visit, making coffee and teas for each visitor. • Communicating with clients and connecting through to employees. • Ensuring the office is clean and tidy at the end of every day and checking the temperature • Given an extension of time to work for the office as an assistant at the end of the contract.
References Gemma Sommerville - Associate at CRGP Ltd 0141 337 2255 / g.sommerville@crgp.co.uk
Secondary School, September 2005 - 2011. St Aloysius College, Glasgow, Scotland
Highers 2009 - 2010 + 2011 Geography: A Art: A Classical Studies: A English: B Chemistry: B Biology: B Maths: C
Advanced Higher 2010 - 2011 Geography: A
Skills revit autocad rhino 3DS max sketchup
MICROSOFT OFFICE COMMUNICATION SKILLS DESIGN SOFTWARE . eg PHOTOSHOP
illustrator photoshop indesign - basic coding knowledge - windows os user - basic mac os knowledge
TIME MANAGEMENT
PROBLEM SOLVING
ORGANIZATION
nb. Is there any different software used in the office? I’m happy to learn
Hobbies + Interests
Graeme Hutton - Masters Unit Tutor at University of Dundee 01382 385315 / g.hutton@dundee.ac.uk Reading
Travel
Baking
Hiking
Video Games
Additional References on Request.
IMAGE
The Monadnock of Dundee MArch Thesis / Design Architecture + Society 2017
PART 2 PORTFOLIO JEMMA . MCBRIDE
THE MONADNOCK OF DUNDEE
MArch
THE IMPERFECT ORNAMENT
Entrance into the formal courtyard of St. Andrews – The nity College, Cambridge. New Court Elevational Study + Details : Drawn in AutoCAD. definition between the private and public, academia and life. TheAXONOMETRIC threshold creates an experience of grandeur. It gives St Salvator’s Courtyard status when entering into the scheme’s residential halls from the North.
A LIBRARY FOR LEITH
Honours
MEASURED DRAWING
STUDENT HOUSING
BArch
Butts wynd lane next to the site – The high gives Study The Scores conveyed in the same way as the wall in Bu Delft. wall Elevational : Hand are Drawn a distinction between St. Andrew’s university and the Wynd – The height of it distinguishing university grounds public realm. The lane width and the height of the wall the public. The landscaping surrounding the wall naturally s creates a sense of property – the university for the tens this. North facing – it becomes a softer landscape co student. A safeguard for knowledge and education. pared to the harshness and formality of the St. Andrews faca
STUDENT HOUSING PROPOSAL , ST. ANDREWS : CONCEPTUAL IMAGES DESCRIBING SPACES AROUND AND WITHIN SITE
PROPOSAL FOR STUDENT HOUSING, ST SALVATOR’S, ST ANDREW’S ELEVATIONS
Trinity College, Cambridge. New Court Elevational Study + Details : Drawn in AutoCAD.
CAMBRIDGE TRINITY COLLEGE
MEASURED DRAWING MEASURED DRAWING AND ORNAMENTAL DETAILS
Delft. Elevational Study : Ha
Demolition of existing buildings on site. Protection of B-Listed building and retaining of existing church gatehouse.
Intervention between existing building to created sensitive addition to library with external spaces formed for private and public use.
VIEW OF ST JAMES’ CHURCH FROM CONSTITUTION STREET
VIEW OF ST JAMES’ CHURCH FROM JOHN’S PLACE
FACADE OF ST JAMES’ CHURCH FROM SOUTH
I NTERVENTION
P ROT E C T ION
Intervention between existing building to created sensitive addition to library with external spaces formed for private and public use.
Demolition of existing buildings on site. Protection of B-Listed building and retaining of existing church gatehouse.
ADAP TIVE RE USE
Adaptive re-use of the church to create Leith’s library. The building is refunctionalized, a different story is born, a new plot is composed out of the old words, a new interpretation has taken place. - Machado, 1976
WITHIN ST JAMES’ CHURCH
VIEW OF ST JAMES’ CHURCH FROM JOHN’S PLACE
UTION STREET ELEVATION
RESTORATION AND ADAPTIVE REUSE OF ST ADAPTI VE RJ EAUS ME E S ’ C H U R C H , L E I T H .
0
I N T E RVE N T ION Intervention between existing building to created sensitive addition to library with external spaces formed for private and public use. WITHIN ST JAMES’ CHURCH
CHURCH REGENERATION DIAGRAMS STREET ELEVATION The building is refunctionalized, a different story is born, a new plot isCHURCH + PROPOSAL
Adaptive re-use of the church to create Leith’s library.
composed out of the old words, a new interpretation has taken place. - Machado, 1976
ST JAMES’ EPISOCOPAL CHURCH, LEITH SCALE 1:500
RESTORATION AND ADAPTIVE REUSE OF ST JAMES’ CHURCH, LEITH. AXONOMETRIC
AXONOMETRIC OF PROPOSAL
OLD
OLD
NEW
NEW
Grass roof to cover pavilion roofs and the drainage to run around perimeter. Flashing is proposed on the edge of the church’s window cill to ensure water run off will reach the roof and not compromise the building’s watertightness.
The threshold between the two buildings is of a high importance, An understanding is created through material choice - you are entering a quiet, importance space of the bulding, a revered space; the library.
DOOR THRESHOLD DETAIL SCALE 1:20
The existing church foundations to be underpinned by new foundations to ensure structure, to engineers specifications.
DOOR THRESHOLD SECTION - OLD + NEW
SCALER1:20 RESTO ATION AND ADAPTIVE REUSE OF ST JAMES’ CHURCH, LEITH.
THRESHOLD STUDY BETWEEN CHURCH AND PROPOSAL
Concrete floor screed to go up towards window seating. Reflection of beam structure above andaround, denseness of space emphasised before the library.
1:20 DETAIL
RESTORATION AND ADAPTIVE REUSE OF ST JAMES’ CHURCH, LEITH.
1 2 3 4 5 6 7
1 2 3 4 5 6 7
8
8
PLAN New Build + Scale1:10
PLAN New Build + Buttress Detail Scale1:10
1 - 150mm insulation 2 - 50mm cavity between brick and insulation 3 - peterson brick course until joint 4 - hidden RWP within brickwork leading into drain 1 - 150mm insulation 5 - drainbrick brickslot - runs around courtyard 2 - 50mm cavity between and insulation - 50mm Zinc fold between brickwork and 3 - peterson brick 6course until joint 4 - hidden RWP church within stone brickwork leading 7 - 10mm mastic joint into drain Herringbone Brickwork 5 - drain brickslot 8- -runs around courtyard 6 - 50mm Zinc fold between brickwork and Buttress Detail church stone 7 - 10mm mastic joint 8 - Herringbone Brickwork
PLAN Paving Study Scale1:10
PLAN R E S T O R A T I O N A N D A D A Paving P T I V EStudy REUSE OF ST J A M E S ’ C H U R C Scale1:10 H, LEITH. 1:10 DETAILS OLD/NEW + LANDSCAPE
PLAN New Build + Church Buttress Joint
RESTORATION AND ADAPTIVE REUSE OF ST JAMES’ CHURCH, LEITH.
Scale1:20
THRESHOLD STUDY BETWEEN CHURCH AND PROPOSAL
RESTORATION AND ADAPTIVE REUSE OF ST JAMES’ CHURCH, LEITH. 1:50 DETAIL STUDY MODEL + 1:500 URBAN STUDY SITE MODEL
DESIGN RESEARCH UNIT THE IMPERFECT ORNAMENT FINAL OBJECTS
DESIGN RESEARCH UNIT THE IMPERFECT ORNAMENT FINAL OBJECTS
CONCEPTUAL IMAGES TO DESCRIBE SITE CHARACTER
THE MONADNOCK OF DUNDEE THESIS DESIGN FOR OVERGATE TOWER
THE MONADNOCK OF DUNDEE THESIS DESIGN FOR OVERGATE TOWER BEFORE / AFTER
THE MONADNOCK OF DUNDEE THESIS DESIGN FOR OVERGATE TOWER CONCEPTUAL IMAGES TO DESCRIBE TOWER SETTING
THE MONADNOCK OF DUNDEE THESIS DESIGN FOR OVERGATE TOWER CONCEPTUAL IMAGES TO DESCRIBE SITE CHARACTER
THE MONADNOCK OF DUNDEE THESIS DESIGN FOR OVERGATE TOWER DEVELOPMENT MODEL
THE MONADNOCK OF DUNDEE THESIS DESIGN FOR OVERGATE TOWER
THE MONADNOCK OF DUNDEE THESIS DESIGN FOR OVERGATE TOWER
MIXED USE BUILDING THIRD AGE HOUSING/ COMMUNITY GARDENS/NURSERY
PUBLIC REALM UNDER THE TOWER
JAMES WATT DOCK HOUSING - FEASBILITY THROUGH TO CONSTRUCTION SITE AXONOMETRIC
ALL DIMENSIONS TO BE CHECKED ON SITE DO NOT SCALE FROM THIS DRAWING. USE FIGURED DIMENSIONS ONLY. IF IN DOUBT ASK. THIS DRAWING IS THE COPYRIGHT OF CHAMELEON AND SHOULD NOT BE REPRODUCED IN ANY FORMAT WITHOUT PRIOR APPROVAL.
Dashed line indicates Brick line of front elevation - battens to run flush with Brick Line. Lead to overlap Brick.
Verge ladder section by truss supplier
GABLE CONSTRUCTION
Marley Modern interlocking roof tile(Smooth Grey) 25 x 50mm battens 25 x 38mm counter battens Type F1 Roofing Felt 9mm OSB Sarking Trusses - Standard Cavity barriers to be 50 x 50mm supplied with timber kit - not proprietary
UPVC soffit and fascias to match elsewhere to roof verge
Lead cover flashing 150
Marley proprietary dry-ridge, eaves and verge systems. 100mm continuous soffit vent strip at eaves and ridge. 250 GRG Fireboard fitted to face of OSB, as per Timber Kit details
18mm WBP Plywood fixed to secondary timber framing fixed back to roof trusses. Continuous Code 4 lead flashing to verge gutter
150 Battens and counter-battens
Type F1 Roofing Felt
Treated SW timber fillet piece
9mm OSB Sarking
Treated SW timber tilting fillet piece
GRG Fireboard fitted to cap low level party wall as per Timber Kit details
Rockwool, or similar flexible 60min Firestop to head of Party Wall. Laid continuously along party wall line between sarking and party wall head. Trusses - Standard
89 x 38 Stud Frame (to Kit manuf requirements) INTERNAL PARTY WALL CONSTRUCTION (TYPICALLY BELOW CEILING)
9mm OSB Sheeting
12.5mm Gyproc Wallboard 19mm Gyproc Plank 89 x 38 Stud Frame (to Kit manuf requirements) 100mm Mineral Fibre insulation quilt compressed within (Min density 10 kg/ m続) 9mm OSB Sheeting 54mm Cavity 50mm Mineral Wool insulation within 9mm OSB Sheeting 89 x 38 Stud Frame (to Kit manuf requirements) 100mm Mineral Fibre insulation quilt compressed within (Min density 10 kg/ m続) 19mm Gyproc Plank 12.5mm Gyproc Wallboard
54mm Cavity 12.5mm Gyproc Wallboard on 19mm Gyproc Wallplank All joints staggered on both sides. Sheeting to achieve min mass of 22 Kg/ m続 A
REV
9
54
9
89
19 13
DESCRIPTION
JS BY
01475 789 411
314
architects@chameleon.ltd
CLIENT
RIVER CLYDE HOMES
300
89
DETAIL UPDATED TO ADDRESS ALIGNMENT ISSUE
Cut
Fold PROJECT
SLAEMUIR HOUSING
200
13 19
23:01:18
DATE
Chameleon Clyde View Riverside Business Park 22 Pottery Street Greenock PA15 2UZ
NOTE: - Butterfly Junction Lead Code 4 minimum. Setting out and cut as shown. Cover over the slates or tiles on each side should not be less than 150mm increasing to 200mm for exposed conditions or where contoured single lap tiles are used.
300
Code Level 4 Lead Sheet flashing dressed up face of step and sealed against brether membrane on GRG Fireboard fitted to face of OSB, as per timber kit Breather Membrane dressed between fixing system and over roofing felt and fillet. Min 50mm Rigid Insulation 9mm OSB Sheeting 89 x 38 Stud Frame (to Kit manuf requirements) 100mm Mineral Fibre insulation quilt compressed within (Min density 10 kg/ m続) 25mm TW55 foil-faced insulation board @ 0.022 W/ mK Board joints foil taped to form continuous VCL. 45 x 38mm s/w Stud service zone. Service zone battens to be fixed back through rigid insulation to main Timber Kit studs. 12.5mm Gyproc Wallboard plasterboard
ROOF CONSTRUCTION
DRG. TITLE
LEAD FLASHING STEPPED GABLE DETAIL
STATUS
CONSTRUCTION
DRAWN
CMG
CHECKED DM
200
PARTY WALL
200
JOB NO.
9232
DRG. NO.-REV.
SCALE
1.5 @A2
ORIGINAL A2 DATE
JAN 2018
9232 - A(21)028-A
MIDDLESEX STREET HOUSING
LEAD FLASHING DETAIL OVERLAPPING ROOFS
CMG CHKD
PART 2 PORTFOLIO JEMMA . MCBRIDE
Entrance into the formal courtyard of St. Andrews – The nity College, Cambridge. New Court Elevational Study + Details : Drawn in AutoCAD. definition between the private and public, academia and life. TheAXONOMETRIC threshold creates an experience of grandeur. It gives St Salvator’s Courtyard status when entering into the scheme’s residential halls from the North.
Butts wynd lane next to the site – The high gives Study The Scores conveyed in the same way as the wall in Bu Delft. wall Elevational : Hand are Drawn a distinction between St. Andrew’s university and the Wynd – The height of it distinguishing university grounds public realm. The lane width and the height of the wall the public. The landscaping surrounding the wall naturally s creates a sense of property – the university for the tens this. North facing – it becomes a softer landscape co student. A safeguard for knowledge and education. pared to the harshness and formality of the St. Andrews faca
info.
STUDENT HOUSING PROPOSAL , ST. ANDREWS : CONCEPTUAL IMAGES DESCRIBING SPACES
jemma.mcbride@hotmail.com 07890713914 135 Blairbeth Road, Glasgow, Scotland, G73 5BU AROUND AND WITHINhttps://issuu.com/jemma__ehm SITE https://www.linkedin.com/in/jemma-mcbride-10000184 https://www.instagram.com/jemma__ehm/
@ P A LI