PORTFOLIO
JEMMA MCBRIDE QUALIFIED ARCHITECT
project list PROJECT LIST
CRGP ltd - 2020 / Present King George V Pavilion South Ayshire Council + CGC Keppochhill Road NG Homes + Cruden Part III Thorntonhall Development Westpoint Homes Jackton Affordable Homes CALA West Part II - 2017 / 2020 Broxden Offices McDermott Group + ALGO Sutherland Avenue Westpoint Homes James Watt Dock Riverclyde Homes + Cruden Newton Mearns Feasaibility Westpoint Homes MIddlesex Street Southside Housing + CBC Part I - 2014 / 2015 Moray Primary Schools Linthouse Housing
bBALEARN a l e aHOUSE rn house • Renovation and proposed extension to private home within Perth & Angus • Active Work Stages 1 • Acting as Project Lead • 2020
n e w tMEARNS n mearns NEWTON • Renovation and proposed extension to private home within Perth & Angus • Active Work Stages 1 • Acting as Project Lead • 2020
jJAMES a m WATT e s DOCK watt dock • 133 flats for River Clyde Homes sited adjacent to historic Sugar Sheds • Active Work Stages 2-4 • Acting as Architectural Assistant • 2017-2018
sSUTHERLAND u t h e r AVENUE l a n d ave n u e • • • •
24 flats for Westpoint Homes within Pollokshields, Glasgow Active Work Stages 3 -6 Acting as Project Contact / Architectural Assistant 2017-2020
k e p p o cROAD hhill road KEPPOCHHILL • • • •
48 flats for NG Homes sited upon the historic Springburn Halls Active Work Stage 5 Acting as Architect 2020 - Current
1.5m
0m
13
990
12
910
910
910
11
910
10
910
910
910
910
9
910
910
910
910
910
910
910
8
910
910
910
910
7
910
910
6
910
910
5
910
910
910
4
910
910
910
3
910
910
910
2a
910
910
910
910
1a
910
910
SITE
80900 mm
1900
1203
80900 mm
04 - ROOF 79700
900
SFL - WINDOW HEAD
750
2500 850
2500
CLADDING LVL 04
CLADDING LVL 03
03 - SFL - 4600 76500
9400
1000
1000
SFL - WINDOW CILL
2500
1000
CLADDING LVL 01
2500 750
750
FFL - WINDOW HEAD
CLADDING LVL 02
02 - FFL - 2300 73000
150
FFL - WINDOW CILL
01 - GFL 71500
00 - GARAGE 70500
bBROXDEN r o x dOFFICES e n o ff i c e s
PPC ALUMINIUM INSULATED FLASHING
NORTH WEST ELEVATION 1 : 75
• Main office for McDermott Group including flexible working space and featuring WELL accreditation as first in Scotland • Active Work Stages 1-5 • Acting as Architectural Assistant / Part 3 CA • 2017-2020
Cavity Barriers
SITE
910
910
910
910
910
910
910
910
910
910
910
910
910
910
910
910
910
910
910
910
910
910
910
910
910
910
910
910
910
EQ.
EQ.
EQ.
1412
81112 mm
750
04 - ROOF 79700
900
SFL - WINDOW HEAD
750
2500 850
CLADDING LVL 04
CLADDING LVL 03
SP
03 - SFL - 4600 76500
1000
SFL - WINDOW CILL
1000
CLADDING LVL 01
2500 750
750
FFL - WINDOW HEAD
CLADDING LVL 02
02 - FFL - 2300 73000
FFL - WINDOW CILL
01 - GFL 71500
SOUTH WEST ELEVATION 1 : 75
3m
VISUAL SCALE 1:75 @ A1
bBROXDEN r o x dOFFICES e n o ff i c e s • Main office for McDermott Group including flexible working space and featuring WELL accreditation as first in Scotland • Active Work Stages 1-5 • Acting as Architectural Assistant / Part 3 CA • 2017-2020
Brick indicated here show tonal differences in Ivanhoe Brick (Stacked Horiztonal) with Beechwood Lea logo
Maintain single soldier course above windows to bring interest to facade overall and gesture towards larger soldier course banding at GFL and SFL.
bBEECHWOOD e e c h wLEA,o oTHORNTONHALL d lea • 28 flats for Westpoint Homes within the village of Thorntonhall, south Double soldier course banding of Glasgow around building • Active Work Stages 5-6 - Double soldier coursing has been introduced around the entirety of the • Acting as Project Contact / Architectural Assistant building. This creates cohesion tying the top and ground floor together. • 2019-Current - The lower soldier course banding grounds the facade. The introduction of stacked soldier coursing at ground floor level emphasizes each storey height and gives it a human scale.
04 - TFL 9225
03 - SFL 6150
02 - FFL 3075
Stacked horizontal brick introduced at the entrances only. Indicates the entrance. BEECHWOOD LEA BLOCK A
Introduction of 'Beechwood Lea' branding used for sales. Creates a cohesive image for development.
GROUND FLOOR PLAN
SCALE 1:200
LIBRARY LONG SECTION SCALE 1:200
lLIBRARY i b r aFOR r yLEITH fo r l e i t h • Renovation and adaption of St James Church for a new Leith Library • Proposal for re-use of disused church in the heart of Leith; through study of materiality and relationship of old + new. • Unit Leaders: Jamie Brown
m o n a d OF n oDUNDEE ck of dundee MONADNOCK • Masters thesis within group masterplan for Overgate area. • Mixed using building containing third age housing / community gardens and nursery utilising overlooked • Unit Leaders: Graeme Hutton + Neil Verow
sSKETCHES ketches thesis design or overgate tower. mixed using building containing third age housing / community gardens and nursery utilising overlooked
dDRAWINGS r aw i n g s thesis design or overgate tower. mixed using building containing third age housing / community gardens and nursery utilising overlooked