1. Case Study Site Visit: Collect data from the case study buildings and identify basic structures and materials. • Eastern Precinct Student Centre
Dimensions (approx.): 33m x 10m Potential construction constraints: Limited small space in between two buildings. Doug McDonell building has multiple floors and casts large shadow over student Centre, not allowing much natural sunlight. Links to other buildings: The Eastern Resource Centre and Doug McDonell support the Student Centre. The outer walls of these two buildings are used as the walls for the Student Centre. Structural Systems: Steel Frame structure. Materials: Steel, glass, wood, concrete • MSLE Building
Dimensions (approx.): 20m x 3m Potential construction constraints: Limited space between two buildings Links to other buildings: Links two parts of the MSLE building, and joins them so that it acts as one building. It uses walls from either side of the buildings for support. Structural Systems: Steel Frame structure. Materials: Steel, glass, timber, concrete, plasterboards, carpet, brick
Week 03 – Case Study Site Visit + On Site
Jennifer Payette
•
Queen’s College Extension
Dimensions (approx.): 15m x 9m Potential construction constraints: Limited space may make it difficult to pour concrete in situ. Links to other buildings: Joined to, but not supported by, the existing building. Structural Systems: Wooden Frame, steel frame and concrete. Materials: Concrete, steel, timber • Ormond Theology Centre Reception
Dimensions (approx.): 12m x 9m Links to other buildings: Connected to old building, which is a mass construction, whereas the new is steel frame structure. Structural Systems: Steel frame and concrete. Materials: Concrete, steel, glass, stone, carpet, brick
Week 03 – Case Study Site Visit + On Site
Jennifer Payette
2. On Site: Oval Pavilion site visit – develop awareness of construction process and link with the documentation drawings.
2
3
1
4
1
2
3
Back of the pavilion. Foundation and basement are complete. Concrete ground floor is underway.
Old tower is being renovated. New frame, roof and frame will be added.
Front of the old tower – not yet renovated.
4
Front of Pavilion – timber frame for floor in place.