$ Building:)) Apartment$building$–$Elisabeth$Street$ Builder:$Maxstra$ Construction$budget:$13$million$ 9$floors$–$55$apartments$ $ Ground$Floor$ K$Precast$panels$ K$Foundation:$piles$(as$the$building$is$heavy$and$on$unstable$ground)$ $
Services$tray$ $ $
$ $
$ $
$ $
$
Reinforced$Block$work$ $ $ $ $ $
$ First$floor$ K$Ceiling:$concrete$slab$(post$tension$concrete)$and$plaster$ K$Metal$stud$walls$ K$Acoustic$insulation:$20mm$gap$for$air$to$absorb$sound$ $
Plaster$Board$walls:$fire$insulation$ $ $ $
$
Fifth$Floor$ $
Concrete$columns$$ Through$building$ $
$
formwork$lines$
$
$
Steel$sheeting$$ formwork$
$
Week$07$–$Off$Campus$ $
$
Jennifer$Payette$
$
Top$Floor$ K$Galvanized$steel$roof$beams$ K$12Kmeter$span$ $ Battens'used'instead'of' studs'on'concrete'walls' due'to'mistakes'in' measurements.'
Steel$frame$walls$
$
$
$
$
$ $ Roof$ $
Steel$sheeting$
$ $ $
$