I NTEGRATED ARCHI TECTURE DESI GN 6
PROJ ECT 1
I NTEGRATED ARCHI TECTURE DESI GN 6
PROJ ECT 1
I NTEGRATED ARCHI TECTURE DESI GN 6
PROJ ECT 1
I NTEGRATED ARCHI TECTURE DESI GN 6
PROJ ECT 1
I NTEGRATED ARCHI TECTURE DESI GN 6
PROJ ECT 1
Kwong Tong Cemet ery Kual a Lumpur One oft he ol destand l ar gestChi nese cemet er i esi n KL.I twasf ounded i n 1895 and i sr un by The Associ at i on of Kwong Tong Cemet er y Management Kual a Lumpur .I t occupi es263 acr esi nt he hear toft he ci t y,most l y atBuki tSeput eh butwi t h anot her smal l ersi t ei n SungaiBesinextt ot he Mi ddl e Ri ng Road 2 nearTaman Connaught . Hi st ory he ear l yyear sofKual a Lumpur , al ar ge Chi nese popul at i onwer e engaged t i n Dur i ng t mi ni ng.The decr eased wer e bur i ed hast i l y ar ound t own,and woul d be exhumed a f ew year sl at erf orr ebur i al si n Chi na. The Chi nese communi t y pr oposed t ot he Sul t an ofSel angorand t he Br i t i sh f orBuki t Seput eh t o be a Chi nese Cemet er yi n 1895 The Kuo mi ng t ang Cenot aph waser ect ed i n 1947 t o honourt hose who r epat r i at ed t o Chi na t oj oi n ant i J apanese ar my.Si nce t hen,many f amouspi oneer sofKual a Lumpur such asKapi t an Ci na Yap Ah Loy have been l ai dt or esther e
I NTEGRATED ARCHI TECTURE DESI GN 6
PROJ ECT 1
Chan Sow Li n wasone oft he moder nf oundi ng f at her sofKual a Lumpur .He pl ayed ar ol ei nr est or i ng t he peace i nt he Lar utW ar s.Hi s pi oneer i ng i nt he i r onwor k i ndust r y ear ned hi mt he t i t l e ofThe f at herofChi nese i r on wor ksi n Mal aya Loke Yew,bor n W ong Loke Yew,CMG,LL. D.was a Chi nesebor n,ofCant onese descent ,busi ness magnat e.Dur i ng hi sl i f et i me,he pl ayed a si gni ficantr ol ei nt he devel opmentofKual a Lumpurand wasal so one oft he f oundi ng f at her sofVi ct or i a I nst i t ut i on i n Kual a Lumpur . ect ed by W ong Yi ng, a pr osper ous Cant onese mi ner and Yap Ah Shak was sel sever alot her st ot ake overf r om Kapi t anChi na Shi nofSungaiUj ong si xmont hsaf t er t he di st ur bancest her e had di ed down.The l at e Kapi t an Shi n wassl ai ni nt he 1860 upr i si ng oft he Chi nese mi ner satSungaiUj ong at t r i but ed t o excessi ve t axat i on by t he l ocalMal ay chi ef s. Zhao Yu,f r om LongxiVi l l age,Tai shan Count y,Guang zhao Pr ef ect ur e.I n 1889,he wasappoi nt ed a memberoft he Sel angorSt at e Counci l .Appoi nt ed asa memberof Kual a LumpurHeal t h Bur eau i n 1890. Yap Kwan Seng wast he fif t h and l astKapi t an Chi na ofKual a Lumpurf r om 1889 t o 1902.Kapi t answer e appoi nt ed chi ef sorheadmenoft he var i ouset hni ccommuni t i es dur i ng t he per i od ofBr i t i sh col oni alr ul ei n whati spr esent day Mal aysi a.Kapi t ans pl ayed an i mpor t antr ol ei nt he hi st or y oft he Chi nese i n Mal aysi a.
I NTEGRATED ARCHI TECTURE DESI GN 6
PROJ ECT 1
I NTEGRATED ARCHI TECTURE DESI GN 6
PROJ ECT 1
I NTEGRATED ARCHI TECTURE DESI GN 6
PROJ ECT 1
I NTEGRATED ARCHI TECTURE DESI GN 6
PROJ ECT 1
I NTEGRATED ARCHI TECTURE DESI GN 6
PROJ ECT 1
I NTEGRATED ARCHI TECTURE DESI GN 6
PROJ ECT 1
I NTEGRATED ARCHI TECTURE DESI GN 6
PROJ ECT 1
I NTEGRATED ARCHI TECTURE DESI GN 6
PROJ ECT 1
I NTEGRATED ARCHI TECTURE DESI GN 6
PROJ ECT 1
I NTEGRATED ARCHI TECTURE DESI GN 6
PROJ ECT 1
I NTEGRATED ARCHI TECTURE DESI GN 6
PROJ ECT 1
I NTEGRATED ARCHI TECTURE DESI GN 6
PROJ ECT 1
I NTEGRATED ARCHI TECTURE DESI GN 6
PROJ ECT 1
I NTEGRATED ARCHI TECTURE DESI GN 6
PROJ ECT 1
I NTEGRATED ARCHI TECTURE DESI GN 6
PROJ ECT 1
I NTEGRATED ARCHI TECTURE DESI GN 6
PROJ ECT 1
I NTEGRATED ARCHI TECTURE DESI GN 6
PROJ ECT 1
I NTEGRATED ARCHI TECTURE DESI GN 6
PROJ ECT 2
I NTEGRATED ARCHI TECTURE DESI GN 6
PROJ ECT 2
I NTEGRATED ARCHI TECTURE DESI GN 6
PROJ ECT 2
I NTEGRATED ARCHI TECTURE DESI GN 6
PROJ ECT 2
I NTEGRATED ARCHI TECTURE DESI GN 6
PROJ ECT 2
I NTEGRATED ARCHI TECTURE DESI GN 6
PROJ ECT 2
I NTEGRATED ARCHI TECTURE DESI GN 6
PROJ ECT 2
I NTEGRATED ARCHI TECTURE DESI GN 6
PROJ ECT 2
I NTEGRATED ARCHI TECTURE DESI GN 6
PROJ ECT 2
I NTEGRATED ARCHI TECTURE DESI GN 6
PROJ ECT 2
I NTEGRATED ARCHI TECTURE DESI GN 6
PROJ ECT 2
I NTEGRATED ARCHI TECTURE DESI GN 6
PROJ ECT 2
I NTEGRATED ARCHI TECTURE DESI GN 6
PROJ ECT 2
I NTEGRATED ARCHI TECTURE DESI GN 6
PROJ ECT 2
I NTEGRATED ARCHI TECTURE DESI GN 6
PROJ ECT 2
I NTEGRATED ARCHI TECTURE DESI GN 6
PROJ ECT 2
I NTEGRATED ARCHI TECTURE DESI GN 6
PROJ ECT 2
I NTEGRATED ARCHI TECTURE DESI GN 6
PROJ ECT 2
I NTEGRATED ARCHI TECTURE DESI GN 6
PROJ ECT 2
I NTEGRATED ARCHI TECTURE DESI GN 6
PROJ ECT 2
I NTEGRATED ARCHI TECTURE DESI GN 6
PROJ ECT 2
I NTEGRATED ARCHI TECTURE DESI GN 6
PROJ ECT 2
I NTEGRATED ARCHI TECTURE DESI GN 6
PROJ ECT 2
I NTEGRATED ARCHI TECTURE DESI GN 6
PROJ ECT 2
I NTEGRATED ARCHI TECTURE DESI GN 6
PROJ ECT 2
I NTEGRATED ARCHI TECTURE DESI GN 6
PROJ ECT 2
I NTEGRATED ARCHI TECTURE DESI GN 6
PROJ ECT 2
I NTEGRATED ARCHI TECTURE DESI GN 6
PROJ ECT 2
I NTEGRATED ARCHI TECTURE DESI GN 6
Museum / Par l or/Memor i alPar k
I NTEGRATED ARCHI TECTURE DESI GN 6
Museum / Par l or/Memor i alPar k
Iwoul dl i ke t o desi gn a bui l di ng t hatcan connectt he pr esentand t he f ut ur e,l et t i ng al l t he human t ot hi nk back t he or i gi n ofhow t he wor l d was l i ke bef or e.I n addi t i on,t hi s desi gn oft he bui l di ng pr eser vest he hi st or y and t adi t i onalofchi nese f uner al .
I NTEGRATED ARCHI TECTURE DESI GN 6
Museum / Par l or/Memor i alPar k
I NTEGRATED ARCHI TECTURE DESI GN 6
Museum / Par l or/Memor i alPar k
I NTEGRATED ARCHI TECTURE DESI GN 6
Museum / Par l or/Memor i alPar k
I NTEGRATED ARCHI TECTURE DESI GN 6
Museum / Par l or/Memor i alPar k
I NTEGRATED ARCHI TECTURE DESI GN 6
Museum / Par l or/Memor i alPar k
I NTEGRATED ARCHI TECTURE DESI GN 6
Museum / Par l or/Memor i alPar k
I NTEGRATED ARCHI TECTURE DESI GN 6
Museum / Par l or/Memor i alPar k
I NTEGRATED ARCHI TECTURE DESI GN 6
Museum / Par l or/Memor i alPar k
I NTEGRATED ARCHI TECTURE DESI GN 6
Museum / Par l or/Memor i alPar k
I NTEGRATED ARCHI TECTURE DESI GN 6
Museum / Par l or/Memor i alPar k
I NTEGRATED ARCHI TECTURE DESI GN 6
Museum / Par l or/Memor i alPar k
I NTEGRATED ARCHI TECTURE DESI GN 6
Museum / Par l or/Memor i alPar k
I NTEGRATED ARCHI TECTURE DESI GN 6
Museum / Par l or/Memor i alPar k
I NTEGRATED ARCHI TECTURE DESI GN 6
Museum / Par l or/Memor i alPar k
I NTEGRATED ARCHI TECTURE DESI GN 6
Museum / Par l or/Memor i alPar k
I NTEGRATED ARCHI TECTURE DESI GN 6
Museum / Par l or/Memor i alPar k
I NTEGRATED ARCHI TECTURE DESI GN 6
Museum / Par l or/Memor i alPar k
I NTEGRATED ARCHI TECTURE DESI GN 6
Museum / Par l or/Memor i alPar k
I NTEGRATED ARCHI TECTURE DESI GN 6
Museum / Par l or/Memor i alPar k
I NTEGRATED ARCHI TECTURE DESI GN 6
Museum / Par l or/Memor i alPar k
I NTEGRATED ARCHI TECTURE DESI GN 6
Museum / Par l or/Memor i alPar k
I NTEGRATED ARCHI TECTURE DESI GN 6
Museum / Par l or/Memor i alPar k
I NTEGRATED ARCHI TECTURE DESI GN 6
Museum / Par l or/Memor i alPar k
I NTEGRATED ARCHI TECTURE DESI GN 6
Museum / Par l or/Memor i alPar k
I NTEGRATED ARCHI TECTURE DESI GN 6
Museum / Par l or/Memor i alPar k
I NTEGRATED ARCHI TECTURE DESI GN 6
Museum / Par l or/Memor i alPar k
I NTEGRATED ARCHI TECTURE DESI GN 6
Museum / Par l or/Memor i alPar k
I NTEGRATED ARCHI TECTURE DESI GN 6
Museum / Par l or/Memor i alPar k
I NTEGRATED ARCHI TECTURE DESI GN 6
Museum / Par l or/Memor i alPar k
I NTEGRATED ARCHI TECTURE DESI GN 6
Museum / Par l or/Memor i alPar k
I NTEGRATED ARCHI TECTURE DESI GN 6
Museum / Par l or/Memor i alPar k
I NTEGRATED ARCHI TECTURE DESI GN 6
Museum / Par l or/Memor i alPar k
I NTEGRATED ARCHI TECTURE DESI GN 6
Museum / Par l or/Memor i alPar k
I NTEGRATED ARCHI TECTURE DESI GN 6
Museum / Par l or/Memor i alPar k
I NTEGRATED ARCHI TECTURE DESI GN 6
Museum / Par l or/Memor i alPar k
I NTEGRATED ARCHI TECTURE DESI GN 6
Museum / Par l or/Memor i alPar k
I NTEGRATED ARCHI TECTURE DESI GN 6
Museum / Par l or/Memor i alPar k
I NTEGRATED ARCHI TECTURE DESI GN 6
Museum / Par l or/Memor i alPar k
I NTEGRATED ARCHI TECTURE DESI GN 6
Museum / Par l or/Memor i alPar k
I NTEGRATED ARCHI TECTURE DESI GN 6
Museum / Par l or/Memor i alPar k
I NTEGRATED ARCHI TECTURE DESI GN 6
Museum / Par l or/Memor i alPar k
I NTEGRATED ARCHI TECTURE DESI GN 6
Museum / Par l or/Memor i alPar k
I NTEGRATED ARCHI TECTURE DESI GN 6
Museum / Par l or/Memor i alPar k
I NTEGRATED ARCHI TECTURE DESI GN 6
Museum / Par l or/Memor i alPar k
UCSIXSABE J ANUAR Y202 1 UNI TA
SCHOOLOFARCHI T ECT URE&BUI L TENVI RONMENT F ACUL T YOFENGI NEERI NG,T ECHNOL OGYANDBUI L TENVI RONMENT
T ECHNI CALREP ORT
P ROGRAMME:BACHEL OROFSCI ENCEI N ARCHI T ECT URE COURSE:AR7 1 8ARCHI T ECT UREDESI GN ST UDI O6 SEMEST ER:202 1_0 1
NAME:L I MJ ENN L I ANG ST UDENTI D:100 1 850935 DAT EOFSUBMI SSI ON :1 8T HMAY202 1
PURPOSE GROUP 5 :OFFI CE
PURPOSE GROUP 5 :SHOP
PURPOSE GROUP 5 :PLACES OF ASSEMBLY
PURPOSE GROUP FLOOR PLAN
-
GROUND
PURPOSE GROUP 5 :OFFI CE
PURPOSE GROUP 5 :SHOP
PURPOSE GROUP 5 :PLACES OF ASSEMBLY
PURPOSE GROUP 3 :OTHER RESI DENTI AL
PURPOSE GROUP - FI RST FLOOR PLAN
PURPOSE GROUP 5 :OFFI CE
PURPOSE GROUP 5 :SHOP
PURPOSE GROUP 5 :PLACES OFASSEMBL Y
PURPOSE GROUP -BASEMENT
45000 FI RE HYDRANT RANGE 45000
SI TE PLAN -FI RE RANGE
DEFI NI TI ON OF ESCAPE (UBBL229) Accor di ng t o UBBL229,bui l di ngsi n whi ch t he t opmostfloori smor et han 18. 3 met er s above fir e apl i ance access l evelshal lbe provi ded wi t h meansofgai ni ng accessand fight i ng fir ef orm wi t hi nt he bui l di ng consi st s of fir ef r om fight i ng access l obby, fir e fight i ng st ai r case, fir el i f t s and dry or wet ri si ng syst em. Fi r e fight i ng access l obbi es shal l be provi ded at every floor l evel and shal l be wel ll ocat ed so t hat t he l eveldi st ence f r om t he f urt hermost poi ntof t he floor doew notexceed 45. 75 met ers
Legend: HORI ZONTALEXI T VERTI CALEXI T EXI T ROUTE LI FT
TYPES OF EGREES - GREOUND FLOOR PLAN
TYPES OF EGREES FI RST FLOOR PLAN
TYPES OF EGREES BASEMENT PLAN
FI RE APPLI ANCES ACCESS -GROUND FLOOR PLAN
FI RE APPLI ANCES ACCESS -FI RST FLOOR PLAN
P ARL OR ARTI FI CI ALL I GHTI NG
NATURALL I GHTI NG
UBBL ByLaw,Cl aus e39,Nat ur alLi ght i ng mi ni mum r equi r ementof10% f or dayl i ght i ng. Cal cul at i on Cal cul at i onf ornat ur all i ght i ng r equi r ement =t ot alf l oorar ea x10% =40x10% =4. 0m²
WOODI SAGOODI NSUL ATORASI T HEL PSI NTHEPROCESSOF CONDUCTI ON, CONVECTI ONAND RADI ATI ON. LI GHTI NG SYSTEM
UBBL ByLaw,Cl aus e39,Nat ur alLi ght i ng mi ni mum r equi r ementof10% f or dayl i ght i ng. Cal cul at i on Cal cul at i onf ornat ur all i ght i ng r equi r ement =t ot alf l oorar ea x10% =40x10% =4. 0m²
WOODI SAGOODI NSUL ATORASI T HEL PSI NTHEPROCESSOF CONDUCTI ON, CONVECTI ONAND RADI ATI ON. VENTI LATI ON SYSTEM
MAI N WAT ERSUPPLY
Jpaappr ovedwat ermet er
32MM BRASST YPEMET ERAND ST OPCOCK
SI NK
WATER SUPPLY SYSTEM
SEW ERAGE SYSTEM
UCSIXSABE J ANUAR Y202 1 UNI TA