Lim Jenn Liang 1001850935
Design Studio 4
ARCHITECTUREPORTFOLIO
UCSI UNIVERSITY
Youtube Link :https://youtu.be/1P0e3U417E4
Crafting
Crafting
Research
Skin
Pura Tanjung Sabtu
The content of this crafting research is for visitors to know more about Pura Tanjung Sabtu arts and crafts.
After doing tons of research, develop a skin from the site for the final building designs.
Craft a building beside Pura Tanjung Sabtu.
Studio 4
Content
Crafting
Video Presentationhttps: //youtu.be/1P0e3U417E4
Project 1
Introduction
Pura Tanjung Sabtu Terengganu
Project 1
Proportion of house
Project 1
Climate
Project 1
Construction
Project 1
Extension
Project 1
Type of Soil
Project 1
Type of House
Project 1
Type of House
Project 1
Spaces
Project 1
Timber Craft
Project 1
Timber Carft
Project 1
Motif
Project 1
Motif
Project 1
Traditional Method
Project 1
Modern Method
Project 1
Tiber Species
Studio 4
Architecture Portfolio
Project 2 Carfting Skin
Design
Concept
Project 2
Design Concept
Being mesmerised by these ring patterns during my visit to Terengganu, I was inspired to use them as a scheme for my building.
I’m interested in making connections between these two different kinds of information, the natural and the artificial. I was pleasantly surprised to discover that with a single sweep, tree rings could be imitated so accurately including early wood, fire scars, false rings, fungus and so on.
Studio 4
Architecture Portfolio
Project 1 Carfting Research
Stamping
Project 2
Stamping Process
Process A collection of 24 pieces of ring patterns were gathered and under scrutiny , only 10 pieces of ring patterns were chosen.These ring patterns were stamped on papers to give a brief image and inspiration to use them as the scheme.
Project 2
Motif Analysis
Motif
Analysis
Making Rubber Mold
Drying
Use steel bars to make the structure of model by wielding.
Let the casting to dry for 45-60 mins and 1:10 wall panel will be produced. Wielding
Fix the rubber model with some sticks and pour the plaster in Paris into the model.
Casting
Project 2
Burn the surface of the woods to get a more obvious ring patterns with some cracks as well
Cut the woods into a rectangular pieces to get the ring patterns.
Structuring
Making Process
Cutting
Burning
Dip the wood pieces into latex layers by layers and let it dry to get the ring patterns on the wood pieces.
Tree Ring
Dates
Rare View
Project 2
Working Drawing
Right
Front View Left
Construction Details
Vertical Wall Panels
vertical wall section
vertical wall panel
1.Vertical wall panel
1.vertical wall section
1.roof panel
2.Trim tongue for wall plate anchor installation
2.wall plate anchor
2.vertical wall
3.anchor rall embedded in concrete beam
3.block parapet wall
3.Wall plate anchor
Project 2
4.Steel beam 5.Steel support angle attached to steel beam
4.trim tongue for wall plate anchor installation 5.concrete beam 6.single ply or built-up
panel
4.mortar bed 5.2 layers of felt paper 6.dowel (drill and epoxy as required 7.reinforcing bar in grout filled key joint
Conclusion
Studio 4
Conclusion
All these wall panel are casted by the ring patterns. These can contribute a natural feeling to the people who are living in these bustle and hustle city. Whether its’s natural or artificial, light is the important element to be considered when designing a space. The resin acts as a transparent wall panel allowing the sight of structure as well as the entrance of light into the space, making the room more lively.
Architecture Portfolio Studio 4
Project 3 Carfting Pura Tanjung Sabtu
J uns hanCul t ur alCent er/Ner i &HuDes i gnandRes ear chOďŹƒce
1. 2. 3. 4. 5. 6.
Bai River Main Entry Reflecting Pool Courtyard Parking Existing Clubhouse
Project 3
Case Study
Introduction Junshan Cultural Center is located just outside of Beijing in the midst of the undulating mountain ranges and meandering rivers near the Miyun Resevoir. Originally just a typical two-story sales building on the outskirts of Beijing, Neri&Hu was asked to transform this donut-shaped building into an iconic clubhouse and sales center.
Concept Drawing inspiration from its context, the architecture combines traditional northern architecture with contemporary architectural language and transforms into a new interpretation of architectural expression. The building quietly rises out of the water as a brick mass with carved out spaces for programs interlocked with gardens that blur the boundary between inside and outside.
Project 3
Case Study
Skin Design On the façade, warm-toned wood pattern aluminum panels form a veil that softens the heaviness of the brick facade. Moments of the screen connects with each interior space, creating a façade that is spontaneous and different on every face. Spaces organisation In terms of materiality, traditional gold brick tiles form the foundation of the building mass, extending from exterior landscape into the interior “in-between” spaces. With brick and wood panels as the primary backdrop for the interior, a common theme throughout the interior is the sculpted ceiling.
Gr oundFl oorPl an 1.Lobby 2.Mul t i pur pos eHal l 3.Sal eRecept i on 4.Medi aRoom 5.Wi nt erGar den 6.Res t r ooms 7.Cour t yar d 8.Ar tExi bi t i onHal l 9.Bar 10.Excut i veLounge 11.Pr i vat eCl i ni c
Fi r s tFl oorPl an 1.Br i gde 2.Sal eAr ea 3.Negot i at i onAr ea 4.Bar 5.Chi l dr enAct i vi t y’ sr oom 6.VI PRoom 7.Cour t yar d 8.Fi nanceRoom 9.HomeTheat er 10.Pr i vat eDi ni ng 11.Pr epki t chen 12.Office
2ndFl oorPl an 1.Bar 2.RoofTer r ace
I nBet weenSpace
Ar chi t ect s :Ner i &HuDes i gnandRes ear chOffice
Case Study Project 3
Inside, all of the Junshan Cultural Center's interiors are positioned with views of the new outdoor spaces, which Neri&Hu has designed to blur the boundary between the outside and inside. This sensation is enhanced by "extending the exterior landscape into the interior", where the same brick used to clad the building's facade also lines many of the interior walls.
Introduction Project 3
In this project,TRD buidling which is also known as the Tree Ring Date building, is built in a village of Terrenganu called Pura Tanjung Sabtu.This TRD buidling is a cultural centre for tourist to know more about the timber craving.
Pura Pura Tanjung Sabtu
Project 3
Site Analysis
Masjid Kristal Sultan Mahmud Airport Kota Lama Duyung
Pura Pura Tanjung Sabtu River side Tanjung Sabtu & Cafe Masjid Kampung Tanjung Sabtu
River
Project 3
Site Analysis
Main Road
Available Space
Jetty Place
Traditional Method Project 3
Design is traced and transfered to the object such as panel
The unwated parts are cut out and then discared.
Carving the wood panel by using a hyriad of carving tools to pare, chisel, shave, drill, and dig to bring the design to life.
Polised using emery paper now wheras the dried skin of the stringray or the leaf of a wild plant called “mempelas�
Projec Goals
Project Objective
-As a ‘must visit place’ in terengganu
1)To presure
-Lack of development of traditional art and cratf in kelantan
2)To maintain -Presure the special quality of timber
-Ruining interaction Weak bonding & interaction between the kampung although they only stay few feet from each other
a.Hisorical show case .........The Gallery b.Timber Carving ..............Learning Space
a.Timber working team..........Timber workshop b.Carft merchandise............Shop area c.Timber working club..........Learning Place d.exibition....................Courtyard
3)To develope a.Education ...................Learning Space -Maintain the traditional craft of timber
b,Reputation of PTS ...........Sales Reception
-Develope the reputation of PTS -Lack of collaboration among the regionn
Target Audience -Tourist -Timber Artisan -Education Group
By casting the Tree Rings pattern on the wall panel,these can contribute a natural feeling to the people who are living in these bustle and hustle city.
Concept Project 3
-Raise exposure of timber
Different Angle of wall panel to produce the feeling of layering and also provide a different point of view for all the visitor in the building.
First Floor
Timber Workshop
Kitchen
Toilet
Sales Reception
Project 3
Bubble Diagram
Resting Area
Second Floor Art Gallery Learning Space
Sourvenir Shop
6 4
3
Journey
1
5
1
Sales Reception Assist visitor and provide information
2
2
Timber Workshop
A spacious space for visitors to do timber craving. 3
Learning Space
Project 3
An area for visitors to learn and do some handcrafted activities. 4
The Gallery
5
Souvenir Shop
area to publish the images or the sample of the successful production of timber arts.
A place for visitors to buy souvenirs and other small gifts. 6
Cafe
Area for visitors to dine in and and have some tea break.
Proposed Site
Project 3
Site Plan
Original Site
River on Site
Ground Floor Plan Project 3
1. 2. 3. 4.
Public Library Cafe Kid’s Room Resting Area
Timber Storage
Timber Workshop
Sales Reception
Project 3
Plan
Cafe
Resting Area
Ground Floor plan Scale 1:250
Gallery
Learning Space Balcony
Project 3
Plan
Souvinir Shop
First Floor plan Scale 1:250
Balcony
Project 3
Plan
Office
Second Floor plan Scale 1:250
Cafe
Co-worker Office
Area for visitors to dine in and and have some tea break.
A space for workers discussion or meeting.
Resting Area
to
make
Learning Space
Space for visitors to take a good
An area for visitors to learn and do some handcrafted activities.
rest after a whole day.
Souvenir Shop
Space Configuration
A place for visitors to buy souvenirs and other small gifts.
Timber Storage
place to place the new timber or store the used timber.
The Gallery
area to publish the images or the sample of the successful production of timber arts.
Timber Workshop
A spacious space for visitors to do timber craving.
Balcony
place on the top of the floor to allow a wide view of the site.
Project 3
Sales Reception
Space Coniguration
North Elevation
Project 3
Site Analysis
Scale 1:250
South Elevation Scale 1:250
West Elevation
Project 3
Elevation
Scale 1:250
East Elevation Scale 1:250
Section B-B Sense of Belonging
Project 3
Section
The comunity planting area goes around Pura Tanjung Sabtu and TRD, where visitor can hangout at almost every corners of the area, creating a sense of belonging in the area.
Center Countyard
Souvinir Shop Resting Area
Section A-A
Timber Storage
Section
Learning Space
Timber Workshop Timber Gallery
Project 3
Spatial Integration
The Space are designed where collaboration of spaces is emphasized of separation of spaces. The building serves as a one whole collection of spaces and activities where people can interact easily between upper level and lower level.
Collaboration of Space
All the spaces work together in a collective way while maintaining the privacy of the ceritain spaces where it can be operated separatelt from the general space.
Co-working Office
Construction Details Project 3
Based on my design studio project, a pile foundation will be used for the building construction. Strip foundation is a type deep foundation. When the bearing capacity of the subsoil is unsuitable to support loads, a deep foundation is used. They transfer the foundation to a deeper layer which getting a higher bearing capacity from the soil. Pile foundation Is suitable when the soil quality is poor which can related to Pura Tanjung Sabtu as the place is near to the River Nerus. Besides that, pile foundation is formed by long, slender, columnar elements and is made from reinforced concrete. This provide a stable substructure to support my building.
Project 3
Construction Details
Brick noggin partition wall is used as internal partitioning system in my project. The wall is built with brick and the assists of framework. The timber framework includes vertical post and horizontal member which is studs and nogging. The distance between studs is 150cm and is hold by the nogging.
The framework provide a stable partition against the vibrations caused and stability. The bricks are laid flat and its cover by the plaster on the both sides. The size of the studs and nogging is 20cm which depends on the partition wall. That’s a layer of coal tar coated between the timber frame work and brick work.
Construction Details Project 3
For roofing Part, my design will be using flat roof. Considering the function, at the same time don’t overshadow the beauty of the façade, this is why flat roof is chosen. The flat roof construction is made up of steels that laid across two uprights. To provide an extra stability to the roof structure, the Rolled Steel Joists are often built into one or both walls. Between these joists space, there are a fixed distance apart, which is approximately 400mm. The specified distance is depends on the wideness that they are covering. Beside that, the covering will Stirling board, when timbers are utilized in the flat roofing, the materials have to be waterproofed and thus, the boards will be put across the joists and rubber is used to envelope the boards to make them water-resistant.
Project 3
Images
Project 3
Image
The Gallery
Project 3
Interior
Learning Space
Souvenir Shop
Timber Workshop
Project 3
Images
T h a n k y o u
UCSI UNIVERSITY