DESIGN STUDIO 8 - DOCUMENTATION SET

Page 1

Sheet Number AD01.01

MAB

TAFE

PROPOSED BUILDING A

SOUTH ROAD

PROPOSED BUILDING B

WESTERN PLANT BUILDING

Sheet Name TITLE SHEET AND LOCATION PLAN

AD01.02

LEGENDS & ANNOTATION

AD02.01

SITE SET OUT PLAN

AD02.02

LANDSCAPING AND PAVING PLAN

AD02.03

LANDSCAPING AND PAVING PLAN

AD03.01

GRID SET OUT

AD03.02

GROUND FLOOR GENERAL ARRANGEMENT PLAN

AD03.03

GROUND FLOOR DIMENSIONS

AD03.04

GROUND FLOOR FURNISHED PLAN

AD03.05

FIRST FLOOR GENERAL ARRANGEMENT PLAN

AD03.06

FIRST FLOOR DIMENSIONS

AD03.07

FIRST FLOOR FURNISHED PLAN

AD03.08

SECOND FLOOR GENERAL ARRANGEMENT FLOOR PLAN

AD03.09

SECOND FLOOR DIMENSIONS

AD03.10

GENERAL ARRANGEMENT ROOF PLAN

AD03.11

ROOF PLAN

AD03.12

ROOF FRAMING PLAN

AD03.13

GROUND FLOOR REFLECTED CEILING PLAN

AD03.14

FIRST FLOOR REFLECTED CEILING PLAN

AD03.15

SECOND FLOOR REFLECTED CEILING PLAN

AD04.01

NORTH ELEVATION BUILDING A

AD04.02

NORTH ELEVATION BUILDING B

AD04.03

SOUTH ELEVATION BUILDING A

AD04.04

SOUTH ELEVATION BUILDING B

AD04.05

ELEVATIONS SHEET 5

AD05.01

SECTIONS

AD05.02

SECTIONS

AD06.01

SECTION DETAILS SHEET 1

AD06.02

SECTION DETAILS SHEET 2

AD06.03

SECTION DETAILS SHEET 3

AD6.04

SECTION DETAILS SHEET 4

AD07.01

PLAN DETAILS SHEET 1

AD07.02

PLAN DETAILS SHEET 2

AD08.01

STAIR DETAILS

AD08.02

STAIR SECTION DETAIL

AD09.01

INTERNAL ELEVATIONS SHEET 1

AD09.02

INTERNAL ELEVATIONS SHEET 2

AD10.01

JOINERY DETAILS SHEET 1

AD10.02

JOINERY DETAILS SHEET 2

C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt

RING ROAD EAST

D TONSLEY BOULEVAR

DRAWING REGISTER

North Elevation

2

© studio theta pty ltd level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982

SETTING OUT OF WORK IS THE RESPONSIBILITY OF THE CONTRACTOR. ALL DIMENSIONS TO BE TAKEN FROM THE JOB. ALL DIMENSIONS TO BE CHECKED ON SITE BEFORE COMMENCING WORK OR MAKING SHOP DRAWINGS. DISCREPANCIES TO BE REPORTED IMMEDIATEL Y TO THE ARCHITECT. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH THE SPECIFICATION. IF IN DOUBT, PLEASE ASK. THIS DRAWING AND DESIGN © STUDIO THETA PTY LTD.

rev

issue

revision description

amd

date

CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 TITLE SHEET AND LOCATION PLAN

Preliminary

date:

07-11-2016

scale:

1 : 1000 @A1

drawn:

BA,JD,HM,JP

sheet no:

AD01.01

revision: project no:

16-0725

printed: 7/11/2016 12:51:03 PM

file:

AD01.01


KEYNOTE LEGEND

LANDSCAPING LEGEND

Regupol® 4 51 5 a coustic polyurethane underlay 4 mm

BL.01

63 Phill ips Element Boll ard LED

AT.01

Acoustic ceil ing tiles, Armstrong Ultima+ 1 20 0x60 0mm 7mm thick

DR.01

StormTech 1 00 ARG 30 Linea r Draina ge System, 10 0 x 30 mm

BAL.0 1

Bal ustra de Type 1 (9 0x2 0mm 2 40 0H Bl ackbutt Timber)

GR.01

Grass l awn as spec.

HR.01

Hammer Smith Circul ar Mono Stair Ha nrail, finished in ( Vic Ash) 4 5x45 mm

BAL.0 2

Bal ustra de Type 2 (9 0x2 0mm 1 20 0H Bl ackbutt Timber)

All works to be in a ccordance with relevant Building C odes and Sta ndards.

Control Joint

PL.01

Pla nter box 1 200 mm

X-Lam structural cross la minated timber, 8 layer 2 60 mm

PL.02

Pla nter box, 2 000 mm

CN.01

Cast in-Situ C oncrete - shot bl asted finish to R1 3 Slip Ra ting

PL.03

Pla nter box, custom

CN.02

Cast in-Situ C oncrete - pol ished a nd epoxy finished

PV.01

Pa ving a s spec.

CN.03

Cast in-Situ C oncrete - interior finish

PV.02

Pa ving a s spec.

CW.0 1

Raico Therm+ H structural timber mull ion system, P il kington Ecl ipse Advantage™ Clear glazing

TF.01

Pa ving a s spec.

CW.0 2

Custom ha rd wood curtain wa ll a nd screening, made from Bla ckbutt

TF.02

Pa ving a s spec.

EA.0 1

Equal a ngle assembly, 17 5x7 5x10 mm bolted to framing & C LT.0 1 with M12 carria ge bol ts

FK

Flush Kerb

FA.0 1

M12 Ca rriage bolt

K

Kerb

FA.0 2

M10 Hex-head bolt

RWT

Rain Wa ter Ta nk Rhino water tanks a s specified

FC.01

Ontra x U-Trax 4 6x3 0mm furring channel , fitted with acoustic pa nell ing between members

IC

Irrigation C onduit, indica tive location, refer eng. details

FC.02

Rondo KEY-LOC K concea led ceil ing system, cross-tee furring channel

IL.01

Bra dford R4 batts

IL.02

Kingspa n Kooltherm K1 0 PLUS soffit board rigid insula tion

GA.01

Hastings HB1 Bulb Sea l

GA.02

Sil icone gla zing sea la nt

HR.01

Handrail type 1, insta lled as spec.

HRS

Handrail support bracket, screw fixed to bal la strade via countersunk screws

ML.0 1

Tyvek HomeWrap plia bl e breatha bl e membrane sarking

PC.01

120 0x24 00 mm EcoPl y Ul traTexture Sha dowclad panel ing fixed by counterssunk screws

PC.02

120 0x24 00 mm EcoPl y Ultra Texture Shadowcl ad pa neling, with peg-holes @ 50 mm spa cing

PS.01

C/D P lywood substra te, 9mm

PP.01

Structural Steel, parapet ca pping equa l angle 1 50 x70 x1 0, Colorbond Monument finished colour

PWS.0 1

Eterno self-leveling pedestal up to 270 mm, spaced @ 60 0mm centres

RL.01

Custom stainl ess steel structure railing, with wel ded outriggers, see shop dwgs for fabrica tion

RP

Refuge Point

SC.01

WoodForm Architectura l suspended ceil ing, Concept Cl ick ba tten screening in Vic. Ash

SC.02

Rondo Key-Lock 12 1 suspension roa d, with 25 43 suspension cl ip

SG

Sculpture Ga rden

SK.01

skylight curtain wa ll , structural Raico THERM+H timber mull ions @ 1 20 0mm centres

ST.01

GluLa m bea m 23 0x1 15 mm

ST.02

Kennedy's Timber 14 0x140 mm structural timber, in Iron Ba rk

ST.04

Structura l MGP10 pine, timber battens 7 0x35 mm

ST.05

Structural MGP 10 pine, timber bottom/top pla te 12 0x45 mm

ST.06

Structura l MGP1 0 pine, timber stud 9 0x45 mm

ST.07

Structura l MGP 10 pine, timber joist 12 0x45 mm

SF.01

Structura l Framing, Gl uLam beam 8 00 x6 00 mm

SF.02

Structura l Framing, Gl uLam column 6 00 x6 00 mm

SF.03

Existing concrete structural fra ming, beam 5 00 x6 00 mm

SF.04

Existing concrete structural fra ming, column 6 00 x6 00 mm

TC.01

Ext. Timber Cl adding WoodForm Architectura l Expression C la dding, in Spotted Gum

TC.02

Sla tted Timber Wal l C la dding

TF.01

Bamboo timber flooring 1 9mm, tongue & groove joins as spec.

TF.02

Joinery drawings to be read in conjunction with all referenced drawings, specifica tion, schedules and services drawings. 15-2 0mm sha dow line at junction of new joinery units with wall / ceiling finishes unless otherwise noted on dra wings. All exposed edges to timber veneers to have laminated timber veneer edging with nominal thickness of 3 mm.

Bamboo commercia l grade timber fl ooring as spec.

TF.03

outdoor timber fl oor sleepers a s spec.

TL.01

Ceramic wet-a rea til ing as spec.

TL.02

Kitchen tiling a s spec.

WC

Toilet

NOTE:

REFLECTED CEILING ANNOTATION

NOTE:

AT.02

Acoustic Tile C eiling a s spec. - 12 00 x 3 00 mm

NC

No Ceiling

PB.01

Flush P la sterboa rd C eiling as spec.

PB.02

Water Resista nt Flush P la sterboard Ceil ing as spec.

PB.03

Perforated Fl ush Pla sterboa rd Ceil ing a s spec.

Existing Concrete Wall

TC.01

WoodForm Architectural , Expression Cl adding system in Spotted Gum, install ed as spec.

300 Cast In-situ Concrete

SC.01

WoodForm Architectura l suspended ceil ing, Concept Cl ick ba tten screening in Vic. Ash

Insert Text Here

WT.01

REFLECTED CEILING LEGEND BH

SOFT PLANTING LEGEND SC REENING SHRUBS - SP ECIES AS SELECTED

TREE TYP E 1 SIZE: 30 L SP ECIES: AS SELECTED

TREE TYP E 2 SIZE: 4 5L SP ECIES: AS SELECTED

TREE TYP E 3 SIZE: 1 00 L SP ECIES: AS SELECTED

Bulkhead (plywood cla dding on timber framing)

SUSTAINABLE DESIGN CONSIDERATIONS:

WoodForm Architectural Cladding in Spotted Gum Structural Timber MGP10 Batten Cast In-Situ Concrete

Insert Text Here

18WAEC / 30 Batten / 216 Concrete LT.02 - Supernova PR Down-Up P enda nt Light 650 mm Round

BP.01

5mm x 3 0mm Brass L Profil e - Bl ackwoods Brass Squa re All oy 3 85

BR.01

12 x 20 0mm Bl ackwood Bra ss Dowl Rod - Round All oy 3 85

P

BR.02

12 x 15 5mm Bl ackwoods Bra ss Dowl Rod - Round All oy 3 85

DT.01

90 x 45 mm Dressed Tasma nian Oak

DT.02

20 x 20 mm Dressed Tasma nian Oak

DT.03

70 x 40 mm Dressed Tasma nian Oak

DT.04

45 x 45 mm Dressed Tasma nian Oak

DT.05

30 x 30 mm Dressed Tasma nian Oak

DT.06

45 x 70 mm Dressed Tasma nian Oak

MT.01

22mm White Ma lamine ta bl etop

MT.02

Mal amine - Square Edge

WT.03

LT.03 - Supernova PR Down-Up P enda nt Light 650 mm Round

External Timber Double Stud Wall WoodForm Architectural Expression Cladding in Spotted Gum Insulated double stud MGP10 structure Internal EcoPly paneling

LT.04 - Delta light Spy on ADL track light 62 mm Round

18WAEC / 35 Batten / 90 stud / 50 air gap / 90 stud / 12 plywood

LT.0 5 - Deltalight Gala LED WW W Wall light 1 48x7 0mm

LT.06 - Thorn Chameleon T5 Ceil ing diffuser 1200x600mm

WT.04 External Timber Double Stud Wall

LT.07 - Thorn Chameleon T5 Ceil ing diffuser 1200x300mm

NC BH BH-S CJ

WoodForm Architectural Expression Cladding in Spotted Gum Insulated double stud MGP10 structure WoodForm Architectural Expression Cladding in Spotted Gum

No Ceiling Bulkhea d (flushed plasterboard on steel fra ming) Bulkhead-Insulated Spandrel (flushed pla sterboard on steel fra ming) Control Joint

18WAEC / 35 Batten / 90 stud / 50 air gap / 90 stud / 35 Batten / 18WAEC

WT.05

Refer to electrical services drawings for detail of installation of lights REFER TO SPECIFICATION FOR SELEC TION

WT.02

LT.01 - LED Downl igh, Deltalight Grand Reo 827 20 S1 W-B 18w 102 mm Round

JOINERY LEGEND

NOTES:

PL.01 PL.02 PL.03

GENERAL NOTES

WALL TYPE LEGENDS

Acoustic Tile C eiling a s spec. - 60 0 x 12 00 mm

Cupboard doors fitted with 'Internal Soft'

Kennedy's Timber 20 0x200 mm structural timber, in Iron Ba rk

ST.03

Unless otherwise noted on drawings, refer to finishes schedule for colour finishes and sel ections Check a ll dimensions/set out dimensions prior to construction.

CLT.01

CJ

JOINERY NOTES

AT.01

AL.01

Plywood Clad Internal Partition

Contractor to allow for 50 mm Boral 'Cairo - 2 step' cornice to al l Units (incl. ensuites), Corridors, Sitting, P antry, Staff Office & Medication, Disabled a nd Ambulant WC (resident & publ ic) rooms.

1200x2400mm EcoPly UltraTexture Shadowclad paneling fixed by counterssunk screws 90mm structural timber MGP10 1200x2400mm EcoPly UltraTexture Shadowclad paneling fixed by counterssunk screws

Contractor to allow for 'square set' cornice to al l remaining areas. Contractor to note tha t no cornice required to wall where feature wa ll l ining/panels exist. Allow for 10mm sha dowl ine. Refer services drawings for details of service points Confirm setout of al l fittings and fixtures on site with Architect prior to instal lation. Extent and number of AP's, l ocations and sizes to be coordinated with services engineer's drawings. Refer to architectural specifica tion for numbers to be a llowed.

18WAEC / 35 Batten / 90 stud / 50 air gap / 90 stud / 35 Batten / 18WAEC

ROOF PLAN ANNOTATION TC.01

WoodForm Architectural , Expression Cl adding system in Spotted Gum, install ed as spec.

BG.01

Box gutter type 1 - 60 0x2 00 mm a s spec. to AS35 00

BG.02

Box gutter type 2 - 40 0 x 2 00 mm a s spec. to AS35 00

GS.01

Gutter sump type 1 - as spec. to AS35 00

RH.01

Rainwater head & overflow assembly

CW.01

DP.01

Down pipe type 1 - 30 0mm dia meter as spec. to AS35 00

Structural Timber Glazed Curtain Wall System

DP.02

Down pipe type 2 - 30 0mm dia meter as spec. to AS35 00

DP.03

Down pipe type 3 - 30 0mm dia meter as spec. to AS35 00

CA( A)

Capping a luminium to cl adding a s spec.

Raico THERM H+H structural curtain wall, finished with Iron Bark timber mullions and capping system Double glazed Pilkington Optilam™ to be fitted as per window schedule

Refer to Interior Finishes, Fittings/Fixtures & Equipment Schedul es within Specification Documentation for further informa tion

CA( S)

Capping steel to gutter system, finish as per box gutter, fit as spec.

CU.01

Condenser Unit to Mecha nica l engineer's dra wings

Al l switches a nd controls on the a ccess path of travel are to be l ocated 1 000 mm A.F.L a nd minimum 5 00 mm from internal corners

EU.01

Eva pora tive Unit to Mecha nica l engineer's dra wings

CW.02

EF.01

Exha ust Cowl Unit to Mechanical engineer's dra wings

Timber Screen Curtain Wall System

SA.0 1

Supply Air C owl Unit to Mecha nica l engineer's dra wings

Blackbutt hardwood vertical timber screen 200mm spacing between 70x20mm louvres 100x45mm structural mullions @ 1200mm centres

ROOF PLAN LEGEND

RTx

Roof Type 1 ,...3 as spec. Refer to Roof Schedul e below.

Fol ded pa ra pet ca pping as spec.

level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982

SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .

rev

issue

revision description

amd

date

CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 LEGENDS & ANNOTATION

Preliminary

dat e:

07-11-2016

sc a l e :

As indicated @A1 rev is io n:

dr aw n :

BA,JD,HM,JP

sh ee t n o :

AD01.02

proj ect no:16-0725

printe d:

© studio theta pty ltd

7/11/2016 12:08:11 PM

file:

C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt

Gutter sump to siphonic dra inga ge bel ow


L BOU SLEY N O T

AA

AB

AD

AC

RING ROAD EAST

A7

A8

AG

BB BA

BD

BE

BF

BG

BH

BI

BJ

BK

BL

BM

BN

BO

BP

BQ

BC

B1

B2

AA3

A3

A6

AF

AA2

A2

A5

AE

AA1

A1

A4

D EVAR

B3

AA4

BUILDING A AA5 PUBLIC WING

BUILDING B MANUFACTURING & OFFICE WING

SOUTH ROAD

B4

B5

AA6

B6

AA7

B7

AA8

DRILL CORE REFERENCE LIBRARY.

B8

level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982

SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .

rev

issue

revision description

amd

date

CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 SITE SET OUT PLAN

Preliminary

dat e: sc a l e : dr aw n :

07-11-2016 1 : 500 @A1 BA

sh ee t n o :

AD02.01

rev is io n: proj ect no:16-0725

printe d:

© studio theta pty ltd

7/11/2016 12:08:17 PM

file:

C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt

TONSLEY GREEN LINK Two-way single lane street as exisiting.


BL.01

Fall away to stormwater runoff drain

BL.01

PV.01

BL.01

BL.01

D s VAR ULE s tre et a O B Y e E n L a l S TON single g. in y -wa exisit k s o w T wor No

BL.01

TGSI

TGSI PV.01

BL.01 BL.01

BL.01 BL.01

Proposed timber framed and clad planter box and edge seat. Allow 120mm of aggregate and layer of geotextile fabric, fill remaining with soil to 120mm from edge seating base.

BL.01

BL.01

122° 3

2 1

BL.01 1 2

BL.01

BL.01

3

Proposed timber framed and clad seating. Woodform architectural timber cladding w. proprietary aluminium edge stops.

BL.01

Fall away to stormwater runoff drain

BL.01

Proposed planting - see planting specifications 2

1

3

PV.01

FK

119 °

GR.01

TGSI

BL.01

3

119 °

Handrail Hammer Smith circular mono ramp handrail Vic Ash natural finish

2

° 131

BL.01 Proposed timber framed and clad planter box and edge seat. Allow 120mm of aggregate and layer of geotextile fabric, fill remaining with soil to 120mm from edge seating base.

1

Fall away to DR.01 stormwater runoff drain

HR.01

BL.01

Proposed planting - see planting specifications

BL.01

Solar LED bollard Philips element bollard LED lighting

Fall away to stormwater runoff drain

Fall away to stormwater runoff drain

BL.01

°

BL.01 FK

BL.01

BL.01 GR.01

103

GR.01

In-situ curb w. stormwater runoff drain - fall to sump. Allow discharge to existing Tonsley stormwater system

BL.01

BL.01

BL.01

GR.01

DR.01 planting - refer to landscape schedule

136°

BL.01

BL.01 HR.01

TSGI

TGSI

BL.01

RWT underground

BL.01 BL.01

° 1 06

BL.01

Proposed timber framed and clad planter box and edge seat. Allow 120mm of aggregate and layer of geotextile fabric, fill remaining with soil to 120mm from edge seating base.

TGSI

BL.01

PV.01

BL.01

Existing landscaping No works

BL.01

BL.01

DR.01

BL.01

BL.01

BL.01

BL.01

TGSI

DR.01

Stormwater runoff drain 2degree fall to sump. Allow discharge to existing Tonsley stormwater system

BL.01

1 2

BL.01

BL.01 BL.01

TGSI BL.01

DR.01

BL.01

Drainage to rainwater tank below, overflow to existing Tonsley stormwater system

2 1

PV.02 Proposed retaining wall. Site to be leveled from site boundary. Ground beyond to be retained - no works

Stormwater runoff drain 2degree fall to sump. Allow discharge to existing Tonsley stormwater system

PV.01

Fall away to stormwater runoff drain

Proposed timber framed and clad planter box and edge seat. Allow 120mm of aggregate and layer of geotextile fabric, fill remaining with soil to 120mm from edge seating base.

°

FFL 51.94

1 00

DR.01

D . ROA isiting x TH SOU ad as e ro way

BL.01 TGSI

BL.01

BL.01

BL.01

Proposed timber framed and clad seating. Woodform architectural timber cladding w. proprietary aluminium edge stops.

BL.01

BL.01 Proposed raised timber framed and clad platforms. Woodform architectural timber cladding w. proprietary aluminium edge stops.

Two

PV.02

Stormwater runoff drain 2degree fall to sump. Allow discharge to existing Tonsley stormwater system

Proposed timber framed and clad planter box and seating. Woodform architectural timber cladding w. proprietary aluminium edge stops.

Proposed timber battern screening. To sit flush to planter box edging

FFL 51.94 Proposed grass strip w. 12mm a/b marine plywood edging strip. Grass and edge strip to sit flush to PV.01

Bike rack

PV.01

FFL 51.94

Fall away to stormwater runoff drain

FFL 51.94

C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt

Fall away to stormwater runoff drain

Fall away to stormwater runoff drain

PROPOSED BUILDING B

level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982

SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .

LANDSCAPING LEGEND

SOFT PLANTING LEGEND

BL.01

63 Phill ips Element Boll ard LED

PL.01

Pla nter box 1 200 mm

PV.01 Pa ving a s spec.

FK

Flush Kerb

DR.01

StormTech 1 00 ARG 30 Linea r Draina ge System, 10 0 x 30 mm

PL.02

Pla nter box, 2 000 mm

PV.02 Pa ving a s spec.

K

Kerb

GR.01

Grass l awn as spec.

PL.03

Pla nter box, custom

TF.01 Pa ving a s spec.

RWT

HR.01

Hammer Smith Circul ar Mono Stair Ha nrail, finished in ( Vic Ash) 4 5x45 mm

PL.04

Pla nter box, custom 2

TF.02 Pa ving a s spec.

IC

Rain Wa ter Ta nk a s specified Irrigation C onduit, indica tive location, refer eng. details

rev

issue

revision description

amd

date

CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042

SC REENING SHRUBS - SP ECIES AS SELECTED

TREE TYP E 1 SIZE: 3 0L SP ECIES: AS SELECTED

TREE TYP E 2 SIZE: 4 5L SP ECIES: AS SELECTED

TREE TYP E 3 SIZE: 1 00 L SP ECIES: AS SELECTED

LANDSCAPING AND PAVING PLAN

Preliminary

dat e:

07-11-2016

sc a l e :

As indicated @A1 rev is io n:

dr aw n :

BA

sh ee t n o :

AD02.02

proj ect no:16-0725

printe d:

© studio theta pty ltd

7/11/2016 12:08:22 PM

file:

PROPOSED BUILDING A


TI.01 FFL 51.94

PROPOSED BUILDING A

PROPOSED BUILDING B

DR.01

Stormwater runoff drain 2degree fall to sump. Allow discharge to existing Tonsley stormwater system Fall away to stormwater runoff drain and grass

FFL 51.94

GR.01

PV.01 FFL 51.94

Fall away to stormwater runoff drain

DR.01 BL.01

GR.01

BL.01

FFL 51.94

BL.01

BL.01

DR.01

Stormwater runoff drain 2degree fall to sump. Allow discharge to existing Tonsley stormwater system

BL.01

BL.01 BL.01 BL.01

BL.01 DR.01

DR.01

BL.01

BL.01

Proposed timber framed and clad planter box Allow 120mm of aggregate and layer of geotextile fabric, fill remaining with soil to 120mm from top.

BL.01 BL.01

BL.01

DR.01

DR.01

BL.01

DR.01 DR.01

Proposed timber framed and clad seating. Woodform architectural timber cladding w. proprietary aluminium edge stops.

BL.01

Proposed retaining wall. Site to be leveled from site boundary. Ground beyond to be retained - no works

PV.01

GR.01

TGSI

BL.01

Proposed planting - see planting specifications

GR.01 BL.01

Proposed timber framed and clad planter box Allow 120mm of aggregate and layer of geotextile fabric, fill remaining with soil to 120mm from top.

BL.01

BL.01

GR.01

BL.01

BL.01

TGSI

BL.01

BL.01

BL.01

Proposed planting - see planting specifications

level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982

SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .

LANDSCAPING LEGEND

SOFT PLANTING LEGEND

BL.01

63 Phill ips Element Boll ard LED

PL.01

Pla nter box 1 200 mm

PV.01 Pa ving a s spec.

FK

Flush Kerb

DR.01

StormTech 1 00 ARG 30 Linea r Draina ge System, 10 0 x 30 mm

PL.02

Pla nter box, 2 000 mm

PV.02 Pa ving a s spec.

K

Kerb

GR.01

Grass l awn as spec.

PL.03

Pla nter box, custom

TF.01 Pa ving a s spec.

RWT

HR.01

Hammer Smith Circul ar Mono Stair Ha nrail, finished in ( Vic Ash) 4 5x45 mm

PL.04

Pla nter box, custom 2

TF.02 Pa ving a s spec.

TF.02

Rain Wa ter Ta nk a s specified Irrigation C onduit, indica tive location, refer eng. details

rev

issue

revision description

amd

date

CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042

SC REENING SHRUBS - SP ECIES AS SELECTED

TREE TYP E 1 SIZE: 3 0L SP ECIES: AS SELECTED

TREE TYP E 2 SIZE: 4 5L SP ECIES: AS SELECTED

TREE TYP E 3 SIZE: 1 00 L SP ECIES: AS SELECTED

LANDSCAPING AND PAVING PLAN

Preliminary

dat e:

07-11-2016

sc a l e :

As indicated @A1 rev is io n:

dr aw n :

BA

sh ee t n o :

AD02.03

proj ect no:16-0725

printe d:

© studio theta pty ltd

7/11/2016 12:08:25 PM

file:

C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt

TONSLEY GREEN LINK Two-way single lane street as exisiting.


AD AA

AB

AC

AE 6000

BB

AF

AG

9000

6000

6000

BA

6000

BD

6000

BE

6000

BF

BG

6000

6000

BH

6000

BI

6000

BJ

6000

BK

6000

BL

6000

BM

6000

BN

6000

BO

6000

BP

6000

BQ

6000

BC

6004 6000

SETOUT

AA1

A1

SETOUT 9000

SETOUT

B1

9000

AA2

A2

9000

UP

B2 AA3

9000

9000

A3

B3 AA4

9000

9000

A4

B4 AA5

9000

9000

A5

B5 AA6

9000

9000

A6

B6 AA7

9000

9000

A7

B7 AA8

A8

AD

AE AF

AB

AC

BA

BC

BB

BD

BE

BF

BG

BH

BI

BJ

BK

BL

BM

BN

BO

BP

BQ

level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982

SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .

rev

issue

revision description

amd

date

CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 GRID SET OUT

Preliminary

dat e: sc a l e : dr aw n :

07-11-2016 1 : 200 @A1 HM,JP

sh ee t n o :

AD03.01

rev is io n: proj ect no:16-0725

printe d:

© studio theta pty ltd

7/11/2016 12:08:29 PM

file:

AA

AG

C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt

B8


AD04.01

2

AD

AD05.01

AE

2

AA

AB

AC

BB

AF

AG

BD

BE

BF

BG

BH

BI

BJ

AD04.02

BK

BL

BM

BN

BO

BP

BQ

1 2

BA

BC

1 AD06.01

FFL 51.94

W.G.01.A

WT.08 W.G.0 1.B

D.G.3 5.B

W.G.3 5.C

WT.04

WT.04

W.G.01.H

D.G.0 1.D

W.G.01.I

W.G.35.A

D.G.43 .A

W.G.01.J

WT.05

WT.04

AD07.01

UP W.G.3 0.B

G.03 TF-2

G.02 TF-1

D.G.03 .A

D.G.02 .A

BAL.1

WT.03

G.04 TF-1

5

D.G.34 .A

WT.05

1

6

AD09.01

WT.04

WT.05

WT.08

KITCHEN G.07

TL-2

G.29

WESTERN CORE

CAFE G.09 TF-1

LIFT 1

G.15

G.16 TF-1

WT.03

WT.03

W.G.3 2.B

W.G.1 2.B

D.G.13 .A

WT.05

W.G.32.A

D.G.7 2.C

RETAIL 2 G.12 TF-1

WT.03 WT.05

W.G.1 2.D

W.G.14.E

D.G.1 2.B

AA8

W.G.1 4.C

G.69 D.G.69 .A

BH.xx

WT.03

SPECIALIST EQUIPMENT

CN-1

CN-1

F WC

W.G.7 2.B

G.72 TF-2

PROTOTYPE SHARE G.71 CN-2

G.63 TL-1

D.G.6 6.C

D.G.71 .A

D.G.59 .A

G.64 TL-1

RP

EMERG. STATION

STAIRUP5

CONTROL ROOM

G.54 CN-1

RP

WT.01

STAIR 6 G.59

G.60 CN-3

D.G.63 .A

M WC

WT.02

G.53 CN-1

RT.1

WT.01

G.58

G.62 D.G.62 .A

G.66 CN-2

WT.04

TF-1

LIFT 6

ACC WC

PROTOTYPE 2

G.55

G.57

WT.02

SOUTHERN CORE

D.G.7 0.B WT.03

PROTOTYPE 1

G.61 TL-1 WT.05

CLNR

WT.02

D.G.70 .A

ADMIN

LIFT 4

D.G.6 5.B

D.G.73 .A

D.G.72 .A

FFL 51.94

G.65 CN-3

WT.02

D.G.6 6.B

G.70

WT.03

WT.04

D.G.65 .A

WT.02 D.G.66 .A

SPRAY ROOM 2

WT.05G.67 D.G.67 .A

SPRAY ROOM 1

W.G.73 .A

WT.04

WT.05G.68 D.G.68 .A

W.G.65 .A

D.G.66 .E

WELD BTH WELD BTH WELD BTH

BH.xx

WT.04

WT.04 D.G.6 6.D

D.G.7 3.B

G.73

D.G.7 2.B

W.G.12.E

WT.04

W.G.73 .B WT.03

G.14 TF-1

A8

WT.04

WT.04

BH.xx

RETAIL 1

W.G.1 4.D

B6

WT.03

AA7

WT.04

WT.01 WT.04

W.G.72.E

TF-3

WT.05

SG

G.74 TF-3

STORE G.13 TF-2

MODULE EXAMPLE

D.G.52 .A

D.G.5 3.A

CP.01

W.G.1 4.B

D.G.14 .A

FFL 52.04

D.G.5 4.A

WT.05

W.G.7 4.B

D.G.5 2.B

G.31 TF-1

D.G.5 4.B

WT.05

A7

SG

STORE D.G.1 6.A

G.17 CN-1

W.G.14.A

W.G.15.A

WT.05

TRANSFORMER ROOM

D.G.31 .A

D.G.0 1.F W.G.12.A

WT.05 D.G.17 .A

AIR LOCK

G.18 CN-1

B5

D.G.3 1.B

D.G.01 .E WT.03 D.G.12 .A

WT.04 D.G.1 7.B

AA6

D.G.18 .A

CW.03

CW.03

AD05.02

D.G.6 1.A

WT.05

WT.02

WT.04

MSB

D.G.52 .J WT.01

WT.01

CN-1UP

W.G.72.A

AD04.03

D.G.55 .A

G.56 CN-1

WT.05

LOADING BAY RT.01

WT.05 WT.05

WT.02

WT.04

RT.1

CP.01

W.G.71 .A

WT.04

W.G.66 .C

W.G.66 .B

W.G.66 .A

WT.02

WT.04

W.G.60 .A

W.G.60 .B

D.G.5 9.B

WT.04

B7

D.G.5 2.G

FFL 51.94

STORAGE WT.02

D.G.60 .A WT.04

D.G.5 2.H

WT.05

FFL 52.04

CP.01

1 2

WT.04

B8

WT.04

FFL 51.94 RT.01 CP.01

AD

CP.01 CP.01

AE AF

AB

AC

BA

2

AD04.04

AD05.01

BC

BB

BD

BE

BF

BG

BH

BI

BJ

BK

BL

BM

BN

BO

BP

BQ

level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982

SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .

General Notes: RP - Refuge Point SG - Sculpture Garden - Existing walls and columns indicated with solid black fill

rev

issue

revision description

amd

date

CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 GROUND FLOOR GENERAL ARRANGEMENT PLAN

Preliminary

dat e: sc a l e : dr aw n :

07-11-2016 1 : 200 @A1 JP

sh ee t n o :

AD03.02

rev is io n: proj ect no:16-0725

printe d:

© studio theta pty ltd

7/11/2016 12:08:34 PM

file:

AA

1 2

AG

AD04.05

WT.01

1

D.G.6 4.A

G.19 CN-1

3

MODULE EXAMPLE

D.G.6 1.B

FIRE PUMP ROOM

MODULE EXAMPLE

D.G.3 2.B

WT.03

W.G.12.F

G.19A

W.G.0 9.B

WT.03

G.21 TL-1

WT.02

G.52

CN-3 FFL 52.04

D.G.6 4.B

WT.05

BOOSTER

MANUFACTURING

W.G.1 2.C

A6

2 AD05.02

UP

D.G.09 .A WT.02

WT.02

B4

MODULE EXAMPLE

UP

WC ACCESS

WT.01

UP

MODULE EXAMPLE

W.G.74.A

D.G.21 .A

G.20 CN-1

BUILDING B

D.G.0 9.B

G.23

D.G.22 .A

STAIR 1

MODULE EXAMPLE

AD07.02

G.32 CN-1

W.G.6 6.D

G.22

WT.02

WT.02

W.G.1 5.B

D.G.2 0.A

COMMS

RT.1

UP

WT.01

1

2

WT.02

D.G.2 0.B

WT.05

AD06.02

RT.1

STAIR 7

FFL 51.94

AD05.02

FFL 52.04 WT.02

WT.04

WT.03

AA5

G.24 TF-1

D.G.24 .A

W.G.49 .A

1

W.G.7 2.D

A5

D.G.4 9.B WT.02

B3

G.10 TL-2

D.G.10 .A

BUILDING A

WT.08

B2

MODULE EXAMPLE

KITCHEN

WT.05

FFL 52.04

G.28

RP

WT.02

WT.02

RT.1

W.G.7 2.C

WT.02

CLNR

WT.03

COLD ROOM G.11 TL-2

G.51 CN-1

G.46

WT.02

W.G.7 1.B

G.27

MECP

D.G.2 8.A

FIP

AD05.02

D.G.2 7.A

FHR

WT.03

G.01 TF-1

D.G.06 .A

D.G.11 .A

D.G.50 .A

WT.02

WT.02

W.G.38 .E

W.G.3 2.C

PUBLIC ATRIUM

WT.02

STORE

1

WT.03

G.49 TF-1

W.G.52 .C

W.G.09.A

WT.02

D.G.3 3.B

UP

G.08

WT.05

WT.05

STAFF ROOM

WT.02

FFL 52.04

D.G.08 .A

STAIR 4

D.G.5 2.C

COLD ROOM

WT.02

WT.01

WT.05

G.45

D.G.32 .A

W.G.0 9.C

2 1

D.G.26 .A MALE WC G.26 TL-1 D.G.2 6.B

G.25 TL-1

WT.08

AA4

D.G.30 .A

FEMALE WC D.G.25 .A D.G.2 5.B

AD04.05

G.06 TF-1

WT.05

CN-1

A4

RESTAURANT

G.50 CN-1

WT.04

UP

RP

D.G.44 .A

WT.02

FFL 52.04

WT.04

W.G.06.A

WT.03 WT.02

STAIR 2

CP.01

B1

D.G.5 2.F

STORAGE

WT.05

LIFT 2 WT.02

D.G.52 .E

RT.1

WT.05

D.G.5 2.I

WT.08

FFL 52.04

WT.05

WT.05

LIFT 3 WT.04

G.33 TF-1

D.G.33 .A W.G.33.A

W.G.3 0.D

D.G.2 9.A

RT.1 UP

AIR LOCK

AD08.01

D.G.4 2.B G.42 WT.05 D.G.3 7.B

D.G.35 .A

UP RT.1

CN-3

F WC

WT.04

2 1

WT.05

D.G.49 .A

G.41 D.G.41 .A

WT.05

CN-1

G.47 TF-1

G.43

G.40

G.48 CP-1

ADMIN

NORTHERN CORE

ACC WC

G.34

D.G.04 .A

D.G.2 9.B

G.38 TF-2

D.G.5 2.D

LOCKERS

D.G.39 .A

G.37 CN-1

STORE

W.G.3 3.B

AA3

CAFE

WT.03

W.G.04.A

W.G.3 0.C

A3

AD09.01

3

G.05 TL-2

WT.01

WT.04

MATERIALS + HARDWARE

STORE

WT.05

WT.04

WT.04 WT.01

FFL 51.94

WT.04

WT.02

WT.02

G.39

CLNR

WT.05

WT.04

D.G.47 .A

TL-1

WT.05

CP.01

G.44 CN-1

M WC

WT.05

WT.05 D.G.37 .A

AD07.01

4

WT.03

G.30 TF-1

KITCHEN

SHOP

1

WT.03

GALLERY

2

PRODUCT AD06.01 G.35 TF-2

RECEPTION

SECURITY

D.G.3 9.B

WT.04

WT.05

AD06.01

W.G.0 2.B

W.G.02.A

WT.05

W.G.4 7.C

STAIR 3

D.G.4 2.A

AA2

3

2

LOADING BAY

W.G.4 7.B

WT.04

W.G.38 .A

CW.02

A2

FFL 51.94

WT.04 D.G.38 .A

WT.05

W.G.30.A

W.G.3 8.D

W.G.3 8.C

C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt

AD07.01

WT.04

WT.04 W.G.3 8.B

D.G.0 1.C

D.G.5 1.B

4

WT.05

D.G.5 1.A

W.G.01.F

D.G.4 8.A

FFL 51.94

W.G.47.A

W.G.01.E

AA1

W.G.3 5.B

A1

WT.04

SG

G.36 TF-3

W.G.0 1.D

D.G.0 1.B

CP.01

D.G.4 4.B

W.G.0 1.C

D.G.01 .A

WT.04

W.G.35 .D

CP.01


AD AA

AB

AE

AC

BB

AF

AG

BA

BD

BE

BF

BG

BH

BI

BJ

BK

BL

BM

BN

BO

BP

BQ

BC

11396 5656

5398 2000

4000

5386

4000

270 1000

1740

2000

1000 270 1200 270

2000

11380

36000

6010

6664

1791 8063

2000

12139

4000

6000

4139

1245

2000

4676

4517

°

1 00

120

5400 2570

6600

5400

120

600

5400

600

5400

30180

600 300

1245

3590

1 00

12410

2710

6000

8 0°

63

11449

839

8630

1000

8809

1791

270

8 0°

°

1 00

2612

270 1200 270 1000

1791

36000

4000

3353

21835

AA1

A1

1740

°

9246

9246

6535

7530

18000

B2

0

B3

18000

1000

1005

5216

6109

5400

3330

1000

B4

2150

5281

4261

4307

1000 1022

2000 978

15

6195

4824

5760

3230

30

6270

5700

978

6191

4592

3251

5146

8936

4234

1460

1022 2000 1139

1978

1600

6000

9000

3000

4310

1800

3620

1580

5190

1541

3620

1003

4186

4830

3530

3000

1800

1890

5094

3356

160

400

1440 1050

960

2605 2670

5400

1100 300

1100

6000

6000

24000 35809

B8

4445

170°

1407

5600

11 0°

10540

0

6000

6000

6000

5970

4039

2000 4545

80 °

1407 3691

12460

39287 13781

41261

AE AF

AG

BA

BC

BB

BD

BE

BF

BG

BH

BI

BJ

BK

BL

BM

BN

BO

BP

BQ

level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982

SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .

rev

issue

revision description

amd

date

CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 GROUND FLOOR DIMENSIONS

Preliminary

dat e: sc a l e : dr aw n :

07-11-2016 1 : 200 @A1 JD

sh ee t n o :

AD03.03

rev is io n: proj ect no:16-0725

printe d:

© studio theta pty ltd

7/11/2016 12:08:38 PM

file:

AC

10600

2550

400 400

AB

6000

2620

270 5600

5240

400 14600

AA

B7

11130

8600

AD

4896

4841 2061

2330 300300

1733

8368

17615

3400

3186

2620

464

5226

4841 1800

5889

8990

3440

1999

6285

2000

5600

3400

285

2000

400

2865

1322

400

3135

2206 250

8600

5600

4541

2666

1469

AA8

120

°

9000

1899 400

1820

7085

4 3178 1022 5600

1691

400

3186

3109

4111

5832

3759

1500

6152

A8

1 00

2644

C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt

120

7091

1678

7580

B6

8344

11128

2050

4645

3802

AA7

A7

18000

6057

9292

2109

2067

1000

956

2000

1160

2072

2000

2000

3050

1075

1044

2000

6161 4554

2000

12150

244

4703

3168

200

4000 2000

AA6

6780

1066

B5

700

2504

1985 5030

2439

1204

4015

795

A6

1100 520 1000

1940

2006

2080

5099

1316

2606

800

220

6864

AA5 2476

1000 470 1500

A5

2070

1988

1000 1000

1500

1268 760 360

54000

4002

31671

6146

6856

4099

1515

2329

AA4 1000

4376

2901

1944

4673

1200 120 1200

3000

1220

3260

1000

6503

1518

2060

1000

3266

200

3550

5021

5901

1000

10950

5514

3000

14075

AA3 4376

A4

2690

5400

2198

8 0°

9042

2108

2834

2720

1450 4

1915

9000

7350

3258

A3

5271

14579

2510

3015

13541

UP

5150

4850

AA2 1000

A2

9000

1599

2430

3866

19388

B1

3331


AD AA

AB

AE

AC

BB

AF

AG

BD

BA

BE

BF

BG

BH

BI

BJ

BK

BL

BM

BN

BO

BP

BQ

BC

SG

G.36

AA1

A1

8 0°

B1

STAIR 3

ADMIN

G.44

AA2

A2

LOCKERS

G.47

M WC

G.48

G.39

SECURITY

UP

G.50

G.35

G.02

G.03

STORAGE

PRODUCT SHOP

RECEPTION

MATERIALS + HARDWARE G.38

NORTHERN CORE

ACC WC

G.43

G.40

GALLERY G.30

STAIR 4

CLNR G.41

STORE

G.51

RP

STAFF ROOM

G.37

KITCHEN

STORE

CAFE

G.05

G.45

F WC

AA3

A3

B2

LIFT 2

G.34

G.04

RP

G.49

G.42

LIFT 3 G.46

AIR LOCK G.33

KITCHEN G.07

B3

RESTAURANT G.06

STAIR 2

MODULE EXAMPLE

G.29

A4

FEMALE WC

AA4

MALE WC

G.25

G.71

COLD ROOM G.08

G.26

MODULE EXAMPLE G.72

COLD ROOM

PUBLIC ATRIUM

G.11

G.01

STORE FHR

FIP

G.28

STAIR 7

G.60

AA5

G.24

B4

MODULE EXAMPLE

G.32

WESTERN CORE

A5

G.10

CLNR

G.27

MECP

KITCHEN

UP

CAFE

MANUFACTURING

MODULE EXAMPLE

G.09

MODULE EXAMPLE

G.52

G.22

G.73

UP

COMMS

UP

LIFT 1

G.22

MODULE EXAMPLE

G.23

G.74

B5

WC ACCESS

STAIR 1

G.21

G.20

AA6

A6

MSB BOOSTER G.19A

FIRE PUMP ROOM

AIR LOCK

G.18

MODULE EXAMPLE

G.31

G.75

G.19

SG

G.74

STORE TRANSFORMER ROOM G.17

G.13

SG

STORE

B6

G.15

G.16

AA7

A7

RETAIL 2 G.12

G.69

G.68

LIFT 4

SPRAY ROOM 2

WELD BTH WELD BTH WELD BTH

G.65

G.67

ADMIN G.55

G.61

RETAIL 1

EMERG. STATION

STAIR 5

CONTROL ROOM G.53

G.54

LIFT 6

G.14

SPRAY ROOM 1 G.73

G.58

SPECIALIST EQUIPMENT G.70

CLNR SOUTHERN CORE

AA8

ACC WC

PROTOTYPE 2

G.72

G.60

STAIR 6 G.59

G.63

G.66

PROTOTYPE 1

B7

RP

G.62

A8

RP

G.57

F WC

STORAGE G.56

PROTOTYPE SHARE G.71

M WC G.64

AD

AE AF

AB

AC

BA

BC

BB

BD

BE

BF

BG

BH

BI

BJ

BK

BL

BM

BN

BO

BP

BQ

level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982

SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .

rev

issue

revision description

amd

date

CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 GROUND FLOOR FURNISHED PLAN

Preliminary

dat e: sc a l e : dr aw n :

07-11-2016 1 : 200 @A1 JP

sh ee t n o :

AD03.04

rev is io n: proj ect no:16-0725

printe d:

© studio theta pty ltd

7/11/2016 12:08:46 PM

file:

AA

AG

C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt

B8

170°


2 AD04.01

AD05.01

AD

AE

1 2

AA

AB

AC

BB

AF

AG

BD

BE

BF

BG

BH

BI

BJ

AD04.02

BK

BL

BM

BN

BO

BP

BQ

1 2

BA

BC

1 AD06.01

BAL.1 HR.1

HR.1 W.1.3 8.B

WT.04

CW.02

WT.04

CP.01

CP.01

WT.04

BAL.1 HR.1 D.1.3 8.D

764

1.28 D.1.2 8.A CN-1

HR.1

1.23

D.1.0 5.A

CW.01

AA7 1.13 TF-2

W.1.10.A

D.1.1 1.A CP-2

D.1.1 0.A

W.1.1 3.D

A8

1.06 CP-1

WT.04

AA8

W.1.1 3.B

WT.04

W.1.9 2.D

WT.05

W.1.92.C

1.10 CP-1

WT.03

QUIET RM 1.09 CP-2

W.1.09.A

WT.05

WT.05

1.87 TF-2

QUIET RM 1.08 CP-2

W.1.08.A

WT.05

QUIET RM

1.86 TF-2

OFFICE 2

1.07 CP-2

1.91 TF-1

1.90 CP-1

1.88 CP-1

1.74 CP-2

WT.05

OFFICE

D.1.9 0.A

1.79 TF-1

FEMALE WC

WT.02

1.75 TL-1

D.1.7 5.B

CLNR 1.76

WT.05

1.89 CP-1

W.1.6 1.B

W.1.6 4.B D.1.6 2.A

1.65

STORE

WT.02

WT.05

1.66 TF-1

D.1.7 1.A

STAIR 6

WC

WT.05

1.71 CN-1 UP HR.1 HR.1

1.62 CN-1

5

MANUFACTURING OFFICE 2 1.60 CP-1

WT.01

OFFICE 1.63 CP-2

WT.03

W.1 .63 .A

WT.02

OFFICE 1.58

CP-2 WT.05

B7 EW.01

EW.01

OFFICE 1.59 CP-2

WT.04

D.1.5 9.A

D.1.6 3.A

WT.02

D.1.7 8.A

TL-1

UPSTAIR

HR.1

WT.02

WT.02

WT.02

RL 59.24

1.77 TL-1

WT.03

STORE

D.1.5 8.A

MANUFACTURING OFFICE 1

1.57

D.1.5 7.A WT.02

1.70

B6 WT.05

D.1.5 6.A

STORE

WT.07

WT.03

WT.03

WT.05

WT.05

LIFT 5

1.72 TF-2

ACC WCD.1.7 7.A

D.1.8 9.A

1.78

W.1 .60 .B

W.1.6 0.C

W.1 .59 .A

WT.04

B8

CP.01

WT.04

W.1 .84 .B

1 2 W.1.9 1.B

W.1 .84 .A

W.1 .79 .E

W.1 .79 .D

W.1.7 9.C

WT.02

WT.04

W.1 .72 .A

WT.02

W.1.6 6.B

WT.04

WT.04

CP.01

CP.01 CP.01

AE AF

AC

WT.03 WT.05

WT.02

1.56 CP-2

WT.03

D.1.6 8.A

D.1.6 5.A

SOUTHERN CORE

D.1.7 5.A D.1.7 6.A

D.1.7 8.B MALE

AB

WT.05

D.1.6 6.B

OFFICE

W.1 .60 .A WT.03

1.69

OFFICE 3

1.83 CP-1

CP.01

AA

D.1.7 9.B

1.61 TF-1

D.1.6 0.A D.1.6 1.A

LIFT 4

1.84 TF-1

AD04.03

1.68 CP-2

WT.03

BOARD ROOM W.1 .60 .D

MEETING

WT.03

W.1 .61 .A WT.03

WT.03

D.1.6 4.A WT.05

WT.02

OFFICE

CPT.01

1.64 CP-1

W.1 .66 .A

D.1.7 4.A

D.1.8 3.A

WT.05

MEETING

MANAGER OFFICE

CP-2 WT.05 D.1.6 6.A

WT.05

WT.03

WT.03

1.67

D.1.6 7.A

D.1.7 3.A

WT.03

W.1 .64 .A

MEETING

WT.05

BOARD ROOM

OFFICE

W.1.7 3.B 1.73 CP-2

D.1.8 0.A

WT.05

WT.03

MEETING

W.1 .79 .B

1.82 CP-1

WT.05

W.1.0 7.B

1.80 CP-1

WT.03

OFFICE

WT.03

W.1 .73 .A

WT.05

D.1.8 2.A

W.1.07.C

D.1.0 7.A

D.1.7 9.A

WT.03

WT.05

STORE

WT.05

AD

W.1.53.A

D.1.44.A D.1.8 6.A

WT.05

UTILITY

D.1.8 8.A D.1.0 8.A

W.1 .80 .B

MANAGER OFFICE

W.1 .79 .A

1.81 CP-1

D.1.8 1.A

WT.04

W.1.0 8.B

B5

BAL.1

WT.05

WT.03

OFFICE

1.85 CP-2

1.92

CP-1

1

D.1.0 9.A

D.1.4 2.B

W.1.39.C

RECEPTION

UNIT OFFICE

WT.04

AD09.02

W.1.0 9.B

D.1.42.A

W.1.38.E

WT.05

WT.05

WT.05

MEETING

WT.03

WT.03

W.1 .91 .A

1.11

AD09.02

W.1.13.C

WT.05

1 2

AG

AD04.05

D.1.3 5.B

D.1.8 4.A

MEETING

4

WT.04

1.35 TF-1

RL 59.24

BAL.1

W.1 .92 .A

OFFICE 1 WT.03

D.1.1 2.A 1.12 CP-2 WT.05

COLLABORATIVE OFFICE 4 WT.04

AIR LOCK

WT.05

MEETING

B4

VOID

WT.02

W.1.1 2.B

D.1.1 3.A

5 CP.01

D.1.0 6.A WT.05

1.14

WT.05

AD09.02

WT.04

STORE WT.05

BAL.1

W.1.58.A

A7

WT.05

D.1.3 5.A

RL 59.22

D.1.0 6.A

WT.03

BAL.1

VOID

W.1.5 9.B

3

1.16 D.1.1 6.A CP-2

VOID WT.05

BOARD ROOM

W.1.16.A

D.1.1 7.A

W.1.17.A

TL-1 WT.04

D.1.0 1.B

W.1.3 5.C

W.1.74.A

TF-1

LINK

W.1.92.E

WT.05

AD05.02

BAL.1

W.1.12.A

WT.05

1.17

AA6

D.1.1 5.A

W.1.11.A

KITCHEN

1.15

WT.07 BAL.1

2

W.1.80.A

RECEPTION

BAL.1

D.1.3 6.B

1

D.1.0 5.B

WT.03

W.1.0 1.D

WT.02

A6

W.1 .05 .B

ACCESS WC 1.18 TL-1

VOID

3

WT.03

WT.02

B3

RL 59.24

BAL.1

W.1.88.A

D.1.2 0.A

W.1.5 0.C

WT.03

UP

W.1.3 5.D

D.1.1 8.A

WT.03 W.1 .51 .B

1.05

CP-1 BAL.1

WT.02

COLLAB OFFICE 3

1.19

W.1.35.E

HR.1

1.20

W.1.90.A

WT.02

D.1.5 0.A

WT.05

AD05.02

W.1.9 2.B

1.21 CN-1

W.1.15.A

UP

WT.02

COMMS LIFT 1

1.36 CN-1

WT.05

W.1.05.C

STAIR 1

D.1.2 1.A

B2

BAL.1

HR.1

STAIR 7

1.04 CP-2

W.1.01.C

RL 59.24

WT.02

BAL.1

RP

WT.02

W.1.36.C

AA5

1.22 TF-2

1.51 TF-2

D.1.5 4.A

CATWALK

COLLAB OFFICE 2

W.1.0 4.B

WESTERN CORE

SPECIALIST EQUIP.

WT.05

W.1 .49 .B

WT.02

HR.1

W.1.0 5.D

W.1.22.A

A5

1.49 TF-2

WT.03

BAL.1

D.1.0 4.A

D.1.2 4.A D.1.2 3.A

WT.02

DIGITAL MODELLING WT.03

1.47

WT.05

D.1.5 5.A

WT.03

W.1.04.A

1.24

1 AD05.02

LIFT 3

W.1 .51 .A

D.1.5 1.A

1.55 TF-1

WT.08

CLNR

W.1 .48 .B

W.1 .49 .A

1.54 CN-1

W.1.05.A

STORE

D.1.4 9.A

D.1.4 8.B

WT.07

UP

STAIR 4

BA

AD04.04

BC

BB

BD

BE

BF

BG

BH

BI

BJ

BK

BL

BM

BN

BO

BP

BQ

2

C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt

WT.02

WT.02

1.46

WT.02

1.53 TF-2

WT.05

LIFT 2

WT.02

WT.05

SPEC. EQUIP

WT.05

D.1.4 5.A

RL 59.24

WT.05

W.1.04.C

D.1.2 6.B WT.02

D.1.3 9.B D.1.3 9.A

W.1.36.A

D.1.2 5.B

CP.01

UP

1.42

D.1.5 3.A

1.50 TF-2

B1

UP

1.03 CP-1

W.1.0 6.B

2 1

COLLAB OFFICE 1 D.1.0 3.A

HR.1

1.25

TL-1

EW.01

D.1.3 6.A

AA4

D.1.0 1.C

MALE WC

D.1.2 5.A

TL-1

RL 59.24

W.1.03.C

FEMALE WCD.1.2 6.A

W.1 .38 .D

EDUCATION WORKSHOP

1.43

CN-3

1.52 TF-2

D.1.5 2.A

EDUCATION SPACE 1.48 TF-1

NORTHERN CORE

D.1.4 1.A

STORED.G.4 1.B

W.1.89.A

WT.02

D.1.4 8.A

HR.1

D.1.3 7.B

W.1 .37 .E

BAL.1

W.1.91.C

D.1.2 7.A

1.26

file:

AD05.01

© studio theta pty ltd level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982

SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .

rev

issue

revision description

amd

date

CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 FIRST FLOOR GENERAL ARRANGEMENT PLAN

Preliminary

date: scale: drawn:

07-11-2016 1 : 200 @A1 JP

sheet no:

AD03.05

revis ion: project no:

16-0725

printed: 7/11/2016 12:08:55 PM

AD04.05

WT.03

W.1 .03 .A

EW.01

HR.1

W.1.3 6.B

TL-2

A4

WT.03

VOID

WT.05

W.1.0 3.B

1.27

HR.1

1.37 TF-1

WT.04

KITCHEN

EW.01

WT.02

STORE

WT.05

WT.02

FEMALE WC

AIR LOCK

RL 59.22

W.1.07.A

UP

W.1.0 3.D

WT.02

WT.01

EW.01

W.1.3 7.D

RL 59.24

STAIR 2

D.1.3 7.A

LINK

W.1.0 1.B

WT.05

WT.02

1.01 TF-1

1.41

WT.02

WT.03

D.1.0 1.A

PUBLIC LOUNGE W.1.27.A

1.29 TF-1

WT.03 WT.04 BAL.1

W.1.37.A

WT.05

WT.05

UTILITY

WT.04

W.1.3 7.B

AA3

A3

WT.02

ACCESS WC

1.39

TF-2

W.1.37.C

W.1.3 0.B

D.1.3 1.A

EW.01

WT.05

1.45 CN-1

1.44

AD06.01

COMMUNAL KITCHEN

W.1.0 2.B

WT.04

MALE WC

WT.05

1.02

W.1.01.A

1.31 CP-1

WT.03

2

TF-3 D.1.0 2.A RL 59.22

1.30 TF-1

W.1.31.A

MEETING

BALCONY

COLLABORATIVE OFFICE 5

D.1.3 2.A

D.1.4 3.A

WT.01

STAIR 3

1.38 TF-2

AD06.01

W.1.3 5.B

1.32

CP-1 WT.05

RL 59.22

EW.01

DINING ROOM

2

CW.02 BAL.1

W.1.32.A

D.1.3 3.A

MEETING

AA2

W.1.35.A

1.33 CP-1 WT.05

W.1.02.A

WT.03

W.1.30.A

QUIET RM

CW.02

D.1.3 4.A

W.1.30.C

W.1.33.A

WT.05

EW.01

WT.04

CW.02 W.1.3 4.B

1.34 CP-1

CP.01 WT.04

1.40 TF-3

D.1.4 4.B

W.1.34.A

BOARD ROOM

WT.04

BALCONY W.1.38.C

VOID

WT.03

A2

VOID

D.1.3 8.C

CW.02 CW.02

CW.02

WT.04

BAL.1

AA1

1 AD06.01

CW.02

D.1.3 8.B

W.1.38.A

A1

D.1.3 8.A


AD AB

AE

AC

BB

AF

AG

BA

BD

BE

BF

BG

BH

BI

BJ

BK

BL

BM

BN

BO

BP

BQ

BC

3989

CL

200

AA

840

9 0°

8241

4110

4027

879

8 0°

10000

970

CL

9 0°

VOID

AA1

2300 100 500

2400

700

6894

6000 200

6785

A1

11366

10°

8 0°

CL

CL

6000

5700

4300

1245

2000

1245

3509

CL

CL 2200

9030 3131

1300

5600 3700 1225 409 1216 475 1450

4581

4596

5226

4490

90

2693

5000

4490

120500

2400

3420

2956 5754 C

4192

L

4564

3736

5508

120500

2400

1030

CL

2680 5580

3120

2700

1030

2850

476 1000

2216

7606

20746

474

1581

CL

2124

5015

B3

1000

CL

°

CL

1956

1178

2450

B2

8526

CL 1044

CL

CL

700 1225 621

VOID

VOID

B4

CL

AA5

CL

2000

9004

1796

VOID 4080

18060

1956

2341

5280

A5

2251

1044 1000

1200 120 1200 120 1200

14920

CL

CL

CL

2000

5146

3328

CL

1163

1 5930

1 00

251

1638

2803

64

2000

3000 200

676

CL

1810

520 1000

5000 7673

2740

CL

1500 1000154

AA4 660

1225

CL 1497

CL 1535

6792

3225 805

4000

3020

RP

1000

264 1000

VOID

5196

4390

15500

A4

B1

1285 10276

5855

270

1475

2780

AA3

10705

2346

AD04.05

3489

CL 5665 12000

100

2855

CL

A3

5258

9065

1686

CL

14090

1708

3145

12145

12250

CL

800230 1100

11 0°

CL

CL

12844

CL

6000

CL

3000

3393

CL

CL

°

AA2

4945 9200

1 00

A2

3335

3866

22197

1114

CL

6000

CL

9115

7996

CL

5861

CL

6367

1 00 1000 880

CL CL

3219

6336 2000

5535

4274

6126

5920

705120

6745

5015 2470

4471 3001

2211

2170

2415

1000 850 1000

3465

4430

1450

CL

CL

3120

2580

300 5109

5700

B7

11949

CL 135

CL

CL

6000

5109

5181

4535

1916

3420

3280

1669

3615

B6

5970

3760

CL

3495

254 1000 415

1669

6610 5754 13816

CL

6926

120

7060

2400 100 3495

2105 8895

2072 2415

6000

3093

3063 3814

6000

CL

120

3352 3511

CL

2956

5400 5155

CL

600

5400

600

5400

600

5400

439

6191

B8

4495

CL

1 2

3533

80 °

170°

7000

AD04.03

6000

13781

11285

AC

CL

17454

5754

4201

CL

4815

3421

12491

2

AG

BA

AD04.04

BC

BB

BD

BE

BF

BG

BH

BI

BJ

BK

BL

BM

BN

BO

BP

BQ

© studio theta pty ltd level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982

SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .

rev

issue

revision description

amd

date

CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 FIRST FLOOR DIMENSIONS

Preliminary

date: scale: drawn:

07-11-2016 1 : 200 @A1 JD

sheet no:

AD03.06

revis ion: project no:

16-0725

printed: 7/11/2016 12:09:02 PM

file:

AB

CL

AE AF

AA

6000

1137

CL

AD

6000

10000 C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt

6039

CL

4056

CL

4592

4472 120

710122 1641

7773

2400

3630

9004

3341

00 °

5920

7926

6000

1

4592

2400

CL 3409

CL

3397

10465

1995

120 4588 120

601

3525

120

6432

2400

3449

4498

1479

2068

120 675

4468

1500 5939

2510

3401

2420

2075 2120

2400

4919

675

13539

9549

CL

4891

AA8

1080 90

6000

5900

344

4506

1919

CL 5080 3335

15234

1512

AA7

A7

4095

6116

CL 4555

3000

12165

A8

B5

CL

5465

4555

CL

500

VOID

1577

3966

4546

CL

6000

5598

4186

2000

3231 3680

3391

AA6

CL CL

700

6655

90

1956

2385 1218

1500 2175

2606

2627

CL

1204

2529

1420

6220

CL

5394

8 0°

1200

°

A6

9 0°


AD AA

AB

AE

AC

BB

AF

AG

BA

BD

BE

BF

BG

BH

BI

BJ

BK

BL

BM

BN

BO

BP

BQ

BC

VOID

AA1

A1

BALCONY 1.40

VOID

BOARD ROOM

STORE

1.45

1.38

AA2

A2

B1

STAIR 3

DINING ROOM

1.34

1.52

MALE WC 1.44

QUIET RM 1.33

EDUCATION SPACE

BALCONY COMMUNAL KITCHEN

1.50

SPEC. EQUIP

ACCESS WC

1.39

1.32

EDUCATION WORKSHOP

1.48

1.02

MEETING

1.41

1.53

NORTHERN CORE

COLLABORATIVE OFFICE 5

STAIR 4

1.43

1.30

MEETING

FEMALE WC

1.31

RP

DIGITAL MODELLING

AA3

1.49

LIFT 3

SPECIALIST EQUIP. 1.51

1.47

PUBLIC LOUNGE

UTILITY

B2

1.46

1.42

A3

1.54

LIFT 2

1.01

1.29

LINK

AIR LOCK 1.37

STAIR 2 1.28

KITCHEN

VOID

1.27

A4

FEMALE WC

AA4

MALE WC

1.26

B3 COLLAB OFFICE 1 1.03

1.25

STORE 1.24

CLNR 1.23

COLLAB OFFICE 2

WESTERN CORE

A5

VOID

B4

VOID

COLLAB OFFICE 3 1.05

COMMS LIFT 1

1.21

1.55

1.36

AA5

1.22

STAIR 1

CATWALK

VOID

STAIR 7

VOID

1.04

1.20

1.19

B5

ACCESS WC 1.18

LINK

AA6

A6

AIR LOCK 1.35

RECEPTION 1.15

KITCHEN

VOID

1.17

BOARD ROOM 1.16

RECEPTION

UNIT OFFICE

STORE

MANAGER OFFICE

OFFICE

1.85

1.92

MEETING

MEETING

1.80

1.81

1.67

1.73

MANAGER OFFICE

BOARD ROOM

1.64

1.61

OFFICE 1.56

1.14

1.06

UTILITY

1.12

1.87

STORE

B6

MEETING

1.74

OFFICE 1

MEETING

AA7

A7

MEETING

1.68

OFFICE

1.86

1.82

STORE

STORE COLLABORATIVE OFFICE 4 1.13

LIFT 4

1.11

1.69

BOARD ROOM

OFFICE

1.88

FEMALE WC

1.79

1.75

SOUTHERN CORE 1.72

QUIET RM 1.09

QUIET RM 1.08

OFFICE 2 1.91

AA8

OFFICE 1.90

STAIR 5

1.66

OFFICE

MANUFACTURING OFFICE 2

1.62

1.58

1.60

1.70

STAIR 6

1.76

OFFICE

MANUFACTURING OFFICE 1

LIFT 5

B7

CLNR

QUIET RM 1.07

A8

OFFICE 3

1.83

MEETING 1.10

1.57

1.65

MEETING

1.71

1.89

OFFICE

ACC WC

OFFICE

1.63

1.77

1.59

STORE 1.84

MALE WC 1.78

AD

AE AF

AB

AC

BA

BC

BB

BD

BE

BF

BG

BH

BI

BJ

BK

BL

BM

BN

BO

BP

BQ

© studio theta pty ltd level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982

SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .

rev

issue

revision description

amd

date

CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 FIRST FLOOR FURNISHED PLAN

Preliminary

date: scale: drawn:

07-11-2016 1 : 200 @A1 JP

sheet no:

AD03.07

revis ion: project no:

16-0725

printed: 7/11/2016 12:09:18 PM

file:

AA

AG

C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt

B8


AD04.01

AD

AE

1 2

AA

AB

AC

BB

AF

BD

BE

BF

BG

BH

BI

AD04.02

2

AG

AD05.01

BA

BJ

BK

BL

BM

BN

BO

BP

BQ

1 2

BC

1 AD06.01

CW.01

CW.01 CP.01

CW.01

CP.01

AA1

A1

CW.02

CW.01 CP.01

WT.03

CW.01

VOID

CW.01

D.G.5 2.EEE

CW.02

2

AA2

A2

WT.03

Perimeter curtain wall s extend to ca nopy underside, refer to window schedule for deta ils

B1

WT.03 HR.1

AD06.01 WT.03

WT.04 CW.02

PLANT ROOM B

WT.03

STAIR 3

2.04 RF.01

2.03

FIRST FLOOR ROOF BELOW

CW.01

FIRST FLOOR ROOF BELOW

RL 62.84 UP WT.03

B2

FIRST FLOOR ROOF BELOW

AA3

A3

WT.03

LIFT OVER RUN CW.01

WT.07

WT.03

WT.03

WT.03 WT.03

CP.01

WT.02

B3

WT.04

AA4

A4 WT.05

AD04.05

2 1

VOID WT.05

WT.05

FIRST FLOOR ROOF BELOW

PLANT ROOM A

B4 VOID

2 AD05.02

AA5

A5

WT.07

VOID

STAIR 7 BELOW

2.02 RF.01

RL 62.84 CP.01

WT.02 D.G.52.DDD

STAIR 1 UP

3

WT.02

AD04.05

2.01

WT.05

LIFT OVER RUN

1

HR.1

A6

B5

AD05.02 WT.05

WT.02

AA6

WT.03

WT.03

WT.03

WT.03

WT.07

B6

WT.04

AA7

A7

WT.03 WT.02

PLANT ROOM C AD09.02

D.G.52.UU

2.06 RF.01

FIRST FLOOR ROOF BELOW LIFT OVER RUN

FIRST FLOOR ROOF BELOW 4

RL 62.84 WT.02

CW.01

CW.01

WT.02

UP 6 STAIR 2.05

FIRST FLOOR ROOF BELOW HR.1

B7 WT.03

A8

AA8

CW.01

CW.01

CW.01 CW.01

Perimeter curtain wall s extend to ca nopy underside, refer to window schedule for deta ils

WT.03

Perimeter curtain wall s extend to ca nopy underside, refer to window schedule for deta ils

CW.01 WT.03

CP.01 WT.03

CW.01

AD04.03

AD

AB

AC

CP.01

CP.01

AE

CP.01

AF

AA

B8

WT.03

CW.01

Perimeter curtain wall s extend to ca nopy underside, refer to window schedule for deta ils

1 2

AG

BA

AD04.04

BC

BB

BD

BE

BF

BG

BH

BI

BJ

BK

BL

BM

BN

BO

BP

BQ

2

© studio theta pty ltd level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982

SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .

rev

issue

revision description

amd

date

CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 SECOND FLOOR GENERAL ARRANGEMENT FLOOR PLAN

Preliminary

date: scale: drawn:

07-11-2016 1 : 200 @A1 JP

sheet no:

AD03.08

revis ion: project no:

16-0725

printed: 7/11/2016 12:09:22 PM

file:

AD05.01

C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt

1 2


AD AA

AB

AE

AC

BB

AF

AG

BA

BD

BE

BF

BG

BH

BI

BJ

BK

BL

BM

BN

BO

BP

BQ

BC

AA1

A1

11556

4523

10°

1923

1506

CL 1 00

CL

CL

CL

CL

CL

°

AA2 6560

A2

B1

6000

CL

13506

13446

10776

CL

1490

B2

18000

CL

AA3

A3

CL

6004

CL

12000

4315

7780

5000

A5

7780

CL CL

CL

CL

6500

2175

1500

3419

B4

AA5

18000

800 1090

18000

90

B3

AA4

CL

A4

54000

CL

CL

CL

4494

3365

AA6

3512

6548

5296

B5

46

CL

2420

4509

CL

2644

CL

A6

CL

2545

1075

6175

18000

B6

AA7

3302

CL

B8

15420 300

AD

CL 94

AE AF

AB

AC

300 300

5400

CL

300

CL

11700

CL

11700

AG

35860

BA

BC

BB

BD

BE

BF

BG

BH

BI

BJ

BK

BL

BM

CL

BN

BO

CL

BP

BQ

© studio theta pty ltd level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982

SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .

rev

issue

revision description

amd

date

CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 SECOND FLOOR DIMENSIONS

Preliminary

date: scale: drawn:

07-11-2016 1 : 200 @A1 JD

sheet no:

AD03.09

revis ion: project no:

16-0725

printed: 7/11/2016 12:09:25 PM

file:

AA

5400

CL

C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt

3874

4970

5136

AA8

A8

B7

CL

CL

300

CL

4886

6084

22797

A7


TC.01

TC.01

TC.01 TC.01 TC.01

TC.01 TC.01

TC.01

TC.01

TC.01

TC.01

TC.01

TC.01

TC.01 TC.01 TC.01 TC.01

LINK BELOW

TC.01

TC.01

TC.01

TC.01

TC.01

GT.02 TC.01

TC.01 TC.01

TC.01

TC.01 TC.01 TC.01

TC.01

TC.01

TC.01

TC.01 TC.01

TC.01 GT.02

TC.01

LINK BELOW TC.01 TC.01

TC.01 TC.01

TC.01 TC.01

TC.01

TC.01

TC.01 TC.01

TC.01

TC.01

TC.01

TC.01

TC.01

TC.01

TC.01

TC.01

TC.01

TC.01 TC.01

© studio theta pty ltd level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982

SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .

rev

issue

revision description

amd

date

CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 GENERAL ARRANGEMENT ROOF PLAN

Preliminary

date: scale: drawn:

07-11-2016 1 : 200 @A1 JD

sheet no:

AD03.10

revis ion: project no:

16-0725

printed: 7/11/2016 12:09:26 PM

file:

C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt

TC.01


AD AA

AB

AE

AC

BB

AF

AG

BA

FIRST FLOOR WALKWAY BELOW

BD

BE

BF

BG

BH

BI

BJ

BK

BL

BM

BN

BO

BP

BQ

BC

DP.01 CA(S)

DP.01 CA(S)

BG.01

10.5°

AF.01

BG .02

BG.01

DP.01

5.00°

RC.01

RC.01

RC.01

10.5° DP.01

13.00°

9.00°

9.00°

5.00° BG.01

RC.01

DP.01

10.5°

AA2

DP.01

B1

DP.01

BG.02

A2

CA(S)

DP.01

9. 00°

AA1

A1

9.00°

BG.02 RC.01

AF.01

RC.01

9.00°

5.00°

B2 10.5° 9.00°

3013

AA3

10.5° 9.00°

5.00°

RC.01

9.00°

BG.01

A3

RC.01

9.00 °

DP.01

RC.01

0° 9.0

5.00°

10.5°

BG .02

9.00°

RC.01 RC.01

CA(S)

9.00°

DP.01 DP.01

AA4

A4

DP.01

B3

DP.01

BG.02

5.00°

BG.02

BG.02

DP.01

CA(S)

0° 9.0

10.5°

10.5°

AF.01 CA(S)

RC.01

CA(S)

RC.01

10.5°

RC.01

BG .0 2

RC.01

9.00°

9.00°

CA(S)

9.00° BG.01

10.5° RC.01

CA(S)

DP.01 BG.02

5.00°

DP.01

9.00°

DP.01

BG.02

AA6

DP.01

BG.02

10.5°

0° 9.0

BG .02

BG .0 2

5.00°

RC.01

RC.01

10.5°

9.00°

9.00° 5.00°

10.5

10.5°

BG.01

RC.01 RC.01

9.00°

B6

RC.01

9.00°

AA7

DP.01

RC.01

RC.01

5.00°

9.00 °

10.5°

6

AF.01

DP.01

AF.01

A7

B5

DP.01

BG.01

A6

B4

RC.01

5.00° BG.01

9.00°

AA5

A5

BG .02

RC.01

BG.01

5.00°

BG.01

9.00°

9.00 °

DP.01

DP.01

9.00°

DP.01

B7

BG.02

BG.02

AA8

A8

BG.02

DP.01

4.00°

10.5°

RC.01

9. 00°

RC.01

AF.01

4.00°

BG.0 2

BG.01

5.00°

DP.01

5.00° 10.5°

DP.01

CA(S)

DP.01

BG.01

9.00°

B8

CA(S)

BG.01

AE

DP.01

AF

AA

AB

CA(S)

AG

AC

BA

BC

BB

BD

BE

BF

BG

BH

BI

BJ

BK

BL

BM

BN

BO

BP

© studio theta pty ltd level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982

SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .

RTx

Roof Type 1,...3 as spec. Refer to Roof Schedule bel ow.

Folded parapet capping a s spec.

BG1 BG2 EJ GS RWH OF DP1-3 CA(A) CA(S)

Box Gutter Type 1: 6 00W x 1 50D as spec. to AS 3 500 Box Gutter Type 2: 4 50W x 2 00D as spec. to AS 3 500 Expa nsion Joint to ma tch gutter Gutter Sump to ma tch gutter to AS 3500 Rainwater head as spec. Overfl ow to AS 3 500 (circul ar-soffit a nd rectangularfacade) Downpipe Type 1,...3 as spec. to AS 3 500 Capping (Al uminium to cladding) a s spec. Capping ( Steel to match gutter) a s spec.

CU.123 Condenser Unit to Mechanical engineer's drawings EC.1,..2 Evaporative Unit to Mecha nica l engineer's drawings EF.1,..2 Exha ust Cowl Unit to Mecha nical engineer's drawings SF.1,..2 Supply Air Cowl Unit to Mechanical engineer's drawings

rev

issue

revision description

amd

date

CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 ROOF PLAN

Preliminary

date:

07-11-2016

scale:

As indicated @A1 revis ion:

drawn:

JD

sheet no:

project no:

AD03.11 16-0725

printed: 7/11/2016 12:09:30 PM

file:

SECOND FLOOR ROOF BELOW

BQ

C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt

DP.01

AD


AD AA

AB

AC

AE 6000

BB

AF

AG

9000

6000

6000

BA

6000

BD

6000

BE

6000

BF

BG

6000

6000

BH

6000

BI

BJ

6000

6000

BK

6000

BL

6000

BM

6000

BN

6000

BO

6000

BP

6000

BQ

6000

BC

6004 6000

SETOUT

AA1

A1

SETOUT 9000

SETOUT

B1 AA2

9000

9000

A2

B2 AA3

9000

9000

A3

B3 AA4

9000

9000

A4

B4 AA5

9000

9000

A5

B5 AA6

9000

9000

A6

B6 AA7

9000

9000

A7

B7 AA8

A8

AD

AE AF

AB

AC

BA

BC

BB

BD

BE

BF

BG

BH

BI

BJ

BK

BL

BM

BN

BO

BP

BQ

level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982

SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .

rev

issue

revision description

amd

date

CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 ROOF FRAMING PLAN

Preliminary

dat e: sc a l e : dr aw n :

07-11-2016 1 : 200 @A1 Author

sh ee t n o :

AD03.12

rev is io n: proj ect no:16-0725

printe d:

© studio theta pty ltd

7/11/2016 12:09:31 PM

file:

AA

AG

C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt

B8


AD AA

AB

AE

AC

BB

AF

BD

BE

BF

BG

BH

BI

BJ

BK

BL

BM

BN

BO

BP

BQ

2

AG

AD05.01

BA

BC

TC. 01 5400 TC. 01 6000

AA1

A1

VOID CANOPY BEYOND

S C. 01 5400

TC. 01 6000

BH

VOID CANOPY BEYOND

VOID CANOPY BEYOND

BH

M WC

AA2

A2

G.35

PB . 03 4800

AD06.01

RECEPTION BH

PB . 03 5600

5400

G.03

G.40

BH

S C. 01 5400

KITCHEN LT .06

LT .06

G.05

G.04

PB . 03 5000

NC

PB . 01 5400

PB . 01 3600

S C. 01 5400

G.47

S C. 01 5600

G.43

PB . 02 3200

STAIR 2

TC. 01 6000

LT .07

LT.06

LT.06

LT.06

STORAGE G.50

TC. 01 5400

PB . 01 5600

LT.06

LT.06

LT.06

LT.06

STAFF ROOM

LT.06

LT.06

LT.06

LT.06

LT.06

LT.06

LT.06

LT.06

LT.06

LT.06

LT.06

LT.06

LT.06

G.49

LT.06

LT.06

LT.06

LT.06

LT.06

LT.06

LT.06

LT.06

AT . 01 4800

B2

BH

BH

TC. 01 6000

LT .07

LT .06

LT .06

LT .06

LT.06

G.07

AT . 01 3600

S C. 01 5400

LT .06

VOID

PB . 01 2700

Refer deta iled stair drawings for detail s of cladding to u/side of stair

LT.06

TC. 01 5400

LT .07

KITCHEN

G.29

LT.06

LT.06

G.46

G.33

AT . 02 5600

LT .07

LT.06

LIFT 3

LT .07

LT .07

TC. 01 6500

LT.06

G.45

AIR LOCK

BH

BH

LIFT 2

G.42

LT.06

BH

S C. 01 5400

F WC

PB . 03 5400

G.51

BH

NORTHERN CORE

B1

STAIR 4

G.48

PB . 01 3600

ADMIN

LT.06

G.37

LT .06

LT .06

PB . 02 3200

STORE

CAFE

BH

AT . 01 3600

AA3

A3 PB . 01 3200

ACC WC

5400

G.30

G.44

PB . 02 3200

S C. 01 5600

BH

G.02 PB . 01

SECURITY PB . 01

GALLERY

G.38

LOCKERS

STAIR 3

G.39

MATERIALS + HARDWARE

PRODUCT SHOP

2

TC. 01 6000

NC

B3

RESTAURANT G.06

AA4

MALE WC

PB . 02 3600

G.26

COLD ROOM G.11

LT .06

AT . 01 3600

LT .06

G.10

G.28

timber beams exposed throughout

LT .06

G.27

KITCHEN

PB . 02 3600

G.01

CLNR

LT .06

PUBLIC ATRIUM STORE

G.08

PB . 03 5400

PB . 02 3200

PB . 02 3200

COLD ROOM

LT .06

G.25

LT .06

FEMALE WC

LT .06

A4

WESTERN CORE G.24

AA5

VOID CANOPY BEYOND

B4

VOID CANOPY BEYOND

2

AD05.02

S C. 01 5000 BH

A5

G.52

TC. 01 6000

VOID CANOPY BEYOND

2

S C. 01 5400

MANUFACTURING

VOID CANOPY BEYOND

AD05.02

CAFE G.09

STAIR 1

COMMS LIFT 1

G.20

G.22

PB . 01 3600

G.23

TC. 01 5400

B5

WC ACCESS G.21

PB . 02 3200

BOOSTER G.19A

NC

FIRE PUMP ROOM

MSB

NC

NC

G.19

AA6

AIR LOCK

TC. 01 6000

LT .07 LT .07 LT .07

TC. 01 5400

LT .07 LT .07

G.18

G.31

AT . 02 3000

TC. 01 5400

LT .07

VOID

LT .07

TC. 01 5400

LT .06

LT .06

LT.06 LT.06 LT.06 LT.06 LT.06 LT.06

LT.06

LT.06 LT.06

LT.06

TC. 01 5600

AT . 01 4800 LT.06

LT.06 LT.06

LT.06

BH

LT.06

LT.06 LT.06 LT.06 LT.06

LT.06 LT.06 LT.06

LT.06

LT.06

LT.06

LT.06

LT.06 LT.06

LT.06 LT.06

G.71

AT . 01 4800

LT.06

LT.06

PROTOTYPE SHARE

LT.06

LT .06 LT .06

S C. 01 5400

NC

G.66

LT .06

LT .06

PROTOTYPE 2 S C. 01 5400

S C. 01 5400

ACC WC G.63

PB . 02 3200

BH

S C. 01 5400

LIFT 6 G.58

PB . 02 3200

PB . 02 4800

CONTROL ROOM

G.55

G.61

G.70

PB . 02 4800

ADMIN

F WC

SPECIALIST EQUIPMENT

G.73

LT .06

LT .06 LT .06

LT .06

LT .06

LT .06

VOID CANOPY BEYOND

SPRAY ROOM 1

LT .06

LT .06

AA8

A8

G.57

G.65

PB . 02 4800

LT.06

LT .06

AT . 01 5600

G.72

LIFT 4

SPRAY ROOM 2

G.67

LT.06

BH

G.68

LT.06

PROTOTYPE 1

BH

G.69

LT.06

LT .06

LT .06

LT .06

BH

WELD BTH WELD BTH WELD BTH

LT .06

LT .06

G.12

LT .06

G.14

RETAIL 2

LT .06

PB . 03 5600

LT .06

RETAIL 1

LT .06

S C. 01 5400 PB . 03 5600

S C. 01 5400

LT.06

AA7

TC. 01 5600

LT .06

A7

S C. 01 5400

LT .06

PB . 01 3600

LT .06

PB . 01 3600

G.16

NC

B6

G.13

STORE

G.17

LT .06

TRANSFORMER ROOM

TC. 01 6000

STORE

PB . 03 4800

G.53

STAIR 5 G.54

NC

B7 SOUTHERN CORE G.60

STAIR 6 G.59

S C. 01 5400

TC. 01 6000

STORAGE G.56

PB . 02 3200

PB . 01 5600

VOID CANOPY BEYOND

M WC G.64

B8

PB . 01 5600

VOID CANOPY BEYOND

AD

AE AF

AA

AB

AG

BA

AC

BC

BB

BD

BE

BF

BG

BH

BI

BJ

BK

BL

BM

BN

BO

BP

BQ

2

C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt

A6

LT .07

TC. 01 6500

level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982

SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .

NOTES:

LT.02 - Supernova PR Down-Up P enda nt Light 650 mm Round

LT.07 - Thorn Chamel eon T5 Ceiling diffuser 1200 x300mm

LT.04 - Delta light Spy on ADL track light 62mm Round LT.06 - Thorn Chameleon T5 Ceil ing diffuser 1200x600mm

P

LT.03 - Supernova PR Down-Up P enda nt Light 650 mm Round

Refer to electrical services drawings for detail of installation of lights

LT.0 5 - Deltalight Gala LED WW W Wall light 1 48x7 0mm

LT.01 - LED Downl igh, Deltalight Grand Reo 827 20 S1 W-B 18w 102 mm Round

Contractor to note tha t no cornice required to wall where fea ture wall lining/panel s exist. Allow for 10mm sha dowl ine. Refer services drawings for details of service points

rev

issue

revision description

amd

date

CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042

Confirm setout of al l fittings and fixtures on site with Architect prior to instal lation.

GROUND FLOOR REFLECTED CEILING PLAN

Extent and number of AP's, l oca tions a nd sizes to be coordinated with services engineer's drawings. Refer to architectural specification for numbers to be allowed.

Preliminary

dat e:

07-11-2016

sc a l e :

As indicated @A1 rev is io n:

dr aw n :

JP

sh ee t n o :

AD03.13

proj ect no:16-0725

printe d:

REFLECTED CEILING LEGEND © studio theta pty ltd

7/11/2016 12:09:38 PM

file:

AD05.01


AD AA

AB

AE

AC

BB

AF

BE

BF

BG

BH

BI

BJ

BK

BL

BM

BN

BO

BP

BQ

AD05.01

BA

BC

TC. 01 3600

AA1

A1

BD

2

AG

BH

VOID CANOPY BEYOND

LT.06

LT.06

LT.06

LT.06

LT.06

LT.06

LT.06

LT.06

LT.06

LT.06

LT.06

LT.06

LT.06

LT.06

LT.06

LT.06

DINING ROOM 1.38

BH

BH

PB . 03 3600

AT . 01 2700

LT.06

LT.06

LT.06

LT.06

LT.06

LT.06

LT.06

LT.06

S C. 01 2400

AT . 01 2400

VOID CANOPY BEYOND

AT . 01 2400

B1

BOARD ROOM 1.34

TC. 01 3600

A2

AA2

AD06.01

1.33

LT.06

LT.06

LT.06

LT.06

LT.06

LT.06

LT.06

LT.06

LT.06

LT.06

LT.06

LT.06

LT.06

S C. 01 3000

S C. 01 RAK ING

S C. 01 3000

S C. 01 RAK ING

1.39

A3

LT.06 LT.06

LT.06

UTILITY

AA3

LT .07 LT .07 LT .07 LT .07

1.28

LT.06

STORE 1.52

LT.06

LT.06

1.41

PB . 02 3200

NORTHERN CORE PB . 01 3200

LT.06

LT.06

LT.06

LT.06

LT.06

LT.06

LT.06

LT.06

BH

STAIR 4 1.54

LT.06

LT.06

1.43

LT.06

LT.06

LT.06

EDUCATION WORKSHOP

SPEC. EQUIP

PB . 01 2700

PB . 01 2700

1.50

LT.06

LT.06

LT.06

BH

PB . 02 3200

1.53

PB . 01 2700

B2

LIFT 2 1.46

FEMALE WC

DIGITAL MODELLING

1.42

1.49

SPECIALIST EQUIP.

PB . 01 2700

1.51

PB . 01 2700

1.47

1.37

PB . 01 2700

PB . 01 3200

B3

FEMALE WC

COLLAB OFFICE 1 1.03

S C. 01 3600

AA4

MALE WC

1.26

TC. 01 3600

1.25

PB . 02 3200

VOID CANOPY BEYOND

PB . 02 3200

STORE 1.24

PB . 01 3200

1

LT.06

LT.06

LIFT 3

AT . 02 3600

LT.06

1.27

PB . 01 3200

AD05.02

LT .07 LT .07 LT .07 LT .07

LT.06

AT . 01 2400

AIR LOCK

KITCHEN

PB . 01 3200

A4

LT .07 LT .07 LT .07

TC. 01 3600

STAIR 2

LT.06

1.48

LT .07 LT .07 LT .07 LT .07

TC. 01 3600

1.29

LT.06

PB . 01 2700

EDUCATION SPACE

BH

BH

1.45

ACCESS WC

1.31

AT . 01 3200

STAIR 3

1.44

COMMUNAL KITCHEN

LT.06

BH

S C. 01 3200

MEETING

MALE WC

LT.06

BH

PB . 02 3200

1.30

1.32

S C. 01 RAK ING

BH

TC. 01 3200

COLLABORATIVE OFFICE 5

S C. 01 3000

LT.06

1.02

LT.06

LT.06

LT.06

BALCONY

MEETING AT . 01 3200

LT.06

2

QUIET RM LT.06

AT . 01 3200

VOID CANOPY BEYOND

CLNR

1.36

1.04

S C. 01 3600

TC. 01 3600

1.22

B4

VOID CANOPY BEYOND

2

AD05.02

AA5

S C. 01 3000

VOID GLAZED ROOF

VOID CANOPY BEYOND

2

WESTERN CORE

A5

STAIR 7

COLLAB OFFICE 2

1.23

AD05.02

COLLAB OFFICE 3 1.05

STAIR 1

COMMS LIFT 1

1.21

1.20

TC. 01 3600

1.19

TC. 01 3600

PB . 01 3200

1

ACCESS WC

AD05.02

1.18

PB . 02 3200

AA6

RECEPTION

LT.07 LT.07 LT.07

VOID CANOPY BEYOND

AT . 01 3200

AT . 01 3200

LT .06

LT .06

AT . 01 3200

OFFICE 2

OFFICE

OFFICE

S C. 01 3200

PB . 03 2700

PB . 03 2700

1.91

AT . 01 3200

1.90

BH

LT.06

LT.06 LT.06

LT.06

LT.06

1.89

PB . 03 2700

LT.06

LT.06 LT.06

LT.07

MEETING

MEETING

AT . 02 2700

AT . 02 2700

LT.07 LT.07 LT.07

LT.07

LT.07

BH

LIFT 4

MANUFACTURING OFFICE 1

STORE

PB . 03 2400

PB . 01 2400

1.66

ACC WC 1.77

1.84

S C. 01 3200

PB . 02 3200

S C. 01 2700

LT.06

LT.06

STAIR 6

LT.06

S C. 01 2700

1.71

1.78

1.58

LT.06

LT.06

LT.06

LT.06

LT.06

AT . 01 2700

LT.06

B7

OFFICE LT.06 1.63

AT . 01 2700

LT.06

LT.06

LT.06

LT.06

LT.06

OFFICE LT.06

LT.06

1.59

LT.06

S C. 01 3200

LT.06

PB . 01 3600

MALE WC

LT.06

OFFICE

BH

LT.06

PB . 01 3200

PB . 02 3200

BH

LT.06

PB . 03 2400

BH

1.75

STORE

1.60

STAIR 5 1.62

1.70

PB . 01 2400

1.57

MANUFACTURING OFFICE 2

LIFT 5

FEMALE WC

BH

B6

STORE

BH

1.65

1.69

PB . 02 3200

PB . 03 2400

1.56

S C. 01 2700

TC. 01 2700

LT.07

1.72

OFFICE

S C. 01 2700

S C. 01 2700

TC. 01 2700

1.68 LT.07

1.79

1.61

1.64

LT.07

SOUTHERN CORE

BH

BOARD ROOM

MANAGER OFFICE

LT.07

LT.07

1.74

OFFICE 3

AT . 01 2400

QUIET RM

AA8

A8

LT.06

PB . 03 2700 1.07

LT.07

1.83

LT .06

LT .06

LT .06

1.08

LT.07

OFFICE

1.88

QUIET RM

1.67

AT . 02 2700

1.73

LT.07

TC. 01 2700

AT . 01 2400

BOARD ROOM

LT .06

1.09

LT .06

LT .06

QUIET RM LT .06

LT .06

LT .06

S C. 01 3200

LT .06

1.10

LT .06

S C. 01 RAK ING

AT . 01 3200

LT .06

MEETING

PB . 03 2700

LT.06

PB . 03 2700

PB . 03 3200

LT .06

1.11

LT .06

S C. 01 3200

MEETING LT .06

BH

LT .06

1.13

MEETING

AT . 02 2700

LT.07

LT.07

LT.07

MEETING

LT.07

1.82

1.86

LT.06

BH

COLLABORATIVE OFFICE 4 S C. 01 RAK ING

LT.07

OFFICE

STORE

1.87

1.06

LT.06

AA7

UTILITY

OFFICE 1

AT . 01 3200

LT.06

1.12

LT.07

1.80

S C. 01 2700

AT . 01 2400

MEETING PB . 03 3000

LT.06

TC. 01 3200

LT.06

S C. 01 3200

S C. 01 3600

LT.06

S C. 01 RAK ING

1.92

BH

LT.06

A7

1.14

MANAGER OFFICE

1.81

1.85

PB . 03 2700

LT.06

BH

TC. 01 3600

OFFICE

RECEPTION BH

UNIT OFFICE

STORE

LT .06

1.16

S C. 01 3200

PB . 01 3200

LT .06

BOARD ROOM

1.35

AT . 02 3600

LT.07

TC. 01 3600

1.17

PB . 03 3600

LT.07 LT.07 LT.07

1.15

KITCHEN

B5

AIR LOCK

LT.07 LT.07

LT .06

A6

LT.07

TC. 01 3600

AT . 01 2700 LT.06

LT.06

LT.06

LT.06

LT.06

LT.06

LT.06

LT.06

VOID CANOPY BEYOND

VOID CANOPY BEYOND

AD

AE AF

AA

AB

AG

BA

AC

BC

BB

BD

BE

BF

BG

BH

BI

BJ

BK

BL

BM

BN

BO

BP

BQ

C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt

B8

2

ABN 43 525 056 982

NOTES:

LT.02 - Supernova PR Down-Up P enda nt Light 650 mm Round

LT.07 - Thorn Chamel eon T5 Ceiling diffuser 1200 x300mm

LT.04 - Delta light Spy on ADL track light 62mm Round LT.06 - Thorn Chameleon T5 Ceil ing diffuser 1200x600mm

P

LT.03 - Supernova PR Down-Up P enda nt Light 650 mm Round

Refer to electrical services drawings for detail of installation of lights

LT.0 5 - Deltalight Gala LED WW W Wall light 1 48x7 0mm

LT.01 - LED Downl igh, Deltalight Grand Reo 827 20 S1 W-B 18w 102 mm Round

Contractor to note tha t no cornice required to wall where fea ture wall lining/panel s exist. Allow for 10mm sha dowl ine. Refer services drawings for details of service points

rev

issue

revision description

amd

date

CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042

Confirm setout of al l fittings and fixtures on site with Architect prior to instal lation.

FIRST FLOOR REFLECTED CEILING PLAN

Extent and number of AP's, l oca tions a nd sizes to be coordinated with services engineer's drawings. Refer to architectural specification for numbers to be allowed.

Preliminary

dat e:

07-11-2016

sc a l e :

As indicated @A1 rev is io n:

dr aw n :

JP

sh ee t n o :

AD03.14

proj ect no:16-0725

7/11/2016 12:09:44 PM

level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au

SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .

printe d:

REFLECTED CEILING LEGEND © studio theta pty ltd

file:

AD05.01


AD AA

AB

AE

AC

BB

AF

AG

BD

BE

BF

BG

BH

BI

BJ

BK

BL

BM

BN

BO

BP

BQ

2 AD05.01

BA

BC

AA1

A1

B1 AA2

A2

STAIR 3 2.03

PLANT ROOM B 2.04

PB . 01 2400

NC

BH

PB . 01 2400

B2 AA3

A3

B3 AA4

A4

VOID CANOPY BEYOND Canopy soffit cla d in CT-01 Typ.

STAIR 7 PLANT ROOM A

1

2.02

AD05.02

NC

AA5

A5

1.36

VOID CANOPY BEYOND

NC

Canopy soffit cla d in CT-01 Typ.

VOID GLAZED ROOF

VOID CANOPY BEYOND Canopy soffit cla d in CT-01 Typ.

B4

2

2

AD05.02

AD05.02

STAIR 1 2.01

1 PB . 01 2400

B5

AD05.02

AA6

A6

B6 BH

AA7

A7

PLANT ROOM C

STAIR 6

NC

PB . 01 2400

2.06

AA8

A8

PB . 01 2400

2.05

BH

B7

PB . 01 2400

AD

AE AF

AA

AB

AG

BA

AC

BC

BB

BD

BE

BF

BG

BH

BI

BJ

BK

BL

BM

BN

BO

BP

BQ

2

C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt

B8

level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982

SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .

NOTES:

LT.02 - Supernova PR Down-Up P enda nt Light 650 mm Round

LT.07 - Thorn Chamel eon T5 Ceiling diffuser 1200 x300mm

LT.04 - Delta light Spy on ADL track light 62mm Round LT.06 - Thorn Chameleon T5 Ceil ing diffuser 1200x600mm

P

LT.03 - Supernova PR Down-Up P enda nt Light 650 mm Round

Refer to electrical services drawings for detail of installation of lights

LT.0 5 - Deltalight Gala LED WW W Wall light 1 48x7 0mm

LT.01 - LED Downl igh, Deltalight Grand Reo 827 20 S1 W-B 18w 102 mm Round

Contractor to note tha t no cornice required to wall where fea ture wall lining/panel s exist. Allow for 10mm sha dowl ine. Refer services drawings for details of service points

rev

issue

revision description

amd

date

CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042

Confirm setout of al l fittings and fixtures on site with Architect prior to instal lation.

SECOND FLOOR REFLECTED CEILING PLAN

Extent and number of AP's, l oca tions a nd sizes to be coordinated with services engineer's drawings. Refer to architectural specification for numbers to be allowed.

Preliminary

dat e:

07-11-2016

sc a l e :

As indicated @A1 rev is io n:

dr aw n :

JP

sh ee t n o :

AD03.15

proj ect no:16-0725

printe d:

REFLECTED CEILING LEGEND © studio theta pty ltd

7/11/2016 12:09:47 PM

file:

AD05.01


BC Top of Building RL. 71.14

BA

AG

AF

6000

AE

6000

AD

9000

6000

3500

6000

Structural Frame Level A RL. 67.64

1200

TC.01

Structural Frame Level B RL. 66.44

3600

TC.01 TC.01

111

°

First Floor Level RL. 59.24

TC.01

TC.01 cj

TC.01

3600

cj

28°

67°

Ground Floor Level FFL. 52.04

3600

Sub Floor Level RL. 55.64

BUILDING B

BUILDING A

North Elevation Building A - Canopy

1 AD04.01

1 : 200

BC Top of Building RL. 71.14

BA 6000

AG

AF

6000

AE

6000

AD

9000

6000

3500

Canopy Beyond

Structural Frame Level A RL. 67.64

1200

CW.0 2 in line with canopy above refer to AD06.01 for details

Structural Frame Level B RL. 66.44

3600

CW.02

Second Floor Level RL. 62.84

3600

BAL.01

First Floor Level RL. 59.24 align

align

align

align

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

CW.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

D.G.0 1.A

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

BUILDING A

C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt

BUILDING B

2

align

D.G.0 1.B

GL.01

D.G.0 1.C

GL.01

D.G.0 1.D

Ground Floor Level FFL. 52.04

align CW.01

3600

align CW.01

3600

align

Sub Floor Level RL. 55.64

North Elevation Building A - Beyond Canopy 1 : 200

© studio theta pty ltd level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982

SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .

rev

issue

revision description

amd

date

CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 NORTH ELEVATION BUILDING A

Preliminary

date: scale: drawn:

07-11-2016 1 : 200 @A1 JP

sheet no:

AD04.01

revis ion: project no:

16-0725

printed: 7/11/2016 12:09:53 PM

file:

AD04.01

3600

Second Floor Level RL. 62.84


1 AD06.02

2 AD05.01

BQ

BP

Top of Building RL. 71.14

6000

BO

BN

6000

BM

6000

BL

6000

BK

6000

BJ

6000

BI

6000

BH

6000

BG

6000

BF

6000

BE

6000

TC.01

Structural Frame Level A RL. 67.64

BD

6000

BB

6000

6000

TC.01

TC.01

Structural Frame Level B RL. 66.44

TC.01

Second Floor Level RL. 62.84

TC.01

TC.01 cj

cj

TC.01

First Floor Level RL. 59.24

TC.01

128°

cj

cj

TC.01

TC.01

TC.01

Sub Floor Level RL. 55.64

cj

cj

cj 62°

41°

Ground Floor Level FFL. 52.04

49°

33°

TC.01

TC.01

BUILDING B

BUILDING A 2 AD05.01

1

1 : 200

BQ Top of Building RL. 71.14

BP 6000

BO 6000

BN 6000

BM 6000

BL 6000

BK

BJ

6000

3500

BG

BF

6000

BE

6000

BD

6000

BB

6000

6000

Walls and Gla zing to underside of canopy, refer to details

1200

EW.01

EW.01

EW.01

EW.01

EW.01

D.G.5 2.F

D.G.52 .E

D.G.5 2.D

CW.01

WT.03

WT.03

EW.01

EW.01

WT.04

EW.01

EW.01

WT.03

CW.01

CW.01

EW.01

WT.01

CW.01

CW.01

EW.01

W.1 .38 .B

BAL.01 WT.04

CW.01

WT.01

WT.04

W.G.47 .B

W.G.47 .B

WT.01

WT.01

CW.01

W.G.38 .D

CW.01

D.G.3 8.A

WT.01

CW.01

D.1.38.A

EW.01

CW.01

D.G.3 5.B

CW.01

D.1.43.A

WT.07

CW.01

D.1.3 8.B

3600

CW.01

D.G.4 7.A

Ground Floor Level FFL. 52.04

6000

Roof Para pet , gla zed roof section beyond

D.G.5 1.B 3200

Sub Floor Level RL. 55.64

3600

First Floor Level RL. 59.24

3600

Second Floor Level RL. 62.84

3600

Structural Frame Level B RL. 66.44

BH

6000

BAL.01 Shown dashed for clarity

Structural Frame Level A RL. 67.64

BI

6000

D.G.4 3.A

AD04.02

AD06.02

North Elevation Building B - Canopy

D.G.4 4.B

1

BAL.01

BUILDING B

BUILDING A

RT.01 Shown dashed for cla rity

North Elevation Building B - Beyond Canopy

C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt

2

1 : 200

© studio theta pty ltd level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982

SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .

rev

issue

revision description

amd

date

CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 NORTH ELEVATION BUILDING B

Preliminary

date: scale: drawn:

07-11-2016 1 : 200 @A1 JP

sheet no:

AD04.02

revis ion: project no:

16-0725

printed: 7/11/2016 12:10:00 PM

file:

AD04.02


AD

AE

AF

6000

9000

AG 6000

3500

Top of Building RL. 71.14

1200

Structural Frame Level A RL. 67.64 SK.01

Structural Frame Level B RL. 66.44

3600

TC.01 TC.01

Second Floor Level RL. 62.84

3600

TC.01

TC.01

TC.01

TC.01

Ground Floor Level FFL. 52.04

3600

36°

53°

Sub Floor Level RL. 55.64

3600

First Floor Level RL. 59.24

BUILDING A

1

BUILDING B

South Elevation Building A - Canopy

AD04.03

1 : 200

AD

AE

AF

6000

9000

AG 6000

CW.01

CW.01

WT.04

3600

SK.01

Second Floor Level RL. 62.84

W.1 .13 .D

W.1.1 3.C

W.1 .13 .B

WT.04

WT.04

WT.04

WT.04

WT.04

W.G.14 .E

W.G.14 .D

W.G.14 .C

W.1 .09 .A

W.1 .08 .A

W.1 .07 .B

3600

First Floor Level RL. 59.24

1200

CW.02 Hidden for clarity

Structural Frame Level B RL. 66.44

3600

Structural Frame Level A RL. 67.64

3500

Top of Building RL. 71.14

WT.04

Ground Floor Level FFL. 52.04

WT.04

W.G.12 .E

3600

Sub Floor Level RL. 55.64

BUILDING A

South Elevation Building A - Beyond Canopy

C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt

2

1 : 200

© studio theta pty ltd level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982

SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .

rev

issue

revision description

amd

date

CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 SOUTH ELEVATION BUILDING A

Preliminary

date: scale: drawn:

07-11-2016 1 : 200 @A1 JP

sheet no:

AD04.03

revis ion: project no:

16-0725

printed: 7/11/2016 12:10:06 PM

file:

AD04.03

BUILDING B


1 AD06.02

2 AD05.01

BB

BD 6000

BE

BF

6000

6000

BG 6000

BH

BI

6000

6000

BJ

BK

6000

BL

6000

BM

6000

6000

BN 6000

BO 6000

BP 6000

BQ 6000

Structural Frame Level A RL. 67.64

SK.01

Roof Para pet , gla zed roof section beyond

SK.01

TC.01 1200

CW.01

3500

Top of Building RL. 71.14

TC.01

TC.01

Second Floor Level RL. 62.84

TC.01

TC.01

TC.01

3600

TC.01

TC.01

TC.01

TC.01

TC.01

3600

First Floor Level RL. 59.24

3600

Structural Frame Level B RL. 66.44

Sub Floor Level RL. 55.64

3600

6 1°

6 1°

41°

61°

Ground Floor Level FFL. 52.04

67°

60°

6 0°

34°

TC.01

TC.01

BUILDING A

BUILDING B

2 AD05.01

1 AD06.02

1

South Elevation Building B - Canopy

AD04.04

1 : 200

BB

BD 6000

BE 6000

BF 6000

BG 6000

BH

BI

6000

6000

BJ

BK

6000

BL

6000

6000

BM 6000

BN 6000

BO 6000

BP 6000

BQ 6000

Structural Frame Level A RL. 67.64

SK.01

3500

Top of Building RL. 71.14

1200

SK.01

W.1 .91 .B

First Floor Level RL. 59.24

WT.04

Sub Floor Level RL. 55.64

CW.01

CW.01

CW.01

CW.01

W.1 .84 .B

W.1 .84 .A

W.1 .79 .E

W.1 .79 .D

W.1.7 9.C

WT.04

WT.04

WT.04

WT.04

WT.04

WT.03

CW.01

W.1 .72 .A

WT.03

W.1 .66 .B

W.1 .63 .A

CW.01

CW.01

CW.01

CW.01

CW.01

3600

CW.01

W.1.6 0.C

W.1 .60 .B

W.1 .59 .A

EW.01

EW.01

EW.01

EW.01

EW.01

EW.01

EW.01

D.G.5 2.H

D.G.5 2.G

3600

CW.01

Second Floor Level RL. 62.84

3600

Structural Frame Level B RL. 66.44

W.G.66 .A

W.G.60 .A

2

WT.01

D.G.52 .J

WT.01

BUILDING B

C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt

BUILDING A

South Elevation Building B - Beyond Canopy 1 : 200

© studio theta pty ltd level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982

SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .

rev

issue

revision description

amd

date

CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 SOUTH ELEVATION BUILDING B

Preliminary

date: scale: drawn:

07-11-2016 1 : 200 @A1 JP

sheet no:

AD04.04

revis ion: project no:

16-0725

printed: 7/11/2016 12:10:12 PM

file:

AD04.04

WT.01

W.G.60 .B

D.G.5 2.I

W.G.66 .B

D.G.5 4.B

W.G.66 .C

D.G.6 0.A

W.G.71 .A

D.G.5 9.B

CW.01

Ground Floor Level FFL. 52.04

3600

WT.04


2 AD05.02

B1

B2

B3

9000

A1

B4

9000

A2

A3

9000

B5

9000

A4

9000

B6

9000

A5

9000

B7

9000

A6

9000

B8

9000

9000

A7

9000

A8

9000

9000

3500

Top of Building RL. 71.14

1200

Structural Frame Level A RL. 67.64 Structural Frame Level B RL. 66.44

TC.01 TC.01

cj

TC.01

TC.01

cj

cj

cj

TC.01

TC.01

3600

cj

First Floor Level RL. 59.24

3600

TC.01

Second Floor Level RL. 62.84

TC.01

TC.01

cj cj

Sub Floor Level RL. 55.64

3600

cj

63°

cj

3600

41°

29°

TC.01

TC.01 46°

Ground Floor Level FFL. 52.04

BUILDING A

1

West Elevation Building A - Canopy

AD04.05

2 AD05.02

1 : 200

B1

B2

B3

9000

A1

B4

9000

A2

A3

9000

B5

9000

A4

9000

B6

9000

A5

9000

B7

9000

A6

9000

B8

9000

9000

A7

9000

A8

9000

9000 Building B Canopy Beyond shown dashed

3500

Top of Building RL. 71.14

Structural Frame Level A RL. 67.64

Building A Ca nopy shown dashed 1200

CW.02

CW.01

CW.01

CW.01

First Floor Level RL. 59.24

3600

Second Floor Level RL. 62.84

3600

Structural Frame Level B RL. 66.44

CW.01

WT.04

CW.01

3600

WT.02

Sub Floor Level RL. 55.64

D.G.1 7.B

D.G.5 2.N

D.G.5 2.O

D.G.2 0.B

D.G.2 9.B

D.G.2 4.A

3600

CW.01

Ground Floor Level FFL. 52.04

BUILDING A

2

West Elevation Building A - Beyond Canopy

AD04.05

2

1 : 200

AD05.02

B8

B7

B6

9000

B5

9000

B4

9000

B3

9000

B2

9000

B1

9000

9000

3500

Top of Building RL. 71.14

Structural Frame Level A RL. 67.64

TC.01

TC.01 1200

TC.01

Structural Frame Level B RL. 66.44

TC.01

VOID

Sub Floor Level RL. 55.64

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

WT.07

WT.07

TC.01 TC.01

WT.07

BAL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

GL.01

TC.01 WT.08

RT.01 hidden for clarity

3600

WT.04

Ground Floor Level FFL. 52.04

TC.01

C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt

WT.04

GL.01

3600

WT.04

TC.01

First Floor Level RL. 59.24

GL.01

3600

CW.01

3600

WT.03

Second Floor Level RL. 62.84

D.G.55 .A

BUILDING B

3

2 AD05.02

1 : 200

© studio theta pty ltd level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982

SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .

rev

issue

revision description

amd

date

CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 ELEVATIONS SHEET 5

Preliminary

date: scale: drawn:

07-11-2016 1 : 200 @A1 JP

sheet no:

AD04.05

revis ion: project no:

16-0725

printed: 7/11/2016 12:10:22 PM

file:

AD04.05

East Elevation Building B - Canopy


2 1 AD6.04

2

4

Modules beyond hidden for clarity

AD6.04

AD06.03

B1

B2

B3

1

AD05.02

3

Ballastrade shown dashed for clarity

AD06.02

B4

AD6.04

B5

B6

B7

B8

Top of Building RL. 71.14 Structural Frame Level A RL. 67.64

Structural Frame Level B RL. 66.44 CL. 65.84 Second Floor Ceiling Level

4

Sub Floor Level RL. 55.64

1.40

COMMUNAL KITCHEN 1.39

CATWALK

CATWALK

1.55

1.55

CL. 58.04 Ground Floor Ceiling Level CL. 55.04 Sub Floor Ceiling Level

MATERIALS + HARDWARE W.G.38 .C

G.38

MANAGER OFFICE 1.80

D.1.7 9.B

BALCONY

OFFICE 3

MANUFACTURING

MANUFACTURING G.52

2

1.79

SPRAY ROOM 2

G.52

MODULE EXAMPLE

G.65

G.22

Ground Floor Level FFL. 52.04

AD05.01

OFFICE 3

1.79

PROTOTYPE 2 G.66

D.G.6 5.B

First Floor Level RL. 59.24

D.1.80.A

3 AD06.03

C.W.02

CL. 62.24 First Floor Ceiling Level

C.W.02

Second Floor Level RL. 62.84

D.1.39.A

AD6.04

Section B 1 : 200

Concrete slab and piles to Structural eng. specs 2

© studio theta pty ltd level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982

SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .

rev

issue

revision description

amd

date

CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 SECTIONS

Preliminary

date: scale: drawn:

07-11-2016 1 : 200 @A1 HM

sheet no:

AD05.01

revis ion: project no:

16-0725

printed: 7/11/2016 12:10:25 PM

file:

C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt

AD05.02


AD Structural framing bea ms and col umns beyond

AE

AF

AG

BA

Atrium curta in wal l shown beyond

1

BUILDING B HIDDEN FOR CLARITY

AD06.01

Top of Building RL. 71.14

Structural Frame Level A RL. 67.64 Structural Frame Level B RL. 66.44 CL. 65.84 Second Floor Ceiling Level

PLANT ROOM A 2.02

Second Floor Level RL. 62.84

D.1.0 1.C

D.1.23.A

D.1.24.A

D.1.27.A

1.22

COLLAB OFFICE 3 1.05

CL. 58.04 Ground Floor Ceiling Level

WT.08

W.G.01 .E

W.G.01 .J D.G.1 0.A

PUBLIC ATRIUM

D.G.2 8.A

G.24

D.G.2 7.A

WESTERN CORE

D.G.3 0.A

D.G.5 2.Q

D.G.2 9.B

Ground Floor Level FFL. 52.04

D.G.52.BB

WT.08

CL. 55.04 Sub Floor Ceiling Level

D.G.5 2.R

Sub Floor Level RL. 55.64

WESTERN CORE

D.G.44.LL

D.G.44.HH

First Floor Level RL. 59.24

D.G.44.II

CW.02

CL. 62.24 First Floor Ceiling Level

G.01

1

CAFE G.09

Concrete sla b a nd piles to Structural eng. specs

AD06.01

2 AD05.01

BUILDING A HIDDEN FOR CLARITY

1

Additional module examples hidden for clarity

BB

Top of Building RL. 71.14

BD

Ballastrade hidden for clarity and outline shown dashed

AD06.02

BE

BF

BG

BH

BI

BJ

BK

BL

BM

BN

BO

BP

BQ

Structural Frame Level A RL. 67.64

Structural Frame Level B RL. 66.44

W.1 .38 .D

STAIR 7 CATWALK 1.55

CATWALK

W.1 .48 .B

1.55

WT.02

WT.03

WT.03

D.1.4 8.B

CATWALK

MANUFACTURING

CW.01

D.G.4 9.B

D.G.3 7.B

D.G.50 .A

MANUFACTURING

G.52

WT.01

WT.01

WT.01

WT.01

WT.01

WT.01

D.G.5 2.D

D.G.52 .E

D.G.5 2.F

1.55

CL. 58.04 Ground Floor Ceiling Level

CW.01

Ground Floor Level FFL. 52.04

CW.01

D.G.2 9.X

Sub Floor Level RL. 55.64

CW.01 1.36

First Floor Level RL. 59.24

CW.01

D.1.39.A

CL. 62.24 First Floor Ceiling Level

CW.01

D.1.43.A

CL. 65.84 Second Floor Ceiling Level

Second Floor Level RL. 62.84

G.52

D.G.51 .A

1 C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt

AD06.02

2

© studio theta pty ltd level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982

SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .

rev

issue

revision description

amd

date

CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 SECTIONS

Preliminary

date: scale: drawn:

07-11-2016 1 : 200 @A1 HM

sheet no:

AD05.02

revis ion: project no:

16-0725

printed: 7/11/2016 12:10:29 PM

file:

AD05.01


BA

Siphonic drainage system hidden behind soffit 600 200

PP.01

120

120

400

Structural Frame Level B RL. 66.44

TC.01

TC.01 600

300

19mm Plywood 240x70mm F11 substrate for box intermediate timber beam gutter beyond attached to beam below via triple-l-grip

400

PP.01

400

Structural Frame Level B RL. 66.44

CL

200*400mm Angled and winged box gutter

240x70mm F11 intermediate timber beam beyond attached to beam below via triple-l-grip

300

Parallel flange channel 100x150x5mm bolted to structural framing above

CL. 65.84 Second Floor Ceiling Level

210

CL. 65.84 Second Floor Ceiling Level

Framing for CW.01 & CW.02 is bolted to PFC with M10 bolts

70x35mm timber batten 1000

CL

ST.04 CW.01

450

Siphonic drainage system hidden behind soffit

CW.02

70

CL

TC.01 returns and wraps to form soffit of canopy

AW.01

Second Floor Level RL. 62.84

240

TC.01

ST.01 dual ribbon beams

AW.01

Intermediate cross-mullion affixed ton Raico Thermal H+I for lateral stability

PC.01 mitred and return to Raico THERM+H border mullion

CL. 62.24 First Floor Ceiling Level

75

100 100

70 70

TC.01 to return to new header frame

New hardwood Iron Bark frame and headercasement for windows, reusing existing glazing

New hardwood Iron Bark frame and sill casement for windows, reusing existing glazing, with sawn notch as drip-cap on exterior

TC.01 returns and wraps to form soffit of canopy

PC.01

10

Second Floor Level RL. 62.84

Two hardwood cross-mullion joined with 5mm steel plate & M10 carriage bolts

Aluminium profile acts as drip-cap for cladding, pushed into Sikaflex F11 caulking

ST.04 Symar Rubber Load Bearing Pad to allow movement under wind load

Timber stablising outrigger assembly bolted to angled beam @ 6000mm centres

Aluminium kick-plate angle installed between wall panelling and studwork

IL.01

TF.01

260

290

19

93

First Floor Level RL. 59.24

260

TC.01

End of CW.02 at first floor level

120

650

Symar Rubber Load Bearing Pad to allow movement under wind load

First Floor Level RL. 59.24

Bottom Edge of Cladding capped with z-angle with drip-cap and endgrain sealed with Sikaflex F11

CL. 58.04 Ground Floor Ceiling Level

100 TF.01

Hardwood curtain wall border mullion notched for drip

Mechanised recessed blind, hidden behind aluminium flange attached to soffit board

CW.01 PV.01 raked away from building at 1 degree slope 300x90mm external timber sleepers suspended on pedestals

Sand as required for raking slope TF.01

Zinaclume flashing between slab & mullion system

Ground Floor Level FFL. 52.04

SF.02

Hardwood members fixed to slab to accept lowered mech. blind end

20

Ground Floor Level FFL. 52.04

Internal street slab raked to drainage systems, built to civil eng. specs

DPM

DPM

300mm diameter stormwater to rainwater tank & grey water treatment system

1

Atrium Wall Section Detail

2 AD06.01

1 : 25

Concrete slab to eng. spec

Street Wall Section Detail 1 : 25

level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982

SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .

rev

issue

revision description

amd

date

CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 SECTION DETAILS SHEET 1

Preliminary

dat e:

07-11-2016

sc a l e :

1 : 25 @A1

dr aw n :

HM

sh ee t n o :

AD06.01

rev is io n: proj ect no:16-0725

printe d:

© studio theta pty ltd

7/11/2016 12:10:30 PM

file:

AD06.01

C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt

Blocking timber as required, bolted to slab with M10 & affixed with Ramset ChemAnchor adhesive


Structural Furring Timber

Zincalume flashing

Pydra Joist Boot

ST.01

Structural Timber Batten (70x35mm); battens attached to rafters via Pryda Batten straps

SS.01

ST.04

250

TC.01

620

690

10

ST.01

IL.01

IL.01

TC.01

370

Z-flashing screwed to batten, sealant to seal endgrain of cladding

PC.01 ST.05

PC.01

Sikaflex 11FC caulking at ends

Zincalume Flashing

180x25mm Iron Bark Hardwood header

70x45mm hardwood framing

Border mullion beyond

B4

100

CL. 55.04 Sub Floor Ceiling Level

65

CL. 58.04 Ground Floor Ceiling Level

25

ST.05

ML.01

TrendGlass Grade A toughened safety glass, 6mm nominal thickness

2 AD06.02

2 AD06.02

Module Typical Wall & Roof 1 : 10

First Floor Level RL. 59.24

Grade A toughened safety glass, double glazed 6mm nominal thickness

ST.04 Butyl glazing tape

70x50mm hardwood framing

TC.01

CL. 58.04 Ground Floor Ceiling Level

170x25mm Iron Bark hardwood sill ST.04

R4 Batts Insulation IL.01

3

TC.01

AD06.02

Z-flashing screwed to batten, sealant to seal endgrain of cladding with Sikaflex 11FC

PC.01

Sub Floor Level RL. 55.64 ST.05

AD06.02

1: 5

27

Sub Floor Level RL. 55.64

CL. 55.04 Sub Floor Ceiling Level

Module Typical Header & Sill Detail

5

ST.01 Joist beam

4

230

M12 Carriage Bolt through GluLam Beam attached to joist via Pryda JD4 joist boot

5 AD06.02

Bottom Edge of Cladding capped with z-angle with drip-cap and endgrain sealed with Sikaflex F11 600

AD06.02

ST.01 Ribbon beam

6

970

Ground Floor Level FFL. 52.04

AD06.02

3mm Aluminium kickplate, fixed to studs with self-tapping screws

CL. 55.04 Sub Floor Ceiling Level

370

TC.01 ST.02

TFF.01

End-cap to wall panel

AD06.02

1 : 50

Module Upper Floor & Column Detail

Sikaflex F11 caulking to seal end-grain

ST.07 floor joist @ 600mm centres

1 : 10

ST.01 floor bearer @ 1500mm centres

Structural plywood 9mm sub-floor

Structural Steel Equal Angle 150x75x10mm, cut to 300mm lengths to fix to bearer

M12 Carriage Bolt through column base and equal angle

M12 Carriage bolt through bearer and angle at each end of bearer

250

ST.03

150mm M12 Anchor Bolts, fixed with RamSet ChemSet 801 XTREM chemical anchoring system

150

Symar Rubber Load Bearing Pad

125 Structural Reinforcement Bar, to Eng. Specs.

C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt

25

Ground Floor Level FFL. 52.04

4

150mm M12 Anchor Bolts, fixed with RamSet ChemSet 801 XTREM chemical anchoring system

Ground Floor Level FFL. 52.04

Structural Steel Equal Angle 150x75x10mm

Concrete Slab, to Eng. Spec.

Module Column to Slab

6 AD06.02

1 : 10

Module Slab Connection 1: 5

level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982

SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .

rev

issue

revision description

amd

date

CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 SECTION DETAILS SHEET 2

Preliminary

dat e:

07-11-2016

sc a l e :

As indicated @A1 rev is io n:

dr aw n :

HM

sh ee t n o :

AD06.02

proj ect no:16-0725

printe d:

© studio theta pty ltd

7/11/2016 12:10:32 PM

file:

AD06.02

380

3

100

AD06.02

Module Example Section

29

1

120

CL CL

ST.03, connected by Mortise Tenon joint


B1

1200

BAL.01

PB.02

ST.04

3mm EPDM Gasket

DT.01 L-profile

ST.06

ST.06

ST.04

L-profile to secure lattice through to vertical ST.04

AL.01

PWS.01 CLT.01

AT.01, fitted in flange of furring channel

TC.03

90

Cafe wall section lattice timber wall

CL. 58.04 Ground Floor Ceiling Level SC.01

35

Cafe wall section exposed timber

2 AD06.03

1 : 10

3 AD06.03

1 : 10

TYPICAL JUNCTION BETWEEN TIMBER AND TILED FLOORING

TF.01

TYPICAL JUNCTION BTW TIMBER AND TILED FLOORING 20x20 x3 mm finished stainl ess steel angle, ma chined down to suit and screw fixed to floor sl ab

TF.01

TL.01

AL.01

Typical Ballastrade & Balcony

20x20 x3 mm finished stainl ess steel angle, ma chined down to suit and screw fixed to floor sla b, sea la nt o n inside edge plywood substra te notched to accept sta inless steel a ngle

Structura l sl ab to Civil eng. spec.

FC.01

1 : 20

TYPICAL JUNCTION BTW CARPET AND RESILIENT FLOORING 20x20 x3 mm l inished stainl ess steel angle machined down to suit and screw fixed to floor sl ab CT.01

TL.01

PS.01

Structura l sl ab to Civil eng. spec.

SF.04 beyond

Level ing a ggregate / compound as required

Level ing a ggregate / compound as required PS.01

SC.02

Typical First Floor Structure

4 AD06.03

1 : 20

AL.01

PS.01

Bulkhead to house ductwork for mech HVAC, see service eng specs

650

Z-metal caulked with Sikaflex F11 to seal fascia & soffit TC.01

CL. 58.04 Ground Floor Ceiling Level

Level ing a ggrega te / compound as required

5

Typical Floor Junctions 1: 5

© studio theta pty ltd level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982

SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .

rev

issue

revision description

amd

date

CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 SECTION DETAILS SHEET 3

Preliminary

dat e:

07-11-2016

sc a l e :

As indicated @A1 rev is io n:

dr aw n :

BA, HM

sh ee t n o :

AD06.03

proj ect no:16-0725

7/11/2016 12:10:33 PM

file:

AD06.03

C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt

CLT.0 1 structural sl ab

printe d:

1

PWS.01

Stacked 70x35mm (ST.04) battens, top member cut to 1 degree angle

TC.01 cladding boards screwed directly to CLT.01 as fascia board

DT.02

AD06.03

EA.01

3mm EPDM Gasket

ST.04

TC.03 to sit behind latttice frame

SF.03

PWS.01 self-leveling pedestal stepped-down as balcony slopes away

1200

10mm spacing shadow line between base of PB.02 and head of Lattice structure

Marine 9mm plywood substrate at 1 degree slope away to balcony edge

First Floor Level RL. 59.24

R4 Batts Insulation

Custom 3mm mild steel profile w. concealed LED lighting strip

L-profile

TC.01 cladding boards screwed directly to CLT.01 as fascia board

290

PB.01

ST.04 at vertical 450mm centers

New hardwood Iron Bark frame and casement for windows, reusing existing glazing

Existing external concrete wall

First Floor Level RL. 59.24

PB.01

ST.04

45 30

Custom stainless steel structure railing, welded outriggers fix timber mullion barrier

260

R4 Batts Insulation

30

2400

PB.02

155

1000

90


200*400mm Angled and winged box gutter

19mm Plywood 240x70mm F11 substrate for box intermediate timber beam gutter beyond attached to beam below via triple-l-grip

190x45mm F11 structural beam

ST.04, fixed on end

TC.01

TC.01

PP.01

TC.01 SS.01 ST.04

TC.01

PS.01

TC.01

ST.07

Structural Frame Level A RL. 67.64

Structural Frame Level A RL. 67.64

Structural Frame Level A RL. 67.64

SF.02

ST.04 TC.01

ST.04

SF.01 Syphonic drainage inlet and sump FA.02

Structural Frame Level B RL. 66.44

Structural Frame Level B RL. 66.44

SF.02

90*45 Timber cross bracing to support wall truss framing

Canopy Parapet Callout

1 AD6.04

2 AD6.04

1 : 25

Canopy Facade Callout 1 : 25

Woodform Architectural Expression cladding, angled sawcut and ridge overlap for waterproofing

B7

4mm Custom angled steel connector plates for timber truss framing

Top of Building RL. 71.14

ST.04

FA.02

ST.06

ST.04

TC.01

90*45 Timber truss frame to support external canopy skin system

EBSA MP2 Framed and operable louvred window system

TC.01

ST.04

VOLCANIZED WATERPROOF MEMBRANE

600*200 angled and winged box gutter

Ground Floor Level FFL. 52.04

M33 Structural Steel bolt to base connector plate, 30mm recess into timber column 5mm Welded steel connector plate, bolted to new timber framing

Steel anchoring bolts to structural engineer specifications

C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt

Structural Frame Level A RL. 67.64

Syphonic drainage inlet and sump Intermediate timber beam beyond 240*70mm attached to beam below via Triple-L-Grip

Concrete piles to structural eng. spec. TC.01

Canopy Sawtooth Callout

3

4

1 : 25

AD6.04

Canopy Truss Facade Callout 1 : 25

level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982

SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .

rev

issue

revision description

amd

date

CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 SECTION DETAILS SHEET 4

Preliminary

dat e:

07-11-2016

sc a l e :

1 : 25 @A1

dr aw n :

JD

sh ee t n o :

AD6.04

rev is io n: proj ect no:16-0725

printe d:

© studio theta pty ltd

7/11/2016 12:10:35 PM

file:

AD6.04


AA

140

100

100

AC

AC

Timber screen bottom plate beyond

70x20 mm hardwood timber vertica l screen members, @ 20 0mm centres , inserted a t borders above a nd bel ow with da do housing joint

Hardwood fra me ST.06

ST.04

PB.01

R4 Batts Insulation

HBI Bulb seal SF.02

90

13

Timber base plate below

TC.01

35

Silicone bead Glazing to meet flush at corner junction - allow 5mm corking Refer to window schedule for details

90

Base plate to sit flush to Column 8 0°

70 45

DT.01 Exposed dressed Tazmaninan oak

TC.03

Timber base plate 45degree mitre joint finish

Hastings front glazed framing AS104, AS109 400

DT.03 Dressed Tazmainian oak angled structure 70

Double sided glazing tape

DT.04

10mm shadow gap between TC.03 and ST.04

Glazing channel at base

Glazing framing hidden bracket to sit flush with DT.04 & DT.05 w. double sided glazing tape

450

Hardwood upright notched to accept bolt

10mm rubber EPDM movement joint between mullion and column

Hastings front glazed framing AS104, AS109 DT.05

DT.04

400

58 14 22

1

Cafe joinery plan detail

53

90

13

2 AD07.01

1 : 10

Glazing framing hidden bracket to sit flush with DT.04 & DT.05 w. double sided glazing tape

Gallery Glazing Column Junction

3 AD07.01

1 : 10

Gallery External Corner

4 AD07.01

1 : 10

Gallery Corner 1 : 10

level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982

SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .

rev

issue

revision description

amd

date

CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 PLAN DETAILS SHEET 1

Preliminary

dat e:

07-11-2016

sc a l e :

1 : 10 @A1

dr aw n :

BA, HM

sh ee t n o :

AD07.01

rev is io n: proj ect no:16-0725

printe d:

© studio theta pty ltd

7/11/2016 12:10:36 PM

file:

C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt

AD07.01

90

Ha stings FG AS10 1 + AS5 extrusions

Bol t through to column

DT.05

355

90

Border upright ha rdwood members for timber screen


BF

TIMBER SCREEN VERTICAL LOUVRE

TrendGlass 6mm Safety Glazing

Iron Bark 70x20m louvre fixed at bottom plate of frame

TIMBER MULLION GLAZING

Sicilone Bead

HB1 Bulb Seal

Hastings Front Glazed Framing AS104, AS109

TIMBER BORDER MULLION

Hastings FG AS105

Hastings FG AS101

Hastings FG AS5

MGP10 90x45mm

ST.04

MODULE DOOR JAMB TYPICAL

MODULE DOOR JAMB TYPICAL

(hinge side)

Tyvek Homewrap Breathable Vinyl Sarking

TC.01

10mm Countersunk Screw into horizontal battens

TC.01

(stop side)

Capral 200 Series Steel Door Jamb

Y-Profile Aluminium Section

MODULE EXT. & INT. CLADDING CORNER JOIN

ETC1 end boards mitred at 45 degrees to meet aluminium section

Blocking as required

Y-Profile Aluminium Section

ST.04

Double Sided Glazing Tape

Spotted Gum mullion, chamfered at internal edges, danish oiled finish100x60mm

10

PC.01 110x20mm Spotted gum hardwood to cover mullion

1

70x20mm Spotted gum hardwood to cover mullion. chamfered at internal corner

10mm shadow gap between ply & hardwood, black membrane behind ply

Screw countersunk fixed to studwork for easy removal and re-use

ST.06

MGP10 furrings to fix door jamb

35mm door leaf

PC.01

PC.02

Module Typical Plan Details 1: 2

level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982

SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .

rev

issue

revision description

amd

date

CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 PLAN DETAILS SHEET 2

Preliminary

dat e: sc a l e : dr aw n :

07-11-2016 1 : 2 @A1 HM

sh ee t n o :

AD07.02

rev is io n: proj ect no:16-0725

printe d:

© studio theta pty ltd

7/11/2016 12:10:37 PM

file:

C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt

AD07.02


1 AD08.02 180

1

TF.01

TF.01

AD08.02

180

1800

1800 220

600

220

2

AD08.02

AD08.02

1810 TSGI

300

1810

2

TSGI

1

UP

1

2

UP

2

3

3

2

4

37

4

AD08.02

5

36

5

6

6

7

34

7

8

33

8

9

9

10

10

2 AD08.02

35

32 31 30 29

11 12

28

13

27

14

26

15

25

16

24

17

23

300

18

22

19 600

21 20 TSGI TSGI

600

TF.01

300

TSGI TSGI

20 21

19

22

18

23

17

24

16

25

15

26

14

27

13

28

12 11

29 30

10

10

31

9

9

32

8

8

33

7

7

34

6

6

35

5

5

36

4

4

37

3

3

2 UP

2

1

UP

1

300

TSGI

TF.01

1

TF.01

600

TSGI

1 AD08.02

AD08.02

Stair 7 Scissor Stair - Ground Floor

1 AD08.01

Stair 7 Scissor Stair - First Floor 1 : 50

level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982

SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .

rev

issue

revision description

amd

date

CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 STAIR DETAILS

Preliminary

dat e:

07-11-2016

sc a l e :

1 : 50 @A1

dr aw n :

HM

sh ee t n o :

AD08.01

rev is io n: proj ect no:16-0725

printe d:

© studio theta pty ltd

7/11/2016 12:10:40 PM

file:

1 : 50

C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt

2 AD08.01


AA4

Second Floor Level RL. 62.84 Handrail a ssembly mirrored for sta ir beyond

CL. 62.24 First Floor Ceiling Level

BC CW.0 1

CW.0 1 D.1.3 6.B

D.1.3 6.A

HRS

First Floor Level RL. 59.24

HRS

37 36

HR.01

35 HRS

34

HR.01

33

92

32 HRS

31 30

900

CL. 58.04 Ground Floor Ceiling Level

HRS

Handrail screw fixed to handra il bra cket with countersunk screw

29 28

HR.01

27

HRS.01 , fixed to BAL.0 1 with countersunk screws

26

HRS

BAL.0 1 Bl ackbutt screen ball astra de

25 24 22

CW.0 2

900

21

19

HRS

18 17 16

15

CL. 55.04 Sub Floor Ceiling Level

14

HRS

11 10

HR.01 Treads a nd risers a ffixed to steel stringer on both sides

BAL.01 beyond shown dashed

13 12

900 HRS

9

Ground Floor Level FFL. 52.04

8 HRS

7 6

300

5 4

HRS

Ground Floor Level FFL. 52.04

1

23

HRS

20

HRS

HR.01

3 2 1

Stair 7 Scissor Stair Section

2

1 : 50

AD08.02

Handrail Detail 1 : 10

© studio theta pty ltd level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982

SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .

rev

issue

revision description

amd

date

CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 STAIR SECTION DETAIL

Preliminary

date:

07-11-2016

scale:

As indicated @A1 revis ion:

drawn:

HM

sheet no:

project no:

AD08.02 16-0725

printed: 7/11/2016 12:10:41 PM

file:

C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt

AD08.02

HR.01

HRS

1200

HRS

CW.0 2

Sub Floor Level RL. 55.64


1535

845

620 320

PB.01 Bulkhead to sit flush with lattice wall joinery

PB.02 Bulkhead to sit flush with DT.01 framing. Finish Dulux Charcoal Domino

1746

PB.01 Finish Dulux Lexicon

1740

AF

7 AD09.01 WT.03

J.G.04C

Sub Floor Level RL. 55.64

WT.04 DT.03 Exposed Tazmainian oak 70 x 40mm dressed timber stud at 65 degree angle

5400

65°

J.G.04A - 20mm Tazmanian oak lattice wall joinery

DT.01 Exposed Tazmainian oak 90 x 45mm dressed timber stud

2760

TC.03 Run horizontal J.G.04B

Note - No DT.03 cross bracing

880

FG

CAFE G.04

J.G.04A

900

50

W.G.04A

TC.03 Run horizontal

Ground Floor Level FFL. 52.04 D.G.04B

WT.03

40mm In-situ concrete countertop

W.G.04B

J.G.04B

1490

Exposed 45mm TC.03 Run vertical Tazmainan oak internal window - fixed glazing 890 620

J.G.04A 300

4024

J.G.04B 325

450

625

6910

Structural 20 x 200mm timber dowl rod through DT.01 - Dulux charcoal Domino to match PB.02 wall finish

40mm In-situ concrete countertop 450

45

900

405

45

J.G.04C - Cantilevering raised countertop - see AD09.01 drawing 7

800

2325

6300

D.G.04B

Cafe elevation 01

3 AD09.01

AA3

4

1 : 50

AD09.01

Cafe elevation 02 1 : 50

D.G.04A

8240 WT.05

J.G.04G J.G.04F J.G.04E J.G.04D Bulkhead above to sit flush to exposed timber wall framing below PB.01

Sub Floor Level RL. 55.64

1 AD09.01

Ground Floor Cafe Plan Callout 1 : 50 CL. 55.04 Sub Floor Ceiling Level FG

TC.03 50mm strip to match exposed framing layout

FG

Timber framed gallery desplay cabinates - glass finish flush to timber framing

TC.03 Run horizontal

AF

J.G.04D

J.G.04E

J.G.04F

J.G.04G 800

FG

920

900

Recessed timber plaque

65°

Ground Floor Level FFL. 52.04

1200

45

J.G.04C

80 200

Note - No DT.03 cross bracing

DT.03 Exposed Tazmainian oak 70 x 40mm dressed timber stud at 65 degree angle

DT.01 Exposed Tazmainian oak 90 x 45mm dressed timber stud

W.G.04A

1400

P

2993

PB.02 Finish Dulux Charcoal Domino

D.G.04A

44

3662

AD09.01

300

920

300

898

300

920

300

1162

80

1118

80

1118

80

1162

931

500

10150

Cafe elevation 03

5

BH

Barcode safety sticker to be applied to glazing

6 AD09.01

1 : 50

Cafe elevation 04 1 : 50

P

P

CAFE G.04

R4 Batts Insulation

ST.06

20

ST.04

Structural 20 x 230mm timber dowl rod through DT.01 - Dulux charcol to match wall finish 13

PB . 03 5000

PB.01

S C. 01 5400

TC.03

90

30mm Tazmainian oak countertop w. chamfered edge

R4 Batts Insulation

19

5

40

DT.01

ST.06

90

AA3

Custom steel U-profile to house timber bench - screw throguh to ST.04 & ST.06

30

35

230

CL

P

L-profile

3mm EPDM Gasket

70

TC.03

70

45

DT.01 Exposed dressed Tazmaninan oak

355

10

ST.04

DT.03 Dressed Tazmainian oak angled structure 45

C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt

10mm shadow gap between TC.03 and ST.04

45

450

400

2

Ground Floor Cafe Reflected Ceiling Plan 1 : 50

7 AD09.01

Plan Detail - Exposed Timber Framing

8

1: 5

AD09.01

Section Detail - Cantilevering Raised Bar 1: 5

level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982

SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .

rev

issue

revision description

amd

date

CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 INTERNAL ELEVATIONS SHEET 1

Preliminary

dat e:

07-11-2016

sc a l e :

As indicated @A1 rev is io n:

dr aw n :

BA

sh ee t n o :

AD09.01

proj ect no:16-0725

printe d:

© studio theta pty ltd

7/11/2016 12:10:45 PM

file:

AD09.01


AA

AB

AC

AD

AE

AA6 MT.02 to continue as wall panel above cabinetry

WT.02

83°

83° 97°

DT.04

CW.01 D.1.13A

J.1.13B

110

J.1.13C

WT.05

FR

120 °

400

First Floor Level RL. 59.24

100 220 180 180 18040

WT.05 WT.05

5mm opaque glass splashback to sit over TC.03

122 °

700

WT.05

80

1.16

2390

D.1.1 7.A

WT.05

WT.05

BOARD ROOM

40 40

D.1.1 6.A CW.01

40 40

40

20

570

CL. 62.24 First Floor Ceiling Level

WT.05

1.17

700

J.1.17A

KITCHEN

TC.03 Run vertical Bulkhead to sit flush to kitchen joinery w. 20mm shadow line

PB.02

D.1.1 2.A

A7

AA7

COLLABORATIVE OFFICE 4

MT.02

J.1.13A

5mm opaque glass splashback to sit over TC.03

1.13

20 751

20

751

680

20

680

100mm recessed kickplate aluminium powder coat charcoal finish

20

10

680

20

680

20

2800

D.1.1 1.A

J.1.13B

10

150 252 751

20

751

800

800

20

5885

MT.02

2522 400

232 145 200 40

2900

J.1.13E

1120

40 200

J.1.13C

MT.02 - Hidden dishwasher behind

450

450

450

450

450

450

1600

450

100mm recessed kickplate aluminium powder coat charcoal finish

450 700

800

D.1.1 5.A

1.15

TC.03 Run vertical

150 150 150 150 20

RECEPTION

J.1.15A

Void in ceiling

97°

WT.05

424

WT.02

900

A6

450 650

450

950

450

950

4100

14885

J.1.13A

J.1.13D

3 AD09.02

Office Elevation 01 1 : 50

D.1.1 0.A

WT.04 WT.04 CW.03

CW.03

Void in ceiling

WT.04

AA8

A8

Void in ceiling

Void in ceiling

160 230

Office Floor Plan

1 AD09.02

Void in ceiling

Second Floor Level RL. 62.84

CW.03

1 : 100 CL. 62.24 First Floor Ceiling Level

FG

FG

FG

FG

FG

AC

AD

AE

FG

FG

W.1.13C

FG

FG

W.1.13D

2751

AB

3000

W.1.13B

AA

First Floor Level RL. 59.24

AA6

A6

J.1.13G

J.1.13H

RECEPTION 1.15

KITCHEN

BC.01 - Barcode safety sticker to be applied to glazing

TC. 01 3600

1.17

PB . 03 3600

TC.03 5040

130

5600

2614 400

5040

5600

400

5600

400

2889

21019

S C. 01 3200

BOARD ROOM 1.16

4

TC. 01 3600

Office Elevation 02 1 : 50

BH

AD09.02 S C. 01 RAK ING

PB.01

S C. 01 3200

TC.03 Run vertical

AA7

A7

380

PB . 03 3000

CL. 62.24 First Floor Ceiling Level

COLLABORATIVE OFFICE 4 1.13

3040

BH

S C. 01 3200

2400

CW.01

First Floor Level RL. 59.24

B.1.13A

S C. 01 3200

J.1.13E

30 368 30

1000

A8

5 2

Reflected Ceiling Plan - Collaborative Office

AD09.02

320

460 30

J.1.13F

900

30

900

30

402

30

5600

40

920

200

12100

40 30

470

150

Office Elevation 03 1 : 50

1 : 100

level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982

SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .

rev

issue

revision description

amd

date

CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 INTERNAL ELEVATIONS SHEET 2

Preliminary

dat e:

07-11-2016

sc a l e :

As indicated @A1 rev is io n:

dr aw n :

BA

sh ee t n o :

AD09.02

proj ect no:16-0725

printe d:

© studio theta pty ltd

7/11/2016 12:10:49 PM

file:

AD09.02

3060 30

AA8

C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt

S C. 01 RAK ING

2660

S C. 01 RAK ING


80mm overhang

900

Desk above 30

900

840

30 300

30

70

900

840 70

300

900

30 45

470

DT.04

383

45

383

45

45

383

45

383

45

45

30

30 80

45 110

470

DT.05

1580

1490

1580

1520

1490

1580

1250

DT.05 Above Hanging timber framed planter box

Base framing below

260

20

45

30

30

160

30

30

45

70

20

Lattice Structure

200

160

20

20

1520

1580

1580

Desk above

DT.04 260

20

DT.04

20

7

DT.04

20

45

30

220

30

30

45

70

AD10.02

160

160

200

20

20

160

Cutout in MT.01 to house hidden rubbish bin

DT.04

20

DT.05 Above Hanging timber framed planter box

20

260

20

1490

1580

BP.01

MT.01 Desk above

110 45

DT.06

9 0° 70 45 80 30

45 45 900

30

45 45 900

30

45 900

300

30

45

470 840

30

30 80

383

45

383

45

900

900

2820 2980

1

Office Joinery Plan - Base Framing 1 : 20

2 AD10.01

Office Joinery Plan - Desk Profile

3

1 : 20

AD10.01

Office Joinery Plan - Desk Structure 1 : 20

file:

C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt

AD10.01

© studio theta pty ltd level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982

SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .

rev

issue

revision description

amd

date

CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 JOINERY DETAILS SHEET 1

Preliminary

date:

07-11-2016

scale:

1 : 20 @A1

drawn:

BA

sheet no:

AD10.01

revis ion: project no:

16-0725

printed: 7/11/2016 12:10:50 PM

80 30

5400

1755

1250

DT.04 Tenon joint


30 80

DT.05

5

200

DT.05

5

30

AD10.02

AD10.02

1580

DT.05

DT.04

30

2820

DT.04

90

DT.06 With tenon joint

DT.06 With tenon joint

2

810

AD10.02

60

DT.04 Bottom plate with housing joint grafting DT.05

DT.04 Bottom plate with housing joint grafting DT.05

DT.04 900 80 30

900

30

1580

900

30

900

30 80

80 30

1580

30

160

30

1580

2980

4

Office Joinery Elevation 1

AD10.02

AD10.02

200

40

17 12 17

30

160

30

1580

40

45

30

45

1 : 20

40

5

45

30

45

200

45 17 12 17

30 80

Office Joinery Elevation 2

6

1 : 20

45

30

5400

45 40

30

45

17 12 17

DT.04 DT.05

DT.05

BP.01 - Exposed

BR.01

DT.04

12 9

30

40

30

MT.01 to sit on base of brass angle Brass angle, Melamine tabletop and Timber edge strip - to sit flush at highest poin

DT.04

BP.01 MT.01

Dressed Tazmainian Oak tabletop framing

200

DT.05

15 9 12 9

75 BR.01

30

DT.06

45

45

17 12 17

30

17 12 17

17 12 17

70

5

5 23

9

30

DT.05

45

17 12 17

DT.04

155

BR.01

30 BR.02 Through to tabletop BP.01 In distance DT.05

7

Office Joinery Plan Detail - Timber Junction 1: 5

5 AD10.02

Office Joinery Section Detail - Timber Junction 1: 5

2 AD10.02

DT.05

Office Joinery Plan Detail - Desk Junction

1

1: 5

AD10.02

Office Joinery Section Detail - Desk Junction 1: 5

© studio theta pty ltd level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982

SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .

rev

issue

revision description

amd

date

CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 JOINERY DETAILS SHEET 2

Preliminary

date:

07-11-2016

scale:

As indicated @A1 revis ion:

drawn:

BA

sheet no:

project no:

AD10.02 16-0725

printed: 7/11/2016 12:10:52 PM

file:

C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt

AD10.02

DT.04 In distance

DT.04


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.