Sheet Number AD01.01
MAB
TAFE
PROPOSED BUILDING A
SOUTH ROAD
PROPOSED BUILDING B
WESTERN PLANT BUILDING
Sheet Name TITLE SHEET AND LOCATION PLAN
AD01.02
LEGENDS & ANNOTATION
AD02.01
SITE SET OUT PLAN
AD02.02
LANDSCAPING AND PAVING PLAN
AD02.03
LANDSCAPING AND PAVING PLAN
AD03.01
GRID SET OUT
AD03.02
GROUND FLOOR GENERAL ARRANGEMENT PLAN
AD03.03
GROUND FLOOR DIMENSIONS
AD03.04
GROUND FLOOR FURNISHED PLAN
AD03.05
FIRST FLOOR GENERAL ARRANGEMENT PLAN
AD03.06
FIRST FLOOR DIMENSIONS
AD03.07
FIRST FLOOR FURNISHED PLAN
AD03.08
SECOND FLOOR GENERAL ARRANGEMENT FLOOR PLAN
AD03.09
SECOND FLOOR DIMENSIONS
AD03.10
GENERAL ARRANGEMENT ROOF PLAN
AD03.11
ROOF PLAN
AD03.12
ROOF FRAMING PLAN
AD03.13
GROUND FLOOR REFLECTED CEILING PLAN
AD03.14
FIRST FLOOR REFLECTED CEILING PLAN
AD03.15
SECOND FLOOR REFLECTED CEILING PLAN
AD04.01
NORTH ELEVATION BUILDING A
AD04.02
NORTH ELEVATION BUILDING B
AD04.03
SOUTH ELEVATION BUILDING A
AD04.04
SOUTH ELEVATION BUILDING B
AD04.05
ELEVATIONS SHEET 5
AD05.01
SECTIONS
AD05.02
SECTIONS
AD06.01
SECTION DETAILS SHEET 1
AD06.02
SECTION DETAILS SHEET 2
AD06.03
SECTION DETAILS SHEET 3
AD6.04
SECTION DETAILS SHEET 4
AD07.01
PLAN DETAILS SHEET 1
AD07.02
PLAN DETAILS SHEET 2
AD08.01
STAIR DETAILS
AD08.02
STAIR SECTION DETAIL
AD09.01
INTERNAL ELEVATIONS SHEET 1
AD09.02
INTERNAL ELEVATIONS SHEET 2
AD10.01
JOINERY DETAILS SHEET 1
AD10.02
JOINERY DETAILS SHEET 2
C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt
RING ROAD EAST
D TONSLEY BOULEVAR
DRAWING REGISTER
North Elevation
2
© studio theta pty ltd level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982
SETTING OUT OF WORK IS THE RESPONSIBILITY OF THE CONTRACTOR. ALL DIMENSIONS TO BE TAKEN FROM THE JOB. ALL DIMENSIONS TO BE CHECKED ON SITE BEFORE COMMENCING WORK OR MAKING SHOP DRAWINGS. DISCREPANCIES TO BE REPORTED IMMEDIATEL Y TO THE ARCHITECT. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH THE SPECIFICATION. IF IN DOUBT, PLEASE ASK. THIS DRAWING AND DESIGN © STUDIO THETA PTY LTD.
rev
issue
revision description
amd
date
CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 TITLE SHEET AND LOCATION PLAN
Preliminary
date:
07-11-2016
scale:
1 : 1000 @A1
drawn:
BA,JD,HM,JP
sheet no:
AD01.01
revision: project no:
16-0725
printed: 7/11/2016 12:51:03 PM
file:
AD01.01
KEYNOTE LEGEND
LANDSCAPING LEGEND
Regupol® 4 51 5 a coustic polyurethane underlay 4 mm
BL.01
63 Phill ips Element Boll ard LED
AT.01
Acoustic ceil ing tiles, Armstrong Ultima+ 1 20 0x60 0mm 7mm thick
DR.01
StormTech 1 00 ARG 30 Linea r Draina ge System, 10 0 x 30 mm
BAL.0 1
Bal ustra de Type 1 (9 0x2 0mm 2 40 0H Bl ackbutt Timber)
GR.01
Grass l awn as spec.
HR.01
Hammer Smith Circul ar Mono Stair Ha nrail, finished in ( Vic Ash) 4 5x45 mm
BAL.0 2
Bal ustra de Type 2 (9 0x2 0mm 1 20 0H Bl ackbutt Timber)
All works to be in a ccordance with relevant Building C odes and Sta ndards.
Control Joint
PL.01
Pla nter box 1 200 mm
X-Lam structural cross la minated timber, 8 layer 2 60 mm
PL.02
Pla nter box, 2 000 mm
CN.01
Cast in-Situ C oncrete - shot bl asted finish to R1 3 Slip Ra ting
PL.03
Pla nter box, custom
CN.02
Cast in-Situ C oncrete - pol ished a nd epoxy finished
PV.01
Pa ving a s spec.
CN.03
Cast in-Situ C oncrete - interior finish
PV.02
Pa ving a s spec.
CW.0 1
Raico Therm+ H structural timber mull ion system, P il kington Ecl ipse Advantage™ Clear glazing
TF.01
Pa ving a s spec.
CW.0 2
Custom ha rd wood curtain wa ll a nd screening, made from Bla ckbutt
TF.02
Pa ving a s spec.
EA.0 1
Equal a ngle assembly, 17 5x7 5x10 mm bolted to framing & C LT.0 1 with M12 carria ge bol ts
FK
Flush Kerb
FA.0 1
M12 Ca rriage bolt
K
Kerb
FA.0 2
M10 Hex-head bolt
RWT
Rain Wa ter Ta nk Rhino water tanks a s specified
FC.01
Ontra x U-Trax 4 6x3 0mm furring channel , fitted with acoustic pa nell ing between members
IC
Irrigation C onduit, indica tive location, refer eng. details
FC.02
Rondo KEY-LOC K concea led ceil ing system, cross-tee furring channel
IL.01
Bra dford R4 batts
IL.02
Kingspa n Kooltherm K1 0 PLUS soffit board rigid insula tion
GA.01
Hastings HB1 Bulb Sea l
GA.02
Sil icone gla zing sea la nt
HR.01
Handrail type 1, insta lled as spec.
HRS
Handrail support bracket, screw fixed to bal la strade via countersunk screws
ML.0 1
Tyvek HomeWrap plia bl e breatha bl e membrane sarking
PC.01
120 0x24 00 mm EcoPl y Ul traTexture Sha dowclad panel ing fixed by counterssunk screws
PC.02
120 0x24 00 mm EcoPl y Ultra Texture Shadowcl ad pa neling, with peg-holes @ 50 mm spa cing
PS.01
C/D P lywood substra te, 9mm
PP.01
Structural Steel, parapet ca pping equa l angle 1 50 x70 x1 0, Colorbond Monument finished colour
PWS.0 1
Eterno self-leveling pedestal up to 270 mm, spaced @ 60 0mm centres
RL.01
Custom stainl ess steel structure railing, with wel ded outriggers, see shop dwgs for fabrica tion
RP
Refuge Point
SC.01
WoodForm Architectura l suspended ceil ing, Concept Cl ick ba tten screening in Vic. Ash
SC.02
Rondo Key-Lock 12 1 suspension roa d, with 25 43 suspension cl ip
SG
Sculpture Ga rden
SK.01
skylight curtain wa ll , structural Raico THERM+H timber mull ions @ 1 20 0mm centres
ST.01
GluLa m bea m 23 0x1 15 mm
ST.02
Kennedy's Timber 14 0x140 mm structural timber, in Iron Ba rk
ST.04
Structura l MGP10 pine, timber battens 7 0x35 mm
ST.05
Structural MGP 10 pine, timber bottom/top pla te 12 0x45 mm
ST.06
Structura l MGP1 0 pine, timber stud 9 0x45 mm
ST.07
Structura l MGP 10 pine, timber joist 12 0x45 mm
SF.01
Structura l Framing, Gl uLam beam 8 00 x6 00 mm
SF.02
Structura l Framing, Gl uLam column 6 00 x6 00 mm
SF.03
Existing concrete structural fra ming, beam 5 00 x6 00 mm
SF.04
Existing concrete structural fra ming, column 6 00 x6 00 mm
TC.01
Ext. Timber Cl adding WoodForm Architectura l Expression C la dding, in Spotted Gum
TC.02
Sla tted Timber Wal l C la dding
TF.01
Bamboo timber flooring 1 9mm, tongue & groove joins as spec.
TF.02
Joinery drawings to be read in conjunction with all referenced drawings, specifica tion, schedules and services drawings. 15-2 0mm sha dow line at junction of new joinery units with wall / ceiling finishes unless otherwise noted on dra wings. All exposed edges to timber veneers to have laminated timber veneer edging with nominal thickness of 3 mm.
Bamboo commercia l grade timber fl ooring as spec.
TF.03
outdoor timber fl oor sleepers a s spec.
TL.01
Ceramic wet-a rea til ing as spec.
TL.02
Kitchen tiling a s spec.
WC
Toilet
NOTE:
REFLECTED CEILING ANNOTATION
NOTE:
AT.02
Acoustic Tile C eiling a s spec. - 12 00 x 3 00 mm
NC
No Ceiling
PB.01
Flush P la sterboa rd C eiling as spec.
PB.02
Water Resista nt Flush P la sterboard Ceil ing as spec.
PB.03
Perforated Fl ush Pla sterboa rd Ceil ing a s spec.
Existing Concrete Wall
TC.01
WoodForm Architectural , Expression Cl adding system in Spotted Gum, install ed as spec.
300 Cast In-situ Concrete
SC.01
WoodForm Architectura l suspended ceil ing, Concept Cl ick ba tten screening in Vic. Ash
Insert Text Here
WT.01
REFLECTED CEILING LEGEND BH
SOFT PLANTING LEGEND SC REENING SHRUBS - SP ECIES AS SELECTED
TREE TYP E 1 SIZE: 30 L SP ECIES: AS SELECTED
TREE TYP E 2 SIZE: 4 5L SP ECIES: AS SELECTED
TREE TYP E 3 SIZE: 1 00 L SP ECIES: AS SELECTED
Bulkhead (plywood cla dding on timber framing)
SUSTAINABLE DESIGN CONSIDERATIONS:
WoodForm Architectural Cladding in Spotted Gum Structural Timber MGP10 Batten Cast In-Situ Concrete
Insert Text Here
18WAEC / 30 Batten / 216 Concrete LT.02 - Supernova PR Down-Up P enda nt Light 650 mm Round
BP.01
5mm x 3 0mm Brass L Profil e - Bl ackwoods Brass Squa re All oy 3 85
BR.01
12 x 20 0mm Bl ackwood Bra ss Dowl Rod - Round All oy 3 85
P
BR.02
12 x 15 5mm Bl ackwoods Bra ss Dowl Rod - Round All oy 3 85
DT.01
90 x 45 mm Dressed Tasma nian Oak
DT.02
20 x 20 mm Dressed Tasma nian Oak
DT.03
70 x 40 mm Dressed Tasma nian Oak
DT.04
45 x 45 mm Dressed Tasma nian Oak
DT.05
30 x 30 mm Dressed Tasma nian Oak
DT.06
45 x 70 mm Dressed Tasma nian Oak
MT.01
22mm White Ma lamine ta bl etop
MT.02
Mal amine - Square Edge
WT.03
LT.03 - Supernova PR Down-Up P enda nt Light 650 mm Round
External Timber Double Stud Wall WoodForm Architectural Expression Cladding in Spotted Gum Insulated double stud MGP10 structure Internal EcoPly paneling
LT.04 - Delta light Spy on ADL track light 62 mm Round
18WAEC / 35 Batten / 90 stud / 50 air gap / 90 stud / 12 plywood
LT.0 5 - Deltalight Gala LED WW W Wall light 1 48x7 0mm
LT.06 - Thorn Chameleon T5 Ceil ing diffuser 1200x600mm
WT.04 External Timber Double Stud Wall
LT.07 - Thorn Chameleon T5 Ceil ing diffuser 1200x300mm
NC BH BH-S CJ
WoodForm Architectural Expression Cladding in Spotted Gum Insulated double stud MGP10 structure WoodForm Architectural Expression Cladding in Spotted Gum
No Ceiling Bulkhea d (flushed plasterboard on steel fra ming) Bulkhead-Insulated Spandrel (flushed pla sterboard on steel fra ming) Control Joint
18WAEC / 35 Batten / 90 stud / 50 air gap / 90 stud / 35 Batten / 18WAEC
WT.05
Refer to electrical services drawings for detail of installation of lights REFER TO SPECIFICATION FOR SELEC TION
WT.02
LT.01 - LED Downl igh, Deltalight Grand Reo 827 20 S1 W-B 18w 102 mm Round
JOINERY LEGEND
NOTES:
PL.01 PL.02 PL.03
GENERAL NOTES
WALL TYPE LEGENDS
Acoustic Tile C eiling a s spec. - 60 0 x 12 00 mm
Cupboard doors fitted with 'Internal Soft'
Kennedy's Timber 20 0x200 mm structural timber, in Iron Ba rk
ST.03
Unless otherwise noted on drawings, refer to finishes schedule for colour finishes and sel ections Check a ll dimensions/set out dimensions prior to construction.
CLT.01
CJ
JOINERY NOTES
AT.01
AL.01
Plywood Clad Internal Partition
Contractor to allow for 50 mm Boral 'Cairo - 2 step' cornice to al l Units (incl. ensuites), Corridors, Sitting, P antry, Staff Office & Medication, Disabled a nd Ambulant WC (resident & publ ic) rooms.
1200x2400mm EcoPly UltraTexture Shadowclad paneling fixed by counterssunk screws 90mm structural timber MGP10 1200x2400mm EcoPly UltraTexture Shadowclad paneling fixed by counterssunk screws
Contractor to allow for 'square set' cornice to al l remaining areas. Contractor to note tha t no cornice required to wall where feature wa ll l ining/panels exist. Allow for 10mm sha dowl ine. Refer services drawings for details of service points Confirm setout of al l fittings and fixtures on site with Architect prior to instal lation. Extent and number of AP's, l ocations and sizes to be coordinated with services engineer's drawings. Refer to architectural specifica tion for numbers to be a llowed.
18WAEC / 35 Batten / 90 stud / 50 air gap / 90 stud / 35 Batten / 18WAEC
ROOF PLAN ANNOTATION TC.01
WoodForm Architectural , Expression Cl adding system in Spotted Gum, install ed as spec.
BG.01
Box gutter type 1 - 60 0x2 00 mm a s spec. to AS35 00
BG.02
Box gutter type 2 - 40 0 x 2 00 mm a s spec. to AS35 00
GS.01
Gutter sump type 1 - as spec. to AS35 00
RH.01
Rainwater head & overflow assembly
CW.01
DP.01
Down pipe type 1 - 30 0mm dia meter as spec. to AS35 00
Structural Timber Glazed Curtain Wall System
DP.02
Down pipe type 2 - 30 0mm dia meter as spec. to AS35 00
DP.03
Down pipe type 3 - 30 0mm dia meter as spec. to AS35 00
CA( A)
Capping a luminium to cl adding a s spec.
Raico THERM H+H structural curtain wall, finished with Iron Bark timber mullions and capping system Double glazed Pilkington Optilam™ to be fitted as per window schedule
Refer to Interior Finishes, Fittings/Fixtures & Equipment Schedul es within Specification Documentation for further informa tion
CA( S)
Capping steel to gutter system, finish as per box gutter, fit as spec.
CU.01
Condenser Unit to Mecha nica l engineer's dra wings
Al l switches a nd controls on the a ccess path of travel are to be l ocated 1 000 mm A.F.L a nd minimum 5 00 mm from internal corners
EU.01
Eva pora tive Unit to Mecha nica l engineer's dra wings
CW.02
EF.01
Exha ust Cowl Unit to Mechanical engineer's dra wings
Timber Screen Curtain Wall System
SA.0 1
Supply Air C owl Unit to Mecha nica l engineer's dra wings
Blackbutt hardwood vertical timber screen 200mm spacing between 70x20mm louvres 100x45mm structural mullions @ 1200mm centres
ROOF PLAN LEGEND
RTx
Roof Type 1 ,...3 as spec. Refer to Roof Schedul e below.
Fol ded pa ra pet ca pping as spec.
level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982
SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .
rev
issue
revision description
amd
date
CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 LEGENDS & ANNOTATION
Preliminary
dat e:
07-11-2016
sc a l e :
As indicated @A1 rev is io n:
dr aw n :
BA,JD,HM,JP
sh ee t n o :
AD01.02
proj ect no:16-0725
printe d:
© studio theta pty ltd
7/11/2016 12:08:11 PM
file:
C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt
Gutter sump to siphonic dra inga ge bel ow
L BOU SLEY N O T
AA
AB
AD
AC
RING ROAD EAST
A7
A8
AG
BB BA
BD
BE
BF
BG
BH
BI
BJ
BK
BL
BM
BN
BO
BP
BQ
BC
B1
B2
AA3
A3
A6
AF
AA2
A2
A5
AE
AA1
A1
A4
D EVAR
B3
AA4
BUILDING A AA5 PUBLIC WING
BUILDING B MANUFACTURING & OFFICE WING
SOUTH ROAD
B4
B5
AA6
B6
AA7
B7
AA8
DRILL CORE REFERENCE LIBRARY.
B8
level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982
SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .
rev
issue
revision description
amd
date
CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 SITE SET OUT PLAN
Preliminary
dat e: sc a l e : dr aw n :
07-11-2016 1 : 500 @A1 BA
sh ee t n o :
AD02.01
rev is io n: proj ect no:16-0725
printe d:
© studio theta pty ltd
7/11/2016 12:08:17 PM
file:
C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt
TONSLEY GREEN LINK Two-way single lane street as exisiting.
BL.01
Fall away to stormwater runoff drain
BL.01
PV.01
BL.01
BL.01
D s VAR ULE s tre et a O B Y e E n L a l S TON single g. in y -wa exisit k s o w T wor No
BL.01
TGSI
TGSI PV.01
BL.01 BL.01
BL.01 BL.01
Proposed timber framed and clad planter box and edge seat. Allow 120mm of aggregate and layer of geotextile fabric, fill remaining with soil to 120mm from edge seating base.
BL.01
BL.01
122° 3
2 1
BL.01 1 2
BL.01
BL.01
3
Proposed timber framed and clad seating. Woodform architectural timber cladding w. proprietary aluminium edge stops.
BL.01
Fall away to stormwater runoff drain
BL.01
Proposed planting - see planting specifications 2
1
3
PV.01
FK
119 °
GR.01
TGSI
BL.01
3
119 °
Handrail Hammer Smith circular mono ramp handrail Vic Ash natural finish
2
° 131
BL.01 Proposed timber framed and clad planter box and edge seat. Allow 120mm of aggregate and layer of geotextile fabric, fill remaining with soil to 120mm from edge seating base.
1
Fall away to DR.01 stormwater runoff drain
HR.01
BL.01
Proposed planting - see planting specifications
BL.01
Solar LED bollard Philips element bollard LED lighting
Fall away to stormwater runoff drain
Fall away to stormwater runoff drain
BL.01
°
BL.01 FK
BL.01
BL.01 GR.01
103
GR.01
In-situ curb w. stormwater runoff drain - fall to sump. Allow discharge to existing Tonsley stormwater system
BL.01
BL.01
BL.01
GR.01
DR.01 planting - refer to landscape schedule
136°
BL.01
BL.01 HR.01
TSGI
TGSI
BL.01
RWT underground
BL.01 BL.01
° 1 06
BL.01
Proposed timber framed and clad planter box and edge seat. Allow 120mm of aggregate and layer of geotextile fabric, fill remaining with soil to 120mm from edge seating base.
TGSI
BL.01
PV.01
BL.01
Existing landscaping No works
BL.01
BL.01
DR.01
BL.01
BL.01
BL.01
BL.01
TGSI
DR.01
Stormwater runoff drain 2degree fall to sump. Allow discharge to existing Tonsley stormwater system
BL.01
1 2
BL.01
BL.01 BL.01
TGSI BL.01
DR.01
BL.01
Drainage to rainwater tank below, overflow to existing Tonsley stormwater system
2 1
PV.02 Proposed retaining wall. Site to be leveled from site boundary. Ground beyond to be retained - no works
Stormwater runoff drain 2degree fall to sump. Allow discharge to existing Tonsley stormwater system
PV.01
Fall away to stormwater runoff drain
Proposed timber framed and clad planter box and edge seat. Allow 120mm of aggregate and layer of geotextile fabric, fill remaining with soil to 120mm from edge seating base.
°
FFL 51.94
1 00
DR.01
D . ROA isiting x TH SOU ad as e ro way
BL.01 TGSI
BL.01
BL.01
BL.01
Proposed timber framed and clad seating. Woodform architectural timber cladding w. proprietary aluminium edge stops.
BL.01
BL.01 Proposed raised timber framed and clad platforms. Woodform architectural timber cladding w. proprietary aluminium edge stops.
Two
PV.02
Stormwater runoff drain 2degree fall to sump. Allow discharge to existing Tonsley stormwater system
Proposed timber framed and clad planter box and seating. Woodform architectural timber cladding w. proprietary aluminium edge stops.
Proposed timber battern screening. To sit flush to planter box edging
FFL 51.94 Proposed grass strip w. 12mm a/b marine plywood edging strip. Grass and edge strip to sit flush to PV.01
Bike rack
PV.01
FFL 51.94
Fall away to stormwater runoff drain
FFL 51.94
C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt
Fall away to stormwater runoff drain
Fall away to stormwater runoff drain
PROPOSED BUILDING B
level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982
SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .
LANDSCAPING LEGEND
SOFT PLANTING LEGEND
BL.01
63 Phill ips Element Boll ard LED
PL.01
Pla nter box 1 200 mm
PV.01 Pa ving a s spec.
FK
Flush Kerb
DR.01
StormTech 1 00 ARG 30 Linea r Draina ge System, 10 0 x 30 mm
PL.02
Pla nter box, 2 000 mm
PV.02 Pa ving a s spec.
K
Kerb
GR.01
Grass l awn as spec.
PL.03
Pla nter box, custom
TF.01 Pa ving a s spec.
RWT
HR.01
Hammer Smith Circul ar Mono Stair Ha nrail, finished in ( Vic Ash) 4 5x45 mm
PL.04
Pla nter box, custom 2
TF.02 Pa ving a s spec.
IC
Rain Wa ter Ta nk a s specified Irrigation C onduit, indica tive location, refer eng. details
rev
issue
revision description
amd
date
CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042
SC REENING SHRUBS - SP ECIES AS SELECTED
TREE TYP E 1 SIZE: 3 0L SP ECIES: AS SELECTED
TREE TYP E 2 SIZE: 4 5L SP ECIES: AS SELECTED
TREE TYP E 3 SIZE: 1 00 L SP ECIES: AS SELECTED
LANDSCAPING AND PAVING PLAN
Preliminary
dat e:
07-11-2016
sc a l e :
As indicated @A1 rev is io n:
dr aw n :
BA
sh ee t n o :
AD02.02
proj ect no:16-0725
printe d:
© studio theta pty ltd
7/11/2016 12:08:22 PM
file:
PROPOSED BUILDING A
TI.01 FFL 51.94
PROPOSED BUILDING A
PROPOSED BUILDING B
DR.01
Stormwater runoff drain 2degree fall to sump. Allow discharge to existing Tonsley stormwater system Fall away to stormwater runoff drain and grass
FFL 51.94
GR.01
PV.01 FFL 51.94
Fall away to stormwater runoff drain
DR.01 BL.01
GR.01
BL.01
FFL 51.94
BL.01
BL.01
DR.01
Stormwater runoff drain 2degree fall to sump. Allow discharge to existing Tonsley stormwater system
BL.01
BL.01 BL.01 BL.01
BL.01 DR.01
DR.01
BL.01
BL.01
Proposed timber framed and clad planter box Allow 120mm of aggregate and layer of geotextile fabric, fill remaining with soil to 120mm from top.
BL.01 BL.01
BL.01
DR.01
DR.01
BL.01
DR.01 DR.01
Proposed timber framed and clad seating. Woodform architectural timber cladding w. proprietary aluminium edge stops.
BL.01
Proposed retaining wall. Site to be leveled from site boundary. Ground beyond to be retained - no works
PV.01
GR.01
TGSI
BL.01
Proposed planting - see planting specifications
GR.01 BL.01
Proposed timber framed and clad planter box Allow 120mm of aggregate and layer of geotextile fabric, fill remaining with soil to 120mm from top.
BL.01
BL.01
GR.01
BL.01
BL.01
TGSI
BL.01
BL.01
BL.01
Proposed planting - see planting specifications
level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982
SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .
LANDSCAPING LEGEND
SOFT PLANTING LEGEND
BL.01
63 Phill ips Element Boll ard LED
PL.01
Pla nter box 1 200 mm
PV.01 Pa ving a s spec.
FK
Flush Kerb
DR.01
StormTech 1 00 ARG 30 Linea r Draina ge System, 10 0 x 30 mm
PL.02
Pla nter box, 2 000 mm
PV.02 Pa ving a s spec.
K
Kerb
GR.01
Grass l awn as spec.
PL.03
Pla nter box, custom
TF.01 Pa ving a s spec.
RWT
HR.01
Hammer Smith Circul ar Mono Stair Ha nrail, finished in ( Vic Ash) 4 5x45 mm
PL.04
Pla nter box, custom 2
TF.02 Pa ving a s spec.
TF.02
Rain Wa ter Ta nk a s specified Irrigation C onduit, indica tive location, refer eng. details
rev
issue
revision description
amd
date
CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042
SC REENING SHRUBS - SP ECIES AS SELECTED
TREE TYP E 1 SIZE: 3 0L SP ECIES: AS SELECTED
TREE TYP E 2 SIZE: 4 5L SP ECIES: AS SELECTED
TREE TYP E 3 SIZE: 1 00 L SP ECIES: AS SELECTED
LANDSCAPING AND PAVING PLAN
Preliminary
dat e:
07-11-2016
sc a l e :
As indicated @A1 rev is io n:
dr aw n :
BA
sh ee t n o :
AD02.03
proj ect no:16-0725
printe d:
© studio theta pty ltd
7/11/2016 12:08:25 PM
file:
C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt
TONSLEY GREEN LINK Two-way single lane street as exisiting.
AD AA
AB
AC
AE 6000
BB
AF
AG
9000
6000
6000
BA
6000
BD
6000
BE
6000
BF
BG
6000
6000
BH
6000
BI
6000
BJ
6000
BK
6000
BL
6000
BM
6000
BN
6000
BO
6000
BP
6000
BQ
6000
BC
6004 6000
SETOUT
AA1
A1
SETOUT 9000
SETOUT
B1
9000
AA2
A2
9000
UP
B2 AA3
9000
9000
A3
B3 AA4
9000
9000
A4
B4 AA5
9000
9000
A5
B5 AA6
9000
9000
A6
B6 AA7
9000
9000
A7
B7 AA8
A8
AD
AE AF
AB
AC
BA
BC
BB
BD
BE
BF
BG
BH
BI
BJ
BK
BL
BM
BN
BO
BP
BQ
level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982
SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .
rev
issue
revision description
amd
date
CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 GRID SET OUT
Preliminary
dat e: sc a l e : dr aw n :
07-11-2016 1 : 200 @A1 HM,JP
sh ee t n o :
AD03.01
rev is io n: proj ect no:16-0725
printe d:
© studio theta pty ltd
7/11/2016 12:08:29 PM
file:
AA
AG
C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt
B8
AD04.01
2
AD
AD05.01
AE
2
AA
AB
AC
BB
AF
AG
BD
BE
BF
BG
BH
BI
BJ
AD04.02
BK
BL
BM
BN
BO
BP
BQ
1 2
BA
BC
1 AD06.01
FFL 51.94
W.G.01.A
WT.08 W.G.0 1.B
D.G.3 5.B
W.G.3 5.C
WT.04
WT.04
W.G.01.H
D.G.0 1.D
W.G.01.I
W.G.35.A
D.G.43 .A
W.G.01.J
WT.05
WT.04
AD07.01
UP W.G.3 0.B
G.03 TF-2
G.02 TF-1
D.G.03 .A
D.G.02 .A
BAL.1
WT.03
G.04 TF-1
5
D.G.34 .A
WT.05
1
6
AD09.01
WT.04
WT.05
WT.08
KITCHEN G.07
TL-2
G.29
WESTERN CORE
CAFE G.09 TF-1
LIFT 1
G.15
G.16 TF-1
WT.03
WT.03
W.G.3 2.B
W.G.1 2.B
D.G.13 .A
WT.05
W.G.32.A
D.G.7 2.C
RETAIL 2 G.12 TF-1
WT.03 WT.05
W.G.1 2.D
W.G.14.E
D.G.1 2.B
AA8
W.G.1 4.C
G.69 D.G.69 .A
BH.xx
WT.03
SPECIALIST EQUIPMENT
CN-1
CN-1
F WC
W.G.7 2.B
G.72 TF-2
PROTOTYPE SHARE G.71 CN-2
G.63 TL-1
D.G.6 6.C
D.G.71 .A
D.G.59 .A
G.64 TL-1
RP
EMERG. STATION
STAIRUP5
CONTROL ROOM
G.54 CN-1
RP
WT.01
STAIR 6 G.59
G.60 CN-3
D.G.63 .A
M WC
WT.02
G.53 CN-1
RT.1
WT.01
G.58
G.62 D.G.62 .A
G.66 CN-2
WT.04
TF-1
LIFT 6
ACC WC
PROTOTYPE 2
G.55
G.57
WT.02
SOUTHERN CORE
D.G.7 0.B WT.03
PROTOTYPE 1
G.61 TL-1 WT.05
CLNR
WT.02
D.G.70 .A
ADMIN
LIFT 4
D.G.6 5.B
D.G.73 .A
D.G.72 .A
FFL 51.94
G.65 CN-3
WT.02
D.G.6 6.B
G.70
WT.03
WT.04
D.G.65 .A
WT.02 D.G.66 .A
SPRAY ROOM 2
WT.05G.67 D.G.67 .A
SPRAY ROOM 1
W.G.73 .A
WT.04
WT.05G.68 D.G.68 .A
W.G.65 .A
D.G.66 .E
WELD BTH WELD BTH WELD BTH
BH.xx
WT.04
WT.04 D.G.6 6.D
D.G.7 3.B
G.73
D.G.7 2.B
W.G.12.E
WT.04
W.G.73 .B WT.03
G.14 TF-1
A8
WT.04
WT.04
BH.xx
RETAIL 1
W.G.1 4.D
B6
WT.03
AA7
WT.04
WT.01 WT.04
W.G.72.E
TF-3
WT.05
SG
G.74 TF-3
STORE G.13 TF-2
MODULE EXAMPLE
D.G.52 .A
D.G.5 3.A
CP.01
W.G.1 4.B
D.G.14 .A
FFL 52.04
D.G.5 4.A
WT.05
W.G.7 4.B
D.G.5 2.B
G.31 TF-1
D.G.5 4.B
WT.05
A7
SG
STORE D.G.1 6.A
G.17 CN-1
W.G.14.A
W.G.15.A
WT.05
TRANSFORMER ROOM
D.G.31 .A
D.G.0 1.F W.G.12.A
WT.05 D.G.17 .A
AIR LOCK
G.18 CN-1
B5
D.G.3 1.B
D.G.01 .E WT.03 D.G.12 .A
WT.04 D.G.1 7.B
AA6
D.G.18 .A
CW.03
CW.03
AD05.02
D.G.6 1.A
WT.05
WT.02
WT.04
MSB
D.G.52 .J WT.01
WT.01
CN-1UP
W.G.72.A
AD04.03
D.G.55 .A
G.56 CN-1
WT.05
LOADING BAY RT.01
WT.05 WT.05
WT.02
WT.04
RT.1
CP.01
W.G.71 .A
WT.04
W.G.66 .C
W.G.66 .B
W.G.66 .A
WT.02
WT.04
W.G.60 .A
W.G.60 .B
D.G.5 9.B
WT.04
B7
D.G.5 2.G
FFL 51.94
STORAGE WT.02
D.G.60 .A WT.04
D.G.5 2.H
WT.05
FFL 52.04
CP.01
1 2
WT.04
B8
WT.04
FFL 51.94 RT.01 CP.01
AD
CP.01 CP.01
AE AF
AB
AC
BA
2
AD04.04
AD05.01
BC
BB
BD
BE
BF
BG
BH
BI
BJ
BK
BL
BM
BN
BO
BP
BQ
level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982
SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .
General Notes: RP - Refuge Point SG - Sculpture Garden - Existing walls and columns indicated with solid black fill
rev
issue
revision description
amd
date
CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 GROUND FLOOR GENERAL ARRANGEMENT PLAN
Preliminary
dat e: sc a l e : dr aw n :
07-11-2016 1 : 200 @A1 JP
sh ee t n o :
AD03.02
rev is io n: proj ect no:16-0725
printe d:
© studio theta pty ltd
7/11/2016 12:08:34 PM
file:
AA
1 2
AG
AD04.05
WT.01
1
D.G.6 4.A
G.19 CN-1
3
MODULE EXAMPLE
D.G.6 1.B
FIRE PUMP ROOM
MODULE EXAMPLE
D.G.3 2.B
WT.03
W.G.12.F
G.19A
W.G.0 9.B
WT.03
G.21 TL-1
WT.02
G.52
CN-3 FFL 52.04
D.G.6 4.B
WT.05
BOOSTER
MANUFACTURING
W.G.1 2.C
A6
2 AD05.02
UP
D.G.09 .A WT.02
WT.02
B4
MODULE EXAMPLE
UP
WC ACCESS
WT.01
UP
MODULE EXAMPLE
W.G.74.A
D.G.21 .A
G.20 CN-1
BUILDING B
D.G.0 9.B
G.23
D.G.22 .A
STAIR 1
MODULE EXAMPLE
AD07.02
G.32 CN-1
W.G.6 6.D
G.22
WT.02
WT.02
W.G.1 5.B
D.G.2 0.A
COMMS
RT.1
UP
WT.01
1
2
WT.02
D.G.2 0.B
WT.05
AD06.02
RT.1
STAIR 7
FFL 51.94
AD05.02
FFL 52.04 WT.02
WT.04
WT.03
AA5
G.24 TF-1
D.G.24 .A
W.G.49 .A
1
W.G.7 2.D
A5
D.G.4 9.B WT.02
B3
G.10 TL-2
D.G.10 .A
BUILDING A
WT.08
B2
MODULE EXAMPLE
KITCHEN
WT.05
FFL 52.04
G.28
RP
WT.02
WT.02
RT.1
W.G.7 2.C
WT.02
CLNR
WT.03
COLD ROOM G.11 TL-2
G.51 CN-1
G.46
WT.02
W.G.7 1.B
G.27
MECP
D.G.2 8.A
FIP
AD05.02
D.G.2 7.A
FHR
WT.03
G.01 TF-1
D.G.06 .A
D.G.11 .A
D.G.50 .A
WT.02
WT.02
W.G.38 .E
W.G.3 2.C
PUBLIC ATRIUM
WT.02
STORE
1
WT.03
G.49 TF-1
W.G.52 .C
W.G.09.A
WT.02
D.G.3 3.B
UP
G.08
WT.05
WT.05
STAFF ROOM
WT.02
FFL 52.04
D.G.08 .A
STAIR 4
D.G.5 2.C
COLD ROOM
WT.02
WT.01
WT.05
G.45
D.G.32 .A
W.G.0 9.C
2 1
D.G.26 .A MALE WC G.26 TL-1 D.G.2 6.B
G.25 TL-1
WT.08
AA4
D.G.30 .A
FEMALE WC D.G.25 .A D.G.2 5.B
AD04.05
G.06 TF-1
WT.05
CN-1
A4
RESTAURANT
G.50 CN-1
WT.04
UP
RP
D.G.44 .A
WT.02
FFL 52.04
WT.04
W.G.06.A
WT.03 WT.02
STAIR 2
CP.01
B1
D.G.5 2.F
STORAGE
WT.05
LIFT 2 WT.02
D.G.52 .E
RT.1
WT.05
D.G.5 2.I
WT.08
FFL 52.04
WT.05
WT.05
LIFT 3 WT.04
G.33 TF-1
D.G.33 .A W.G.33.A
W.G.3 0.D
D.G.2 9.A
RT.1 UP
AIR LOCK
AD08.01
D.G.4 2.B G.42 WT.05 D.G.3 7.B
D.G.35 .A
UP RT.1
CN-3
F WC
WT.04
2 1
WT.05
D.G.49 .A
G.41 D.G.41 .A
WT.05
CN-1
G.47 TF-1
G.43
G.40
G.48 CP-1
ADMIN
NORTHERN CORE
ACC WC
G.34
D.G.04 .A
D.G.2 9.B
G.38 TF-2
D.G.5 2.D
LOCKERS
D.G.39 .A
G.37 CN-1
STORE
W.G.3 3.B
AA3
CAFE
WT.03
W.G.04.A
W.G.3 0.C
A3
AD09.01
3
G.05 TL-2
WT.01
WT.04
MATERIALS + HARDWARE
STORE
WT.05
WT.04
WT.04 WT.01
FFL 51.94
WT.04
WT.02
WT.02
G.39
CLNR
WT.05
WT.04
D.G.47 .A
TL-1
WT.05
CP.01
G.44 CN-1
M WC
WT.05
WT.05 D.G.37 .A
AD07.01
4
WT.03
G.30 TF-1
KITCHEN
SHOP
1
WT.03
GALLERY
2
PRODUCT AD06.01 G.35 TF-2
RECEPTION
SECURITY
D.G.3 9.B
WT.04
WT.05
AD06.01
W.G.0 2.B
W.G.02.A
WT.05
W.G.4 7.C
STAIR 3
D.G.4 2.A
AA2
3
2
LOADING BAY
W.G.4 7.B
WT.04
W.G.38 .A
CW.02
A2
FFL 51.94
WT.04 D.G.38 .A
WT.05
W.G.30.A
W.G.3 8.D
W.G.3 8.C
C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt
AD07.01
WT.04
WT.04 W.G.3 8.B
D.G.0 1.C
D.G.5 1.B
4
WT.05
D.G.5 1.A
W.G.01.F
D.G.4 8.A
FFL 51.94
W.G.47.A
W.G.01.E
AA1
W.G.3 5.B
A1
WT.04
SG
G.36 TF-3
W.G.0 1.D
D.G.0 1.B
CP.01
D.G.4 4.B
W.G.0 1.C
D.G.01 .A
WT.04
W.G.35 .D
CP.01
AD AA
AB
AE
AC
BB
AF
AG
BA
BD
BE
BF
BG
BH
BI
BJ
BK
BL
BM
BN
BO
BP
BQ
BC
11396 5656
5398 2000
4000
5386
4000
270 1000
1740
2000
1000 270 1200 270
2000
11380
36000
6010
6664
1791 8063
2000
12139
4000
6000
4139
1245
2000
4676
4517
°
1 00
120
5400 2570
6600
5400
120
600
5400
600
5400
30180
600 300
1245
3590
1 00
12410
2710
6000
8 0°
63
11449
839
8630
1000
8809
1791
270
8 0°
°
1 00
2612
270 1200 270 1000
1791
36000
4000
3353
21835
AA1
A1
1740
°
9246
9246
6535
7530
18000
B2
0
B3
18000
1000
1005
5216
6109
5400
3330
1000
B4
2150
5281
4261
4307
1000 1022
2000 978
15
6195
4824
5760
3230
30
6270
5700
978
6191
4592
3251
5146
8936
4234
1460
1022 2000 1139
1978
1600
6000
9000
3000
4310
1800
3620
1580
5190
1541
3620
1003
4186
4830
3530
3000
1800
1890
5094
3356
160
400
1440 1050
960
2605 2670
5400
1100 300
1100
6000
6000
24000 35809
B8
4445
170°
1407
5600
11 0°
10540
0
6000
6000
6000
5970
4039
2000 4545
80 °
1407 3691
12460
39287 13781
41261
AE AF
AG
BA
BC
BB
BD
BE
BF
BG
BH
BI
BJ
BK
BL
BM
BN
BO
BP
BQ
level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982
SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .
rev
issue
revision description
amd
date
CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 GROUND FLOOR DIMENSIONS
Preliminary
dat e: sc a l e : dr aw n :
07-11-2016 1 : 200 @A1 JD
sh ee t n o :
AD03.03
rev is io n: proj ect no:16-0725
printe d:
© studio theta pty ltd
7/11/2016 12:08:38 PM
file:
AC
10600
2550
400 400
AB
6000
2620
270 5600
5240
400 14600
AA
B7
11130
8600
AD
4896
4841 2061
2330 300300
1733
8368
17615
3400
3186
2620
464
5226
4841 1800
5889
8990
3440
1999
6285
2000
5600
3400
285
2000
400
2865
1322
400
3135
2206 250
8600
5600
4541
2666
1469
AA8
120
°
9000
1899 400
1820
7085
4 3178 1022 5600
1691
400
3186
3109
4111
5832
3759
1500
6152
A8
1 00
2644
C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt
120
7091
1678
7580
B6
8344
11128
2050
4645
3802
AA7
A7
18000
6057
9292
2109
2067
1000
956
2000
1160
2072
2000
2000
3050
1075
1044
2000
6161 4554
2000
12150
244
4703
3168
200
4000 2000
AA6
6780
1066
B5
700
2504
1985 5030
2439
1204
4015
795
A6
1100 520 1000
1940
2006
2080
5099
1316
2606
800
220
6864
AA5 2476
1000 470 1500
A5
2070
1988
1000 1000
1500
1268 760 360
54000
4002
31671
6146
6856
4099
1515
2329
AA4 1000
4376
2901
1944
4673
1200 120 1200
3000
1220
3260
1000
6503
1518
2060
1000
3266
200
3550
5021
5901
1000
10950
5514
3000
14075
AA3 4376
A4
2690
5400
2198
8 0°
9042
2108
2834
2720
1450 4
1915
9000
7350
3258
A3
5271
14579
2510
3015
13541
UP
5150
4850
AA2 1000
A2
9000
1599
2430
3866
19388
B1
3331
AD AA
AB
AE
AC
BB
AF
AG
BD
BA
BE
BF
BG
BH
BI
BJ
BK
BL
BM
BN
BO
BP
BQ
BC
SG
G.36
AA1
A1
8 0°
B1
STAIR 3
ADMIN
G.44
AA2
A2
LOCKERS
G.47
M WC
G.48
G.39
SECURITY
UP
G.50
G.35
G.02
G.03
STORAGE
PRODUCT SHOP
RECEPTION
MATERIALS + HARDWARE G.38
NORTHERN CORE
ACC WC
G.43
G.40
GALLERY G.30
STAIR 4
CLNR G.41
STORE
G.51
RP
STAFF ROOM
G.37
KITCHEN
STORE
CAFE
G.05
G.45
F WC
AA3
A3
B2
LIFT 2
G.34
G.04
RP
G.49
G.42
LIFT 3 G.46
AIR LOCK G.33
KITCHEN G.07
B3
RESTAURANT G.06
STAIR 2
MODULE EXAMPLE
G.29
A4
FEMALE WC
AA4
MALE WC
G.25
G.71
COLD ROOM G.08
G.26
MODULE EXAMPLE G.72
COLD ROOM
PUBLIC ATRIUM
G.11
G.01
STORE FHR
FIP
G.28
STAIR 7
G.60
AA5
G.24
B4
MODULE EXAMPLE
G.32
WESTERN CORE
A5
G.10
CLNR
G.27
MECP
KITCHEN
UP
CAFE
MANUFACTURING
MODULE EXAMPLE
G.09
MODULE EXAMPLE
G.52
G.22
G.73
UP
COMMS
UP
LIFT 1
G.22
MODULE EXAMPLE
G.23
G.74
B5
WC ACCESS
STAIR 1
G.21
G.20
AA6
A6
MSB BOOSTER G.19A
FIRE PUMP ROOM
AIR LOCK
G.18
MODULE EXAMPLE
G.31
G.75
G.19
SG
G.74
STORE TRANSFORMER ROOM G.17
G.13
SG
STORE
B6
G.15
G.16
AA7
A7
RETAIL 2 G.12
G.69
G.68
LIFT 4
SPRAY ROOM 2
WELD BTH WELD BTH WELD BTH
G.65
G.67
ADMIN G.55
G.61
RETAIL 1
EMERG. STATION
STAIR 5
CONTROL ROOM G.53
G.54
LIFT 6
G.14
SPRAY ROOM 1 G.73
G.58
SPECIALIST EQUIPMENT G.70
CLNR SOUTHERN CORE
AA8
ACC WC
PROTOTYPE 2
G.72
G.60
STAIR 6 G.59
G.63
G.66
PROTOTYPE 1
B7
RP
G.62
A8
RP
G.57
F WC
STORAGE G.56
PROTOTYPE SHARE G.71
M WC G.64
AD
AE AF
AB
AC
BA
BC
BB
BD
BE
BF
BG
BH
BI
BJ
BK
BL
BM
BN
BO
BP
BQ
level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982
SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .
rev
issue
revision description
amd
date
CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 GROUND FLOOR FURNISHED PLAN
Preliminary
dat e: sc a l e : dr aw n :
07-11-2016 1 : 200 @A1 JP
sh ee t n o :
AD03.04
rev is io n: proj ect no:16-0725
printe d:
© studio theta pty ltd
7/11/2016 12:08:46 PM
file:
AA
AG
C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt
B8
170°
2 AD04.01
AD05.01
AD
AE
1 2
AA
AB
AC
BB
AF
AG
BD
BE
BF
BG
BH
BI
BJ
AD04.02
BK
BL
BM
BN
BO
BP
BQ
1 2
BA
BC
1 AD06.01
BAL.1 HR.1
HR.1 W.1.3 8.B
WT.04
CW.02
WT.04
CP.01
CP.01
WT.04
BAL.1 HR.1 D.1.3 8.D
764
1.28 D.1.2 8.A CN-1
HR.1
1.23
D.1.0 5.A
CW.01
AA7 1.13 TF-2
W.1.10.A
D.1.1 1.A CP-2
D.1.1 0.A
W.1.1 3.D
A8
1.06 CP-1
WT.04
AA8
W.1.1 3.B
WT.04
W.1.9 2.D
WT.05
W.1.92.C
1.10 CP-1
WT.03
QUIET RM 1.09 CP-2
W.1.09.A
WT.05
WT.05
1.87 TF-2
QUIET RM 1.08 CP-2
W.1.08.A
WT.05
QUIET RM
1.86 TF-2
OFFICE 2
1.07 CP-2
1.91 TF-1
1.90 CP-1
1.88 CP-1
1.74 CP-2
WT.05
OFFICE
D.1.9 0.A
1.79 TF-1
FEMALE WC
WT.02
1.75 TL-1
D.1.7 5.B
CLNR 1.76
WT.05
1.89 CP-1
W.1.6 1.B
W.1.6 4.B D.1.6 2.A
1.65
STORE
WT.02
WT.05
1.66 TF-1
D.1.7 1.A
STAIR 6
WC
WT.05
1.71 CN-1 UP HR.1 HR.1
1.62 CN-1
5
MANUFACTURING OFFICE 2 1.60 CP-1
WT.01
OFFICE 1.63 CP-2
WT.03
W.1 .63 .A
WT.02
OFFICE 1.58
CP-2 WT.05
B7 EW.01
EW.01
OFFICE 1.59 CP-2
WT.04
D.1.5 9.A
D.1.6 3.A
WT.02
D.1.7 8.A
TL-1
UPSTAIR
HR.1
WT.02
WT.02
WT.02
RL 59.24
1.77 TL-1
WT.03
STORE
D.1.5 8.A
MANUFACTURING OFFICE 1
1.57
D.1.5 7.A WT.02
1.70
B6 WT.05
D.1.5 6.A
STORE
WT.07
WT.03
WT.03
WT.05
WT.05
LIFT 5
1.72 TF-2
ACC WCD.1.7 7.A
D.1.8 9.A
1.78
W.1 .60 .B
W.1.6 0.C
W.1 .59 .A
WT.04
B8
CP.01
WT.04
W.1 .84 .B
1 2 W.1.9 1.B
W.1 .84 .A
W.1 .79 .E
W.1 .79 .D
W.1.7 9.C
WT.02
WT.04
W.1 .72 .A
WT.02
W.1.6 6.B
WT.04
WT.04
CP.01
CP.01 CP.01
AE AF
AC
WT.03 WT.05
WT.02
1.56 CP-2
WT.03
D.1.6 8.A
D.1.6 5.A
SOUTHERN CORE
D.1.7 5.A D.1.7 6.A
D.1.7 8.B MALE
AB
WT.05
D.1.6 6.B
OFFICE
W.1 .60 .A WT.03
1.69
OFFICE 3
1.83 CP-1
CP.01
AA
D.1.7 9.B
1.61 TF-1
D.1.6 0.A D.1.6 1.A
LIFT 4
1.84 TF-1
AD04.03
1.68 CP-2
WT.03
BOARD ROOM W.1 .60 .D
MEETING
WT.03
W.1 .61 .A WT.03
WT.03
D.1.6 4.A WT.05
WT.02
OFFICE
CPT.01
1.64 CP-1
W.1 .66 .A
D.1.7 4.A
D.1.8 3.A
WT.05
MEETING
MANAGER OFFICE
CP-2 WT.05 D.1.6 6.A
WT.05
WT.03
WT.03
1.67
D.1.6 7.A
D.1.7 3.A
WT.03
W.1 .64 .A
MEETING
WT.05
BOARD ROOM
OFFICE
W.1.7 3.B 1.73 CP-2
D.1.8 0.A
WT.05
WT.03
MEETING
W.1 .79 .B
1.82 CP-1
WT.05
W.1.0 7.B
1.80 CP-1
WT.03
OFFICE
WT.03
W.1 .73 .A
WT.05
D.1.8 2.A
W.1.07.C
D.1.0 7.A
D.1.7 9.A
WT.03
WT.05
STORE
WT.05
AD
W.1.53.A
D.1.44.A D.1.8 6.A
WT.05
UTILITY
D.1.8 8.A D.1.0 8.A
W.1 .80 .B
MANAGER OFFICE
W.1 .79 .A
1.81 CP-1
D.1.8 1.A
WT.04
W.1.0 8.B
B5
BAL.1
WT.05
WT.03
OFFICE
1.85 CP-2
1.92
CP-1
1
D.1.0 9.A
D.1.4 2.B
W.1.39.C
RECEPTION
UNIT OFFICE
WT.04
AD09.02
W.1.0 9.B
D.1.42.A
W.1.38.E
WT.05
WT.05
WT.05
MEETING
WT.03
WT.03
W.1 .91 .A
1.11
AD09.02
W.1.13.C
WT.05
1 2
AG
AD04.05
D.1.3 5.B
D.1.8 4.A
MEETING
4
WT.04
1.35 TF-1
RL 59.24
BAL.1
W.1 .92 .A
OFFICE 1 WT.03
D.1.1 2.A 1.12 CP-2 WT.05
COLLABORATIVE OFFICE 4 WT.04
AIR LOCK
WT.05
MEETING
B4
VOID
WT.02
W.1.1 2.B
D.1.1 3.A
5 CP.01
D.1.0 6.A WT.05
1.14
WT.05
AD09.02
WT.04
STORE WT.05
BAL.1
W.1.58.A
A7
WT.05
D.1.3 5.A
RL 59.22
D.1.0 6.A
WT.03
BAL.1
VOID
W.1.5 9.B
3
1.16 D.1.1 6.A CP-2
VOID WT.05
BOARD ROOM
W.1.16.A
D.1.1 7.A
W.1.17.A
TL-1 WT.04
D.1.0 1.B
W.1.3 5.C
W.1.74.A
TF-1
LINK
W.1.92.E
WT.05
AD05.02
BAL.1
W.1.12.A
WT.05
1.17
AA6
D.1.1 5.A
W.1.11.A
KITCHEN
1.15
WT.07 BAL.1
2
W.1.80.A
RECEPTION
BAL.1
D.1.3 6.B
1
D.1.0 5.B
WT.03
W.1.0 1.D
WT.02
A6
W.1 .05 .B
ACCESS WC 1.18 TL-1
VOID
3
WT.03
WT.02
B3
RL 59.24
BAL.1
W.1.88.A
D.1.2 0.A
W.1.5 0.C
WT.03
UP
W.1.3 5.D
D.1.1 8.A
WT.03 W.1 .51 .B
1.05
CP-1 BAL.1
WT.02
COLLAB OFFICE 3
1.19
W.1.35.E
HR.1
1.20
W.1.90.A
WT.02
D.1.5 0.A
WT.05
AD05.02
W.1.9 2.B
1.21 CN-1
W.1.15.A
UP
WT.02
COMMS LIFT 1
1.36 CN-1
WT.05
W.1.05.C
STAIR 1
D.1.2 1.A
B2
BAL.1
HR.1
STAIR 7
1.04 CP-2
W.1.01.C
RL 59.24
WT.02
BAL.1
RP
WT.02
W.1.36.C
AA5
1.22 TF-2
1.51 TF-2
D.1.5 4.A
CATWALK
COLLAB OFFICE 2
W.1.0 4.B
WESTERN CORE
SPECIALIST EQUIP.
WT.05
W.1 .49 .B
WT.02
HR.1
W.1.0 5.D
W.1.22.A
A5
1.49 TF-2
WT.03
BAL.1
D.1.0 4.A
D.1.2 4.A D.1.2 3.A
WT.02
DIGITAL MODELLING WT.03
1.47
WT.05
D.1.5 5.A
WT.03
W.1.04.A
1.24
1 AD05.02
LIFT 3
W.1 .51 .A
D.1.5 1.A
1.55 TF-1
WT.08
CLNR
W.1 .48 .B
W.1 .49 .A
1.54 CN-1
W.1.05.A
STORE
D.1.4 9.A
D.1.4 8.B
WT.07
UP
STAIR 4
BA
AD04.04
BC
BB
BD
BE
BF
BG
BH
BI
BJ
BK
BL
BM
BN
BO
BP
BQ
2
C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt
WT.02
WT.02
1.46
WT.02
1.53 TF-2
WT.05
LIFT 2
WT.02
WT.05
SPEC. EQUIP
WT.05
D.1.4 5.A
RL 59.24
WT.05
W.1.04.C
D.1.2 6.B WT.02
D.1.3 9.B D.1.3 9.A
W.1.36.A
D.1.2 5.B
CP.01
UP
1.42
D.1.5 3.A
1.50 TF-2
B1
UP
1.03 CP-1
W.1.0 6.B
2 1
COLLAB OFFICE 1 D.1.0 3.A
HR.1
1.25
TL-1
EW.01
D.1.3 6.A
AA4
D.1.0 1.C
MALE WC
D.1.2 5.A
TL-1
RL 59.24
W.1.03.C
FEMALE WCD.1.2 6.A
W.1 .38 .D
EDUCATION WORKSHOP
1.43
CN-3
1.52 TF-2
D.1.5 2.A
EDUCATION SPACE 1.48 TF-1
NORTHERN CORE
D.1.4 1.A
STORED.G.4 1.B
W.1.89.A
WT.02
D.1.4 8.A
HR.1
D.1.3 7.B
W.1 .37 .E
BAL.1
W.1.91.C
D.1.2 7.A
1.26
file:
AD05.01
© studio theta pty ltd level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982
SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .
rev
issue
revision description
amd
date
CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 FIRST FLOOR GENERAL ARRANGEMENT PLAN
Preliminary
date: scale: drawn:
07-11-2016 1 : 200 @A1 JP
sheet no:
AD03.05
revis ion: project no:
16-0725
printed: 7/11/2016 12:08:55 PM
AD04.05
WT.03
W.1 .03 .A
EW.01
HR.1
W.1.3 6.B
TL-2
A4
WT.03
VOID
WT.05
W.1.0 3.B
1.27
HR.1
1.37 TF-1
WT.04
KITCHEN
EW.01
WT.02
STORE
WT.05
WT.02
FEMALE WC
AIR LOCK
RL 59.22
W.1.07.A
UP
W.1.0 3.D
WT.02
WT.01
EW.01
W.1.3 7.D
RL 59.24
STAIR 2
D.1.3 7.A
LINK
W.1.0 1.B
WT.05
WT.02
1.01 TF-1
1.41
WT.02
WT.03
D.1.0 1.A
PUBLIC LOUNGE W.1.27.A
1.29 TF-1
WT.03 WT.04 BAL.1
W.1.37.A
WT.05
WT.05
UTILITY
WT.04
W.1.3 7.B
AA3
A3
WT.02
ACCESS WC
1.39
TF-2
W.1.37.C
W.1.3 0.B
D.1.3 1.A
EW.01
WT.05
1.45 CN-1
1.44
AD06.01
COMMUNAL KITCHEN
W.1.0 2.B
WT.04
MALE WC
WT.05
1.02
W.1.01.A
1.31 CP-1
WT.03
2
TF-3 D.1.0 2.A RL 59.22
1.30 TF-1
W.1.31.A
MEETING
BALCONY
COLLABORATIVE OFFICE 5
D.1.3 2.A
D.1.4 3.A
WT.01
STAIR 3
1.38 TF-2
AD06.01
W.1.3 5.B
1.32
CP-1 WT.05
RL 59.22
EW.01
DINING ROOM
2
CW.02 BAL.1
W.1.32.A
D.1.3 3.A
MEETING
AA2
W.1.35.A
1.33 CP-1 WT.05
W.1.02.A
WT.03
W.1.30.A
QUIET RM
CW.02
D.1.3 4.A
W.1.30.C
W.1.33.A
WT.05
EW.01
WT.04
CW.02 W.1.3 4.B
1.34 CP-1
CP.01 WT.04
1.40 TF-3
D.1.4 4.B
W.1.34.A
BOARD ROOM
WT.04
BALCONY W.1.38.C
VOID
WT.03
A2
VOID
D.1.3 8.C
CW.02 CW.02
CW.02
WT.04
BAL.1
AA1
1 AD06.01
CW.02
D.1.3 8.B
W.1.38.A
A1
D.1.3 8.A
AD AB
AE
AC
BB
AF
AG
BA
BD
BE
BF
BG
BH
BI
BJ
BK
BL
BM
BN
BO
BP
BQ
BC
3989
CL
200
AA
840
9 0°
8241
4110
4027
879
8 0°
10000
970
CL
9 0°
VOID
AA1
2300 100 500
2400
700
6894
6000 200
6785
A1
11366
10°
8 0°
CL
CL
6000
5700
4300
1245
2000
1245
3509
CL
CL 2200
9030 3131
1300
5600 3700 1225 409 1216 475 1450
4581
4596
5226
4490
90
2693
5000
4490
120500
2400
3420
2956 5754 C
4192
L
4564
3736
5508
120500
2400
1030
CL
2680 5580
3120
2700
1030
2850
476 1000
2216
7606
20746
474
1581
CL
2124
5015
B3
1000
CL
°
CL
1956
1178
2450
B2
8526
CL 1044
CL
CL
700 1225 621
VOID
VOID
B4
CL
AA5
CL
2000
9004
1796
VOID 4080
18060
1956
2341
5280
A5
2251
1044 1000
1200 120 1200 120 1200
14920
CL
CL
CL
2000
5146
3328
CL
1163
1 5930
1 00
251
1638
2803
64
2000
3000 200
676
CL
1810
520 1000
5000 7673
2740
CL
1500 1000154
AA4 660
1225
CL 1497
CL 1535
6792
3225 805
4000
3020
RP
1000
264 1000
VOID
5196
4390
15500
A4
B1
1285 10276
5855
270
1475
2780
AA3
10705
2346
AD04.05
3489
CL 5665 12000
100
2855
CL
A3
5258
9065
1686
CL
14090
1708
3145
12145
12250
CL
800230 1100
11 0°
CL
CL
12844
CL
6000
CL
3000
3393
CL
CL
°
AA2
4945 9200
1 00
A2
3335
3866
22197
1114
CL
6000
CL
9115
7996
CL
5861
CL
6367
1 00 1000 880
CL CL
3219
6336 2000
5535
4274
6126
5920
705120
6745
5015 2470
4471 3001
2211
2170
2415
1000 850 1000
3465
4430
1450
CL
CL
3120
2580
300 5109
5700
B7
11949
CL 135
CL
CL
6000
5109
5181
4535
1916
3420
3280
1669
3615
B6
5970
3760
CL
3495
254 1000 415
1669
6610 5754 13816
CL
6926
120
7060
2400 100 3495
2105 8895
2072 2415
6000
3093
3063 3814
6000
CL
120
3352 3511
CL
2956
5400 5155
CL
600
5400
600
5400
600
5400
439
6191
B8
4495
CL
1 2
3533
80 °
170°
7000
AD04.03
6000
13781
11285
AC
CL
17454
5754
4201
CL
4815
3421
12491
2
AG
BA
AD04.04
BC
BB
BD
BE
BF
BG
BH
BI
BJ
BK
BL
BM
BN
BO
BP
BQ
© studio theta pty ltd level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982
SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .
rev
issue
revision description
amd
date
CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 FIRST FLOOR DIMENSIONS
Preliminary
date: scale: drawn:
07-11-2016 1 : 200 @A1 JD
sheet no:
AD03.06
revis ion: project no:
16-0725
printed: 7/11/2016 12:09:02 PM
file:
AB
CL
AE AF
AA
6000
1137
CL
AD
6000
10000 C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt
6039
CL
4056
CL
4592
4472 120
710122 1641
7773
2400
3630
9004
3341
00 °
5920
7926
6000
1
4592
2400
CL 3409
CL
3397
10465
1995
120 4588 120
601
3525
120
6432
2400
3449
4498
1479
2068
120 675
4468
1500 5939
2510
3401
2420
2075 2120
2400
4919
675
13539
9549
CL
4891
AA8
1080 90
6000
5900
344
4506
1919
CL 5080 3335
15234
1512
AA7
A7
4095
6116
CL 4555
3000
12165
A8
B5
CL
5465
4555
CL
500
VOID
1577
3966
4546
CL
6000
5598
4186
2000
3231 3680
3391
AA6
CL CL
700
6655
90
1956
2385 1218
1500 2175
2606
2627
CL
1204
2529
1420
6220
CL
5394
8 0°
1200
°
A6
9 0°
AD AA
AB
AE
AC
BB
AF
AG
BA
BD
BE
BF
BG
BH
BI
BJ
BK
BL
BM
BN
BO
BP
BQ
BC
VOID
AA1
A1
BALCONY 1.40
VOID
BOARD ROOM
STORE
1.45
1.38
AA2
A2
B1
STAIR 3
DINING ROOM
1.34
1.52
MALE WC 1.44
QUIET RM 1.33
EDUCATION SPACE
BALCONY COMMUNAL KITCHEN
1.50
SPEC. EQUIP
ACCESS WC
1.39
1.32
EDUCATION WORKSHOP
1.48
1.02
MEETING
1.41
1.53
NORTHERN CORE
COLLABORATIVE OFFICE 5
STAIR 4
1.43
1.30
MEETING
FEMALE WC
1.31
RP
DIGITAL MODELLING
AA3
1.49
LIFT 3
SPECIALIST EQUIP. 1.51
1.47
PUBLIC LOUNGE
UTILITY
B2
1.46
1.42
A3
1.54
LIFT 2
1.01
1.29
LINK
AIR LOCK 1.37
STAIR 2 1.28
KITCHEN
VOID
1.27
A4
FEMALE WC
AA4
MALE WC
1.26
B3 COLLAB OFFICE 1 1.03
1.25
STORE 1.24
CLNR 1.23
COLLAB OFFICE 2
WESTERN CORE
A5
VOID
B4
VOID
COLLAB OFFICE 3 1.05
COMMS LIFT 1
1.21
1.55
1.36
AA5
1.22
STAIR 1
CATWALK
VOID
STAIR 7
VOID
1.04
1.20
1.19
B5
ACCESS WC 1.18
LINK
AA6
A6
AIR LOCK 1.35
RECEPTION 1.15
KITCHEN
VOID
1.17
BOARD ROOM 1.16
RECEPTION
UNIT OFFICE
STORE
MANAGER OFFICE
OFFICE
1.85
1.92
MEETING
MEETING
1.80
1.81
1.67
1.73
MANAGER OFFICE
BOARD ROOM
1.64
1.61
OFFICE 1.56
1.14
1.06
UTILITY
1.12
1.87
STORE
B6
MEETING
1.74
OFFICE 1
MEETING
AA7
A7
MEETING
1.68
OFFICE
1.86
1.82
STORE
STORE COLLABORATIVE OFFICE 4 1.13
LIFT 4
1.11
1.69
BOARD ROOM
OFFICE
1.88
FEMALE WC
1.79
1.75
SOUTHERN CORE 1.72
QUIET RM 1.09
QUIET RM 1.08
OFFICE 2 1.91
AA8
OFFICE 1.90
STAIR 5
1.66
OFFICE
MANUFACTURING OFFICE 2
1.62
1.58
1.60
1.70
STAIR 6
1.76
OFFICE
MANUFACTURING OFFICE 1
LIFT 5
B7
CLNR
QUIET RM 1.07
A8
OFFICE 3
1.83
MEETING 1.10
1.57
1.65
MEETING
1.71
1.89
OFFICE
ACC WC
OFFICE
1.63
1.77
1.59
STORE 1.84
MALE WC 1.78
AD
AE AF
AB
AC
BA
BC
BB
BD
BE
BF
BG
BH
BI
BJ
BK
BL
BM
BN
BO
BP
BQ
© studio theta pty ltd level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982
SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .
rev
issue
revision description
amd
date
CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 FIRST FLOOR FURNISHED PLAN
Preliminary
date: scale: drawn:
07-11-2016 1 : 200 @A1 JP
sheet no:
AD03.07
revis ion: project no:
16-0725
printed: 7/11/2016 12:09:18 PM
file:
AA
AG
C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt
B8
AD04.01
AD
AE
1 2
AA
AB
AC
BB
AF
BD
BE
BF
BG
BH
BI
AD04.02
2
AG
AD05.01
BA
BJ
BK
BL
BM
BN
BO
BP
BQ
1 2
BC
1 AD06.01
CW.01
CW.01 CP.01
CW.01
CP.01
AA1
A1
CW.02
CW.01 CP.01
WT.03
CW.01
VOID
CW.01
D.G.5 2.EEE
CW.02
2
AA2
A2
WT.03
Perimeter curtain wall s extend to ca nopy underside, refer to window schedule for deta ils
B1
WT.03 HR.1
AD06.01 WT.03
WT.04 CW.02
PLANT ROOM B
WT.03
STAIR 3
2.04 RF.01
2.03
FIRST FLOOR ROOF BELOW
CW.01
FIRST FLOOR ROOF BELOW
RL 62.84 UP WT.03
B2
FIRST FLOOR ROOF BELOW
AA3
A3
WT.03
LIFT OVER RUN CW.01
WT.07
WT.03
WT.03
WT.03 WT.03
CP.01
WT.02
B3
WT.04
AA4
A4 WT.05
AD04.05
2 1
VOID WT.05
WT.05
FIRST FLOOR ROOF BELOW
PLANT ROOM A
B4 VOID
2 AD05.02
AA5
A5
WT.07
VOID
STAIR 7 BELOW
2.02 RF.01
RL 62.84 CP.01
WT.02 D.G.52.DDD
STAIR 1 UP
3
WT.02
AD04.05
2.01
WT.05
LIFT OVER RUN
1
HR.1
A6
B5
AD05.02 WT.05
WT.02
AA6
WT.03
WT.03
WT.03
WT.03
WT.07
B6
WT.04
AA7
A7
WT.03 WT.02
PLANT ROOM C AD09.02
D.G.52.UU
2.06 RF.01
FIRST FLOOR ROOF BELOW LIFT OVER RUN
FIRST FLOOR ROOF BELOW 4
RL 62.84 WT.02
CW.01
CW.01
WT.02
UP 6 STAIR 2.05
FIRST FLOOR ROOF BELOW HR.1
B7 WT.03
A8
AA8
CW.01
CW.01
CW.01 CW.01
Perimeter curtain wall s extend to ca nopy underside, refer to window schedule for deta ils
WT.03
Perimeter curtain wall s extend to ca nopy underside, refer to window schedule for deta ils
CW.01 WT.03
CP.01 WT.03
CW.01
AD04.03
AD
AB
AC
CP.01
CP.01
AE
CP.01
AF
AA
B8
WT.03
CW.01
Perimeter curtain wall s extend to ca nopy underside, refer to window schedule for deta ils
1 2
AG
BA
AD04.04
BC
BB
BD
BE
BF
BG
BH
BI
BJ
BK
BL
BM
BN
BO
BP
BQ
2
© studio theta pty ltd level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982
SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .
rev
issue
revision description
amd
date
CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 SECOND FLOOR GENERAL ARRANGEMENT FLOOR PLAN
Preliminary
date: scale: drawn:
07-11-2016 1 : 200 @A1 JP
sheet no:
AD03.08
revis ion: project no:
16-0725
printed: 7/11/2016 12:09:22 PM
file:
AD05.01
C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt
1 2
AD AA
AB
AE
AC
BB
AF
AG
BA
BD
BE
BF
BG
BH
BI
BJ
BK
BL
BM
BN
BO
BP
BQ
BC
AA1
A1
11556
4523
10°
1923
1506
CL 1 00
CL
CL
CL
CL
CL
°
AA2 6560
A2
B1
6000
CL
13506
13446
10776
CL
1490
B2
18000
CL
AA3
A3
CL
6004
CL
12000
4315
7780
5000
A5
7780
CL CL
CL
CL
6500
2175
1500
3419
B4
AA5
18000
800 1090
18000
90
B3
AA4
CL
A4
54000
CL
CL
CL
4494
3365
AA6
3512
6548
5296
B5
46
CL
2420
4509
CL
2644
CL
A6
CL
2545
1075
6175
18000
B6
AA7
3302
CL
B8
15420 300
AD
CL 94
AE AF
AB
AC
300 300
5400
CL
300
CL
11700
CL
11700
AG
35860
BA
BC
BB
BD
BE
BF
BG
BH
BI
BJ
BK
BL
BM
CL
BN
BO
CL
BP
BQ
© studio theta pty ltd level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982
SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .
rev
issue
revision description
amd
date
CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 SECOND FLOOR DIMENSIONS
Preliminary
date: scale: drawn:
07-11-2016 1 : 200 @A1 JD
sheet no:
AD03.09
revis ion: project no:
16-0725
printed: 7/11/2016 12:09:25 PM
file:
AA
5400
CL
C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt
3874
4970
5136
AA8
A8
B7
CL
CL
300
CL
4886
6084
22797
A7
TC.01
TC.01
TC.01 TC.01 TC.01
TC.01 TC.01
TC.01
TC.01
TC.01
TC.01
TC.01
TC.01
TC.01 TC.01 TC.01 TC.01
LINK BELOW
TC.01
TC.01
TC.01
TC.01
TC.01
GT.02 TC.01
TC.01 TC.01
TC.01
TC.01 TC.01 TC.01
TC.01
TC.01
TC.01
TC.01 TC.01
TC.01 GT.02
TC.01
LINK BELOW TC.01 TC.01
TC.01 TC.01
TC.01 TC.01
TC.01
TC.01
TC.01 TC.01
TC.01
TC.01
TC.01
TC.01
TC.01
TC.01
TC.01
TC.01
TC.01
TC.01 TC.01
© studio theta pty ltd level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982
SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .
rev
issue
revision description
amd
date
CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 GENERAL ARRANGEMENT ROOF PLAN
Preliminary
date: scale: drawn:
07-11-2016 1 : 200 @A1 JD
sheet no:
AD03.10
revis ion: project no:
16-0725
printed: 7/11/2016 12:09:26 PM
file:
C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt
TC.01
AD AA
AB
AE
AC
BB
AF
AG
BA
FIRST FLOOR WALKWAY BELOW
BD
BE
BF
BG
BH
BI
BJ
BK
BL
BM
BN
BO
BP
BQ
BC
DP.01 CA(S)
DP.01 CA(S)
BG.01
10.5°
AF.01
BG .02
BG.01
DP.01
5.00°
RC.01
RC.01
RC.01
10.5° DP.01
13.00°
9.00°
9.00°
5.00° BG.01
RC.01
DP.01
10.5°
AA2
DP.01
B1
DP.01
BG.02
A2
CA(S)
DP.01
9. 00°
AA1
A1
9.00°
BG.02 RC.01
AF.01
RC.01
9.00°
5.00°
B2 10.5° 9.00°
3013
AA3
10.5° 9.00°
5.00°
RC.01
9.00°
BG.01
A3
RC.01
9.00 °
DP.01
RC.01
0° 9.0
5.00°
10.5°
BG .02
9.00°
RC.01 RC.01
CA(S)
9.00°
DP.01 DP.01
AA4
A4
DP.01
B3
DP.01
BG.02
5.00°
BG.02
BG.02
DP.01
CA(S)
0° 9.0
10.5°
10.5°
AF.01 CA(S)
RC.01
CA(S)
RC.01
10.5°
RC.01
BG .0 2
RC.01
9.00°
9.00°
CA(S)
9.00° BG.01
10.5° RC.01
CA(S)
DP.01 BG.02
5.00°
DP.01
9.00°
DP.01
BG.02
AA6
DP.01
BG.02
10.5°
0° 9.0
BG .02
BG .0 2
5.00°
RC.01
RC.01
10.5°
9.00°
9.00° 5.00°
10.5
10.5°
BG.01
RC.01 RC.01
9.00°
B6
RC.01
9.00°
AA7
DP.01
RC.01
RC.01
5.00°
9.00 °
10.5°
6
AF.01
DP.01
AF.01
A7
B5
DP.01
BG.01
A6
B4
RC.01
5.00° BG.01
9.00°
AA5
A5
BG .02
RC.01
BG.01
5.00°
BG.01
9.00°
9.00 °
DP.01
DP.01
9.00°
DP.01
B7
BG.02
BG.02
AA8
A8
BG.02
DP.01
4.00°
10.5°
RC.01
9. 00°
RC.01
AF.01
4.00°
BG.0 2
BG.01
5.00°
DP.01
5.00° 10.5°
DP.01
CA(S)
DP.01
BG.01
9.00°
B8
CA(S)
BG.01
AE
DP.01
AF
AA
AB
CA(S)
AG
AC
BA
BC
BB
BD
BE
BF
BG
BH
BI
BJ
BK
BL
BM
BN
BO
BP
© studio theta pty ltd level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982
SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .
RTx
Roof Type 1,...3 as spec. Refer to Roof Schedule bel ow.
Folded parapet capping a s spec.
BG1 BG2 EJ GS RWH OF DP1-3 CA(A) CA(S)
Box Gutter Type 1: 6 00W x 1 50D as spec. to AS 3 500 Box Gutter Type 2: 4 50W x 2 00D as spec. to AS 3 500 Expa nsion Joint to ma tch gutter Gutter Sump to ma tch gutter to AS 3500 Rainwater head as spec. Overfl ow to AS 3 500 (circul ar-soffit a nd rectangularfacade) Downpipe Type 1,...3 as spec. to AS 3 500 Capping (Al uminium to cladding) a s spec. Capping ( Steel to match gutter) a s spec.
CU.123 Condenser Unit to Mechanical engineer's drawings EC.1,..2 Evaporative Unit to Mecha nica l engineer's drawings EF.1,..2 Exha ust Cowl Unit to Mecha nical engineer's drawings SF.1,..2 Supply Air Cowl Unit to Mechanical engineer's drawings
rev
issue
revision description
amd
date
CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 ROOF PLAN
Preliminary
date:
07-11-2016
scale:
As indicated @A1 revis ion:
drawn:
JD
sheet no:
project no:
AD03.11 16-0725
printed: 7/11/2016 12:09:30 PM
file:
SECOND FLOOR ROOF BELOW
BQ
C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt
DP.01
AD
AD AA
AB
AC
AE 6000
BB
AF
AG
9000
6000
6000
BA
6000
BD
6000
BE
6000
BF
BG
6000
6000
BH
6000
BI
BJ
6000
6000
BK
6000
BL
6000
BM
6000
BN
6000
BO
6000
BP
6000
BQ
6000
BC
6004 6000
SETOUT
AA1
A1
SETOUT 9000
SETOUT
B1 AA2
9000
9000
A2
B2 AA3
9000
9000
A3
B3 AA4
9000
9000
A4
B4 AA5
9000
9000
A5
B5 AA6
9000
9000
A6
B6 AA7
9000
9000
A7
B7 AA8
A8
AD
AE AF
AB
AC
BA
BC
BB
BD
BE
BF
BG
BH
BI
BJ
BK
BL
BM
BN
BO
BP
BQ
level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982
SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .
rev
issue
revision description
amd
date
CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 ROOF FRAMING PLAN
Preliminary
dat e: sc a l e : dr aw n :
07-11-2016 1 : 200 @A1 Author
sh ee t n o :
AD03.12
rev is io n: proj ect no:16-0725
printe d:
© studio theta pty ltd
7/11/2016 12:09:31 PM
file:
AA
AG
C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt
B8
AD AA
AB
AE
AC
BB
AF
BD
BE
BF
BG
BH
BI
BJ
BK
BL
BM
BN
BO
BP
BQ
2
AG
AD05.01
BA
BC
TC. 01 5400 TC. 01 6000
AA1
A1
VOID CANOPY BEYOND
S C. 01 5400
TC. 01 6000
BH
VOID CANOPY BEYOND
VOID CANOPY BEYOND
BH
M WC
AA2
A2
G.35
PB . 03 4800
AD06.01
RECEPTION BH
PB . 03 5600
5400
G.03
G.40
BH
S C. 01 5400
KITCHEN LT .06
LT .06
G.05
G.04
PB . 03 5000
NC
PB . 01 5400
PB . 01 3600
S C. 01 5400
G.47
S C. 01 5600
G.43
PB . 02 3200
STAIR 2
TC. 01 6000
LT .07
LT.06
LT.06
LT.06
STORAGE G.50
TC. 01 5400
PB . 01 5600
LT.06
LT.06
LT.06
LT.06
STAFF ROOM
LT.06
LT.06
LT.06
LT.06
LT.06
LT.06
LT.06
LT.06
LT.06
LT.06
LT.06
LT.06
LT.06
G.49
LT.06
LT.06
LT.06
LT.06
LT.06
LT.06
LT.06
LT.06
AT . 01 4800
B2
BH
BH
TC. 01 6000
LT .07
LT .06
LT .06
LT .06
LT.06
G.07
AT . 01 3600
S C. 01 5400
LT .06
VOID
PB . 01 2700
Refer deta iled stair drawings for detail s of cladding to u/side of stair
LT.06
TC. 01 5400
LT .07
KITCHEN
G.29
LT.06
LT.06
G.46
G.33
AT . 02 5600
LT .07
LT.06
LIFT 3
LT .07
LT .07
TC. 01 6500
LT.06
G.45
AIR LOCK
BH
BH
LIFT 2
G.42
LT.06
BH
S C. 01 5400
F WC
PB . 03 5400
G.51
BH
NORTHERN CORE
B1
STAIR 4
G.48
PB . 01 3600
ADMIN
LT.06
G.37
LT .06
LT .06
PB . 02 3200
STORE
CAFE
BH
AT . 01 3600
AA3
A3 PB . 01 3200
ACC WC
5400
G.30
G.44
PB . 02 3200
S C. 01 5600
BH
G.02 PB . 01
SECURITY PB . 01
GALLERY
G.38
LOCKERS
STAIR 3
G.39
MATERIALS + HARDWARE
PRODUCT SHOP
2
TC. 01 6000
NC
B3
RESTAURANT G.06
AA4
MALE WC
PB . 02 3600
G.26
COLD ROOM G.11
LT .06
AT . 01 3600
LT .06
G.10
G.28
timber beams exposed throughout
LT .06
G.27
KITCHEN
PB . 02 3600
G.01
CLNR
LT .06
PUBLIC ATRIUM STORE
G.08
PB . 03 5400
PB . 02 3200
PB . 02 3200
COLD ROOM
LT .06
G.25
LT .06
FEMALE WC
LT .06
A4
WESTERN CORE G.24
AA5
VOID CANOPY BEYOND
B4
VOID CANOPY BEYOND
2
AD05.02
S C. 01 5000 BH
A5
G.52
TC. 01 6000
VOID CANOPY BEYOND
2
S C. 01 5400
MANUFACTURING
VOID CANOPY BEYOND
AD05.02
CAFE G.09
STAIR 1
COMMS LIFT 1
G.20
G.22
PB . 01 3600
G.23
TC. 01 5400
B5
WC ACCESS G.21
PB . 02 3200
BOOSTER G.19A
NC
FIRE PUMP ROOM
MSB
NC
NC
G.19
AA6
AIR LOCK
TC. 01 6000
LT .07 LT .07 LT .07
TC. 01 5400
LT .07 LT .07
G.18
G.31
AT . 02 3000
TC. 01 5400
LT .07
VOID
LT .07
TC. 01 5400
LT .06
LT .06
LT.06 LT.06 LT.06 LT.06 LT.06 LT.06
LT.06
LT.06 LT.06
LT.06
TC. 01 5600
AT . 01 4800 LT.06
LT.06 LT.06
LT.06
BH
LT.06
LT.06 LT.06 LT.06 LT.06
LT.06 LT.06 LT.06
LT.06
LT.06
LT.06
LT.06
LT.06 LT.06
LT.06 LT.06
G.71
AT . 01 4800
LT.06
LT.06
PROTOTYPE SHARE
LT.06
LT .06 LT .06
S C. 01 5400
NC
G.66
LT .06
LT .06
PROTOTYPE 2 S C. 01 5400
S C. 01 5400
ACC WC G.63
PB . 02 3200
BH
S C. 01 5400
LIFT 6 G.58
PB . 02 3200
PB . 02 4800
CONTROL ROOM
G.55
G.61
G.70
PB . 02 4800
ADMIN
F WC
SPECIALIST EQUIPMENT
G.73
LT .06
LT .06 LT .06
LT .06
LT .06
LT .06
VOID CANOPY BEYOND
SPRAY ROOM 1
LT .06
LT .06
AA8
A8
G.57
G.65
PB . 02 4800
LT.06
LT .06
AT . 01 5600
G.72
LIFT 4
SPRAY ROOM 2
G.67
LT.06
BH
G.68
LT.06
PROTOTYPE 1
BH
G.69
LT.06
LT .06
LT .06
LT .06
BH
WELD BTH WELD BTH WELD BTH
LT .06
LT .06
G.12
LT .06
G.14
RETAIL 2
LT .06
PB . 03 5600
LT .06
RETAIL 1
LT .06
S C. 01 5400 PB . 03 5600
S C. 01 5400
LT.06
AA7
TC. 01 5600
LT .06
A7
S C. 01 5400
LT .06
PB . 01 3600
LT .06
PB . 01 3600
G.16
NC
B6
G.13
STORE
G.17
LT .06
TRANSFORMER ROOM
TC. 01 6000
STORE
PB . 03 4800
G.53
STAIR 5 G.54
NC
B7 SOUTHERN CORE G.60
STAIR 6 G.59
S C. 01 5400
TC. 01 6000
STORAGE G.56
PB . 02 3200
PB . 01 5600
VOID CANOPY BEYOND
M WC G.64
B8
PB . 01 5600
VOID CANOPY BEYOND
AD
AE AF
AA
AB
AG
BA
AC
BC
BB
BD
BE
BF
BG
BH
BI
BJ
BK
BL
BM
BN
BO
BP
BQ
2
C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt
A6
LT .07
TC. 01 6500
level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982
SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .
NOTES:
LT.02 - Supernova PR Down-Up P enda nt Light 650 mm Round
LT.07 - Thorn Chamel eon T5 Ceiling diffuser 1200 x300mm
LT.04 - Delta light Spy on ADL track light 62mm Round LT.06 - Thorn Chameleon T5 Ceil ing diffuser 1200x600mm
P
LT.03 - Supernova PR Down-Up P enda nt Light 650 mm Round
Refer to electrical services drawings for detail of installation of lights
LT.0 5 - Deltalight Gala LED WW W Wall light 1 48x7 0mm
LT.01 - LED Downl igh, Deltalight Grand Reo 827 20 S1 W-B 18w 102 mm Round
Contractor to note tha t no cornice required to wall where fea ture wall lining/panel s exist. Allow for 10mm sha dowl ine. Refer services drawings for details of service points
rev
issue
revision description
amd
date
CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042
Confirm setout of al l fittings and fixtures on site with Architect prior to instal lation.
GROUND FLOOR REFLECTED CEILING PLAN
Extent and number of AP's, l oca tions a nd sizes to be coordinated with services engineer's drawings. Refer to architectural specification for numbers to be allowed.
Preliminary
dat e:
07-11-2016
sc a l e :
As indicated @A1 rev is io n:
dr aw n :
JP
sh ee t n o :
AD03.13
proj ect no:16-0725
printe d:
REFLECTED CEILING LEGEND © studio theta pty ltd
7/11/2016 12:09:38 PM
file:
AD05.01
AD AA
AB
AE
AC
BB
AF
BE
BF
BG
BH
BI
BJ
BK
BL
BM
BN
BO
BP
BQ
AD05.01
BA
BC
TC. 01 3600
AA1
A1
BD
2
AG
BH
VOID CANOPY BEYOND
LT.06
LT.06
LT.06
LT.06
LT.06
LT.06
LT.06
LT.06
LT.06
LT.06
LT.06
LT.06
LT.06
LT.06
LT.06
LT.06
DINING ROOM 1.38
BH
BH
PB . 03 3600
AT . 01 2700
LT.06
LT.06
LT.06
LT.06
LT.06
LT.06
LT.06
LT.06
S C. 01 2400
AT . 01 2400
VOID CANOPY BEYOND
AT . 01 2400
B1
BOARD ROOM 1.34
TC. 01 3600
A2
AA2
AD06.01
1.33
LT.06
LT.06
LT.06
LT.06
LT.06
LT.06
LT.06
LT.06
LT.06
LT.06
LT.06
LT.06
LT.06
S C. 01 3000
S C. 01 RAK ING
S C. 01 3000
S C. 01 RAK ING
1.39
A3
LT.06 LT.06
LT.06
UTILITY
AA3
LT .07 LT .07 LT .07 LT .07
1.28
LT.06
STORE 1.52
LT.06
LT.06
1.41
PB . 02 3200
NORTHERN CORE PB . 01 3200
LT.06
LT.06
LT.06
LT.06
LT.06
LT.06
LT.06
LT.06
BH
STAIR 4 1.54
LT.06
LT.06
1.43
LT.06
LT.06
LT.06
EDUCATION WORKSHOP
SPEC. EQUIP
PB . 01 2700
PB . 01 2700
1.50
LT.06
LT.06
LT.06
BH
PB . 02 3200
1.53
PB . 01 2700
B2
LIFT 2 1.46
FEMALE WC
DIGITAL MODELLING
1.42
1.49
SPECIALIST EQUIP.
PB . 01 2700
1.51
PB . 01 2700
1.47
1.37
PB . 01 2700
PB . 01 3200
B3
FEMALE WC
COLLAB OFFICE 1 1.03
S C. 01 3600
AA4
MALE WC
1.26
TC. 01 3600
1.25
PB . 02 3200
VOID CANOPY BEYOND
PB . 02 3200
STORE 1.24
PB . 01 3200
1
LT.06
LT.06
LIFT 3
AT . 02 3600
LT.06
1.27
PB . 01 3200
AD05.02
LT .07 LT .07 LT .07 LT .07
LT.06
AT . 01 2400
AIR LOCK
KITCHEN
PB . 01 3200
A4
LT .07 LT .07 LT .07
TC. 01 3600
STAIR 2
LT.06
1.48
LT .07 LT .07 LT .07 LT .07
TC. 01 3600
1.29
LT.06
PB . 01 2700
EDUCATION SPACE
BH
BH
1.45
ACCESS WC
1.31
AT . 01 3200
STAIR 3
1.44
COMMUNAL KITCHEN
LT.06
BH
S C. 01 3200
MEETING
MALE WC
LT.06
BH
PB . 02 3200
1.30
1.32
S C. 01 RAK ING
BH
TC. 01 3200
COLLABORATIVE OFFICE 5
S C. 01 3000
LT.06
1.02
LT.06
LT.06
LT.06
BALCONY
MEETING AT . 01 3200
LT.06
2
QUIET RM LT.06
AT . 01 3200
VOID CANOPY BEYOND
CLNR
1.36
1.04
S C. 01 3600
TC. 01 3600
1.22
B4
VOID CANOPY BEYOND
2
AD05.02
AA5
S C. 01 3000
VOID GLAZED ROOF
VOID CANOPY BEYOND
2
WESTERN CORE
A5
STAIR 7
COLLAB OFFICE 2
1.23
AD05.02
COLLAB OFFICE 3 1.05
STAIR 1
COMMS LIFT 1
1.21
1.20
TC. 01 3600
1.19
TC. 01 3600
PB . 01 3200
1
ACCESS WC
AD05.02
1.18
PB . 02 3200
AA6
RECEPTION
LT.07 LT.07 LT.07
VOID CANOPY BEYOND
AT . 01 3200
AT . 01 3200
LT .06
LT .06
AT . 01 3200
OFFICE 2
OFFICE
OFFICE
S C. 01 3200
PB . 03 2700
PB . 03 2700
1.91
AT . 01 3200
1.90
BH
LT.06
LT.06 LT.06
LT.06
LT.06
1.89
PB . 03 2700
LT.06
LT.06 LT.06
LT.07
MEETING
MEETING
AT . 02 2700
AT . 02 2700
LT.07 LT.07 LT.07
LT.07
LT.07
BH
LIFT 4
MANUFACTURING OFFICE 1
STORE
PB . 03 2400
PB . 01 2400
1.66
ACC WC 1.77
1.84
S C. 01 3200
PB . 02 3200
S C. 01 2700
LT.06
LT.06
STAIR 6
LT.06
S C. 01 2700
1.71
1.78
1.58
LT.06
LT.06
LT.06
LT.06
LT.06
AT . 01 2700
LT.06
B7
OFFICE LT.06 1.63
AT . 01 2700
LT.06
LT.06
LT.06
LT.06
LT.06
OFFICE LT.06
LT.06
1.59
LT.06
S C. 01 3200
LT.06
PB . 01 3600
MALE WC
LT.06
OFFICE
BH
LT.06
PB . 01 3200
PB . 02 3200
BH
LT.06
PB . 03 2400
BH
1.75
STORE
1.60
STAIR 5 1.62
1.70
PB . 01 2400
1.57
MANUFACTURING OFFICE 2
LIFT 5
FEMALE WC
BH
B6
STORE
BH
1.65
1.69
PB . 02 3200
PB . 03 2400
1.56
S C. 01 2700
TC. 01 2700
LT.07
1.72
OFFICE
S C. 01 2700
S C. 01 2700
TC. 01 2700
1.68 LT.07
1.79
1.61
1.64
LT.07
SOUTHERN CORE
BH
BOARD ROOM
MANAGER OFFICE
LT.07
LT.07
1.74
OFFICE 3
AT . 01 2400
QUIET RM
AA8
A8
LT.06
PB . 03 2700 1.07
LT.07
1.83
LT .06
LT .06
LT .06
1.08
LT.07
OFFICE
1.88
QUIET RM
1.67
AT . 02 2700
1.73
LT.07
TC. 01 2700
AT . 01 2400
BOARD ROOM
LT .06
1.09
LT .06
LT .06
QUIET RM LT .06
LT .06
LT .06
S C. 01 3200
LT .06
1.10
LT .06
S C. 01 RAK ING
AT . 01 3200
LT .06
MEETING
PB . 03 2700
LT.06
PB . 03 2700
PB . 03 3200
LT .06
1.11
LT .06
S C. 01 3200
MEETING LT .06
BH
LT .06
1.13
MEETING
AT . 02 2700
LT.07
LT.07
LT.07
MEETING
LT.07
1.82
1.86
LT.06
BH
COLLABORATIVE OFFICE 4 S C. 01 RAK ING
LT.07
OFFICE
STORE
1.87
1.06
LT.06
AA7
UTILITY
OFFICE 1
AT . 01 3200
LT.06
1.12
LT.07
1.80
S C. 01 2700
AT . 01 2400
MEETING PB . 03 3000
LT.06
TC. 01 3200
LT.06
S C. 01 3200
S C. 01 3600
LT.06
S C. 01 RAK ING
1.92
BH
LT.06
A7
1.14
MANAGER OFFICE
1.81
1.85
PB . 03 2700
LT.06
BH
TC. 01 3600
OFFICE
RECEPTION BH
UNIT OFFICE
STORE
LT .06
1.16
S C. 01 3200
PB . 01 3200
LT .06
BOARD ROOM
1.35
AT . 02 3600
LT.07
TC. 01 3600
1.17
PB . 03 3600
LT.07 LT.07 LT.07
1.15
KITCHEN
B5
AIR LOCK
LT.07 LT.07
LT .06
A6
LT.07
TC. 01 3600
AT . 01 2700 LT.06
LT.06
LT.06
LT.06
LT.06
LT.06
LT.06
LT.06
VOID CANOPY BEYOND
VOID CANOPY BEYOND
AD
AE AF
AA
AB
AG
BA
AC
BC
BB
BD
BE
BF
BG
BH
BI
BJ
BK
BL
BM
BN
BO
BP
BQ
C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt
B8
2
ABN 43 525 056 982
NOTES:
LT.02 - Supernova PR Down-Up P enda nt Light 650 mm Round
LT.07 - Thorn Chamel eon T5 Ceiling diffuser 1200 x300mm
LT.04 - Delta light Spy on ADL track light 62mm Round LT.06 - Thorn Chameleon T5 Ceil ing diffuser 1200x600mm
P
LT.03 - Supernova PR Down-Up P enda nt Light 650 mm Round
Refer to electrical services drawings for detail of installation of lights
LT.0 5 - Deltalight Gala LED WW W Wall light 1 48x7 0mm
LT.01 - LED Downl igh, Deltalight Grand Reo 827 20 S1 W-B 18w 102 mm Round
Contractor to note tha t no cornice required to wall where fea ture wall lining/panel s exist. Allow for 10mm sha dowl ine. Refer services drawings for details of service points
rev
issue
revision description
amd
date
CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042
Confirm setout of al l fittings and fixtures on site with Architect prior to instal lation.
FIRST FLOOR REFLECTED CEILING PLAN
Extent and number of AP's, l oca tions a nd sizes to be coordinated with services engineer's drawings. Refer to architectural specification for numbers to be allowed.
Preliminary
dat e:
07-11-2016
sc a l e :
As indicated @A1 rev is io n:
dr aw n :
JP
sh ee t n o :
AD03.14
proj ect no:16-0725
7/11/2016 12:09:44 PM
level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au
SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .
printe d:
REFLECTED CEILING LEGEND © studio theta pty ltd
file:
AD05.01
AD AA
AB
AE
AC
BB
AF
AG
BD
BE
BF
BG
BH
BI
BJ
BK
BL
BM
BN
BO
BP
BQ
2 AD05.01
BA
BC
AA1
A1
B1 AA2
A2
STAIR 3 2.03
PLANT ROOM B 2.04
PB . 01 2400
NC
BH
PB . 01 2400
B2 AA3
A3
B3 AA4
A4
VOID CANOPY BEYOND Canopy soffit cla d in CT-01 Typ.
STAIR 7 PLANT ROOM A
1
2.02
AD05.02
NC
AA5
A5
1.36
VOID CANOPY BEYOND
NC
Canopy soffit cla d in CT-01 Typ.
VOID GLAZED ROOF
VOID CANOPY BEYOND Canopy soffit cla d in CT-01 Typ.
B4
2
2
AD05.02
AD05.02
STAIR 1 2.01
1 PB . 01 2400
B5
AD05.02
AA6
A6
B6 BH
AA7
A7
PLANT ROOM C
STAIR 6
NC
PB . 01 2400
2.06
AA8
A8
PB . 01 2400
2.05
BH
B7
PB . 01 2400
AD
AE AF
AA
AB
AG
BA
AC
BC
BB
BD
BE
BF
BG
BH
BI
BJ
BK
BL
BM
BN
BO
BP
BQ
2
C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt
B8
level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982
SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .
NOTES:
LT.02 - Supernova PR Down-Up P enda nt Light 650 mm Round
LT.07 - Thorn Chamel eon T5 Ceiling diffuser 1200 x300mm
LT.04 - Delta light Spy on ADL track light 62mm Round LT.06 - Thorn Chameleon T5 Ceil ing diffuser 1200x600mm
P
LT.03 - Supernova PR Down-Up P enda nt Light 650 mm Round
Refer to electrical services drawings for detail of installation of lights
LT.0 5 - Deltalight Gala LED WW W Wall light 1 48x7 0mm
LT.01 - LED Downl igh, Deltalight Grand Reo 827 20 S1 W-B 18w 102 mm Round
Contractor to note tha t no cornice required to wall where fea ture wall lining/panel s exist. Allow for 10mm sha dowl ine. Refer services drawings for details of service points
rev
issue
revision description
amd
date
CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042
Confirm setout of al l fittings and fixtures on site with Architect prior to instal lation.
SECOND FLOOR REFLECTED CEILING PLAN
Extent and number of AP's, l oca tions a nd sizes to be coordinated with services engineer's drawings. Refer to architectural specification for numbers to be allowed.
Preliminary
dat e:
07-11-2016
sc a l e :
As indicated @A1 rev is io n:
dr aw n :
JP
sh ee t n o :
AD03.15
proj ect no:16-0725
printe d:
REFLECTED CEILING LEGEND © studio theta pty ltd
7/11/2016 12:09:47 PM
file:
AD05.01
BC Top of Building RL. 71.14
BA
AG
AF
6000
AE
6000
AD
9000
6000
3500
6000
Structural Frame Level A RL. 67.64
1200
TC.01
Structural Frame Level B RL. 66.44
3600
TC.01 TC.01
111
°
First Floor Level RL. 59.24
TC.01
TC.01 cj
TC.01
3600
cj
28°
67°
Ground Floor Level FFL. 52.04
3600
Sub Floor Level RL. 55.64
BUILDING B
BUILDING A
North Elevation Building A - Canopy
1 AD04.01
1 : 200
BC Top of Building RL. 71.14
BA 6000
AG
AF
6000
AE
6000
AD
9000
6000
3500
Canopy Beyond
Structural Frame Level A RL. 67.64
1200
CW.0 2 in line with canopy above refer to AD06.01 for details
Structural Frame Level B RL. 66.44
3600
CW.02
Second Floor Level RL. 62.84
3600
BAL.01
First Floor Level RL. 59.24 align
align
align
align
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
CW.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
D.G.0 1.A
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
BUILDING A
C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt
BUILDING B
2
align
D.G.0 1.B
GL.01
D.G.0 1.C
GL.01
D.G.0 1.D
Ground Floor Level FFL. 52.04
align CW.01
3600
align CW.01
3600
align
Sub Floor Level RL. 55.64
North Elevation Building A - Beyond Canopy 1 : 200
© studio theta pty ltd level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982
SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .
rev
issue
revision description
amd
date
CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 NORTH ELEVATION BUILDING A
Preliminary
date: scale: drawn:
07-11-2016 1 : 200 @A1 JP
sheet no:
AD04.01
revis ion: project no:
16-0725
printed: 7/11/2016 12:09:53 PM
file:
AD04.01
3600
Second Floor Level RL. 62.84
1 AD06.02
2 AD05.01
BQ
BP
Top of Building RL. 71.14
6000
BO
BN
6000
BM
6000
BL
6000
BK
6000
BJ
6000
BI
6000
BH
6000
BG
6000
BF
6000
BE
6000
TC.01
Structural Frame Level A RL. 67.64
BD
6000
BB
6000
6000
TC.01
TC.01
Structural Frame Level B RL. 66.44
TC.01
Second Floor Level RL. 62.84
TC.01
TC.01 cj
cj
TC.01
First Floor Level RL. 59.24
TC.01
128°
cj
cj
TC.01
TC.01
TC.01
Sub Floor Level RL. 55.64
cj
cj
cj 62°
41°
Ground Floor Level FFL. 52.04
49°
33°
TC.01
TC.01
BUILDING B
BUILDING A 2 AD05.01
1
1 : 200
BQ Top of Building RL. 71.14
BP 6000
BO 6000
BN 6000
BM 6000
BL 6000
BK
BJ
6000
3500
BG
BF
6000
BE
6000
BD
6000
BB
6000
6000
Walls and Gla zing to underside of canopy, refer to details
1200
EW.01
EW.01
EW.01
EW.01
EW.01
D.G.5 2.F
D.G.52 .E
D.G.5 2.D
CW.01
WT.03
WT.03
EW.01
EW.01
WT.04
EW.01
EW.01
WT.03
CW.01
CW.01
EW.01
WT.01
CW.01
CW.01
EW.01
W.1 .38 .B
BAL.01 WT.04
CW.01
WT.01
WT.04
W.G.47 .B
W.G.47 .B
WT.01
WT.01
CW.01
W.G.38 .D
CW.01
D.G.3 8.A
WT.01
CW.01
D.1.38.A
EW.01
CW.01
D.G.3 5.B
CW.01
D.1.43.A
WT.07
CW.01
D.1.3 8.B
3600
CW.01
D.G.4 7.A
Ground Floor Level FFL. 52.04
6000
Roof Para pet , gla zed roof section beyond
D.G.5 1.B 3200
Sub Floor Level RL. 55.64
3600
First Floor Level RL. 59.24
3600
Second Floor Level RL. 62.84
3600
Structural Frame Level B RL. 66.44
BH
6000
BAL.01 Shown dashed for clarity
Structural Frame Level A RL. 67.64
BI
6000
D.G.4 3.A
AD04.02
AD06.02
North Elevation Building B - Canopy
D.G.4 4.B
1
BAL.01
BUILDING B
BUILDING A
RT.01 Shown dashed for cla rity
North Elevation Building B - Beyond Canopy
C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt
2
1 : 200
© studio theta pty ltd level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982
SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .
rev
issue
revision description
amd
date
CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 NORTH ELEVATION BUILDING B
Preliminary
date: scale: drawn:
07-11-2016 1 : 200 @A1 JP
sheet no:
AD04.02
revis ion: project no:
16-0725
printed: 7/11/2016 12:10:00 PM
file:
AD04.02
AD
AE
AF
6000
9000
AG 6000
3500
Top of Building RL. 71.14
1200
Structural Frame Level A RL. 67.64 SK.01
Structural Frame Level B RL. 66.44
3600
TC.01 TC.01
Second Floor Level RL. 62.84
3600
TC.01
TC.01
TC.01
TC.01
Ground Floor Level FFL. 52.04
3600
36°
53°
Sub Floor Level RL. 55.64
3600
First Floor Level RL. 59.24
BUILDING A
1
BUILDING B
South Elevation Building A - Canopy
AD04.03
1 : 200
AD
AE
AF
6000
9000
AG 6000
CW.01
CW.01
WT.04
3600
SK.01
Second Floor Level RL. 62.84
W.1 .13 .D
W.1.1 3.C
W.1 .13 .B
WT.04
WT.04
WT.04
WT.04
WT.04
W.G.14 .E
W.G.14 .D
W.G.14 .C
W.1 .09 .A
W.1 .08 .A
W.1 .07 .B
3600
First Floor Level RL. 59.24
1200
CW.02 Hidden for clarity
Structural Frame Level B RL. 66.44
3600
Structural Frame Level A RL. 67.64
3500
Top of Building RL. 71.14
WT.04
Ground Floor Level FFL. 52.04
WT.04
W.G.12 .E
3600
Sub Floor Level RL. 55.64
BUILDING A
South Elevation Building A - Beyond Canopy
C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt
2
1 : 200
© studio theta pty ltd level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982
SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .
rev
issue
revision description
amd
date
CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 SOUTH ELEVATION BUILDING A
Preliminary
date: scale: drawn:
07-11-2016 1 : 200 @A1 JP
sheet no:
AD04.03
revis ion: project no:
16-0725
printed: 7/11/2016 12:10:06 PM
file:
AD04.03
BUILDING B
1 AD06.02
2 AD05.01
BB
BD 6000
BE
BF
6000
6000
BG 6000
BH
BI
6000
6000
BJ
BK
6000
BL
6000
BM
6000
6000
BN 6000
BO 6000
BP 6000
BQ 6000
Structural Frame Level A RL. 67.64
SK.01
Roof Para pet , gla zed roof section beyond
SK.01
TC.01 1200
CW.01
3500
Top of Building RL. 71.14
TC.01
TC.01
Second Floor Level RL. 62.84
TC.01
TC.01
TC.01
3600
TC.01
TC.01
TC.01
TC.01
TC.01
3600
First Floor Level RL. 59.24
3600
Structural Frame Level B RL. 66.44
Sub Floor Level RL. 55.64
3600
6 1°
6 1°
41°
61°
Ground Floor Level FFL. 52.04
67°
60°
6 0°
34°
TC.01
TC.01
BUILDING A
BUILDING B
2 AD05.01
1 AD06.02
1
South Elevation Building B - Canopy
AD04.04
1 : 200
BB
BD 6000
BE 6000
BF 6000
BG 6000
BH
BI
6000
6000
BJ
BK
6000
BL
6000
6000
BM 6000
BN 6000
BO 6000
BP 6000
BQ 6000
Structural Frame Level A RL. 67.64
SK.01
3500
Top of Building RL. 71.14
1200
SK.01
W.1 .91 .B
First Floor Level RL. 59.24
WT.04
Sub Floor Level RL. 55.64
CW.01
CW.01
CW.01
CW.01
W.1 .84 .B
W.1 .84 .A
W.1 .79 .E
W.1 .79 .D
W.1.7 9.C
WT.04
WT.04
WT.04
WT.04
WT.04
WT.03
CW.01
W.1 .72 .A
WT.03
W.1 .66 .B
W.1 .63 .A
CW.01
CW.01
CW.01
CW.01
CW.01
3600
CW.01
W.1.6 0.C
W.1 .60 .B
W.1 .59 .A
EW.01
EW.01
EW.01
EW.01
EW.01
EW.01
EW.01
D.G.5 2.H
D.G.5 2.G
3600
CW.01
Second Floor Level RL. 62.84
3600
Structural Frame Level B RL. 66.44
W.G.66 .A
W.G.60 .A
2
WT.01
D.G.52 .J
WT.01
BUILDING B
C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt
BUILDING A
South Elevation Building B - Beyond Canopy 1 : 200
© studio theta pty ltd level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982
SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .
rev
issue
revision description
amd
date
CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 SOUTH ELEVATION BUILDING B
Preliminary
date: scale: drawn:
07-11-2016 1 : 200 @A1 JP
sheet no:
AD04.04
revis ion: project no:
16-0725
printed: 7/11/2016 12:10:12 PM
file:
AD04.04
WT.01
W.G.60 .B
D.G.5 2.I
W.G.66 .B
D.G.5 4.B
W.G.66 .C
D.G.6 0.A
W.G.71 .A
D.G.5 9.B
CW.01
Ground Floor Level FFL. 52.04
3600
WT.04
2 AD05.02
B1
B2
B3
9000
A1
B4
9000
A2
A3
9000
B5
9000
A4
9000
B6
9000
A5
9000
B7
9000
A6
9000
B8
9000
9000
A7
9000
A8
9000
9000
3500
Top of Building RL. 71.14
1200
Structural Frame Level A RL. 67.64 Structural Frame Level B RL. 66.44
TC.01 TC.01
cj
TC.01
TC.01
cj
cj
cj
TC.01
TC.01
3600
cj
First Floor Level RL. 59.24
3600
TC.01
Second Floor Level RL. 62.84
TC.01
TC.01
cj cj
Sub Floor Level RL. 55.64
3600
cj
63°
cj
3600
41°
29°
TC.01
TC.01 46°
Ground Floor Level FFL. 52.04
BUILDING A
1
West Elevation Building A - Canopy
AD04.05
2 AD05.02
1 : 200
B1
B2
B3
9000
A1
B4
9000
A2
A3
9000
B5
9000
A4
9000
B6
9000
A5
9000
B7
9000
A6
9000
B8
9000
9000
A7
9000
A8
9000
9000 Building B Canopy Beyond shown dashed
3500
Top of Building RL. 71.14
Structural Frame Level A RL. 67.64
Building A Ca nopy shown dashed 1200
CW.02
CW.01
CW.01
CW.01
First Floor Level RL. 59.24
3600
Second Floor Level RL. 62.84
3600
Structural Frame Level B RL. 66.44
CW.01
WT.04
CW.01
3600
WT.02
Sub Floor Level RL. 55.64
D.G.1 7.B
D.G.5 2.N
D.G.5 2.O
D.G.2 0.B
D.G.2 9.B
D.G.2 4.A
3600
CW.01
Ground Floor Level FFL. 52.04
BUILDING A
2
West Elevation Building A - Beyond Canopy
AD04.05
2
1 : 200
AD05.02
B8
B7
B6
9000
B5
9000
B4
9000
B3
9000
B2
9000
B1
9000
9000
3500
Top of Building RL. 71.14
Structural Frame Level A RL. 67.64
TC.01
TC.01 1200
TC.01
Structural Frame Level B RL. 66.44
TC.01
VOID
Sub Floor Level RL. 55.64
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
WT.07
WT.07
TC.01 TC.01
WT.07
BAL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
GL.01
TC.01 WT.08
RT.01 hidden for clarity
3600
WT.04
Ground Floor Level FFL. 52.04
TC.01
C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt
WT.04
GL.01
3600
WT.04
TC.01
First Floor Level RL. 59.24
GL.01
3600
CW.01
3600
WT.03
Second Floor Level RL. 62.84
D.G.55 .A
BUILDING B
3
2 AD05.02
1 : 200
© studio theta pty ltd level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982
SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .
rev
issue
revision description
amd
date
CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 ELEVATIONS SHEET 5
Preliminary
date: scale: drawn:
07-11-2016 1 : 200 @A1 JP
sheet no:
AD04.05
revis ion: project no:
16-0725
printed: 7/11/2016 12:10:22 PM
file:
AD04.05
East Elevation Building B - Canopy
2 1 AD6.04
2
4
Modules beyond hidden for clarity
AD6.04
AD06.03
B1
B2
B3
1
AD05.02
3
Ballastrade shown dashed for clarity
AD06.02
B4
AD6.04
B5
B6
B7
B8
Top of Building RL. 71.14 Structural Frame Level A RL. 67.64
Structural Frame Level B RL. 66.44 CL. 65.84 Second Floor Ceiling Level
4
Sub Floor Level RL. 55.64
1.40
COMMUNAL KITCHEN 1.39
CATWALK
CATWALK
1.55
1.55
CL. 58.04 Ground Floor Ceiling Level CL. 55.04 Sub Floor Ceiling Level
MATERIALS + HARDWARE W.G.38 .C
G.38
MANAGER OFFICE 1.80
D.1.7 9.B
BALCONY
OFFICE 3
MANUFACTURING
MANUFACTURING G.52
2
1.79
SPRAY ROOM 2
G.52
MODULE EXAMPLE
G.65
G.22
Ground Floor Level FFL. 52.04
AD05.01
OFFICE 3
1.79
PROTOTYPE 2 G.66
D.G.6 5.B
First Floor Level RL. 59.24
D.1.80.A
3 AD06.03
C.W.02
CL. 62.24 First Floor Ceiling Level
C.W.02
Second Floor Level RL. 62.84
D.1.39.A
AD6.04
Section B 1 : 200
Concrete slab and piles to Structural eng. specs 2
© studio theta pty ltd level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982
SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .
rev
issue
revision description
amd
date
CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 SECTIONS
Preliminary
date: scale: drawn:
07-11-2016 1 : 200 @A1 HM
sheet no:
AD05.01
revis ion: project no:
16-0725
printed: 7/11/2016 12:10:25 PM
file:
C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt
AD05.02
AD Structural framing bea ms and col umns beyond
AE
AF
AG
BA
Atrium curta in wal l shown beyond
1
BUILDING B HIDDEN FOR CLARITY
AD06.01
Top of Building RL. 71.14
Structural Frame Level A RL. 67.64 Structural Frame Level B RL. 66.44 CL. 65.84 Second Floor Ceiling Level
PLANT ROOM A 2.02
Second Floor Level RL. 62.84
D.1.0 1.C
D.1.23.A
D.1.24.A
D.1.27.A
1.22
COLLAB OFFICE 3 1.05
CL. 58.04 Ground Floor Ceiling Level
WT.08
W.G.01 .E
W.G.01 .J D.G.1 0.A
PUBLIC ATRIUM
D.G.2 8.A
G.24
D.G.2 7.A
WESTERN CORE
D.G.3 0.A
D.G.5 2.Q
D.G.2 9.B
Ground Floor Level FFL. 52.04
D.G.52.BB
WT.08
CL. 55.04 Sub Floor Ceiling Level
D.G.5 2.R
Sub Floor Level RL. 55.64
WESTERN CORE
D.G.44.LL
D.G.44.HH
First Floor Level RL. 59.24
D.G.44.II
CW.02
CL. 62.24 First Floor Ceiling Level
G.01
1
CAFE G.09
Concrete sla b a nd piles to Structural eng. specs
AD06.01
2 AD05.01
BUILDING A HIDDEN FOR CLARITY
1
Additional module examples hidden for clarity
BB
Top of Building RL. 71.14
BD
Ballastrade hidden for clarity and outline shown dashed
AD06.02
BE
BF
BG
BH
BI
BJ
BK
BL
BM
BN
BO
BP
BQ
Structural Frame Level A RL. 67.64
Structural Frame Level B RL. 66.44
W.1 .38 .D
STAIR 7 CATWALK 1.55
CATWALK
W.1 .48 .B
1.55
WT.02
WT.03
WT.03
D.1.4 8.B
CATWALK
MANUFACTURING
CW.01
D.G.4 9.B
D.G.3 7.B
D.G.50 .A
MANUFACTURING
G.52
WT.01
WT.01
WT.01
WT.01
WT.01
WT.01
D.G.5 2.D
D.G.52 .E
D.G.5 2.F
1.55
CL. 58.04 Ground Floor Ceiling Level
CW.01
Ground Floor Level FFL. 52.04
CW.01
D.G.2 9.X
Sub Floor Level RL. 55.64
CW.01 1.36
First Floor Level RL. 59.24
CW.01
D.1.39.A
CL. 62.24 First Floor Ceiling Level
CW.01
D.1.43.A
CL. 65.84 Second Floor Ceiling Level
Second Floor Level RL. 62.84
G.52
D.G.51 .A
1 C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt
AD06.02
2
© studio theta pty ltd level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982
SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .
rev
issue
revision description
amd
date
CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 SECTIONS
Preliminary
date: scale: drawn:
07-11-2016 1 : 200 @A1 HM
sheet no:
AD05.02
revis ion: project no:
16-0725
printed: 7/11/2016 12:10:29 PM
file:
AD05.01
BA
Siphonic drainage system hidden behind soffit 600 200
PP.01
120
120
400
Structural Frame Level B RL. 66.44
TC.01
TC.01 600
300
19mm Plywood 240x70mm F11 substrate for box intermediate timber beam gutter beyond attached to beam below via triple-l-grip
400
PP.01
400
Structural Frame Level B RL. 66.44
CL
200*400mm Angled and winged box gutter
240x70mm F11 intermediate timber beam beyond attached to beam below via triple-l-grip
300
Parallel flange channel 100x150x5mm bolted to structural framing above
CL. 65.84 Second Floor Ceiling Level
210
CL. 65.84 Second Floor Ceiling Level
Framing for CW.01 & CW.02 is bolted to PFC with M10 bolts
70x35mm timber batten 1000
CL
ST.04 CW.01
450
Siphonic drainage system hidden behind soffit
CW.02
70
CL
TC.01 returns and wraps to form soffit of canopy
AW.01
Second Floor Level RL. 62.84
240
TC.01
ST.01 dual ribbon beams
AW.01
Intermediate cross-mullion affixed ton Raico Thermal H+I for lateral stability
PC.01 mitred and return to Raico THERM+H border mullion
CL. 62.24 First Floor Ceiling Level
75
100 100
70 70
TC.01 to return to new header frame
New hardwood Iron Bark frame and headercasement for windows, reusing existing glazing
New hardwood Iron Bark frame and sill casement for windows, reusing existing glazing, with sawn notch as drip-cap on exterior
TC.01 returns and wraps to form soffit of canopy
PC.01
10
Second Floor Level RL. 62.84
Two hardwood cross-mullion joined with 5mm steel plate & M10 carriage bolts
Aluminium profile acts as drip-cap for cladding, pushed into Sikaflex F11 caulking
ST.04 Symar Rubber Load Bearing Pad to allow movement under wind load
Timber stablising outrigger assembly bolted to angled beam @ 6000mm centres
Aluminium kick-plate angle installed between wall panelling and studwork
IL.01
TF.01
260
290
19
93
First Floor Level RL. 59.24
260
TC.01
End of CW.02 at first floor level
120
650
Symar Rubber Load Bearing Pad to allow movement under wind load
First Floor Level RL. 59.24
Bottom Edge of Cladding capped with z-angle with drip-cap and endgrain sealed with Sikaflex F11
CL. 58.04 Ground Floor Ceiling Level
100 TF.01
Hardwood curtain wall border mullion notched for drip
Mechanised recessed blind, hidden behind aluminium flange attached to soffit board
CW.01 PV.01 raked away from building at 1 degree slope 300x90mm external timber sleepers suspended on pedestals
Sand as required for raking slope TF.01
Zinaclume flashing between slab & mullion system
Ground Floor Level FFL. 52.04
SF.02
Hardwood members fixed to slab to accept lowered mech. blind end
1°
20
Ground Floor Level FFL. 52.04
Internal street slab raked to drainage systems, built to civil eng. specs
DPM
DPM
300mm diameter stormwater to rainwater tank & grey water treatment system
1
Atrium Wall Section Detail
2 AD06.01
1 : 25
Concrete slab to eng. spec
Street Wall Section Detail 1 : 25
level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982
SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .
rev
issue
revision description
amd
date
CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 SECTION DETAILS SHEET 1
Preliminary
dat e:
07-11-2016
sc a l e :
1 : 25 @A1
dr aw n :
HM
sh ee t n o :
AD06.01
rev is io n: proj ect no:16-0725
printe d:
© studio theta pty ltd
7/11/2016 12:10:30 PM
file:
AD06.01
C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt
Blocking timber as required, bolted to slab with M10 & affixed with Ramset ChemAnchor adhesive
Structural Furring Timber
Zincalume flashing
Pydra Joist Boot
ST.01
Structural Timber Batten (70x35mm); battens attached to rafters via Pryda Batten straps
SS.01
ST.04
250
TC.01
620
690
10
ST.01
IL.01
IL.01
TC.01
370
Z-flashing screwed to batten, sealant to seal endgrain of cladding
PC.01 ST.05
PC.01
Sikaflex 11FC caulking at ends
Zincalume Flashing
180x25mm Iron Bark Hardwood header
70x45mm hardwood framing
Border mullion beyond
B4
100
CL. 55.04 Sub Floor Ceiling Level
65
CL. 58.04 Ground Floor Ceiling Level
25
ST.05
ML.01
TrendGlass Grade A toughened safety glass, 6mm nominal thickness
2 AD06.02
2 AD06.02
Module Typical Wall & Roof 1 : 10
First Floor Level RL. 59.24
Grade A toughened safety glass, double glazed 6mm nominal thickness
ST.04 Butyl glazing tape
70x50mm hardwood framing
TC.01
CL. 58.04 Ground Floor Ceiling Level
170x25mm Iron Bark hardwood sill ST.04
R4 Batts Insulation IL.01
3
TC.01
AD06.02
Z-flashing screwed to batten, sealant to seal endgrain of cladding with Sikaflex 11FC
PC.01
Sub Floor Level RL. 55.64 ST.05
AD06.02
1: 5
27
Sub Floor Level RL. 55.64
CL. 55.04 Sub Floor Ceiling Level
Module Typical Header & Sill Detail
5
ST.01 Joist beam
4
230
M12 Carriage Bolt through GluLam Beam attached to joist via Pryda JD4 joist boot
5 AD06.02
Bottom Edge of Cladding capped with z-angle with drip-cap and endgrain sealed with Sikaflex F11 600
AD06.02
ST.01 Ribbon beam
6
970
Ground Floor Level FFL. 52.04
AD06.02
3mm Aluminium kickplate, fixed to studs with self-tapping screws
CL. 55.04 Sub Floor Ceiling Level
370
TC.01 ST.02
TFF.01
End-cap to wall panel
AD06.02
1 : 50
Module Upper Floor & Column Detail
Sikaflex F11 caulking to seal end-grain
ST.07 floor joist @ 600mm centres
1 : 10
ST.01 floor bearer @ 1500mm centres
Structural plywood 9mm sub-floor
Structural Steel Equal Angle 150x75x10mm, cut to 300mm lengths to fix to bearer
M12 Carriage Bolt through column base and equal angle
M12 Carriage bolt through bearer and angle at each end of bearer
250
ST.03
150mm M12 Anchor Bolts, fixed with RamSet ChemSet 801 XTREM chemical anchoring system
150
Symar Rubber Load Bearing Pad
125 Structural Reinforcement Bar, to Eng. Specs.
C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt
25
Ground Floor Level FFL. 52.04
4
150mm M12 Anchor Bolts, fixed with RamSet ChemSet 801 XTREM chemical anchoring system
Ground Floor Level FFL. 52.04
Structural Steel Equal Angle 150x75x10mm
Concrete Slab, to Eng. Spec.
Module Column to Slab
6 AD06.02
1 : 10
Module Slab Connection 1: 5
level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982
SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .
rev
issue
revision description
amd
date
CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 SECTION DETAILS SHEET 2
Preliminary
dat e:
07-11-2016
sc a l e :
As indicated @A1 rev is io n:
dr aw n :
HM
sh ee t n o :
AD06.02
proj ect no:16-0725
printe d:
© studio theta pty ltd
7/11/2016 12:10:32 PM
file:
AD06.02
380
3
100
AD06.02
Module Example Section
29
1
120
CL CL
ST.03, connected by Mortise Tenon joint
B1
1200
BAL.01
PB.02
ST.04
3mm EPDM Gasket
DT.01 L-profile
ST.06
ST.06
ST.04
L-profile to secure lattice through to vertical ST.04
AL.01
PWS.01 CLT.01
AT.01, fitted in flange of furring channel
TC.03
90
Cafe wall section lattice timber wall
CL. 58.04 Ground Floor Ceiling Level SC.01
35
Cafe wall section exposed timber
2 AD06.03
1 : 10
3 AD06.03
1 : 10
TYPICAL JUNCTION BETWEEN TIMBER AND TILED FLOORING
TF.01
TYPICAL JUNCTION BTW TIMBER AND TILED FLOORING 20x20 x3 mm finished stainl ess steel angle, ma chined down to suit and screw fixed to floor sl ab
TF.01
TL.01
AL.01
Typical Ballastrade & Balcony
20x20 x3 mm finished stainl ess steel angle, ma chined down to suit and screw fixed to floor sla b, sea la nt o n inside edge plywood substra te notched to accept sta inless steel a ngle
Structura l sl ab to Civil eng. spec.
FC.01
1 : 20
TYPICAL JUNCTION BTW CARPET AND RESILIENT FLOORING 20x20 x3 mm l inished stainl ess steel angle machined down to suit and screw fixed to floor sl ab CT.01
TL.01
PS.01
Structura l sl ab to Civil eng. spec.
SF.04 beyond
Level ing a ggregate / compound as required
Level ing a ggregate / compound as required PS.01
SC.02
Typical First Floor Structure
4 AD06.03
1 : 20
AL.01
PS.01
Bulkhead to house ductwork for mech HVAC, see service eng specs
650
Z-metal caulked with Sikaflex F11 to seal fascia & soffit TC.01
CL. 58.04 Ground Floor Ceiling Level
Level ing a ggrega te / compound as required
5
Typical Floor Junctions 1: 5
© studio theta pty ltd level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982
SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .
rev
issue
revision description
amd
date
CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 SECTION DETAILS SHEET 3
Preliminary
dat e:
07-11-2016
sc a l e :
As indicated @A1 rev is io n:
dr aw n :
BA, HM
sh ee t n o :
AD06.03
proj ect no:16-0725
7/11/2016 12:10:33 PM
file:
AD06.03
C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt
CLT.0 1 structural sl ab
printe d:
1
PWS.01
Stacked 70x35mm (ST.04) battens, top member cut to 1 degree angle
TC.01 cladding boards screwed directly to CLT.01 as fascia board
DT.02
AD06.03
EA.01
3mm EPDM Gasket
ST.04
TC.03 to sit behind latttice frame
SF.03
PWS.01 self-leveling pedestal stepped-down as balcony slopes away
1200
10mm spacing shadow line between base of PB.02 and head of Lattice structure
Marine 9mm plywood substrate at 1 degree slope away to balcony edge
First Floor Level RL. 59.24
R4 Batts Insulation
Custom 3mm mild steel profile w. concealed LED lighting strip
L-profile
TC.01 cladding boards screwed directly to CLT.01 as fascia board
290
PB.01
ST.04 at vertical 450mm centers
New hardwood Iron Bark frame and casement for windows, reusing existing glazing
Existing external concrete wall
First Floor Level RL. 59.24
PB.01
ST.04
45 30
Custom stainless steel structure railing, welded outriggers fix timber mullion barrier
260
R4 Batts Insulation
30
2400
PB.02
155
1000
90
200*400mm Angled and winged box gutter
19mm Plywood 240x70mm F11 substrate for box intermediate timber beam gutter beyond attached to beam below via triple-l-grip
190x45mm F11 structural beam
ST.04, fixed on end
TC.01
TC.01
PP.01
TC.01 SS.01 ST.04
TC.01
PS.01
TC.01
ST.07
Structural Frame Level A RL. 67.64
Structural Frame Level A RL. 67.64
Structural Frame Level A RL. 67.64
SF.02
ST.04 TC.01
ST.04
SF.01 Syphonic drainage inlet and sump FA.02
Structural Frame Level B RL. 66.44
Structural Frame Level B RL. 66.44
SF.02
90*45 Timber cross bracing to support wall truss framing
Canopy Parapet Callout
1 AD6.04
2 AD6.04
1 : 25
Canopy Facade Callout 1 : 25
Woodform Architectural Expression cladding, angled sawcut and ridge overlap for waterproofing
B7
4mm Custom angled steel connector plates for timber truss framing
Top of Building RL. 71.14
ST.04
FA.02
ST.06
ST.04
TC.01
90*45 Timber truss frame to support external canopy skin system
EBSA MP2 Framed and operable louvred window system
TC.01
ST.04
VOLCANIZED WATERPROOF MEMBRANE
600*200 angled and winged box gutter
Ground Floor Level FFL. 52.04
M33 Structural Steel bolt to base connector plate, 30mm recess into timber column 5mm Welded steel connector plate, bolted to new timber framing
Steel anchoring bolts to structural engineer specifications
C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt
Structural Frame Level A RL. 67.64
Syphonic drainage inlet and sump Intermediate timber beam beyond 240*70mm attached to beam below via Triple-L-Grip
Concrete piles to structural eng. spec. TC.01
Canopy Sawtooth Callout
3
4
1 : 25
AD6.04
Canopy Truss Facade Callout 1 : 25
level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982
SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .
rev
issue
revision description
amd
date
CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 SECTION DETAILS SHEET 4
Preliminary
dat e:
07-11-2016
sc a l e :
1 : 25 @A1
dr aw n :
JD
sh ee t n o :
AD6.04
rev is io n: proj ect no:16-0725
printe d:
© studio theta pty ltd
7/11/2016 12:10:35 PM
file:
AD6.04
AA
140
100
100
AC
AC
Timber screen bottom plate beyond
70x20 mm hardwood timber vertica l screen members, @ 20 0mm centres , inserted a t borders above a nd bel ow with da do housing joint
Hardwood fra me ST.06
ST.04
PB.01
R4 Batts Insulation
HBI Bulb seal SF.02
90
13
Timber base plate below
TC.01
35
Silicone bead Glazing to meet flush at corner junction - allow 5mm corking Refer to window schedule for details
90
Base plate to sit flush to Column 8 0°
70 45
DT.01 Exposed dressed Tazmaninan oak
TC.03
Timber base plate 45degree mitre joint finish
Hastings front glazed framing AS104, AS109 400
DT.03 Dressed Tazmainian oak angled structure 70
Double sided glazing tape
DT.04
10mm shadow gap between TC.03 and ST.04
Glazing channel at base
Glazing framing hidden bracket to sit flush with DT.04 & DT.05 w. double sided glazing tape
450
Hardwood upright notched to accept bolt
10mm rubber EPDM movement joint between mullion and column
Hastings front glazed framing AS104, AS109 DT.05
DT.04
400
58 14 22
1
Cafe joinery plan detail
53
90
13
2 AD07.01
1 : 10
Glazing framing hidden bracket to sit flush with DT.04 & DT.05 w. double sided glazing tape
Gallery Glazing Column Junction
3 AD07.01
1 : 10
Gallery External Corner
4 AD07.01
1 : 10
Gallery Corner 1 : 10
level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982
SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .
rev
issue
revision description
amd
date
CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 PLAN DETAILS SHEET 1
Preliminary
dat e:
07-11-2016
sc a l e :
1 : 10 @A1
dr aw n :
BA, HM
sh ee t n o :
AD07.01
rev is io n: proj ect no:16-0725
printe d:
© studio theta pty ltd
7/11/2016 12:10:36 PM
file:
C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt
AD07.01
90
Ha stings FG AS10 1 + AS5 extrusions
Bol t through to column
DT.05
355
90
Border upright ha rdwood members for timber screen
BF
TIMBER SCREEN VERTICAL LOUVRE
TrendGlass 6mm Safety Glazing
Iron Bark 70x20m louvre fixed at bottom plate of frame
TIMBER MULLION GLAZING
Sicilone Bead
HB1 Bulb Seal
Hastings Front Glazed Framing AS104, AS109
TIMBER BORDER MULLION
Hastings FG AS105
Hastings FG AS101
Hastings FG AS5
MGP10 90x45mm
ST.04
MODULE DOOR JAMB TYPICAL
MODULE DOOR JAMB TYPICAL
(hinge side)
Tyvek Homewrap Breathable Vinyl Sarking
TC.01
10mm Countersunk Screw into horizontal battens
TC.01
(stop side)
Capral 200 Series Steel Door Jamb
Y-Profile Aluminium Section
MODULE EXT. & INT. CLADDING CORNER JOIN
ETC1 end boards mitred at 45 degrees to meet aluminium section
Blocking as required
Y-Profile Aluminium Section
ST.04
Double Sided Glazing Tape
Spotted Gum mullion, chamfered at internal edges, danish oiled finish100x60mm
10
PC.01 110x20mm Spotted gum hardwood to cover mullion
1
70x20mm Spotted gum hardwood to cover mullion. chamfered at internal corner
10mm shadow gap between ply & hardwood, black membrane behind ply
Screw countersunk fixed to studwork for easy removal and re-use
ST.06
MGP10 furrings to fix door jamb
35mm door leaf
PC.01
PC.02
Module Typical Plan Details 1: 2
level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982
SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .
rev
issue
revision description
amd
date
CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 PLAN DETAILS SHEET 2
Preliminary
dat e: sc a l e : dr aw n :
07-11-2016 1 : 2 @A1 HM
sh ee t n o :
AD07.02
rev is io n: proj ect no:16-0725
printe d:
© studio theta pty ltd
7/11/2016 12:10:37 PM
file:
C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt
AD07.02
1 AD08.02 180
1
TF.01
TF.01
AD08.02
180
1800
1800 220
600
220
2
AD08.02
AD08.02
1810 TSGI
300
1810
2
TSGI
1
UP
1
2
UP
2
3
3
2
4
37
4
AD08.02
5
36
5
6
6
7
34
7
8
33
8
9
9
10
10
2 AD08.02
35
32 31 30 29
11 12
28
13
27
14
26
15
25
16
24
17
23
300
18
22
19 600
21 20 TSGI TSGI
600
TF.01
300
TSGI TSGI
20 21
19
22
18
23
17
24
16
25
15
26
14
27
13
28
12 11
29 30
10
10
31
9
9
32
8
8
33
7
7
34
6
6
35
5
5
36
4
4
37
3
3
2 UP
2
1
UP
1
300
TSGI
TF.01
1
TF.01
600
TSGI
1 AD08.02
AD08.02
Stair 7 Scissor Stair - Ground Floor
1 AD08.01
Stair 7 Scissor Stair - First Floor 1 : 50
level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982
SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .
rev
issue
revision description
amd
date
CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 STAIR DETAILS
Preliminary
dat e:
07-11-2016
sc a l e :
1 : 50 @A1
dr aw n :
HM
sh ee t n o :
AD08.01
rev is io n: proj ect no:16-0725
printe d:
© studio theta pty ltd
7/11/2016 12:10:40 PM
file:
1 : 50
C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt
2 AD08.01
AA4
Second Floor Level RL. 62.84 Handrail a ssembly mirrored for sta ir beyond
CL. 62.24 First Floor Ceiling Level
BC CW.0 1
CW.0 1 D.1.3 6.B
D.1.3 6.A
HRS
First Floor Level RL. 59.24
HRS
37 36
HR.01
35 HRS
34
HR.01
33
92
32 HRS
31 30
900
CL. 58.04 Ground Floor Ceiling Level
HRS
Handrail screw fixed to handra il bra cket with countersunk screw
29 28
HR.01
27
HRS.01 , fixed to BAL.0 1 with countersunk screws
26
HRS
BAL.0 1 Bl ackbutt screen ball astra de
25 24 22
CW.0 2
900
21
19
HRS
18 17 16
15
CL. 55.04 Sub Floor Ceiling Level
14
HRS
11 10
HR.01 Treads a nd risers a ffixed to steel stringer on both sides
BAL.01 beyond shown dashed
13 12
900 HRS
9
Ground Floor Level FFL. 52.04
8 HRS
7 6
300
5 4
HRS
Ground Floor Level FFL. 52.04
1
23
HRS
20
HRS
HR.01
3 2 1
Stair 7 Scissor Stair Section
2
1 : 50
AD08.02
Handrail Detail 1 : 10
© studio theta pty ltd level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982
SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .
rev
issue
revision description
amd
date
CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 STAIR SECTION DETAIL
Preliminary
date:
07-11-2016
scale:
As indicated @A1 revis ion:
drawn:
HM
sheet no:
project no:
AD08.02 16-0725
printed: 7/11/2016 12:10:41 PM
file:
C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt
AD08.02
HR.01
HRS
1200
HRS
CW.0 2
Sub Floor Level RL. 55.64
1535
845
620 320
PB.01 Bulkhead to sit flush with lattice wall joinery
PB.02 Bulkhead to sit flush with DT.01 framing. Finish Dulux Charcoal Domino
1746
PB.01 Finish Dulux Lexicon
1740
AF
7 AD09.01 WT.03
J.G.04C
Sub Floor Level RL. 55.64
WT.04 DT.03 Exposed Tazmainian oak 70 x 40mm dressed timber stud at 65 degree angle
5400
65°
J.G.04A - 20mm Tazmanian oak lattice wall joinery
DT.01 Exposed Tazmainian oak 90 x 45mm dressed timber stud
2760
TC.03 Run horizontal J.G.04B
Note - No DT.03 cross bracing
880
FG
CAFE G.04
J.G.04A
900
50
W.G.04A
TC.03 Run horizontal
Ground Floor Level FFL. 52.04 D.G.04B
WT.03
40mm In-situ concrete countertop
W.G.04B
J.G.04B
1490
Exposed 45mm TC.03 Run vertical Tazmainan oak internal window - fixed glazing 890 620
J.G.04A 300
4024
J.G.04B 325
450
625
6910
Structural 20 x 200mm timber dowl rod through DT.01 - Dulux charcoal Domino to match PB.02 wall finish
40mm In-situ concrete countertop 450
45
900
405
45
J.G.04C - Cantilevering raised countertop - see AD09.01 drawing 7
800
2325
6300
D.G.04B
Cafe elevation 01
3 AD09.01
AA3
4
1 : 50
AD09.01
Cafe elevation 02 1 : 50
D.G.04A
8240 WT.05
J.G.04G J.G.04F J.G.04E J.G.04D Bulkhead above to sit flush to exposed timber wall framing below PB.01
Sub Floor Level RL. 55.64
1 AD09.01
Ground Floor Cafe Plan Callout 1 : 50 CL. 55.04 Sub Floor Ceiling Level FG
TC.03 50mm strip to match exposed framing layout
FG
Timber framed gallery desplay cabinates - glass finish flush to timber framing
TC.03 Run horizontal
AF
J.G.04D
J.G.04E
J.G.04F
J.G.04G 800
FG
920
900
Recessed timber plaque
65°
Ground Floor Level FFL. 52.04
1200
45
J.G.04C
80 200
Note - No DT.03 cross bracing
DT.03 Exposed Tazmainian oak 70 x 40mm dressed timber stud at 65 degree angle
DT.01 Exposed Tazmainian oak 90 x 45mm dressed timber stud
W.G.04A
1400
P
2993
PB.02 Finish Dulux Charcoal Domino
D.G.04A
44
3662
AD09.01
300
920
300
898
300
920
300
1162
80
1118
80
1118
80
1162
931
500
10150
Cafe elevation 03
5
BH
Barcode safety sticker to be applied to glazing
6 AD09.01
1 : 50
Cafe elevation 04 1 : 50
P
P
CAFE G.04
R4 Batts Insulation
ST.06
20
ST.04
Structural 20 x 230mm timber dowl rod through DT.01 - Dulux charcol to match wall finish 13
PB . 03 5000
PB.01
S C. 01 5400
TC.03
90
30mm Tazmainian oak countertop w. chamfered edge
R4 Batts Insulation
19
5
40
DT.01
ST.06
90
AA3
Custom steel U-profile to house timber bench - screw throguh to ST.04 & ST.06
30
35
230
CL
P
L-profile
3mm EPDM Gasket
70
TC.03
70
45
DT.01 Exposed dressed Tazmaninan oak
355
10
ST.04
DT.03 Dressed Tazmainian oak angled structure 45
C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt
10mm shadow gap between TC.03 and ST.04
45
450
400
2
Ground Floor Cafe Reflected Ceiling Plan 1 : 50
7 AD09.01
Plan Detail - Exposed Timber Framing
8
1: 5
AD09.01
Section Detail - Cantilevering Raised Bar 1: 5
level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982
SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .
rev
issue
revision description
amd
date
CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 INTERNAL ELEVATIONS SHEET 1
Preliminary
dat e:
07-11-2016
sc a l e :
As indicated @A1 rev is io n:
dr aw n :
BA
sh ee t n o :
AD09.01
proj ect no:16-0725
printe d:
© studio theta pty ltd
7/11/2016 12:10:45 PM
file:
AD09.01
AA
AB
AC
AD
AE
AA6 MT.02 to continue as wall panel above cabinetry
WT.02
83°
83° 97°
DT.04
CW.01 D.1.13A
J.1.13B
110
J.1.13C
WT.05
FR
120 °
400
First Floor Level RL. 59.24
100 220 180 180 18040
WT.05 WT.05
5mm opaque glass splashback to sit over TC.03
122 °
700
WT.05
80
1.16
2390
D.1.1 7.A
WT.05
WT.05
BOARD ROOM
40 40
D.1.1 6.A CW.01
40 40
40
20
570
CL. 62.24 First Floor Ceiling Level
WT.05
1.17
700
J.1.17A
KITCHEN
TC.03 Run vertical Bulkhead to sit flush to kitchen joinery w. 20mm shadow line
PB.02
D.1.1 2.A
A7
AA7
COLLABORATIVE OFFICE 4
MT.02
J.1.13A
5mm opaque glass splashback to sit over TC.03
1.13
20 751
20
751
680
20
680
100mm recessed kickplate aluminium powder coat charcoal finish
20
10
680
20
680
20
2800
D.1.1 1.A
J.1.13B
10
150 252 751
20
751
800
800
20
5885
MT.02
2522 400
232 145 200 40
2900
J.1.13E
1120
40 200
J.1.13C
MT.02 - Hidden dishwasher behind
450
450
450
450
450
450
1600
450
100mm recessed kickplate aluminium powder coat charcoal finish
450 700
800
D.1.1 5.A
1.15
TC.03 Run vertical
150 150 150 150 20
RECEPTION
J.1.15A
Void in ceiling
97°
WT.05
424
WT.02
900
A6
450 650
450
950
450
950
4100
14885
J.1.13A
J.1.13D
3 AD09.02
Office Elevation 01 1 : 50
D.1.1 0.A
WT.04 WT.04 CW.03
CW.03
Void in ceiling
WT.04
AA8
A8
Void in ceiling
Void in ceiling
160 230
Office Floor Plan
1 AD09.02
Void in ceiling
Second Floor Level RL. 62.84
CW.03
1 : 100 CL. 62.24 First Floor Ceiling Level
FG
FG
FG
FG
FG
AC
AD
AE
FG
FG
W.1.13C
FG
FG
W.1.13D
2751
AB
3000
W.1.13B
AA
First Floor Level RL. 59.24
AA6
A6
J.1.13G
J.1.13H
RECEPTION 1.15
KITCHEN
BC.01 - Barcode safety sticker to be applied to glazing
TC. 01 3600
1.17
PB . 03 3600
TC.03 5040
130
5600
2614 400
5040
5600
400
5600
400
2889
21019
S C. 01 3200
BOARD ROOM 1.16
4
TC. 01 3600
Office Elevation 02 1 : 50
BH
AD09.02 S C. 01 RAK ING
PB.01
S C. 01 3200
TC.03 Run vertical
AA7
A7
380
PB . 03 3000
CL. 62.24 First Floor Ceiling Level
COLLABORATIVE OFFICE 4 1.13
3040
BH
S C. 01 3200
2400
CW.01
First Floor Level RL. 59.24
B.1.13A
S C. 01 3200
J.1.13E
30 368 30
1000
A8
5 2
Reflected Ceiling Plan - Collaborative Office
AD09.02
320
460 30
J.1.13F
900
30
900
30
402
30
5600
40
920
200
12100
40 30
470
150
Office Elevation 03 1 : 50
1 : 100
level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982
SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .
rev
issue
revision description
amd
date
CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 INTERNAL ELEVATIONS SHEET 2
Preliminary
dat e:
07-11-2016
sc a l e :
As indicated @A1 rev is io n:
dr aw n :
BA
sh ee t n o :
AD09.02
proj ect no:16-0725
printe d:
© studio theta pty ltd
7/11/2016 12:10:49 PM
file:
AD09.02
3060 30
AA8
C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt
S C. 01 RAK ING
2660
S C. 01 RAK ING
80mm overhang
900
Desk above 30
900
840
30 300
30
70
900
840 70
300
900
30 45
470
DT.04
383
45
383
45
45
383
45
383
45
45
30
30 80
45 110
470
DT.05
1580
1490
1580
1520
1490
1580
1250
DT.05 Above Hanging timber framed planter box
Base framing below
260
20
45
30
30
160
30
30
45
70
20
Lattice Structure
200
160
20
20
1520
1580
1580
Desk above
DT.04 260
20
DT.04
20
7
DT.04
20
45
30
220
30
30
45
70
AD10.02
160
160
200
20
20
160
Cutout in MT.01 to house hidden rubbish bin
DT.04
20
DT.05 Above Hanging timber framed planter box
20
260
20
1490
1580
BP.01
MT.01 Desk above
110 45
DT.06
9 0° 70 45 80 30
45 45 900
30
45 45 900
30
45 900
300
30
45
470 840
30
30 80
383
45
383
45
900
900
2820 2980
1
Office Joinery Plan - Base Framing 1 : 20
2 AD10.01
Office Joinery Plan - Desk Profile
3
1 : 20
AD10.01
Office Joinery Plan - Desk Structure 1 : 20
file:
C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt
AD10.01
© studio theta pty ltd level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982
SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .
rev
issue
revision description
amd
date
CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 JOINERY DETAILS SHEET 1
Preliminary
date:
07-11-2016
scale:
1 : 20 @A1
drawn:
BA
sheet no:
AD10.01
revis ion: project no:
16-0725
printed: 7/11/2016 12:10:50 PM
80 30
5400
1755
1250
DT.04 Tenon joint
30 80
DT.05
5
200
DT.05
5
30
AD10.02
AD10.02
1580
DT.05
DT.04
30
2820
DT.04
90
DT.06 With tenon joint
DT.06 With tenon joint
2
810
AD10.02
60
DT.04 Bottom plate with housing joint grafting DT.05
DT.04 Bottom plate with housing joint grafting DT.05
DT.04 900 80 30
900
30
1580
900
30
900
30 80
80 30
1580
30
160
30
1580
2980
4
Office Joinery Elevation 1
AD10.02
AD10.02
200
40
17 12 17
30
160
30
1580
40
45
30
45
1 : 20
40
5
45
30
45
200
45 17 12 17
30 80
Office Joinery Elevation 2
6
1 : 20
45
30
5400
45 40
30
45
17 12 17
DT.04 DT.05
DT.05
BP.01 - Exposed
BR.01
DT.04
12 9
30
40
30
MT.01 to sit on base of brass angle Brass angle, Melamine tabletop and Timber edge strip - to sit flush at highest poin
DT.04
BP.01 MT.01
Dressed Tazmainian Oak tabletop framing
200
DT.05
15 9 12 9
75 BR.01
30
DT.06
45
45
17 12 17
30
17 12 17
17 12 17
70
5
5 23
9
30
DT.05
45
17 12 17
DT.04
155
BR.01
30 BR.02 Through to tabletop BP.01 In distance DT.05
7
Office Joinery Plan Detail - Timber Junction 1: 5
5 AD10.02
Office Joinery Section Detail - Timber Junction 1: 5
2 AD10.02
DT.05
Office Joinery Plan Detail - Desk Junction
1
1: 5
AD10.02
Office Joinery Section Detail - Desk Junction 1: 5
© studio theta pty ltd level 5 kaurna building, fenn place adelaide sa 5000 telephone 8 8269 1555 email hello@studiotheta.com.au www.studiotheta.com.au ABN 43 525 056 982
SET T ING O U T O F W O RK IS THE R ESP O N S IBIL IT Y OF T HE C O N T R ACT O R . AL L D IM EN S IO N S T O B E TAK EN FR O M T HE J O B . AL L D IMEN S IO N S T O B E CHEC K ED O N S IT E B EF OR E C O M M ENC IN G W O R K OR M AK IN G S HOP D R AW IN G S . DIS C R EP AN C IES TO B E R EP O R TED IMM ED IATEL Y TO T HE AR C HIT EC T . T HIS D R AWIN G S HAL L B E R EAD IN CO N J U NC T IO N W IT H THE S P EC IF IC AT IO N . IF IN DO U B T , P L EASE AS K . T HIS D R AW IN G AN D DES IG N © S TU D IO T HET A P T Y L T D .
rev
issue
revision description
amd
date
CSMIC Renewal SA 1284 South Rd, Clovelly Park SA 5042 JOINERY DETAILS SHEET 2
Preliminary
date:
07-11-2016
scale:
As indicated @A1 revis ion:
drawn:
BA
sheet no:
project no:
AD10.02 16-0725
printed: 7/11/2016 12:10:52 PM
file:
C:\Users\Jeremy\Documents\ADS8-REVIT-MASTER_jpearce13.rvt
AD10.02
DT.04 In distance
DT.04