CHEN YI-CHUN Address: 6F,No.52,Tien-Mu W.Rd,ShihLin Dist,Taipei City 111,Taiwan(ROC) Email: medici790222@gmail.com Phone: +886987008172
CURRICULUM VITAE Education
2009-2012
Bachelor of Landscape Architecture Chinese Culture University,Taiwan
Professional Experience 2012-2013
Designer of Progressive Environmental Inc.
2011-2012
Intern at Progressive Environmental Inc.
2010-2011
Intern at E.D.G International.
Related Experience 2013 Jul.
I2a Architecture of the Urban Countryside workshop,Melide SZ.
2012 Aug.
International Co-Workshops by Universities Grant Program,Taipei TW.
2012 Jul.
International Architecture and Design Showcase,London UK.
Awards 2011
YuanYe Award Landscape International Competition. (3rd Prize)
2011
Bridge Design Aesthetics Competition. (1st Prize)
2011
2011 National Competition of Architecture Association. (Goodwork Prize)
2010
2010 National Competition of Architecture Association (2nd Prize)
2010
2010 Competition of Local Implementation on a Fragile Island,TILA (Goodwork Prize)
IT Skills Adobe Photoshop,Illustrator,InDesign,AutoCAD,Google SketchUP,Microsoft Office,Lumion,Corel Draw
Language Mandarin,English
II
CONTENTS 01. Bachelor Projects - Urban Oasis (Bachelor Thesis) - Let’s Bike (Year 3)
02. Exhibitions , Workshops - Corridor Zipper (International Co-workshops by University Grant Program) - Apocolyptic (International Exhibition of Architecture & Design in UK)
03. Office Works - Set Sail (Dafeng Port International Commercial Affairs Building Landscape Design) - Matrix (Chongqing Jiangbeizui Financial City No.2 Lot A03 Landscape Design) - Unbounded (Harbin MUL-TEC House Landscape Design)
IV
BACHELOR PROJECTS
URBAN OASIS Urban Green Infrastructure Planning & Design Year 4, Autumn 2011 Taipei,TW
Taipei city,capital of Taiwan now is dealing with some critical problems,such as urban heat island, green land fragemtaion,river contamination and distruction of wildlife habitation etc. This project expect to use the method fundiment on urban green infrastrucure planning theroy to find a way of mitigation and adaptation to the problems from urban spaw and related envirmentalproblems. Prompting Taipei to become a city that compares with producting,living & ecology. from urban spaw and related envirmental problems.
2
URBAN OASIS Background
Taipei city,capital of Taiwan now is dealing with some critical problems,such as urban heat island, green land fragemtaion,river contamination and dstruction of wildlife habitation etc.
Objectives
This project expect to use the method fundiment on urban green infrastrucure planning theroy to find a way of mitigation and adaptation to the problems from urban spaw and related envirmentalproblems.
Scope
Taiwan Taipei City TAIPEI RAILWAY WORKSHOP
Taipei Railway Workshop is located in southeast of Taipei acreage 17,000m². It was constructed in 1935 by Japanese. It’s main function was assembling and repairing trains from 1935 - 1990. Now this workshop has been replaced and identified as a historical site in 2001 by city government.
URBAN OASIS Methods
I. Discover & Identify Environmental Resources Nature Landscape Resources
Resources II. Problems & Solutions Issues / Strategies
III. Future Aspects Visions
Culture Landscape Resources Related & Other Resources
G.I. Resources Defining
Building City Aesthetics & Living Experiences Creating Urban Axles & Nudges Unique Industries & Recreations Integrate Urban Green Infrastructures Preserve Indispensable Historical Sites
Transfer & Link up G.I. Resources
Use in situ G.I. Resources Linking with Souroundings Renew Old Factory Spaces & Preserve Historical Relics Flip Currient Street Elevations & Reserve Openspaces for Residents Importing Culture Industry & Recreations with Related Programs
New Types of Usage
4
URBAN OASIS Rigional Planning Mapping Urban Sprawl
In the mid-18th people who live in Taipei build their 1904 villiage along Dansui & Xindian river and foothills in the basin living rely on agriculture despite there are villiages but the population are in a small number. Through the 19th centry Taiwan was colonialed by the Japanese, the government of Japan develope Taipei City agressively. The railway system was built during the colonization. After the universal of the train network Taipei convert into an industrial society from agriculturial. In the mid-20th centry,the Taiwan government start to develope the city aggresively after that many public facilities were erected. Taipei now has become a serious densely populated and urbanized city .
1875
1905
1920
1935
1958
1972
1980
1990
2000
2011
1895-2011 Population of Taipei
1875
1905
1920
1935
1958
1972
1980
1990
2000
1949
2012
Settlements
2011
1895-2011 Green of Taipei
The bar chart illustrate an extrime growth of the population and an extrime decrease of the green land and openspaces. This is the main cause of the urban heat island.
URBAN OASIS G.I. Resources Mountains
Rivers
Wetlands
Farmlands
Parks & Greens
Schools & Corridors
Brown Fields
Brown Fields
Urban Infrastructure contains with two different types of infrastructures “Gray Infrastrutures” & “Green Infrastructures” . Therefore green infrastructure was known as a biological network system. It includes “Hubs” and “Linkage”. Through using Geographic Information System (GIS) to find out Green Infrastructure in Taipei basin with eight different factors such as mountain, rivers , wetlands, framlands, parks, schools & corridors, brownfields ,and heritages to define their locations and character in the G.I network.
6
URBAN OASIS Rigional Planning Strategy
Through the mapping of all the green infrastructure resources it is clear to define the distribute of all GI rescources in Taipei basin and we can devide Taipei into 8 districts such as Dansui, ShihLin & Beitou, Shezhi, Taipei Metropolitian, Neihu & Nangang, SanChung , Luzou & Xinchuang, Banquao & Zonhe Younghe, Xinian & Muzha etc. Each district has it’s own unique landscape and function surporting the city. Through the mapping analysis we can formulate the strategies of each districts to built the green infrastructure network to make a connection between nature region and urban region. The site that been chosen is in the district of “Taipei Metropolitian” area. Based on the analysis above as well as the various function of the dividing sub-systems, we can clearify more about the orientation of the site and the role in Taipei city.
URBAN OASIS Dansui : 1. Make an extention and connection to the green space on the edge of the mountains. 2. Relink riverfront and ocean. 3. Creating culture sight seeing & Eco-traveling system.
Sanchung , Luzou & Xinchuang : 1. Develope green industry 2. Enhance the quality of cultural sightseeing and living. 3. Creating mutiple living environment.
● Shihlin & Beitou : 1. Consolate mountain ridges. 2. Renforce the relationship between rivers and residental areas. 3. Develope eco communities and industral parks.
● Taipei Metropolitan : 1. Construct complete green infrastructure network. 2. Link up exsisting G.I. systems. 3. Built urban detaintion sewer system..
Shezhi : 1. Develope Low Carbon Communities. 2. Construct Urban detention sewer system.
Xindian & Muzha : 1. Develope Low Carbon Communities. 2. Consolate mountain ridges. 3. Enhance the relationship with the rivers.
●
●
● Neihu & Nangang : 1.Maintain mountain ridges. 2.Develope eco-techonology industry.
●
●
Neihu & Nangang : 1.Maintain mountain ridges. 2.Develope eco-techonology industry. ●
8
URBAN OASIS District Planning Mapping District Planning Analysis
Zoning Analysis
Water Analysis
Green Analysis
Eco-transit Analysis
Through the rigional planning result we can easily see that the green infrastructure in Taipei is fragled and broken. In the district planning we have to define all the breaking points and the texture of the network based on five orient developement treatments to achieve a sustainable oriented developement city. The following diagram is the five oriented developement treatment.
Sustainable Oriented Development ● ● ● ● ●
Transit Oriented Development (TOD) People Oriented Development (POD) Green Oriented Development (GOD) Cultural Oriented Development (COD) Water Oriented Development (WOD) TOD
SOD POD
Transit Oriented Development
People Oriented Development
COD
Cultural Oriented Development
GOD
Green Oriented Development
WOD
Water Oriented Development
Sustainable Oriented Development diagram
URBAN OASIS District Green Infrastructure Planning Strategy
After the previous analysis it is east to find out which area that need to consolate, relink or enhance the strengh of the G.I. network. The diagram on the right displayed the ideal green infrastructure of Taiei Metropolitian Area which is the area that also Taipei railway workshop was located. By knowing the difference of those broken points in the green infrastructure we devided them into 4 different type and we came out with 4 different strategies to fit in. Such as “Green Infrastructure Consolation” “Potiential Site Creating” “Reinforcemnt” and “Crossing Point Enhancement”.It is clear that our site is an improtant and irreplaceable potential site of the network. Based on the district analysis there are three main concept for Taipei Railway Workshop. 1. Cultural heritage preservation and link up urban culture axis. 2. Urban flood control area. 3. Green Infrastructure mending hot spot. Site
Reforcement Point
Potiential Site Creating
Crossing Point Ehancing
Green Infrastructure Consolation 10
URBAN OASIS Site Analysis G.I Resources Distribution Green field distribution
Water distribution
1. This area is lack of water area, there are only two arificial lack in this area and none of them is in our site. 2. Due to the heritage site this area preserve enlarge amount of green fields and trees. 3. The diagram display the distribution of the street wider than 15m and also have street trees. 4. There are three herticulture site in this area and Taipei Railway Workshop is one of them, the others are Songsan Tabaco Factory and Sun-YetSan Memorial Hall.
1 2 3 4 Corridor distribution
Culture heritage distribution
URBAN OASIS Historical Timeline 1899
1931
1935
1941
The Workshop was The capacity of the The Workshop The Pacafic War triggered built in the middle workshop was full so was construced and Taiwan was attacked of Taipei City the workshop has by the U.S. army most of been moved to the the railway system were east of Taipei City hardly damaged and the and reconstruct at workshop was forced to the currient location. closed.
北門台北鐵道工廠設立
1962
1978
2001
Taiwan got the fund from America and the workshop was fixed and enlarge the function then it became the biggest railway workshop in the south-east pacific area.
The freeway system became more accessable than the train so the railway system has been replaced by trucks.The workshop was abandent in 1970s.
In 01.05.2001 Taipei Railway Workshop has been designated as a herticultural site by the Culture Affair of Taipei City.
新台北鐵道工廠
太平洋戰爭
澡堂畫定為歷史古蹟
12
URBAN OASIS Factory Zoning
There are four kinds of different function in the workshop namely “Cart Factory”, “Repairment Factory”, “Diesel Power Factory” and “Electric Power Factory”. Cart Factory: The main function of the cart factory contains fixing the entire 636 air-conditioned carts and 516 non-airconditioned carts, also the factory supports all the electric locomotives and diesel sheet metal work. The coach factory use as fixing the EMUs (similar as the assemble factory). Repairment Factory: The rapairment factory repairs all the break systems and valves devices on the train, and specially all electrical equipment maintenance and the full range of vehicles are mainly shock absorbers; also for the production, manufacture and testing of some of the main springs. Electric Power Factory: Responsible for power trams and the maintenance of EMU and supports diesel motor car body wheels Rotary cutting operations, and the whole plant or a commonly used special machined parts. Diesel Power Factory: Responsible for the maintenance of diesel-electric locomotives tasks. Addition to the maintenance of diesel electric locomotive traction motors and various turn back outside and are responsible for electric locomotives and EMUs traction motors and maintains of other transfer parts
Cart Factory
Repairment Factory
Diesel Power Factory
Electric Power Factory
URBAN OASIS Historical Buildings
Taipei Railway Workshop has been announced as a historical site officially by Taipei cultural affair in 05.01.01 and the buildings were divided into 3 different preservation levels, level 1 stands for most improtant historical site in the preservation law and so on by the number. Level 1 : The bathroom, Assemble Factory Level 2 : The great hall, Office, Cart Factory,Chimney Level 3 : Engine Factroy,Machinery Factory,Kaji Factory The figure below discribe the constrction area of all different level of the historical buildings,and each percentages of the overall construction areas.
Building Area
Catagories
Total Construction Area (m²)
Overall Percentages (%)
Level 1
5574.2 m²
9%
Level 2
16312.1 m²
28%
Level 3
14092.7 m²
24%
Others
22841.0 m²
39%
Total
58840 m²
100%
Level 1
Level 2
Level 3
14
URBAN OASIS Space Textures Circulation Texture
Constructions Texture
Horizontal Circulation Virtical Circulation
Open Spaces (Soft Pavement) Open Spaces (Hard Pavement)
It is obvious that the circulation in the workshop has been cut clearly as virtical direction and horizenital direction in the site because the site was a factory space in original.On the other hand there are a number of small open spaces cut by the circulations and buildings.Futher more the abandent railway track in the field on the south-west creat a unique landscape as well. The factory strongly reveal the spirital of railway industrail from flourishing to debilitating.Large scale factory spaces,scattered pipeline,sometimes open and close circulations and full with liner spaces tightly woven the space structure of Within & Inbetweens.
1F 2F
3F 4F
5F and above Crane Facility
The main construction of the workshop are concret buildings which is built in 1-4 floors. Creating a unique landscape of industrail site with special visual experiences. However the building in the workshop are much lower than the surrounding areas. The building surrounded will effect the visual and space experiece much more than the building in our site. Besides the chimney which tall by 45m located in the south side in the site is the only landmark that provides great visiualbility and clear idenity for the user and the factory.
URBAN OASIS Issues & Strategies
Green Infrastructure issues :
The green field and open space is fracture and shred. Besides the surrounding area is a flood potiential area in downtown Taipei and this area is lack of detaintion and retaintion facilities. The region will have a great oppurtunity to witness a disaster when the typhoon hits or dealing with heavy rains.
How to link up all the green fields and openspaces? Relocate the green fields and openspaces try making the fracture re-integration as possible as it can be and creat a green corridor or green network. How to slove the flood problem? Make good use of the exsisting ditches & channels, re-open the culverts and decrease the area of impremeable pavements make good use of mid water system and creat a detaintion pond in the site. Horticulture preservation issues :
The site owned the most important railway industrail heritage of Taipei, besides there are many buildings were nominated as a monuments which is preserved with a high celings and large span architecctural features. Further this workshop is the most important hot spot on the culture corridor.
How to preserve and turn all the old fabrics into good use?
Basicly most of the buildings are protecting by the law so it is nearly impossible to demolish the monuments, so it is more easier to re-introduce new types of activities such as railway meseum, unban farm and exhibition spaces etc.
16
URBAN OASIS Urban Activities issues :
Basically the site is located in the core position of the city so the land use of this area are mainly residental areas and commercial areas. By the way there are several activity hot spot near by so when there is an big event being held it is a serious problem with traffic and crowd evacuation. The exsiting region and residental area are in a distance so the accessibility is weak so the area is full of negitive spaces.
How to change the relationship and accessibility between residental area and the site? Through enhancing the strengh and density of the activities in both site and surrounging area. Creating unique landscape and openspaces to actract people to come over from their home. Further use different scales of possitive & negitive spaces to create several types of spaces. How to solve the traffic issue when there is a big event being held? Creating enough openspaces, clear circulation system and signature guide for the crowds and set up convient public transportation systems all around the area to decrease the number of private transportation of the area.
URBAN OASIS Vision
Humanity urban living spaces :
A place covered with green transit system
Equally considered mass transit system, pedistrain sapces, and bicycle path into entire circulation system.
People oriented developement
The planning of openspaces are all consider due to thr residental area and put the suitable activities and functions in it.
Premeable urban spaces :
Creating green belts and corridors
Built up riginal green network and link up with both virtical and horizontal methods such as green wall & roof gardens to mend the broken green system.
Enhance site water preservation and flood dranige system
Apply eco-construction methods instead of traditional methods to mantain more mid-water than the earlier methods. Creat detaintion and retaintion pond to avoild flooding issue to occur.
Space with memories Old frabics and historical site preservations
Reconstruct the old factory spaces into different uses such as railway museum, musical performance spaces or theaters. Reintroduce new activities to reactivate the current spaces that have been long forgotten. Also let people relize the history of the great railway industries that we have.
18
URBAN OASIS Concepts Remove and Preservation
The current fabric of the workshop is close and isolate with the surroundings. After remove some buildings to make the circulation more simple and accessible to the residental and commercial areas.
Before Current Figure Ground
After
Demolish Figure Ground
Final Figure Ground
URBAN OASIS Integregate Linkage
Circulations
Accessibility
Acticities
Space under the highway
1. Linkage of south-north and east-west bund 2. Simple curculation and preserve the original texture of railway tracks. 3. Creat a green barrier under the highway to decrease the noise of busy car flows. 4. Enhance the accessibility by creating entrance in each important corner. 5. Introduce multiple activities indoor or out door to actract people to come over.
20
URBAN OASIS Zoning
8 5 6
3 1
Cinema
2
Department Store
4
Hotel
Sungsan Tabaco Factory Creative & Culture Park
Arena
9 10
7
11
1
Transit Hub
2
Railway Park
3
Designer Studio
4
Information Center
5
Manage Office
6
Urban Vegetation Center
7
Railway Meseum
8
Bathroom Historicl Site
9
Classical Drama Theater
10
Art Exhibition Center
11
Excersise Plaza
Park
Hotel
Office
URBAN OASIS Project Approach Master Plan 1 2 3
20 17 18
13 12 5
1
3
7
6
10
19
5
14
11
4
4
22
23 10
2
9
21
9
6 12
15
8
24
11
7 16
13 8 14 15 16 17 18 19 20 21 22 23 24
Transit Station West Entrance Railway Landscape Park Railway Square Platfrom Arbor Platfrom Caf’e Art Studio & Design Office Urban Vegetation Center South Entrance Office Eco-Detaintion Pond Food Court Information Center Aqua Avenue Railway Museum Exercise Plaza Bathroom (Historical site) Music Exhibition Center Amphitheater North Enterance Art Gallery Tree Plaza Outdoor Exhibitions Creative Market
22
URBAN OASIS Sections
Section A-A’
Exercise Plaza
Outdoor Exhibition Space & Railway Meseum
Amphitheater
Section B-B’
Vegetation Buffer
Railway Square
Section C-C’
Railway Park
Platfrom Arbor
Information Center
Detaintion Pond
Trail
Urban Vegetation Center
URBAN OASIS Map Index A
C Music Exhibition Center
Urban Vegetation Center
Trail
Trail
B
A’
C’
B’
Bathroom Sidewalk Historical Site
Vegetation Buffer
Management Office
Amphitheater
Sidewalk
Tree Square
24
URBAN OASIS
URBAN OASIS
26
URBAN OASIS
URBAN OASIS
28
URBAN OASIS
URBAN OASIS
30
URBAN OASIS
URBAN OASIS
32
URBAN OASIS
URBAN OASIS
34
URBAN OASIS
URBAN OASIS
36
LET’S BIKE! Theme Park Planning & Design Year 3, Summer 2011 Changhua, TW
Taiwan, Known as the kingdom of bicycle manufacturing in the world therefore Changhua county is the most improtant core site design and produce bicycles. Besides as the raise of the green transprotation mode has been promote eagerly in recent years. The government deside to construct a bicycle theme park in Erlin,Changhua.
38
LET’S BIKE! Background
Taiwan, Known as the kingdom of bicycle manufacturing in the world therefore Changhua county is the most improtant core site design and produce bicycles. Besides as the raise of the green transprotation mode has been promote eagerly in recent years. The government deside to construct a bicycle theme park in Erlin,Changhua.
Scope
Objectives
This project is closly relitive to the entire country cycling system in Taiwan and this theme park is one of the most improtant cycling park that not only most of the cycling competitions con be held in here but also contain with the bicycle meseum for education people how the bicycle be made and the history of the bicycles.
Taiwan Changhua,Erlin
Erlin cycling park is located in mid-west of Changhua county acreage 17,500m². It is near the Erlin town that best of bicycle manufacturing, and it is also an important hot spot in the national cycling route. The county government decide to develope this site as a theme park for bicycle users to held competitions of all kinds of cycling races and educate people the knowledges of bicycles
ERLIN BICYCLE THEME PARK
LET’S BIKE! Site Anaysis Bcycle Route System Lugang Xihu Culture Center Xihu Sugar Factory Erlin Bicycle Theme Park
Mailiao Xihu Elementary School Xihu Farm Circle Route Rigional Route
Taiwan Sugar Experiment Center Beilou
Erlin Farm
Linnei Douliu City Douliu Sugar Factory Gukeng
There are two national bicycle routes in Taiwan. One of them is the circle route and the other is the rigional route.. The circle route go through big cities and the surrounding towns and it’s for all bicycle users , the rigional one only go through big cities so it’s for the advanced bicycle users. Erlin bicycle theme park is located in the cirle route and there are many hot spot nearby means it plays an important role in the whole system.
40
LET’S BIKE! Slope Analysis Slope
Slope Direction
WS W WN
0%-5% 5%-15% 15%
This site is located on a hillside that mainly the slope are between 5-15%. Based on this information the grading cut and fill will be improtant during the development.
There is a ridge extent from east to the north-east of the site. Beside the highest elevation point is located in the south-east of the site witch is EL 84.41m and the lowest appear in the west which is EL 37.77m.
LET’S BIKE! Concepts Design Requirement
Bicycle Meseum (Total: 10,000㎡) 1.Storage Spaces 2.Exhibition Spaces 3.Special Exhibition Spaces 4.Media Room 5.Library 6.Gift Shop 7.Resturant 8.Bicycle Parts Shop 9.Industry Promote Space 10.Administrative Space 11.Public Service Space 12.Eletrical Equipment Space 13.Parking
BMX Field (Total: 6,000㎡) Include Auditorium
750㎡ 1,000㎡ 500㎡ 800㎡ 350㎡ 500㎡ 500㎡ 750㎡ 350㎡ 350㎡ 1,500㎡ 700㎡ 1,800㎡
Bicycle School (Total: 2,000㎡) 1. Media Classroom 2.Bcycle Classroom 3.Equipment Classroom 4.Office 5.Public Servise Space 6.Electrical Equipment Space
350㎡ 350㎡ 350㎡ 100㎡ 200㎡ 150㎡
Parkinglots
Buses: 8 seats,Cars: 160 seats,motorbike: 34 seats
Detaintion Pond (Total: 3,000㎡) In this case at least 3000㎡
Off-road bike trail
42
LET’S BIKE! Zoning
Zoning Diagram
From the design requirement list this zoning diagram display the construction’s locations and the size of each activities took place. Bicycle Recreations
The Great Meadow
Detaintion Pond
Motorbike Parkings
The Tsao Family Tumb BMX Fields (Historical Site) Central Plaza
Entrance Bicycle Meseum
Resturant
Parkinglots
Temple
Off-road Tracks
Bicycle School
LET’S BIKE! Concept of the Meseum
The concept of the bicycle meseum is based on the form of the bicycle transmission parts. The metal part become the construction and the hollow part become patio on the rooftop. Besides this building also have bicycle tracks on the roof top link with the track on the ground so visitors can ride their bike from ground level to the top of the meseum to over look the whole theme park.
Bicycle Meseum Concept Diagram Patio
Green Roof
Bicycle Meseum Building
Bicycle Transmission Parts
Bicycle Track
44
LET’S BIKE! Circulations
There are four different types of circulations for the bicycles in the park namely Main bicycle track(For circling the whole park), Rigional bicycle tracks, Off-road tracks and Rooftop tracks.
Main Bicycle Tracks
Rigional Bicycle Tracks
Off-road Bicycle Tracks
Rooftop Bicycle Tracks
Activities
Rider’s Party
Winter
Bicycle Meseum Exhibition
BMX International Tour
National Graffiti Festival
Street Dance Festival
Off-road Race
Autumn
Bicycle EXPO
Latest Bicycle Exhibitions
Bicycle Marathon
Maple Season
Temple Festival
Summer
Wetland Advanture
Floating Bicycle
BMX Competition
Grass Skiing
Bicycle Riding
Kite Flying
Picnicing
Flower Watching
Spring
Bicycle Summer School
This is the diagram that shows different activities that can be held in the theme park in four seasons.
LET’S BIKE! Project Approach Master Plan A Entrance Plaza (Drop-off zone) B The Tsao’s Tumb (Historical Site)
J
C Bicycle Exhibition Center
D Bicycle History Gallery E Centeral Plaza (Bike Renting,Performing Spaces)
K
H G
F Detaintion Pond (Bird watching,Aquatic Plants Guide) G Water Bicycle Harbor (Water Bicycle Renting) H The Great Meadow (Grass Skiing,Picnicing,Race Gathering Place)
B
F
I
E
I BMX Field J Rest Stop (Water,Bumping,Fixing) K Motorbike Parkings (120 seats)
A
C D
L
L Food Court (Caf’e,Resturants)
P
M
M Temple (Exsisting Historical Site) N Off-road Track O Bicycle School (Bicycle Knowledges,Learning) P Parkinglots (Cars 160 seats, Buses 8 seats)
N
O
46
LET’S BIKE! Detail Design
Bicycle Exhibition Center
This is the core of the whole park providing almost all kinds of service for the visitors. Not only the center plaza will held outdoor events but also the exhibition center itselt always has the exhibition of bicycles. Worth to mention is the rooftop bicycle tracks it provide visitors unique riding experience to ride on the roof and overlook the whole park as well.
Bicycle Exhibition Center Plan View Bicycle Exhibition Center Section
LET’S BIKE!
Parkinglots
Because the parkinglot is locat on a slope so the design of the parkinglot will be form like a terrace. Not only encrease the number of the parkings but also preserve enough spaces for the vegetation area for shading. Beside the vegetation area construct with a sidewalk for pedestrians and the paving is different between sidewalk and the car drive to remind the drivers to slow down while crossing the pedstrian area. Parkinglots Section
Parkinglots Plan View
48
LET’S BIKE!
Detaintion Pond
In addtion to the ecological purpose setting a detaintion pond in the site can clear the mid-water and restore it. Beside it also provide many wildlife habitats in the wetland and more water activities and experience for the visitors, and become the most ecological place in the park.
Detaintion Pond Plan View
Detaintion Pond Section
LET’S BIKE! Systems
Afforestation Program
Paving System
This hillside was a cemetery ,and it is hard to see big trees in cemetery at Taiwan. Desipe that is it a massive work with the planting design we use the common reforestation method to refill the vegetation in the site. By the concept of the vegetation system choosing the original species is the best way for afforestation for the site and trees.
Based on most of the circulations are for bicycles so porous asphalt will be use in all the bicycle paths. Granite and slate are apply in the squares or plaza which contains with heavy capacity in the site.
50
EXHIBITIONS & WORKSHOPS
CORRIDOR ZIPPER International Co-workshops by University Grant Program International Workshop, Summer 2012 Taipei, TW
By the developent of Taipei city there are many invisible corridors in the city during the old railway tracks paths we have many historical sites all along and many of the historical site have turned into museums or creative parks and there is another invisiable corridor between Taipei city and Yangmingshen national park which is regard as the living corridor and Shuang Xi Park is located on the crossing point between two corridors.
54
CORRIDOR ZIPPER Background
By the developent of Taipei city there are many invisible corridors in the city during the old railway tracks paths we have many historical sites all along and many of the historical site have turned into museums or creative parks and there is another invisiable corridor between Taipei city and Yangmingshen national park which is regard as the living corridor and Suang Xi Park is located on the crossing point between two corridors.
Objectives
Firstly the main objective is to refunction the park as a gateway between Taipei city and Yangmingshan national park which include the improvment of the access to the mountain. With regard to traffic flow the traffic issue around the park must to be sloved by providing varety of public transit system in the park. Last but not least is to slove the weak relationship between residental area ,park and the riverfront.
Scope
Taiwan
Taipei City
Shuang Xi Park is located in northwest of Taipei acreage 3,200m². It was the most improtant crossing point between the living corridor and culture corridor of Taipei and also the gate of the Yangmingshan National Park. In history it was a gift for the president in 1960s now it was nearly abandent and lack of management and users eventhough there are many neghibor hoods nearby.
Shuang Xi Park
CORRIDOR ZIPPER Urban Model Corridor Relationship
Yangmingshan National Park
The diagram on the left illustrates the relationship between Taipei city and Yangmingshan National Park. Shuang Xi Park is locate in the red triangle position so it is clear that this park plays a very improtant role as a gateway from urban area to the nature area. The picture below displayed two corridors and the crossing point which is crossing just right at the park and this refer this park is plays an important role between urban living and the culture experience of the city. Shuang Xi Park Living Corridor
National Palace Museum Culture Corridor
Taipei City
56
CORRIDOR ZIPPER Issues & Strategies Circulation Issue
Shuang Xi Park located in an important intersection that with heavy car flows during both work days and holidays. After some caculation of the daily capacity the result is much way too far from the current situation to the capacity it should be. So it have to make a lot of change from the current situation. The first thing is introduce the public transprotation such as the mass rapid transt system and city bicycle system to reduce the heavy traffic issues. Second is to change the circulation system from one layer into several virtical layers to make better use of the spaces.
Daily Capacity Analysis
Daily Visit:
Traffic Flow Treatment
11,506
Total Resident of Taipei City: 3,000,000 people/year Total Visitors: 1,200,000 people/year About nearly 8,219 people/day visit Yangming Mt. About nearly 3,287 visitors/day visit Yangming Mt.
Daily Leave: Total Resisident of Yangming Mt.: 35,538 people/year About nearly 98 people/day left Yangming Mt.
Daily Total: Total visitors of Yangming Mt. 11,408 people/day
98 11,408 City Bicycle Rental
MRT Station
Current Car Flow
Car Flow After improvement
CORRIDOR ZIPPER Spatial Issue
It is clear that the relationship between residental area and the park is weak because the width of the road is too wide and the same problem occurs with the riverfront. These issue can be sloved after we apply different layers of circulations through the bridge or the under paths trun the park into a virtical park and systems to link up with the spatial all around.
Spatial Issues
Virtical Spatial Diagram
Residental Area
Spatial Fragmentation
58
CORRIDOR ZIPPER Embankment Treatment
The embankment among the riverside inturrupted the connection between the residential areas and the park. There are three types of relationships between to the embankment. The diagram below illustrates the current situations and the treatment to the situation in the future.
Type A
Current Situation.
Step1 - Create different layers of spaces and make linkage to both sides of rivers.
CORRIDOR ZIPPER
Type B Current Situation - Low level residential buildings with the embankment
Type C Current Situation - High level residential buildings with the embankment
Step1 - Lower the roads Step1 - Creat a bridge from the second floor to the embankment
Step 2 - Creat a slope from side walk to embankment
60
CORRIDOR ZIPPER Concept The Zipping Up
Shuang Xi Park is located right at the diversion point of two corridors and it is no doubt that it is in an unreplaceable starting point to access to both corridors. As the diagram displayed the relationship between two corridors and the site is like a shape of opened zipper and the park is right at the connection between two corridors. This project aims to zip up the relationship of both corridors and the relationship with the riverfront and the surrounding residential areas so it is more like a hub than a park in the future.
Nature Corridor
Residential Area Shuang Xi Park Culture Corridor Residential Area
CORRIDOR ZIPPER Project Apporach Master Plan
5 4 2 6
3
7 1
1
MRT Station
2
City Bicycle Station
3
Parking Lots Entrance
4
Virtical Park
5
Amphitheater
6
Forest Blvd.
7
Bird Watching Deck
62
CORRIDOR ZIPPER Circulation System
Car Circulations
After introduce more public transprotation system into shuang xi park it is more lilely to have a great decrease to the capacity of car flows. Which means the road system can be more simple so the small access used to be at the south of the park has been demolished whereas the park can be extent to the south and make linkage with the school to release more public spaces.
Pedestrain & Bicycle Circulations
Adding more layers of pedestrain and bicycle paths and access is a more pratical way to make linkage in a fragle space which is not possible to change current road system. Creating a complete circulation web system is more efficient treatment to the site and construct a friendly green transportation system.
CORRIDOR ZIPPER Function Diagrams Park & MRT
Park & Underpass
Park,Underpass,MRT and Parkinglots
Double Layerd Park
Outdoor Exhibiton Spaces
Park
Connection Of The Riverfront
64
CORRIDOR ZIPPER
CORRIDOR ZIPPER
66
APOCALYPTIC International Exhibition of Architecture & Design Exhibition, Summer 2012 London,UK
Due to the climate change all around the world our living style will be totally different in the future. This project illustrate the life sytle of Taipei City in 2112 if the environment getting worse amd worse which means many disaster occured in the future such as sea level rising, deforestation and nuclear power pollution etc.
68
APOCALYPTIC Background
Due to the climate change all around the world our living style will be totally different in the future. This project illustrate the life sytle of Taipei City in 2112 if the environment getting worse amd worse which means many disaster occured in the future such as sea level rising, deforestation and nuclear power pollution etc.
Objectives
This project aim to remind people the life style in the past and what will happened if people still ignore the environment issues through the rendering images.This might happened someday in the future not only in Taiwan but all over the world. Through this hard-earnd chance participating this international exhibition during the great olympic game held in UK to warn people in each corner on this planet.
Scope
Taiwan
Taipei City
TAIPEI BASIN This project focus on the changing in Taipei basin by having serveral survays and also doing simulations of the future landscape and life styles. Taipei basin used to be a lake from 500 B.C. to 17th centry after the erotion Taipei Lake bocame a basin in 400 years Taipei basin became a metropolitan city from a swamp and who knows what will be the next in the future?
APOCALYPTIC Landscape Changes (M) 1000 900 800 700 600 500 400 300 200 100 0 -100
(M) 1000 900 800 700 600 500 400 300 200 100 0 -100
(M) 1000 900 800 700 600 500 400 300 200 100 0 -100
(M) 1000 900 800 700 600 500 400 300 200 100 0 -100
(M) 1000 900 800 700 600 500 400 300 200 100 0 -100
0
1,000
3,000
5,000
10,000
20,000
25,000 (M)
0
1,000
3,000
5,000
10,000
20,000
25,000 (M)
0
1,000
3,000
5,000
10,000
20,000
25,000 (M)
0
1,000
3,000
5,000
10,000
20,000
25,000 (M)
0
1,000
3,000
5,000
10,000
20,000
25,000 (M)
70
Maybe one day the human civilization will be compeletly destroyed in the near future due to the climate change...
72
It seems too difficult to rehabitate... 74
Maybe this is only a dream for mankind...`
76
OFFICE WORKS
SET SAIL Dafeng Port International Commercial Affair Building Landscape Design Office Work 2012,Autumn Dafeng,China
Dafeng Port has been included in the 63 ports with direct ships to Taiwan. Other international navigation lines are also linked to Korea, Japan and Russia. Surround the Sun Moon Lake, many new industrial parks have built in this port area such as renewal energy, petro-chemical, material, medical,metallurgy, machinery, timber and agricultural products processing industry, in total five main industries. These industrial parks and new port city, marine education center together are becoming the pilot projects of this new port area development.
80
SET SAIL Background
This Project is located on the Sun Moon Lake southeast coast in Dafeng City, Jiangsu Province. Dafeng Port is one of theimportant construction in Jiangsu. It is the national first class open port. In the center of the 1040 km coastline of Jiangsu Province port blank tape, modern traffic pattern has been formed.
Objectives
Firstly the main objective is to refunction the park as a gateway between Taipei city and Yangmingshan national park which include the improvment of the access to the mountain. With regard to traffic flow the traffic issue around the park must to be sloved by providing varety of public transit system in the park. Last but not least is to slove the weak relationship between residental area ,park and the riverfront.
Scope
CHINA
DAFENG CITY
The100 meters highDafeng port international commercial affairs buildingis located in the middle of the land,andthe outdoor space isthedesign range.This project creates a variety of public spaces, such as cascading platforms, sunken plaza, and so on. Total public landscape design area is about 13,000 square meters( 20,500 square meters Including municipal green space ).
DAFENG INTERNATIONAL COMMERCIAL AFFAIR BUILDING
SET SAIL Rigional Analysis Corridors
Water Systems
Hubs Nature Corridor Culture Corridor Industrial Corridor
Channels Recreational Waters
In the Dafeng New Port City master plan, a East-West living corridor is planned in the central area and surrounded by industrial parks. Within this living corridor, a large lake is the center and combined with the wetland in the north forming another South-North green corridor. These two corridors are providing a good quality of living environment and also becoming an attractive place. Additionally, two new planned large water areas are potential for the water recreation where the site is exactly located. Therefore, water becomes the key element in this landscape design project
82
SET SAIL District Analysis Centralities
Flows OUTLET SHOPPING
L/M LA
VIL
LA
SHOPPING
VIL
WATER LEISURE
WATER LEISURE
NT
THEME PARK
C
AU ST
RE
RE
AL
M
THEME PARK
EDUCATION/ COMMERCIAL
C
UR ULT
N
E RE
D
OA
GR
N RI
PARK
AL
UR ULT
NT
RA
RA
AU ST
K
R
PA
STREET
URBAN
K
R
PA
OFFICE
HOTEL
ADMINISTRATION/ COMMERCIAL
EXHIBITION/ OFFICE/HOTEL
G
S
COMMERCIAL
L M
International Core National Core
S
Local Core Site
Green Belt
Administrative Core
Tourisim Core
Green Corridor
Recreational Waters
Commercial Core
Commercial Corridor
Community Paths
There are three sub centers in the New Port City central area. Each sub center contains different public facilities and thus individually characterized as international, regional, and local center. The site is located in the international center and accommodated various programs such as administration, outlet center, hotels, exhibition hall and office etc. The shopping flow from the north-west outlet center will be continued toward east and combined with the exhibition hall and office in the site and another recreation flow along the green ring road, these flows could be reinforced as a business trip package via a good public space design in this area.
SET SAIL Site Analysis Road System
Spatial Structure
Circulation
Entrance
Nudges
Spatial Corridor
Main Entrance
Secondary Entrance
The new commericial affair building is located on an important entersection which is near the lakeshore, riverfront park and outlet store. There are two important visual and spatial corridor in the north and west through our site. There are many special ndges hidden in the corridor so the aligment of each space is quite important with the openspace and landscape of the building.
84
SET SAIL Concept The building in base is like ahugewheel, the concept of landscape design is “the huge wheel pilot out to sea�, reflects thedevelopment of Dafeng City. The landscape design of the including: Rise and Fall, Balance, Bridge, Division, and Axis, to reveal the characteristics of international modern port city should be presented. Reflect on the human and natural qualities, such as the harbor, waves, educated youth farms, wetlands and other elements to form water and green urban landscape space. Design style and materials reflect the characteristics of the building, Building and site have a unified style, at the same time to make appropriate changes so that there are different details.
Street Corner Plaza
Parking
Parking
Urban Plaza
Mir
ror
To Ou The tlet
Hotel Entrance
Fun tain
Water Feature
To The Lakeshore
Trade Exhibition Center
10m
SET SAIL Project Approach 1
Sailing Boulevard (Main Access)
2
Economic Boulevard
3
Palm Boulevard
4
Trade Boulevard
5
Exhibition Plaza
6
Welcoming Plaza
7
Hotel Drop Off
8
International Plaza
9
Globe Sculpture Public Art
10
Edgeless Pool
11
Eco-Pool
12
Wave Landscape
13
Island Landscape
14
Parking Lot
15
Bicycle Parking
16
Underground Parking Entrance 1
17
Underground Parking Entrance 2 Building Red Line
86
88
90
92
MATRIX Chongqing Jiangbeizui Financial City No.2 Lot A03 Landscape Design Office Work 2012,Autumn Chongqing,China
This Project is located in Jiangbeizui CBD A03 Lot, as part of Chongqing Jiangbeizui Financial City No.2. Chongqing City, has rich and various historical, cultural and geographic resources. Jiangbeizui is located at the intersection of Yangtze and Jialing River and serves as the stop of business ships. Since ancient times, it is considered as an important economic transportation center.
94
MATRIX Background
This Project is located in Jiangbeizui CBD A03 Lot, as part of Chongqing Jiangbeizui Financial City No.2. Chongqing City, has rich and various historical, cultural and geographic resources. Jiangbeizui is located at the intersection of Yangtze and Jialing River and serves as the stop of business ships. Since ancient times, it is considered as an important economic transportation center.
Objectives
The architectural layout creates a cross-shaped open space in the central and in the perimeter. Because of different topography at each corner, this project creates a variety of public spaces, such as cascading platforms, sunken plaza, and semi-open space which have different elevations. In order to connect those spaces, interesting landscape elements are used, for instance, corridors, stairs, ramps and raised planters
Scope
CHINA CHONGQING Financial City No.2 Lot A03
Four commercial buildings are planned at the four corners of A03 Lot. The architectural layout creates a cross-shaped open space in the central and in the perimeter. Total public landscape design area is about 1,174 square meters
MATRIX Location
Tower 2
Tower 1
A03 Tower 3
Tower 4
A04
A03
A04
Tower 2 38 fl Tower 1 25 fl
Tower 3 Tower 4 30 fl
96
MATRIX Concept
FOREST
Miao’sTin-Embroidery
RIVER
MEADOW
TERRACES
WATER FALL / STREAM
MATRIX The landscape design follows the major design concept of the project: Rise and Fall, Balance, Bridge, Division, and Axis, to reveal not only a sense of splendor but also stability as the essential spirit of a modern financial center. Design Elements & Transformation Forest
The green corridor on the major west-east axis.
Stream
The water basin along the green corridor.
Waterfall
The waterfall between the central and sunken plaza.
Fountain
Small water features along the western corridor, splash fountains at the eastern transition plaza, and the fountain display at the office building entrances.
Meadow
The use of seasonal / perennial groundcovers and shrubs.
Terrace
A series of platforms at the office entrance (+257), central plaza (+252) and sunken plaza (+246.4); the grand stair on the eastern corridor, and terraced planters‌etc.
Tin-Embroidery
Reflecting the embroidery’s stripe pattern on the pavement of the site to integrate overall architectural and landscape elements into one unified entity.
98
MATRIX Project Approach A Entrance Plaza B Central Plaza C Grand Staircase
D Water Dance Plaza
A
C B D
MATRIX
100
MATRIX
MATRIX
102
MATRIX
MATRIX
104
UNBOUNDED Harbin MUL-TEC House Landscape Design Office Work 2013,Spring Harbin,China
This Project is located in Harbin near the Harbin botanical garden. It is a new developing area that eight high level residental building will be construct in the site. This project aims to have creat a good living openspace for the neghiborhood and enhace the chance to make people to live closely.
106
UNBOUNDED Background
This Project is located in Harbin near the Harbin botanical garden. It is a new developing area that eight high level residental building will be construct in the site. This project aims to have creat a good living openspace for the neghiborhood and enhace the chance to make people to live closely.
Objectives
Creating the openspaces that contains with a lot of landscape elements such as water features, paths, and recreation areas. These spaces will shown exteremely different during four seasons especially in the winter the garden will be covered by the snow and the water feature became an ice rink.
Scope
CHINA
HARBIN
HARBIN MUL-TEC HOUCE
The total area of this project is 38635.5 square meters and the total design area is 14716.06 square meter which is about 40% green space coverage of the entire site.
UNBOUNDED Design Elemtnts
108
UNBOUNDED Project Approach Use clear lines and arc as the basic method to create clear circulations and spaces. This project is trying to create a elegant master plan while people who live in the high level apartment will able to see a out stading garden form above, as well the user can experience each corner to another to feel the sprit of the spaces and interact with these unique spaces. More over the space and activities will change during each season so that people will able to have entire different experiences in a year.
F
A Entrance Plaza B Main Hallway
K
C Central Park
D Wisteria Terrace
G
E Glass Cube Pavilion F Villa
H
G Maple Wood Forest H Sakura Garden I Full Moon Square J Wall Climbing Area K Play Ground
I
UNBOUNDED A
B
C
E
D
J
0
6
18(m)
110
UNBOUNDED
UNBOUNDED
112
UNBOUNDED
UNBOUNDED
114
UNBOUNDED
UNBOUNDED
116
UNBOUNDED
UNBOUNDED
118
UNBOUNDED
UNBOUNDED
120