Buildings have feelings too

Page 1

BUILDINGS HAVE FEELINGS TOO A COL L ECTION OF WORK S & I DE A S BY J E RNE J BO RKO



BUILDINGS HAVE FEELINGS TOO A COL L ECTION OF WORK S & I DE A S BY J E RNE J BO RKO


PERSONAL INFORMATION

Name Nationality Date of Birth Address

Phone number Email address Web page

Jernej Borko Slovene September 4, 1989 Cresnjevci 9 9250 Gornja Radgona Slovenia +386 31 73 00 93 jernej.borko@hotmail.com buildingshavefeelingstoo.tumblr.com


EDUCATION 2008 / 2011

Bachelor of scienece, architecture (UN) Faculty of civil engineering Maribor Maribor, Slovenia

April 2010

NEPTUNE: Network for Environmental Projects in Technology, United in Europe

April 2011

NEPTUNE: Network for Environmental Projects in Technology, United in Europe

2011 /

Master of science, architecture Faculty of civil engineering Maribor Maribor, Slovenia

January / April 2013

Leuphana Digital University, Luneburg, Germany

WORK EXPERIENCE February 2011

TOKAMAK ARHITEKTI d.o.o. visualisation

2011 /

HOUSE OF ARCHITECTURE MARIBOR technical staff

2011 /

GRAPHIC DESIGN freelance

July 2012 / October 2012

ATELJE OSTAN PAVLIN project work

LANGUAGES Slovene English German

Native speaker Oral fluency and writen proficiency Oral fluency and writen proficiency

SYSTEMS & SOFTWARE CAD Software

Archicad 2d & 3d design Cinema 4d + Vray 3d design & visualisation Rhinoceros basic knowledge Autocad basic knowledge

Graphic

Adobe Photoshop Adobe Illustrator Adobe InDesign



01

ARTIST HOUSING September 2011 I Slovenia I bachelor thesis

02

ACADEMY OF FINE ARTS June 2012 I Slovenia I academic project

03

FRAGILITY OF SPACE June 2013 I Slovenia I instalation

04

MEMORIAL TO VICTIMS OF ALL WARS Semptember 2013 I Slovenia I national comeptition

05

HOUSE ABOVE SEA March 2014 I Croatia I private client

06

TRENCIN - CITY ON THE RIVER April 2014 I Slovakia I international competition


4

01

ARTISTS HOUSING

type size date location task

temporary architecture 550 sqm september 2012 Maribor, Slovenia diploma thesis

10 3 2

8

7 11

6 5

5

9 1

1 1 2 3 4 5 6 7 8 9 10 11 12

12

parter stanovanje I studio 1 stanovanje I studio 2 stre na terasa stopni e ve namenski prostor bar sanitarije servisni prostor stanovanjski stolp lupina umetna krajina 01 3

7m

!*(#'(

!**#%)

+3.55

!%#&$

+6.47

!%#&$

!'#()

!"#$$

!"#$$

+3.55

+9.05

+11.97

+9.05


Maribor had in 2012 as European Capital of Culture a great opportunity to develop small scale projects such as the art center in Pekre which cause significant changes but not so in the urban fabric rather than in the social fabric. A degraded, pitched piece of land is developed into a public green space at the transition between urban and rural, where the word green describes only the color. For residents of the surrounding bedroom communities would

= 180째 r = 6.90 m

= 61째 r = 6.10 m

= 114째 r = 5.50 m

+6.47

+11.97

= 126째 r = 6.90 m

the new art center become a mean to interact in their spare time. And if the project proves to be successful no restrictions for expansion of services were present as the built structures, possitioned on the edge of the plot, occupy only a tenth of the available land. The solution presented is my own interpretation of the rural-urban integration in the present circumstances.


A+1.21

A+1.18

A+1.16 A+1.14

A+1.15

A+1.17 A+1.22

A+1.9

U+0.15

A+1.10

A+1.11

A+1.12

A+1.13

A+1.4

+2.76 U+0.14

+2.76 A+1.20

A+1.2

A+1.3

A+1.5 A+1.1

+0.89

+0.89

U+0.12

U+0.13

A+1.8 -1.43

A+1.7 +2.76 A+1.6

-1.43

U0.2

U0.3 +1.56

+2.84

+1.27

A+0.6

+2.84

U0.1 +1.27 A0.4

U0.10

A+0.7

+0.00 -1.43 A+0.5

U0.4

+0.60 U0.11

U0.9

A0.2 A+0.8

U0.5

A0.3

U0.6

U0.7

U0.8

A0.1

A+1.19


02

ACADEMY OF FINE ARTS

type size date location task team

renovation, expansion 8900 sqm June 2012 Maribor, Slovenia academic project J. Borko, A. Patekar

The project was positioned at the edge old city center where once the city walls had been standing. Positioned on the axis between city library and university building, adjoining the existing Art gallery, the academy of fine arts is a logical continuation in this context. A subtle extension blends in the surrounding and in the meantime represent the existance of historical legacy. Cultural programme is complemented with areas for Academy of fine Arts and studios for visiting artists. The design represents a building itself as a small center of art with linear public square in the middle of complex. A+2.36 A+2.35 A+2.20

A+2.34

A+2.37

A+2.14 A+2.38 A+2.13

+7.24 A+2.39 A+2.15 A+2.23 A+2.16

A+2.21

A+2.33

A+2.24

A+2.22

A+2.12

U+1.7 A+2.11

A+2.32

A+2.10 A+2.25

A+2.17 +5.78 U+1.6

A+2.18

A+2.9

A+2.19

A+2.31

A+2.26

A+2.8 +7.24

+7.24 +5.78 U+1.5 A+2.4

A+2.27 A+2.30

A+2.7 U+1.4 U+1.8

+5.78

+5.78 A+2.20

U+1.9

A+2.6

A+2.28

U+1.1 A+2.1

U+1.3

A+2.2

A+2.29

A+2.3

A+2.5

U+1.2

+17.60

+14.51

+10.92

+10.71

+7.24 +5.78

+5.78

+2.84 +1.27 0.00

-1.90 -2.56

-1.43

-3.95 -4.45


03

FRAGILITY OF SPACE

type size date location task team

installation 50 sqm june 2013 Maribor, Slovenia personal work J. Borko, S. Lober, D. Vogrincic

Living is inseperably connected with changing the landscape to ones needs, but people are not aware of the responsibility they carry with their interventions in the sourounding. With an exaggerated expression of individualism landscape is broken into pieces instead of being shaped into a coherent whole one could call cultural landscape. A new image of the Slovenian landscape becomes the sum of excesses by individuals out of context of time and spirit.

This installation is a critique of expressing free will. Our desire is to establish responsibility for our sourounding we call home and the people who live there. Our commitment to the environment and the desire to change the relationship to it is expressed by this installation, which required more than 500 hours of work and was destroyed in a few moments, as in the same moment changed the attitude to architecture and space.


500 hours of work and 30.000 shells destroyed ina matter of minutes.


04

MEMORIAL TO VICTIMS OF ALL WARS

type size date location task team

public space 150 sqm September 2013 Ljubljana, Slovenia competition J. Borko, S. Lorber, A. Patekar, D. Vogrincic

Space for memory is conceived as the heart of the connection between park Zvezda and Knafljev prehod . A hitherto unnoticed area is is liberated of service facilities and converted into a public open space. The notch in the paving creates an inviting entrance to the world beyond the monument. Spread wings define a significant panorama. Upon entering the dark interior deeper understanding is being awaken. The memorial at the end of the dark path opens to the sky. Water as a symbol

of eternity ends the feeling of anxiety that arises when passing through the monument. Infinite reflective surface that constantly pours over the edge with inscription of commemorative nature is a reminder of human sacrifice.



2.70 2.50

480

480 0.00

0.00 = 479.30

-2.79 = 476.51

475

475


05

HOUSE ABOVE THE SEA

type size date location task team

house 180 sqm March 2014 Opatija, Croatia private client J. Borko, A. Patekar

An inspiring task for a house in the hilly background of the mediterranean sea requested modern design, well integrated into its surrounding. Complete concept of a house is a set of costumers requirements and wishes. House, primarily designed for a young family, also includes separated area for visiting parents, connected to the main area through outdoor mediterranean landscape. The house is closed towards the neighbours and open to the beautiful sea view.

A

B *97/2

481.37

nij

. ju

21

479.92

481.32

:14

05

:54

20

481.21

t

C

pu

479.37

.22

16

479.62

481.85

482.27

482.62

D

479.09

481.88

477.22

479.54

477.08 :00

15

.41

7 481.39

3

479.36

479.91 479.76

479.61 479.46

479.31 479.16

7

480.50

0

5.8

6.2

T1

479.30

T2 479.23

481.07

475.50

4 474.21

474.43

476.18

.73

10

473.79

477.30 477.43

479.00

476.81 477.56

479.15 478.98

474.52

473.59

477.69

477.72

473.93

473.64

473.87

477.82

477.75

478.48

478.08

477.17

478.21

478.50

478.34

478.86 478.60

.84

477.37

475.88

476.48 477.50

472.54

472.46 472.53

475.30

475.13

474.47

A

474.31

475.0

put

3P

475.89 477.21

477.00

476.74

476.86

472.71

476.21 478.01

477.53

472.90

477.00

478.40

12

475.28

474.51

478.47

478.73

478.31

477.64

477.67

475.71

477.95

478.01

479.01

479.00

.05

479.00

477.51

20

7

473.98

476.91

477.17

479.09

478.88

5.0

473.99 475.15

1187/3

477.04

utrjena povr ina

2.3

477.52

5.7

476.64

2

477.58

477.55

474.76

476.78

479.09

0

2.6

479.06

1P

476.50

476.50

476.62

476.63

479.00

479.68

479.30

478.11

477.55

476.60

476.70

479.30

8

479.40 477.26

480.50

480.00

480.0

3.5

1

9.7

479.80 479.80

477.50

24

9

480.0

.58

0.7

477.99

T3

6

479.80

477.27

479.33

480.87

476.34

476.60

477.00

0.9

480.78

:00

12

474.83

476.12

479.00

480.50

480.95

09

15

476.60

479.01

481.10

472.46

472.61

474.62 472.81

473.91

473.19

476.05

472.53 475.14

472.64

474.22 473.43

473.03

1186

B

.64

25

2P

07: :00

:00

476.66

479.00

479.01 480.50

er

mb

ce

. de

21 39

12

:22

.73 10

479.21 479.06

480.20

:00

09 :00

16

476.50

9 3.9 479.36

utrjena povr ina 481.00

1187/2

:00

:00

15

3.4

479.00

480.46

12

477.13

479.00

481.00

09

480.38

481.84

:00

09

:00

18

477.23

479.00 481.81

1196

:00

18

:15

7 7.8

481.39

c r are be .m m 21 septe . 23

C

D


BUSINESS DISTRICT

PIER _upper level direct connection to housing _open space with public services, skyline of the city

HOUSING ZONE _mixed use _public / semi-public open space _playgrounds, community _parking at street level, car-free zone

PEDESTRIAN PATHS AND POCKET SQUARES _green space network _connection to city centre _bike-and-ride service

The proposal is based on an integrated approach to achieve effective and overall integrated use of land. Sustainability and interdisciplinarity are keys of urban development. The main objective is to create high-quality environment for people. The main challenge from an environmental point of view is traffic planning as well as the physical and social structure of the city. The existing railway track and main access road represent a sharp barrier and prevent connection of city to the river. The new railway track will release some urban areas and will open historic city structure. Despite the relocation of the railway track the character of the area between the river and the historic center is still subordinated to the transport infrastructure and hardly accessible because of the central four-lane street. The crossings of pedestrian paths and traffic routes cause conflict situations. Tendencies for new public spaces, accessible green areas, living at/on the river, design for pedestrians and cyclists, are reflected in sustainable character of the roads, which no longer separate but connect. Site should become the generator of the place with guaranteed pulse of the city, the place which allows connections in all directions.

OLD HEROLD MUSEUM _redevelopement of factory grounds _part of local identity

urban planning 550.000 sqm April 2014 Trencin, Slovakia international competition M. Klemencic, V. Skalicky J. Borko, A. Patekar

KINDERGARDEN _semi-public playground

type size date location task team

BAY OF TRANQUILITY _leisure in nature (picnic park) and play

TRENCIN - CITY ON THE RIVER

HOUSING ZONE _mixed use _public / semi-public open space _playgrounds, community _underground parkings, car-free zone

06


BUSINESS / COMMERCIAL BUILDING

PUBLIC SQUARE _main interconnecting public space; city centre - city park - transport terminal _central water element with sculpture _integrated illumination for underground traffic

HOUSE OF ART _addition to skyline

PUBLIC, BUSINESS AND RESIDENTAL ZONE _public programme at ground level _semi-private, semi-public and public atriums and niches _open and semi opened perimeter buildings typology

WELLNESS & SPA _redevelopement of swimming pools hall

LINEAR SQUARE _vibrant public interconnecting open space, car-free zone _pavillions; showrooms, info turistic office, public spots,cafeés, transport services _pocket parks with playgrounds _Forma Viva and water elements

WATERFRONT OASIS _leisure spot, viewing

MULTI-CULTURAL & PROGRAMME ZONE “SPONGEBOB” _mixed use; open theatre, skatepark, services, shopps, cyber cafees, workshops, reading room, exhibition area, accomodoation _green roof - public park, overlapping use, connected to riverfront

PUBLIC MARKET _eco-centre _open public space programme

DOCK YARDS _redevelopement _mooring for larger vessels _residental / accomodation potential

NATURAL ORNITHOLOGY ZONE _natural habitat, passive recreation

FOOTBRIDGE _promenade accompanied with Forma Viva

PEIRS AND PATHS _leisure in natural enviroment

BOATHOUSE AREA _semi-natural bay


CONTACT

Jernej Borko jernej.borko@hotmail.com (+386) 31 73 00 93 buildingshavefeelingstoo.tumblr.com




Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.