E CT
“I don’t think that architecture is only about shelter, is only about a very simple enclosure. It should be able to excite you, to calm you, to make you think.” Zaha Ha did
2
Content : CONTENT; RESUME RESUME
1 4
ACADEMIC ACADEMIC YAWNING HOUSE PROJECT 6 YAWNING HOUSE PROJECT
3-8 - 9
THE MIXED USE BUILDING VLOJ ARCH. THE MIXED USE BUILDING BYBY VLOJ ARCH LTDLTD
12-15 9-12
MATSYASANA YOGA STUDIO 16-19 MATSYASANA YOGA STUDIO 13-16 WAREHOUSE BUILD WAREHOUSE 17-20 HAND SKETCHES 23-24 MODELS 25-30
INTRODUCTION I'm an Architectural Technology student from George
I’m an Architectural Technology student from George Brown ColThis portfolio academic work during my journey during mylege. journey through consists school, of done in both a collabothrough school, done on both a collaborative and individual bases
3
JERRAD COLAIRE
(416)700-9055 jerrad.colaire@georgebrown.ca
Architectural Technologist
PROFILE
SKILLS AND SOFTWARE 2D
EDUCATIONAL BACKGROUND Advanced Diploma Architectural Technology (2017 - expected 2020) Associates Degree in Computer Science (2013 - 2017) Dominica State College, Faculty Of Applied Arts & Technology Roseau, Dominica High School Diploma
(2008 - 2013)
Adobe InDesign Adobe Illustrator
AutoCAD
3D
Roseau, Dominica
EMPLOYMENT HISTORY (Sept 2018 - Present)
Welcome Desk Assistant
FABRICATION PROFESSIONAL SKILLS Detail Oriented
9th Life Studios-Toronto, Canada Assistant DP, Ph otographer
(Jan 2018 - Present)
Create Caribbean Inc.,Dominica technician
(Sept 2013- July 2016)
INTERESTS
ADDITIONAL EXPERIENCES and people. arts
References Available upon request
1
4
R E S R E U S M U E M E
25
6 3
ROOF FLOOR 10980,00
THIRD FLOOR
3660 1300 105 1125 1430
C A CA AD D EE MM I I C C
432
A
W2
W2
W2
W2
74
SITE
YAWNING HOUSE PROJECT Project Detail Contributors: Jerrad Colaire, Jason Tran
produced for for this assignment as a way of introducing us to the consept
8 5
GROUND FLOOR GROUND FLOOR PLANPLAN
SECOND FLOOR PLAN SECOND FLOOR PLAN
MASKING MODEL
96
SOUTH ELEVATION
CROSS SECTION
10 7
NORTH ELEVATION
DOOR SECTION DETAIL
11 8
1
A
150
4320
3915
3260
B
W2
12625
W2
1640
A-4.0
W2
W1
W1
E R1
W3
R1
W7
12194 3600 2033 970
F1
F1
W7
F1
F1
W3
BALCONY
UNIT 201
UNIT 202
UNIT 220
UNIT 219
F
BALCONY
UNIT 221
W33054
1339
UNIT 106
CORR.
UNIT #C6 W7
W1 F1
W7
F2
F2
W7
W7
F1
4790 5950
#4
W2
F2
UNIT #C15 (WE SELL REAL ESTATE) F2
W7
LONGITUDINAL CROSS SECTION
THE MIXED USE BUILDING BY VLOJ ARCH. LTD
Colaire
3750 5950
F1
-3200,00
Project Detail
2200 12200
BALCONY
655 355
W3
F1
3230 F2
2541 6100
000,00
PARKING LEVEL
TYP. SLOPE
5775
EX
300 386
3600
UNIT 215 W1
3600 2146
GROUND FLOOR
UNIT 206
CORRI.
1500
R1
W1
W2
6000 R1
7725 2214
1205
MECH. PENTHOUSE
W3
3360,00
W2
UNIT 222
BALCONY
D
WEST ELEVATION
SECOND FLOOR
UNIT 200
W2
3200
CX
-3200,00
7320,00
BALCONY
W2
28975 6000 150 7725 3260 386 2449
1
THIRD FLOOR
W2
A-4.1
PARKING LEVEL 1
10880,00
2174
C
0000.00
TOP OF ROOF
4790
6000
4890
B.X
W1
5950 1235
W2
4900
1
W2
4790
W3
A
BALCONY
W2
300 386
W2
5950 1041
3260
W2
GROUND FLOOR
12 9
5950
1630
1300
W2
SECOND FLOOR 3360,00
5950
2709
2214
7320,00
F
1630 620 1630
THIRD FLOOR
E
D W4
4
3
3260
10980,00
3660 3660 3660 2652 1008 1105 1215 1340 1105 1125 1430
ROOF FLOOR
C
B
2
W1
THIRD FLOOR PLAN
W2
580 505
BALCONY 4790 5950
5
#3
6
7
8
1
9
#1
11
10
1
A-4.2
12
14
13
14.1
15
A-4.3
83600 5950 3264
3260
5950 1116
5950
4790
1160
5950 4790
1160
5950
4790
1160
5950
4790
5950
255
10301
BALCONY
W3
W2
W2
BALCONY
BALCONY
W2
W3
W2
3260
W2
1899
UNIT 207
UNIT 206
UNIT 208
UNIT 210
UNIT 209
6000
1 A-6.6
12625
UNIT 205
4890
UNIT 204
1
A-4.0
1640
W2
W2
UNIT 203
2
BALCONY
1830
BALCONY W2
1160
W3 W2
BALCONY
1830 1830
W3
W2
5950
4790
386 300
1630 620 1630
4900
5950 3264
BALCONY
3260
1830
5950 1041
1899
UNIT 213
6000 28975
3260 7725 2214 1630
W4
UNIT 214
4790
4790
4790
W2
505 430
W2
505 300
4790
430
35400 5950
5950
5950
5950 5950
5950
2214 7725 5775
3260
BALCONY 5650 5950
4790
505
580
4790
355 580
2000
W3 1682
11900 5950
5950
386
BALCONY
W2
580 505
3655 12200
4283
5950
300
BALCONY
W2
W2
430 430
1500
BALCONY
W3
5950
83600
1
1
A-4.3
W7
A-4.2
840
840
2675
W7
W6
2235
2438 2
SPEC. BY MANUFACTURER 200 0 300
995 9 5 840
2675
840
W7
ST. B.
W7
ST. B.
2962
CORRIDOR
W7
STAIRS
2032 2 2
2202 2 2
5650 5 0
ST. B.
W2
505 580
#2
5775
W3
W3
BALCONY
11759
1630
UNIT 215
W2
UNIT 216
6000
UNIT 217
W4
W4
UNIT 218
1
A-4.1
150 6000
W2
5650
9
BALCONY
7725
1800 1800
CORRIDOR
150 386 2449
W5
CORRIDOR
PLAN STAIRS DETAIL
13 10
METAL CAP FLASHING
GREEN ROOF SYSTEM
WITH COUNTER
WATERPROOF MEMBRANE
FLASHING
50mm RIGID INSULATION
12 mm PLY. 1 x 3 BLOCK
AIR BARRIER
W3
12.5mm SHEATHING 1300
12 mm PLY.
1 x 3 PURLINS @ 406 mm O/C 18" TJI FLOORING @ 406 mm O/C
TOP OF ROOF 10880,00
MIN.
R1
R60 BATT INSULATION
VAPOUR BARRIER
STEEL BEAM W/ JOIST HANGER AND BLOACKING
12.5mm GYPSUM BOARD
PROVIDE MIN. AIR SPACE TOP OF INSUL. TO THE UNDERSIDE OF SHEATHING
UNIT 220
W2 BALCONY MIN 2 % SLOPE
F1
THIRD FLOOR 7320,00
STEEL BEAM W/ JOIST HANGER AND BLOACKING
UNIT #C2 (READ BOOKSTORE)
1105
W2 BALCONY MIN 2 % SLOPE
SECOND FLOOR 3360,00
F1
STEEL BEAM W/ JOIST HANGER AND BLOACKING
EXTERIOR
INTERIOR
CONCRETE FLR. W/ REBAR REINFORCEMENTS GROUND FLOOR 0000.00
PARKING LEVEL
410
-3200,00
915
WALL SECTION DETAIL
14 11
W1
F2
840
840
RESIDENTIAL BUILDING ENTRANCE
W7
W5
992
840
4200
RESIDENTIAL LOBBY
W6
C 840
W6
2438
STAIRS
RESIDENTIAL LOBBY
3038
COVERED PORTE COCHERE (DRIVEWAY)
840
300
840
6250
Cx
150
300
W7
STAIR PLAN DETAIL 2
12 15
PERSPECTIVE
MATSYASANA YOGA STUDIO Project Detail Designer: Jerrad Colaire
design took in consideration sustainability as key in construction. One of the main features of this building is its water collection system underground which is achieved by the sloped and arched roof.
SITE 16 13
RESUME ACADEMIC INDIVIDUAL
ADD IN HAND CONCEPT SCKETCH
14 17
U.C. MicRroewa fr. ve
2 A2 of 2
A AREA YOG YOGARM.
MAIN FLOOR PLAN
1
GRAB BAR 35 MM 40 MM DEPTH L SHAPED ON SIDE OF TOILET FOLDING GRAB BAR
2
COAT HOOK
3
TISSUE DISPENSER WALL MOUNTED, LOCATED BELOW THE GRAB BAR IN LINE/NOT MORE THAN 300 MM IN FRONT OF THE SEAT NOT LESS THAN 600 MM ABOVE THE FINISHED FLOOR. AIR DRYER AUTOMATIC OPERATION
4 5
TILTED MIRROR ABOVE LAVATORY
6
ADULTS IZE CHANGE TABLE 810 mm x 1830 mm CARRY MIN. 1.33 kN FORWARD APPROACH SPACE 920 mm x 1370mm MAX 500 mm PROJECTION PERMITTED BELOW LAVTORY
7
18 15
8
TRANSFER AREA 900 X 1500 MM CLEAR TRANSFER SPACE BESIDE WC
9
WATER CLOSETS EASY HANDOPERATED FLUSH OR AUTOMATICALLY OPERATED. NOT SPRING ACTIVATE SEAT
10
EMERGENCY BUTTON INSTALLED INSIDE AND OUTSIDE AUDIBLE AND VISUAL SIGNALS
11
DOOR OPENING MORE THAN 810mm AUTOMATIC PUSH BUTTON LOCATED INSIDE AND OUTSIDE SPRING TYPE
12
SOAP DISPENSER AUTOMATIC OPERATION
FLOOR LEVEL
1 ET ILE T OIL TTO
H.H ECC ME M E RM./ S TOR AG
ROOM
WASHROOM 2 ACCESIBLE WASHROOM PLAN DETAIL
1
920
7
1370
10
3
ø 1700
458
1 10
458
915
900
11
2
9
6
810
5
150
8
11
460
4
1500
1033
460
12
1830
19 16
6.1
7
8
8.1
9
21556 9434
1876
W2
9434
3289
20744
9434
6144
9434
Ab
4810 1775
6455
2359
2359
2359
2359
HEAD ACCOUNTANT
V.C PRESIDEN SALES
ACCOUNT MANAGER
6441
6096
-
481
4040
1
1
1
1052
1878
2145
W2
1551
1551
2033
2660 1150
12404
1565
3100
6343
5
4521
794 1595
1
1878
5
PRESIDENT
1
1878 1179
---
1
A
1041
TRAINING ROOM
W2
6096
V.C PRESIDENT MARKETING
3670
3591
1150
1
5
OFFICES FOE SALES REPRESENTATIVES
481
1237 12
1
844
1059
2278
1622
A.7.0 ---
1015
7524
4
4488
1325
1 UNIVERSAL WASHROOM
1
TEMPORARY STAFF
KITCHEN WITH 4 PEOPLE AREA TO EAT
---
5433
5865
5503
-
1
MEETING ROOM
UNIVERSAL WASHROOM
2759
2637
9581
Bb 2021
4
W1
14967
B
ACME WAREHOUSE 1
W2 6139
21549
SECOND FLOOR OFFICE
SECOND FLOOR OFFICE 1 : 50
Project Detail
Winter 2019 Second Year Project Collaborators: Sarah Korba Alakhras, Jerrad Colaire Project Description The Acme Warehouse was the first project given in the second semester where the use of steel frame construction had to be use. The warehouse consists of an open warehouse area with all needed room and accessibility and two office levels complete with all necessary rooms
17
1 A.5.0
1
GROU
6.1
7
8
8.1
9
18867 9434
9434
1876
3289
6144
21556 19552
1775
W2 3
Ab
3551
2499
2 PEOPLE OFFICE
4099
2359
699
LOBBY
OFFICES FOE SALES REPRESENTATIVES
4482
1
537
5
7959
SEVER ROOM
1
12411
2660
4605
4905
12404 814
A
5
10
12909
1150
1
2800
5
1843
4092
W2
560
10
UP
1
1414
6096
1
W2
1150
8496
4038
4798 3
4598
3178
1775
RECEPTION ROOM
1579 3
3
1
564
16539
481
7524
MEETING ROOM
4473
5051
4
4488
1
1240
1840
796
1 KITCHEN WITH 4 PEOPLE AREA TO EAT
ENTRY STUFF AREA
885
1
SERVICE STUFF AREA
5 COPIER ROOM
1100 UNIVERSAL WASHROOM
1344
481
3160
5503
1
2260
5433
480
760
864
UNIVERSAL WASHROOM
1
2741
2637
1366
8136
10
Bb
No.
1 2
2021
4
13840
1128
4135
1775
W2 W1
14967
5910
B
BRENTWO JOLLEY
GROUND FLOOR OFFICE 1
GROUND FLOOR OFFICE 1 : 50
Date
Drawn by
1
Checked by
A.5.1
5
6
7 6.1
74173 9218
9218
9218
9218
9218
9434
3804
3353
11500
19062
3289
---
7342
8534
19438
1876
1775
W2
1 3268
3781 1
1 1 3655
WWF 8" x 8"
5405
1 1
WWF 8" x 8"
1150
1
1
4482
2359
OFFICES FOR SALES REPRESENTATIVES
1
1
2637 1366
1 1 1344 2741 WASHRO OM
1
SERVICE STUFF AREA
COPIE R ROOM
2
1
2540
B
1 HSS 8"x8"
HSS 8"x8"
7940 WWF 8" x 8"
W3
HSS 8"x8"
HSS 8"x8"
HSS 8"x8"
HSS 8"x8"
-
3250 1000 3250 1000 3250
---
3
5
A.8.0
1
1
1350
10
WWF 8" x 8"
5
HSS 8"x8"
W1
1
1
8259
3047
2
W3
1
WWF 8" x 8"
HSS 8"x8"
HSS 8"x8"
900 1176 1 1 1
WASHROOM
WWF 8" x 8"
1
HSS 8"x8"
1201 900
FORKLIFT CHARGING AREA
3089
SHAWERS
12476
2060
HSS 8"x8"
9100
4
4824
3140
7524 7524 7524
HSS 8"x8"
W2
1700
HSS 8"x8"
1893
68608 HSS 8"x8"
WWF 8" x 8"
F
45726
-
1
9177
36586
HSS 8"x8"
1893
HSS 8"x8"
10
4
---
Gb
HSS 8"x8"
WWF 8" x 8"
D E
HSS 8"x8"
2976 1201
7524
3140
HSS 8"x8"
4605
51241
HSS 8"x8"
12275
5466
C
1688
---
1 WASHROOM
10 WWF 8" x 8"
W3
1700
HSS 8"x8"
MALE CHANGING ROOM
HSS 8"x8"
HSS 8"x8"
SHAWERS
4
HSS 8"x8"
FEMALE CHANGING ROOM
7524
3140
A.8.0 HSS 8"x8"
---
ENTRY STUFF AREA
1
KITC HEN
-
W2
2660
OPEN AREA
1
MEETING ROOM
4038
OFFICE 2 PEOPLE
1
1
WWF 8" x 8"
4761
4798
1414
5937 2148
KITCHEN ROOM
REPAIR SHOP
2
UP
4473
W3
SHIPPING & RECEIVING OFFICE
4993
2827 3313
WWF 8" x 8"
PLANT MANAGER OFFICE
3 1150
8496
RECEPTION
COMPUTER ROOM
1353
8939
7524
3
FIRST AID ROOM
A
Bb
W1
3
LOBBY
1775 4080
---
2499
W2
Ab
6144
-
74975
12182
9218
9
8.1
51936
4
3080
3
5433
2
A.6.1 Scale
8
55
1
1688
WWF 8" x 8"
HSS 8"x8"
WWF 8" x 8"
WWF 8" x 8"
WWF 8" x 8"
WWF 8" x 8"
W2 2
1
2
WWF 8" x 8"
5
G
-
A.5.0
---
W1
2
W3
2485
6549 18368
1250
3589
1300 2360
8284
3485
3900
13404
35410
1309
14600
GROUND FLOOR
UND FLOOR PLAN
PROJECT GROUND FL OFFICE
Project number
1 A.5.1
18
8.1
8.1
INTERIOR FACE
INTERIOR FACE
203mmX203mm (8"X8") WIDE FLANGE COLUMN ("I"COLUMN) AT PERIMETER WALL OF BUILDING
203mmX203mm (8"X8") WIDE FLANGE COLUMN ("I"COLUMN) AT PERIMETER WALL OF BUILDING
20
203
203
Gb
51
203
229
229
10
51
51
SEALANT 10mm(3/8") MIN. JOINT
229
Gb
203
20
A
PRECAST CONC. PANEL CURTAIN WALL WITH 229mm (9") THICK
10
PLAN DETAIL 1 DETAIL 1 CONC. MEETS CONC. 1
SEALANT 10mm(3/8") MIN. JOINT
229
51
EXTERIOR FACE
2
PRECAST CONC. PANEL CURTAIN WALL WITH 229mm (9") THICK
1 : 10
1 : 10
EXTERIOR FACE
Ab
1
PLAN DE
PLAN DETAIL 1 DOUBLE GLAZED GLASS
1 : 10
Storefront Double Glazed-Jamb at Finish-
Ab
EXPANSION JOINT METAL FASTENING ANGLE BAR
SEALANT 10mm(3/8") MIN. JOINT
GROUND FLOOR PLAN
230
230 GRADE 0 254mm (10") CONC. WALL EXTENSION
CRUSHED STONE BASE
SMALL TRENCH
DOUBLE GLAZED GLASS
Storefront Double Glazed-Jamb at Finish-
EXPANSION JOINT
EXT. STAIRS 1 -695 METAL FASTENING ANGLE BAR
SEALANT 10mm(3/8") MIN. JOINT
230
1829mm (6'-0") DIAMETER REINFORCED CONC.CAISSON FOUNDATION EXTENDING 7010mm (23'-0") BELOW GRADE
-305
FOUNDATION PLAN -1220
3
SECTION DETAIL 4 1 : 10
DETAIL 3 CURTAIN WALL MEETS GROUND SLAB
19
254mm (10") CONC. WALL EXTENSION
CRUSHED STONE BASE
4
S
1
1
1 EXTERIOR FACE
EXTERIOR FACE
20
229
SEALANT 10mm(3/8") MIN. JOINT
203mmX203mm(8"X8") WIDE 203 FLANGE COLUMN ("I"COLUMN) AT PERIMETER WALL OF BUILDING
10
204
A
1 : 10
20
203
INSULATED METAL STUD CURTAIN WALL WITH PREFINISHED METAL SIDING 204 mm(8") THICK
PLAN 3 MEETS CONC. DETAILDETAIL 2 ALUMINUM
51
203
INSULATED METAL STUD CURTAIN WALL WITH PREFINISHED METAL SIDING 204 mm(8") THICK
RIGID INSULATION
2
PRECAST CONC. PANEL CURTAIN WALL WITH 229mm (9") THICK
203
10
A
51
SEALANT 10mm(3/8") MIN. JOINT
229
PRECAST CONC. PANEL CURTAIN WALL WITH 229mm (9") THICK
INTERIOR FACE 203mmX203mm(8"X8")
WIDE FLANGE COLUMN ("I"COLUMN) AT PERIMETER WALL OF BUILDING
204
RIGID INSULATION
INTERIOR FACE
9
2
PLAN DETAIL 3 1 : 10 PARAPET CAP
9
WOOD BLOCKING
ROOF PLAN
CANT BLOCK
2% SLOPE
9550
EPDM MEMBRANE
PARAPET CAP
WOOD BLOCKING UB305X165X40 STEEL BEAM
CANT BLOCK
2% SLOPE
GROUND FLOOR PLAN
VERTICAL MULLION ANCHOR TO HSS
230 GRADE 0
SMALL TRENCH
TOP PLT. 9144
ROOF PLAN 9550
EPDM MEMBRANE SPANDREL PANEL
609mm (24") DEEP O.W.S.J @ 1829 (6'-0") O/C SPANING FROM GIRDER TO GIRDER
TOP PLT. 203mmX203mm (8"X8") WIDE FLANGE COLUMN ("I"COLUMN) AT PERIMETER WALL OF BUILDING
-305
UB305X165X40 STEEL BEAM
9144
VERTICAL MULLION ANCHOR TO HSS SPANDREL PANEL
609mm (24") DEEP O.W.S.J @ 1829 (6'-0") O/C SPANING FROM GIRDER TO GIRDER
EXT. STAIRS 1
Date
Drawn b
Checked
-695
4
SECTION DETAIL 2 1 : 10
P S
Project n
203mmX203mm (8"X8") WIDE FLANGE COLUMN ("I"COLUMN) AT PERIMETER WALL OF BUILDING
Scale
DETAIL 4 CURTAIN WALL FOUNDATION PLAN
P S
Project
-1220
Date
Drawn b
4
SECTION DETAIL 2 1 : 10
Checke
20
H A N D S K E T C H E S VISUAL COMMUNICATION Project Detail
Winter 2018 First Year Project By: Jerrad Colaire Project Description The sketches highlighted were part of a class assignment to develop our hand drawing skills for later on when we had to draw buildings by hand. More over it helped develop our abilities to see things and try to realistically represent them on paper.
21
22
DISPLAY CASE
23
WINDOW VIEW
24
25
M O D E L W O R K
26
WOOD FRAME SECTION MODEL STUDIO 1- COACH HOUSE Project Detail
Winter 2018 First Year Project By: Jerrad Colaire, Sean Panacci Project Description A construction package was given to us of a traditional wood frame constructed house complete with floor plan and elevations, from the set drawing we were tasked in locating errors in the drawing and submitting the corrected version. From the corrected version we were then tasked to build a scale model of an assigned section.
27
28
9
3804
4080
1775
Ab
---
A 8939
7524
3
Bb
WWF 8
W3
WW
7524
3140
B 4
WW
5466
W3
3140
7524
4
WW
D
-
4605
51241
C
7524
1 A.5.0
29
Gb
7524
F
2060 3047
Winter 2019 Second Year Project By: Jerrad Colaire, Sarah Korba Alakhras Project Description This model was taken from the Warehouse Project highlighted earlier in the project. It looks at how steel frame structures are assembled as steel structures was the main focus of the semester.
4
WW
3250 1000 3250 1000 3250
7524
E SECTION MODEL CURTAIN WALL
MATERIALS 2- WAREHOUSE Project Detail
3140
---
2
9218
9218
9218
9218
9218
9
74975 3353
11500
19062
7342
8534
W
1 3268
3781 1
1 1 3655
WF 8" x 8"
KITCHEN ROOM
REPAIR SHOP
5405
1 1
2148
2
UP WWF 8" x 8"
1
WWF 8" x 8"
1353
SHIPPING & RECEIVING OFFICE
4993
8" x 8"
PLANT MANAGER OFFICE
FIRST AID ROOM
3313
2827
W1
4761
HSS 8"x8"
HSS 8"x8"
HSS 8"x8"
HSS 8"x8"
HSS 8"x8"
HSS 8"x8"
HSS 8"x8"
HSS 8"x8"
HSS 8"x8"
HSS 8"x8"
WF 8" x 8"
10
45726
WF 8" x 8"
68608 HSS 8"x8"
HSS 8"x8"
HSS 8"x8"
HSS 8"x8"
WF 8" x 8"
FORKLIFT CHARGING AREA
4824
9100 WWF 8" x 8"
WWF 8" x 8"
W3
W3
HSS 8"x8"
HSS 8"x8"
HSS 8"x8"
HSS 8"x8"
HSS 8"x8"
---
3
5
A.8.0
WWF 8" x 8"
5
CURTAIN WALL SECTION MODEL 5
HSS 8"x8"
WWF 8" x 8"
WWF 8" x 8"
WWF 8" x 8"
WWF
30