2 minute read

Week 5

Next Article
Week 4

Week 4

week five

Revised Floorplans (Monday)

Advertisement

Today for homework we were to look our design after interim reviews.

I completely re looked at my floor plan and the feel that I wanted to achieve from my planning. I added some contrasting curves in the interior of the form to balance the very rectilinear nature of my façade. I looked at where my vegetation is and how I could join these areas with vegetation and integrate joinery.

Context Collage

Homework for Wednesday was to develop a collage to shows how we interpreted the overall area surrounding the site.

This collage was not very successful. I should change the way that I construct the collage and take my building out of it and just focus on the site context.

Revised Floorplans (Wednesday)

For Wednesday I really refined my floor plan. There were a few changes needed, but largely it is much improved from the interim review.

I really explored how I can use the greenery throughout the building and analysed how I use the spaces and made them less generic and more custom to my building. This has resulted in a much more pleasing plan and I think works significantly better.

Revised Floorplans (Friday)

For Friday worked on my revit model and further developed my floor plans.

I looked at how I could actually integrate my garden areas into my project. This was largely successful, however there was not was not enough contrast in my plan. Some of the areas were also odd.

This article is from: