Sheet List Sheet Number
TITLE SHEET CODE ANALYSIS DEMOLITION SHEET CONSTRUCTION PLAN FURNITURE & EQUIPMENT PLAN REFLECTED CEILING PLAN POWER & TELDATA PLAN FINISH PLAN ENLARGEMENTS ELEVATIONS DETAILS SCHEDULES
Current Revision
Current Revision Date
07/27/17 02/13/19 01/31/19 02/13/19 02/13/19 02/13/19 02/13/19 02/13/19 02/13/19 02/13/19 02/13/19 02/13/19
www.autodesk.com/revit
Consultant Address Address Phone Fax e-mail
RENDERED IMAGE
Consultant Address Address Phone Fax e-mail Consultant Address Address Phone Fax e-mail
GENERAL NOTES 1. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS SHOWN ON DRAWINGS AT THE JOB SITE AND SHALL NOTIFY DESIGNER OF ANY DISCREPANCIES, OMISSIONS, AND/OR CONFLICTS BEFORE PROCEEDING WITH THE JOB. 2. CONTRACTOR MUST COMPLY WITH RULES AND REGULATIONS OF AGENCIES HAVING JURISDICTION AND SHALL CONFORM TO ALL CITY, COUNTY, STATE AND FEDERAL CONSTRUCTION, SAFETY AND SANITARY LAWS, CODES, STATUES AND ORDINANCES. ALL FEES, TAXES, PERMITS APPLICATIONS AND CERTIFICATES OF INSPECTION, AND THE FILING OF ALL WORK WITH GOVERNMENTAL AGENCIES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. 3. CONTRACTOR SHALL COMPLY WITH THE RULES AND REGULATIONS OF THE BUILDING AS TO HOURS OF AVAILABILITY OF LOADING DOCKS AND ELEVATORS FOR THE PURPOSES OF DELIVERY, AND ALSO AS TO THE MANNER OF HANDLING MATERIALS, EQUIPMENT AND DEBRIS TO AVOID CONFLICT AND INTERFERENCE WITH NORMAL BUILDING OPERATIONS. 4. ALL WORK SHALL BE PERFORMED BY SKILLED AND QUALIFIED WORKMEN IN ACCORDANCE WITH THE BEST PRACTICES OF THE TRADES INVOLVED. AND IN COMPLIANCE WITH BUILDING REGULATIONS AND/OR GOVERNMENT LAWS, STATUES OR ORDINANCES CONCERNING THE USE OF THE UNION LABOR. 5. EACH TRADE WILL PROCEED IN A FASHION THAT WILL NOT DELAY THE TRADES FOLLOWING THEM. 6. CONTRACTORS SHALL BE RESPONSIBLE FOR THE DISTRIBUTION OF DRAWINGS TO ALL TRADES UNDER HIS JURISDICTION. 7. ALL WORK SHALL BE ERECTED AND INSTALLED PLUMB, LEVEL, SQUARE, TRUE AND IN PROPER ALIGNMENT. 8. ALL MATERIALS SHALL BE NEW, UNUSED AND OF THE HIGHEST QUALITY IN EVERY RESPECT, UNLESS OTHERWISE NOTED. MANUFACTURED MATERIALS AND EQUIPMENT SHALL BE INSTALLED PER MANUFACTURERS RECOMMENDATIONS AND INSTRUCTIONS. 9. THERE SHALL BE NO SUBSTITUTION OF MATERIALS WHERE A MANUFACTURER IS SPECIFIED. WHERE THE TERMS "EQUAL TO" OR "APPROVED EQUAL" ARE USED, THE ARCHITECT SHALL DETERMINE EQUALITY BASED ON INFORMATION SUBMITTED BY THE CONTRACTOR. 10. ALL WORK AND MATERIALS SHALL BE GUARANTEED AGAINST DEFECTS FOR A PERIOD OF AT LEAST ONE (1) YEAR FROM APPROVAL FOR FINAL PAYMENT. 11. CONTRACTOR SHALL BE RESPONSIBLE FOR CUTTING AND PATCHING REQUIRED FOR HIS WORK. 12. CONTRACTOR SHALL AT ALL TIMES KEEP THE PREMISES FREE OF ACCUMULATION OF WASTE MATERIALS OR RUBBISH. PREMISES TO BE SWEPT CLEAN DAILY OF RELATED CONSTRUCTION DEBRIS. AT THE COMPLETION OF THE WORK, LEAVE THE JOB SITE FREE OF ALL MATERIALS AND BROOM CLEAN. 13. DO NOT SCALE DRAWINGS. DIMENSIONS GOVERN. LARGER SCALE DRAWINGS SHALL GOVERN SMALLER SCALE. 14. PATCH ALL AREAS WHERE FLOOR IS NOT LEVEL OR TRUE PRIOR TO THE INSTALLATION OF FLOORING OR CARPETING. 15. TO INSURE PROPER AND ADEQUATE BLOCKING, ALL BLOCKING FOR CABINET WORK WILL BE THE RESPONSIBILITY OF THE CABINET CONTRACTOR. 16. UPON COMPLETION OF WORK THE CONTRACTOR SHALL WALK THROUGH WITH ARCHITECT AND COMPILE A "PUNCH LIST" OF CORRECTIONS AND UNSATISFACTORY AND/OR INCOMPLETE WORK. FINAL PAYMENT WILL BE CONTINGENT UPON THE COMPLETION OF THESE ITEMS. 17. ANY CHANGE WHICH RESULTS IN EXTRA COST SHALL NOT PROCEED WITHOUT WRITTEN AUTHORIZATION OF ARCHITECT AND BUILDING OWNER.
Consultant Address Address Phone Fax e-mail
ABBREVIATIONS AB. ANCHOR BOLT ACT ACOUSTICAL CEILING TILE A.F.F. ABOVE FINISHED FLOOR AGGR. AGGREGATE AL. ALUMINUM ALT. ALTERNATE APPROX. APPROXIMATE ARCH. ARCHITECTURAL BD. BOARD BLDG. BUILDING BLK BLOCK BLK'G BLOCKING BM. BEAM BOT. BOTTOM BTWN. BETWEEN B.U.R. BUILT UP ROOFING B.W. BOTH WAYS C.J. CONTROL JT. CLG. CEILING CLKG. CAULKING CLR. CLEAR C.M.U. CONCRETE MASONRY UNIT COL. COLUMN CONC. CONCRETE CONN. CONNECTION CONSTR. CONSTRUCTION CONT. CONTINUOUS C.T. CERAMIC TILE DEG. DEGREE DET./DTL. DETAIL D.F. DRINKING FOUNTAIN DIAG. DIAGONAL DIA. DIAMETER DN. DOWN DS. DOWNSPOUT DWG. DRAWING E EAST (E) EXISTING EA. EACH E.J. EXPANSION JOINT E.I.F.S. EXTERIOR INSULATION AND FINISH SYSTEM ELEC. ELECTRICAL
ELEV. ELEVATION EMER EMERGENCY ENCL. ENCLOSURE EQ. EQUAL EQUIP. EQUIPMENT E.W. EACH WAY E.W.C. ELECTRIC WATER COOLER EXP. EXPANSION EXT. EXTERIOR F.A. FIRE ALARM F.D. FLOOR DRAIN F.D.C. FIRE DEPARTMENT CONNECTION FDN. FOUNDATION F.E. FIRE EXTINGUISHER F.E.C. FIRE EXTINGUISHER CABINET F.F. FINISH FLOOR F.H.C. FIRE HOSE CABINET FIN. FINISH F.L. FLOW LINE FLR. FLOOR FLUOR. FLUORESCENT FND. FOUNDATION F.O.B. FACE OF BRICK F.O.C. FACE OF CONCRETE F.S. FULL SIZE FT. FOOT OR FEET FTG. FOOTING FURR. FURRING GA. GAUGE GALV. GALVENIZED G.C. GENERAL CONTRACTOR G.L. GLASS GR. GRADE GYP. GYPSUM GYP. BD. GYBSUM BOARD H.B. HOSE BIBB H.C. HOLLOW CORE H/C HANDICAPPED HDWD. HARDWOOD HDWE. HARDWARE H.M. HOLLOW METAL HR. HOUR HT. HIEGHT HVAC HEATING, VENTILATION AND AIR CONDITIONING
NOTE: CLARIFY WITH ARCHITECT ALL ABBREVIATIONS NOT LISTED
I.D. INSIDE DIAMETER INSUL. INSULATION INT. INTERIOR JAN. JANITOR JNT. JOINT JST. JOIST KIT.
Consultant Address Address Phone Fax e-mail
R. RISER R.D. ROOF DRAIN RE: REFER TO... REFR. REFRIGERATOR REINF. REINFORCED REQ'D. REQUIRED RM ROOM R.O. ROUGH OPENING
KITCHEN
LAB. LABORATORY LAM. LAMINATE LAV. LAVATORY LT. LIGHT MAX. MAXIMUM MECH. MECHANICAL MEMB. MEMBRANE MFR. MANFUCATURER M.H. MANHOLE MIN. MINIMUM MISC. MISCELLANEOUS M.O. MASONRY OPENING MTL. METAL MUL. MULLION N NORTH N.I.C. NOT IN CONTRACT NO. NUMBER NOM. NOMINAL N.T.S NOT TO SCALE O.C. ON CENTER O.D. OUTSIDE DIAMETER OH. OVERHEAD OPG. OPENING OPP. OPPOSITE PCT. PRE-CAST P.L. PROPERTY LINE P.LAM. PLASTIC LAMINATE PLAS. PLASTER PLYWD. PLYWOOD PR. PAIR Q.T. QUARRY TILE
S SOUTH S.C. SOLID CORE SCHED. SCHEDULE SECT. SECTION S.F. SQUARE FOOT SHT. SHEET SIM. SIMILAR SPEC. SPECIFICATION SQ. ORSQUARE S.S. STAINLESS STEEL STAGG. STAGGERED STD. STANDARD STIFF STIFFENER STL. STEEL STRUC. STRUCTURAL SUSP. SUSPENDED
No.
Description
Date
TR TREAD T&B TOP AND BOTTOM TER. TERRAZZO T&G TONGUE & GROOVE THK. THICK T/ TOP OF TYP. TYPICAL U.O.N. UNLESS OTHERWISE NOTED VCT VINYL COMPOSITION TILE VER VERIFY VERT. VERTICAL W WEST W/ WITH W.C. WATER CLOSET WD. WOOD W/O WITHOUT
DEWEY, CHEATHAM & HOWE 296 CAMBRIDGE STREET
TITLE SHEET Project number Date Drawn by Checked by
ID308-01 05.14.19 JESSICA DUBOIS MWF
A0.1 Scale
5/9/2019 3:45:05 PM
A0.1 A0.2 A1.1 A2.1 A3.1 A4.1 A5.1 A6.1 A7.1 A8.1 A9.1 A10.1
Sheet Name
Sheet Issue Date