Jessica Butler 2013 Work Samples

Page 1

Jessica

Butler


Master’s Project: Creating a framework for the creation of unique high-rise residences

Pre-Fab High-Rise Pre-Fab High-Rise is a structural and architectural framework for the prefabrication of flexible, responsive, and economical high-rise structures in quickly urbanizing areas. After spending a semester researching the conditions of urbanizing metropolises in Asia, this proposal was developed to create a process for the creation of residential buildings. By applying a prefabrication methodology to save costs and time while ensuring quality of construction, a technical framework was designed which then informed the architectural stance of the project, which was to create a successful vertical community. Primary and secondary structural systems were employed and tested as part of this process as well.

Primary structure: precast concrete & steel truss system

15m 49.2ft

2.5m 8.2ft

7.5m 24.6ft

Secondary structure: steel truss cantilevered units


Unit exploded axonometric and two views of exterior roof decks.

Typical residential floor plan (left); typical commercial/mechanical floor plan (right); sectional perspective (bottom)

Mechanical

0m 2.5m 5m

0m 2.5m 5m

10m

10m


Commercial floor (right); Unit interior (below); typical section (below right); interior atrum (opposite)

Neighborhood: 8 stories 32m | 105ft

Commercial/ Mechanical Zone: 2 stories 8m | 26ft


Final Presentation Board (2’10”x7’4”)


Master plan and detail development of a K-12 boarding school in rural Haiti.

Haiti Sustainable Education Working with a 'real' client who formed the Haiti Sustainable Education organization, we were charged with creating a master plan for a K-12 boarding school in rural eastern Haiti. Taking into consideration the issues of community, feasibility, safety, and the needs of the children, the master plan was refined and then one aspect of the plan was developed in detail.

Support 3%

Offices Infirmary Maintenance

5-12 Dorms

8%

12%

K-4 Dorms 24%

Dining

Track & Field Athletics Offices Amphitheatre Infirmary Dining Hall Maintenance Classes & Labs

Private

Meeting Studying

Pavillion 17%

Plaza

Playing

Amphitheater

7%

Public

Hanging Out

7%

K-5 Education

The core goals of the master plan were to create opportunities for and encourage social connections across the hilly site. The final focus of the project became a large, multi-use amphitheatre space which acts as the public interface of the school on its public side while facilitating circulation and activity.

Dorm

6-12 Education

23%

Frequency

Dormitories

Dorm

Walking Meeting Studying

Class

Class

Walking

Meeting

Meeting

Learning

Learning

Eating

Studying

Hanging Out

Dorm

Class

Class

Public

Seating Public Playground Variety

Traffic Seating Private

Traffic Seating Public Private

Seating Public Traffic

A


B

C

Views of progression through site, keyed to master plan on previous spread. Opposite top: Site section.

D

F

E

G

H


Final Presentation Board (3’x7’)


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.