WEEK 07 ACTIVITY: ‘OFF CAMPUS’

This week’s activity is an off campus site visit. The company working here is called Maxstra. According to the site manager, this residential building will be built up to 10 storeys using concrete. Pre-casted panel and PT slab will be mainly used.

The first place we get in is the ground floor which is part of the footing system. The footing is 8 meters deep. In order to hold the building, they applied strip footing on the sides as well as pole footing in the middle.

PVC

Steel Pipe

PVC

Copper Pipe

Formwork

Machines

The pictures show that many pipes and cables are hanging on the ceiling. There are PVC pipes which are for stormwater sewage. There are also Steel pipes, copper pipes and many cables that are connected to machines. Obviously, this is the area where supplying all the services such as water, electricity and gas for the whole building. The lines on the ceiling are the sign of formwork which means that the slabs are in-situ concrete slab.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.