WEEK 10 ACTIVITY: ‘DETAILING VOLUME’ (PART TWO) This is the finalised looking after the formwork has been done.
These are the steel reinforcers. The retaining wall will come up 100 meters high.
reinforcements
Plywood
LBL member
WEEK 10 ACTIVITY: ‘DETAILING VOLUME’ (PART TWO) This is the finalised looking after the formwork has been done.
These are the steel reinforcers. The retaining wall will come up 100 meters high.
reinforcements
Plywood
LBL member