STATUS BUILT
LOCATION
GOLD COAST, AUS
DESIGN YEAR
2018
STATUS BUILT
LOCATION
GOLD COAST, AUS
DESIGN YEAR
2018
PROJECT INFORMATION:
This is a spectacular spiral tower over 4 levels with interactive play equipment like a glockenspiel, binoculars, telescopes, suspended nets, rope tunnels and an enclosed slide. With differing sized nets and bridges, younger kids can climb a fair way up (and back down) safely and comfortably. It delivers a fabulous interactive experience that caters to all ages and you could easily spend a day hanging out here.
MY ROLES IN THE PROJECT:
• Assist the chief designer to to develop the chief creative idea and turn ideas into model
• SketchUp model
• Rendering
pictures from Mrs LardeedahPROJECT INFORMATION:
The playground is like a big game board - SNAKES AND LADDERS. Children can play a real-life version of the game by throwing the sieve in a huge, secure enclosed net. The key to this design is not just fun, safety is the first thing to consider. Therefore, the design of the net should not only allow children to play joyfully, it provide a safe space for the children to develop their nature.
MY ROLES IN THE PROJECT:
• Assist the chief designer to turn ideas into model and to develop the chief creative idea
• SketchUp model
• Rendering
STATUS CONCEPT DESIGN
LOCATION
THE GABLES, AUS
DESIGN YEAR
2018
PROJECT INFORMATION:
There are several key small buildings in the park of the resort. In addition to the visitor center, the most attention is this small but exquisite auditorium. Although the area is less than 400 square meters, the completed auditorium has become the most open destination for tourists. In addition to weddings, grass camping and other events can also be held here.
MY ROLES IN THE PROJECT:
• Assist the chief designer to turn ideas into model and to develop the chief creative idea
• Sketch Up model
• Rendering
STATUS
BUILT
LOCATION
QINGZHOU, CHINA
DESIGN YEAR
2015
NIGHT EVENT
SILENT DAY
The project uses Revit for design and modeling, and is completed coordination with other disciplines. The most difficult point is coordinate the curved door and the cladding with the overall without being obtrusive.
completed in how to overall shape
MY ROLES IN THE PROJECT:
• BIM model
• Technical drawings
• Coordinate with other professionals
PROJECT INFORMATION:
The modeling of the performing arts center is mainly divided into two parts, one is the facade, which is mainly modeled by the design team with Rhino; the other is the internal civil construction, which is modeled by me with Revit and combined with the facade of the design team. During the modeling process, I also cooperate with other professions, such as HVAC. There are many large-scale equipment, and there will be many conflicts after entering the model. I can quickly f i nd problems and solve them through Revit modeling, helping designers reduce design mistakes.
MY ROLES IN THE PROJECT:
• BIM model
• Technical drawings
• Coordinate with other professionals
PROJECT INFORMATION:
The designer made a huge roof in the conceptual design stage, and it was full of various challenges when the design was deepened. Moreover, when coordinating with the professional equipment, in order to keep the ceiling clean and simple, the height between the roof and the suspended ceiling is particularly high, but in order to ensure that the roof is light and thin from the outside, the overhanging eaves of the roof are greatly reduced.
MY ROLES IN THE PROJECT:
• BIM model
• Technical drawings - floor plan, wall sections
• Coordinate with other professionals
DESIGN YEAR
2022
PROJECT INFORMATION:
We want to design a high-rise building in a group of skyscrapers. We hope that the tower part will be a clean volume, while the podium at a human scale can have very pleasant landscapes, walkways, and supporting commercial. Therefore, in the podium part, we introduced the landscape system of the adjacent plot, turned the independent park into a double park, and extended it into the building.
MY ROLES IN THE PROJECT:
• BIM model
• Technical drawings
• Coordinate with other professionals
STATUS SCHEMATIC DESIGN LOCATION SHENZHEN, CHINA
DESIGN YEAR 2021
PROJECT INFORMATION:
This is a small building renovation. This project uses Revit to express three stages, namely the original building, the demolished building and the reconstructed building. It clearly expressed the drawings before and after the renovation, and cooperated with the cost team smoothly.
MY ROLES IN THE PROJECT:
• Bim model
• Technical drawings - floor plan, reflected ceiling plan, elevation, section
• Coordinate with other professionals
STATUS DESIGN DEVELOPMENT LOCATION SYDNEY, AUS DESIGN YEAR 2018
STATUS CONSTRUCTION DRAWINGS
LOCATION
GUANGDONG, CHINA
DESIGN YEAR
2022
PROJECT INFORMATION:
As the bim manager of this project, I carried out the in-depth design of the designer's plan, and produce drawings to cooperate with the construction application. With the assistance of the Revit model, the designer can better make indepth modifications to the design to meet the feasibility.
MY ROLES IN THE PROJECT:
• BIM model
• technical drawings - floor plan, section, elevation, detail drawings.
• coordinate with other professionals
STATUS CONSTRUCTION DRAWINGS
LOCATION
GUANGDONG, CHINA
DESIGN YEAR
2022
PROJECT INFORMATION:
This is a commercial podium of a residential complex. Due to the large height difference of the site, Revit helps designers better understand the site and make a more reasonable design for the height difference. At the same time, the facade of the building can be design by study the wall detail through the Revit model to perfect the design.
MY ROLES IN THE PROJECT:
• BIM model
• Technical drawings - floor plan, wall section, elevation, staircase enlarged plan
• Coordinate with other professionals