2012. 02. 12 2009. 06. 28 - 07. 24
o
verseas trip
o
ther works
Coffee shop brand reneal suggestion Petitzel competition Anipair competition travel company competition
< ORANGE >
a
rchtecture works
Contents.
Undergraduate course 4-2 [Utopia] Personal Academic work 2012. 09-12
Graduate course 1-2 Personal Academic work
Undergraduate course 4-1 Personal Academic work
2013.03 - 06
2012. 03-06
Undergraduate course 3-2 Personal Academic work 2009. 05-06
Collaborative work with 2 members
Undergraduate course 3-1 Personal Academic work
2009. 07
2009. 03-05
g
raduation project
Theme : Critic : Professor Hyunjun Mihn, Soonsup Choi Personal Academic work : Graduation Project 5-1 2013. 03-06
# Location “Children are not small adults” - Unsuitable space for children
What image
comes to your mind when you think of Children’s Hospital? Extremely important period - as they are growing
Background of choosing project
Number of Children’s Hospitals
Cognition
1
5
1
1
224-32/21, Seogye-dong, Yongsan-gu, Seoul, Republic of Korea
1
HOSPITAL” 1
1
I don’t want to go to _______________ I’m scared of going to _______________ How can I take my child into _____________ Scary place...........
CHUNGPA LIBRARY
SEOUL STATION CHUNGPA PARK AIRPORT RAILROAD
NATIONAL THEATER COMPANY OF KOREA
New Wave of SOHWA CHILDREN’S HOSPITAL
Children’s Hospital “we need new type of it!”
There is no place for resting
- Children’s Hospital
MUST have its proper spaces based on its scientific facts
INTERCOMMUNICATION HOSIPITAL
Physical develoment
0-2 ages
0-2 4-6
3-5 ages 6-11 ages 11-13 ages
Selected
Congnitive develoment
0-2
Emotional develoment
0-3
Sociality develoment
DEVELOPMENT + PALYGROUND
4-6 7-
Language develoment
4-6 7-
+ Requaring place such as
DOCTOR’s OFFICE PATIENT’s ROOM HOSPITAL ADMINISTRATION PHYSICAL THERAPY ROOM PHYCHOTHERAPY PHARMACIST’S OFFICE
HEALING PROCESS
I WANT TO GO _________________
Have you ever been to THIS TYPE OF HOSPITAL ?
# Concept story
roof garden doctor’s office
patient’s room
kid’s cafe & gallery
playground & children’s space
0
ELEV
ELEV
ELEV
ELEV
1
5
10(m)
0
ELEV
±0 ELEV
ELEV
ELEV
)
1
5
10(m)
EL +8000
EL +4000
EL +1000
GL ±0
EL -5500
MAIN ENTRANCE
FL EL +8000
FL EL +4000
EL +2000
EL -2000
#
u
topia 4-2
Theme : Utopia Critic : Professor Jaeyoung Chung, Dongho Lee Collaborative work : Undergraduate course 4-2 2012. 09-12
“ The World has changed “ - ABC news
There is a village in Finand. Its nickname is Utopa. Now, we will explore this village.
Section diagram
# Mass study
N
#
# Unit type
#
Type A _ For 1~2
Type B _ For 2~3
Type C _ For 3~4
People who are sick and tired of their society are moving more towards northern part of Finland. Eco-ship party is a group of people who wants to live in the Eco-fellowship village where they explore new world.
.... Utopia
I
mmerse into flow 4-1
Theme : Residential Complex Critic : Professor Beomsik Na, Heeryoung Park Collaborative work : Undergraduate course 4-1 Personal Academic work 2012. 03-06
# Location
Mt. Sung-mi
Here!
Location :
Building land ratio(42%) Floor area ratio(180%) Parking lot : 65
Mt. Sung-mi
Site Boundary
# Site analysis
4
8 Site boundary
14
9
Site boundary
1
14
8 1 1
8
8
1
14
8 8
8 7
Site is located near Seongmisan of Seongsandong. Seodaemun-gu, Seoul. To the right, 50 meters-long mass blocks the flow of mountain, and 8m wall in the front causes severance. Therefore, movement line going in out of the mountain, and in the site is form into one way. Thus, by using the siteĂ&#x152;s landscape, the site recovers its original duty. I propose a plan for this site to work as a link, inside the residence, to Seongmisan and connector of right and left, back and forth.
# Retaning wall for use
# Green View
# Case study1
# Study model
# Site plan
# Unit plan
Living R Toilet
Room
Room
Toilet
Kitchen
25
30
Living R
67
Room
Toilet Living R + Room
Room
TypeA Kitchen Toilet
Living R + Room
64
Living R
25
Toilet
Room
TypeB
Kitchen Room
75 Toilet
Room
Room
Living R Room
75
Living R Toilet
TypeD
Room Toilet
Room
Kitchen Living R
70
Kitchen
Room Living R
90 Toilet
Toilet
Room
Type E
# Elevation
# Unit
Type A
Type B
Type C
Type D
Type E
Type G
m
ood attack ; competition work
Theme : Critic : Professor Sun goo Gong Collaborative work : work with 2 members at Yanbian University of Science and Technology 2009. 07
# Location
a : site boundary b : river
Location : Site area: 5232m Building land ratio(40%) : 2092.8m Floor area ratio(250%) : 3080m Landscape architecture area (30
# Concept Sketch
ELEVATION
1st Floor Plan
s
tand renovation 3-1
Theme :
[
]
Critic : Professor Yeonsu Lim, Changhoon Shin Personal Academic work : Undergraduate course 3-1 2009. 05-06
“ Renovated State”
Before renovation : Stand
# Concept
# Study Model
# Concept Diagram
# Using Sunlight & Ventilation
# Elevation
Void
# Roof plan
# 1F plan
I
mage preservation project 3-1
Theme : Critic : Professor Yeonsu Lim, Changhoon Shin Personal Academic work : Undergraduate course 3-1 2009. 03-05
By proposing a new program of Ă&#x17D;shared roomsĂ&#x152;, that satisfies social, economical and enviromental requirements, and reanalyzing the paths within the community to function as a conveying network, I planned a new development measure of Ihwa-dong that will bring up an issue to the former development programs of unconditional construction of skyscapers.
# Concept & Zoning
A TYPE B TYPE
PATH
C TYPE
A+C TYPE
D TYPE
A+C TYPE
C TYPE
COMMMUNITY SPACE
CONCEPT
# Design process
ACCESSIBILITY
MOVEMENT WAY
# Main Units ROOM LIVING R TERRAS
ROOM TOILET
TERRAS
ENTRANCE
TOILET
KITCHEN
Area : 36.3 m Resident population of the area : 1~2 people Vocation : RUN A WORKSHOP
ENTRANCE TOILET
ENTRANCE ROOM
TERRAS
TOILET ENTRANCE
ROOM
Area : 72.6 m Resident population of the area : 3~4 people Vocation : RUN A WORKSHOP or STUDENT
# Combination
LIVING R TERRAS
ROOM KITCHEN
Area : 49.5 m Population of the area : 1 person Vocation : RUN A WORKSHOP
TOILET
TOILET
ENTRANCE
ENTRANCE
TERRAS
PRIVATE
TOILET (TOILET A + TOILET C)
TOILET
ENTRANCE (ENTRANCE A+ ENTRANCE C)
ENTRANCE
TERRAS
SALE & EXHIBIT
ENTRANCE
TERRAS
SALE & EXHIBIT SALE & EXHIBIT
WORK R
PRIVATE
PRIVATE
BAD ROOM (ROOM A + PRIVATE C)
SALE & EXHIBIT WORK R
WORK R WORK ROOM (ROOM A + WORK ROOM C)
TOILET ROOM
ROOM
Area : 135.3 m Population of the area : 3~4 people Vocation : RUN A WORKSHOP : 2 3
TOILET
TOILET
TERRAS
WORK R
ENTRANCE
ENTRANCE
TOILET
TOILET
ENTRANCE
ENTRANCE
KITCHEN
TERRAS
LIVING R SALE & EXHIBIT
SALE & EXHIBIT
TOILET
TERRAS
LIVING R
LIVING R
ROOM
ROOM
WORK R
LIVING R
PRIVATE
TOILET
KITCHEN
TERRAS
ENTRANCE
KITCHEN
PRIVATE
SALE & EXHIBIT
SALE & EXHIBIT
WORK R TOILET SALE & EXHIBIT
WORK R
WORK R
ROOM LIVING R TERRAS
ROOM TOILET
TERRAS
ENTRANCE
KITCHEN ENTRANCE TOILET
TOILET
TOILET
TERRAS
ENTRANCE
LIVING R
PRIVATE
SALE & EXHIBIT
SALE & EXHIBIT WORK R
WORK R
# Image preservation PROJECT
Thank you