ARCHITECTURE PORTFOLIO
Jim Chiu
2014.07 - 2014.08 李瑋珉建築師事務所-实习 LWM architect-Intern 2015.07 - 2016.11 潘正華建築師事務所-设计师 C.H.PAN architect-Designer 2017.08 - 2018.07 瀚亚建築師事務所(台北)-设计师 Archasia Group(Teipei)-Designer 2018.07 - 2019.12 瀚亚建築设计咨询有限公司(上海)-设计师 Archasia Group(Shanghai)-Designer
瞿 勁 Jim Chiu PHONE:18621077441 E-mail:jimsong820917@qq.com jimsong930917@gamil.com Experience:4 years(Shanghai 1.5 year) Education:2012-2015 Ming Chuan University,Arch 2015-2017 China University of Technology,Arch
SOFTWARE AutoCAD、Sketch Up、Rhino、Grasshopper RANDER Vray、Podium、Lumion GRAPHIC Photoshop、Illustrator Hi, i’m Jim. I have 4 years expericene, include layout,preliminary design, permint drawing,detail design and as building drawing. besides, i have experance about project architect sereval times,that me learned skills from early stage to the end of project. I’m a happy guy and glad to study design with others,and i’m looking for a job about architect(perfer major in early stage).
Content Tanfu Hi-Tech industry office building
Archasia Group Shanghai
Foxsemicon Integrated Technology Inc. Nanjing Industrial Park Nanjing Walsin Center-Phase 2 Nanjing Walsin Center-Phase 3 Chengchi University Dah Hsian SeeToo Library
Archasia Group Taipei
Digiwin Soft Taichung Headquarter UNIS Nanjing Research & Manufacture Park Church & Residences Renewal Apartment
C.H.Pan Architect
Zhanhua Park & Community center Yang Ming Mountain Country House Nanshih street Apartment Sanzhi Residences Fishing Port,Without fiish - redefine fishery industry
Graduation Project
Tanfu Hi-Tech industry office building
Location: Chengdu Site area: 15,006m² Total building area: Office: 72,000m²,Retail: 3,000m² Participation year: 2019 Participation stage: Preliminary design(Project Designer)
Site introduce The site block is located at TANFU 5 street , Hi-Tech industry development zone, southern CHENGDU downtown, which is called“kingdom financial backstage base”. Area :53,729M². Zoning: business (technology、office)/retail. Site: Lot3, Area: 15,006M².
Pr oper ty type T1(Office) T2(Office) Retail SUM.
SITE
Business model content table(Client Requirement) Floor Ar ea(M²) 2000 2000 1500 5500
Stor y 20 16 2
Floor h eigh t(M) 4.2 4.2 6
Site plan restrict The distance between southwest side building(T2) and kingdom base building(built) must >50M(regress ≧11.39M from red line) ,and the building height must < 68M. If the building direction is north-south, must regress ≧10.5M from red line(next to P5 side). To fill the requirement: the distance with P5 #3 building ≧21M. Basement: connect with P5 #3 building and share the vehicle entrance.
Total(M²) 40000 32000 3000 75000
Str ategy Own ed Own ed Own ed
Traffic route analysis Railway station
SITE
Air por t
From railway station(9KM)
From airport(15KM)
From subway(800M)
Retail in neighborhood
Roadside store
Su bway
INTIME city(800M)
Diagram 1.
Green area
2.
Extend the Ext. road for site used.
Ext. road
Sidework
3.
Setback the office to maximum the square for retail use.
4.
5.
6.
Place retail at northside of site along the main
To let people walk into and through the
Shape the square building volume to make
road and face the nearby retail.
square easily ,Split volume into four cube.
new main facade for the viewer.
Perspective
Perspective
Site plan
Foxsemicon Integrated Technology Inc. Nanjing Industrial Park
Location: Nanjing Site area: 1,728,008m²(1st phase area:84,333m²) Participation time: 2019 Participation stage: Overall planning,Phase 1 preliminary design(Project Designer)
Site introduce The site is located at Pukou economic development zone , which between TSMC(north) and UNIS(south).
TSMC
UNIS Concept Ordinary industrial park gave people Closed,Cold and boreding feeling. We open the part of park and create a “Happy Street”(YUN SHIN road),to make differ one park from the ordinary modes. The street provided food and daily appliances,served Foxsemicon’s,TSMC’s and UNIS’s employees. AD(35M
Phase 1
JING DING ROAD(30
M)
The site is bounded by roads on four sides,and the most widest one is BU YUE road. Besides,YUN SHIN road spilt site into two pieces and client want divide development into two phases.
A
B
B
F
F
A
B
A
Place the HQ and office(B) at the middle of the site and face the BU YUE road. Make the junction of BU YUE road and YUN SHIN road as a entrance.
A
B F
C
Kept main manufacturing plants(A) away from YUN SHIN road and set the secondary plants(F) next to office and main plants.
A
C
H
HAPPY STREET
A
B
YUN SH
Phase 2
AN RO
SHIN ROAD(16M) YUN
downstream manufacturers use
)
BU YUE ROAD(54M)
B
A
A
C
C
F H
To avoid vehicular access disturb “Happy street”and BU YUE road, set storages at southside of site. Set apartments at the other side of street. The retail placed at lower floors of office and apartment and roadside of the street.
Perspective
YU
ER
OA
YU N
BU
SH IN
RO AD
Phase 1 site plan
D
Perspective
Happy street(Phase 1)
Happy street perspective
Office
Office plan
1F
4F
7F
2F
5F
RF
3F
6F
Acorrding clientâ&#x20AC;&#x2122;s information,the office will be used for many different downstream companys. I place the open space at each floor,and create many coner which could be use for copy zoom or tea room. The people can contact through open space and companys can save operating cost. Also i create a roof garden and a open to below lobby to make the worker feeling comfortable.
Office perspective
Parking building
Apartnent
Apartnent perspective
Nanjing Walsin Center-Phase 2
Location:Nanjing Total building area:Mall:160,226m²,Office T1:103,377m²,Office T6:14,644m² Participation time:2018-2019 Participation stage:Design management(Mall,T6),Detail design(T1)
Project introduce T2
T5
T6 Mall T1
T2
Mall&T1
T6
T5
Phase 2 working content The civil constucture(especially mall and T6) was almost completed and curtain engineering was just began,when i joined the phase 2 in 2018/08. My main content of work is improve original design,solution of engineering interface conflict and design change proposal. besides,i also participate in working drawing review.
Gas pressure station&fire lift design change proposal
The original design was use green wall as a enclosure of station and lift. The client considered maintain green wall would cost too much,and they also thought the facade volume was too large.
Key plan
Original design
Due to client’s requirement,i split one volume into two and reduced volume as small as possible. The materials i used were all came from the facade of mall.
Mall façade (Pottery pipe)
façade between T1 double side and mall
OPT1-Aluminium pipe&Gray panel OPT2-White&sliver plane To let gas pressure station become part of mall,I use grille and use same Use the façade vocabulary between T1 double side and mall,which was color with façade of mall (gray and pottery yellow). white and sliver plane.
Gas pressure station&fire lift design change proposal
Besides, i suggest client the station and left could be a eye catching artwork because itâ&#x20AC;&#x2122;s part of central sunken plaza.
OPT1
OPT2
OPT3
Gas pressure station&fire lift design change proposal
DD drawing
Photo after completed
Main enterance sunken plaza design change proposal
Due to clientâ&#x20AC;&#x2122;s requirement change,the sunken plaza was carried out a series of design changes.
Key plan Process of scheme
Process 1
Original design
Process 2
Process 3
Main enterance sunken plaza design change proposal Final scheme
Main enterance sunken plaza design change proposal
Final scheme
Main enterance sunken plaza design change proposal
DD drawing
Main enterance sunken plaza design change proposal Photo after completed
Solution of engineering interface conflict(fire trunk road between mall and T6)
Due to engineering management wasnâ&#x20AC;&#x2122;t implemented completely,elevation of H.V.A.C pipes are lower than curtain ceiling. Worse, the elevation of pipes are lower than minimum height of fire code(4M). Thus,i submitted a solution of this complex problem.
Key plan
Before solve
Air pipes analysis
Original curtain ceiling plan
Solution of engineering interface conflict(fire trunk road between mall and T6)
Drawings of solution
Solution of engineering interface conflict(fire trunk road between mall and T6)
Drawings of solution
After solve
Nanjing Walsin Center-Phase 3
Location:Nanjing Total building area:Office T2:172,320m²;Office T5:11,296m² Participation time:2018-2019 Participation stage:Scheme design
T2 plan improve
Due to client changed requirment(turn curve plan into square plan),and different lift systems were comparing. We studied and presented several improved plans. Casestudy and primary improve
Primary improve
Casestudy(IFC Nanjing)
T2 plan improve
Improve Plan A_4 Zooms(1 Sky lobby)
1F Plan
Lift
Lobby
Toilet&Tea Room
Electrial Room&Storage
Zoom 1&2 Plan
Zoom 3&4 Plan
Zoom 3 Plan
Zoom 4&5 Plan
Improve Plan B_5 Zooms(1 Sky lobby)
Zoom 1&2 Plan
T2 plan improve
Improve Plan C_6 Zooms(2 Sky Lobbies)
Zoom 1&2 Plan
Zoom 3&4 Plan
Zoom 4&5 Plan
Zoom 1&2 Plan
Zoom 3&4 Plan
Improve Plan D_4 Zooms
1F Plan
T2 plan improve
Improve Plan E_3 Zooms
1F Plan Improve Plans Compare
Zoom 1&2 Plan
Zoom 3 Plan
T5 Elevation&Plan Design
Chengchi University Dah Hsian SeeToo Library
Location:Taipei Total building area:28,474m² Participation time:2017-2018 Participation stage:Detail design、Permits drawing
Concept
The site is located at hillside and the conservation land. We didnâ&#x20AC;&#x2122;t break water and soil conservation, instead we use the nature of site placed a 80M large slope. The large slope let people can walk, run,play and appraoch library easily. Besides,we planned a 200 sqm square,could be connect with MRT station in the future.
We also planned a small lake in the other side of library. And placed a lakeside reading building,which seem like float on the lake.
In the interior of library, we made floor step back one by one. Also we designed a open hall to made whole space spacious.
DigiWin Soft Taichung Headquarter
Location:Taichung Total building area:64,625m² Participation time:2017-2018 Participation stage:Permits drawing、As built drawing(Project Architect)
Concept
The concept from bettery combination, and we reach conclusion from sereval combinations possibility. The perfect volume is four high and one large,low ring.
casestudyďź&#x161; Bonaventure Hotel, LA
Process
Five high
two high + two low + ring
Four high + one hollow
two high + one low + ring
UNIS Nanjing Research&Manufacture Park
Location:Nanjing Total building area:28,474m² Participation time:2017-2018 Participation stage:Overall planning
Concept UNIS is the largest IC research&manfufacture group in China, and growing up year and year. Nanjing would be the next place of UNIS HQ park, so our concept is “A great hawk spreads its wings”.
The north of site is TSMC and Foxsemicon,so the first impression of facade become important. We planned a wide main facade,faced the entrance. Due to client’s requirement,the project would be spilted into four phases.
Phase1
TSMC
Foxsemicon Phase2
Phase3&4
Perspective
Church & Residence Renewal Apartment Participation time: 2015-2016 Participation stage:Scheme design, 3D modeling, Permit drawing
Location:Sanchong,New Taipei City Site Area:Lot A:1,155.06m² ,Lot B:1,396.57m² Total Building Area:Bldg A:10,974.66m² ,Bldg B:12,207.57m² Content:15 Floors,Bldg A:60 units,Bldg B:80 units
Concept
New Taipei City has been growing up from 1950s,that cause lots old buildings at present. The site has been facing this serious social issue,too. There are four old buildings in the site, include an old church. The church is too old and small to use. We design a renewal apartment for the orignal residents and place an exclusive space for churches. The new apartment will be bring comfort to people, and can be use in another decades.
Because We think the urban renewal not just demolish old building and build a new one. The one point of urban renewal is to make people have better living environment. therefore,we plan sereval small parks and street corner square for the public use. besides,we bring green in the roof and terrace to make the graden for the apartment residents own.
Zhanhua Park & Community Center Preliminary Planning Participation time: 2015-2016 Participation stage:Preliminary design, 3D modeling,
Location: Shipai,Taipei Site Area: 14,326.26m² Total Building Area: 26,393m²(Parking:25,574.18m²,Community Center:818.82m²)
Existing Accessibility Analysis
Routes Analysis
Elderly Population Analysis Over 60 year 1854 people 23%
car route
Zhanh
walk route
ua St.
zebra crossing prak entrance existing community center
praking entrance bike praking lot
0-59 year 6290 people 77%
Elderly population ratio(Zhanhua vil.) Over 60 year 11131 people 21% 0-59 year 42729 people 79%
Ln. 114, Yumin 6th Rd. Elderlypopulation ratio(Nearby 7 vils.)
A.Rough surface of pavement
B.Rough connection
C.Rough pavement of walk path
D.Rough connection
E.Steep ramp without handrail
F.Recreation facilities are lack of safe protection
G.Ditch cover will be H.Obstacles will be hinder the wheel chair hinder the wheel chair
I.Different height of path
1. Car route: The entrance of ”Zhanhua park parking lot”, across from Zhanhua street No. 36(existing community center). 2. Bike route: The exist bike parking(36 lots),located at northwest side of site. 3. Walk route: There is no walk path except the north side of park(width 4M). Sereval entrancese are connected with residential street in the east and south side of park. In west side of site,the retail bldg. isn’t have walk path beteeen bldg. entrance and parking lot.
Site plan
Accessibility plan
Public art place opts plan A D
B 7
1
C
4
16 8 12
2
Accessibility planning content: 1. Loop walk path should be accessible. 2. All path should be use comfortble for elderly.
5 9
Public Art place planning content: 1. Public art should be placed at paths crossing and nodal point.
13 6 14
10 3
Public art image : 1. Use Shipai historical memory. 2. Echo geog. traits of Shipai area.
11 15 1. U-BIKE parking lots 2. Bike parking lots 3. Coner square 4. Public art 5. Elderly’s square 6. Community center 7. Car entrance 8. Roller skate rink 9. Stage 10.Childen’s play ground 11.Elderly’s recreation area 12.Orignal tree area 13.Wooden deck 14.Orignal tree area 15.Orignal tree area 16.Loop walk path
Site planning content: 1. To perserve original trees,excavations of basement parking should avoid trees area as possible. 2. The west side of site should place setback belt,and plant trees to reduce spatial stress. 3. Place green area and plant trees as possible. 4. Place the new community center for public use.(Nearby 7 vils. are all lack of community space) 5. Place the elderly’s square and recreation area. 6. Place the all-weather space.
Lift place opts
OPT-A
OPT-B
U-BIKE parking lots opts
OPT-A
OPT-B
OPT-C
Perspective
Community center preliminary plan
1F plan
Section
2F plan
Elevation
Basement plan-OPT-A
Parking Lot Amount Motobike: 153 Accessible motobike: 5 Heavy type motobike: 4 Car: 624 Accessible car: 14
Walk route Car entrance route Car departure route Motobike route
Vertical route
B1F plan
Basement plan-OPT-A
B2F plan
B3F plan
Basement plan-OPT-B
Parking Lot Amount Motobike: 153 Accessible motobike: 4 Heavy type motobike: 4 Car: 540 Accessible car: 14
B1F plan
B2F-B4F plan
B5F plan
Yang Ming Mountain Country House Participation time: 2015-2016 Participation stage: Scheme design,3D modeling, permit drawing
Location: Taipei Site area: 2,688.64m² Totel building area: 624.42m²
Nanshih Street Apartment Location: New Taipei City Site area: 1,140m² Totel building area: 3,262.42m² Content: 12 floors,24 units
Participation time: 2015-2016 Participation stage: Scheme design,Permit drawing 3D modeling
A2-1 一層樓地板面積 A戶 9 :76.35+24.30(夾層)=100.65㎡ B戶 7 :42.02+23.72(夾層)=65.74㎡ 電梯(計入容積) 5 :5.71㎡ 梯廳 4 :28.13㎡ 管委會空間 6 :44.72㎡ 機電空間 1 + 3 + 8:26.96㎡ 陽台 12 + 13 :8.70㎡ 總樓地板面積 (不含夾層):223.89㎡ 總樓地板面積(含夾層) :271.91㎡
梯廳面積檢討 28.13 ≧ 271.91X0.1 =27.19㎡
28.13-27.19=0.94㎡(計入容積)
陽台面積檢討 8.70 ≦ 271.91X0.1 =27.19㎡...OK
陽台+梯廳面積檢討
1.99x3.82=7.60m2
8.70+28.13=36.83 ≦ 271.91x0.15=40.79㎡...OK
2.43x2.35=5.71m2
2
4.90x4.50+2.43x2.28+0.32x1.70=28.13m
4'
3'
容積樓地板面積
2.15x4.78=10.28m2
271.91-28.13-44.72-26.96+0.94=173.04㎡(含夾層) 223.89-28.13-44.72-26.96+0.94=125.02㎡(不含夾層)
2
1
3
12F(41.35m )
4
5
樓梯數量檢討
7.47x3.75=28.01m2(車道) 5.85x4.75+1.62x4.60+1.67x5.03 +0.37x2.93=44.72m2 5.54x4.07+5.85x2.61+1.85x2.27=42.02m2 4.00x2.27=9.08m2 9.05x7.25+2.30x4.67=76.35m2 0.50x2.44=1.22m2(計入建築面積) 0.50x2.15=1.08m2(計入建築面積) 2.56x1.70=4.35m2(陽台)
直通樓梯數量依技規95條檢討,其面積依技規89條檢討 樓地板 > 240㎡,及8F以上應設兩座直通樓梯. 本案共計地下2層地上12層,故採2座直通梯...OK
A
樓梯寬度檢討 居室樓地板面積 166.39㎡ < 200㎡ OK. 故直通樓梯寬度依技規33條第4款檢討 安全梯寬 93cm ≧ 75cm OK. 實設級深 24cm ≦ 法定級深 24cm OK. 實設級高 16.67cm ≦ 法定級高 18cm OK. R:16.67cm T:24cm 55<2R+T=16.67x2+24=57.34<65 OK.
計入建築面積=28.01㎡
行動不便設施檢討
1.60x2.72=4.35m2(陽台)
1.居室出入口、昇降設備、停車空間及樓梯設有無障礙通路通達...OK 2.停車位數量:27輛,應設無障礙車位數量:1輛 實設無障礙車位:1輛...OK
合計(不含陽台):223.89m2
碰撞距離 Nsx=5.67cm Nsy=6.84cm 實設碰撞距離Nsy : 31cm
B 105m/min 12人份 行動不便昇降機
計入建蔽率2.30㎡
無障礙 停車位
台電配電箱 200×225×150
C
C'
D
D'
無障礙樓梯
雨遮投影
直通樓梯
雨遮投影
一層平面圖 修 正 REVISION
說
明 DESCRIPTION
繪 圖 DRAWN BY
設 計 DESIGNED BY
比例尺 SCALE
核 對 CHECKED BY
核准 APPROVED BY
日 期 DATE
1/100
潘正華建築師事務所 地址:235 新北市員山路504號4樓之6 電話:(02)2223-6808 傳真:(02)2223-7808 email:pp2031@gmail.com
雨遮投影
SCALE=1/100
新北市林口區建林段970、969、969-1等3筆地號
一層平面配置圖
圖 號 DRAWING NO.
A2-1
Premit drawing: 1F plan
張 號 SHEET NO.
簽
3/11
章
雨遮投影
E
A2-3 2
1
3'
4'
3
4
1
5
2
3'
4'
3
4
5
A
A
雨遮 雨遮
11F 雨遮 頂板
11F雨遮頂板 雨遮
雨遮
雨遮
B
B 雨遮
雨遮
105m/min 12人份 行動不便昇降機
C D
D'
C
C'
D
D'
無障礙樓梯
無障礙樓梯
雨遮
雨遮
105m/min 12人份 行動不便昇降機
雨遮
11F雨遮頂板
直通樓梯
直通樓梯
雨遮
雨遮
E
雨遮
E
雨遮 11F雨遮頂板
三層至十一層樓地板面積
十二層樓地板面積
A戶 6:72.38㎡
A戶 6:62.45㎡
B戶 5:72.25㎡ 電梯(計入容積) 2:5.71㎡ 梯廳 4:10.63㎡ 機電空間 1 + 3:18.30㎡ 陽台 7 + 8 + 9 + 10:16.76㎡ 總樓地板面積 : 179.27㎡
B戶 5:61.84㎡ 電梯(計入容積) 2:5.71㎡ 梯廳 4:10.63㎡ 機電空間 1 + 3:18.30㎡ 陽台 7 + 8 + 9 + 10 :16.76㎡ 總樓地板面積 : 158.93㎡
梯廳面積檢討
梯廳面積檢討
10.63 ≦ 179.27x0.1 = 17.93㎡...OK
10.63 ≦ 158.93x0.1 = 15.89㎡...OK
陽台面積檢討
陽台面積檢討
16.76 ≦ 179.27x0.1 = 17.93㎡...OK
16.76 ≧ 158.93x0.1 = 15.89㎡ 16.76-15.89=0.87㎡ (計入容積)
陽台+梯廳面積檢討
陽台+梯廳面積檢討
16.76+10.63=27.39 ≧ 179.27x0.15=26.89㎡ 27.39-26.89=0.5㎡(計入容積)
16.76+10.63=27.39 ≧ 158.93x0.15=23.84㎡ 27.39-0.87-23.84=2.68㎡ (計入容積)
容積樓地板面積
容積樓地板面積
158.93-10.63-18.30+3.55=133.55㎡
179.27-10.63-18.30+0.5=150.84㎡
1.99x3.82+0.30x1.40=8.02m2
樓梯數量檢討
2
2.43x2.35=5.71m
1.99x3.82+0.30x1.40=8.02m2
直通樓梯數量依技規95條檢討,其面積依技規89條檢討 樓地板 > 240㎡,及8F以上應設兩座直通樓梯. 本案共計地下2層地上12層,故採2座直通梯...OK
2.15x4.78=10.28m2 2.43x4.08+0.30x2.03+0.03x3.43=10.63m2
2.15x4.78=10.28m2
2.15x1.88=4.03m2(陽台) 1.60x2.72=4.35m2(陽台)
9.05x6.90=62.45m2 1.99x2.03=4.03m2(陽台) 2.15x1.88=4.03m2(陽台)
裝飾柱寬度檢討
1.60x2.72=4.35m2(陽台)
結構裝飾柱< 150cm OK. 純裝飾柱< 100cm OK.
合計樓地板面積(不含陽台):179.27m2
居室樓地板面積 144.63㎡ < 200㎡ OK. 故直通樓梯寬度依技規33條第4款檢討 安全梯寬 93cm ≧ 75cm OK. 實設級深 24cm ≦ 法定級深 24cm OK. 實設級高 17.78cm ≦ 法定級高 18cm OK. R:17.78cm T:24cm 55<2R+T=17.78x2+24=59.56<65 OK.
6.82x8.90+0.38x3.00=61.84m2
裝飾柱寬度檢討
2.56x1.70=4.35m2(陽台)
樓梯寬度檢討
2.43x4.08+0.30x2.03+0.03x3.43=10.63m2
居室樓地板面積 144.63㎡ < 200㎡ OK. 故直通樓梯寬度依技規33條第4款檢討 安全梯寬 93cm ≧ 75cm OK. 實設級深 24cm ≦ 法定級深 24cm OK. 實設級高 16cm ≦ 法定級高 18cm OK. R:16cm T:24cm 55<2R+T=16x2+24=56<65 OK.
1.99x2.03=4.03m2(陽台)
直通樓梯數量依技規95條檢討,其面積依技規89條檢討 樓地板 > 240㎡,及8F以上應設兩座直通樓梯. 本案共計地下2層地上12層,故採2座直通梯...OK
2.43x2.35=5.71m2
樓梯寬度檢討
4.25x11.35+2.57x8.90+0.38x3.00=72.25m2 9.05x6.90+2.30x4.32=72.38m2
樓梯數量檢討
結構裝飾柱< 150cm OK. 純裝飾柱< 100cm OK.
2.56x1.70=4.35m2(陽台)
新北市建築物陽台外緣裝飾性質之柱、版、透空柵欄檢討
新北市建築物陽台外緣裝飾性質之柱、版、透空柵欄檢討
裝飾版長度65cm < 264cm(陽臺長度) / 4 = 66cm,且裝飾版長度95cm < 100cm OK. 格柵透空:65cm + 6cm x 11=131cm< 264cm(陽臺長度) x 2/3 = 176cm OK.
裝飾版長度65cm < 264cm(陽臺長度) / 4 = 66cm,且裝飾版長度95cm < 100cm OK. 格柵透空:65cm + 6cm x 11=131cm< 264cm(陽臺長度) x 2/3 = 176cm OK.
逃生步行距離檢討
三至十一層平面圖 修 正 REVISION
說
明 DESCRIPTION
SCALE=1/100
繪 圖 DRAWN BY
設 計 DESIGNED BY
比例尺 SCALE
核 對 CHECKED BY
核准 APPROVED BY
日 期 DATE
1/100
逃生步行距離檢討
合計樓地板(不含陽台):158.93m2
十二層平面圖
LA=4.47+10.49+2.41=17.37m<50m LB=0.86+1.13+5.04+5.15+4.59=16.77m<50m
潘正華建築師事務所 地址:235 新北市員山路504號4樓之6 電話:(02)2223-6808 傳真:(02)2223-7808 email:pp2031@gmail.com
新北市林口區建林段970、969、969-1等3筆地號
三至十一層平面圖、十二層平面圖
圖 號 DRAWING NO.
A2-3
張 號 SHEET NO.
簽
5/11
章
Premit drawing: 3F-11F plan &12F plan
SCALE=1/100
LA=3.97+9.04+2.41=15.42m<50m LB=4.36+3.31+5.04+1.13+0.86=14.7m<50m
A3-1
屋頂透空遮牆檢討 遮牆面積:33.52㎡
屋頂透空遮牆檢討
屋頂透空遮牆檢討
遮牆面積:29.82+35.12=64.94㎡
屋頂透空遮牆檢討 遮牆面積:29.19㎡
遮牆面積:69.21㎡
透空部分:5.24x0.8+5.04x1.45+4.24x1.6=19.8㎡
透空部分:4.32x0.8+4.1x1.45+4.06x1.6+5.6x0.8+4.6x1.45+4.6x1.6=34.41㎡
透空部分:10.06x0.8+9.5x1.45+10.18x1.6=38.11㎡
透空部分:4.38x0.8+3.48x1.45+3.48x1.6=14.12㎡
19.8㎡ > 33.52x1/3 = 11.17㎡...OK
34.41㎡ > 64.94x1/3 = 21.65㎡...OK
38.11㎡ > 69.21x1/3 = 23.07㎡...OK
14.12㎡ > 29.19x1/3 = 9.73㎡...OK
北向立面圖
SCALE=1/200
南向立面圖
SCALE=1/200
西向立面圖
SCALE=1/200
Premit drawing: Elevation
東向立面圖
SCALE=1/200
Sanzhi Residences
Participation time: 2015-2016 Participation stage:Perliminary design,3D modeling Location: New Taipei City Site area: 14,666.17m² Totel building area: 15,476.42m² Content: 48 units
Overall Site Plan
TYP Floor Plan
Perspective
B
Elevation