INTERNSHIP RESEARCH PROGRAM Repurposing 2023
RESEARCH
P7
Site Analysis Existing Building Study Mobility AI Design Exploration Sustainability
02
Phase 2 Precedents Tribune Tower Quay Quarter Tower 63 Madison Tai center for Heritage & Arts
03
Phase 3 Environmental Analysis
RESEARCH BRIEF
Phase 1 Research
CHAPTER 1 OF 3
01
Phase 1: Research, Phase 2 : Precedents, Phase 3 : Environmental Analysis
P9
Site Highways Railroads DTLA
LA County Map
Phase 1: Research, Phase 2 : Precedents, Phase 3 : Environmental Analysis
P 11
SITE VIEW
US Bank Tower Gas Company Tower
Pershing Square Metro
Phase 1: Research, Phase 2 : Precedents, Phase 3 : Environmental Analysis
P 13
HEIGHT & SCALE
US Bank Tower
73 STORIES + 1,018 FT
Gas Company Tower
52 STORIES + 750 FT
5min walking range
Pershing Square
3 STORIES +8.5 ft / -25.5 ft
METRO
Pershing Square -50 ft
ASE 3. SITE IMPLEMENTATION
P 17
Land Use Highlights
Hospitality Residential
Land Use Highlights
Commercial Cultural & Educational
Site (53 Acres)
7 Helipads
Office
Land Use
HIGHLIGHTS
Phase 1: Research, Phase 2 : Precedents, Phase 3 : Environmental Analysis
GAS COMPANY TOWER Skidmore Owens & Merrill, 1988
This fifty-two-story building was designed by Richard Keating of SOM. ADDRESS 555 W 5th St Los Angeles, CA 90071 HEIGHT 750ft 52 stories tall INFRASTRUCTURE Central core = column free experience Concrete Floors and exposed ceilings FACTS Class A Office Building 1.4 million sqft 300,000 sqft of parking garage Experiential Lobby LEED Gold Certified
The Gas Company Tower was the second building whose height is a result of Maguire Partners’ Central Library air rights exchange (the other is U.S. Bank Tower). The building rises in a series of cliff-like setbacks and inverted corners, with an elliptical top of blue glass symbolizing the trademark blue gas flame of the building’s primary tenant and joint venture partner, Southern California Gas Company. Inside is an unusual lobby, with a wall of windows looking out to an enormous mural by Frank Stella painted on the side of the adjacent building. The mural, titled “Dusk,” is the public art component of the building. In the area between the mural and the lobby was a water installation which continued under the glass wall and inside the lobby under transparent strips of flooring. After renovations, this feature was dismantled, having the rembrandts of this idea visible in the new flooring.
P 23
Phase 1: Research, Phase 2 : Precedents, Phase 3 : Environmental Analysis
P 25
GAS COMPANY TOWER FLOOR 3
Mech. Grating 20
13
Service Elev.
Terrace
FLOOR 30
WEST FIFTH STREET
Floor 30
SOUTH OLIVE STREET
750’
Mech. Enclosure
GAS COMPANY TOWER
SOUTH GRAND AVENUE
Floor 3
Elec/Tele
Elec/Tele
SOUTH OLIVE STREET
SOUTH GRAND AVENUE
Mech.
TOP VIEWS
GAS COMPANY TOWER
WEST FIFTH STREET
FLOOR 45
NORTH-WEST ELEVATION NORTH-EAST WORMSEYE ISOMETRIC SOUTH OLIVE STREET
SOUTH-WEST ELEVATION
SOUTH GRAND AVENUE
3D SOUTH-WEST ISOMETRIC
Floor 45 WEST FIFTH STREET
Elevations
Plans
Phase 1: Research, Phase 2 : Precedents, Phase 3 : Environmental Analysis
P 27
SERVICE ELEVATOR + EMERGENCY ESCALATOR Service Elevator +
Emergency Escalator
USER ELEVATOR
User Elevator
SOUTH FACING TERRACE
South Facing Terrace
NORTH FACING TERRACE
North Facing Terrace
Exterior Walls
Windows
Structural columns
EXTERIOR WALLS
WINDOWS
STRUCTURAL COLUMNS
VERTICAL CIRCULATION
LOBBY
Lobby Vertical Circulation
UNDERGROUND PARKING
Underground Parking
EXTERIOR WALLS
WINDOWS
Section
STRUCTURAL COLUMNS
VERTICAL CIRCULATION
Floor Plates FLOOR PLATES
Structural Diagram
Phase 1: Research, Phase 2 : Precedents, Phase 3 : Environmental Analysis
US BANK TOWER Henry N. Cobb - Pei Cobb Freed & Partners, 1989
ADDRESS 633 West Fifth Street Los Angeles, CA 90071 HEIGHT 1,018ft 72 stories tall INFRASTRUCTURE Central core = column free experience HVAC: condenser water system with 24/7 capacity FACTS Class A Office Building 1,396 parking spaces 300,000 sqft of parking garage
Soaring 1,018 feet high, US Bank Tower is considered the defining anchor of the Downtown Los Angeles skyline. The 72-story building offers tenants a level of quality, luxury and prestige that has few rivals in the United States. The 1.4 million square foot Class A tower boasts full height windows with unrivaled floor-to-ceiling heights ranging from 13 to 18 feet. Silverstein Properties has completed a $60M capital improvement program to modernize the building. The renovation breathes new life into over 35,000 SF of common area spaces throughout the building. The renovation includes: • A complete redesign of the lobby and entrances • New day-to-night food and beverage options, from casual grab-and-go eateries to fine dining and catering • A full elevator modernization • Bolstered meeting and collaboration spaces • The 54th floor has been reintroduced as The Vista, a hospitality-inspired destination exclusive to building tenants, featuring curated food and beverage options, event and conferencing spaces, flexible workspaces, and meeting and pitch rooms (15,000 SF of amenity space.)
P 29
Phase 1: Research, Phase 2 : Precedents, Phase 3 : Environmental Analysis
P 31
Floor 7
Floor 50 LIBRARY +/- 275 S.F.
PARTNER OFFICE +/- 285 S.F.
ASSOCIATE OFFICE +/- 140S.F.
ASSOCIATE OFFICE +/- 140S.F. ASSOCIATE OFFICE +/- 140 S.F. PARTNER OFFICE +/- 269 S.F.
PARTNER OFFICE +/- 246 S.F.
WS #4 8X8
SERVER ROOM +/- 125 S.F.
MAIL/COPY/ +/- 240 S.F. ASSOCIATE OFFICE +/- 148 S.F.
COPY/ SATELLITE
WS #1 8X8
PARTNER OFFICE +/- 280 S.F.
WS #2 8X8
FILE ROOM +/- 287 S.F.
RECEPTION LARGE CONFERENCE ROOM +/- 730 S.F.
STORAGE +/- 57 S.F.
COMMON AREA BY LANDLORD PARTNER OFFICE +/- 271 S.F.
BREAK ROOM +/- 163 S.F.
ASSOCIATE OFFICE +/- 148 S.F.
WS #3 11'X8'-6
SMALL CONFERENCE ROOM +/- 400 S.F.
7th FLOOR
1018’-0”
Floor 61
Floor 73 73RD FLOOR
STAIR NO. 1
ELECT. RM.
H.V.A.C. RM.
SERVICE CL.
SERVICE ELEVATOR LOBBY WOMEN'S TOILET
STAIR NO. 1
3D SOUTH-WEST ISOMETRIC
SOUTH-WEST ELEVATION
NORTH-EAST ELEVATION
TOP VIEWS
VESTIBULE
SERVICE ELEVATOR
ELEVATOR LOBBY
VESTIBULE
WOMEN'S TOILET
MEN'S TOILET
SERVICE ELEVATOR
VESTIBULE
VESTIBULE
MEN'S TOILET
ELECT. RM.
Elevations
ELEVATOR LOBBY
STAIR NO. 2
61ST FLOOR
SERVICE CL.
STAIR NO. 2
SERVICE ELEVATOR LOBBY
H.V.A.C. RM.
73RD FLOOR
Plans
Phase 1: Research, Phase 2 : Precedents, Phase 3 : Environmental Analysis
P 33
Elevators to lvl. 73
Elevators to lvl. 61
Mechanical Floors
Exterior Walls EXTERIOR WALLS
Windows
WINDOWS + FRAMING
Structural columns STRUCTURAL COLUMNS 86 Columns
VERTICAL CIRCULATION / CORE
Elevators to lvl.48
Ground Floor Underground Parking Structure EXTERIOR WALLS
Section
WINDOWS + FRAMING
STRUCTURAL COLUMNS 86 Columns
Vertical VERTICALCirculation CIRCULATION / CORE
Floor Plates FLOOR PLATES
Structural Diagram
P 53
SUSTAINABILITY Guiding Questions • • • • •
How do we design a building that will last beyond the present? What does net zero mean, in practice? What processes and techniques would help us reach net zero? Could we aim to be net positive? How can we leverage the natural environment to minimize waste and energy? • How do we fuse sensory pleasures with sustainable technologies? • Can we design beyond the building to create a more sustainabilityoriented culture in DTLA?
Current & Future Trends The carbon footprint of a building goes beyond its ground; it factors in construction, occupant transportation, behaviour, design, operations, and waste. In the design stages, EVs and public transit should be incentivized, providing onsite renewable energy and storage wherever possible. During build and construction, upfront embodied carbon should be minimized. Finally, circular economy principles should be a priority – rather than designing single-use buildings, we should be designing adaptive, modular spaces that evolve with changing times. Any residual emissions should be offset with comprehensive schemes like Gold Standard, WELL, or Living Building Challenge.
IDEATION
CHAPTER 2 OF 3
P 63
P 65
P 69
the knot
P 71
Form & Massing
BRIDGE
RETAIL
HIGHLINE
FOREST
AMPHITHEATER
HEALTHCARE
OFFICE
RESIDENTIAL/HOTEL
MEZZANINE
GROUND
Program
P 75
Section
P 77
Elevation
P 79
P 81
Mobility
BRIDGES
shared sports, recreation, and amenities
HUBS
rest, recharging, and replenishing for humans and drones. offers 24h solar charging and parking.
DOCKS
access points for residents on each floor. offers 24h solar charging and parking.
Legend : Pedestrian Private Drone Uber Air Public Transit Birds
HIGHLINE
connecting the towers to Pershing Square and DTLA.
P 85
Active Sustainability
SMART MEP SYSTEMS SOLAR powers all operations through microgrid, and offers 24h EV-drone charging stations for residents and visitors.
upgraded, energy-efficient MEP & HVAC systems throughout the buildings (LEDs, low flush, DCV ventilation, fuel cells, etc.). Controlled by an adaptive BMS system.
WIND TUNNELS Wind
Energy
BMS-CONTROLLED WINDOWS automatically tint facade when temperature comfort limits are reached
GEOTHERMAL PUMPS stabilize building temperature through groundwater heat exchange
Power over 100%. of building operations, and donate extra energy to DTLA grid.
BMS-CONTROLLED WINDOWS
P 87
Passive Sustainability Algae Facade Shade
CO2 (air)
Biomass (fuel & fertilizer) Heat (electricity)
Terraces & Oppenings
DOUBLE SKIN FACADE thermal insulation & ventilation control
Save over 20% of the average building‘s operational CO2 emissions with efficient design.
P 91
Facade & Materiality living walls & trellised terraces
double skin glass
double skin glass
open terraces (OUTDOOR COURTS)
semi-open aluminum mesh (OUTDOOR COURTS)
algae walls (WELLNESS & SPA) tri-fold solar panel gates double skin glass
semi translucent glass (FITNESS)
living walls & trellised terraces
tri-fold solar panel gates BMS- controlled tinting SafeGlass
greenhouse glass watertight glazed glass (POOL) double skin glass
tri-fold solar panel gates double skin glass (semi-open air)
tri-fold solar panel gates
algae walls double skin glass tri-fold solar panel gates
semi-open wood & glass
open-air walkway
semi-open wood & glass
Sensory Experience
P 93
HEAR FEEL SMELL TASTE SEE
DESIGN
CHAPTER 3 OF 3
P 99
P 101
PHASE 1. RESEARCH • PHASE 2. CONCEPT DESIGN • PHASE 3. SITE IMPLEMENTATION
P 103
Plan Re-Design
One Path East-West One Path East- West remove the other sidethe other sides remove
Shrink down Shrink side corridors down side corridors 6’ Egress Stair opening 6’, Egress Stair opening facing
Original Office Corridor Original Office Corridor need 6’ need 6’
Unit Division Unit Division Merge-Outline Merge- outline
DoorDoor Spotsspots
Exterior Wall line Exterior Wall Lines
Plan Finder
Plan-finder
Diagrams • Plans • sections • renDers
PHASE PHASE 1. RESEARCH 1. RESEARCH • PHASE • PHASE 2. CONCEPT 2. CONCEPT DESIGN DESIGN • PHASE • PHASE 3. SITE 3. IMPLEMENTATION SITE IMPLEMENTATION
Plan Re-Design
P 105
5 5units units 5(1b-5b) units (1b-5b) (1b-5b)
3D 3D long in-unit long in-unit corridor corridor | insight | insight
Diagrams Diagrams • Plans • Plans • sections • sections • renDers • renDers
work needs
WC
FLOOR 17 TO 21, 10 FT HIGH 3-S, 3-1B, 1-3B
7' - 6" 2' - 4"
2. CONCEPT DESIGN • PHASE 3. SITE IMPLEMENTATION
K J
17' - 6"
I
Schematic Design
Tower Adaptive Reuse
RESIDENTIAL - US BANK PLAN
Downtown Los Angelas, CA
P 107
1B
43' - 6"
H
3B
22' - 6"
F
141' - 8"
2B
21' - 0"
E
D 17' - 6"
1B
B A
DESCRIPTION
DATE
2' - 4" 7' - 6"
C
REVISIONS
2' - 10" 8' - 9"
14' - 1"
13' - 0"
14' - 0"
15' - 6"
18' - 6"
18' - 6"
15' - 6"
14' - 0"
13' - 0"
14' - 1"
8' - 9" 2' - 10"
SHEET TITLE
173' - 4".
1 2
3
4
5
6
7
8
15
14
RESIDENTIAL - US BANK PLAN F17-21, 25 LEVELS - 10FT 3-S, 3-1B, 1-3B
10
9
11
Residential - US Bank Plan
1213
SHEET NUMBER
Diagrams • Plans • sections • renDers
101.1
JOB NO.
Project Number DATE
Issue Date SCALE
3/32" = 1'-0"
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE & PARTNERS INC. AND IS FURNISHED IN CONFIDENCE FOR THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF MVE & PARTNERS INC. ALL RIGHTS RESERVED, © COPYRIGHT 2015.
Plan Isometric view
P 109 ZONING PLAN
EGRESS PLAN
FLOOR 17 TO 21, 10 FT HIGH
FLOOR 17 TO 21, 10 FT HIGH
PHASE 1. RESEARCH • PHASE 2. CONCEPT DESIGN • PHASE 3. SITE IMPLEMENTATION
PHASE 1. RESEARCH • PHASE 2. CONCEPT DESIGN • PHASE 3. SITE IMPLEMENTATION Room Legend Bed
Room Legend
Type 1A: UL Concerete : 2h+
Bed
171 SF
Drone Parking
WC 103 SF
Closet Living Room 425 SF
Hallway
Bed
Closet WC
Bed
51 SF
71 SF
Living Room Office home office work needs
Bed
221 SF
UP
171 SF
Drone Parking WC
Closet
103 SF
Bed
100 SF
Storage
238 SF
30 SF
6 '- 0".
Residential 12 R-2
Living Room
Storage
WC
674 SF
Hallway
WC
Office
Office
WC
Bed
79 SF
88 SF
68 SF
152 SF
Living Room 425 SF
Closet WC
UP
Living Room
677 SF
Living Room
WC 100 SF
Office
237 SF
Storage
100 SF
6 '- 0".
Bed
WC
71 SF
223 SF
WC
Bed
51 SF
Office
Storage
Storage 30 SF
30 SF
me office k needs
51 SF
71 SF
63ft (<125)
376 SF
Living Room
Office
Office
79 SF
88 SF
119 SF
WC
206 SF
WC
Drone Parking
117ft (<250)
Bed
All: 12 ppl <20 ppl 30 SF
All: 12 ppl <20 ppl
1. CBC: Chapter 10- Table: Maximum Common Path of egress travel distance with sprinkler : - Residential areas: 125 ft
Maximum Common Path :of egress travel with 2. CBC: 1.CBC: Chapter Chapter 10- Table: 10Exit Table: Access travel distance with sprinkler - Residential areas:distance 250 ft sprinkler : - Residential areas: 125 ft 3. The width of Common Path is caculated by multiplying the OL by egress capacity factor of 0.2 inch per occupant. But minimum door width is 36”=3ft 2.CBC: Chapter 10Table: Exit Access travel distance with sprinkler : - Residential
100 SF
Storage
WC
71 SF
WC
51 SF
Office 376 SF
Living Room
areas: 250 ft 12ppl x 0.2 in/ppl=6 inch < 3 ft (clear door width in current plan)
PHASE 1. RESEARCH • PHASE 2. CONCEPT DESIGN • PHASE 3. SITE IMPLEMENTATION
Room Legend Bed Bed
3.The of Common is caculated by multiplying the OLcapacity by egress capacity 4.The width ofwidth Corridor/ Stairway isPath caculated by multiplying the OL by egress factor of 0.3 inch per occupant. WC Drone Parking But minimum is 44”=3ft 8in factor ofstair 0.2 width inch per occupant. 119 SF
Bed
But minimum door width is 36"=3ft
12ppl x 0.3in/ppl=3.6 inch < 6 ft (clear corridor width in current plan) Bed
171 SF
Type 1A: UL
12ppl x 0.2 in/ppl=6 inch < 3 ft (clear door width in current plan)Concerete : 2h+ 5.Corridor length: CBC: Chapter 10 - Dead End Corridor do not exceed 50 feet for occupany in group R-2. Drone Parking
Closet Closet
206 SF
WC
103 SF
Living Room 425 SF
Hallway Hallway
4.The width of Corridor/ Stairway is caculated by multiplying the OL by egress capacity Both longest and inch EA satify the codes in terms of egress exit for fire safety factor CP of 0.3 per occupant. But minimum stair width is 44"=3ft 8in All: 12 ppl <20 ppl 6 '- 0". 12ppl x 0.3in/ppl=3.6 inch < 6 ft (clear corridor width in current Residential plan) 12 R-2 1.CBC: Chapter 10- Table: Maxim 5.Corridor length: CBC: Chapter 10 - Dead End Corridor do not exceed 50 feet for occupany group R-2. sprinkler : -inResidential areas: 125 Closet
WC
Bed
51 SF
71 SF
Living Room Living Room
221 SF
UP
WC
100 SF
Bed
Storage
238 SF
30 SF
Office Office home office work needs
Living Room
Storage Storage WC WC
674 SF
Office
Office
WC
Bed
79 SF
88 SF
68 SF
152 SF
677 SF
Living Room
Both longest CP and EA satify the codes in terms of egress exit for fire safety 30 SF
100 SF
Storage
237 SF
Bed
WC
71 SF
223 SF
63ft
2.CBC: Chapter 10- Table: Exit Ac
PHASE 1. RESEARCH • PHASE 2. CONCEPT DESIGN • PHASE 3. SITE IMPLEMENTATION
P 111
Closet Gym
ASE 1. RESEARCH • PHASE 2. CONCEPT DESIGN • PHASE 3. SITE IMPLEMENTATION
Hallway Living Room Storage WC
F'
42' - 3"
3B
B'
S
S
2B
1B
20' - 0"
120' - 6"
16' - 0" 14' - 3"
C'
S
1B
E'
D'
1B
155 ft (<250)
Belocony Outdoor Awning rainwater Privacy
123 ft (<125)
WC
Bed
66 SF
201 SF
Bed
Bed
Bed
215 SF
215 SF
219 SF
649 SF
158 SF
573 SF
Living Room
Living Room
Living Room
205 SF
204 SF
207 SF
WC
28' - 0"
1B
Bed
Living Room Living Room
Bed
Bed 200 SF
47 SF
Living Room WC
135 SF
176 SF
83 SF
6 '- 0".
194 ft (<250)
WC
Living Room 651 SF
Bed 125 SF
69 SF
Bed
Residen tial 17 R-2
Bed 128 SF
215 SF
A'
Schematic Design
Bed
Downtown Los Angelas, CA
FLOOR 11 TO 34, 10 FT HIGH 3-S, 3-1B, 1-3B
Tower Adaptive Reuse
Room Legend
RESIDENTIAL - GAS TOWER PLAN
WC
Storage
56 SF
32 SF
WC 71 SF
Closet
REVISIONS
Storage
24 SF
DESCRIPTION
DATE
33 SF
Living Room 580 SF
UP
Gym
WC
97 SF
86 SF
Closet 80 SF
Bed 220 SF
12' - 6"
12' - 6"
15' - 0"
15' - 0"
15' - 0"
15' - 0"
30' - 0"
UP
1'
2'
3'
All: 17 ppl <20 ppl
4'
5'
6'
30' - 0"
15' - 0"
15' - 0"
15' - 0"
15' - 0"
12' - 6"
12' - 6"
230' - 0"
7'
8'
9'
10'
11'
12'
13'
RESIDENTIAL - GAS TOWER PLAN F11-34, 23 LEVELS - 10FT 3-S, 3-1B, 1-3B
14'
15'
67 ft (<125)
Residential - Gas Tower Plan
SHEET NUMBER
Diagrams • Plans • sections • renDers
1.CBC: Chapter 10- Table: Maximum Common Path of egress travel distance with sprinkler : - Residential areas: 125 ft 2.CBC: Chapter 10- Table: Exit Access travel distance with sprinkler : - Residential areas: 250 ft 3.The width of Common Path is caculated by multiplying the OL by egress capacity factor of 0.2 inch per occupant. But minimum door width is 36"=3 ft 17ppl x 0.2 in/ppl=3.4 inch < 3 ft (clear door width in current plan) 4.The width of Corridor/Stairway is caculated by multiplying the OL by egress capacity factor of 0.3 inch per occupant. But minimum stair width is` 44"=3ft 8in 17ppl x 0.3in/ppl=5.1 inch < 6 ft (clear stair width in current plan) 5.Corridor length: CBC: Chapter 10 - Dead End Corridor do not exceed 50 feet for occupany in group R-2.
Both longest CP and EA satify the codes in terms of egress exit for Resi OL
SHEET TITLE
101.2
JOB NO.
Project Number DATE
Issue Date SCALE
3/32" = 1'-0"
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE & PARTNERS INC. AND IS FURNISHED IN CONFIDENCE FOR THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF MVE & PARTNERS INC. ALL RIGHTS RESERVED, © COPYRIGHT 2015.
Plan Isometric view
Diagrams • Plans • sections • renDers
Gym Hallway Living P 113 Room
ZONING PLAN
Storage
EGRESS PLAN
FLOOR 11 TO 34, 10 FT HIGH
FLOOR 11 TO 34, 10 FT HIGH
WC
PHASE 1. RESEARCH • PHASE 2. CONCEPT DESIGN • PHASE 3. SITE IMPLEMENTATION
Residen tial 17 R-2
155 ft (<250) 123 ft (<125)
WC
Bed
66 SF
Bed
Room Legend 201 SF
128 SF
Living Room
Bed
649 SF
215 SF
WC
Bed
Bed
Bed
215 SF
215 SF
219 SF
Living Room
Bed 158 SF
573 SF
Living Room
Living Room
Living Room
205 SF
204 SF
207 SF
Bed 200 SF
47 SF
Living Room WC
194 ft Bed(<250)
WC
176 SF
83 SF
6 '- 0".
69 SF
Bed
Living Room 651 SF
Storage
135 SF
32 SF
Bed 125 SF
WC 56 SF
Closet 24 SF
WC 71 SF
Storage 33 SF
Living Room 580 SF
Closet
UP
Gym
WC
97 SF
86 SF
Closet 80 SF
Gym
Bed 220 SF
Hallway
67 ft (<125)
Living All: 17 ppl <20 ppl All: 17 ppl <20 ppl Room
1.CBC: Chapter 10- Table: Maximum Common Path of egress travel distance with sprinkler : - Residential areas: 125 ft 1. CBC: Chapter Table:Exit Maximum Common Path of egress travel distance with sprinkler : - Residential areas: 125 ft 2.CBC: Chapter 10-10Table: Access travel distance with sprinkler : - Residential areas: 250 ft Storage 3.The width of Common Path is caculated by multiplying the OL by egress capacity factor of 0.2 inch per occupant. 2. CBC: Chapter 10- Table: Exit Access travel distance with sprinkler : - Residential areas: 250 ft But WCminimum door width is 36"=3 ft 17ppl3.xThe 0.2width in/ppl=3.4 inch < 3 ft (clear door width in current plan) of Common Path is caculated by multiplying the OL by egress capacity factor of 0.2 inch per occupant. 4.The width of Corridor/Stairway is caculated by multiplying the OL by egress capacity factor of 0.3 inch per occupant. But minimum door width is 36”=3ft But minimum stair width is` 44"=3ft 8in 17ppl x17ppl 0.3in/ppl=5.1 inch <inch stairdoor width in current plan) 6 ft< (clear x 0.2 in/ppl=3.4 3 ft (clear width in current plan) 5.Corridor length: CBC: Chapter 10 - Dead End Corridor do not exceed 50 feet for occupany in group R-2.
SE 1. RESEARCH • PHASE 2. CONCEPT DESIGN • PHASE 3. SITE IMPLEMENTATION SE 1. RESEARCH • PHASE 2. CONCEPT DESIGN • PHASE 3. SITE IMPLEMENTATION
Room Room Legend Legend 155 ft (<250) 123 ft (<125)
WC
Bed
66 SF
201 SF
Bed 128 SF
Bed
Bed
Bed
215 SF
215 SF
219 SF
Living Room Living Room
Bed
649 SF
215 SF
WC
Bed 158 SF
573 SF
Living Room
Living Room
Living Room
205 SF
204 SF
207 SF
Bed 200 SF
47 SF
Living Room WC
194 ft (<250)
WC
176 SF
83 SF
Living Room 651 SF
6 '- 0".
69 SF
Bed
Tower TowerAdaptive AdaptiveReuse Reuse
UP
Storage
135 SF
56 SF
32 SF
Bed 125 SF
WC
Closet 24 SF
WC
Storage 33 SF
580 SF
Gym
WC
97 SF
86 SF
17ppl x 0.3in/ppl=5.1 inch < 6 ft (clear stair width in current plan)
Both longest CP and EA satify the codes in terms of egress exit for fire safety
Living Room
UP
But minimum stair width is 44”=3ft 8in
5.Corridor length: CBC: Chapter 10 - Dead End Corridor do not exceed 50 feet for occupany in group R-2.
Bed Bed Bed Closet Residen Closet Closet tial Gym Gym Gym 17 Hallway R-2 Hallway Hallway Living Living Living Room Room Room Storage Storage Storage WC WC WC 71 SF
widthCP of and Corridor/ Stairway is caculated multiplying the OL by egress capacity Both4.The longest EA satify the codes inby terms of egress exit for Resi OL factor of 0.3 inch per occupant.
Closet
Spa Storage
P 115
HASE 2. CONCEPT DESIGN • PHASE 3. SITE IMPLEMENTATION
Cafeteria
7' - 6" 2' - 4"
Bar K J
Beauty Salon
17' - 6"
I
Schematic Design
Tower Adaptive Reuse
FLOOR 1 TO 10, 12 FT HIGH Mixed use concept design: dynamity & a wide variety use
Downtown Los Angelas, CA
COMMERCIAL - US BANK PLAN
H
22' - 6"
F
141' - 8"
43' - 6"
open concept design: creativity & collabration
21' - 0"
E
D 17' - 6"
Food Market REVISIONS
B A
DATE
2' - 4" 7' - 6"
DESCRIPTION
C
Education Center
2' - 10" 8' - 9"
14' - 1"
13' - 0"
14' - 0"
15' - 6"
SHEET TITLE
Commercial - US Bank Plan
18' - 6"
18' - 6"
15' - 6"
14' - 0"
13' - 0"
14' - 1"
8' - 9" 2' - 10"
173' - 4".
1 2
3
COMMERCIAL - US BANK PLAN F1-10, 10 LEVELS - 1512FT 14 6 7 8 10 9 Mixed use concept design: dynamity & a wide variety use 4
5
SHEET NUMBER 11
102.1
1213
Diagrams • Plans • sections • renDers
JOB NO.
Project Number DATE
Issue Date SCALE
3/32" = 1'-0"
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE & PARTNERS INC. AND IS FURNISHED IN CONFIDENCE FOR THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF MVE & PARTNERS INC. ALL RIGHTS RESERVED, © COPYRIGHT 2015.
Plan Isometric view
PHASE 1. RESEARCH • PHASE 2. CONCEPT DESIGN • PHASE 3. SITE IMPLEMENTATION
ZONING PLAN
FLOOR 1 TO 10, 12 FT HIGH
P 117
RoomEGRESS Legend PLAN
Restaurant 4429SF 30 B
FLOOR 1 TO 10, 12 FT HIGH
ASE 1. RESEARCH • PHASE 2. CONCEPT DESIGN • PHASE 3. SITE IMPLEMENTATION
Bar
Cafeteria 2554 SF
Room Legend Cafeteria
Bar 1051 SF
Education Center
Kitchen 824 SF
Hallway
46' - 11"
Kitchen
dd
Bar
Outdoor Terrace
Cafeteria 2554 SF
Retail
8' - 6"Bar
Cafeteria
1051 SF
Spa
Storage
Education Center Retail
Hallway
2761 SF
46' - 11"
Kitchen Outdoor Terrace Retail
Market 3134SF 21 B
Storage 373 SF
92.5 ft (<100 ft)
Spa
8' - 6"
170 ft (<300 ft)
Storage
PHASE 1. RESEARCH • PHASE 2. CONCEPT DESIGN • PHASE 3. SITE IMPLEMENTATION
CBC: Chapter 10: Maximum Area OccupantCBC: Floor Chapter 10:Allowance MaximumPer Floor Area Allowance Per Occupant- Bussiness : 150 gross Bussiness : 150 gross Resturant: (1051+2554+824)/150=30 ppl <49ppl Resturant: (1051+2554+824)/150=30 ppl <49ppl ppl <49ppl Retail: (373+2761)/150=21 Retail: (373+2761)/150=21 ppl <49ppl , so 2 exits needed All: 30+21=51ppl
Room Legend
R
2
1.CBC: Chapter 10- Table: Maximum Common Path of egress travel distance with sprinkler : -
All: 30+21 = 51ppl, so 2Bussiness exits needed areas: 100 ft
2.CBC: Chapter 10- Table: Exit Access travel distance with sprinkler : - Bussiness areas: 300 ft
1. CBC: Chapter 10- Table: Maximum travel with : - Bussiness ft 3.The width ofCommon CommonPath Pathofis egress caculated by distance multiplying thesprinkler OL Restaurant by egress capacityareas: factor100 of 0.2
inch per occupant.But minimum door width is 36"=3 ft
4429SF
Bar Bar
2. CBC: Chapter 10- Table: Exitx Access travel distance sprinkler : - Bussiness areas:30 300 49ppl 0.2 in/ppl=9.8 (clear door width in current plan)ft inch < 5 with ft 8 in
Cafeteria Cafeteria
3. The width of Common Path is caculated by multiplying the OL by egress capacity factor of 0.2 inch per occupant. inch per occupant.But minimum stair width is 44"=3ft 8in But minimum door width is 36”=3ft
Cafeteria
4.The width of Corridor/Stairway is caculated by multiplying the B OL by egress capacity factor of 0.3 2554 SF
EducationCenter Center Education
Bar
1051 SF
51ppl x 0.3in/ppl=15.3 inch < 8.5 ft (clear corridor width in current plan) 5.Corridor length: CBC: Chapter 10 - Dead End Corridor do not exceed 50 feet for occupany in group B. in our case, this is going to be a sprinklered building so the deaddd end corridor is 50 ft - this 4.The width of Corridor/ Stairway caculated by multiplying the OL by egress capacity factor of 0.3 inch per occupant. 46' is- is 11" information usually found in the IBC But minimum stair width is 44”=3ft 8in Kitchen
49ppl x 0.2 in/ppl=9.8 inch < 5ft 8in (clear door width in current plan) 824 SF
Hallway Hallway Kitchen Kitchen OutdoorTerrace Terrace Outdoor Retail Retail
Both longest CP and EA satify the codes in terms of egress exit for fire safety
51ppl x 0.3in/ppl=15.3 inch < 8.5 ft (clear stair width in current plan)
Storage 373 SF
92.5 ft Diagrams • Plans • sections • renDers (<100 ft)
Spa Spa
5.Corridor length: 8' - 6" CBC: Chapter 10 - Dead End Corridor do not exceed 50 feet for occupany in group B. In our case, this is going to be a sprinklered building so the dead end corridor is 50 ft - this information is usually found in the IBC
Storage Storage
Both longest CP and EA satify the codes in terms of egress exit for fire safety Retail 2761 SF
CBC: Chapter 10: Maximum Floor Area Allowance Pe
Kitchen Library
P 119
Nail Beauty COMMERCIAL - GAS TOWER PLAN
Outdoor Terrace
Museum Venue
Storage
42' - 3"
F'
Stoage Schematic Design
EARCH • PHASE 2. CONCEPT DESIGN • PHASE 3. SITE IMPLEMENTATION
Retail Downtown Los Angelas, CA
Tower Adaptive Reuse
FLOOR 1 TO 10, 12 FT HIGH
Cafe 20' - 0"
Retail
16' - 0"
D'
120' - 6"
E'
Art Gallery
14' - 3"
C'
28' - 0"
B'
Library REVISIONS
A'
DESCRIPTION
DATE
Retail
12' - 6"
12' - 6"
15' - 0"
15' - 0"
15' - 0"
15' - 0"
30' - 0"
30' - 0"
15' - 0"
15' - 0"
15' - 0"
15' - 0"
12' - 6"
12' - 6"
230' - 0"
SHEET TITLE 1'
2'
3'
4'
5'
6'
7'
8'
9'
10'
11'
12'
13'
14'
Commercial Gas Tower Plan
15'
COMMERCIAL - GAS TOWER PLAN F1-10, 10 LEVELS - 12FT
SHEET NUMBER
Diagrams • Plans • sections • renDers
102.2
JOB NO.
Project Number DATE
Issue Date SCALE
3/32" = 1'-0"
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE & PARTNERS INC. AND IS FURNISHED IN CONFIDENCE FOR THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF MVE & PARTNERS INC. ALL RIGHTS RESERVED, © COPYRIGHT 2015.
Plan Isometric view
PHASE 1. RESEARCH • PHASE 2. CONCEPT DESIGN • PHASE 3. SITE IMPLEMENTATION P 121
Room Legend
ZONING PLAN
EGRESS PLAN
FLOOR 1 TO 10, 12 FT HIGH
FLOOR 1 TO 10, 12 FT HIGH
Accountant Room
170 ft (<300)
Art Gallery Cafe
HASE 1. RESEARCH • PHASE 2. CONCEPT DESIGN • PHASE 3. SITE IMPLEMENTATION
Cinema 1296 SF
Cinema Hallway Kitchen
96 ft (<100)
Room Legend
Library
9' - 8".
Stoage 99 SF
Library
Storage
4096 SF
Art Gallery
138 SF
1332 SF
Accountant Room
Nail Beauty
170 (<3
Art Gallery
Outdoor Terrace Retail
Cafe
Stoage
Cinema
Storage
Hallway
Storage 89 SF
Gallary&Cinema 2816SF 19 9' - 8". B Cinema 1296 SF
Accountant Room
96 ft (<100)
158 SF
Stoage 99 SF
Library Storage
Kitchen
4096 SF
Art Gallery
138 SF
1332 SF
Library
E 1. RESEARCH • PHASE 2. CONCEPT DESIGN • PHASE 3. SITE IMPLEMENTATION
Library&bookstore 4491SF 30 B
Nail Beauty
Room Legend Outdoor Terrace
Storage
Art Gallery Art Gallery
CBC: Chapter CBC: 10- Table: Maximum AreaMaximum Allowance Per OccupantChapter 10-Floor Table: Floor Area Allowance Per OccupantBussiness areas: 150 gross Bussiness areas: 150 gross Accountant Room (4096+138+158+99)/150=30 ppl <49ppl Stoage Bookstore: Bookstore: (4096+138+158+99)/150=30 ppl <49ppl Cinema: (1296+1332+89)/150=19 ppl <49ppl 170 ft
Cafe Cafe
StorageAll: 30+19 = 49ppl All: 30+19=49ppl
Retail
AccountantRoom Room Accountant
89 SF
158 SF
Cinema: (1296+1332+89)/150=19 ppl <49ppl (<300)
Gallary 2816SF 19 B
1.CBC: Chapter 10Table:Path Maximum Pathwith of egress distance 1. CBC: Chapter 10- Table: Maximum Common of egressCommon travel distance sprinkler travel : - Bussiness areas: 100 ft Cinema
Cinema Cinema
1296 SF
with sprinkler : - 9'Bussiness areas: 100 ft 96 ft - 8". 2. CBC: Chapter 10- Table: Exit Access distance with sprinkler : - distance Bussiness areas: 300 ft (<100) 2.CBC: Chapter 10-travel Table: Exit Access travel with sprinkler :Bussiness areas: 300 ft 3. The width of Common Path is caculated by multiplying the OL by egress capacity factor of 0.2 inch per occupant. Library&bookstore 3.The widthisof36”=3ft Common Path is caculated by multiplying the OL by egress But minimum door width 4491SF capacity factor of 0.2 inch per occupant. 49ppl x 0.2 in/ppl=9.8 inch < door 5ft 8inwidth (clear is door width in current plan) 30 But minimum 36"=3ft 49ppl x 0.2 in/ppl=9.8 inch < 5ft 8in (clear width in current plan) B 4.The width of Corridor/ Stairway is caculated by multiplying the OL by egress capacity factor of 0.3 inch per occupant. 4.The width of Corridor/Stairway is caculated by multiplying the OL by egress But minimum stair width is 44”=3ft 8in capacity factor of 0.3 inch per occupant. 49ppl x 0.3in/ppl=14.7 inch < stair 9ft 8inwidth (clear is corridor width in current plan)Maximum Floor Area Allowance Per Occ But minimum 44"=3ft 8in10CBC: Chapter Table: Gallary&Cinema 49ppl x 0.3in/ppl=14.7 inch < ft (clear corridor 9ft areas: 8 in Bussiness 150 gross width in current plan) 2816SF 5.Corridor length: 5.Corridor length: CBC: Chapter 10 - Dead End Corridor do not exceed 50 feet for occupany in group B. 19 Bookstore: (4096+138+158+99)/150=30 ppl <49ppl CBC: Chapter 10 - Dead End Corridor do not exceed 50 feet for occupany in B Cinema: (1296+1332+89)/150=19 ppl <49ppl Both longest CP and EA group B. satify the codes in terms of egress exit for fire safety Stoage 99 SF
Hallway Hallway
Library
Kitchen Kitchen Library Library NailBeauty Beauty Nail OutdoorTerrace Terrace Outdoor Retail Retail Storage Stoage Storage Storage
Storage
4096 SF
Art Gallery
138 SF
1332 SF
Storage 89 SF
Accountant Room 158 SF
All: EA 30+19=49ppl Both longest CP and satify the codes in 1.CBC: Chapter terms of egress exit for fire safety 10- Table: Maximum Common Path of egress travel d with sprinkler : - Bussiness areas: 100 ft Library&bookstore Plansdistance • sectionswith • renDers 2.CBC: Chapter 10- Table: ExitDiagrams Access•travel sprinkler :
Kitchen
President Office 189 SF
Office 3465 SF
Meeting Room
Office Reception Room
532 SF
P 123
514 SF
Printing Room 163 SF
Meeting Room Redundant Room
Hallway
Office
1953 SF
OFFICE - GAS TOWER PLAN
Meeting Room 1055 SF
FLOOR 37 TO 46, 10 FT HIGH Open concept design: creativity & collabration
President Office
Meeting Room 321 SF
33 SF
72 SF
Reception Room
Meeting Room
109 SF
Office
204 SF
2989 SF
Meeting Room 276 SF
1. RESEARCH • PHASE 2. CONCEPT DESIGN • PHASE 3. SITE IMPLEMENTATION
Office
Reception Room
1822 SF
Schematic Design
Printing RoomKitchen
Downtown Los Angelas, CA
1585 SF
Tower Adaptive Reuse
Printing Room Office
42' - 3"
F'
20' - 0" 16' - 0"
D'
120' - 6"
E'
14' - 3"
C'
B'
28' - 0"
Large Meeting Room for common use
REVISIONS
A'
DESCRIPTION
DATE
Shared Work Space Meeting Chambers 12' - 6"
12' - 6"
15' - 0"
15' - 0"
15' - 0"
15' - 0"
30' - 0"
30' - 0"
15' - 0"
15' - 0"
15' - 0"
15' - 0"
12' - 6"
12' - 6"
230' - 0"
1'
2'
3'
4'
5'
6'
7'
8'
SHEET TITLE 9'
10'
OFFICE - GAS TOWER PLAN F37-46, 10 LEVELS - 10FT open concept design: creativity & collabration
11'
12'
13'
14'
Office - Gas Tower Plan
15'
SHEET NUMBER
Diagrams • Plans • sections • renDers
103
JOB NO.
Project Number DATE
Issue Date SCALE
3/32" = 1'-0"
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE & PARTNERS INC. AND IS FURNISHED IN CONFIDENCE FOR THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF MVE & PARTNERS INC. ALL RIGHTS RESERVED, © COPYRIGHT 2015.
Plan Isometric view
PT DESIGN • PHASE 3. SITE IMPLEMENTATION
P 125
ZONING PLAN
FLOOR 37 TO 46, 10 FT HIGH
EGRESS PLAN
FLOOR 37 TO 46, 10 FT HIGH
Room Legend
82 ft (<100)
Office 6157SF 41 B
Hallway
Reception Room 514 SF
HASE 1. RESEARCH • PHASE 2. CONCEPT DESIGN • PHASE 3. SITE IMPLEMENTATION Kitchen President Office 189 SF
Office 3465 SF
Meeting Room
532 SF
514 SF
Printing Room
Office
163 SF
Meeting Room Redundant Room
Hallway 1953 SF
Meeting Room
President Office
1055 SF
Room Legend
Meeting Room
5' - 4"
Office 1585 SF
Printing Room Kitchen
President Office
Office
189 SF
1822 SF
Printing Room
Hallway
Reception Room
Kitchen
Reception Room
109 SF
514 SF
72 SF
Meeting Room
3465 SF
204 SF
514 SF
109 SF
Office
Meeting Room
532 SF
Reception Room
Reception Room
Office
Office Reception Room
33 SF
82 ft (<100)
Office 6157SF 41 B
321 SF
2989 SF
Meeting Room Printing Room
Office
276 SF
163 SF
2989 SF
Meeting Room
Meeting Room
Hallway
276 SF
1953 SF
Redundant Room
Meeting Room 1055 SF
Meeting Room
Office
321 SF
President Office
225 ft (<300)
Office
5' - 4"
1585 SF
6'-3".
Reception Room
6'-3".
Office
Printing Room Kitchen
Meeting Room 321 SF
33 SF
Printing Room
72 SF
Office 1585 SF
Reception Room
Printing RoomKitchen 33 SF
Office
72 SF
Reception Room
1822 SF
Meeting Room
CBC: Chapter 10- Table: Maximum Floor Area Allowance Per Occupant- Bussiness areas: 150 gross Office 1 : (514+321+1585+33+72)/150=17 ppl <49ppl Office 2: (204+109+279+2989)/150=24 ppl <49ppl
Reception Room 109 SF
Office
204 SF
2989 SF
Meeting Room
109 SF
204 SF
Office 2989 SF
Meeting Room 276 SF
Meeting Room 276 SF
All: 17+24 = 41ppl
PHASE 1. RESEARCH • PHASE 2. CONCEPT DESIGN • PHASE 3. SITE IMPLEMENTATION
Room Legend Hallway Bed
CBC: Chapter 10Table: Floor Area Allowance 1. CBC: OL: Chapter 10- Table: Maximum Common PathMaximum of egress travel distance with sprinkler : - Bussiness areas: 100 ft Per Occupant- Bussiness areas: 150 gross Office 1 : (514+321+1585+33+72)/150=17 ppl <49ppl 3. The width of Common Path is caculated by multiplying the OL by egress capacity factor of 0.2 inch per occupant. Office 2: (204+109+279+2989)/150=24 ppl <49ppl But minimum door width is 36”=3ft Type 1A: UL All: 17+24=41ppl Concerete : 2h+
225 (<30
2. CBC: Chapter 10- Table: Exit Access travel distance with sprinkler : - Bussiness areas: 300 ft
Bed
171 SF
Drone Parking
Kitchen Closet
WC
103 SF
41ppl x 0.2 in/ppl=8.2 inch < 5ft 8in (clear door width in current plan) Living Room 425 SF
Meeting Room Hallway
1.CBC: Chapter 10-isTable: Common Pathcapacity of egress 4.The width of Corridor/ Stairway caculatedMaximum by multiplying the OL by egress factor of 0.3 inch per occupant. But minimum stair width iswith 44”=3ft 8in travel distance sprinkler : - Bussiness areas: 100 ft Chapter Table: Exit Access travelplan) distance with 41ppl 2.CBC: x 0.3in/ppl=12.3 inch < 106ft 3in (clear corridor width in current 10- Table: Maximum Floor Area A 6 '- 0". areas: 300 ft OL: CBC: Chapter Residential sprinkler : - Bussiness Per Occupant- Bussiness areas: 150 gross 5.Corridor length: 12 the OL by 3.The width of Common Path is caculated by multiplying CBC: Chapter 10 - Dead End Corridor do not exceed 50 Office feet for occupany in group B. 1 : (514+321+1585+33+72)/150=17 ppl <49ppl R-2 egress capacity factor of 0.2 inch per occupant. Office 2: (204+109+279+2989)/150=24 ppl <49ppl Both longest CP and EA satify codes is in terms of egress exit for fire safety But minimum doorthewidth 36"=3ft All: 17+24=41ppl 41ppl x 0.2 in/ppl=8.2 inch < 5ft 8in (clear width in current plan) 4.The width of Corridor/Stairway is caculated by multiplying the OL 1.CBC: Chapter 10- Table: Maximum Common Path of by egress capacity factor of 0.3 inch63ft per occupant. travel distance with sprinkler : - Bussiness areas: 100 ft (<125) But minimum stair width is 44"=3ft 8in Table: 41ppl x 0.3in/ppl=12.3 inch < 6 ft 3 in2.CBC: (clear Chapter corridor 10width in Exit Access travel distance w Closet
WC
Bed
51 SF
71 SF
Living Office Room
221 SF
UP
WC
100 SF
Bed
Storage
238 SF
30 SF
Office President Office home office work needs
Living Room
Storage Printing Room Reception Room WC
674 SF
Office
Office
WC
Bed
79 SF
88 SF
68 SF
152 SF
677 SF
Living Room
30 SF
100 SF
Storage
237 SF
Bed
WC
71 SF
WC
223 SF
51 SF
Office 376 SF
Living Room
Bed
LIFESTYLE BRIDGE PLAN
F 55 Amenity level Bridging: Fitness center, SPA, sky GRADERN, PET PARK, POOL +outdoor recreational
Table Tennis
Tower Adaptive Reuse
P 127
PHASE 1. RESEARCH • PHASE 2. CONCEPT DESIGN • PHASE 3. SITE IMPLEMENTATION
Badminton Dog Park
Outdoor Catering
Badminton Catering
Walkway Bridge
Fitness Center
Spa
Swimming Pool
Tennis
Hot Spring
REVISION
DE
LIFESTYLE BRIDGE PLAN F55
SHEET T
Ame
Amenity level Bridging: Fitness center, SPA, sky GRADERN, PET PARK, POOL +outdoor recreational
SHEET N
10
Diagrams • Plans • sections • renDers
THIS DOCUMENT CONTAI INC. AND IS FURNISHED I EVALUATION, BIDDING OR BE USED FOR ANY OTHER DISCLOSED TO OTHERS W PARTNERS INC. ALL RIGH
P 129
P 131
P 135
P 137
P 141
P 143
P 145
P 149
INTERNSHIP RESEARCH PROGRAM
P 151
Repurposing
Leadership
Matthew Mclarand, AIA Kap Malik, FAIA Mark Kim, AIA
Mentors
Kap Malik, FAIA Joe McClyde Asmaa Abu Assaf Nikhil Bang Andrea Vilcarima
Interns
Cayetana Moncayo Chloe Mascolo Ira Puri Jean Wang Youssef Hachchane
TEAM
2023
RESEARCH