Symbiosis Design Srategy And Street Reorganize
Advertisement
01 Ecology Implantation
The aim is to use patch, line and dot those different types of greenery space of infrastructure to improve the site ecology condition, so the green corridor, the habitat and some green roof or facade were implanted into the builing and site.
02 Traffic Solution
To make the community more consistent. Vehicles are restricted from entering the site to ensure that residents can freely shuttle on the road and use the road as a green axis for residents to have social meeting or leisuring.
03 Heritage Reveal
To respect the site to the greatest extent, all the old buildings over one hundred years old have been preserved to the greatest extent with their original functions. Also some rebuilt industrial areas and museum areas will also serve as windows for cultural transmission to tell people the stories of the past here.
04 Reprogramming
The old party school area that is no longer in use is replanned as a cultural and entertainment center, and near the edge of Wushan Mountain, ecological facilities that are integrated with the mountain are built in accordance with the terrain to provide a suitable entertainment area.
Street Reorganize
There are various types of street in the site, to make the street more functional, it is important to define the hierarchy of the street layer.
in Detail
To sectional plan to show the street organization in more detailed way. As it reveals that the street not only has the nature and pedestrian. It is redesigned in more hierarchy like the sidewalk, terrace, greenery, cycle path.
Instead the originally only car path, a clear hierachy with specific ground hatch could let people consciously carry out activities according to the level of the road so as to improve the space use efficiency of the road, and also make the circulation of the whole community more orderly.