1 minute read

Symbiosis Design Srategy And Street Reorganize

Advertisement

01 Ecology Implantation

The aim is to use patch, line and dot those different types of greenery space of infrastructure to improve the site ecology condition, so the green corridor, the habitat and some green roof or facade were implanted into the builing and site.

02 Traffic Solution

To make the community more consistent. Vehicles are restricted from entering the site to ensure that residents can freely shuttle on the road and use the road as a green axis for residents to have social meeting or leisuring.

03 Heritage Reveal

To respect the site to the greatest extent, all the old buildings over one hundred years old have been preserved to the greatest extent with their original functions. Also some rebuilt industrial areas and museum areas will also serve as windows for cultural transmission to tell people the stories of the past here.

04 Reprogramming

The old party school area that is no longer in use is replanned as a cultural and entertainment center, and near the edge of Wushan Mountain, ecological facilities that are integrated with the mountain are built in accordance with the terrain to provide a suitable entertainment area.

Street Reorganize

There are various types of street in the site, to make the street more functional, it is important to define the hierarchy of the street layer.

in Detail

To sectional plan to show the street organization in more detailed way. As it reveals that the street not only has the nature and pedestrian. It is redesigned in more hierarchy like the sidewalk, terrace, greenery, cycle path.

Instead the originally only car path, a clear hierachy with specific ground hatch could let people consciously carry out activities according to the level of the road so as to improve the space use efficiency of the road, and also make the circulation of the whole community more orderly.

This article is from: