ARCHITECTURAL PORTFOLIO 2014-2019

Page 1

PORTFOLIO 2014-2019| JISHNU MURALI




JISHNU MURALI DATE OF BIRTH| 13 NOVEMBER, 1995

ABOUT ME Hi, I am Jishnu, a B.arch graduate from Sushant School of Art and Architecture, Gurgaon, India. Over the past five years, I’ve developed an eclectic approach towards architecture and the built form. Architecture for me exists not only in the detailing of a structural system, but also in the most modest solutions that cater to human beings and the living environment. My portfolio presents a coherent idea of my design ideologies, evolved over the years through diverse projects, each with their own challenges. Thankyou for having a look at my portfolio! I’d be happy to contribute to your firm.

phone +91 965-071-4323

e-mail jishnu.murali25@gmail.com

linkedIn jishnu.murali1

languages English, hindi, malayalam

home Noida, India

EDUCATION

AHLCON INTERNATIONAL SCHOOL, NEW DELHI HIGH SCHOOL 2000 - 2014

EXPERIENCES MYVN ARCHITECTURE INTERNSHIP JUN-DEC, 2019

NBCC ARCHITECTURE CONSULTANCY INTERNSHIP JUN-AUG, 2016

SKILLS AND OTHER INTERESTS BASKETBALL ANSAL UNIVERSITY CAPTAIN 2016-2018

ARCHITECTURAL PHOTOGRAPHY TRAVELLING


STUDY TOURS AJMER, RAJASTHANT CITY LEVEL STUDY OF AJMER 2018

THE NETHERLANDS AMSTERDAM, LJBURG, ROTTERDAM, DELFT 2017

SPITI VALLEY, HIMACHAL VERNACULAR ARCHITECTURE 2018

SARAIN, HIMACHAL KATH-KHUNI ARCHITECTURE, DISSERTATION 2017

SHIMLA, HIMACHAL COLONIAL ARCHITECTURE 2016

CHANDIGARH, PUNJAB THE WORKS OF LE CORBUSIER 2016

AHMEDABAD, GUJRAT THE WORKS OF BV DOSHI 2016

ARCHITECTURAL EVENTS

AA VISITING SCHOOL DELHI BREATHE 2019

AD DESIGN SHOW MUMBAI 2018

INDIAN ARCHITECTURE DIALOGUE DELHI 2018

LECTURE BY FRANCIS DK CHING MASA, BENGALURU 2019

IPAC SSAA, GURUGRAM 2019

ACHIEVEMENTS

SPORTS CAPTAIN ANSAL UNIVERSITY 2016-2018

NATIONAL LEVEL BASKETBALL DELHI TOP 20 STUDENTS 2011

IILM UNIVERSITY TOURNAMENT SECURED 3RD POSITION IN BASKETBALL 2016

SPORTOPIA, GD GOENKA BASKETBALL 2015

SOFTWARE SKILLS 3D rhino, sketchup

drafting autocad, rhino

rendering

adobe suit

office suit

vray, lumion

photoshop, indesign, ilustrator

microsoft office



CONTENTS 1.

MASK

01 - 016

a research and development centre for air pollution

2.

CONNECT

017 - 026

a housing colony for all income groups

3.

FLOW

027 - 034

an institute desing for the school of art

4.

OLD vs NEW

035 - 044

urban study and design for the city of ajmer

5.

WORK EXPERIENCE

045 - 062

internship at MYVN architecture

6.

WORKING DRAWINGS

063 - 068

internship and institute design

7.

OTHER WORKS installations and graphics

069 - 074


01

0 1 MASK A RESEARCH AND DEVELOPMENT CENTRE FOR AIR POLLUTION | ARCHITECTURAL THESIS

SEMESTER | X SITE | Sikanderpur, Gurugram, Haryana BUILT UP | 25,000 sqm SITE AREA | 4.5 acre AIR, ONE OF THE MOST ESSENTIAL ELEMENTS FOR SURVIVAL OF THE LIVING HAS BECOME A GLOBAL GARBAGE. HUMAN BEINGS, FOR SEVERAL YEARS HAVE NEGLIGENTLY DESTROYED OUR ENVIRONMENT FOR UNSUSTAINABLE BENEFITS OF “DEVELOPMENT” AND “GLOBALIZATION”. THE RATE AT WHICH WE ADVANCE USING OUR LIMITED RESOURCES IS MAKING THE AIR AROUND US LESS VIABLE TO BREATHE IN. POLLUTANTS AND TOXIC CHEMICALS IN THE AIR POSE HIGH LEVELS OF HEALTH RISKS CAUSING SEVEN MILLION DEATHS PER ANNUM. MY THESIS INVESTIGATES SYSTEMS AND INTERVENTIONS THAT CAN PROVIDE HUMAN BEINGS WITH STRATERGIES TO REDUCE AIR POLLUTION THROUGH THEIR DEVELOPMENTAL PROJECTS. AT FIRST, AN OVERALL STRATERGY IS CREATED AT AN URBAN LEVEL BY REDESIGNING PUBLIC SPACES THAT WILL SPREAD AWARENESS OF THE ISSUE. FURTHER, THE PROBLEM IS CATERED TO AT A MICRO LEVEL BY IDENTIFYING A SUITABLE TESTING SITE FOR AN INTERVENTION THAT WILL LOCALLY IMPROVE AIR QUALITY IN THAT PARTICULAR AREA.


02


03

Need for the

Project

Causes

-L a r g e -s c a le c o n s tr u c tio n in D e lh i-N C R

-T r a ffic m

e n a c e in D e lh i

-S ta g n a n t w in te r w in d s le a d to th e s e ttlin g o f d u s t p a r tic le s a n d p o llu ta n ts in th e a ir a n d r e s u lt in s m o g .

-P o o r p u b lic in fr a s tr u c tu r e a n d p u b lic tr a n s p o r t.

-L a r g e -s c a le c o n s tr u c tio n in D e lh i-N C R

-I n d u s tr ia l p o llu tio n a n d g a r b a g e d u m p s a r e in c r e a s in g a ir p o llu tio n .


Aim and Rationale

04


05

ite

election

R a jiv C h o w k A Q I 205

S e c t o r 14 , G u r u g r a m A Q I 19 6 D L H

C y b e r H u b A Q I 200

I F F C O C h o w k A Q I 19 4

S ik a n d e r p u r M e tr o s ta tio n A Q I 224

S a d a r B a z a r A Q I 201

H U D A C ity C e n tr e A Q I 19 8

Air ualit inde of di erent localities ithin uru ram as calculated to locate the site ith ma imum A he result sho ed that i ander ur had the hi hest A


ite Parameters

Areas ith most tra c and footfall ere shortlisted ecause of the resence of multi le NCs around the i ander ur tra c as found to e more com ared to other localities ince the ristol Cho connects olf Course road ur aon arida ad road and road the tra c is more

- Lower density - lesser traffic on roads - thinner roads

- Increase in population - Denser urban fabric - higher density on traffic roads - development of cyber city and first set

- More migration - formation of junctions for better traffic movement - widening of roads

etro station the footfall an

- Denser urban fabric - Construction of Metro completed -junctions have become chaotic because of heavy traffic

Sikanderpur Metro Bristol Hotel

Rapid metro

Housing

Golf Course Road

Views

Noise Analysis

Busiest Junctions

A schematic lin in the di erent social rou s of uru ram tracin here the li e or and the acti ities the en a e in leisure he data is collected from follo in eo le throu hout the da and also from s ner ies hinted other scholars or on uru ram

06


07

A

roach and

trater

2 he Pa ilion T h e p a v ilio n a c ts a s a p u b li u r b a n c o n te x t w T h e s tr u c tu r a l fr a m e a n d in v ite th e g r i A n in te g r a te d w a te r in g s y s te m w a te r

c s ith s v d . p .

5 acade terations

p a c e c o n n e c tin g th e th e s ite . is ito r s to s e e d p la n ts o n r o v id e s th e p la n ts w ith C o m e m s u c h w h a ls o a n d

A p h o to c a ta s c r e e n p o s itio tw e e n c a r s a n d w o u ld tr a p a n m a n y o f th e h b y -p r o d u c ts o b u s tio n e n g

ly tic n e d b e p e o p le d filte r a r m fu l f c o m in e s .

1 U s in g c ir c u la tio n s p a c e s fo r s e a tin g p u r p o s e s , g iv in g a v is u a l c o n n e c tiv ity to w a r d s th e m a in r o a d . Soil

Drainage layer Concrete screed Geotextile cloth XPS Insulation Board W/P Membrane RCC SLAB

6

3

6

2

1

it

a il e

p a w

b


A

A d d fa c a d io x g r e e tio n u s tio n e n g h a r m fu l to s N O x a n d e r u n n in g , m it V O C s , o r tic u la te m h ile r e s tin g

.

in d e id n

g a c o e a to

f a n ta

r a m e te d w d c o v c k le

w o r k ith T e r e d th e a

t it w ir

roach and

trater

o th e a n iu m ith p o llu -

in e s x in s V O C s a n d z o n e a tte r .

Research and e elo ment Centre T h e b m ic r o m u c h e n ts a

u ild i -c lim lik e n d o

n g a th x y

a c t s a s a n ‘U r b a n S p o n g e ’ f e e d i n g o n p o llu t e d a i r & w a t e r o f i t s te a n d g iv e s o u t c le a n a ir & w a te r b a c k to th e E n v ir o n m e n t e A q u a tic s p o n g e w h ic h fe e d s o n b a c te r ia a n d g iv e s o u t n u tr ig e n .

4

5 4

- G r e e n c o n e c tiv te x t a n d - T e r r a c

te r ity th e s

r a c e s b e tw e s ite a c t a s .

to g iv e a v is u a l e e n th e u r b a n c o n p u b lic s p a c e .

Soil Drainage layer Concrete screed Geotextile cloth XPS Insulation Board W/P Membrane RCC SLAB

6 6

2

3

08


09

ections

C

N C

R





C

N C

R


ections

PA

N



R

ARC

C N R

10


11

ie

s


ie

N

PA

N A

s

12


13

ie

s


ie

N AR A A

R

N

s

14


15

ie

s

R

N

A

N

PA

N


ie

R

N

PA

s

N A

R

N

A

N

16


17

0 2 CONNECT A HOUSING PROJECT TO SERVE ALL KINDS OF INCOME GROUPS | RESIDENTIAL DESIGN

SEMESTER | VII SITE | Golf Course road, Gurugram, Haryana BUILT UP | 25000 sqm SITE AREA | 4.5 acres

D SIG BRI AIM D A D L PI G A MAS R PLA A CA R D DI R I C M GR PS I CL DI G MICALL W A R S C I S WS IS MAS R PLA WAS D L P D I A GR P RMI G DI R CL S R SI G P L GI S AC CL S R WAS DI ID D AM G PAIRS A W R D AIL D A D D SIG D WI ADDI I AL C I S PLA AS PLA GR DS C MM RCIAL S RIPS A CL B S A DAC RAL GARD A RM D C

AR

PR

C


18


19

A

roach and

trate

he master lan de elo ed as an in ard loo ing layout hich led to the direction and circulation o the ro osed to er

orm

he acre master lan as urther di ided into acres o site on hich di erent ty ologies ere designed including o en and semi o en ublic s aces

e elo ment

our units are di ided ee ing the core at the center

dges are made cur ed to gi e a anoramic ie o the central garden and the Gurgaon s yline

A ter calculating the area re uired er unit t o oids are created diagonally to ro ide ie or all the units

Interloc ing o s ace to brea the monotony

o units are mirrored using the same core

inal orm de elo ed ith maximum ie and s aces


A C

RC A

C N N

A C N

Continuous balconies ro ided around the building

AR

C

C R

Cur ed edges instead o shar edges to ro ide a anoromic ie o the central o en s ace

RARC

P

A

Commercial hub is laced at the central garden ma ing it e ually accessible rom all ones

P N PAC

he o en s aces are di ided into ublic o en s aces semi ublic o en s aces and ri ate o en s aces

illas are aligned to ha e a anoromic ie o the central green s ace

N

RAC

C

N

RRAC

It is designed in such a manner that a lot o interacti e common terraces are made to increase ublic acti ities

N

R

C N

trate

C PAC

Public s aces are ro ided or social interaction

R N A

N

o ers are oriented in such a ay that there is an ade uate amount o sunlight and ind inside e ery unit

PAC

Interloc ing s aces to brea the monotony

R AN C

roach and

R

he building o ers a uid and dynamic orm

ach unit is designed in a ay that the li ing rooms and the master bedrooms gets the ie o the central green

NA

RA

N

A

N

A collaborati e or ing o nature and building hel s ma ing the building a ery energy e cient design

20


21

Plans and

ections Core Li t Lobby

Core

Bedroom oilet Bedroom oilet Bedroom oilet itchen

Bedroom oilet Bedroom oilet Li ing room oilet Bedroom

Bedroom oilet Bedroom itchen itchen oilet Li ing room Bedroom oilet Bedroom Li ing room itchen Bedroom oilet Bedroom

Core Li t Lobby

Core

Li ing room Bedroom Bedroom Li ing room oilet itchen


Plans and

illa

ections

22


23

le ations


e ations

24


25

ie

s

A


ie

s

R

26


27

0 3 FLOW AN INSTITUTIONAL BUILDING FOR THE STUDENTS OF ART AND ARCHITECTURE | INSTITUTE DESIGN

SEMESTER | V SITE | Lotus Blvd, Gurugram, Haryana BUILT UP | 6000 sqm SITE AREA | 14000 sqm he design ro ect is to concei e a mini thesis ro ect s eci cally in the orm o a creati e arts institution School o Architecture School o Design he ro ect aim as to design a creati e arts college ha ing t o courses he studio aces the challenge o ex loring the idea o institution and ex loring our o n brei identi y contextual res onsibilities and ositions hich ill hel in ma ing a conce tual thought into an architectural orm


28


29

A

roach and

trate

Architecture Bloc Wor sho s Design Bloc Admin Bloc

Wor sho s

Ca eteria Auditorium

Institute Bloc

Admin Bloc

In ard loo ing orm Central ublic s ace ndulating circulation

Placing a rectangular bloc on the ermissible area


A

Design Bloc

Le el

trate

Architecture Bloc

he main challenge as to create a lin bet een the school o design and the school o architecture by or ing ith ublic s aces and to increase the synergies bet een the academic context and it s urban context

Le el

roach and

Le el

Public S aces at di erent le els

Am le o o en s aces to increase the le el o hysical acti ity More interac ti e s aces Connecti ity through bridges and staircases Di erent le els to create more interacti e s aces

Mo able alls or collaborati e studio s aces

Circulation rom the main entrance the circulation is continuous ollo ing hal o en undulating corridors

sing Circulation s aces or seating ur oses

3 0


3 1

ections

ection at AA

ection at

ection at CC

ection at


ite Plan

3 2


3 3

ie

s

ie o the central courtyard


ie

s3

ie o the Ca eteria area

4


3 5

0 4 OLD VS NEW PROMOTING TOURISM IN AJMER | URBAN DESIGN

SEMESTER | IX SITE | AJMER, Rajasthan BUILT UP | 4200 sqm

A mer s natural cultural religious and heritage assets shal be le eraged to de elo the city as a global tourist destination Le eraging resence o Anasagar la e in the heart o city by de elo ing its huge la e ront as an attracti e recreational destination in the city ith tourism amenities around the la e thus extending the ex erience o eo le isiting A mer he intent o the ro ect is to ma e A mer a orld class ilgrimage and heritage city by catering to the needs o ilgrims and tourists and enhancing and integrating heritage sites entertainment and hos itality Creating a robust state state o the art trans ortation and transit in rastructure that ro ides seamless mobility o tions to all by strengthening multi modal trans ortation system by de elo ing a smart centrali ed bus stand and moderni ing o rail ay station area Promoting uitable and com lete streets ith em hasis o al ability and non motori ed trans ort


3 6


3 7

A

roach and

trate

a

our

According to the distance bet een sites a day tour has been ormulated gi ing e ui alent im ortance and o ortunity to each site A thorough lan ould o ercome the issues aced by the isitors ma ing A mer more than ust a day isit and attract o ernight isitors

RA

C

C

urturing A mer s ristine en ironment to ma e it a global tourist attraction ni ersal Access to the S A

AR World class in rastructure or

im ro ed uality o li e

N AN A IBRA

Pro osed ourist

ots

A

x anding beyond the ace ted s ots li e the Dargar these nine existing sites ro ide am le otential to romote A mer as a aluable ee end Destination

A RISM PILGRIMAG

AC

RC

Poc et Anasagar La e Subhash Par

A mer Museum Rail ay Station Dargah Adhai Din a ho ra

Pro osed aradari street m ide cycle trac s m ide edestrian al

ay by the la e

Ade uate street lighting

he mar et as su osed to be commercial on the ground oor and residential on the rst oor but no most o the u er oors ha e turned into godo ns

L IS R D S I A I

Catering to the needs o tourists and locals nhancing and integrating heritage sites entertainment and hos itality ro ide seamless mobility or isitors to the sites ro ide accomodation and trans ortation Sa ety and Security Increase tourism acilities and in rastructure extended days o stay re enue generation through tourism

A


A

roach and

trate

Poc et hal ari Bai Mayo College

aragarh ort

oysagar La e

r an nter ention Pro iding al ays to ma e it edestrian riendly Rich street urniture one ay roads Segregating ehicular and cycle trac s

A

us sto s Bus sto s at e ery tourist s ot or better accecibility Ad ertisements to create re enue

A dense net or o al ing and cycling routes results in short aried and direct connections that Im ro e access to goods ser ices and ublic trans ort

r an A

roach

R

N

A

Ade uate ar ing ees and a reduction in the o erall su ly o ar ing create incenti es or the use o ublic trans ort al ing and cycling

Pro ide street trees and co ered al ays to ma e al ing leasant e en during hot months nsure that lighting is resent to increase sa ety at night

ro iding unobstructed edestrian oot aths trans orming al ays into ibrant ublic s aces through urniture landsca ing elements and acti e building edges

P

C NN C

C C

C RAN P R

re uent ast and reliable high ca acity ra id transit reduces de endence on ersonal motor ehicles

A dense net or o al ing and cycling routes results in short aried and direct connections that Im ro e access to goods ser ices and ublic trans ort

creating se arate cycle trac s A com lete net or ade uate shading elements smooth sur aces and secure cycle ar ing are essential

3 8


ace Anal sis

3 9

ite street connecting cho

ati and Baradari

timal ermanent eateries added on an m ide edestrian al ay o increase ublic engagement and stimulating the economy

ocation of the site

he site ali ns ell ith the r an nter ention

Site is located at the intersection o both the oc ets Rail ay station ithin m Darga ithin ms Indra Gandhi Memorial ithin m

In the ro osed bus routes interconnecting the tourist attractions the site is right at the intersection o the t o routes Moreo er the site is at a distance o ust m rom the A mer Rail ay Station he ro osed common bus sto or both Route A and Route B is at a distance m rom the site distan o ust


e e

lements of the site

lements

aali aali is normally a er orated stone or latticed screen

emi circular arches aali is normally a er orated stone or latticed screen

haro ha he haro ha balcony is a stone indo hich ro ects rom all lane

ical rac et aali is normally a er orated stone or latticed screen

Cus ed Arches Cus ed orms a ear commonly in early Islamic architecture

Chhatris Chhatris are the ele ated a ilions or orches in dome sha e and are the best illustrations o the architecture o Ra asthan

Columns hree di erent ty es o columns noted at site

le ations

A

A

N

A

N

N R

A

N

A

N

4 0


4 1

Plan

A

A

C

C

Plan


ections

ection at AA

ection at

ection at CC

ection at

4 2


4 3

ie

s


ie

s

4 4


4 5

0 5 MYVN ARCHITECTURE SIX MONTHS INTERNHSIP JUN-DEC | INTERNSHIP

SEMESTER | IX YEAR | V INTERNSHIP PERIOD | JUN-DEC, 209

M Architecture is a Bangalore based young multi disci linary architectural rm ormed by highly creati e and inno ati e architects It ocuses on architecture and design ith a strong belie in the undamentals o design hiloso hies and design rocesses and at the same time ex loring the contem orary tools and techni ues through constant research and com utational methods o design he rm currently or s on multi scaled architectural interior and urban design ro ects across India


4 6


4 7

le ation


le ation

TYPE - HIGH RISED IT PARK LOCATION - DEVANHALLI, BENGALURU AREA - 5 LAKH SQFT

CLIENT BRIEF

Wining entry o a com etition oated by the ayala shmi grou o clients Client A o ns Client B o ns

shares shares

o to ers se erated yet connected or both the clients astu to be ollo ed Clean rectangular building Pro ections allo ed only on orth ast side because o astu ery orr late to ha e breathing s aces

4 8


4 9

or in

ra

in s


or in

ra

in s

5 0


5 1

ouse

P

A

CA

N C

N

R

AR A

C

N

R

hould act as oth Residence and uest house ouse should com liment the three ie s of the ale hills and tea arden Noise cancellation from the roads


or in

ra

in s

5 2


5 3

or in

ra

in s


or in

ra

in s5 4


5 5

or in

ra

in s


or in

ra

in s

5 6


5 7

An en

um ai

TYPE - INTERIORS LOCATION - ANDHERI, MUMBAI AREA - 1800 SQFT PROJECT STATUS - COMPLETED CLIENT BRIEF Anzen Insurance Office est li ht to e cut do n en Plan en t e nteriors u tle colours ud et Constraints reen


An en

um ai

R

5 8


5 9

Plan


le ations

6 0


A

N

R C



6 3

or in

ra

in s

0 5 WORKING DRAWINGS TECHNICAL DRAWINGS| 2014-2019


or in

ra

in s

6 4


6 5

or in

ra

in s


or in

ra

in s

6 6


6 7

or in

ra

in s


or in

ra

in s

6 8


6 9

R

R


A

PA N

N

WALL PAINTINGS FOR CAMPUS DEVELOPMENT

7 0


7 1

nstallations

LIGHT INSTALLATION USING ACRYLIC, MYVN BANGALORE


nstallations

AIR PURIFIER FACADE USING FRP

7 2


7 3

AA

isitin

school


AA

isitin

school

7 4



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.