January 2019
SELECTED PROJECTS
Ground Floor
9
cargas e decargas
34
26 21
20
35 8 10
5
7 16
6
33
19 15
30
27
18
17
22
25
11
4
31,00m
14 36
32
29
24
30,50m
28
23
1 2 31
3 12
13
Corte Corte 18
Corte 2 Section Longitudinal Corte 9
CONCEÇÃO E ESTUDO P
CMA/DMOPATD
COORDENADOR DO PRO
EMPRESA: _______
ARQUITETURA: ENGENHARIA:
Transversal Section Corte 10 Corte 3
MODELAÇÃO:
Almada Council Setúbal, Portugal pages 002 - 003
Ramalha Kindergarten Achievements: - Architectural Assistant - Architecture Initial Study; 3D management and modelling; create families (.RFA) and BIM materials; area schedules; photo realistic render’s to simulate ambients; make virtual walktroughs like a drone.
Corte 1
Project Size: - 970 sqm Gross Area - 2.918 sqm Field Area
Corte 8
Client: Public Sector Software: Autodesk Revit
Corte 2 Corte 9
I was nominated to work in collaboration with João Lucas Dias architect in this project; our team have two more great architects who helped us developping our ideas. Beside of that I was BIM Manager of all project and modelled everything, in this phase. It was required to design a kindergarten with five classrooms in this area. Our aproach was to not replicate what have been done in the past and try to create corners each give possibilities to their user, children, to play and make their little stories around the place they spend the majority of time.
Corte 3
Corte 10
Corte 4
Corte 11
Corte 5
Corte 12
Axonometrics and Perspectives of electronic models
Patio Solar Study
B.I. 33.15
R
32.90
M1
31.85
ACESSO DE
PE04
L1
I.S. 3.93m2
Pi01
3
33.15
2
Working with PointClouds
VE0
REFEITÓRIO 60.36m2
VE0 2
AGR
1
Cx
4 1
Pi0
Cx ELE
4
4 1
1 33.15
33.15
GR01
32.90
L1 31.85
EQ.
02
Eixo da Rua de Tânger
VE03
3
29.05
29.00
3
2
PRODUCED BY AN AUTODESK STUDENT VERSION
2
Corte 1
33.15
32.90
31.85
VE01
UDENT VERSION
1
ESC01
6
2
6
11.16m2
14 13 12 11 10 9 8 7 6 5 4 3 2 1
29.05
COZINHA 13.50m2
PRODUCED BY AN AUTODESK STUDENT VERSION
2.90m2
.01 Ser
ENTRADA 3.24m2
32.90
MLL
Pi01
Painel solar
N
2.90m2
32.90
PE01
UTA
29.03
4
2
3
Corte 2 7 6 5 4 3 2 1
29.03
UE
29.00
31.65
29.03
M1
PE02
VE
VE03
41
Pi01
29.05
DESP. 5.40m2
Frig.
VE01
PE03
QG
PRODUCED BY AN AUTODESK STUDENT VERSION
2
EMERGÊNCIA
Pi01
29.05
Corte 2
29.03
Almada Council Setúbal, Portugal pages 004 - 005
BIM Models of Mazagão Canteen Achievements: - BIM Manager - Detail Construction Pack - Construction and Handover - 3D management and modelling; LOD 400; create families (.RFA) and BIM materials; detailed quantity schedules; photo realistic render’s to simulate ambients; image edition; construction monitoring; make presentations; 3D printing; work with point clouds; make virtual walktroughs; clash detection between specialties. Project Size: 140 sqm Client: Public Sector 3D Section
Photomontage of the construction work panel
Software: Autodesk Revit Pilot project to implement BIM work methodology in the office. When I arrive the project was almost finished, but with this new tool we could resolve better some technical aspects. As main results the advertising campaign was much reliable and the construction process seemed to be easier, with digital monitoring.
3D Printing Model in PLA
Mechanical, Electrical and Plumbing
Structure
Architecture
PRODUCED BY AN AUTODESK STUDENT VERSION PRODUCED BY AN AUTODESK STUDENT VERSION
J. Lucas F. Jorge
2.51
Axonometrics of electronic models
Perspective of Monastery and its surroundings
13.29
0.15
2.93
0.15
1.30
0.15
1.40
0.15 0.90
0.40
1.30
0.10
i.s.d.
0.15
3.23
2.45
0.40
1.80
0.40
7.39
1.60
1.00
0.30
0.15
2.10
6.50
i.s.s.
5.70
6.60
4.40
0.15
0.40
1.70
0.40
0.40
21.22
PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION
3.65
0.75
0.75
3.65 4.40
5.30
12.42
29.54 2.90
1.10
4.57
0.93
3.42
0.93
18.82 3.45
1.06
2.82
0.90
4.02
0.99
1.05
1.11
0.30
1.76
0.83
1.86
0.83
2.58
0.94
2.94
1.90
2.54
0.85
1.79
3.45
3.56
0.81
0.80
4.75
0.70
6.35
0.66
0.82
1.00
3.79
24.82
1.71
0.90
0.47
0.93
0.77
0.88
1.72 1.22
11.71
0.71
4.04
1.09
7.34
4.97
6.80
0.70
0.78
2.52
0.50
11.98
0.60
4.95
7.80
1.30
5.55
1.08
0.95
1.60
0.83
1.49
21.95
0.83
1.63
0.82
1.65
0.82
17.45
1.60
0.83
1.60
0.87
0.88 3.81
21.26
N
1.55
ION
5.75 5.42
0.95
0.40
0.98
0.43
2.50
0.03
Ground Floor
0.83 1.78 0.83 1.55 0.83 0.70
0.69
2.67
Transversal Section
4.37
0.70 2.44
4.63
1.05 0.77
0.65
1.08
1.40 3.67
5.96
1.54
4.37
9.34
1.67
8.44
2.28
0.62
0.95
2.40
11.62
0.83
0.62
1.53
5.21
0.05
0.58
0.82
8.20 5.05
4.60
0.565
0.58
1.66
0.90 0.15 0.90 0.15
1.66
1.00
0.90 0.10
0.64
1.50 0.10 0.90
2.27
0.85
1.82
0.565
16.07
0.66
1.74
1.32
1.30
0.70
1.05
0.82
1.45
1.84
1.64
1.00
0.63
3.95 5.48
1.83
0.55
7.10
1.45
0.80
0.70
1.87
2.83
0.54
5.94
1.79
0.90
1.76
0.15 0.90
0.83
0.96
1.20
4.91
1.19
0.70
4.25
0.75
0.15
3.21
1.54
2.16
1.75
2.99
0.45
4.35
2.03
2.30
2.08
0.45
0.55
1.40
0.15 0.90
5.66
5.24
0.68 0.25
0.90
1.50
2.65
1.05
5.85
2.30
2.65
2.72
1.80
0.73
2.18
PRODUCED BY AN AUTODESK STUDENT VERSION
4.40
Longitudinal Section
Almada Council SetĂşbal, Portugal pages 004 - 005
Exploring BIM Models of Capuchos Monastery of Caparica Achievements: - Facility Manager - 3D management and modelling; LOD 400; create families (.RFA) and BIM materials; detailed quantity schedules; photo realistic render’s to simulate ambients; image edition; make presentations; make both interior and exterior virtual walktroughs; clash detection between specialties. Project Size: 1.915 sqm Client: Public Sector Software: Autodesk Revit Post Thesis conclusions and resoltutions to complete the architectural BIM model allready done with other specialities, and gather those electronic important files to future refurbishments or maintenance activities. The implementation of BIM technology to heritage buildings provides the preservation of their constructive truth as well as the record of interventions and adaptations in the buildings. Moreover, this technology brings the possibility of patrimony disclosure to a wider range of population while preserving the fragility of its construction.
January 2019
SELECTED PROJECTS