The disaster of the European energy policy (Michel Gay) France French

Page 1

The disaster of the European energy policy, especially for France

By Michel Gay January 23, 2014

For 10 years, the energy policy of Europe is a disaster that continues to grow. The first 2003 European directive on renewable energies, called " green " has been the cause of any abuse. While France had led since General de Gaulle an independent and consistent policy, the European Commission decided in 2001 to require each country guidelines motivated by ideological bias and not taking into account the specificities of each country. This first directive in 2003, setting a target of 21 % of gross domestic consumption from renewable energy sources in 2010, was a sham. Under pressure from Germany, antinuclear environmentalist lobbies, very influential in Brussels and unacceptable passivity French negotiators, nuclear power has been voluntarily removed from non-emitting energy greenhouse gas emissions (GHG), while that the objective of the Directive was primarily the fight against global warming. Europe has seriously failed excluding nuclear non- GHG emitting energy and is responsible for tens of billions of euros engulfed wasted. The so-called 3 x 20 Directive, who succeeded it in 2008 was applied in France by law programming August 3, 2009 issue of the Grenelle environment. This law provides in particular that the share of renewable energy will be increased to 23% in 2020 in the final energy consumption. It was passed almost unanimously in the french "AssemblĂŠe Nationale". Economic, environmental and societal consequences for our country are disastrous. Tens of billions of euros were engulfed wasted in wind turbines and photovoltaic panels. Investment must be repeated three times with respect to the given nuclear lifetime of these installations is that a maximum of 20 years. This causes an increase in the cost of electricity paid by consumers, especially the poorest. And for 20 years, EDF (ElectricitĂŠ de France) has an obligation to purchase electricity at exorbitant prices. This also causes an increase in CO2 emissions due to intermittency must be compensated by central gas or coal as in Germany at this time. In addition, the manufacture of solar modules is made in China and we purchase our wind turbines in Denmark, Germany and Spain.

The objective of 5 GW solar energy provided in 2020 by the Grenelle Environment Forum will be reached in late 2013, six years earlier. It will cost investment over 30 billion euros. It will be repeated three times over 60 years while the energy produced, only 1% of total production, could be produced by a nuclear reactor of 600 MW (the third production of Nuclear plant of Fessenheim which has two reactors of 900 MW) for an investment of less


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.