John Barry - Portfolio 2017

Page 1

johnbarryg.com PORTFOLIO

Jo hn B a r r y Gimutao +4 9 0 17 6 2 4 2 1882 5 johnbarryg@yahoo.com linkedin.com/in/johnbarryg instagram.com/johnbarryg


CONTENTS

studio:coherent spaces

studio project: urban arcadia

work: park studios potsdam

comp: al jazira bank, riyadh

comp:kuwait science & tech (KFAS)

comp: KSP visitor pavilion & nursery

competition: krakow oxygen home

work:selected renderings & graphics

co m p e t i t i o n : b a u haus stage

case study: s - m - l

furniture: 1 foot triangle table

-

design & competitions

academic studio works

BIM & const. docu



01.

COHERENT SPACES

hybrid urban work/live spaces for foodies Location: Project:

May-Ayim-Ufer, Berlin Master’s Thesis

Year:

2017

3rd Prize KONRAD WACHSMANN STUDIENPREIS 2017

D/A

*ROBERT-OXMAN PRIZE NOMINEE (2017)

K reuz berg am Wa s s e r Coherent Spaces is a study that aims to explore new intentions through developing a new adaptable live/work spaces catering the food culture or food production in Berlin Kreuzberg. The site within an underused public park and remains of a broken fragment of the city is where former warehouse typologies were situated. The project aims to defy the basic frameworks by integrating a genuine sense of community, through shared and flexible spaces; achieving an unparalleled coherence in todays necessities.

BE

VE

RN

ST

R

SITE DEVELOPMENT PLAN

SCHLESISSES TOR U-BAHN

CITY FRAGMENT

OBERBAUMBRUCKE


MARKETHALL+FOOD PRODUCTION + RESIDENTIAL


COMPLETING THE CITY FRAGMENT (Aerial View-Schlesisches Tor)


URBAN INTERVENTIONS Activities and movements along the area of the site


UP

GROUND FLOOR PLAN (MARKETHALL)


DN

beer brewery + pub + office (*sample scenario) production + selling + office DN

live/work 1 + production kitchen 1 bedroom + living + production kitchen

DN

live/work 2 + production UP kitchen

DN

2 bedroom + living + production kitche+ selling

1st FLOOR PLAN scale

DN

UP

3rd FLOOR PLAN

1:200

scale DN

1:200


FLEXIBILITY & POTENTIALS Facade of the building showing activities in the markethall combined with work/live spaces.


residential +small food manufacturing

communal & workshop kitchens

office spaces in mezzanine level

mezzanine floor for extra dining area

markethall pop-up stores


DESIGN RESEARCH

Atisan Ice Cream (Kreuzberg)

Fresh Meat + Burger

Pasta Manufaktur

(Kreuzberg)

(Prenzlauerberg)

Fresh Tofu Manufaktur (Kreuzberg)

THE BUILDING AS A TYPOLOGY Exposed Utilty pipes along the core of infrastructure walls 200mm THK Pre-cast slab unit + insulation

400 mm x 300 mm x 800mm (L) custom pre-cast beam

2.10

100 mm x 800 mm(L) precast concrete purlin

0.50

0.15

0.20

0.25

_0.40

welded angle connector

0.30

2.70

2.60

5.00

Custom Pre-stressed LShaped Concrete Column + Foundation

custadditional beam support every 2.8 m

0.70

1/2 in - 10 in holes for utility pipes


Micro Beer Brewery (Wedding)

3RD LEVEL RESIDENTIAL UNITS + FOOD MANUFACTURING

COMMON FOOD HALL (FOOD PRODUCTION AREA)


02.

Aljazira Bank HQ 1st Prize, Saudi Arabia Project/Team: Role: Year:

Gerber Architekten Design competition team Architect, part of design team 2018

The curve, hints at nature; green terraces rain down to meet the Aljazira Gardens and Plazas. This open green space will benefit the community and activate the street with a playground, picnic areas and an urban farm. The green terraces, when seen from afar, are pockets of greenery in an urban landscape.

*Rendering (outsourced)



03.

KFAS HQ & CONVENTION CENTER Special Mention, Kuwait Project/Team: Role:

Gerber Architekten Design competition team Architect, part of design team

Year:

2018 Phase 1 & Phase 2

The design of each building has evolved from a detailed analysis of the site, developed out of consideration for Arabic culture, and drawing on the possibilities of a highly innovative construction system. The organic shapes are respectful of the surrounding buildings - for instance, by not blocking views from the Pearl Marzouq housing block - and at the same time they are able to represent a venerable institution such as KFAS through contemporary design and integrated urban and landscape design.

*Rendering (outsourced)


Parking Parking Robot Headquarters Basement 01 Floor Plan 1:200

N

Automated Parking Configuration

Automated Parking

Voids

Cores

Open Office Space

Enclosed Offices

An integral part of the Fraunhofer IAO design strategy is planning for the future. The unique floor plan of the KFAS Headquarters allows for the future work settings anticipated for KFAS. Currently, the floor plan design accommodates for 25% of enclosed office spaces. By 2043, 50% of the office space could be enclosed. These can be located along the perimeter of the facade, where the glazed partitions and voids still allow natural light to filter through to the shared functions in the center. Circulation and chance encounters remain at the center - the core of KFAS.

Fraunhofer Institute: Planning for the Future

Year 2023: 25% enclosed office spaces

Private outdoor roof terraces are available to the Offices and Start-ups. The Conference and Meeting rooms have access to a larger roof terrace which can be used for outdoor functions and events.

Parking Parking

In order to maximize space efficiency, a zerostacking automated car parking system is proposed. Drivers enter the basement via a ramp and leave their vehicle at a Transfer Station, where their car is lifted by a parking robot and moved into a space-saving park. The system has minimal construction costs and can provide up to 60% more parking capacity than conventional car parks, allowing flexibility for future use. Conventional car parks are also provided for guests and visitors.

This is achieved with three separate entrances to the building at Ground Floor. The KFAS Foyer is accessed from the main entry and is the primary entrance for KFAS office staff and guests, including access to the Conference and Meeting Facilities at Level 4. A secondary office entrance is located at the Start-ups, allowing separate access for the Start-ups and direct access to Management (Level 5) via elevator. A third entrance is located at the Restaurant, where by the Staff Facilities, such as Gym and Nursery, can be accessed via elevator. This allows these functions to operate outside of normal working hours.

Automated Parking

Once inside the building, individuals are encouraged to travel to their destination via the circulation stairs to the internal voids. The voids move horizontally through the building, connecting all floors and providing visual links and promoting chance encounters. Three elevator cores service the building, located in close proximity to the Ground Floor entrances. The cores provide elevator access from the underground car park at Basement Level to all upper levels. In addition, direct stair access can be found from the underground car park to the Restaurant.

N

Private outdoor roof terraces are available to the Offices and Start-ups. The Conference and Meeting rooms have access to a larger roof terrace which can be used for outdoor functions and events.

Headquarters Typical Office Floor Plan (Level 2) 1:200

Once inside the building, individuals are encouraged to travel to their destination via the circulation stairs to the internal voids. The voids move horizontally through the building, connecting all floors and providing visual links and promoting chance encounters. Three elevator cores service the building, located in close proximity to the Ground Floor entrances. The cores provide elevator access from the underground car park at Basement Level to all upper levels. In addition, direct stair access can be found from the underground car park to the Restaurant.

The public and private functions of the KFAS Headquarters Building are carefully planned in a way that maximize circulation routes while maintaining privacy of the various programs.

Headquarters Utilization and Circulation Diagram

The views from the building are maximized by placing a variety of functions along the facade. A mixture of enclosed offices, shared spaces and open individual workplaces share the views to the surrounding Science Cape Campus and the magnificent Arabian Gulf. Glazed

partitions allow natural light from the facades to penetrate into the central functions of the office space while maintaining visual connections and transparency throughout the building.

N

Fraunhofer Institute: Planning for the Future

Year 2043: 50% enclosed office spaces

An integral part of the Fraunhofer IAO design strategy is planning for the future. The unique floor plan of the KFAS Headquarters allows for the future work settings anticipated for KFAS. Currently, the floor plan design accommodates for 25% of enclosed office spaces. By 2043, 50% of the office space could be enclosed. These can be located along the perimeter of the facade, where the glazed partitions and voids still allow natural light to filter through to the shared functions in the center. Circulation and chance encounters remain at the center - the core of KFAS.

Open Office Space

Enclosed Offices

Cores

Year 2023: 25% enclosed office spaces

n

Utilization and Circulation

N Shared and open spaces are located adjacent the voids, creating naturally lit hubs of interaction through visual links between floor levels and chance encounters through the natural circulation of the building.

Headquarters Typical Office Floor Plan (Level 2) 1:200

Perspective Interior View of KFAS Offices

1:500

In collaboration with the Fraunhofer IAO, the KFAS Headquarters employs a supportive, modern and flexible work-environment for KFAS Employees. The design of the office areas are flexible and future-proof, combining a mixture of open and enclosed work settings. Enclosed spaces consist of Think-Tanks, various sized meetings rooms and single offices. Open ‘We-Spaces’ consist of work lounges, media-talk and individual work-stations.

separate entrances to the The KFAS Foyer is accessed s the primary entrance for ts, including access to the ilities at Level 4. A secondary at the Start-ups, allowing rt-ups and direct access to elevator. A third entrance is where by the Staff Facilities, an be accessed via elevator. o operate outside of normal

Fraunhofer Institute for Industrial Engineering IAO

ate functions of the KFAS carefully planned in a way routes while maintaining ams.

Perspective View to Headquarters Plaza from Northern Marina Walk

S Offices

Voids Year 2043: 50% enclosed office spaces


04.

KSP VITIOR’S PAVILION & NURSERY Sustainability & Building Perfomance Analysis Studies for competition - Riyadh Project/Team: Role:

Gerber Architekten Competition Team, Architect, part of design team

Year:

2019

As a seed is integral to the growth of the forest, so is the Visitor Pavilion and Nursery to King Salman Park. Merged into one building, the Visitor Pavilion and Nursery forms an unbreakable part of The Innovation Loop. The new building complements the Innovation Loop in the form of an infinity loop, a never-ending cycle of life and possibilities. The Visitor Pavilion and Nursery is the seed growing from the Innovation Loop, the core of King Salman Park. Shadow Study

*Rendering (outsourced)


Plant Nursery Floor Plan


05.

PARKSTUDIOS POTSDAM 3D MODELING, BIM, VISUALIZATIONS Location: Project/Team:

Potsdam Babelsberg work Related/ modus.architekten+John Barry

Year:

2017

Parkstudios Potsdam Babelsberg is a unique project that was done together with modus.architekten. It is a conversion of an old film studios into a residentail building,

ATRIUM (Solar Study)


5.00 2.70

2.60

1/2 in - 10 in holes for utility pipes

100 mm THK precast slab + insulation custadditional beam support every 2.8 m

0.70

pre-stressed purlin system

Utility pipes though the L-foundation

UTILITY & STRUCTURAL CONCEPT


WOHNUNGS TYPOLOGIEN Apartment unit type in Parkstudios Potsdam Project of modus.architekten. 3D models and visualizations are done for presentation and approval drawings. See more details at the portfolio website.

1.12 2 1

A

HAUS 1 + HAUS 2 : LANGSSCHNITT

A

1.12 2 1

1.8 A

A

2

D

1

E HAUS 1 - 1.OG 2.95

A

HAUS 1_EG 0.00

1.8

WOHNUNGSTYPOLOGIEN - A1 Alle Maße sind vor Baubeginn örtlich und rechnerisch zu prüfen!

D

Evtl. Unstimmigkeiten sind mit den Architekten und der örtlichen Bauleitung abzustimmen. Die Werkpläne gelten nur in Verbindung mit den Detailplänen des E Architekten und der einzelnen Fachplaner. Alle tragenden und konstruktiven Bauteile müssen nach geprüfter

Änderungen

Typ A1_Basic_Innenperspektive Bauherr

Planart

Baumaßnahme

Planer

PSP Babelsberg, Potsdam

Große We 14469 Pots


3D SECTION OF BUILDING CONNECTION The project is two old buildings connected that were previously used as film studios in Potsdam. The section shows how we have connected the two buildings and made unqie apartments in it’s connection.


INTERIOR VISUALISATIONS The drawings shows interior visualisations of one of the WohnungsTypologie in the Attic. See more details at johnbarryg.com


WOHNUNGS TYPOLOGIEN:

DACHWOHUNG TYP A1 + TYP A2


06.

TOGETHER WITH THE FOREST suburbia housing project Location: Project/Team:

MuhlefleiĂ&#x;, Berlin Master’s studio Project

Year:

2017

Suburbia is extremly succesful in terms of market mechanics and it is growing. Yet, the current model of suburban life is highly questionable, characterized by a mindless use of land and continuous destruction of landscape as a resource. Instead of purely criticizing the existing, we can look for relevant qualities of the suburban belt along the governmental border between Berlin and Brandenburg to propose an alternative: a dense and green horizontal city that comes up with qualities other than just being metropolitan.


SITE PHOTO DOCUMENTATION

MAPPING THE TREES The drawing is a study of the site in Mühlenfleiß, Berlin, a tree farm near Müggelsee. The trees are drawn based on the compiled images from the archive to show how the trees are cut and planted on the area.

Mühlenfeliß, Berlin


SITE DEVELOPMENT PLAN Inside the Forest The drawing shows where the proposed living units will be placed. It is carefully studied that the residential units will be places 30 m from each other for them to have a feeling of exclusivity but still have a connect through forest paths and haning walkways



07.

THE BAUHAUS STAGE Explorations on Body and Space Location: Project/Team:

Bauhaus, Dessau Special Mention Recognition/Design Competition

Year:

2016

The Minimalism of Erik Satie Like arrangement of music pieces from Erik Satie, the stage aims to be light & linear, affording supple but transparent platform that will change and transcend through different depths of spaces through light & shadown produced in the stage space.



08.

KRAKOW OXYGEN HOME

COMPETITION ENTRY/STUDIO PROJECT Location: Project/Team:

Krakow, Poland Studio Project, John Barry

Year:

2015

Due to reliance on coal-burning furnaces for heating, residents of Krakow are threatened by pervasive air pollution causing increasing incidents of asthma, chronic lung disease, and lung cancer. The brief calls for the design of a care center for lung cancer patients as part of the Maria Sklodowska-Curie Memorial Institute of Oncology.


THE BUILDING AS A S A N C T U A R Y The drawing is an explded axonometric of the proposed building in Krakow to become a sanctuary for lung-cancer patients, combining the building function and the building as a filter. URBAN AIR FILTER

GARDEN SANCTUARY

TREATMENT AREA


ONE-FOOT TRIANGLE TABLE EXPERIMENTAL FURNITURE Project/Team:

Studio Project, John Barry

Year:

2017

The table is made to serve as an experiement in the studio - Building Platform. It is in a triangle shape that has no equal sides which depicts that it can be connected to other tables or lean into any side. It can also be folded to form a rectangle andmean to be hanged on the wall as a piece of art


S - M - L case study

(an experimen t pro j ec t )

The case study/ experiment project is about providing a certain space or framework for a number of people based on the amount of space provided.


SELECTED RENDERINGS & GRAPHICS

National Bank of Kazakhstan

Mactan-Cebu Int’l Airport

King Salman Park

National Bank of Kazakhstan Mactan-Cebu Int’l Airport

King Salman Park


Mactan-Cebu Int’l Airport

National Bank of Kazakhstan

22a Mackerrow, Singapore

National Bank of Kazakhstan


view more at: JOHN BARRY | 2018 | www.johnbarryg.com Please visit the site for more info on each project and future updates.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.