EXPRESS RAIL LINK PRESENTATION ON THE WEST KOWLOON TERMINUS 21 APRIL, 2011
WKT Presentation
OVERVIEW
XRL West Kowloon Terminus
INTERIOR DESIGN
TERMINUS STATION
CONTEXT
E xpr es s R ail L in k - C ons ult anc y Agr eem en t N o. C8 0 1 | D et ail ed D es i gn f or W es t K owl oon Term in us | P l ann in g Pr es en t ati on | C ONT EXT OF W EST KOW L OO N
STATION ZONE
Express Rail Link - Consultancy Agreement No. C801 | Detailed Design for W est Kowloon Terminus | Architectural Presentation | SITE ZONING STRATEGY | Station Zone
TERMINUS STATION
MAXIMIZE CIVIC OPEN SPACE
E x p r es s R ai l L i n k - C o n s u l t a n c y A g r e e m e n t N o. C 8 0 1 | D e t a i l e d D es i g n f or W es t K o w l o o n Ter m i n u s | A r c h i t ec t u r a l P r es e n t a t i o n | M O D E L
Express Rail Link - Consultanc y Agreement No. C801 | Detailed Design for W est Kowloon Terminus | Architectural Pres entation | RENDERING | View of Station Entranc e
E xpr es s R ail Li n k - C ons ult anc y A gr eem en t N o. C8 0 1 | D et ail ed D es ig n f or W es t K owl o on Term in us | Arc hit e c tur al Pr es en t ati on | RE NDERI NG | E ven i ng Vi ew
E xpr es s R ail Li nk - C ons ult an c y A gr e em en t N o. C8 0 1 | D et ail ed D es i g n f or W es t K owl oon Ter mi n us | Arc h it e c tur al Pr es en t at i on | RE NDER I NG | S t ati on Vi ew
Express Rail Link - Consultanc y Agreement No. C801 | Detailed Design for W est Kowloon Terminus | Architectural Pres entation | RENDERING | View of Pedestrian Links
Express Rail Link - Cons ultanc y Agreement No. C801 | Detailed Des ign f or W est Kowloon Terminus | Arc hitectural Pres entation | RENDERING | Entranc e to Station
Express Rail Link - Consultancy Agreement No. C801 | Detailed Design f or W est Kowloon Terminus | Architectural Pres entation | RENDERING | View onto Public Plaza
E xpr es s R ail L in k - C on s u lt anc y A gr eem en t N o. C 80 1 | D et ail ed D es i gn f or W es t K owl o on Ter mi n us | Arc h it e c tur al Pr es en t ati on | R ENDERI NG | In t eri or Vi ew
E xpr es s R ail L in k - C on s u lt anc y A gr eem en t N o. C 80 1 | D et ail ed D es i gn f or W es t K owl o on Ter mi n us | Arc h it e c tur al Pr es en t ati on | R ENDERI NG | In t eri or Vi ew
TRADITIONAL UNDERGROUND STATION Perceptually No Awareness of Surrounding Environment
PROPOSED UNDERGROUND STATION Awareness of Surrounding Environment
VIEWS FROM THE STATION TOWARDS CITY
Express Rail Link - Consultancy Agreement No. C801 | Detailed Design for West Kowloon Terminus | Architectural Presentation | COMPARATIVE DIAGRAM | Arrivals & Departures
DESIGN A “BELOW GROUND STATION” TO NOT FEEL“ BELOW GROUND” • IMMEDIATE SENSE OF ARRIVING INTO HONG KONG
B4 PLATFORM LEVEL
N
E xp ress Rail L in k - Con su lt an cy Ag reem ent
No. C801 | Det ailed Desig n for W est K owloon
Terminus | SD Presen t at ion
| LA YO UT OVE RVI EW | PLA NS
B2 ARRIVALS LEVEL
N
E xp ress Rail L in k - Con su lt an cy Ag reem ent
No. C801 | Det ailed Desig n for W est K owloon
Terminus | SD Presen t at ion
| LA YO UT OVE RVI EW | PLA NS
GROUND LEVEL
N
E xp ress Rail L in k - Con su lt an cy Ag reem ent
No. C801 | Det ailed Desig n for W est K owloon
Terminus | SD Presen t at ion
| LA YO UT OVE RVI EW | PLA NS
THE ENTRANCE BUILDING
XRL West Kowloon Terminus
INTERIOR DESIGN
COMPARATIVE AREAS
LANDSCAPE
COMPONENTS
E xpr es s R ail Li n k - C ons ult anc y A gr eem en t N o. C8 0 1 | D et ail ed D es ig n f or W es t K owl o on Term in us | Arc hit e c tur al Pr es en t ati on | RE NDERI NG | E ven i ng Vi ew
EASTERN ARCH
V BEAMS
Express Rail Link - Consultanc y Agreement No. C801 | Detailed Design for W est Kowloon Terminus | Architectural Pres entation | RENDERING | View of Station Entranc e
SOUTH FACADE
MEGA COLUMNS
XRL West Kowloon Terminus
B3 INTERIOR DESIGN
30% of steel weight saved through optimisation of mega column form
Rationalisation to Constructible Forms
Parametric Manipulation of Column Forms
NORTH TRUSS ZONE
SECONDARY STRUCTURES & FINS
Importing Geometry
Rhino
RSA
Automated Member and Nodal Numbering • For final coordinate and member presentation. • Links to our in-house design tools where renumbering can occur through use of scripted processes.
CLERESTORY
MODELS
Rhino Model (Architectural)
Rhino Model (Structural)
Revit Model (Production)
Revit Model (Contract)
Drawings - scope (from Revit Model File)
Drawings - detailed scope (with BGLs)
BGL’s
BGL’s
Drawings – EWS details (with BGL’s)
BGL’s
BGL’s
Drawings – Panel Sizing Schedules
CONTEXT
CIVIC
ARRIVING or DEPARTING…
CONTEXT
DESIGN A “BELOW GROUND STATION” TO NOT FEEL“ BELOW GROUND”
CIVIC PLAZA
SCHEME A - 3 TOWERS
SCHEME A - 3 TOWERS
TERMINUS STATION
XRL West Kowloon Terminus
B3 INTERIOR DESIGN
THANK YOU
AEDAS
Paul MUI