Jon Powell : Part 2 Architecture Folio

Page 1

Part II Architecture Folio Jon Powell

RIBA part II M Arch w/ Distinction [University of Strathclyde]

Email : jonnypowell95@gmail.com

Mob : 07825 291074



Contents CV

Chapter I : Post Graduate : Eden : Plastic Genesis Utopia Exhibition Plastic Waste in the Built Environment [Thesis] A Story of Beauty

Chapter II : Part 1 Work Placement : Margate Childcare Centre St Mary’s College 14 Manning Road 12 Margaret Street Forcett Street Fishy Business

Chapter III : Undergraduate : 1st Year : Facade Project 2nd Year : Library Project 3rd Year : City of Justice : A New Law 4th Year : The Hoptimist 1st Year : A Story of Newtons Cenotaph 3rd Year : A Story of My Host City

Chapter IV : Other : The Other Tradition Exhibition Bamboo Pandas Awaken my Kawai Bees


Jon Powell

RIBA part II M Arch w/ Distinction [University of Strathclyde]

I believe there is value in being out of context; this is not to ignore the surrounding situation but rather to explore ideas, knowledge or experiences from outside of the obvious.

Key Qualities and Skills Software

Physical

Soft

After Effects Proficient

Microsoft Office Proficient

Drawing Proficient

Sketching Proficient

Verbal Com.

Listening

Photoshop Proficient

InDesign Proficient

Spray Painting Intermediate

Mathematics Proficient

Teamwork

Accountability

After Effects Intermediate

PremierePro Intermediate

Resin Casting Intermediate

Concrete Mixing Intermediate

Enthusiasm

Creative Thinking

Sketch Up Basic

Rhino/Grasshopper

Woodwork Intermediate

Animation Intermediate

Friendly

Reliable

Basic

Email: jonnypowell95@gmail.com

Mob: 07825 291074


Education:

Non Architecture Work Experience

2018

June 2014 - Sept 2014

Bsc Architectural Studies

2:1

w/ International Studies

Chalmit Lighting - Hillington Production Line Worker

University of Strathclyde

w/ University of Technology Sydney

Nov 2014 - Jan 2016 Macdonald Crutherland Hotel - East Kilbride Waiting/ Conference and Banqueting

2019 Masters in Advanced Architectural Design w/ Distinction

University of Strathclyde

Sept 2017 - Dec 2018 Odeon Luxe - East Kilbride Cinema Host

Part 1 Work Experience Aug 2016 - May 2017

From Sept 2019

IDW Architecture + Interiors - Hobart, Tasmania

WVA - Glasgow/ Edinburgh Agency subcontractor

Software Used : Vectorwork I Renderworks

I Photoshop I Excel

Typologies worked on :

- Purvis Marquees

assemble and deconstruction marquees of various sizes ranging from 10m x 15m to 20m x 30m.

Learning - I worked on generating a complex

computer model to be used for school master planning, site inspections and client meetings and worked on the design and drafting of a DA for a small childcare centre

Residential - I produced renders for 3 housing

projects , worked on BA and DA for several house extensions and minor works and met with clients.

Office - I worked on DAs for 3 offices fit-outs

carrying out tasks such as layout design, site surveys, HVAC plans and document drafting.

-Bridgewater

Demolition, Deliveries and Site Tidying on Various Office Fit-outs .

From Nov 2019 Core Crew - Glasgow Crew

- Itison

Set-up and maintainence on the Elfingrove Event at Kelvingrove Museum .

- Camerons

Set up for corporate events at city chambers and others.



Chapter I:

Post Graduate


Post Graduate : Design Project: Eden:

Plastic Genesis

Brief: To create a vision of Utopia set in 2069 and express this vision through a set media.

Utopian Ethos : Utopia is a matter of perspective, in an Utopia a problem that seems overwhelming can be solved beautifully Taking the problem of plastic and creating a Paradise. 3

1

2

By Individuals

The collection is sorted by its kind

A Sacred Frame Of Ultra dense PE

Expands ouwards

A 7 step Process Mimicking the Story of the 7 Days of Creation

Framework

Plastic is gathered

Processing

WIth a New Creation Story

Collecting

A Plastic Genesis

And Processed By Governments

By Machines

with techniques old and new

Media : Animation The Media element shaped the design, animation puts addtional focus onto Time and narrative This led to the design of a system within a fable around an advancing recycling system By exploring this new media I gained a wealth of new software and real world skills.

Please scan code to Watch Project Formative Video

Floated on Emissions


Feedback : “ In depth research, a thorough investigation into concept and media technique. Impressive.” “Appreciate all the hardwork that was put into production of the film and supporting materials ”

- Head of Review Panel David Reit 7 5

Learning

Migrating

Forming

New islands

Animals Migrate

The Creation Story Ends with Man

Birds are formed within the frame

Trusting

6

4

Eden is then Handed over to the A.I of EDEN

A Trusted System for recycling Ours with Machine

Fish We Teach

water flows we prepare Eden

Please scan code to Watch Project Presentation Video

Animals

And We Learn

The plastic of the past

into the paradise of the future


Post Graduate : Design Project: Utopia Exhibition Brief: To create a vision of Utopia set in 2069 and express this vision through a set media. Initial Division of Space

people 3 4 5 6 7

13 14 16 16 16

m2

m2 people

30 2.3 39.7 2.83 66.7 4.16 57.6 3.6 61.3 3.83

m2

m2 people

13 14 16 16 16

44 50 53 61 59

3.38 3.57 3.31 3.81 3.68

3 4 5 6 7

7

6

5

3

2

people

7

6 5

my

1

My Proposed Division of Space

my

my unit

3

4

1

2

3

4

unit

unit

Fifth year design was graded through exhibition with the Utopia unit displaying alongside 6 other design units. The units were initially allocated spaces by the head of year, but this draft left my unit (3) with a comparably smaller and more difficult space than other units. An issue compounded by the experimental nature of the Utopia unit. In order to get sufficient space for my team I took leadership of my unit, holding discussions with other units. leading to me proposing a new layout to the other units. My proposed layout was demonstrably fairer in terms space per person which helped to convince the year group to adopt it. The layout was also used for the end of year exhibition.

x4 A

B

E

A

team of 2

F

C

H

G

A

D

E

C

F

A

G

H

Unique pieces

A

I

I

Continuing in this role, I set about organising the exhibition layout for my unit. Establishing everyones unique needs based on their media and big ideas : working out a layout to suit.

B D

Layout of unit 3


Grade 5a

5b

70 / 72 A Method for

7 more Square tiles used to display the 7 steps of the process along with stills from the process animation

detail sketch

5 rectangular polyester cast resin tiles With painted Recycled plastic flecks thourough used to display descriptions of the who? what? Where? When? and How?

detail sketch

detail sketch

I chose to prefabricate my exhibition booth to minimise set up time.

Each panel connects to another 2 panels by a single m8 bolt

detail sketch

detail sketch

Wall Mounted TV Screen for video presentation

6 stills printed and mounted onto foam board attached to wooden spaces to create depth.

A 45 colour coded

sketches illustrating aspects of eden relating to each stage of the process. Printed onto Acetate hexagons, lightly dusted with spraypaint to give a semi transulcent finish.

C A cast resin lid

using the same technique as the tiles opens to allow access to a USB port connected to the Tv as well as several sketch books

D Tools and

development models were displayed behind a sheet of perspex

sketch

detail sketch

5 coordinate with the descriptions with the 6th displaying the final scene of the short film

C D

A B

The Boards were spraypainted a mixtures of blues to give off the impression of a sea. with the images floating in front as islands.

B A poem of Eden

written in the biblical style spray painted onto the board


Post Graduate : Thesis

Grade

Project: Plastic waste in the Built Environment : A Method for recycling plastic waste into bricks

90 A Method for

Abstract: Value and Relevance The mismanagement of plastic waste has been of growing concern in recent times. In dealing with this ongoing crisis, governing bodies such as the EU have been setting a series of targets for higher recycling and recovery rates that member states must achieve by a certain date. The UK is yet to meet the 2020 target of 50% recycle and recovery for household waste, with some of the methods currently used under scrutiny. There is therefore an interest in new outlets that the UK can use to convert its plastics waste into products and services. Purpose The purpose of this thesis is to examine the current shortcomings of the UK waste management system and suggest a solution from the field of architecture, design, and engineering. The aim is to select a product and analyse its suitability to provide a new outlet for the recycling of plastic waste. Methodology This thesis makes use of a literature review and data analysis to analyse the plastic waste management problem within the UK, leading to the presentation of a criteria for potential solutions. This criteria is then used 3 times within the study; first to select a type of intervention from the field of architecture, design and engineering, and secondly to select a product relevant to the chosen type. From here, further literature review alongside a series of experiments that were carried out with a prototype of the product were used to quantify the product’s potential to satisfy the established criteria. Limitations This thesis will focus exclusively on a solution appropriate for the UK. Within the experiments there was limited access to equipment, which meant procedures had to be altered. Due to cost and time limitations the sample of material produced to study was quite small. Expected Findings The initial literature review and data analysis will provide an applicable criteria. This will then be used to assess the common types of intervention from the field of architecture, design and engineering, and select a product. This product will be presented against the criteria to assess its potential.


Feedback : “ The student has engaged with a real-life problem and has produced an excellent test protocol with high quality analysis and data presentation. This is a dissertation that should be viewed as the 1st year of a PhD. The work is of real importance and should trigger further experimentation and testing. The department should recommend this student for a faculty scholarship to allow this work to continue.�

Proposed Criteria

Hypothesis

There is a place for plastic waste within the Built Environment.

A solution should meet the proposed criteria.

Proposing a Solution

Part II

Part I

- Dr Stirling Howieson 1

3

High Volume

Fit for Purpose

2

4

Long Service Life

Low Energy Cost Solution chosen for testing:

3.82 m3 3.8%

Unique Interventions

18.08 m3 17.91 %

4.54 m3 4.49%

0.03 m3 0.03% 16.5 m3 16.24 %

Concrete Brick with partial plastic waste aggregate replacement

Guerilla Recycling 21.3 m3 21.1%

1.14 m3 1.13%

Building Materials

8.8 m3 8.71% 26.33 m3 26.09% 0.36 m3 0.36%

Testing a Solution Against the Criteria

Part III

Post Petro-Plastics

Volume and % of total Volume for building materials in a model UK semi detached home

Essential Characteristics Length

222.5 mm

Width

102.5 mm

Height

65 mm

Tolerance

D1

Dimwwwwensions

Configuration

Performance

1

High Volume : Can treat 10,000+ tonnes per year.

Shape and feautures

2 Group according to EN 1996-1-1 (EC6) Compressive Stength

Characteristic Compression Strength Direction of Load Unit Category

Dimensional Stability Bond Strength

Sheer Bond Strength Flexural Bond Strength

Reaction to Fire

Group 1 48.6 N/mm2

35.0 N/mm2

mean (50% fractal)

Perpendicular to bed faces Category II

Category I

0.55 mm/m 0.15 N/mm2 (Fixed value) N/A Requires testing

Water Absorption

5.4 %

Water vapour permiability

5 / 15 (Tabulated Value)

Direct Airborne Sound Insulation

Gross Dry Density

Long Service Life : A service life in excess of 50 years is targeted. 3

Fit for Purpose : To be likely to pass the UK regulations.

2102 kgm3

Thermal Resistance

1.21 - 1.28 W/mK

Durability against Freeze/Thaw

>F1

Dangerous Substances

400 g of PE within aggregates

4

Low Energy Cost : As simple a process as possible.


Post Graduate : Cultural Studies 5th Year Project: A

Story of Beauty

Brief: To create a piece of artwork based on a beauty in built environment lecture

The piece tells a story over 5 equal panels representative of different times going from past through present into a utopian idea. The time periods (from left to right): 1 - Prehistory 2 - Ancient History 3 - Industrial revolution to Post WWII 4 - The Digital Revolution to Present day 5 - My Utopian Design project: Eden I became fascinated by the notion that beauty comes from a system of chaos and order, beauty as found in truth. How beautiful solutions last the test of time. The idea of bringing the unbeautiful into a system thatcreates beauty through a new balance drove my 5B design project (see prior). Dividing each of the 5 time periods into a secondary grid of 6 x 10 allows smaller stories to play out across time periods whilst alluding to the density of life and the diversity of beauty: with focus on human influenced beauty. For example the journey of reaching new heights from trees > columns > Skyscrapers > Space travel > floating forests of Eden. The grid displays stories of continuous repetition that is parameter guided, elements similar (order) and elements different (chaos).


Grade 78 A Method for



Chapter II:

Part 1 Work Placement


Part 1 work Placement : IDW Project: Margate

Childcare Centre

Brief: Small Childcare Centre

KEY

1689 CHANNEL HWY RESIDENTIAL

DM1 -DEMOUNTABLE COV WALKWAY

1697 CHANNEL HWY EX AUSTRALIA POST OFFICE

DM2 -DEMOUNTABLE COV COURTYARD

north T w his co ith dr re ns all awi po ul as ng rt tan so is A an ts ci to C ll w d dr ate b BOUNDARY ot aw d e S od or ONTO RESID he i s re ENTS Au tan e o ks a r w ng pe ad th dar f A re u o rit s, g cific in 2m minimum D rit ds, st to te e a co r y c R Olandscaping n ot tio n NO re Lo alia om ep boundary in ec n ju A c g C rc o st h s, nc ul al , re ply ru ni hi rt a T S a tio a ct ca tio nd lev wi 16te ll d CA n NO io l t c a n /3 tu i 14.00 ns s oth nt h th /1 r sc LE . a 6 e nd er Au e B DA Ta + rep OF s r TE By el tra uil ad sWIn in F e d de a te cie D l la va 2miaminimum R d te r n ing ws nlandscaping NO M r siors s w A t ith WI TE arc ew boundary h er 20 ID NG 20 co 00 W S 1 n

3260

2000

W/C

OFFICE

KITCHEN COT ROOM

v.

ch

4/ b T 147 15 No. RAISED E (03 Li 06 PLANTING AC info ) 6 ver C @ 234 poo . N id l um wa 564 St r 4 c be h H r. ite ob ct ar BOUNDARY u 8632 t 9221 re .c TA om S .a PROPOS 70 ED u 00 CC 98 0Y

ur

e

S

] SEWER RISING MAIN

5

1800

+

All works are to comply Code of Australia, relev Standards, Local and o Authority regulations a

00

DO NOT SCALE OFF Report all discrepincies Architecture + Interiors

20

00

OSHC WING

NO.

rio

Duerincky En PTY LTD Address

KITCHEN

7350

1699 Channe Margate Tas

17.50

Project

2372

16 RIVERDOWN STREET RESIDENTIAL

rs

4615

NOTE

Client

W/C

18.00

DATE

17.00

in

te

EX BITCHUMEN DRIVEWAY

This drawing is to be re with all associated spe consultants drawings, g report and other written

10

2m minimum landscaping boundary

Jo

ite

15.50

16.00

16.50

SANDPIT PLAYGROUND

W/C

ar

ct

PHONE BOX

C

15.00

EX TREE

7

BABY AND TODDLER CARE WING

10

1: 10 D a 0 16 te @ -0 A3 520 17 RAISED

Re

e

te

21

18050

EX TELSTRA BUILDING

BOUNDARY

1701 CHANNEL HWY

al

FL17.00 RL

COT ROOM EX PUBLIC BENCH AREA

A

Sc

W/C

14.50

no

S

BOUNDARY

n

BO ON UND TO AR RE Y SID E

ENTRANCE FOYER REC

io

16

ENTRY CANOPY

ct

n

DM1

BIKE PARKING 6 SPACES

ne

lie

t He PLAYGROUND le Ad n & 1 dress Ia O 4M n rfo a Ha Pr oj rd nn ec llid in Ha t g ay llid Dr D PAVED PLAY ay AREA ra ive PAVED Fo wing AREA Re , ot sid in D g en w g Pl N ce o. a B n

YOUNG CHILDREN CARE WING

EXIT

6

C

DM2

KITCHEN

[ PAINTED LINE - TASWATER

EX BUILDING

16930

[ PAINTED LINE - TASWATER ] SEWER

DROP OFF / PICK UP PARKING 9 SPACES

LINE

PAVED DECK

EXH

FL17.00 RL

CARPARK STAFF PARKING 8 SPACES

NT

2030

4010

FENCE

EX TREE Wheelie Bins and Outdoor Play Equipment Storage in existing Double Garage

BO ON UND TO AR RE Y SID E

EX FOOTPATH

2m minimum landscaping boundary

FFL EXH 17.88 RL NEW PLANTING IN THE GREENZONE

2400 2400 2400 2400

2065

14.50

BUS PARKING SPACE

3380

2400

10320

ENTRY

GREENZONE

3360 2400

BOUNDARY

BOUNDARY

CHANNEL HIGHWAY

2100

15.00

16.50

17.00

PROPOSED

9455

4800

2400

2400

16.00

6200

NT

EX BUILDING 4800

Margate Chil Centre Drawing

Proposed Flo Dwg No.

DA-103 1703 CHANNEL HWY EX COMMERCIAL BUILDING

INTERNAL FENCED SPACE

EX CARPARK

Scale

1:200 @ A2 Date

14 RIVERDOWN STREET RESIDENTIAL

14-11-2016

north

Rev.

4/147 Liverpool St

H

T (03) 6234 5644 E info@idwarchitecture ACC. Number.

Ground Floor Plan

My Role

architecture +

Roof Plan

I was added to the project after an unfortunate discovery of a pipeline running across the centre of the site had led to an original design being thrown out. Andrew allowed me a lot of freedom to work together towards a solution. We used the existing age group split (Baby and Toddler, Young Children and OSHC) to create 3 wings and retained the existing house for a staff area, this split allowed a protected outdoor play area for smaller children with the wings providing good passive surveillance. This was also the first car parking plan I done. The DA I drafted had been accepted when I left IDW with work on the BA about to begin.


ENTRANCE FOYER - BEHIND -

OSHC WING DEMOUNTABLE COVERED WALKWAY EX

CB

PC

GL

GL

GL

TELSTRA BUILDING

EX PC

GL

- BEHIND -

CARPARK EXH GL

GL

GL

GL

GL

GL

GL

GL

GL

GL

GL

GL

GL

GL

GL

GL

GL

GL

EX

GL

GL

ENTRANCE FOYER - BEHIND -

EX

OSHC WING

GB

M

DEMOUNTABLE COVERED WALKWAY TS

PC

EX

CB GL

GL

GL

TELSTRA BUILDING

EX PC

GL

- BEHIND -

CARPARK EXH

NATURAL GROUND LINE GL

GL

GL

GL

GL

GL

GL

GL

GL

GL

GL

GL

GL

GL

GL

GL

GL

2065

01

North West Elevation

---

Scale 1:100

GL

EX

GL

GL

10320

2101

9457 EX

GB

EXISTING BUILDING (BEHIND) TELSTRA BUILDING (BEHIND)

EX

DECK

M SIDE

YOUNG CHILDREN CARE WING

EXISTING BUILDING

EXIT

TS

EXH RL 22.100

PC

PC NATURAL GROUND LINE

M

GL

CB

CB 2065

GL

North West Elevation GL GL

01

GL

GL GL GL

GL

GL

GL

GL

GL

GL

GL

GL

GL

2101

GL

GL

GL

9457

GB

GL

GL

SIDE EXIT

GL

GL

GL

EXISTING BUILDING

GB

TS

PC

All works are to comply with the Building Code of Australia, relevant Australian Standards, Local and other relevant Authority regulations and By-laws DO NOT SCALE OFF DRAWINGS Report all discrepincies with IDW Architecture + Interiors

FENCE WITH GATE

NO.

GL

CB

NATURAL

M GL

GL

GL

GL OSHC WING

GL

GL

GL

GL GL GL

GL

GL

GL

GL

GL

GL

GL

GL

GL

GL

GL

GL

GL

GL

GL

GL

GL

GL

GL BOUNDARY

EX - EXISTING BUILDING ELEMENT GB

Scale 1:100

GB

GB

EXH - EXISTING BUILDING ON PROPERTY

FL17.00 RL M RL 22.100

BOUNDARY

NOTE

This drawing is to be read in conjunction with all associated specifications, consultants drawings, geotechnical report and other written instructions

GROUND LINE

KEY

02a North East Elevation OSHC in front ---

DATE

CB

7449

M

BOUNDARY

This drawing is to be read in conjunction with all associated specifications, consultants drawings, geotechnical report and other written instructions

FL17.00 RL

EXH

M

RL 22.100

GL

YOUNG CHILDREN CARE WING

GB

TELSTRA BUILDING (BEHIND)

PC

BOUNDARY

DECK

EXISTING BUILDING (BEHIND)

North West Elevation EX

BOUNDARY

GL

Scale 1:100

---

10320 M

GL

7449

GL

BOUNDARY

GL

PC

TS

EX

Duerincky Enterprises PTY LTD

GL - NEW GLAZING

DO NOT SCALE OFF DRAWINGS Report all discrepincies with IDW Architecture + Interiors Address

FN - NEW TIMBER FENCE [1500mm or 1800mm] TS - NEW TIMBER SCREENING

NO.

FENCE WITH GATE

PC

All works are to comply with the Building Code of Australia, relevant Australian ClientLocal and other relevant Standards, Authority regulations and By-laws

1699 Channel Hwy NOTE Margate Tas.

DATE

Project CB

CB

GL

CB

NATURAL

OSHC WING

GL

GL

GL

GL

GB - NEW GLASS BALUSTRADE M-

M

GL

GL

GL

GL

GL

GL

GL

GL

GL

GL

GL

GL

GL

GL

GL

GL

GL

GL

GL

GL

GL

GL

GL

GL

GL

GL

GL

GL

GB

Scale 1:100 RL 22.100

BOUNDARY

PC BOUNDARY

Drawing

FC - NEW FIBRE CEMENT SHEET EX - EXISTING BUILDING ELEMENT GL

CB - COLORBOND ROOF CLADDING EXH - EXISTING BUILDING ON PROPERTY PC - CLEAR POLYCARBONATE ROOF GL - NEWSHEET GLAZING

GL FL17.00 RL

EX

M

Proposed Elevations 01 Client

Enterprises Duerincky Dwg No. PTY LTD

DA-201

Address TS

PC

1699 Channel Hwy Scale Margate Tas.

FN - NEW TIMBER FENCE [1500mm or 1800mm] TS - NEW TIMBER SCREENING

FENCE WITH GATE

1:200 @ A3

Project CB

GL

CB

17835

CB

4275

GB - NEW GLASS BALUSTRADE M-

M GL

GL

GL

GL

GL

BABYGL AND TODDLER CARE GL GL WING GL

GL

GL

GL

GL

GL

GL

GL

GL

ENTRANCE GL GL FOYER

GL

North East Elevation Scale 1:100

GL

GL

GL

GL

GL

GL

YOUNG CHILD CARE WING GL

GL

GL

GL

GL

GL

GB

GL

E NEW LIN

GL

NATU

Date

Margate Child Care 14-11-2016 Centre Job No. Rev.

MASONRY WALL

1520

Drawing

FC - NEW FIBRE CEMENT SHEET

Proposed Elevations 01

GL

---

PC - CLEAR POLYCARBONATE ROOF SHEET

FL17.00 RL

Dwg No.

architecture + interiors

DA-201

M

Covered area with terrace dotted and greyed in

4/147 Liverpool St

TS BOUNDARY

OUND

GR RAL

CB - COLORBOND ROOF CLADDING

02b North East Elevation/ Section Covered Area

BOUNDARY

NEW MASONRY WALL

KEY

GL

02a North East Elevation OSHC in front ---

Margate Child Care Centre

GROUND LINE

Hobart

TAS 7000

T (03) 6234 5644 E info@idwarchitecture.com.au Scale ACC. Number. CC980Y

FENCE WITH GATE

1:200 @ A3

Date

17835

4275

BABY AND TODDLER CARE WING

ENTRANCE FOYER

14-11-2016 E

RAL

YOUNG CHILD CARE WING

NATU

ND LIN

Job No.

Rev.

GROU

1520

02b North East Elevation/ Section Covered Area Scale 1:100

---

architecture + interiors

Covered area with terrace dotted and greyed in

4/147 Liverpool St

TELSTRA BUILDING

Hobart

TAS 7000

T (03) 6234 5644 E info@idwarchitecture.com.au ACC. Number. CC980Y

EXISTING BUILDING -AT BACKTELSTRA BUILDING ENTRANCE FOYER EXISTING BUILDING -BEHIND-AT BACKCOVERED COURTYARD * ENTRANCE FOYER -BEHIND-

-BEHIND-

PC

COVERED COURTYARD *

PC

PC

-BEHIND-

PC

EX

M

M

M

EX FENCE EX

M

FN1500

FN1500

M

M

M

M

GL

GL

GL

FN1800

EX FENCE

FN1500

FN1500

GL

NATURAL GROUND LINE

GL

GL

FN1800

NATURAL GROUND LINE

4603 TELSTRA SITE

9421

BABY AND TODDLER 4603 CARE WING

8626

BABY AND TODDLER 9421 CARE WING

COURTYARD

8626

9185 OSHC WING -ON BOUNDARY9185

-ON BOUNDARY-

South East Elevation

---

Scale 1:200

BOUNDARY

South East Elevation Scale 1:200

South East Elevation

03 ---

BABY AND TODDLER CARE WING

BOUNDARY

TELSTRA SITE

03

BABY AND TODDLER CARE WING

COURTYARD

OSHC WING -ON BOUNDARY-

-ON BOUNDARY-

This drawing is to be read in conjunction with all associated specifications, consultants drawings, geotechnical report and other written instructions This drawing is to be read in conjunction with All all works associated are tospecifications, comply with the Building consultants Code ofdrawings, Australia,geotechnical relevant Australian report and otherLocal written instructions Standards, and other relevant Authority regulations and By-laws All works are to comply with the Building CodeDO of NOT Australia, relevant Australian SCALE OFF DRAWINGS Standards, Local and other Report all discrepinciesrelevant with IDW Authority regulations and By-laws Architecture + Interiors

BABY AND TODDLER CARE WING - BEHIND -

BABY AND TODDLER TELSTRA CARE WING BUILDING -IN FRONT- BEHIND -

EXISTING BUILDING TELSTRA BUILDING -IN FRONT-IN FRONT-

DO NOT SCALE OFF DRAWINGS NO. DATE NOTE Report all discrepincies with IDW Architecture + Interiors

NEW ENTRANCE EXISTING BUILDING FOYER -IN FRONT-

NO.

M AEX R G A T E GLC H I L D CTSA R E C E N T R E

GL TS

NEW TIMBER SCREEN

4495 4495

EX

TS

TS

FL17.00 RL

EX

TS

NEW WINDOW IN FORMER ROLLER DOOR LOCATION

FL17.00 RL TS

*LOGO DIMENSIONS BOUNDARY

NEW VERTICAL MODWOOD SLAT SCREEN SCREW FIXED TO TREATED PINE STUD FRAMING NEW VERTICAL MODWOOD NEW WINDOW IN FIXED SLAT SCREEN SCREW FORMER ROLLER DOOR TO TREATED PINE STUD LOCATION FRAMING

nd Line

GL

*LOGO DIMENSIONS

1100

3330

TS

Natural Grou

GL

880

FFL EXH 17.88 RL

GL

GL

1100

3330

FC

EX

EX

TS

NEW TIMBER SCREEN

04

South West Elevation (Channel Hwy)

Scale 1:200 South West Elevation 04 South West Elevation (Channel Hwy) ---

---

Scale 1:200

TELSTRA BUILDING

EX

1400

1400

BOUNDARY

EX

BOUNDARY

FC

M

GL

GL GL STEPPING STONES

BOUNDARY

EX

*LOGO

GL

TELSTRA BUILDING

2346 2346 2259 2259

7185

EX

nd Line

BOUNDARY

EX

MARGATE CHILDCARE CENTRE 2580

EXISTING BUILDING

EX

FFL EXH 17.88 RL

2580

EXISTING BUILDING

EX

880

7185

EX

GL

EX

M

STEPPING STONES

EXH

EXH

Natural Grou

BOUNDARY

DATE

NOTE

NEW ENTRANCE FOYER *LOGO

GL

KEY EX - EXISTING BUILDING ELEMENT KEY EXH - EXISTING BUILDING ON PROPERTY EX - EXISTING BUILDING ELEMENT GL - NEW GLAZING EXH - EXISTING BUILDING ON FNPROPERTY - NEW TIMBER FENCE [1500mm or GLAZING 1800mm] GL - NEW TS - NEW TIMBER SCREENING FN - NEW TIMBER FENCE [1500mm GBor- 1800mm] NEW GLASS BALUSTRADE TS - NEW TIMBER SCREENING M - NEW MASONRY WALL GB - NEW GLASS BALUSTRADE FC - NEW FIBRE CEMENT SHEET M - NEW MASONRY WALL CB - COLORBOND ROOF CLADDING FC - NEW FIBRE CEMENT SHEET PC - CLEAR POLYCARBONATE ROOF SHEET CB - COLORBOND ROOF CLADDING PC - CLEAR POLYCARBONATE ROOF SHEET

Client

Duerincky Enterprises PTY LTD Address Duerincky Enterprises 1699 Channel Hwy PTY LTD Margate Tas. Address ProjectChannel Hwy 1699 Margate Tas. Margate Child Care Centre Project Drawing Margate Child Care Proposed Elevations 02 Centre Client

Drawing Dwg No. Proposed Elevations 02

DA-202

Dwg No.

Scale

1:200 @ A3 DA-202 Date Scale

14-11-2016 1:200 @ A3 Job No.

DateRev.

1520

14-11-2016 Rev.

Job No.

1520

architecture + interiors 4/147 Liverpool St

Hobart

TAS 7000

T (03) 6234 5644

E info@idwarchitecture.com.au architecture + interiors ACC. Number. 4/147 Liverpool St Hobart

CC980Y TAS 7000

T (03) 6234 5644 E info@idwarchitecture.com.au ACC. Number. CC980Y


Part 1 work Placement : IDW Project: St

Mary’s College

Brief: Survey and draft masterplanning model for future works on the school.

1F

2F

3F

4F

My Role

5F

6F

7F

Roofs Proposed Connection view 1

Andrew had a working relationship with St Mary’s College having recently completely several major works on the school, I was tasked with modelling the school for future work to be done. I modelled the building in Vectorworks from old floor plans mixed the recent drawing files from the works. Each area had been previously dealt with in isolation mainly due to the complexity of the site and the hill. I made 2 gifs of the model cycling through the floors. We were then asked to propose a method to make the school more disability friendly as the nature of the current school campus was unsuitable for students with certain disabilities. Through analysis I suggested a location and modelled up the proposal onto the new masterplan model, providing the client with quick renders.


Lift meeting connection

Lift Shaft in courtyard

Proposed Connection view 3

Proposed connection view 2


Part 1 work Placement : IDW Project: 14

Manning Road

Brief: House extension, the addition of 2 new deck areas a dining room, plunge pool and a refacading of the whole house.

CO

LEGEND LEGEND

CO

T

CO ST

ST

ST GL

STST

ST

T

GLGL GL T D.5 D.5 ST

T

ST

T GL

ST

GL D.5

T

EAST ELEVATION EAST ELEVATION ST

1:100 1:100 ST ST NOTE : PERGOLA NOTE : PERGOLA STRUCTURE STRUCTURE DASHED DASHED

East Elevation

T w co re

CO - COLOURED CO - COLOURED CUSTOM CUSTOM ORB ORB D - DOOR D - DOOR GL - GLAZING GL - GLAZING HT - HOT HT -TUB HOT TUB PB - PLASTER PB - PLASTER BOARD BOARD PC - POLYCARBONATE PC - POLYCARBONATE ROOFING ROOFING SK - SKIRTING SK - SKIRTING BOARD BOARD LEGEND SL - SLIDING SL - SLIDING DOORDOOR ST - STONE ST - CUSTOM STONE CLADDING CLADDING CO - COLOURED ORB T VERTICAL T VERTICAL SLATTED SLATTED TIMBER TIMBER D - DOOR GL - GLAZING HT - HOT TUB PB - PLASTER BOARD PC - POLYCARBONATE ROOFING SK - SKIRTING BOARD SL - SLIDING DOOR ST - STONE CLADDING EXTENSION EXTENSION ROOF/ DECK ROOF/ DECK T - VERTICAL TIMBER4649 4649 4150 SLATTED 4150

EXISTINGEXISTING

A C S A

D R A

This drawing NO is with all associa consultants dra report and othe

All works are to Code of Austra Standards, Loc Authority regul

DO NOT SCAL Report all disc C Architecture + NO.

DATE

H

N

A

1 O

P

EAST ELEVATION

CO

1:100

H

CO

Client

NOTE : PERGOLA STRUCTURE DASHED

D

ST

T W.5

W.5

W.4

W.4

GL

GL GL

GL GL D.2

ST

GL

GL D.1

D.2

T W.3 GL D.1

W.3

Helen & E

ROOF/ DECK 4649

Address

T W.2

W.2

W.1

W.1

5226

T

EXTENSION 4150

5226

EXISTING

14 Mann D Orford Project

B

Halliday

CO

Drawing

T

ST W.5

W.4

GL

GL

GL D.2

T GL D.1

W.3

W.2

W.1

5226

Elevatio

NORTH NORTH ELEVATION ELEVATION 1:100

1:100

Dwg No.

BA 20 Scale

a

1:50 @4/A Date

T

E 16-05-20

A

North Elevation NORTH ELEVATION 1:100

Rev.

architectu

4/147 Liverpoo

T (03) 6234 56 E info@idwarch ACC. Number.

My Role I was assigned to the project after an initial planning application had been lodged but met complications with being over budget, in response the client scrapped the addition of a second structure deciding to add on additional elements to the holiday home instead. In terms of design much of the internal plan remained the same from the previous DA, my role was to design and draw the new additions (the new facade, roof and decking). Alongside Architect Andrew Williamson we met with the client twice to agree to changes and confirm the design. I drew up a revised DA which was submitted and accepted and subsequently worked on the Building Application, being responsible for detailing, making adjustments with the correspondence of a structural engineer.


COLOURBOND ROOF CLADDING "ANTICON 55" FOIL BLACKET

NEW TIMBER TRUSSES OVER EXISTING

LEGEND HT - HOT TUB PC - POLYCARBONATE ROOFING SYSTEM SK - SKIRTING BOARD

R6 INSULATION

This d with a consu repor

All wo Code Stand Autho

EXISTING ROOF FRAMING/ TRUSSES

CC 302

Section CC Repitched Roof 1:50 @ A3

DO N Repo Archit NO.

D

SEE ALSO ROOF FRAMING DETAIL ENTRY CANOPY ROOF BEHIND

R3.8 ROOF INSULATION DOUBLE SIDED FOIL SISALATION

SKYLIGHT

Client

He

Addre

This drawing is to be read in conjunction with all associated specifications, consultants drawings, geotechnical report and other written instructions

PB

All works are to comply with the Building Code of Australia, relevant Australian Standards, Local and other relevant Authority regulations and By-laws

14 Orf

TIMBER CEILING LINING ON BATTONS TO UNDERSIDE OF PURLINS

Proje

Ha

DO NOT SCALE OFF DRAWINGS Report all discrepincies with IDW Architecture + Interiors NO.

DATE

Drawi

Se

NOTE

Dwg N

HT

BA

Sca

SK

FLOOR LINE

1:

Dat

Client

16

Helen & Ian Halliday

Rev

Address

14 Manning Drive, Orford BB Project

302 Halliday Residence

FOOTING AND FLOOR REFER TO BA 105 AND BA 106

Section BB 1:50 @ A3

Detailed Section D ROOF CLADDING

arch

4/147

NEW TIMBER TRUSSES OVER EXISTING

Drawing

" FOIL BLACKET

Elevations 02

T (03) E info ACC.

LEGEND HT - HOT TUB PC - POLYCARBONATE ROOFING SYSTEM SK - SKIRTING BOARD

Dwg No.

BA 202

ON

Scale

500 x 500 mass concrete pad footing to approved base

rth

no

16-05-2017

Job No.

Rev.

This drawing is to be read in conjunction with all associated specifications, consultants drawings, geotechnical report and other written instructions

450 dia. Bored Pier to approved base

1:50 @ A3 Date

All works are to comply with the Building Code of Australia, relevant Australian Standards, Local and other relevant Authority regulations and By-laws

EXISTING ROOF FRAMING/ TRUSSES

1506

ed base

Section CC Repitched Roof rth

architecture + interiors 4/147 Liverpool St

Hobart

NO.

TAS 7000

T (03) 6234 5644 E info@idwarchitecture.com.au ACC. Number. CC980Y

Y

DO NOT SCALE OFF DRAWINGS Report all discrepincies with IDW Architecture + Interiors

no

d footing approved 1:50to@ A3 base

DATE

NOTE This drawing is to be read in con

SEE ALSO ROOF FRAMING DETAIL

R3.8 ROOF INSULATION DOUBLE SIDED FOIL SISALATION

with all associated specifications consultants drawings, geotechni report and other written instructi

All works are to comply with the Code of Australia, relevant Aust Standards, Local and other relev Authority regulations and By-law

SKYLIGHT This drawing is to be read in conjunction with all associated specifications, consultants drawings, geotechnical report and other written instructions Client

DO NOT SCALE OFF DRAWIN Report all discrepincies with IDW Architecture + Interiors

C

16/3/16 TasWater sewer connec added March 2016

DATE NOTE Helen & IanNO.Halliday

All works are to comply with the Building Code of Australia, relevant Australian Standards, Local and other relevant Authority regulations and By-laws Address

PB

TIMBER CEILING LINING ON BATTONS TO UNDERSIDE OF PURLINS

DO NOT SCALE OFF DRAWINGS Report all discrepincies with IDW Architecture + Interiors

14 Manning Drive, Orford

16/3/16 TasWater sewer connection note added March 2016

C

NO.

DATE

Project

NOTE

Client Halliday Residence

Helen & Ian Hallid Drawing Address

Section 02 14 Manning Drive, Orford Dwg No.

Client

HT

Helen & Ian Halliday Address

SK

OR LINE

BA 302 Scale

14 Manning Drive, Orford Halliday Residence

Proposed Foundation Plan

Drawing

1:50 @ A3 Footing Plan

Date

Rev.

Job No. BA 105 1506 Scale

Drawing

Section BB 1:50 @ A3

Halliday Residenc

16-05-2017 Dwg No.

Project

FOOTING AND FLOOR REFER TO BA 105 AND BA 106

Project

1:100 @ A3

Footing Plan

Date

16-05-2017

architecture + interiors

Dwg No.

4/147 Liverpool St

Rev.

Hobart

C

TAS 7000

T (03) 6234 5644 E info@idwarchitecture.com.au ACC. Number. CC980Y

BA 105

Job No.

150

Scale

1:100 @ A3

architecture + interi

Date

4/147 Liverpool St

16-05-2017 Rev.

C

Job No.

1506

Hobart

T

T (03) 6234 5644 E info@idwarchitecture.com.au ACC. Number.


45

0d

ia.

50

0x

50

Bo

red

Pie

Part 1 work Placement : IDW 0m

as

r to

sc

ap

pro

on

cre

te

ve

pa

db

as

df

oo

e

tin

gt

Project: 12 oa

pp

Margaret Street

rov

ed

ba

se

Brief: House Extension, New Kitchen and decking. KEY EXISTING BUILDING LINE BOU

EV

ION

E-0

2

north

AT

DA

547

BO

UN

0

460

0

86 9

RY

RY

EL

BO

UN

DA

RY

NDA

8

TD This drawing is to be read in conjunction with all associated specifications, consultants drawings, geotechnical report and other written instructions

200 De 0 ck

BOWLING GREEN

210 ten 0 sio n Ex

E-0 1

10

EL EV

AT

DO NOT SCALE OFF DRAWINGS Report all discrepincies with IDW Architecture + Interiors

north

ION

176 18

All works are to comply with the Building Code of Australia, relevant Australian Standards, Local and other relevant Authority regulations and By-laws

NO.

DATE

NOTE

KEY BR - New Brickwork

Th wit is dra co h all win g rep nsult asso is to ort ants cia te be an d o draw d sp read All the ing ec in Co work r w s, ifica con Sta de o s are ritt geo tio jun en te n ctio Au nda f Aus to c ins chn s, n tho rds tra om tru ica rity , Lo lia, ply ctio l DO reg cal rele wit ns ula an va h th Re NO d n tio po T ns othe t Au e Bu CArch rt a SCA s il a r tr d ll nd re 16itectu dis LE By lev alian ing /3/1 re cre OF -la ant NO F 6T + p ws . a In incie DR W te DACAR A ad sPARK TE de aterriors s wit WIN d M se h ID GS arc we NO W

DP - Downpipe DS - Double Slider EL

EX - Existing

KEY

EV

AT

ION

E-0

3

BR - New Brickwork

GL - Glazing

DP - Downpipe

MW - Modified Window KEY

KEY 14

KEY

TE

h 2 r co 01 nne 6 cti

on

Kitchen Render

Address

Margaret Street Sandy Bay

EX - W

Project

EX BOWLING CLUB SHELTER

12 Margaret Street Aleterations + Additions Drawing

no

Site Plan

te

BR - New BRBrickwork - New Brickwork BR W TD - Timber Deck Dwg No. BR - New Brickwork Cli DP - Downpipe en DP - Downpipe 45o RELOCATED DP t DA 102 W - New Weatherboard He DP - Downpipe len EX - W GL ScaleGL GL GL GL DS - Double Slider SliderA DS - Double &I dd 1:200 @BOWLING A3 an re EX CLUB DS Ha 14 ss DS - Double Slider Date SHELTER llid GATE EX - Existing EX - Existing Or Man 22-05-17 ay EX - W EX - W for nin Pro d g Job No. Rev. je EX - Existing c Dr EX BOWLING CLU EX BOWL 1522 EX - W ive Ha t GL - Glazing GL - Glazing SHELTERSHELTER , BR l l i da BRICK WALL EX BOWLING CLUB W yR GL - Glazing Dra EXTENSION TD SHELTER e win Window MW - Modified Window MW - Modified s ide 45o Fo g 2100 RELOCATED DP This drawing is to be nc oti architecture + interiors BR e BR ng MW - Modified Window with all associated sp 4/147 Liverpool St Hobart TAS 7000 W W Pla GL GL TD - Timber Deck TD - Timber GL GL consultants drawings Dw GL Deck T (03) 6234 5644 gN n BR report and other writte E info@idwarchitecture.com.au o. W 45o 45o Number. CC980Y TD - Timber Deck RELOCATED DP ACC.DP DS RELOCATED BA Weatherboard W - NewWWeatherboard - New --- GATE Scale 1:100 --All works are to comp Scale 1:100 45o RELOCATED DP 1 GL GL Code of Australia, rel GL GLGL GLGL GLGL GL 05 W - New Weatherboard Scale Street ElevationStandards, unchanged Local and ET

DS - Double Slider

AR

ET

GL - Glazing

3000

ST

RE

EX - Existing

MA

RG

MW - Modified Window TD - Timber Deck W - New Weatherboard

Elevation

Elevation

2

3000

1

v.

Jo

bN

15

tec

o.

BRICK WALL BRICK WALL EXTENSION EXTENSION 2100 2100

tur

T (0 Liv E in 3) 6 erpo AC fo@ 234 5 ol St C. id 6 Ho Nu warc 44 ba mb hit rt er. ec ture .co m.a u

GL - Glazing

e+

Scale 1:100

---

TA

S7

4180

TD - Timber Deck

00

0

Elevation Elevation Street Elevation unchanged 1Back 1 Elevation W Elevation --- EX - Scale --1:100 Scale 1:100

---

Scale 1:100

3000

Street Elevation unc

W

Address

W

Margaret St Sandy Bay

o EX45 BUILDING LINE DEMOLISHED

4125

GL

GL

GL

GL

GL

EX

DS GATE

MW

Project

12 Margaret Aleterations

EX WEATHERBOARD EX WEATHERBOARD

EX WEATHERBOARD

Drawing

FLOOR Elevations

4180

EXISTING LATTICE

3

EX TIMBER FENCE

EX BUILDING EX BUILDING LINE DEMOLISHED LINE DEMOLISHED

1

Elevation

---

Scale 1:100

EX TIMBER EX TIMBER FENCE FENCE

EX BUILDING LINE DEMOLISHED

4125

Scale 1:100

EX BOWLING Dwg CLUB No.SHELTERS IN FRONT DASHED

W

W

4125

4125

---

2

EX FLOOR LEVEL

---

EX

Elevation EX

Rev.

EX IN EX BOWLING CLUB IN FRONT DASHED

3 Elevation ----Scale 1:100 Scale 1:100

architecture +

This is the first project that I was given from scratch, I was allowed to develop the DA from nothing4with consultation Extension Section from Andrew I was allowed to design the kitchen extension. Scale 1:100

---

---

MW

Date

EX BOWLING CLUB SHELTERS IN FRONT DASHED

Elevation 3 Elevation

3

MW Scale

MW

Street Elevation unchanged 22-05-17

Side Elevation

EX TIMBER FENCE

DA 201

Scale 1:100 1:100 @ A3

Elevation

Scale 1:100 My Role ---

W MW

EX

Elevation

4125

EX TIMBER FENCE

EX BUILDING LINE DEMOLISHED TD

3

NOTE

Str Scale 1:100

---

W

BRICK WALL EXTENSION 2100

DATE

2 E2 Elevation --S-

2 EX BOWLING CLUB SHELTER

EX WEATHERBOARD

Scale 1:100

---

NO.

1

BR

Section Section 4 Extension 4 Extension Extension -----Section Scale 1:100 Scale 1:100

4

DO NOT SCALE OFF Report all discrepincie Architecture + Interior

Client

EX WEATHERBOARD

EX TIMBER FENCE

Authority regulations

Scale 1:100

---

RELOCATED DP

Scale 1:100

GATE

0Y

EX TIMBER EX TIMBER FENCE FENCE

EX TIMBER FENCE

Section W 4- NewExtension Weatherboard

GATE

98

EXISTING LATTICE

MW - Modified Window

DS

EXISTING LATTICE LATTICE EXISTING CC

4180

EX TIMBER FENCE

DS GL

TD TD Elevation

2 TD

2100

int eri Extension Section 4 Extension Section ors

EX - Existing EXISTING LATTICE

GL

GATE

06 EXTENSION ---4/1archi Scale 1:100 47

GL DS

Elevation BRICK WALL

1

GL

-05

3000

GL

00 @ A3 -20 TD 17

te

C

EX TIMBER FENCE

DS - Double Slider

---

1:1

Da

16 Re

3000

EXISTING LATTICE

4180

DP - Downpipe

EXTENSION 2100

3000

BR - New BrickworkBRICK WALL

4180

KEY

4180

Client

4/147 Liverpool St

T (03) 6234 5644 E info@idwarchitectur ACC. Number.

EX WEATHERBOARD

Scale 1:100

The job was quite simple which allowed me more freedom to learn. The client also requested some renders which I made with Vectorworks and Renderworks. W

The DA was submitted when I left IDW.

EX BUILDING LINE DEMOLISHED MW

4125

EX EX TIMBER FENCE

FLOOR

EX BOWLING CLUB SHELTERS IN FRONT DASHED

3

Elevation

---

Scale 1:100


C

80Y CC9 .au

ture itec l St arch erpoo

Hob

.com 7 Liv 644 4/14 6234 5 itecture rch 3) T (0 @idwa r. fo be E in . Num C C A

rs terio 000 + inart TAS 7

6 No.

150

Job

017 Rev.

A3 0@

5-2 16-0

Date

105

1:10

le

Sca

No. Dwg

BA

Plan ting g win

Foo

Dra

e, Driv ress ing ann 14 M rd ce Orfo iden ject Res Pro iday ll a H Add

ay allid nH & Ia

n Hele

nt

Clie

N

ion junct con s, ad in e re fication ical to b n ci g is d spe eotech ions in draw ociate gs, g struct ing This all ass drawin tten in ri Build with ltants ther w n the su o with stralia con rt and mply nt Au levant repo to co leva re are lia, re other laws s ork nd stra ByAll w e of Au Local a s and n GS Cod dards, gulatio WIN n DRA IDW Sta ority re note OFF s with Auth tion LE e SCA epinci rs connec T cr is NO rio wer DO ort all d + Inte er se 2016 at ch Rep itect/1u6reTasW d Mar de h16/3 ad rc A OTE

---

Existing Ground Floor / Demolition Plan Existing Ground Floor / Demolition Plan

EXISTING EXISTING

Scale 1:100 Scale 1:100

RWH * RWH * HWC HWC

KITCHEN KITCHEN 14.3 M2 14.3 M2 EX EX SHED SHED

LIVING LIVING 19.6 M2 19.6 M2 W/C W/C 1.5 M2 1.5 M2

GAS GAS

Scale 1:100 Scale 1:100

TD TD

EX GATE EX GATE

REMOVE EX WINDOW REMOVE EX WINDOW AND MODIFY OPENING AND MODIFY OPENING TO SUIT NEW WINDOWS TO SUIT NEW WINDOWS

EXISTING EXISTING

report and other written instructions All works are to comply with the Building Code of Australia, relevant All works are to comply withAustralian the Building Standards, Local and other Australian relevant Code of Australia, relevant Authority regulations By-laws Standards, Local andand other relevant Authority regulations and By-laws DO NOT SCALE OFF DRAWINGS Report allSCALE discrepincies with IDW DO NOT OFF DRAWINGS Architecture + Interiors with IDW Report all discrepincies Architecture + Interiors NO.

DATE

NOTE

NO.

DATE

NOTE

RWH RWH

TIMBER DECK TIMBER 9.4 M2 DECK 9.4 M2

EX EX SHED SHED

LIVING LIVING 14.8 M2 14.8 M2

This drawing is to be read in conjunction with associated specifications, This all drawing is to be read in conjunction consultants drawings, geotechnical with all associated specifications, report and other writtengeotechnical instructions consultants drawings,

KITCHEN KITCHEN 34 M2 34 M2

NEW NEW SINGLE SINGLE SLIDER SLIDER

Proposed Ground Floor Plan Proposed Ground Floor Plan

DINING DINING 18.4 M2 18.4 M2

NEW DOOR

NEW DOOR

NEW DOOR

NEW DOOR

W/C W/C 5.5 M2 5.5 M2

LAUNDRY LAUNDRY 5.3 M2 5.3 M2

Client Client

LIVING LIVING 14.8 M2 14.8 M2

NEW WINDOWS NEW WINDOWS

Address

Margaret Street Margaret Street Sandy Bay Sandy Bay

Address

Project Project

12 Margaret Street 12 Margaret +Street Aleterations Additions Aleterations + Additions Drawing Existing / Demolition / Existing / Demolition / Proposed Plans Proposed Plans Dwg No. Drawing

Proposed Ground Floor Plan KEY KEY se d ba

Dwg No.

Demolish Wall Demolish Wall

Rain Head Rain Head

g to

app

rove

RWH RWH

* *

pad

n footi

rove

se d ba

Demolish Demolish

New Wall / Infill New Wall / Infill

* RAINHEAD TO BE MOVED SO WALL *CAN RAINHEAD TO BE MOVED SO WALL BE EXTENDED CAN BE EXTENDED

DA 103 DA 103 Scale

Scale 1:100

1:100 Date

@A3 @A3

Date 22-05-17

22-05-17

Rev. Rev.

ass 5

d

0m

Bore

1522 Job No.

architecture + interiors 4/147 Liverpool St + Hobart TAS 7000 architecture interiors

50 00 x

dia. 450

Job No.

1522

crete con

Existing Building Line Existing Building Line app

---

DINING DINING 9.9 M2 9.9 M2

LAUDNRY LAUDNRY 3.4 M2 3.4 M2

PROPOSED BUILDING PROPOSED EXTENTION BUILDING EXTENTION 2100 2100

NEW NEW WINDOW WINDOW

02 02 ---

PROPOSED DECK PROPOSED DECK

NEW NEW DOUBLE DOUBLE SLIDER SLIDER

Demolition Plan

EX GATE EX GATE

HALL HALL 8.3 M2 8.3 M2

nonr or th th

01 01 ---

to Pier

no

rth

C

NO

.

DATE

Kitchen Render

T (03) Liverpool 6234 5644St Hobart TAS 7000 4/147 E (03) info@idwarchitecture.com.au T 6234 5644 ACC. Number. CC980Y E info@idwarchitecture.com.au ACC. Number.

CC980Y


Part 1 work Placement : IDW Project: Forcett

Street

Brief: Provide renders to a client for sales purposes. House 1 Back Garden Render 1

House 1 Back Garden Render 2

My Role A Client (Building Developer) required a set of renders to use as the promotional material to sell 2 houses previously designed by Andrew. I modelled the buildings from the existing Vectorworks file using the drawing information to assign textures etc, before rendering with the internal Renderworks package. This gave me a great opportunity to familiarise myself with the software as well as the IDW way of laying out drawings as I spent a few days consulting the BA for the necessary information. After a meeting outside of town we drove past the building site and I got a proud photograph next to the for-sale sign with displaying one of my renders.


Both Houses Front Render

House 2 Parking Render

House 2 Back Garden Render


Part 1 work Placement : IDW Project: Fishy

Buisness

Brief: Fish and Chip shop barge: New Deck with seating plus ramp connecting decking to marina.

02

02

302

301

WHARF CONNECTION BRACKET REFER TO DETAIL

NEW GLVANISED STORAGE/SCREEN PLATFORM. 5mm GALVINISED PLATE WELDED ONTO 150x50x3 RHS WELDED ONTO 150 PFC BRACKET SEE DETAIL

rth no

GATE

NEW GALVANISED LADDER FRAMED "GANG PLANK" RAMP MODWOOD PLANKS RAMP SURFACE. ALUMINIUM SHS HANDRAILS. POSTS AND ALUMINIUM KICKRAIL SEE RAMP DETAIL

1316

ROOF OVER DASHED

01 303

740

This drawing is to be read in c with all associated specificatio consultants drawings, geotec report and other written instru

All works are to comply with t Code of Australia, relevant Au Standards, Local and other re Authority regulations and By-

DO NOT SCALE OFF DRAW Report all discrepincies with I Architecture + Interiors

ELEVATION E-03

6600

ELEVATION E-02

STEP

NO.

DATE

NOTE

Client

Phil Cooper WOBBLE WHEELS Address

Constitution Doc Hobart

BRACKETS UNDER SEE DETAIL

Project

Fishy Business 01 Drawing

302

01

LINE OF STEEL PERGPOLA FRAME ABOVE

02

100 SHS POSTS ELEVATION E-01

NEW TIMBER BENCHTOP TO RAILING EDGE

303

NEW MODWOOD DECK ON BATTENS @450 CENTRES OVER EXISTING STEEL DECK

301

PROPOSED FLO PLAN Dwg No.

BA-102 Scale

1:50 @ A3 Date

01-02-2017 3000

0

1

2

3000

3000

15

12000

1360

EXISTING PUNT DECK

PLATFORM

architecture + int

2.5m

4/147 Liverpool St

Hobart

T (03) 6234 5644

1:50 SCALE BAR

GALVANIZED STEEL PERGOLA FRAME

E info@idwarchitecture.com.a This drawing is to be read in conjunctio ACC. Number. with all associated specifications, consultants drawings, geotechnical report and other written instructions

SEE DETAIL ON BA 303

All works are to comply with the Buildin Code of Australia, relevant Australian Standards, Local and other relevant Authority regulations and By-laws

1355

GALVANIZED STEEL RHS PERGOLA FRAME WITH 100x5 SHS COLUMNS TO EXISTING FISH PUNT.

1050

HORIZONTAL SLATTED TIMBER S/STEEL SCREW FIXINGS, EQUALLY SPACED GALVANISED STEEL RHS FRAME @1000 CTRS TO EXISTING BARGE STRUCTURE

GALVANISED LADDER FRAMED "GANG PLANK" RAMP. ALUMINIUM PLATE RAMP SURFACE. ALUMINIUM CHS HANDRAIL, POSTS AND ALUMINIUM KICKRAIL.

DO NOT SCALE OFF DRAWINGS Report all discrepincies with IDW Architecture + Interiors NO.

DATE

NOTE

SEE DETAIL ON BA 301

PERSPEX WINDOW TO IMITATE EXISTING PORTHOLE DESIGN BARGE.

375

1425

Job

Rev.

2850

Client

Phil Cooper

GALVANISED STEEL BRACKET SECURED TO PUNT SUBSTRUCTURE. SEE DETAIL ON BA 301

STEEL HINGE WITH PIN FIXING TO WHARF EDGE. SEE RAMP DETAIL.

Address

Constitution Dock, Hobart Project

Fishy Business

My Role

Drawing

ELEVATION 03 Dwg No.

I was tasked with reworking a design after a more experienced member of staff left, the workBA-203 1:50 @ A3 turned out to be more complex than initial thought as elements that were supposed to already have been resolved were not. This included an issue with trying to ensure the access ramp 01-02-2017 connecting the barge to the marina was optimised for compliance for the maximum amount of time. SOUTH ELEVATION ELEVATION E-03 1:50 @ A3

Scale

Date

Rev.

0 1:50 SCALE BAR

1

2

2.5m

Job No.

1515

architecture + interiors 4/147 Liverpool St

Hobart

TAS 700

T (03) 6234 5644 E info@idwarchitecture.com.au ACC. Number. CC980

With this work being overdue when I received it, I had to work quickly in an area of detailing that was completely new to me, I had to calculate the angles based on low and high tide and was quite happy with my contribution to the design. The seating area was also redesigning to swell out in the middle to allow more circulation space behind it.


Ramp Section 1000 1000

89 X 3.5 SHS 89 X 3.5 SHS

300 X 20 PLATE 300 X 20XPLATE TO 300 20 PL TO 300 XTO 20 WH PL BOLTED BOLTED WH WITH 4 XTO M24 C WITH BOLTS4 X M24 C BOLTS

60 Ø C17 TUBE 60 Ø C17 TUBE CROSS BRACING CROSS BRACING

450 450

This drawing is to be read in conjunction with all associated specifications,

100 SHS GALVANISED STEEL COLUMNS WELDED TO STEEL PUNT

consultants drawings, geotechnical 01 RAMP SECTION DETAIL report and other written DETAIL instructions 01 SECTION 1:20 RAMP @ A3

1:20 @ A3 All works are to comply with the Building All works are to comply with the Building Code of Australia, relevant Australian Standards, Local and other relevant Authority regulations and By-laws DO NOT SCALE OFF DRAWINGS Report all discrepincies with IDW Architecture + Interiors

2100

NO.

DATE

TIMBER SCREENING TIMBER SCREENING

E E

750

50 Ø RAILING 50 Ø RAILING

Client

400

SEATING AT 600 CTRS

76 Ø CHS @ 450 76 Ø CHS @ 450 CENTRES CENTRES

NOTE

EXTENDED TIMBER BENCHTOP TO RAILING EDGE

1:20 @ A3

102 X 96 WOBBLE 102 X 96ON WOBBLE WHEEL 18mm WHEEL ONWELDED 18mm SPINDLES SPINDLES TO INSIDE WELDED OF TO INSIDE OF FRAME FRAME

CONCR CONCR WHARF WHARF

Phil Cooper Address

Constitution Dock, Hobart

TIMBER SLATS ONTO 60 SHS GALVANISED STEEL RAILING

Project

TIMBER TIMBER

Fishy Business

150 PFC 150 PFC

Drawing

02 Detail 03

BRACKETS FIXED BRACKETS FIXED TO BOAT TOP TO BOAT TOP @450 CENTRES @450 CENTRES

Dwg No.

Detail E

23mm MODWOOD 23mm DECK MODWOOD DECK

BA-303 BA-102

1:20 @ A3

1000 1000

60 SHS GALVANISED STEEL RAILING FRAME WELDED TO STEEL PUNT

02 PLA 02 1:20 PLA @ A3

150 ALUMINIUM 150 KICKALUMINIUM BOARD KICK BOARD

1600 1600

100 SHS GALVANISED STEEL PERGOLA FRAME

BLOCK BLOCK

Scale

1:20 @ A3 Varies Date

01-02-2017 14-12-16 15-01-2016 Rev.

Ramp Platform to Barge Detail

02 SEATING AND PERGOLA DETAIL

01 PLATFORM TO PUNT CONNECTION DETAIL 01 TO PUNT CONNECTION DETAIL 1:20 PLATFORM @ A3

02 ELEV 02 1:20 ELEV @ A3

1:20 @ A3

1:20 @ A3

Detail A Plan 1:20 @ A3 architecture + interiors

1:20 @ A3

4/147 Liverpool St Hobart TAS 7000 T (03) 6234 5644 E info@idwarchitecture.com.au ACC. Number. CC980Y

300

50 Ø RAILING

This drawin with all asso ass consultants report and o

89 X 3.5 SHS

All works ar Code of Au Standards, Authority re

60 Ø C17 TUBE WELDED BRACING

DO NOT SC Report all d Architecture

89 X 3.5 SHS

TIMBER SCREENING

23mm MODWOOD DECK FIXED TO TIMBER

Job No.

1515

Pergola Detail

23mm MODWOOD DECK FIXED TO 76 CHS RUNNING PERPENDICULAR @450 CENTRES

76 X 3.5 SHS

89 X 3.5 SHS

STEEL HINGE FOOTPLATE WITH NON MARK RUBBER UNDER ONE SIDE

150mm ALUMINIUM KICK BOARD 76 X 3.5 SHS

NO.

DATE

STEEL HINGE PIN FIXING TO WHARF Client

Phil C

20 PLATE

Address

Consti Hobar

150 PFC

Project

BRACKETS @910 CENTRES

Fishy Drawing

910

01 PLATFORM TO RAMP DETAIL 1:20 @ A3

Ramp to Deck Detail

910

Detail 02 RAMP TO WHARF CONNECTION DETAIL 1:20 @ A3

Ramp to Wharf Detail

Dwg No.

BA-3 BA-1 Scale

Plan 1:100 @ A3

1:20 @ Varies Date

01-02 14-12 15-01 Rev.



Chapter III:

Undergraduate


1st Year : Design 1C Project: Facade

Project

Brief: To Design a facade for an Artist’s [Roddy Buchanan] Studio in North Berwick 1 - Brick [neutral grey Flemish bond] 2 - Concrete Strip Foundation 3 - Air Gap 4 - Compact Hardcore 5 - Glass Bricks 6 - Concrete 7 - Insulation 8 - Skirting Board 9 - Flooring 10 - Window Frame 11 - Double Glazed Window [Opens] 12 - Double Glazed Window [Fixed] 13 - Stone Lintel 14 - Stone Sill 15 - Stone Window Support Frame 16 - Main Entrance 17 - Steel Balcony Frame 18 - Timber Wall Plate 19 - Rafters 20 - Plaster Board 21 - Concrete Interlocking Roof Tiles 22 - Blocks 23 - Weep Hole 24 - Membrane 25 - Outdoor Stone Flooring

Axonometric

The Project My understanding of artist Roddy Buchanan was that his art was based in observation: trying to notice things often missed and gift attention to these small discoveries. It was therefore important that my facade design delivered mechanisms for Roddy to engage in the 2 elements: Observation and Display. A range of viewpoints for the artist is given through the rooftop balcony and mid-level box windows. A step back from the street creates a invite to pedestrians as well as a wall to project current work to the public.


Grade 68 A Method for

Photo Montage

Street Elevation

Context Model


2nd Year : Design 2C Project: Constructive

D D

Interference

Brief: Small Library with 6000 books On the University of St Andrews Campus

1 - Main Library Space [A-L] 1

2 - Toilet

4 4

2

3 2 3

1

5 5 3 3 14 14 9 10 2 9 10 11 2 2 11 2 2 13 12 14 13 12 14

2

4 - Environmental Entrance

7 7 8 8

2 2

2

3 - Lounge Area

6 6

4 4

5 - Lobby Desk 6 - Computer Area 7 - Exhibition Space 8 - Lecture Theatre 9 - Plant Room 10 - Staff Workspace 11 - Staff Room

Ground Floor Plan

12 - Twin Bedroom

D

pace rs

13 - Kitchen/ Living room 14 - Closet 15 - Main Library Space [M-Z] 1

2

4

3

16 - Reading Room

17

6

15

17 - Study Corals

5 17

7 3

2 2

17

2

12

4

9

10 11

8

14

2 2 14

13

16

First Floor Plan

The Project During the class site visit I spent some time thinking about what site to pick while skipping stones, this experience became the seminal inspiration for the rest of the project. The library form was influenced by 2 concepts: the ripple patterns generated by a skipping stone and the tide retreating to reveal unseen forms. The site closest to the sea was chosen with the site being treated as though a stone had skipped across it. From a practical aspect the size had multiple approach directions from the existing university library in the south and street access from the north. The ripples addressed these approach paths to provide a passage through the library.


Grade 65 A Method for

ELEVATIONS Photomontage

Street Entrance Elevation

Rear Entrance Elevation

Technical Section


3rd Year : Exchange Building Technology Project: City

of Justice: a New Law

Brief : To analyse a given building (City of Justice by David Chipperfield), model in detail in Rhino then change the facade using grasshopper.

City of Justice Analysis

The Project

Development of new law

For this project I was assigned a building (City of Justice by David Chipperfield) to first analyse from a building technology perspective and model using Rhino. From there the task was to suggest an adjustment to the building facade and justify the change: the changed facade had to be modelled in Rhino using the Grasshopper plug in. This was my first time using either software. The City of Justice has an austere and authoritative presence which is rigid and orderly but to the point of being anti-people. I perceived that it could be more playful and inviting whilst still following strict rules: hence the introduction of a new law to the facade. The new rule introduced diminishing sin waves to the facade to keep the top rigid but the bottom more inviting. This was also inspired by the Frank Gehry [Dr Chau Chak Wing] Building on campus at UTS.


Axonometric of City of Justice : A New Law

New Window Detail

Grid overlay


4th Year : Design Project: The

Hoptimist

Brief : To design a building in Govan with a social agenda Process Flowchart Rain Reservoir at the Cloud Container

Plant Water from the Cloud Container

When the rain water overflows the tank it spills over into the cloud containers Rain Reservoir

Rain Water

Rain Water Collection

Process done within Masterplan Barley is imported from local farmed due to a combination of abundance and the scale required

On the other hand when there is not enough water from the rain water collection plant water from the Cloud Container is used

Raw Barley

Picking

Hops Plants

Milled Grain

Milling

Drying Hydroponic system

Nutrients

Produced on Masterplan

Imported to Masterplan

Wet Hops

HOP FARMING

Dried Hops

Packaging

When the hops are freashly picked wet hop beer can be made.

PROCESSING

Zone Plan Education

Education

Exhibition

Brewery Bar Processing

Hops

The Project The Hoptimist was an optimistic approach to engaging the topic of alcohol by trying to add a sense of pride and value to the process of brewing. Using a solar panel pink light hydroponic farming system to grow hops in Scotland : the only ingredient in beer that is not currently grown in Scotland. With the recent rise of craft beer and Scottish brands like Brewdog and Innis & Gunn it seemed like this was an industry on the up that could bring value and attraction to Govan. The elements of this project that I am proud of centre around the analysis of a set of complex processes and breaking that down into usable data. The building tries to do a lot of things, but it is most successful in the way it connects its internal hop growing process and in the way it was to engage with the other members of the masterplan.


Grade 4a

4b

68 / 58 A Method for

Drinking Water From the Cloud Container

The Water is coming from the Clyde and being purified less than 200m from where it becomes beer

Mashing

Composting For The Orchard

The Water is coming from the Clyde and being purified less than 200m from where it becomes beer

Yeast Cultivation

Spent Grain Wort Separation Boiling

Yeast Cooling Heat

Yeast from a previous batch often self cultivates if left between batches which means it doesnt have to be replenished often

Fermentation Cans are recycled elsewhere and new cans are made from the old ones to be brought back to site

CO2

Keg Cleaning

Dirty Keg

Clean Keg

Consumed

Kegging

Keg of Beer

Conditioning

Packaging

New Can

Canning

Can of Beer

Recylcing

Empty Can

Consumed

BREWERY

Structural Diagram of Indoor hops farm with brewery

BAR



1st Year : Cultural Studies Project: A

Story of Newtons Cenotaph

Brief : Create an artwork based on a given building (Newtons Cenotaph)

Grade 73 A Method for


3rd Year : Cultural Studies Project: A

Story of my host City

Brief : Create a series of 4 pieces telling a story of the host city of exchange (Sydney)

1

3


Grade 58 A Method for

2

4



Chapter IV:

Other


Other : Archifringe Project: The

Other Tradition Exhibition

My Brief: To design the exhibition stands for the 36 A0 sheets displaying the groups work. My Role - Surveying the Building With a brief window of access before the date of occupation, I led a small group to quickly survey the site. Producing a useful model on my laptop. -D Designing the frames For the frames we exclusively used wood reclaimed from the end of year exhibition. By taking initial stock of the available wood I was best able to design in way which ensured we would not need to purchase any more material for my aspect of the exhibition. After consulting with a few team members I came up with a McIntosh inspired design, using some quick renders, I was able to get the approval of the other 33 team members

x5 Main Exhibition

Models

Main Circulation

x4 Wall of Curiosity

Presentation Space


- Building the Frames The Night before we had access to the site I organised the necessery timber, cut to the required sizes and labelled for transport. I generated working drawings of the frames from the design model which I used on site to direct my team mates in assembling the frames. - Opening Night Opening night was a great sucess, highlighted by an inspiring presentation given by Architect David Page of Page Park Architects.

Render compared to As Built


Other : Spray Paint Art Project: Bamboo

Pandas

Description Spray paint onto MDF. This piece was a Christmas present to my mum based on an ongoing family joke that she loves pandas. It was a big hit and currently hangs in the family kitchen.


Other : Spray Paint Art Project: Awaken

the Kawai Bees

Description Spray paint onto MDF. This piece was a present to my friend Gregor for moving into his first flat. It is a mash up of album artwork by 2 of his favourite artists Childish Gambino and Tyler the creator. It currently hangs in his bedroom.


Undergraduate : Acamemic Script

Grade : 2 : 1

First Year

Second Year Class

Grade

Design 1 A Design 1 B Design 1 C Design 1 D Cultural Studies 1 Technology Studies 1

65 65 68 58 73 58

Third Year

Class Design 2 A Design 2 B Design 2 C Cultural Studies 2 Technology Studies 2 Mobile Lands 1 Mobile Lands 2

Grade 60 55 65 55 59 70 62

Fourth Year Class

Grade

Design 3 A Design 3 B [Exchange] Introduction to Practice Cultural Studies 1 Technology Studies 1

58 68 62 58 48

second semester exchange at University of Technology Sydney Exchange Classes Acoustics and lighting Group Design Building Technology

Class Design 4 A Design 4 B Cultural Studies 4 (Dissertation) Architectural Publications

Grade 68 58 68 72


Post Graduate : Acamemic Script

Grade : Distinction

Class Design 5 A Design 5 B Cultural Studies 5 Combined Electives (BIM and ICT) Professional Studies Masters Thesis

Grade 70 72 76 72 77 90


Jon Powell

RIBA part II M Arch w/ Distinction [University of Strathclyde]

Email : jonnypowell95@gmail.com

Mob : 07825 291074


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.