Kansas City Zoo Metro Station Spring 2021

Page 1

KANSAS CITY METRO: KANSAS CITY ZOO STATION HANNAH NEHMER & JORDAN YARNELL COMPREHENSIVE STUDIO / ARCH 609 / KAPILA SILVA 1


TABLE OF CONTENTS

2

UNDERSTANDING SITE

4-9

UNDERSTANDING FORM

10-15

UNDERSTANDING FUNCTION

16-21

ENTRY DESIGN

22-25

GROUND LEVEL

26-33

LOWER LEVEL 1

34-39

LOWER LEVEL 2

40-47

PLATFORM

48-53

UNDERSTANDING CONSTRUCTION

54-69

FINAL DESIGN

70-73

3


05 NS-01

Leavenworth

NS-02

MCI Airport

NS-03

Tiffany Springs

NS-04

Linden Park

NS-05

Briarcliff

08 BL-22

Liberty Hospital

BL-21

Downtown Liberty

BL-20

Glenaire

BL-19

Claycomo

BL-18

Worlds of Fun

13 Kansas Speedway

N. Kansas City

OR-01 RL-03 NS-06

Avondale

RL-04

Fairfax

PROJECT PROMPT

C. Wheeler Airport

NS-07 RL-02

10 KCK Community Collage

PR-01

Quindaro

OR-02

s sa

i Missour

r

ve

Ri

n Ka

RD-05 BL-17

East Bottoms

River Market

NS-08

Casino KC Courthouse

NS-09

Kessler Park

03 Wyndotte High School OR-03

West Bottoms

Downtown KCK

PR-02 RL-01 OR-04

Power & Light OR-06 NS-10

OR-05

OR-07 BL-13

In this studio, each team designed an individual metro rail station that connects Kansas City together in collaboration with the City of KCMO, City of KCKS, and Kansas City Area Transportation Authority (KCATA). Public transit is an important part of a well-integrated city. It provides social, ecological, economical, and culturally sustainable benefits to the entire city.

12

KC Soccer Dome

River

OR-11

Independence

BL-16

BL-15

RL-06

Sheffield

BL-14

18th & Vine

Grove Park OR-08

Blue Valley OR-09

RL-07 OR-10

Blue Summit

The project has two main features: an underground station box component and an above ground main lobby. Each hub is designed to provide more than transport, and is specific to each site location and surrounding amenities. They are to become an icon or landmark to the area for both patrons and tourists.

Crossroads IL-06 NS-11

04 West Side North

IL-05

Washington Sq. Pk.

Armourdale

PR-04 NS-12

PR-03

PR-05 BL-12 IL-07

Truman Med Center

Penn Valley IL-04

PR-06IL-08

CC-Penn Valley

KU Medical Center

Shawnee

BL-10 IL-03

RL-14

BL-11 NS-13

Westport BL-09

27th & Prospect

VA Med Center

IL-09

PR-07

Spring Valley NS-14 PR-08

Roeland

IL-10

Troost North

Seven Oaks

IL-02 NS-15

Counrty Club Plaza

Troost South IL-11 PR-09

Merriam Town Center GR-08 RD-13

BL-08 RD-07

State Line

Mission

01

Ivanhoe Park

02

NS-16 PR-10 IL-01

GR-06

GR-04

GR-07

Brush Creek

Truman Sports Complex RL-08 GR-03

UMKC

Brookside NS-17

PR-11

Blenheim Square

Old Town Overland Park BL-07 RD-12

Pinegate West GR-09 Hale Cook NS-18

PR-12

GR-02

Camp Creek

GR-01

I-70 & I-470

Swope Park

BL-06

Shawnee Mission West

Shawnee Mission Park GR-10

Leawood NS-19 BL-05

15

RL-09

Johnson County Library

PR-13

KC Zoo

14 Dodson RL-10

St. Joseph Med RL-11 NS-29

Overland Pk. Conv. NS-21 BL-04

Oak Park Mall

SL-02

17

NS-B1

Jeffreys

PR-14

Raytown North

PR-15

Raytown South

16

Leawood SL-02

SL-13

Avila

Corporate Woods NS-22 BL-03

SL-03

Town Center

SL-04

St. Luke’s South

Market Center SL-12

Legend

Lenexa South JCCC NS-23

BL-02

Connecting Transportation

Prairie Fire SL-11

Olathe North High School

PR-16 NS-B2

St. Luke’s Hospital

Grandview City Bus

KU Edwards BL-01

NS-24 SL-05

Kensington

PR-17

09 Blue Valley SL-09

Overland Park

Highland View SL-08

Download Maps 4 2021 Kansas City Metro Design Group

Lee’s Summit

11 SL-06

MNU

NS-26

06

Wellington

NSL

North-South Line

PRL

Purple Line

BLL

Blue Line

IL

Inner Loop

ORL

Orange Line

RL

Red Loop

GRL

Green Line

SLRT

Silver LRT

Station Code NS-B3

SL-07

Streetcar

Lines

Lakewood SL-10

Downtown Olathe

Olathe East NS-25

Airport

07

Belton

Line Colour

Interchange Code OR-06 NS-10 Standard Transfer

GR-01 Line Code

Station Number

RL-09

PR-13

Tap Out to Transfer

5


STARLIGHT THEATER

KANSAS CITY ZOO

SITE

SWOPE PARK

NEIGHBORHOOD

RED LOOP RED LINE North KC

Downtown KCK Shawnee RL14

RL01 O04 P02

RL03 NS06 RL02

RL04

Avondale

Fairfax Merriam Town Center RL13

RL06 Sheffield

G08

OldTown RL12 BL16

RL05 KC Soccerdome BL07

St. Joseph

KC Zoo

RL11 NS20

RL09 P13 RL10

Dodson

RL08 G03

RL07 Blue Summit O11

Truman Sports Complex

PURPLE LINE

6

7


SITE PLAN SCALE: 1” = 80’-0” 8

N 9


FORM DIAGRAM

LEGEND STARLIGHT THEATER

KANSAS CITY ZOO

GROUND LEVEL

LOWER LEVEL 1

LOWER LEVEL 2

STATION BOX/PLATFORM

1

SITE LOCATION AND RAILWAY ORIENTATION The train’s trajectory is between both the Starlight Theater and the KC Zoo going from south to north. This led to a natural decision of our site being located between the two amenities so that the hub can be used by both the theater and zoo.

3 FORM INSPIRATION With our site being adjacent to the KC Zoo and located in Swope Park, a tree became an early design inspiration. The idea of a main tree’s canopy led to the creation of the levels designed radially.

6

PATTERN INSPIRATION The pattern of a leaf became inspiration for the look and design of the roof membrane.

10

4 SITE, FORM, AND ENTRANCE RELATIONSHIP The 40 ft site elevation change from the Starlight Theater to the KC Zoo led to the design of two separate entrances on different floors. Both serve a separate function, the first being a main dropoff location and access to the theater and the second being designed for direct access to the zoo.

7 ROOF SHAPE The material transparency of the roof is dictated by location and desired level of light. Perforated metal panels help cover the areas in need of shade while glass above the structural trees provide ample natural daylight to highlight the design.

2

HUB AND STATION BOX LOCATION The station box was able to be completely underground in the hill on the chosen site which led to the decision of the hub location being more in the middle. This allowed the hub to have adequate space without the need to build too high and compete with the theater and zoo.

5 MAIN VERTICAL CIRCULATION SHAFT Inspired by the way a tree’s canopy protects the forest floor, we created a roof that acts as a canopy over all the programmed spaces of the hub. The “trunk” of the tree became the main form of vertical circulation for all the hub floors.

8 FINAL FORM DESIGN The final hub design with three radial levels, roof membrane, vertical circulation, and access to the station box.

11


FULL HUB EASTERN CUT-AWAY VIEW

12

13


HUB LAYERS AND STRUCTURAL TREE DIAGRAM

14

15


GIFT SHOP

GROUND LEVEL RESTAURANT OFFICES

OVERLOOK

GALLERY

LOWER LEVEL 1 CLASSROOMS INTERACTIVE EXHIBIT

LOWER LEVEL 2 FOOD COURT ALCOVE

LEGEND MAIN ENTRY TO TRAINS

MAIN ENTRY TO RESTAURANT

MAIN ENTRY TO GALLERY

ZOO ENTRY TO TRAINS

TRAINS TO ALCOVE

CIRCULATION DIAGRAM

16

17


GROUND LEVEL

MEP PLANTER LOWER LEVEL 1

LOWER LEVEL 2

LEGEND SUPPLY RETURN

MAIN MEP ROOM

HUB MEP DIAGRAM

18

19


GROUND LEVEL

LOWER LEVEL 1

LOWER LEVEL 2

LEGEND EXHAUST EGRESS

STATION BOX EXHAUST AND EGRESS DIAGRAM

20

21


MAIN ENTRY

22

23


MAIN ENTRY

24

25


D

3

2

5

1

5

A B

5

4

C

C

5

8

6

D

A

2

7

LEGEND

1

CONVENIENCE STORE

2

MEP ROOMS

3 KITCHEN 4 RESTAURANT

5

BALCONIES

6 OVERLOOK 7 OFFICES

8

ZOO GIFT SHOP

GROUND LEVEL (20’-0”) SCALE: 3/64” = 1’-0” 26

N 27


MAIN ENTRY

28

29


RESTAURANT

30

31


BALCONY

32

33


3 5

6

6

4 1

2 3

LEGEND

1

ZOO INFORMATION DESK

2

INTERACTIVE EXHIBIT

3

MEP ROOMS/STORAGE

4 GALLERY

5

UNLOADING DOCK

6 CLASSROOMS

LOWER LEVEL 1 (0’-0”) SCALE: 3/64” = 1’-0” 34

N 35


LOWER LEVEL 1

36

37


GALLERY

38

39


3

2

7 6 5 4

4

8

1

2 1

LEGEND

1

STORAGE

2

MEP SHAFTS

3

MEP ROOMS

4

TICKET OFFICE

5

FOOD COURT BOOTH

6 KITCHEN

LOWER LEVEL 2 (-20’-0”) SCALE: 3/64” = 1’-0” 40

7

SERVICE HALLWAY

8

OUTDOOR DINING ALCOVE

N 41


FOOD COURT

42

43


ALCOVE

44

45


STATION BOX ENTRANCE

46

47


PLATFORM LEVEL (-38’-0”) SCALE: 1/64” = 1’-0” 48

N 49


2

1

3 4

4 3

1

LEGEND

1

PLATFORM

2

FIRE ESCAPE STAIRWELL

3

OVERHEAD VENTILATION

2

4 RAILS

PLATFORM LEVEL (-38’-0”) SCALE: 1/32” = 1’-0” 50

N 51


PLATFORM

52

53


2

3

9' - 2"

4

24' - 10"

16' - 0"

5

6

20' - 0"

40' - 0"

7

8

18' - 2"

18' - 6"

9

10

15' - 8"

11

27' - 8"

12

23' - 3"

13

37' - 3"

14

30' - 0"

15

30' - 0"

16

30' - 0"

17

30' - 0"

18

30' - 0"

19

30' - 0"

30' - 0"

20

21

30' - 0"

22

37' - 3"

23' - 3"

23 27' - 8"

24 15' - 8"

UNDER PLATFORM EXHAUST

25 18' - 6"

26 18' - 2"

27

28

40' - 0"

20' - 0"

29 16' - 0"

30 24' - 10"

UNDER PLATFORM EXHAUST

AUXILLARY POWER ROOM

AUXILLARY POWER ROOM

FAN ROOM TRACTION POWER

FAN ROOM TRACTION POWER

PLENUM

EMERGENCY FAN ROOM

ELECTRICAL ROOM

PLENUM

ELECTRICAL ROOM

EMERGENCY MAINTENANCE STAIR

31 9' - 2"

EMERGENCY STAIR

PLENUM

EMERGENCY FAN ROOM

TOP SLAB 42' - 0"

PLENUM EMERGENCY MAINTENANCE STAIR

EMERGENCY STAIR

20' - 6"

1

CONCOURSE LEVEL 21' - 6" GAP BREAKER ROOM

EJECTOR ROOM

CUSTODIAL CLOSET

ELECTRICAL ROOM

STORAGE/ CUSTODIAL CLOSET

BATTERY ROOM

ANCILLARY MECHANICAL ROOM

AUXILLARY POWER ROOM

STORAGE/ CUSTODIAL CLOSET

GAP BREAKER ROOM

TUNNEL VALVE ROOM

BATTERY ROOM ANCILLARY MECHANICAL ROOM

PLENUM

PLENUM

EJECTOR ROOM

PLATFORM LEVEL 3' - 6"

CABLE ROOM

AUXILLARY POWER ROOM

SUMP PUMP

SUMP PUMP

RAIL LEVEL 0' - 0"

14' - 8"

3' - 6"

CABLE ROOM

CUSTODIAL CLOSET

ELECTRICAL ROOM

18' - 0"

TUNNEL VALVE ROOM

Sump Pump -14' - 8"

1

Section - 1/8" = 1'-0" 1/8" = 1'-0"

1

2

3

9' - 2"

4

24' - 10"

16' - 0"

5

6

20' - 0"

40' - 0"

7

8

18' - 2"

18' - 6"

9

10

15' - 8"

11

27' - 8"

12

23' - 3"

13

37' - 3"

14

30' - 0"

15

30' - 0"

16

30' - 0"

17

30' - 0"

18

30' - 0"

19

30' - 0"

30' - 0"

20

21

30' - 0"

22

37' - 3"

23' - 3"

23 27' - 8"

24 15' - 8"

25 18' - 6"

26 18' - 2"

27 40' - 0"

28 20' - 0"

29 16' - 0"

30 24' - 10"

31 9' - 2"

20' - 6"

TOP SLAB 42' - 0"

18' - 0"

CONCOURSE LEVEL 21' - 6"

RAIL LEVEL 0' - 0"

14' - 8"

3' - 6"

PLATFORM LEVEL 3' - 6"

Sump Pump -14' - 8"

Section - No Labels - 1/8" = 1'-0" 1/8" = 1'-0"

1

2

3

9' - 2"

24' - 10"

4

5

16' - 0"

6

20' - 0"

7

40' - 0"

18' - 2"

8 18' - 6"

9

10

15' - 8"

11

27' - 8"

12

23' - 3"

13

37' - 3"

14

30' - 0"

15

30' - 0"

16

30' - 0"

17

30' - 0"

30' - 0"

18

19

30' - 0"

20

30' - 0"

30' - 0"

21

22

37' - 3"

23' - 3"

23 27' - 8"

24 15' - 8"

UNDER PLATFORM EXHAUST

25 18' - 6"

26 18' - 2"

27 40' - 0"

28 20' - 0"

29 16' - 0"

30 24' - 10"

31 9' - 2"

UNDER PLATFORM EXHAUST

AUXILLARY POWER ROOM

AUXILLARY POWER ROOM

FAN ROOM TRACTION POWER

TOP SLAB 42' - 0"

FAN ROOM TRACTION POWER

PLENUM

EMERGENCY MAINTENANCE STAIR

EMERGENCY FAN ROOM

PLENUM

ELECTRICAL ROOM

EMERGENCY STAIR

ELECTRICAL ROOM

EMERGENCY STAIR

PLENUM

EMERGENCY FAN ROOM

PLENUM

EMERGENCY MAINTENANCE STAIR

20' - 6"

1

GAP BREAKER ROOM

EJECTOR ROOM

CUSTODIAL CLOSET

BATTERY ROOM

ANCILLARY MECHANICAL ROOM

AUXILLARY POWER ROOM

STORAGE/ CUSTODIAL CLOSET

PLENUM

CUSTODIAL CLOSET

ELECTRICAL ROOM

STORAGE/ CUSTODIAL CLOSET

GAP BREAKER ROOM BATTERY ROOM

ANCILLARY MECHANICAL ROOM

PLENUM

TUNNEL VALVE ROOM EJECTOR ROOM

AUXILLARY POWER ROOM

CABLE ROOM

SUMP PUMP

SUMP PUMP

PLATFORM LEVEL 3' - 6" RAIL LEVEL 0' - 0"

14' - 8"

3' - 6"

CABLE ROOM

ELECTRICAL ROOM

18' - 0"

CONCOURSE LEVEL 21' - 6" TUNNEL VALVE ROOM

Sump Pump -14' - 8"

1

Section - 3/32" = 1'-0" 3/32" = 1'-0"

1

2

3

9' - 2"

24' - 10"

4

5

16' - 0"

6

20' - 0"

40' - 0"

7 18' - 2"

8 18' - 6"

9

10

15' - 8"

11

27' - 8"

12

23' - 3"

13

37' - 3"

14

30' - 0"

15

30' - 0"

16

30' - 0"

17

30' - 0"

30' - 0"

18

19

30' - 0"

20

30' - 0"

30' - 0"

21 37' - 3"

22 23' - 3"

23 27' - 8"

24 15' - 8"

25 18' - 6"

26 18' - 2"

27 40' - 0"

28 20' - 0"

29 16' - 0"

30 24' - 10"

31 9' - 2"

20' - 6"

TOP SLAB 42' - 0"

PLATFORM LEVEL 3' - 6" RAIL LEVEL 0' - 0"

14' - 8"

3' - 6"

18' - 0"

CONCOURSE LEVEL 21' - 6"

Sump Pump -14' - 8"

1

Section - No Labels - 3/32" = 1'-0" 3/32" = 1'-0"

1

2

9' - 2"

3 24' - 10"

4 16' - 0"

5 20' - 0"

6 40' - 0"

7 18' - 2"

8 18' - 6"

9 15' - 8"

10 27' - 8"

11 23' - 3"

12 37' - 3"

13 30' - 0"

14 30' - 0"

15 30' - 0"

16 30' - 0"

17 30' - 0"

18 30' - 0"

19 30' - 0"

20 30' - 0"

21 37' - 3"

22 23' - 3"

23 27' - 8"

24 15' - 8"

25 18' - 6"

26 18' - 2"

27 40' - 0"

28 20' - 0"

29 16' - 0"

30 24' - 10"

31

9' - 2"

14' - 8" 3' - 6"

18' - 0"

20' - 6"

TOP SLAB 42' - 0"

1

CONCOURSE LEVEL 21' - 6" PLATFORM LEVEL 3' - 6" RAIL LEVEL 0' - 0"

Sump Pump -14' - 8"

Section - No Labels - 1/16" = 1'-0" 1/16" = 1'-0"

STATION BOX DEVELOPMENT

54

In this studio, we worked together as a team to design the station box. This allowed for each individual hub to have a platform that met the standard for the entire metro. 55


STARLIGHT THEATER

KC ZOO

NORTHEASTERN SECTION A SCALE: 3/64” = 1’-0” 56

57


B1 1

LEGEND 1 1/4” CARBON STEEL PERFORATED PANELING SYSTEM 1/2” CONNECTOR BOLTS 1” DOUBLE PANED STRUCTURAL GLAZING 6” DIAMETER X 3/4” STEEL CUSTOM PIPE FRAME 2 6” CONCRETE VAPOR BARRIER 4” GRAVEL

3 1 1/2” SNOW WHITE TERRAZZO DIVIDER CLIP 5” CONCRETE SLAB VAPOR BARRIER 2” RIGID INSULATION 4” GRAVEL

B2 2

3

4

B3 5

6

4 1 1/2” SNOW WHITE TERRAZZO DIVIDER STRIP 5” CONCRETE STEEL DECKING 5” STEEL BEAM 1/2” GYPSUM BOARD 5 HVAC

6 4” GRAVEL 2” RIGID INSULATION VAPOR BARRIER 18” CONCRETE 1/2” GYPSUM BOARD FURRING STRIPS STEEL CLIPS VERTICAL FIRE TREATED PINE WOOD CLADDING

B4

WALL SECTION B SCALE: 1/4” = 1’-0” 58

59


8

7

6

5

4

3

2

9 10

1

1 2 3 4 5 6 7 8 9 10 11 12 13 14

11 12 13 14 15 16

CUSTOMIZED MULLION SYSTEM FOR ROOFING PANELS 1/4” CARBON STEEL PERFORATED PANELING SYSTEM 1/2” CONNECTOR BOLTS VINYL GLAZING CAP 1” DOUBLE PANELED STRUCTURAL GLAZING

1

RUBBER PLATE

2

CUSTOM CONTINUOUS STEEL BLOCK THERMAL BREAK

3

2” BLANKET FIBER INSULATION

4

6” DIAMETER X 3/4” STEEL CUSTOM PIPE FRAME

5

3/4” STEEL PLATE

6

CUSTOM 2” DIAMETER HORIZONTAL ALUMINUM MULLION SYSTEM

7

CUSTOM 2” DIAMETER VERTICAL ALUMINUM MULLION SYSTEM 1” DOUBLE PANED STRUCTURAL GLAZING

8

8”X8” STEEL COLUMN

9 10

11

1 2 3 4 5 6 7 8

1” DOUBLE PANED STRUCTURAL GLAZING

9 10 11 12 13 14 15 16

8” X 8” STEEL COLUMN

17 18 19 20

VERTICAL FIRE TREATED PINE WOOD CLADDING

1 2 3 4 5

4” GRAVEL

6 7 8 9 10 11

VERTICAL FIRE TREATED PINE WOOD CLADDING

12 13 14 15 16

ALUMINUM STEEL TOP CROSS RAIL

CUSTOM 2” DIAMETER HORIZONTAL ALUMINUM MULLION SYSTEM 1/2” EXPANSION JOINT 6” CONCRETE VAPOR BARRIER 2” RIGID INSULATION 4” GRAVEL 18” CONCRETE

STEEL COLUMN PLATE 1 1/2” SNOW WHITE TERRAZZO DIVIDER CLIP 5” CONCRETE STEEL DECKING 5” STEEL BEAM 1/2” GYPSUM BOARD

FURRING STRIPS STEEL CLIPS 1/2” GYPSUM BOARD

17 12

18

13

19 20

14

B2

B1

TOP WALL DETAIL SCALE: 1” = 1’-0”

ROOF DETAIL SCALE: 3” = 1’-0”

11 12

6

13 14 15 16 17 18

7 1 2 3 4 5 6 7 8 9 10

1 2 3 4 5

11 12 13 14 15 16 17 18

6 7

8 9

8

1” DOUBLE PANED STRUCTURAL GLAZING

1

CUSTOM 2” DIAMETER HORIZONTAL ALUMINUM MULLION SYSTEM

2

9

1/2” EXPANSION JOINT

3

10

6” CONCRETE

4

11

4” GRAVEL

5

2” RIGID INSULATION VAPOR BARRIER EXPANSION JOINT 3’ CONCRETE SLAB

3/4” DRAINAGE MAT 8” CONCRETE FOUNDATION WALL CONCRETE DRAINAGE CONTROL 14” X 34” CONCRETE FOOTING 4” DIAMETER PERFORATED DRAINAGE PIPE 8” X 8” STEEL COLUMN

FURRING STRIPS STEEL CLIPS 1/2” GYPSUM BOARD 1 1/2” SNOW WHITE TERRAZZO DIVIDER CLIP

STEEL COLUMN PLATE 1 1/2” SNOW WHITE TERRAZZO DIVIDER CLIP 5” CONCRETE VAPOR BARRIER 2” RIGID INSULATION 4” GRAVEL

12

FURRING CHANNEL BLACK POWDER COATED ALUMINUM U-CHANNEL DOMINO JOINT SNOW GUM EXTERNAL WOOD GRAIN ALUMINUM PANEL

13 14 15

10

B3

60

16

FOUNDATION DETAIL SCALE: 1” = 1’-0”

B4

BOTTOM WALL DETAIL SCALE: 1” = 1’-0”

61


LEGEND

C2

1

2 1/2” SNOW WHITE TERRAZZO DIVIDER STRIP 5” CONCRETE STEEL DECKING 5” STEEL BEAM 1/2” GYPSUM BOARD

2

HVAC

3

VERTICAL FIRE TREATED PINE WOOD CLADDING FURRING STRIPS STEEL CLIPS 1/2” GYPSUM BOARD 7” BATT INSULATION 8”X8” STEEL STUD WALL VAPOR BARRIER 2” RIGID INSULATION HOUSE WRAP

4

2” FIRE TREATED EURO BEECH EXPOSED PLY EDGE PANEL EVERY 6” L-ANGLE BOLTED STEEL PLATE CONNECTOR

5

1 1/2” SNOW WHITE TERRAZZO DIVIDER CLIP 4” CONCRETE SLAB VAPOR BARRIER 2” RIGID INSULATION 8” GRAVEL

C1 1

2

3

6 4” GRAVEL VAPOR BARRIER 6” CONCRETE 8

4

C4 C3

7

4” CONCRETE SLAB 8” GRAVEL SLOPE: 1/4” / 1’-0”

8 12”X12” STEEL COLUMN

9 DRAIN

6

5

7

9

WALL SECTION C SCALE: 3/16” = 1’-0” 62

63


6 5 4 3 2 1

7

8 9 10 11 12 13 14 15 16 17 18

1 2 3 4 5 6

1 1/2” SNOW WHITE TERRAZZO

7 8 9 10

STEEL PLATE

19 20 21 22 23 24 25 26

C1

1 2 3 4 5 6 7 8 9

1/2” GYPSUM BOARD

6 5 4 3 2 1

BOLTS 8” X 8” STEEL COLUMN CUSTOM 2” DIAMETER VERTICAL

1” RECYCLED COMPOSITE WOOD DECKING

7 8 9 10

2” X 6” PINE RAILING

ALUMINUM MULLION SYSTEM

2X4 SUPPORT BATTONS STEEL CLIP 12” X 12” STEEL BEAM 2X8 TIMBER SUPPORT BEAM 8X36 CURVED STEEL H BEAM

STEEL CLIP 1/2” STEEL CABLE 2” FIRE TREATED EURO BEECH

1” DOUBLE PANED STRUCTURAL GLAZING CUSTOM 2” DIAMETER HORIZONTAL ALUMINUM MULLION SYSTEM

1” RECYCLED COMPOSITE WOOD DECKING 2 X 4 SUPPORT BATTONS STEEL CLIP

16 17 2X8 TIMBER SUPPORT BEAM 18 1/2” ANCHOR BOLTS 19 7” BATT INSULATION 20 1/2” STEEL PLATE 21 WELDED JOINT 22 STEEL SUPPORT H BEAM 23 6” X 8” STEEL STUD WALL 24 VAPOR BARRIER 25 2” RIGID INSULATION 26 HOUSE WRAP 12” X 12” STEEL BEAM

EXPOSED PLY EDGE PANEL

11 12 13 14 15 16 17

TOP CROSS RAIL

1 2 3 4 5 6 7 8 9 10

STONE CAPSTONE

FURRING CHANNEL BLACK POWDER COATED U-CHANNEL 1/2” ANCHOR BOLTS STEEL SUPPORT BRACKETS STEEL BEAM DECKING SUPPORT STEEL MESH SCREEN

10 11 12 13 14 15 16 17

C2 24 25

26 27 28 29

16 17

18 30 19

31

20

32

21

33

22

34

23

64

5” STEEL BEAM

13 14 15

9

STEEL DECKING

1 2 3 4 5 6

TOP WALL DETAIL SCALE: 1” = 1’-0”

15 14 13 12 11 10

C3

5” CONCRETE

11 12

7 8

DIVIDER STRIP

BOTTOM WALL DETAIL SCALE: 1” = 1’-0”

1 2 3 4 5 6 7 8 9

VERTICAL FIRE TREATED PINE WOOD CLADDING

10 11 12 13 14 15

1 1/2” SNOW WHITE TERRAZZO

16 17 18 19 20 21 22 23

STEEL CLIP

9

1/2” STEEL CABLE

10

24 25 26 27 28 29

2” FIRE TREATED EURO BEECH EXPOSED PLY EDGE PANEL

30 31 32 33 34

12” CONCRETE RETAINING WALL

FURRING STRIPS STEEL CLIPS 1/2” GYPSUM BOARD

RAILING DETAIL SCALE: 1” = 1’-0”

1 2

7” BATT INSULATION

3

8” X 8” STEEL STUD WALL

4

VAPOR BARRIER

5

2” RIGID INSULATION

6

HOUSE WRAP

BOLT SEALANT CONCRETE RETAINING WALL NATURAL LIMESTONE BLOCKS CONCRETE SUPPORT DRAINAGE MAT 1 1/2” GRAVEL DRAIN 4” GRAVEL

DIVIDER STRIP 5” CONCRETE STEEL DECKING

7

5” STEEL BEAM

8

1/2” GYPSUM BOARD

SUSPENSION CLIP TOP CROSS RAIL FURRING CHANNEL BLACK POWDER COATED U-CHANNEL SNOW GUM EXTERNAL WOOD GRAIN ALUMINUM PANEL DOMINO JOINT

L-ANGLE BOLTED STEEL PLATE CONNECTOR SEALANT UNDERLAYMENT STEP FLASHING METAL COUNTER FLASHING

VAPOR BARRIER 2” RIGID INSULATION HOUSE WRAP GRAVEL

C4

PLANTER DETAIL SCALE: 1” = 1’-0” 65


SOUTHEASTERN SECTION D SCALE: 1” = 40’-0” 66

67


SOUTHEASTERN SECTION D 68

69


EXTERIOR FACING NORTH

70

71


ZOO ENTRY

72

73


74