PASSIVE HOUSE
WALL SCHEDULE P1 - 1/2" GYPSUM WALL BOARD - 2"x4" WOOD STUDS @16" O.C. - 1/2" GYPSUM WALL BOARD
W1 - WOOD SIDING - 1/2" AIR SPACE - 3" RIGID INSULATION - VAPOUR BARRIER - 1/2" PLYWOOD SHEATHING - 2"x6" WOOD STUDS @16" O.C. - 5 1/2" BATT INSULATION - MOISTURE BARRIER - 1/2" GYPSUM WALL BOARD
P2 - 1/2" GYPSUM WALL BOARD - 2"x6" WOOD STUDS 16" O.C. - 1/2" GYPSUM WALL BOARD
W2 - WOOD PLANKS - 1/2" AIR SPACE - 3" RIGID INSULATION - VAPOUR BARRIER - 1/2" PLYWOOD SHEATHING - 2"x6" WOOD STUDS @16" O.C. - 5 1/2" BATT INSULATION - MOISTURE BARRIER - 1/2" GYPSUM WALL BOARD
FD1 - 2 LAYERS BITUMOUS DAMP PROOFING - 3" RIGID INSULATION - 8" C.I.P. CONCRETE FOUNDATION
W3 - PLANT LIFE - 3" RIGID INSULATION - VAPOUR BARRIER - 1/2" PLYWOOD SHEATHING - 2"x6" WOOD STUDS @16" O.C. - 5 1/2" BATT INSULATION - MOISTURE BARRIER - 1/2" GYPSUM WALL BOARD
SHEET LIST SHEET NUMBER
A1U1 + A2U2 + A2U2 + A2U2 + ... U0 = A1 + A2 + A3 + A4 + ...
No.
SCHOOL OF SUSTAINABLE BUILDING AND ENVIRONMENTAL MANAGEMENT ARCHITECTURAL TECHNOLOGY INTERIOR DESIGN TECHNOLOGY
PASSIVE HOUSE TERM PROJECT
Description
Date
COVER PAGE SITE PLAN MAIN FLOOR PLAN SECOND FLOOR PLAN ROOF PLAN NORTH ELEVATION EAST ELEVATION SOUTH ELEVATION WEST ELEVTION BUILDING SECTION A BUILDING SECTION B WALL SECTION A WALL SECTION B SECTION DETAILS PLAN DETAILS RENDERINGS
COVER PAGE Project number Date Drawn by Checked by
ARCT 2510 APRIL 25 2019 JOSHUA PERRAS MEHDI ZAHED
A0.1 Scale 3/16" = 1'-0"
2019-04-24 5:28:52 PM
A0.1 A1.1 A2.1 A2.2 A2.3 A3.1 A3.2 A3.3 A3.4 A3.5 A3.6 A4.1 A4.2 A5.1 A6.1 A10
SHEET NAME
164' - 0 1/2"
26' - 4 13/32"
GAZEBO
34' - 1" 17' - 11 1/32"
PROPERTY LINE
1' - 0 15/32"
16' - 4 13/16"
9' - 3 1/2"
PLAYGROUND
SOLAR VOLTAIC PANELS
4' - 11 17/32"
25' - 0"
98' - 5 3/32"
82' - 0 5/16"
27' - 1 13/32"
ROAD ACCESS
16' - 4 13/16"
SITE PLAN 1" = 20'-0"
No.
SCHOOL OF SUSTAINABLE BUILDING AND ENVIRONMENTAL MANAGEMENT ARCHITECTURAL TECHNOLOGY INTERIOR DESIGN TECHNOLOGY
PASSIVE HOUSE TERM PROJECT
Description
Date
SITE PLAN Project number Date Drawn by Checked by
ARCT 2510 APRIL 25 2019 JOSHUA PERRAS MEHDI ZAHED
A1.1 Scale 1" = 20'-0"
2019-04-24 5:28:53 PM
1 A1.1
147' - 7 11/16"
No. Date
MAIN FLOOR PLAN
Project number Date Drawn by Checked by
ARCT 2510 APRIL 25 2019 JOSHUA PERRAS MEHDI ZAHED
A2.1
Scale 3/16" = 1'-0"
2019-04-24 5:28:53 PM
7' - 6" 14' - 9" 9' - 8"
2' - 2 3/4"
A2.1
1
2' - 4 3/4"
3' - 6" 1' - 10" 2' - 2" 5' - 1" 5' - 1" 2' - 4 1/4"
PASSIVE HOUSE TERM PROJECT DN
A3.6
1
W2
MAIN FLOOR PLAN 3/16" = 1'-0"
7' - 3 1/4"
146 SF
104
1 A6.1
W3
49 SF
101
A3.5
1
59 SF
103
BATH
4' - 10"
193 SF
102
KITCHEN
DW
15' - 11"
82 SF
105
3' - 2 1/4"
W1
31' - 11" REF.
A4.2
1
A3.6
1
101 102 103 104 105 201 202 203 204 205 S1 S1
NUMBER
ENTRY KITCHEN BATH LIVING ROOM GREENERY BED BATH BATH HALL BED STAIR STAIR
NAME
49 SF 193 SF 59 SF 146 SF 82 SF 113 SF 38 SF 61 SF 64 SF 108 SF 103 SF 100 SF
AREA
ROOM SCHEDULE
GREENERY
103 SF
S1
W1
5' - 4 1/2"
STAIR UP
ENTRY
2 A6.1
LIVING ROOM
A4.1
1
2' - 6 1/4"
8' - 10"
24' - 9"
A3.5
1
8' - 0"
INTERIOR DESIGN TECHNOLOGY
6' - 8 3/4"
ARCHITECTURAL TECHNOLOGY
16' - 6"
SCHOOL OF SUSTAINABLE BUILDING AND ENVIRONMENTAL MANAGEMENT Description
38 SF
202
A4.2
201
BATH
1
BED
A3.6
1
W1 12' - 5 1/4"
1
A2.2
SECOND FLOOR PLAN 3/16" = 1'-0"
1 A3.6
1
W2
BED
8' - 3 1/2"
A3.5
64 SF 108 SF
113 SF
204 205
HALL
4' - 0" DN
3' - 8" A4.1
1
W1
8' - 10"
100 SF
S1
W2
24' - 9"
A3.5
1
15' - 11"
STAIR
W1
8' - 5 3/4"
61 SF
10' - 8"
203
6' - 8 1/2"
6' - 2 3/4"
BATH
32' - 1" 2' - 4 1/4"
2' - 2"
10' - 2"
3' - 6" 1' - 10"
2' - 2 3/4" 14' - 9"
7' - 6"
SCHOOL OF SUSTAINABLE BUILDING AND ENVIRONMENTAL MANAGEMENT ARCHITECTURAL TECHNOLOGY INTERIOR DESIGN TECHNOLOGY
PASSIVE HOUSE TERM PROJECT
Description
Date
SECOND FLOOR PLAN Project number Date Drawn by Checked by
ARCT 2510 APRIL 25 2019 JOSHUA PERRAS MEHDI ZAHED
A2.2 Scale 3/16" = 1'-0"
2019-04-24 5:28:53 PM
9' - 10"
No.
RIDGE
ASPHALT SHINGLES
GABLE
SOLAR VOLTAIC PANELS
ROOF PLAN 3/16" = 1'-0"
No.
SCHOOL OF SUSTAINABLE BUILDING AND ENVIRONMENTAL MANAGEMENT ARCHITECTURAL TECHNOLOGY INTERIOR DESIGN TECHNOLOGY
PASSIVE HOUSE TERM PROJECT
Description
Date
ROOF PLAN Project number Date Drawn by Checked by
ARCT 2510 APRIL 25 2019 JOSHUA PERRAS MEHDI ZAHED
A2.3 Scale 3/16" = 1'-0"
2019-04-24 5:28:53 PM
1 A2.3
1' - 2"
T.O. ROOF 24' - 1"
1' - 4"
U.S. OF ROOF 20' - 0" WOOD PLANKS
6' - 0"
1' - 4"
3' - 1 1/8"
6' - 0"
1' - 6"
GRADE -1' - 6" TOTAL WALL AREA
1 A3.1
NORTH ELEVATION 3/16" = 1'-0"
WINDOW AREA
49 SQ. FT.
TOTAL AVE. R-VALUE
20
No.
SCHOOL OF SUSTAINABLE BUILDING AND ENVIRONMENTAL MANAGEMENT ARCHITECTURAL TECHNOLOGY INTERIOR DESIGN TECHNOLOGY
PASSIVE HOUSE TERM PROJECT
489 SQ. FT.
Description
Date
NORTH ELEVATION Project number Date Drawn by Checked by
ARCT 2510 APRIL 25 2019 JOSHUA PERRAS MEHDI ZAHED
A3.1 Scale 3/16" = 1'-0"
2019-04-24 5:28:54 PM
T.O. MAIN FLOOR 0' - 0"
1' - 4"
6' - 0"
6' - 0"
WOOD CLADDING
3' - 6"
T.O. SECOND FLOOR 10' - 0"
1' - 7"
WOOD CLADDING
SOLAR VOLTAIC PANELS
1' - 3 5/16"
T.O. ROOF 24' - 1"
3' - 1 1/8"
1' - 4"
U.S. OF ROOF 20' - 0"
T.O. SECOND FLOOR 10' - 0" 2' - 0"
1' - 10 3/4"
C.I.P. CONCRETE
5' - 0"
6' - 2 3/4"
11' - 4 3/4"
WOOD CLADDING
T.O. MAIN FLOOR 0' - 0" GRADE -1' - 6"
1 A3.2
EAST ELEVATION 3/16" = 1'-0"
WINDOW AREA
42 SQ. FT.
TOTAL AVE. R-VALUE
24
No.
SCHOOL OF SUSTAINABLE BUILDING AND ENVIRONMENTAL MANAGEMENT ARCHITECTURAL TECHNOLOGY INTERIOR DESIGN TECHNOLOGY
PASSIVE HOUSE TERM PROJECT
707 SQ. FT.
Description
Date
EAST ELEVATION Project number Date Drawn by Checked by
ARCT 2510 APRIL 25 2019 JOSHUA PERRAS MEHDI ZAHED
A3.2 Scale 3/16" = 1'-0"
2019-04-24 5:28:55 PM
TOTAL WALL AREA
SOLAR VOLTAIC PANELS
T.O. ROOF 24' - 1" U.S. OF ROOF 20' - 0"
3' - 1 1/8"
3' - 2 3/4" 3' - 6"
2' - 9 3/4" 4' - 4 1/2"
WOOD CLADDING
T.O. SECOND FLOOR 10' - 0"
3' - 1 1/8"
10' - 0"
WOOD PLANKS
C.I.P. CONCRETE
TOTAL WALL AREA
1 A3.3
SOUTH ELEVATION 3/16" = 1'-0"
513 SQ. FT.
WINDOW AREA
38 SQ. FT.
DOOR AREA
56 SQ. FT.
TOTAL AVE. R-VALUE
14
No.
SCHOOL OF SUSTAINABLE BUILDING AND ENVIRONMENTAL MANAGEMENT ARCHITECTURAL TECHNOLOGY INTERIOR DESIGN TECHNOLOGY
PASSIVE HOUSE TERM PROJECT
Description
GRADE -1' - 6"
Date
SOUTH ELEVATION Project number Date Drawn by Checked by
ARCT 2510 APRIL 25 2019 JOSHUA PERRAS MEHDI ZAHED
A3.3 Scale 3/16" = 1'-0"
2019-04-24 5:28:55 PM
1' - 6"
T.O. MAIN FLOOR 0' - 0"
SOLAR VOLTAIC PANELS
3' - 2 3/4" 2' - 9 1/4"
U.S. OF ROOF 20' - 0"
WOOD CLADDING
T.O. SECOND FLOOR 10' - 0" WOOD CLADDING
4' - 0"
6' - 0"
WOOD CLADDING
4' - 2 3/4" 2' - 9 1/4"
4' - 0"
WOOD PLANKS
2' - 5 1/4" 3' - 0"
3' - 0"
T.O. ROOF 24' - 1"
3' - 0"
WOOD PLANKS
T.O. MAIN FLOOR 0' - 0" GRADE -1' - 6"
1 A3.4
WEST ELEVATION 3/16" = 1'-0"
575 SQ. FT.
WINDOW AREA
90 SQ. FT.
DOOR AREA
21 SQ. FT.
TOTAL AVE. R-VALUE
16
No.
SCHOOL OF SUSTAINABLE BUILDING AND ENVIRONMENTAL MANAGEMENT ARCHITECTURAL TECHNOLOGY INTERIOR DESIGN TECHNOLOGY
PASSIVE HOUSE TERM PROJECT
Description
Date
WEST ELEVTION Project number Date Drawn by Checked by
ARCT 2510 APRIL 25 2019 JOSHUA PERRAS MEHDI ZAHED
A3.4 Scale 3/16" = 1'-0"
2019-04-24 5:28:56 PM
TOTAL WALL AREA
34' - 1"
15' - 6 1/2"
18' - 6 1/2"
1' - 6 3/4"
R1
W1
U.S. OF ROOF 20' - 0"
4' - 0"
1' - 4"
3' - 0"
P1
3' - 0"
4' - 1" 1' - 4" 1' - 4"
P1
F1
W2
32' - 1"
2' - 7 3/8"
1' - 2"1' - 0 5/8"
1' - 2"
T.O. ROOF 24' - 1"
T.O. SECOND FLOOR 10' - 0"
W2 1 A5.1
10' - 0"
10' - 0"
W1
F1
6' - 6"
5' - 0"
1' - 6"
T.O. MAIN FLOOR 0' - 0" GRADE -1' - 6"
FD1 FD1
F2 FD1
1' - 0"
B.O. FOUNDATION -8' - 0"
A3.5
BUILDING SECTION A 3/16" = 1'-0"
No.
SCHOOL OF SUSTAINABLE BUILDING AND ENVIRONMENTAL MANAGEMENT ARCHITECTURAL TECHNOLOGY INTERIOR DESIGN TECHNOLOGY
PASSIVE HOUSE TERM PROJECT
Description
Date
BUILDING SECTION A Project number Date Drawn by Checked by
ARCT 2510 APRIL 25 2019 JOSHUA PERRAS MEHDI ZAHED
A3.5 Scale 3/16" = 1'-0"
2019-04-24 5:28:57 PM
1
26' - 9" 17' - 8 1/2"
9' - 0 1/2" 12 4
R1
1' - 6 3/4"
T.O. ROOF 24' - 1" U.S. OF ROOF 20' - 0" 7' - 0"
W2
P1
P1
P1 2 A5.1
W1
2' - 8"
T.O. SECOND FLOOR 10' - 0"
W2 W1
6' - 0"
32' - 1"
3' - 0"
F1
1' - 6" 1' - 4"
F1
T.O. MAIN FLOOR 0' - 0" GRADE -1' - 6"
6' - 6"
FD1
FD1
B.O. FOUNDATION -8' - 0"
A3.6
BUILDING SECTION B 3/16" = 1'-0"
No.
SCHOOL OF SUSTAINABLE BUILDING AND ENVIRONMENTAL MANAGEMENT ARCHITECTURAL TECHNOLOGY INTERIOR DESIGN TECHNOLOGY
PASSIVE HOUSE TERM PROJECT
Description
Date
BUILDING SECTION B Project number Date Drawn by Checked by
ARCT 2510 APRIL 25 2019 JOSHUA PERRAS MEHDI ZAHED
A3.6 Scale 3/16" = 1'-0"
2019-04-24 5:28:57 PM
1
GRADE -1' - 6"
F2
B.O. FOUNDATION -8' - 0"
T.O. MAIN FLOOR 0' - 0" F1
T.O. SECOND FLOOR 10' - 0"
Description
1 Date
WALL SECTION A Project number Date Drawn by Checked by
ARCT 2510 APRIL 25 2019 JOSHUA PERRAS MEHDI ZAHED
A4.1 Scale 3/4" = 1'-0"
2019-04-24 5:28:58 PM
1' - 4"
1' - 7"
9' - 1 7/8"
1' - 10 3/4"
INTERIOR DESIGN TECHNOLOGY
PASSIVE HOUSE TERM PROJECT
7' - 1"
ARCHITECTURAL TECHNOLOGY
8' - 0"
SCHOOL OF SUSTAINABLE BUILDING AND ENVIRONMENTAL MANAGEMENT
A4.1
WALL SECTION A 3/4" = 1'-0"
FD1
W1
3
W1
12
1' - 11 3/4"
F1
U.S. OF ROOF 20' - 0"
No.
3' - 0 1/4"
PLASTIC DRAIN TILE
B.O. FOUNDATION -8' - 0"
GRADE -1' - 6"
U.S. OF ROOF 20' - 0"
T.O. MAIN FLOOR 0' - 0" 5' - 11 3/4"
SOLAR VOLTAIC PANELS
T.O. SECOND FLOOR 10' - 0"
1' - 0 3/4"
9' - 2 3/16"
ARCHITECTURAL TECHNOLOGY INTERIOR DESIGN TECHNOLOGY
PASSIVE HOUSE TERM PROJECT
Date
WALL SECTION B Project number Date Drawn by Checked by
ARCT 2510 APRIL 25 2019 JOSHUA PERRAS MEHDI ZAHED
A4.2 Scale 3/4" = 1'-0"
2019-04-24 5:28:58 PM
1 SCHOOL OF SUSTAINABLE BUILDING AND ENVIRONMENTAL MANAGEMENT
Description
A4.2
F2
WALL SECTION B 3/4" = 1'-0"
FD1
FD1
F1
F1
1' - 6 3/4"
W1
W1
W1
12
4
7' - 11 1/4"
No.
12
1" AIR GAP
4
W2
1' - 6"
STEEL ANGLE
GRADE -1' - 6" W1
2
SECTION DETAIL 1 1" = 1'-0"
A5.1
No.
SCHOOL OF SUSTAINABLE BUILDING AND ENVIRONMENTAL MANAGEMENT ARCHITECTURAL TECHNOLOGY INTERIOR DESIGN TECHNOLOGY
PASSIVE HOUSE TERM PROJECT
SECTION DETAIL 2 1" = 1'-0"
Description
Date
SECTION DETAILS Project number Date Drawn by Checked by
ARCT 2510 APRIL 25 2019 JOSHUA PERRAS MEHDI ZAHED
A5.1 Scale 1" = 1'-0"
2019-04-24 5:28:59 PM
1
U.S. OF ROOF 20' - 0"
PRE-FINISHED METAL FLASHING
FD1
A5.1
0' - 9 11/32"
T.O. MAIN FLOOR 0' - 0"
0' - 7 1/4"
0' - 10 3/4"
F1
2' - 2"
W2
W1
3' - 4"
2' - 1"
1' - 4"
2' - 11 3/4"
W1
W1
W1 W2
A6.1
2
PLAN DETAIL 1 1" = 1'-0"
A6.1
PLAN DETAIL 2 1" = 1'-0" No.
SCHOOL OF SUSTAINABLE BUILDING AND ENVIRONMENTAL MANAGEMENT ARCHITECTURAL TECHNOLOGY INTERIOR DESIGN TECHNOLOGY
PASSIVE HOUSE TERM PROJECT
Description
Date
PLAN DETAILS Project number Date Drawn by Checked by
ARCT 2510 APRIL 25 2019 JOSHUA PERRAS MEHDI ZAHED
A6.1 Scale 1" = 1'-0"
2019-04-24 5:28:59 PM
1
SCHOOL OF SUSTAINABLE BUILDING AND ENVIRONMENTAL MANAGEMENT ARCHITECTURAL TECHNOLOGY INTERIOR DESIGN TECHNOLOGY
PASSIVE HOUSE TERM PROJECT
Description
Date
RENDERINGS Project number Date Drawn by Checked by
ARCT 2510 APRIL 25 2019 JOSHUA PERRAS MEHDI ZAHED
A10 Scale
2019-04-24 5:29:00 PM
No.