Commercial Office Construction Drawings

Page 1

LIST OF DRAWINGS

MORRIS INSURANCE HEADQUARTERS

SHEET #

DRAWINGS

A0.1 A1.1 A2.1 A2.2 A2.3 A2.4 A3.1 A3.2 A4.1 A4.2 A5.1 A6.1 A6.2 S2.1 S2.2

COVER PAGE SITE PLAN MAIN FLOOR PLAN SECOND FLOOR PLAN MAIN FLOOR RCP SECOND FLOOR RCP E/N BUILDING ELEVATIONS W/S BUILDING ELEVATIONS BUILDING SECTIONS AA,BB BUILDING SECTION CC/SCHEDULES WALL SECTIONS PLAN DETAILS SECTION DETAILS FRAMING PLAN SECOND FLOOR FRAMING PLAN ROOF

SCHOOL OF APPLIED BUILDING SCIENCE ARCHITECTURAL TECHNOLOGY

CONSTRUCTION SCHEDULE W1 EXTERIOR WALL - 1st FLOOR - CAVITY WALL ON FRAMED GWB 90mm BRICK VENEER 25mm AIR SPACE 75mm RIGID INSULATION C/W MECHANICAL FASTENERS PEEL AND STICK AIR/VAPOUR BARRIER OVER PRIMED SURFACE 13mm EXTERIOR GRADE GYPSUM 92mm STEEL STUDS @ 400mm O.C. 16mm GYPSUM BOARD

W2 STAIRWELL WALLS - 1st FLOOR - CAVITY WALL ON CONCRETE BLOCK 90mm BRICK VENEER 25mm AIR SPACE 75mm RIGID INSULATION C/W MECHANICAL FASTENERS THERMOFUSIBLE AIR/VAPOUR BARRIER 200mm (nominal) CONCRETE BLOCK C/W JOINT REINFORCING/

W3 EXTERIOR WALL - 2nd FLOOR - EIFS STUCCO SYSTEM ON FRAMED GWB 5mm ACRYLIC STUCCO 125mm RIGID INSULATION PEEL AND STICK AIR/VAPOUR BARRIER OVER PRIMED SURFACE 13mm EXTERIOR GRADE GYPSUM SHEATHING 92mm STEEL STUDS @ 400mm O.C. 16mm GYPSUM BOARD

W4 STAIRWELL WALLS - 2nd FLOOR - EIFS STUCCO SYSTEM ON CONCRETE BLOCK 5mm ACRYLIC STUCCO 125mm RIGID INSULATION THERMOFUSIBLE AIR/VAPOUR BARRIER 200mm (nominal) CONCRETE BLOCK

P1 PARTITION WALL CONSTRUCTION (ALL NON-MARKED WALLS) 16mm GYPSUM BOARD 92mm STEEL STUDS @ 400mm O.C. 16mm GYPSUM BOARD

P5 COLUMN ENCASEMENT ASSEMBLY 2x16mm GYPSUM BOARD 42mm STEEL STUDS

No.

Description

Date

P6 2-HOUR FIRE-RATED PARTITION WALL CONSTRUCTION 2x16mm GYPSUM BOARD 92mm STEEL STUDS 2x16mm GYPSUM BOARD

P7 REINFORCED CAST IN PLACE CONCRETE ELEVATOR WELL CONSTRUCTION 16mm GYPSUM BOARD 22mm STEEL FURRING CHANNELS @ 400mm O.C. 190mm CAST IN PLACE CONCRETE

P8 ALTERNATE COLUMN ENCASEMENT ASSEMBLY 1x16mm GYPSUM BOARD 42mm STEEL STUDS

PT1 PARAPET CONSTRUCTION - EIFS STUCCO SYSTEM ON FRAMED GWB 5mm ACRYLIC STUCCO 125mm RIGID INSULATION PEEL AND STICK AIR/VAPOUR BARRIER OVER PRIMED SURFACE 13mm EXTERIOR GRADE GYPSUM SHEATHING 92mm STEEL STUDS @ 400mm O.C. 16mm GYPSUM BOARD PEEL AND STICK AIR/VAPOUR BARRIER OVER PRIMED SURFACE 69mm RIGID INSULATION

R1 ROOF CONSTRUCTION 5mm EPDM ROOFING MEMBRANE 120mm RIGID INSULATION VAPOUR BARRIER 13mm EXTERIOR GRADE GYPSUM SHEATHING 38mm CELLULAR STEEL DECK

MORRIS INSURANCE HEADQUARTERS COVER PAGE

P2 PLUMBING PARTITION WALL CONSTRUCTION (300mm WIDE) 16mm GYPSUM BOARD 92mm STEEL STUDS @ 400mm O.C. 84mm VOID SPACE 92mm STEEL STUDS @ 400mm O.C. 16mm GYPSUM BOARD

F1 MAIN FLOOR CONSTRUCTION 100mm REINFORCED CAST IN PLACE CONCRETE

P3 CONCRETE BLOCK PARTITION WALL CONSTRUCTION 16mm GYPSUM BOARD 22mm STEEL FURRING CHANNELS @ 400mm O.C. 200mm (nominal) CONCRETE BLOCK C/W JOINT REINFORCING

F2 SECOND FLOOR CONSTRUCTION 62mm CONCRETE TOPPING 38mm CELLULAR STEEL DECK

Project Number

0001

Date Drawn by

26/04/2019 JOSHUA PERRAS

Checked by

ANDRE LUCENA

A0.1 P4 REINFORCED ELEVATOR WELL PARTITION 190mm CAST IN PLACE CONCRETE

K1 KAWNEER SYSTEM CURTAIN WALL 150x50mm ALUMINUM FRAME 25mm DOUBLE-GLAZING PANEL

Scale

1 : 20


55000

SCHOOL OF APPLIED BUILDING SCIENCE ARCHITECTURAL TECHNOLOGY

10000

9000

-150

1000 (TYP.)

No.

Description

Date

BUILDING

39000

9000

4800 x2400 PARKING STALL

4800 x4800 PARKING STALL

PROPERTY LINE GRASS

MORRIS INSURANCE HEADQUARTERS

3000

-300

6000

SITE-HARDCORE

1000 1000

SITE PLAN CONCRETE

Project Number

0001

Date Drawn by

6000

26/04/2019 JOSHUA PERRAS

Checked by

ANDRE LUCENA

39000

A1.1 1 A1.1

SITE PLAN 1 : 100

Scale

1 : 100


A

2

1

A4.1

A4.1

B

SCHOOL OF APPLIED BUILDING SCIENCE ARCHITECTURAL TECHNOLOGY

C

D

E

F

20920

4200

2895

5410

W1

1-

2-

W2

A6.1 ---

W1

600

1

A5.1

D102B

A6.1 ---

3655

3

D1NSB

4760

NORTH STAIR

2

W1

P2

WASHROOM

VESTIBULE

101

102

D1NSA

1945

1NS

UP

3 P1

D101

108

OFFICE

P3

103

D102A

2000

OFFICE

4415

RECEPTION

P1

110

1 A4.2

1

HALL

P1

A4.2

1300

109 P1

P1

2970

No.

Date

D103

P7

1648

1016

4 A6.1

2210

P1

D104 1300

D105

D107

14160

D108

4

Description

4415

D106A

P4

OFFICE

D1SS

SOUTH STAIR

OFFICE

105

1SS

107

OFFICE P1

104

UP

3

VESTIBULE

A6.1

106

1945

5 1

P3

A5.1

D106B

840

6 W2

7 W1

1800

2000

5160

2105

MORRIS INSURANCE HEADQUARTERS

2 A5.1

2500

MAIN FLOOR PLAN Project Number

2

1

A4.1

A4.1

0001

Date Drawn by

26/04/2019 JOSHUA PERRAS

Checked by

1 A2.1

MAIN FLOOR PLAN

Checker

A2.1

1 : 50

Scale

1 : 50


A

2

1

A4.1

A4.1

B

C

D

E

F

SCHOOL OF APPLIED BUILDING SCIENCE ARCHITECTURAL TECHNOLOGY

20920 4760

4200

2895

5410

3655

3 A5.1

W4 W3

1

600

G2 DN

NORTH STAIR

2 W3 P2

WASHROOM

MEACHANICAL ROOM

201

202

3

2NS D2NS

1945

P3

2000

P6

P1

D202

D201 4415

P3

P6

KITCHEN 203

OFFICE 205

1

1

A4.2

HALL 2

P1

P1

2700

P6

A4.2

P1

206

No.

Description

Date

1145

D205

4

14160

D203

D204

P4

4415

P1

OFFICE SOUTH STAIR

D2SS

204

2SS P1

DN

5 1945

G1 1

P3

A5.1

W3

840

6 7 W3

W3 2

W4

A5.1

MORRIS INSURANCE HEADQUARTERS SECOND FLOOR PLAN

2 A4.1 1

Project Number

0001

A4.1

Date Drawn by

26/04/2019 JOSHUA PERRAS

Checked by

1 A2.2

ANDRE LUCENA

SECOND FLOOR PLAN

A2.2

1 : 50

Scale

1 : 50


A

B

C

D

E

F

SCHOOL OF APPLIED BUILDING SCIENCE ARCHITECTURAL TECHNOLOGY

1 991

1950

OPEN TO ABOVE

1007

2600

2340

969

2

662

668

2600

2600

1049

1158

2000

3

1244

2600

2600

4

No.

Description

Date

1750

OPEN TO ABOVE

690

2600

1244

805

2600 2600

OPEN TO ABOVE

1033

5

2000

2600

6 7

CEILING SCHEDULE

1 A2.3

MAIN FLOOR RCP

MORRIS INSURANCE HEADQUARTERS MAIN FLOOR RCP

1200x600 T-BAR SYSTEM

1 : 50

Project Number

0001

Date

26/04/2019

GYPSUM ON METAL STUD

Drawn by

JOSHUA PERRAS

Checked by TROFFER LIGHT - PARABOLIC RECTANGULA 2 LAMP - 120V

DOWNLIGHT - RECESSED CAN 152mm INCANDESCENT 120V

ANDRE LUCENA

A2.3 Scale

1 : 50


A

B

C

D

E

F

SCHOOL OF APPLIED BUILDING SCIENCE ARCHITECTURAL TECHNOLOGY

1120

622

1 2600

1950

625

1276

603

2600

2600

2000

2340

991

1240

1244

622

3

2007

1893

717

635

2

2600

1244

735

2000

1001

1158

1007

2600

630

2600

1317

2600

4 OPEN TO ABOVE

Description

Date

368

No.

2600

2600

1244

643

2000

614

5

2000

2600

368

6

7

CEILING SCHEDULE

1 A2.4

SECOND FLOOR RCP 1 : 50

1200x600 T-BAR SYSTEM

MORRIS INSURANCE HEADQUARTERS SECOND FLOOR RCP

GYPSUM ON METAL STUD

Project Number

0001

Date TROFFER LIGHT - PARABOLIC RECTANGULA 2 LAMP - 120V

26/04/2019

Drawn by

Author

Checked by DOWNLIGHT - RECESSED CAN 152mm INCANDESCENT 120V

ANDRE LUCENA

A2.4 Scale

1 : 50


7

6

5

4

3

2

1

T.O. PARAPET

SCHOOL OF APPLIED BUILDING SCIENCE ARCHITECTURAL TECHNOLOGY

108702 T.O. ROOF DECK

600

2000

846

108102

7410

SECOND FLOOR SLAB

2600

1364

103964

MAIN FLOOR SLAB

1 A3.1

1065

EAST ELEVATION

1065

1065

1 : 50

F

1065

310

1065

1065

1065

100000

1065

No.

8830

E

D

C

B

Description

Date

A

T.O. PARAPET 108702 T.O. ROOF DECK 108102

SECOND FLOOR SLAB

MORRIS INSURANCE HEADQUARTERS

103964

E/N BUILDING ELEVATIONS Project Number

0001

Date Drawn by MAIN FLOOR SLAB

26/04/2019 JOSHUA PERRAS

Checked by

ANDRE LUCENA

100000

A3.1 2 A3.1

NORTH ELEVATION 1 : 50

Scale

1 : 50


1

2

3

4

5

6

7

T.O. PARAPET 108702 T.O. ROOF DECK

SCHOOL OF APPLIED BUILDING SCIENCE ARCHITECTURAL TECHNOLOGY

600

2000

846

108102

7410

SECOND FLOOR SLAB

2600

1364

103964

MAIN FLOOR SLAB 100000 1065

1 A3.2

1065

1065

1065

310

1065

1065

1065

1065

8830

WEST ELEVATION

No.

Description

Date

1 : 50

A

B

C

D

E

F

T.O. PARAPET 108702 T.O. ROOF DECK

600

2000

846

108102

7410

SECOND FLOOR SLAB

1364

103964

MORRIS INSURANCE HEADQUARTERS

2600

W/S BUILDING ELEVATIONS Project Number

0001

Date

26/04/2019

MAIN FLOOR SLAB 1000

1000

1210

1210

320

1210

1210

100000

Drawn by

JOSHUA PERRAS

Checked by

2 A3.2

ANDRE LUCENA

A3.2

SOUTH ELEVATION 1 : 50

Scale

1 : 50


7

6

5

4

3

2

1

T.O. EL RF DK 109602 T.O. PARAPET

R1

108702 T.O. ROOF DECK

SCHOOL OF APPLIED BUILDING SCIENCE

108102

ARCHITECTURAL TECHNOLOGY

2A6.2 ---

W3

W3

P6

3 A6.2

R1

F2

SECOND FLOOR SLAB 103964 4 A6.2

W1 P1

P1

W1

MAIN FLOOR SLAB 100000 B.O. FOUNDATION 99400 B.O. ELEV WELL 98800

1 A4.1

7

Section AA

6

5

No. R1

4

3

2

Description

Date

1

1 : 50

T.O. EL RF DK 109602

1R1

A6.2 ---

T.O. PARAPET PT1

108702 T.O. ROOF DECK 108102

W4

P4

P7

F2

W3

F2

SECOND FLOOR SLAB 103964

W2

MORRIS INSURANCE HEADQUARTERS BUILDING SECTIONS AA,BB

W1

Project Number

MAIN FLOOR SLAB 100000 B.O. FOUNDATION 99400 B.O. ELEV WELL

0001

Date Drawn by

26/04/2019 JOSHUA PERRAS

Checked by

ANDRE LUCENA

98800

A4.1 2 A4.1

Section BB 1 : 50

Scale

1 : 50


A

B

C

D

E

F SCHOOL OF APPLIED BUILDING SCIENCE ARCHITECTURAL TECHNOLOGY

T.O. EL RF DK 109602 T.O. PARAPET 108702 T.O. ROOF DECK

PT1

108102

W3

P1

W3

P1

P1

K1

SECOND FLOOR SLAB 103964

P1

W1

P1 W1

No.

Description

Date

MAIN FLOOR SLAB 100000 B.O. FOUNDATION 99400 B.O. ELEV WELL 98800

1 A4.2

Section C 1 : 50

ROOM SCHEDULE

DOOR SCHEDULE

NUMBE R

NAME

AREA

1NS 1SS 2NS 2SS 101 102 103 104 105 106 107 108 109 110 201 202 203 204 205 206

NORTH STAIR SOUTH STAIR NORTH STAIR SOUTH STAIR WASHROOM VESTIBULE OFFICE OFFICE OFFICE VESTIBULE OFFICE OFFICE HALL RECEPTION WASHROOM MEACHANICAL ROOM KITCHEN OFFICE OFFICE HALL 2

13 m² 12 m² 13 m² 12 m² 19 m² 10 m² 28 m² 32 m² 25 m² 12 m² 41 m² 31 m² 20 m² 19 m² 19 m² 10 m² 11 m² 79 m² 72 m² 48 m²

MARK D1NSA D1NSB D1SS D2NS D2SS D101 D102A D102B D103 D104 D105 D106A D106B D107 D108 D201 D202 D203 D204 D205

TYPE MARK D2 D2 D2 D2 D2 D4 D1 D1 D3 D3 D3 D1 D1 D3 D3 D4 D4 D4 D3 D3

FAMILY M_Single-Flush M_Single-Flush M_Single-Flush M_Single-Flush M_Single-Flush M_Single-Flush M_Door-Double-Glass M_Door-Double-Glass M_Single-Flush M_Single-Flush M_Single-Flush M_Door-Double-Glass M_Door-Double-Glass M_Single-Flush M_Single-Flush M_Single-Flush M_Single-Flush M_Single-Flush M_Single-Flush M_Single-Flush

HEAD WIDTH HEIGHT FINISH 915 915 915 915 915 762 1700 1700 813 813 813 1700 1700 813 813 762 762 762 813 813

2134 2134 2134 2134 2134 2134 2100 2100 2134 2134 2134 2100 2100 2134 2134 2134 2134 2134 2134 2134

FRAME MATERIAL

WINDOW SCHEDULE Comments FIRE RESISTENCE RATING OF 45MIN FIRE RESISTENCE RATING OF 45MIN FIRE RESISTENCE RATING OF 45MIN FIRE RESISTENCE RATING OF 45MIN FIRE RESISTENCE RATING OF 45MIN DOUBLE DOOR DOUBLE LEAF GLAZING DOUBLE DOOR DOUBLE LEAF GLAZING

TYPE MARK G1 G2

FAMILY M_Fixed with Trim Louver_window_family_object_4856

SILL WIDTH HEIGHT HEIGHT COUNT 915 914

1220 1524

915 915

1 1

MORRIS INSURANCE HEADQUARTERS BUILDING SECTION CC/SCHEDULES Project Number

DOUBLE DOOR DOUBLE LEAF GLAZING DOUBLE DOOR DOUBLE LEAF GLAZING

0001

Date Drawn by

26/04/2019 JOSHUA PERRAS

FIRE RESISTENCE RATING OF 2HR

Checked by

ANDRE LUCENA

A4.2 Scale

1 : 50


A

6

2

1 SCHOOL OF APPLIED BUILDING SCIENCE ARCHITECTURAL TECHNOLOGY

T.O. PARAPET 108702

R1

R1

T.O. PARAPET

T.O. PARAPET

108702

108702 R1

PT1

PT1

PT1

T.O. ROOF DECK

T.O. ROOF DECK

T.O. ROOF DECK

108102

108102

108102

C1

C1

C2

K1

No.

W4

Description

Date

W3 F2 F2

SECOND FLOOR SLAB

SECOND FLOOR SLAB

SECOND FLOOR SLAB

103964

103964

103964

C1

C1

MORRIS INSURANCE HEADQUARTERS

W2 W1

F1

F1

F1

WALL SECTIONS MAIN FLOOR SLAB

MAIN FLOOR SLAB

MAIN FLOOR SLAB

100000

100000

100000

Project Number

0001

Date Drawn by

26/04/2019 JOSHUA PERRAS

Checked by

1 A5.1

WALL SECTION 1 : 25

2 A5.1

CURTAIN WALL SECTION 1 : 25

3 A5.1

STAIR WALL SECTION

ANDRE LUCENA

A5.1

1 : 25

Scale

1 : 25


B

E

SCHOOL OF APPLIED BUILDING SCIENCE

W1

ARCHITECTURAL TECHNOLOGY

CAVITTY WALL

240

W2

1

1 W1

600

W1

P5 240

STEEL COLUMN HSS 152x152x9.5

STAIRWELL WALLS

2

2

PLUMBING WALL P3

No. 1 A6.1

PLAN DETAIL 1

2

1 : 10

A6.1

Description

Date

PLAN DETAIL 2 1 : 10

F

F

1065

K1

MORRIS INSURANCE HEADQUARTERS

K1 P1

P5

ALUMINUM CURTAIN WALL MULLION 150x50mm

310

ALUMINUM CURTAIN WALL MULLION 150x50mm

5

4

PLAN DETAILS

ALUMINUM BRAKESHAPE STEEL COLUMN HSS 152.4x152.4x9.5

290

Project Number

0001

W1

Date Drawn by

240

26/04/2019 JOSHUA PERRAS

Checked by

3 A6.1

PLAN DETAIL 3 1 : 10

4 A6.1

PLAN DETAIL 4

ANDRE LUCENA

A6.1

1 : 10

Scale

1 : 10


2

7

PARAPET CAP

PARAPET CAP

SCHOOL OF APPLIED BUILDING SCIENCE T.O. PARAPET

ARCHITECTURAL TECHNOLOGY

T.O. PARAPET

108702

108702

PT1 PT1

R1

R1

T.O. ROOF DECK

T.O. ROOF DECK 108102

692

108102

W4

STEEL BEAM W310x32.7

W3

REINFORCED BOND BEAM LINTEL BLOCK

240

90

K1

1 A6.2

SECTION DETAIL 1

2

1 : 10

A6.2

No.

SECTION DETAIL 2

Description

Date

1 : 10

6 2

1

PARAPET CAP

W3

PT1 R1

F2

SECOND FLOOR SLAB

SECOND FLOOR SLAB 103964 364

87

364

87

103964

MORRIS INSURANCE HEADQUARTERS

CHANNEL C150x15.6

SECTION DETAILS Project Number

STEEL BEAM W310x32.7

0001

240

Date

W1

26/04/2019

W1

Drawn by

JOSHUA PERRAS

Checked by

3 A6.2

SECTION DETAIL 3 1 : 10

4 A6.2

ANDRE LUCENA

A6.2

SECTION DETAIL 4 1 : 10

Scale

1 : 10


A

B

C

D

E

F SCHOOL OF APPLIED BUILDING SCIENCE ARCHITECTURAL TECHNOLOGY

20920

4760

2895

5410

3655

C150x16

600

1

4200

1945

2

OWSJ - 16K3 (TYP.)

No.

Description

Date

4415

4

14160

4415

3

C150x16

C150x16

1945

5

840

6 7

MORRIS INSURANCE HEADQUARTERS FRAMING PLAN SECOND FLOOR

1 S2.1

SECOND FLOOR FRAMING PLAN

Project Number

0001

1 : 50

Date Drawn by

26/04/2019 JOSHUA PERRAS

Checked by

ANDRE LUCENA

S2.1 Scale

1 : 50


SCHOOL OF APPLIED BUILDING SCIENCE

A

B

C

D

E

ARCHITECTURAL TECHNOLOGY

F

20920

4760

4200

2895

5410

3655

600

1

1945

C150x16

2

OWSJ - 12K3 (TYP.)

4415

3

Date

1945

5

840

6 7

OWSJ - 12K3 (TYP.)

4415

C150x16

4

Description

14160

No.

MORRIS INSURANCE HEADQUARTERS FRAMING PLAN ROOF Project Number

1 S2.2

0001

ROOF FRAMING PLAN 1 : 50

Date Drawn by

26/04/2019 JOSHUA PERRAS

Checked by

ANDRE LUCENA

S2.2 Scale

1 : 50