REVAMP Lawrencville

Page 1


TABLE OF CONTEXTS GC0.00 IN1.00 IN2.00 IN3.00 IN4.00 PN1.00 PN1.01 PN1.02 PN1.03 PS1.00 PS1.01 PS1.02 PS1.03 PS1.04 PS1.05 PS2.00 PS2.01 PS2.02 PS2.03 PS3.00 PS3.01 PS4.00 PS4.01 PS5.00 PS5.01 PS5.02 PS5.03 PS6.00 PS6.01 PS7.00 PS7.01 PS7.02 PS7.03 PS8.00 PS8.01 PS8.02 PS8.03 PS9.00 PS9.01 PS10.00 PS10.01 PS11.00 PS11.01 PS11.02 PS11.03 SC1.00 SC1.01 SC1.02 SC1.03 SC2.00 SC2.01 CN1.00 CN101 AT1.00 AT1.01 AT1.02 AT1.03 AT1.04 AT1.05 AT2.00 AT2.01 AT2.02 AT2.03 AT2.04 AT2.05 AT2.06 AT2.07

Cover Sheet Index : Table of Contents Index : Report Layout Index : General Use Notes Index : Keys and Definitions Project Narrative : An Introduction Project Narrative : Decision Process Project Narrative : Context Project Narrative : Comparative Typology Project Scope : Demographics Project Scope : Demographics Project Scope : Demographics Project Scope : Demographics Project Scope : Demographics Project Scope : Demographics Project Scope : Land Use and Zoning Project Scope : Land Use and Zoning Project Scope : Housing Location, Typologies Project Scope : Housing Location, Type 1 Project Scope : Housing Location, Type 2, 3, 4 Project Scope : Housing Location, Type 5, 6, 7 Project Scope : Eight Study Houses Project Scope : Eight Study Houses Project Scope : Site Utilization Project Scope : Site Utilization Project Scope : Site Utilization Project Scope : Site Utilization Project Scope : Housing Condition Project Scope : Housing Condition Project Scope : Case Study 1 Overview Project Scope : Case Study 1 Housing Condition Project Scope : Case Study 2 Overview Project Scope : Case Study 2 Housing Condition Project Scope : Zoning Deviations Project Scope : Zoning Deviations Project Scope : Zoning Deviations Project Scope : Zoning Deviations Project Scope : House Construction Project Scope : House Materials Project Scope : Heating Strategies Project Scope : Heating Strategies Project Scope : Environmental Data Project Scope : Environmental Data Project Scope : Environmental Data Project Scope : Environmental Data Site Context : General Site Modifications Site Context : General Site Modifications Site Context : General Site Modifications Site Context : General Site Modifications Site Context : Scalar Representations Site Context : Scalar Representations Contract Negotiations : The Players Contract Negotiations : The Responsibilities Adaptive Transformation 1: Building Envelope Adaptive Transformation 1: Building Envelope Adaptive Transformation 1: Building Envelope Adaptive Transformation 1: Building Envelope Adaptive Transformation 1: Building Envelope Adaptive Transformation 1: Building Envelope Adaptive Transformation 2: Rainwater Harvesting Adaptive Transformation 2: Rainwater Harvesting Adaptive Transformation 2: Rainwater Harvesting Adaptive Transformation 2: Rainwater Harvesting Adaptive Transformation 2: Rainwater Harvesting Adaptive Transformation 2: Rainwater Harvesting Adaptive Transformation 2: Rainwater Harvesting Adaptive Transformation 2: Rainwater Harvesting

INTRODUCTION

CONTEXT

TYPOLOGIES

CASE STUDY HOUSES

PROPOSALS

ADAPTIVE TRANSFORMATION 1

ADAPTIVE TRANSFORMATION 2


AT2.08 AT2.09 AT3.00 AT3.01 AT3.02 AT3.03 AT3.04 AT3.05 AT3.06 AT3.07 AT3.08 AT3.09 AT3.10 AT3.11 AT3.12 AT3.13 AT3.14 AT3.15 AT3.16 AT3.17 AT4.00 AT4.01 AT4.02 AT4.03 AT4.04 AT4.05 AT4.06 AT4.07 AT4.08 AT4.09 AT4.10 AT4.11 AT4.12 AT4.13 AT4.14 AT4.15 AT4.16 AT4.17 AS1.00 AS1.01 AS1.02 SD1.00 IMP1.00 IMP1.01 IMP1.02 IMP1.03 IMP2.00 IMP2.01 IMP2.02 IMP2.03 IMP3.00 IMP3.01 IMP3.02 IMP3.03 CA1.00 CA1.01 CA1.02 CA1.03 CA1.04 CA1.05 SP1.00 SP1.01 SP1.02 SP1.03 SP1.04 SP1.05

Adaptive Transformation 2: Rainwater Harvesting Adaptive Transformation 2: Rainwater Harvesting Adaptive Transformation 3: Roof Greenhouse ADAPTIVE TRANSFORMATION 3 Adaptive Transformation 3: Roof Greenhouse Adaptive Transformation 3: Roof Greenhouse Adaptive Transformation 3: Roof Greenhouse Adaptive Transformation 3: Roof Greenhouse Adaptive Transformation 3: Roof Greenhouse Adaptive Transformation 3: Roof Greenhouse Adaptive Transformation 3: Roof Greenhouse Adaptive Transformation 3: Roof Greenhouse Adaptive Transformation 3: Roof Greenhouse Adaptive Transformation 3: Roof Greenhouse Adaptive Transformation 3: Roof Greenhouse Adaptive Transformation 3: Roof Greenhouse Adaptive Transformation 3: Roof Greenhouse Adaptive Transformation 3: Roof Greenhouse Adaptive Transformation 3: Roof Greenhouse Adaptive Transformation 3: Roof Greenhouse Adaptive Transformation 3: Roof Greenhouse Adaptive Transformation 4: The Rental Module ADAPTIVE TRANSFORMATION 4 Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Assembly Sequence : Stages 1 IMPLEMENTATION Assembly Sequence : Stages 2 Assembly Sequence : Stages 3 Selective Demolition : Stages 1 Implementation : Logistics Implementation : Logistics Implementation : Logistics Implementation : Logistics Implementation : Critical Path Implementation : Critical Path Implementation : Critical Path Implementation : Critical Path Implementation : Hard Costs Implementation : Hard Costs Implementation : Soft Costs Implementation : Budget Code Analysis : Building Transformation SPECIFICATIONS AND CODE ANALYSIS Code Analysis : Building Transformation Code Analysis : Building Transformation Code Analysis : Building Transformation Code Analysis : Building Transformation Code Analysis : Building Transformation Specifications : Material Legend Specifications : Material Legend Specifications : Material Legend Specifications : Material Legend Specifications : Material Legend Specifications : Wall Types


PMN1.00

PROJECT NARRATIVE: AN INTRODUCTION

GC0.00 Cover Sheet IN1.00 Index : Table of Contents IN2.00 Index : Report Layout IN3.00 Index : General Use Notes IN4.00 Index : Keys and Definitions PN1.00 Project Narrative : An Introduction PN1.01 Project Narrative : Decision Process PN1.02 Project Narrative : Context PN1.03 Project Narrative : Comparative Typology PS1.00 Project Scope : Demographics PS1.01 Project Scope : Demographics PS1.02 Project Scope : Demographics PS1.03 Project Scope : Demographics PS1.04 Project Scope : Demographics PS1.05 Project Scope : Demographics PS2.00 Project Scope : Land Use and Zoning PS2.01 Project Scope : Land Use and Zoning PS2.02 Project Scope : Housing Location, Typologies PS2.03 Project Scope : Housing Location, Type 1 PS3.00 Project Scope : Housing Location, Type 2, 3, 4 PS3.01 Project Scope : Housing Location, Type 5, 6, 7 PS4.00 Project Scope : Eight Study Houses PS4.01 Project Scope : Eight Study Houses PS5.00 Project Scope : Site Utilization PS5.01 Project Scope : Site Utilization PS5.02 Project Scope : Site Utilization PS5.03 Project Scope : Site Utilization PS6.00 Project Scope : Housing Condition PS6.01 Project Scope : Housing Condition PS7.00 Project Scope : Case Study 1 Overview PS7.01 Project Scope : Case Study 1 Housing Condition PS7.02 Project Scope : Case Study 2 Overview PS7.03 Project Scope : Case Study 2 Housing Condition PS8.00 Project Scope : Zoning Deviations PS8.01 Project Scope : Zoning Deviations PS8.02 Project Scope : Zoning Deviations PS8.03 Project Scope : Zoning Deviations PS9.00 Project Scope : House Construction PS9.01 Project Scope : House Materials PS10.00 Project Scope : Heating Strategies PS10.01 Project Scope : Heating Strategies PS11.00 Project Scope : Environmental Data PS11.01 Project Scope : Environmental Data PS11.02 Project Scope : Environmental Data PS11.03 Project Scope : Environmental Data SC1.00 Site Context : General Site Modifications SC1.01 Site Context : General Site Modifications SC1.02 Site Context : General Site Modifications SC1.03 Site Context : General Site Modifications SC2.00 Site Context : Scalar Representations SC2.01 Site Context : Scalar Representations CN1.00 Contract Negotiations : The Players CN101 Contract Negotiations : The Responsibilities AT1.00 Adaptive Transformation 1: Building Envelope AT1.01 Adaptive Transformation 1: Building Envelope AT1.02 Adaptive Transformation 1: Building Envelope AT1.03 Adaptive Transformation 1: Building Envelope AT1.04 Adaptive Transformation 1: Building Envelope AT1.05 Adaptive Transformation 1: Building Envelope AT2.00 Adaptive Transformation 2: Rainwater Harvesting AT2.01 Adaptive Transformation 2: Rainwater Harvesting AT2.02 Adaptive Transformation 2: Rainwater Harvesting AT2.03 Adaptive Transformation 2: Rainwater Harvesting AT2.04 Adaptive Transformation 2: Rainwater Harvesting AT2.05 Adaptive Transformation 2: Rainwater Harvesting AT2.06 Adaptive Transformation 2: Rainwater Harvesting AT2.07 Adaptive Transformation 2: Rainwater Harvesting AT2.08 Adaptive Transformation 2: Rainwater Harvesting AT2.09 Adaptive Transformation 2: Rainwater Harvesting AT3.00 Adaptive Transformation 3: Roof Greenhouse AT3.01 Adaptive Transformation 3: Roof Greenhouse AT3.02 Adaptive Transformation 3: Roof Greenhouse AT3.03 Adaptive Transformation 3: Roof Greenhouse AT3.04 Adaptive Transformation 3: Roof Greenhouse AT3.05 Adaptive Transformation 3: Roof Greenhouse AT3.06 Adaptive Transformation 3: Roof Greenhouse AT3.07 Adaptive Transformation 3: Roof Greenhouse AT3.08 Adaptive Transformation 3: Roof Greenhouse AT3.09 Adaptive Transformation 3: Roof Greenhouse AT3.10 Adaptive Transformation 3: Roof Greenhouse AT3.11 Adaptive Transformation 3: Roof Greenhouse AT3.12 Adaptive Transformation 3: Roof Greenhouse AT3.13 Adaptive Transformation 3: Roof Greenhouse AT3.14 Adaptive Transformation 3: Roof Greenhouse AT3.15 Adaptive Transformation 3: Roof Greenhouse AT3.16 Adaptive Transformation 3: Roof Greenhouse PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING AT3.17 Adaptive Transformation 3: Roof Greenhouse

CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


AT4.00 AT4.01 AT4.02 AT4.03 AT4.04 AT4.05 AT4.06 AT4.07 AT4.08 AT4.09 AT4.10 AT4.11 AT4.12 AT4.13 AT4.14 AT4.15 AT4.16 AT4.17 AS1.00 AS1.01 AS1.02 SD1.00 IMP1.00 IMP1.01 IMP1.02 IMP1.03 IMP2.00 IMP2.01 IMP2.02 IMP2.03 IMP3.00 IMP3.01 IMP3.02 IMP3.03 CA1.00 CA1.01 CA1.02 CA1.03 CA1.04 CA1.05 SP1.00 SP1.01 SP1.02 SP1.03 SP1.04 SP1.05

Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Assembly Sequence : Stages 1 Assembly Sequence : Stages 2 Assembly Sequence : Stages 3 Selective Demolition : Stages 1 Implementation : Logistics Implementation : Logistics Implementation : Logistics Implementation : Logistics Implementation : Critical Path Implementation : Critical Path Implementation : Critical Path Implementation : Critical Path Implementation : Hard Costs Implementation : Hard Costs Implementation : Soft Costs Implementation : Budget Code Analysis : Building Transformation Code Analysis : Building Transformation Code Analysis : Building Transformation Code Analysis : Building Transformation Code Analysis : Building Transformation Code Analysis : Building Transformation Specifications : Material Legend Specifications : Material Legend Specifications : Material Legend Specifications : Material Legend Specifications : Material Legend Specifications : Wall Types

I n t r o d u c t ion PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

PROJECT NARRATIVE: AN INTRODUCTION

PMN1.00


SO, WHAT DO I NEED TO KNOW? GENERAL NOTES 1. These documents are the copyrighted intellectual property of Carnegie Mellon University and its authors. The documents are not to be reproduced or utilized for any purpose other than originally intended as stipulated on the cover sheet and titleblock. 2. None of the documents included in drawing index are intended to be considered in isolation of one another, all parties utilizing these documents for bidding, quantity survey, and/or construction shall consult the general notes and information located on this sheet and all other sheets before proceeding. 3. All work shall conform to the requirements of the Pennsylvania Building Code, Pittsburgh Fire Department regulations, Utility company requirements, and the best trade practices. 4. Before commencing work, the Contractor shall file all required Certificates of Insurance with the Department of Buildings, obtain all required permits, and pay all fees required by governing agencies. 5. The Contractor shall verify all existing conditions in the field prior to commencing work, and shall report any discrepancies between drawings and field conditions to the Architect. 6. Minor details not usually shown or specified, but necessary for proper construction of any part of the work shall be included as if they were indicated in the drawings. 7. The Contractor shall coordinate all work procedures with requirements of local authorities and building management. 8. The Contractor shall be responsible for the protection of all conditions and materials within the proposed construction area. The Contractor shall design and install adequate shoring and bracing for all structural or removal tasks. The Contractor shall have sole responsibility for any damage or injuries caused by or during the execution of the work. 9. The Contractor shall lay out his/her own work, and shall provide all dimensions required for other trades (plumbing, electrical, etc.). 10. Plumbing and electrical work shall be performed by persons licensed in their trades, who shall arrange for and obtain inspections and required sign-offs. 11. The Contractor shall do all cutting, patching, repairing as required to perform all of the work indicated on the drawings, and all other work that may be required to complete the job. 12. All existing piping and wiring shall be removed to a point of concealment and shall be properly capped or plugged. 13. The Contractor, upon completion of the work, shall arrange for Department of Buildings inspections and signoffs as required. 14. Work shall conform to PA Building Code and all applicable State and City Building Laws. 15. Plumbing work to be performed by Licensed Plumber in accordance with the PA Building Code. 16. Electrical work to be performed by Licensed Electrician in accordance with the PA Building Code.

TENANTS SAFETY PLAN 1.General: All work to be done in accordance with the Allegheny County Building Code and regulations of all other agencies having jurisdiction. 2.Structural: Contractor to provide adequate temporary bracing and shoring wherever any structural work is involved. 3.Means of Egress: ALL existing means of egress for tenants of the building to be maintained clear and free of all obstructions, such as building materials, tools, etc. 4.Fire Safety: ALL building materials stored at construction area, and/or in any area of the building are to be secured in a locked area. Access to such areas to be controlled by Owner and/or General Contractor. 5.Dust Control: Debris, dirt, and dust to be kept to a minimum, and be confined to the immediate construction area; and be cleaned up and cleared from building periodically to avoid any excessive accumulation. 6.Noise After Hours: Construction operations will be confined to normal working hours: 9 a.m. to 5 p.m., Mondays through Fridays, except legal holidays, unless an After-Hours Work Permit is secured from the Department of Buildings. 7.Construction operations will not involve interruption of heating, water, or electrical services to other tenants of the building. 8.Construction work will be confined to the proposed construction floor. Contractor will limit to the minimal, the amount of dust, dirt, or other such inconveniences created to all other areas within the

IN3.00

INDEX: GOVERNING USE NOTES

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


ABBREVIATIONS & @ ALUM. ARCH. C C.O. CLG. COORD. C.T. DET. DIA. D.O.F. DWG. ELEV. EQ. EQUIP. EXIST. FIN. FL. FT. GA. GWB

AND AT ALUMINUM ARCHITECTURAL CENTERLINE CENTER ON / OVER CEILING COORDINATE CERAMIC TILE DETAIL DIAMETER DIRECTION OF FLOORING DRAWING ELEVATION EQUAL EQUIPMENT EXISTING FINISHED FLOOR FEET GAUGE GYPSUM WALL BOARD

H.M. HT. MANUF. MAX. MECH. MIN. N.I.C. NO. O.C. O.H. RCP REF. REQ. S.F. SIM. S.S. THK. T.O. TYP. V.I.F W/

METAL HEATER MANUFACTURER MAXIMUM MECHANICAL MINIMUM NOT IN CONTRACT NUMBER ON CENTER OPPOSITE HAND REFLECTED CEILING PLAN REFRIGERATOR REQUIRED SQUARE FEET SIMILAR STAINLESS STEEL THICK TOP OF TYPICAL VERIFY IN FIELD WITH

SECTION CUT

2223

DOOR TAG

KITCHEN 2226

ROOM TAG x

WALL TYPE

x

WINDOW TAG

x

KEY NOTE

x A105

DETAIL

1

DRAWING TITLE

22ND FLOOR PLAN

A-104 SCALE: 1/4"=1'-0"

NOTES: 1. ALL DIMENSIONS SHOWN FINISH TO FINISH 2. ALL FURNITURE TO BE SHOWN PROVIDED BY OWNER

DEFINITIONS BUILDING GRADE DEFINITIONS (Per The Sabre Residential Cost Valuation Manual)

A Architecturally attractive buildings constructed with excellent quality materials and workmanship throughout. High quality interior finish and built-in features. Deluxe heating system and very good grade plumbing and lighting fixtures. (Architect designed and supervised homes would normally fall into this classification). B Buildings constructed with good quality materials and above average workmanship throughout. Moderate architectural treatment. Good quality interior finish and built-in features. Good grade heating, plumbing and lighting fixtures. (Custom built tract homes would normally fall into this classification). C Buildings constructed with average quality materials and workmanship throughout, conforming with the base specifications used to develop the pricing schedule. Minimal architectural treatment. Average quality interior finish and built-in features. Standard grade heating, plumbing and lighting fixtures. (Typical tract-built homes would normally fall into this classification). D Buildings constructed with economy quality materials and workmanship throughout. Void of architectural treatment. Cheap quality interior finish and built-in features. Low grade heating, plumbing and lighting fixtures. (Economy mass built homes would normally fall into this classification).

ALIGN

ALIGN TAG

NOTE

EXTERIOR SECTION TAG

NEW PARTITIONS TO BE CENTERED W/ EXISTING COLUMN (TYP.)

2/A3.0

2/A3.0

XX/X Buildings generally having an outstanding architectural style and design, constructed with the finest quality materials and workmanship throughout. Superior quality interior finish and built-in features. Deluxe heating system and high grade plumbing and lighting fixtures. (Having all the features typically characteristic of mansion-type homes).

EXTERIOR ELEVATION TAG

9'-0"

ELEVATION HEIGHT

E Buildings constructed with a very cheap quality grade of materials, usually “culls” and “seconds” and very poor workmanship resulting from unskilled, inexperienced, “do-ityourself” type labor. Low grade heating, plumbing and lighting fixtures (Normally self built with mechanical contractor assistance). BUILDING CONDITION DEFINITIONS (Per The Sabre Residential Cost Valuation Manual) Excellent Very Good Good Average Fair Poor Very Poor Unsound

Building is in perfect condition; very attractive and highly desirable Slight evidence of deterioration; still attractive and quite desirable Minor deterioration visible; still attractive and quite desirable. Normal wear and tear is apparent; average attractiveness and desirability. Marked deterioration - but quite usable; rather unattractive and undesirable. Definite deterioration is obvious; definitely undesirable, and barely usable Condition approaches unsoundness; extremely undesirable and barely usable. Building is definitely unsound and practically unfit for use

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

x A105

DETAIL CALLOUT 3 4 A204

A204

4 A204

3 A204

INTERIOR ELEVATIONS TAG

INDEX: KEYS AND DEFINITIONS

IN4.00


AN INTRODUCTION The impetus for this project stems from an issues of Practice class offerred in the School of Architecture at Carnegie Mellon University. The neighborhood of study is dervied from a combined focus on Lawrenceville in both Issues of Practice and the Urban Lab Studio. The diagram below describes the structure of the project and the key players:

Carnegie Mellon University

SO, WHAT IS THIS ALL ABOUT?

School of Architecture

Lawrenceville is an aspiring and uniquely diverse community of Pittsburgh that has a rich character and history. The health and revitalization of this once thriving community is important, not only to its residents, but also to the Greater Pittsburgh area because of its potential for commerce and wealth of historic residences. The vision presented in this document serves to reaffirm the commitment of organizations and individuals to help reenergize the residential neighborhoods and preserve their unique character.

5th year

Fall Semester

This study, which serves as a facet of the Pittsburgh Program for the Adaptive Transformation of Community Housing [P_PATCH], aims to re-envision the role of the residential fabric by defining strategies for re-purposing and maintenance of unique housing typologies for future sustainability.

Urban Lab 48-500

Issues of Practice 48-550 .

LAWRENCEVILLE

The Applied Research Component of study represented by the Pittsburgh Program for the Adaptive Transformation of Community Housing (P_PATCH) will focus on tangible implementation strategies through the development of comprehensive political, financial, legal, and prescriptive implementation strategies. Executed as an iterative investigation, empirical assumptions will be tested and refined in the context of physical, economic, legal and social conditions. The project will be biased toward identification of universal/prescriptive standards. Appropriate/affordable strategies for enclosure system modification, mechanical system calibration, water harvesting/management and site utilization strategies will be investigated as a mechanism to increase energy efficiency and reduce the baseline costs of homeownership for families demonstrating subsistence at forty, sixty, and eighty percent median income thresholds. Solutions will focus on retaining the residents embedded in these communities and will leverage the success of redevelopment in proximate communities/neighborhoods.

P_PATCH Project

P_PATCH Project Statement, John Folan

Residents

Students

Through sensitive observations and analytical mapping, numerous multiple housing typologies are identified as a means for characterizing the fabric of residential units. Ultimately, a strategy is proposed for application to many houses in Lawrenceville that will increase the sustainability of the individual residences, introduce reuse for vacant and blighted sites, and support the resident’s desire to maintain community authenticity. As identified by the Lawrenceville Corporation, the goals of the community include the retention of the unique residential fabric through community diversity and class heritage. The project also remains sensitive to the residents’ desire to build upon their architectural assets by supporting high quality design that will help to inspire and engage visionary planning.

REVAMP

PN1.00

PROJECT NARRATIVE: AN INTRODUCTION

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


WHAT HOUSES ARE BEING STUDIED?

Common Housing Typologies Central Lawrenceville Row Houses

A considerate study of trends, population, vacancies, and potential for sustainable development, yielded a strong understanding of the dynamic forces which shape Lower, Central, and Upper Lawrenceville. After sensitive consideration of this information, Central Lawrenceville was identified as the primary focus of this study. There, numerous unique housing typologies were identified, characterized, and given a series of attribute qualifiers in an attempt to catalogue each housing type and its variation. Through a series of qualitative and quantitative attributes, each house can be assigned a unique “barcode” comprised of the set of qualifiers that relate to that specific house. This process produced a specific typology that presented itself as the most adaptable, common, and appeared to have the most potential for modification. Typology : Brick, two story, three bay row house with gabled roof. This housing type was first developed in the 19th century as boarding homes for the industrial workers of Lawrenceville.

The rowhouse comprises the majority of the houses in Lawrenceville . These houses, built in the early 20th century for local industrial workers, tend to be modestly sized under 1,500 sq. ft. These houses are further characterized by their brick facades, narrow street profile and lack of yard or driveway. Large Historic Houses Many of these houses date to the early 1900’s and are considerably larger than the ubiquitous row house. These houses can range between 2,000 and 3,000 sq. ft. and are attracting homebuyers to the region because of their charm and architectural style. Alley Housing

Variations: Back extension with half-pitched shed roof Third floor indicated by singular dormer on front façade Additional dormer in back Combined with mirrored volume and converted into duplex

These small and densely packed houses are some of the most modest housing still existant in Pittsburgh. No larger than 1,000 sq. ft., these residences are often seen in poor condition and provide a poor quality of life because of the lack of space and yards. Many have been demolished, leaving sporadic vacant lots throughout these blocks.

Assets: This typology is congruent with very common housing dimensions of many residences throughout Lawrenceville. The house is also found throughout the Lawrenceville neighborhoods.

Upper Floor Apartments

There are 134 instances of this typology in Central Lawrenceville. The house consists, on average, of 1,728 sq. ft. of inhabitable, conditioned space.

Along with the revitalization of many commercial corridors, the upper floor apartments above many of these shops and restaurants have gained new life and appeal. Much effort has been put into converting these commericial or unused spaces into usable apartments and condos, yielding strong interest and high property values.

The housing type is very adaptable; many iterations of the house found in Central Lawrenceville contain a replaceable addition with half-pitched shed roof that extends the existing volumetric grid of the house. The half-pitch allows for adjacent houses to create complete-pitched duplexes. This typology is found in additional neighborhoods of Pittsburgh, outside of Lawrenceville, extending the feasibility and effective dissemination of the proposed project. Identical typologies exist in Bluff, the Lower Hill District, Shadyside, and may be found in other neighborhoods as well.

The typology of focus : 151 44th Street, Lawrenceville

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

PROJECT NARRATIVE: DECISION PROCESS

PN1.01


PMN1.00

PROJECT NARRATIVE: AN INTRODUCTION

GC0.00 Cover Sheet IN1.00 Index : Table of Contents IN2.00 Index : Report Layout IN3.00 Index : General Use Notes IN4.00 Index : Keys and Definitions PN1.00 Project Narrative : An Introduction PN1.01 Project Narrative : Decision Process PN1.02 Project Narrative : Context PN1.03 Project Narrative : Comparative Typology PS1.00 Project Scope : Demographics PS1.01 Project Scope : Demographics PS1.02 Project Scope : Demographics PS1.03 Project Scope : Demographics PS1.04 Project Scope : Demographics PS1.05 Project Scope : Demographics PS2.00 Project Scope : Land Use and Zoning PS2.01 Project Scope : Land Use and Zoning PS2.02 Project Scope : Housing Location, Typologies PS2.03 Project Scope : Housing Location, Type 1 PS3.00 Project Scope : Housing Location, Type 2, 3, 4 PS3.01 Project Scope : Housing Location, Type 5, 6, 7 PS4.00 Project Scope : Eight Study Houses PS4.01 Project Scope : Eight Study Houses PS5.00 Project Scope : Site Utilization PS5.01 Project Scope : Site Utilization PS5.02 Project Scope : Site Utilization PS5.03 Project Scope : Site Utilization PS6.00 Project Scope : Housing Condition PS6.01 Project Scope : Housing Condition PS7.00 Project Scope : Case Study 1 Overview PS7.01 Project Scope : Case Study 1 Housing Condition PS7.02 Project Scope : Case Study 2 Overview PS7.03 Project Scope : Case Study 2 Housing Condition PS8.00 Project Scope : Zoning Deviations PS8.01 Project Scope : Zoning Deviations PS8.02 Project Scope : Zoning Deviations PS8.03 Project Scope : Zoning Deviations PS9.00 Project Scope : House Construction PS9.01 Project Scope : House Materials PS10.00 Project Scope : Heating Strategies PS10.01 Project Scope : Heating Strategies PS11.00 Project Scope : Environmental Data PS11.01 Project Scope : Environmental Data PS11.02 Project Scope : Environmental Data PS11.03 Project Scope : Environmental Data SC1.00 Site Context : General Site Modifications SC1.01 Site Context : General Site Modifications SC1.02 Site Context : General Site Modifications SC1.03 Site Context : General Site Modifications SC2.00 Site Context : Scalar Representations SC2.01 Site Context : Scalar Representations CN1.00 Contract Negotiations : The Players CN101 Contract Negotiations : The Responsibilities AT1.00 Adaptive Transformation 1: Building Envelope AT1.01 Adaptive Transformation 1: Building Envelope AT1.02 Adaptive Transformation 1: Building Envelope AT1.03 Adaptive Transformation 1: Building Envelope AT1.04 Adaptive Transformation 1: Building Envelope AT1.05 Adaptive Transformation 1: Building Envelope AT2.00 Adaptive Transformation 2: Rainwater Harvesting AT2.01 Adaptive Transformation 2: Rainwater Harvesting AT2.02 Adaptive Transformation 2: Rainwater Harvesting AT2.03 Adaptive Transformation 2: Rainwater Harvesting AT2.04 Adaptive Transformation 2: Rainwater Harvesting AT2.05 Adaptive Transformation 2: Rainwater Harvesting AT2.06 Adaptive Transformation 2: Rainwater Harvesting AT2.07 Adaptive Transformation 2: Rainwater Harvesting AT2.08 Adaptive Transformation 2: Rainwater Harvesting AT2.09 Adaptive Transformation 2: Rainwater Harvesting AT3.00 Adaptive Transformation 3: Roof Greenhouse AT3.01 Adaptive Transformation 3: Roof Greenhouse AT3.02 Adaptive Transformation 3: Roof Greenhouse AT3.03 Adaptive Transformation 3: Roof Greenhouse AT3.04 Adaptive Transformation 3: Roof Greenhouse AT3.05 Adaptive Transformation 3: Roof Greenhouse AT3.06 Adaptive Transformation 3: Roof Greenhouse AT3.07 Adaptive Transformation 3: Roof Greenhouse AT3.08 Adaptive Transformation 3: Roof Greenhouse AT3.09 Adaptive Transformation 3: Roof Greenhouse AT3.10 Adaptive Transformation 3: Roof Greenhouse AT3.11 Adaptive Transformation 3: Roof Greenhouse AT3.12 Adaptive Transformation 3: Roof Greenhouse AT3.13 Adaptive Transformation 3: Roof Greenhouse AT3.14 Adaptive Transformation 3: Roof Greenhouse AT3.15 Adaptive Transformation 3: Roof Greenhouse PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING AT3.16 Adaptive Transformation 3: Roof Greenhouse CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550 AT3.17 Adaptive Transformation 3: Roof Greenhouse


AT4.00 AT4.01 AT4.02 AT4.03 AT4.04 AT4.05 AT4.06 AT4.07 AT4.08 AT4.09 AT4.10 AT4.11 AT4.12 AT4.13 AT4.14 AT4.15 AT4.16 AT4.17 AS1.00 AS1.01 AS1.02 SD1.00 IMP1.00 IMP1.01 IMP1.02 IMP1.03 IMP2.00 IMP2.01 IMP2.02 IMP2.03 IMP3.00 IMP3.01 IMP3.02 IMP3.03 CA1.00 CA1.01 CA1.02 CA1.03 CA1.04 CA1.05 SP1.00 SP1.01 SP1.02 SP1.03 SP1.04 SP1.05

Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Assembly Sequence : Stages 1 Assembly Sequence : Stages 2 Assembly Sequence : Stages 3 Selective Demolition : Stages 1 Implementation : Logistics Implementation : Logistics Implementation : Logistics Implementation : Logistics Implementation : Critical Path Implementation : Critical Path Implementation : Critical Path Implementation : Critical Path Implementation : Hard Costs Implementation : Hard Costs Implementation : Soft Costs Implementation : Budget Code Analysis : Building Transformation Code Analysis : Building Transformation Code Analysis : Building Transformation Code Analysis : Building Transformation Code Analysis : Building Transformation Code Analysis : Building Transformation Specifications : Material Legend Specifications : Material Legend Specifications : Material Legend Specifications : Material Legend Specifications : Material Legend Specifications : Wall Types

C o n t ex t PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

PROJECT NARRATIVE: AN INTRODUCTION

PMN1.00


LOCATION OF STUDY The P_PATCH investigation in this report is focused on the historic community of Lawrenceville. Officially founded in the early 1800’s, Lawrenceville has been a hub of industry and commerce throughout out its history. After its relatively recent down turn because of economic decline, the community has begun to experience a regeneration of energy and residential appeal. Large number of people, especially younger demographics, are moving into the neighborhood, encouraging development and need for efficient retrofits.

After study of the exisitng housing stock and selection of a common house typology, two specific houses of that type were selected as Case Study houses for in-depth analysis and development of retrofit designs. These two houses are labeled while the other houses in Central Lawrenceville of the same typology are highlighted in black.

WHERE ARE WE?

UPPER LAWRENCEVILLE

HOUSE 2 LOCATION 4919 BUTLER STREET

CENTRAL LAWRENCEVILLE

HOUSE 1 LOCATION 151 44TH STREET

LOWER LAWRENCEVILLE

Contextual map of Lower, Central, and Upper Lawrenceville adjacencies Houses in Black are of same typology as the two Case Study Houses

PN1.02

PROJECT NARRATIVE: CONTEXT

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


COMPARATIVE HOUSES IN OTHER NEIGHBORHOODS

3 S. A IKE NS TRE ET EN AV 5T H

UE

The same typology identified in Lawrenceville appears in other Pittsburgh neighborhoods, including Bluff. This repetition and permeation of this typology broadens and expands the effective scope of the proposed intervention. By developing this design proposal with a typology that appears consistently throughout the Pittsburgh region, the intervention is posed to be even more effective in it’s ability to creat drastic changes in the Regional Community.

LAWRENCEVILLE

3

SENECA STREET

South Aiken Street, Shadyside

BLUFF

SHADYSIDE

1 FORBES AVENUE

2 TUSTIN STREET

1

Seneca Street, Bluff

2

Tustin Street, Bluff

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

PROJECT NARRATIVE: COMPARATIVE TYPOLOGY

PN1.03


DEMOGRAPHICS

$8800

Central Lawrenceville Median Housing Value - $51,042

$4200

$4600 $7500 $7100 $52100

Upper Lawrenceville Median Housing Value - $46,328 Lower Lawrenceville Median Housing Value - $44,468

$9000

cancy

13.8% 3%

17.9%

ler S

40t

hS

2000 Census Data

tre

But

Google Maps + PGHSNAP

tree

t

Central

et

4%

Upper

Google Maps + PGHSNAP

$4800 $5900

2000 Census Data

$13100

13.5% 15.3%

e

Penn Av

$1600

Lower

$100

$5400

Google Maps + PGHSNAP

$5900 $500

2000 Census Data

Vacancy

Vacant Lots around Lawrenceville

Department of City Planning, Pittsburgh Snap File and GIS http://www.pittsburghpa.gov based on Census 2000, Claritas 2009, Google Maps

Lower Lawrenceville has many more vacant lots or abandoned homes than the rest of the community. This is primarily due to the steep slopes in the southern area which are recorded as Landslide prone areas. These areas are being used recreationally for the most part, however the rest of the lots that are not in those landslide zones still amount to a greater frequency than either Upper or Central Lawrenceville. The least amount of vacancies is in Central Lawrenceville which could suggest that it is a more desirable community to live in. It does suggest that vacancies are dropping as population rises. Central Lawrenceville has the highest population, if population can begin to rise, vacancy will drop.

9.8% UNEMPLOYMENT

4.2% UNEMPLOYMENT

tre ler S

40t

hS

But

Unemployment will start to drop as population rises, new residents moving in will likely be employed. According to The Bureau of Labor Statistics (http://www.bls.gov/) Lawrenceville area will have an unemployment level of 7.1 by the end of 2010, a slight drop from the current average.

et

Unemployment

et

6.4% UNEMPLOYMENT

Unemployement in Lawrenceville

PS1.00

PROJECT SCOPE: DEMOGRAPHICS

8.3% UNEMPLOYMENT

tre

e

Penn Av

Department of City Planning, Pittsburgh Snap File and GIS http://www.pittsburghpa.gov

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


Average Income of Lawrenceville Neighborhoods

$20k

$30k 2008

$28472 $25357 $19712 $23315 $27107 $26985 $19911 $21078 $21776 $15600 $19107

$36560 $32560 $25312 $29938 $34807 $34651 $25567 $27066 $27962 $20031 $24535

12 13 14 15 16 17 18 19

$22143 $25326 $22146 $22292 $23694 $16287 $16466 $41719

1

2

5

4 tree

40t

hS

tre

et

3

Between 2000 and 2008, there was a 28% increase in median income throughout Lawrenceville. This trend is projected to continue.

6 11

7

enn Ave

13

10

P

12

15 9

18

17

30% 20%

Department of City Planning, Pittsburgh Snap File and GIS http://www.pittsburghpa.gov http://www.city-data.com/

Lower Median Income: $26,711

Central Median Income: $28,406

40%

Upper Median Income: $32,348

Average Incomes of Different Neighborhoods in Lawrenceville

50%

14

16

8

19

It seems that Lawrenceville has a fairly low median income in general. The area that would presumably have a higher median (Lower) actually has the lowest. There are pockets of lower income groups in the neighborhood, these are further from Butler Street and in general, closer to Polish Hill and the railroad. The most interesting numbers come just south of Lawrenceville, in the Strip District, where the median income nearly doubles that of any part of lawrenceville. The graphs show spattering of income groupings throughout the 3 areas, it is also possible that a select group of high income residents can drive up the median in any specific area, in this case Upper Lawrenceville may benefit from this sort of situation. The average income for these neighborhoods will increase as population rises and vacancies are filled by new residents. Increasing the property value of the neighborhood will also increase the average income.

t

2000 1 2 3 4 5 6 7 8 9 10 11

$10k

But ler S

$40k

Central Upper

10%

Lower $200,000 or more

$150,000 - $199,999

$100,000 - $149,999

$75,000 - $99,999

$50,000 - $74,999

$35,000 - $49,999

$25,000 - $34,999

$15,000 - $24,999

$10,000 - $14,999

< $10,000

0

Central Median Income: $28,406 Upper Median Income: $32,348 Lower Median Income: $26,711 PercentageCentral of Income Upper

Department of City Planning, Pittsburgh Snap File and GIS http://www.pittsburghpa.gov

Lower

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

PROJECT SCOPE: DEMOGRAPHICS

PS1.01


Population of Lawrenceville

9000 Population

6000

3000 0

The population of Pittsburgh as well as Lawrenceville has been on a steady decline for at least 70 years. While the trajectory has slowed its pace more recently it is still continuing downward. If anything is to be said about diversity, Lower Lawrenceville has the highest percentage of non-white residents at around 15%. The population decrease has dramatically slowed into the current years 1940 and is 1950 1960 poised to begin to make an 1970 increase.

15000 12000 9000

1980

6000

1990

2000

2008

3000 0

1940

1950

1960

1970

1980

2000

2008

Population Breakdown Trends Department of City Planning, Pittsburgh Snap File and 100 GIS http://www.pittsburghpa.gov

100 80

80

20

100

80

80

Upper

60

60

Lower

40

Central

20 40

Occupations

35%

The graphing of occupations in Lawrenceville depicts a situation in which management and higher positions tend to live closer to the amenities of Butler Streets main business area and closer to downtown. Central and Lower Lawrenceville cater to much more Management/ Professional employees whereas Upper seems to be primarily positions in service, sales, and production/ transportation. Jobs generally associated with lower income levels.

30%

20

% Age 20-34

0 % Age 5-19

% Age 75+

% Age 60-74

% Age 35-59

% White

Population Breakdowns Age

% Other

% Asian

% Age 20-34

0

% African American

20

% Age 5-19

0

% White

% Other

% Asian

% African American

40

Department of City Planning, Pittsburgh Snap File and GIS http://www.pittsburghpa.gov

25% 20% 15% 10%

Population Breakdowns Occupation

PS1.02

PROJECT SCOPE: DEMOGRAPHICS

Production, Transport.

Construction/Extraction

Farm/Fishing/Forestry

Sales and office

Service

0

Mgmt./Professional

5%

Department of City Planning, Pittsburgh Snap File and GIS http://www.pittsburghpa.gov

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

% Age 75+

40

The majority of the residents in Lawrenceville are middle aged and white. The only trends visible are that more elderly people live in Central Lawrenceville where there are less children and young adults.

100 60

% Age 60-74

Age

% Age 35-59

60

0

1990


CENTRAL

LOWER 5-19

75+

75+

UPPER 5-19 Population of Lawrenceville75+

5-19

60-74

60-74

15000 60-74

12000 900020-34

20-34 35-59

20-34

35-59

35-59

6000 Population Breakdowns Age

Department of City Planning, Pittsburgh Snap File and GIS http://www.pittsburghpa.gov

3000 0

Upper Lawrenceville

1940

1950

1960

1970

1980

African American Asian Other

Central Lawrenceville

White

African American Asian Other

100

10

80

8

60

6

40

4

White

20

2

Asian African American

Population Breakdowns Ethnicity

% White

% Other

% Asian

0

White

% African American

Lower Lawrenceville

Department of City Planning, Pittsburgh Snap File and GIS http://www.pittsburghpa.gov

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

PROJECT SCOPE: DEMOGRAPHICS

PS1.03


Education

Upper

t

Lower 40

th

ler Stre e

The proximity to downtown may explain the trend in education. In the downtown area there are many jobs that require a higher education, living in the neighborhoods closest to those jobs would be those who can fill them.

Central

Str

But

All of Lawrenceville sits around 70% High School Educated. The Closer to downtown, the more college degrees though. Lower Lawrenceville is at nearly 16% with at least a Bachelor Degree, Central is just below 13% and Upper is about 9%.

ee

t

Penn Ave

Population Breakdown Education

UPPER LAWRENCEVILLE

CENTRAL LAWRENCEVILLE

LOWER LAWRENCEVILLE

PS1.04

PROJECT SCOPE: DEMOGRAPHICS

Department of City Planning, Pittsburgh Snap File and GIS http://www.pittsburghpa.gov

43.9% 7.9% 22.4% 13.1% 3.5% 6.9% 2.4%

HighSchool Graduate Less than 9th Grade 9th-12th Grade Some college, no degree Associate Degree Bachelor Degree Grad. or Prof. Degree

41% 6.8% 19.5% 15.4% 4.3% 9.5% 3.4%

HighSchool Graduate Less than 9th Grade 9th-12th Grade Some college, no degree Associate Degree Bachelor Degree Grad. or Prof. Degree

37% 8% 18.7% 15% 5.3% 10.9% 5%

HighSchool Graduate Less than 9th Grade 9th-12th Grade Some college, no degree Associate Degree Bachelor Degree Grad. or Prof. Degree

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


2000

DRIVE ALONE

CARPOOL

BUS

MOTORCYCLE

BICYCLE

WALK

OTHER

WORK AT HOME

1500

1000

500

0

DOWNTOWN

2.5 MILES

.5 MILES

LOWER LAWRENCEVILLE

CENTRAL LAWRENCEVILLE

.5 MILES

UPPER LAWRENCEVILLE

Transportation It appears that the breakdown of modes of transportation for the 3 areas of Lawrenceville tell a lot about the character of the community.

.5 miles

Upper Lawrenceville

While driving alone is a primary mode of transportation to and from work, it seems that nearly half of the population of Lawrenceville uses alternative methods of commuting other than driving alone. Public transportation and carpooling are dominant among the alternatives, though biking seems to be popular as well, especially closer to Down Town.

Central Lawrenceville .5 miles

Lower Lawrenceville

2.5 miles

Downtown

Transportation Analysis Bus Routes

Department of City Planning, Pittsburgh Snap File and GIS http://www.pittsburghpa.gov, Google Maps

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

PROJECT NARRATIVE: DEMOGRAPHICS

PS1.05


LAND USE AND ZONING Very-High Density Subdistrict Site Development Standard: Minimum Lot Size 1,200 s.f. Minimum Lot Size per Unit 400 s.f. Minimum Front Setback 5 ft. Minimum Rear Setback 15 ft. Minimum Exterior Sideyard Setback 5 ft. Minimum Interior Sideyard Setback 10 ft. Maximum Height 40 ft. (not to exceed 3 stories) Pittsburgh Zoning Code 911.02 Single-Unit Attached Residential means the use of a zoning lot for one dwelling unit that is attached to one or more dwelling units by a party wall or separate abutting wall and that is located on its own separate lot.

Zoning Information for Pittsburgh, R1A-VH Single-Unit Attached Residential in Very High Density Area 903.01.A Purpose. Pittsburgh’s overall character is defined to a great degree by its diverse and unique residential areas. The Urban Zoning Code’s approach to residential zoning reflects this diversity by allowing very fine-grained adjustments in the range of zoning controls applied within and among neighborhoods. The purpose of these controls is to encourage development and redevelopment while preserving the character of existing residential neighborhoods. Allowable Uses

Permission Needed

Detached Single-Family Homes Attached Single-Family Homes Community Home (Disabled persons) Elderly Home Personal Care Residence (Small) Agricultural Bed and Breakfast (limited) Child Care (limited) Communication Tower (class A, B) Communication Tower (class C) Community Center Cultural Service (limited) <5,000 sqft Excavation, Grading, Fill Forestry Activities Library (limited) Parks and Recreation (limited) less than 19 parking Religious Assembly Public Safety Service School (limited) <75 students Transit Facility Utility (limited)

Permitted Permitted Special Exception Special Exception Administrator Exception Administrator Exception Special Exception Special Exception Special Exception Conditional Use Special Exception Special Exception Conditional Use Special Exception Special Exception Administrator Exception Special Exception Special Exception Special Exception Conditional Use Administrator Exception

me

m mu

ble

a

ild

bu

lu vo

M

xi

um

im

in

Ma

Maximum Buildable Height

om fr

. ft

k

5

ac

tb

Se

ft

15

ft .

5

M

in

im

um

Se

tb

ac k

fr om

FR O

N

T

M

in

im

um

Se

tb

ac k

fr om

BA CK

40 ft.

DE

SI

Zoning Setbacks from Property Lines

PS3.00

PROJECT SCOPE: LAND USE AND ZONING

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


Lower Central Upper 23.7% 20.6% 10.9% 4.9% 54.6% 16.1% 0.0% 1.9% 5.0% 56.5% 5.8% 0.0%

24.4% 9.1% 53.0% 0.0% 1.2% 12.3%

Map Key: Residential Mixed Use/Commercial Mixed Use/Industrial Institutional / Educational /Medical Open Space Hillside

LNC

R2-L

R1A-VH

UI

R1A-VH RM-M

LNC

R1A-H R1A-VH

R1A-VH

EMI

P

LNC LNC R1A-H

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

PROJECT SCOPE: LAND USE AND ZONING

PS3.01


PMN1.00

PROJECT NARRATIVE: AN INTRODUCTION

GC0.00 Cover Sheet IN1.00 Index : Table of Contents IN2.00 Index : Report Layout IN3.00 Index : General Use Notes IN4.00 Index : Keys and Definitions PN1.00 Project Narrative : An Introduction PN1.01 Project Narrative : Decision Process PN1.02 Project Narrative : Context PN1.03 Project Narrative : Comparative Typology PS1.00 Project Scope : Demographics PS1.01 Project Scope : Demographics PS1.02 Project Scope : Demographics PS1.03 Project Scope : Demographics PS1.04 Project Scope : Demographics PS1.05 Project Scope : Demographics PS2.00 Project Scope : Land Use and Zoning PS2.01 Project Scope : Land Use and Zoning PS2.02 Project Scope : Housing Location, Typologies PS2.03 Project Scope : Housing Location, Type 1 PS3.00 Project Scope : Housing Location, Type 2, 3, 4 PS3.01 Project Scope : Housing Location, Type 5, 6, 7 PS4.00 Project Scope : Eight Study Houses PS4.01 Project Scope : Eight Study Houses PS5.00 Project Scope : Site Utilization PS5.01 Project Scope : Site Utilization PS5.02 Project Scope : Site Utilization PS5.03 Project Scope : Site Utilization PS6.00 Project Scope : Housing Condition PS6.01 Project Scope : Housing Condition PS7.00 Project Scope : Case Study 1 Overview PS7.01 Project Scope : Case Study 1 Housing Condition PS7.02 Project Scope : Case Study 2 Overview PS7.03 Project Scope : Case Study 2 Housing Condition PS8.00 Project Scope : Zoning Deviations PS8.01 Project Scope : Zoning Deviations PS8.02 Project Scope : Zoning Deviations PS8.03 Project Scope : Zoning Deviations PS9.00 Project Scope : House Construction PS9.01 Project Scope : House Materials PS10.00 Project Scope : Heating Strategies PS10.01 Project Scope : Heating Strategies PS11.00 Project Scope : Environmental Data PS11.01 Project Scope : Environmental Data PS11.02 Project Scope : Environmental Data PS11.03 Project Scope : Environmental Data SC1.00 Site Context : General Site Modifications SC1.01 Site Context : General Site Modifications SC1.02 Site Context : General Site Modifications SC1.03 Site Context : General Site Modifications SC2.00 Site Context : Scalar Representations SC2.01 Site Context : Scalar Representations CN1.00 Contract Negotiations : The Players CN101 Contract Negotiations : The Responsibilities AT1.00 Adaptive Transformation 1: Building Envelope AT1.01 Adaptive Transformation 1: Building Envelope AT1.02 Adaptive Transformation 1: Building Envelope AT1.03 Adaptive Transformation 1: Building Envelope AT1.04 Adaptive Transformation 1: Building Envelope AT1.05 Adaptive Transformation 1: Building Envelope AT2.00 Adaptive Transformation 2: Rainwater Harvesting AT2.01 Adaptive Transformation 2: Rainwater Harvesting AT2.02 Adaptive Transformation 2: Rainwater Harvesting AT2.03 Adaptive Transformation 2: Rainwater Harvesting AT2.04 Adaptive Transformation 2: Rainwater Harvesting AT2.05 Adaptive Transformation 2: Rainwater Harvesting AT2.06 Adaptive Transformation 2: Rainwater Harvesting AT2.07 Adaptive Transformation 2: Rainwater Harvesting AT2.08 Adaptive Transformation 2: Rainwater Harvesting AT2.09 Adaptive Transformation 2: Rainwater Harvesting AT3.00 Adaptive Transformation 3: Roof Greenhouse AT3.01 Adaptive Transformation 3: Roof Greenhouse AT3.02 Adaptive Transformation 3: Roof Greenhouse AT3.03 Adaptive Transformation 3: Roof Greenhouse AT3.04 Adaptive Transformation 3: Roof Greenhouse AT3.05 Adaptive Transformation 3: Roof Greenhouse AT3.06 Adaptive Transformation 3: Roof Greenhouse AT3.07 Adaptive Transformation 3: Roof Greenhouse AT3.08 Adaptive Transformation 3: Roof Greenhouse AT3.09 Adaptive Transformation 3: Roof Greenhouse AT3.10 Adaptive Transformation 3: Roof Greenhouse AT3.11 Adaptive Transformation 3: Roof Greenhouse AT3.12 Adaptive Transformation 3: Roof Greenhouse AT3.13 Adaptive Transformation 3: Roof Greenhouse AT3.14 Adaptive Transformation 3: Roof Greenhouse PITTSBURGH PROGRAM FOR THE ADAPTIVE OF COMMUNITY HOUSING AT3.15TRANSFORMATION Adaptive Transformation 3: Roof Greenhouse AT3.16 Adaptive Transformation CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550 3: Roof Greenhouse AT3.17 Adaptive Transformation 3: Roof Greenhouse


AT4.00 AT4.01 AT4.02 AT4.03 AT4.04 AT4.05 AT4.06 AT4.07 AT4.08 AT4.09 AT4.10 AT4.11 AT4.12 AT4.13 AT4.14 AT4.15 AT4.16 AT4.17 AS1.00 AS1.01 AS1.02 SD1.00 IMP1.00 IMP1.01 IMP1.02 IMP1.03 IMP2.00 IMP2.01 IMP2.02 IMP2.03 IMP3.00 IMP3.01 IMP3.02 IMP3.03 CA1.00 CA1.01 CA1.02 CA1.03 CA1.04 CA1.05 SP1.00 SP1.01 SP1.02 SP1.03 SP1.04 SP1.05

Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Assembly Sequence : Stages 1 Assembly Sequence : Stages 2 Assembly Sequence : Stages 3 Selective Demolition : Stages 1 Implementation : Logistics Implementation : Logistics Implementation : Logistics Implementation : Logistics Implementation : Critical Path Implementation : Critical Path Implementation : Critical Path Implementation : Critical Path Implementation : Hard Costs Implementation : Hard Costs Implementation : Soft Costs Implementation : Budget Code Analysis : Building Transformation Code Analysis : Building Transformation Code Analysis : Building Transformation Code Analysis : Building Transformation Code Analysis : Building Transformation Code Analysis : Building Transformation Specifications : Material Legend Specifications : Material Legend Specifications : Material Legend Specifications : Material Legend Specifications : Material Legend Specifications : Wall Types

T y p o lo g i es PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

PROJECT NARRATIVE: AN INTRODUCTION

PMN1.00


WHAT DO THE EXISTING HOUSES LIKE?

th

47

Through the typological study, we examined every house in Central Lawrenceville North of Butler Street to categorically identify every unique type of house. The results from this analysis not only revealed the unique diversity of residences but also the density of each type and which typologies were most common. Through the classification we identified 8 major types of structures found in the residential fabric. We then explored each unique variation of those major types and have documented our findings here.

e m Ho

St eld

W ay

Ha tfi

St

ay W lly Ho M

th

od

46

oc

on tt Co

ue

rg

ay W

arn

ay W

c Lo

Plu m

m

th

er

cu Ly

erp tw An

45

St

ay W

The map below describes the distribution of types in the sampling area. The following pages chart the variations and relationships between the several typologies.

ay aW

th

44 Ed

en

W illo w

Way

St

It quickly became evident that typology 1, the Brick, two story, three bay row house with gabled roof, was the most common and adaptable type of house in Central Lawrenceville. Thus, we chose this typology to explore further. We completed our typology study by selecting eight houses of the Typology 1 to observer and document for weaknesses and opportunities. These eight houses are outlined on PS4.00.

43

tle r

St

HOUSING TYPOLOGIES

St

Bu

1/2

Area of Study in Lawrenceville

TYPE 1

TH

47

TYPE 2

ES

M

HO

ST

OD M

TH

46

OC

W AY

HA TF

IE

AY W

LD

Y LL

T

HO

TYPE 3

ON TT CO

AY EW

P

ER

ER M

NA AR

AY W

C LO

PL UM

GU

TW

R CU LY

AN

TH

45

ST

AY W

TYPE 4

AY W

TYPE 5

2 1/

T RS TLE

43 ST

BU

W

IL

ED EN

LO W

WA Y

ST

TH

44

RD

43

TYPE 6

46 TH

TYPE 7

T

ES

ER

AY EW

IC

RV

SE

ST

PROJECT NARRATIVE: AN INTRODUCTION

R

W LA

AY W

41

Sampling of Typologies

PS1.00

TH

45

NN

BA

GARAGE / SHED

C EN

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


36 FOOT GABLE VARIATIONS

TYPOLOGY 1: 3-BAY ROWHOUSE WITH GABLE th 47 e m Ho

St d

oc

W ay

Ha tfi el

St

ay W lly Ho M

od

th 46 on tt Co

na ar

ay W

c Lo

Pl um

m

er

St

ay W

th 45

p er tw An

+

ay eW

u rg

cu Ly

ay W 43 St

u do

th 46

ble

rm do

ce

er

th 45

nn

Ba

nt

ay W

fro

2 1/

er

er

rm do

Bu tle rS t

W ill ow

Ed en Wa y

St

th 44

rd 43

ion

ens ext

Se rv

st 41

ay eW ic

THE SELECTED TYPOLOGY FOR REVAMP INTIATIVE

r

nt

fro

er

r

e orm

d

ck

ba

e orm

d

le

ub

do

rm do

22 FOOT GABLE VARIATIONS

+

ion

ens ext

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

PROJECT SCOPE: TYPOLOGY 1

PS2.01

n re

w La

St


TYPOLOGY 2 th 47

St d

M

od

th 46

oc

W ay

Ha tfi el

St

ay W lly Ho

e m Ho

+

on tt Co ay W

ay eW

er m

na ar ay W Ed en Wa y

43 2 1/ St

ion

er

th 46

er

th 45

nn

Ba

e nc

St

ay W

do

Se rv

st 41

ay eW ic

th

47

+

e

m Ho oc

W ay

Ha tfi

el

d

ay W

St

ly

St

l Ho M

th

od

46 n to

t Co ay W

ay eW

er m

th

x

ple

du

ion

ens ext

p

Pl

ay W

c Lo

um

rm do

er tw An

45

St

u rg

le

ub

re

w La

TYPOLOGY 3

cu Ly

le

ub

do

Bu tle rS t

St

th 44

rd 43

W ill ow

d

rm do

ens t x e

ay W

c Lo

Pl um

p er tw An

th 45

St

u rg

cu Ly

nt

fro

er

er

orm

na

ar ay W St

Bu

2

1/

tle

43

rS t

Ed e

W ill

ow

nW ay

St

th

44

rd

43

th

46

th

er

45

nn

Ba

ce

n re

St

w La

ay W Se

st

rv

41

ay eW ic

TYPOLOGY 4 47 th e

m Ho od oc

W ay

Ha tfi e

ld

ay W

St

ly

St

l Ho

46

M

th n to

t Co

m m

na

ar

ay W

c Lo

Pl u

p er tw An

th

45

er St

ay W

ay eW

u rg

cu Ly

ay W

44 St

Bu

2 1/

tle

43

rS t

Ed en

W ill

rd

ow

Wa y

St

th

43

46 th

th

er

45

nn

Ba

ce

n re

St

w La

ay W Se

st

rv

41

ay eW ic

PS2.02

PROJECT SCOPE: TYPOLOGY 2,3,4

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


43

rS t

th

rd

2 1/

tle

ay W

ay W

44

Wa y

p er tw An

na

ar

Ed en

ay W

c Lo

43

St

Bu M

od oc

W ay

St

ay W

n to

er St

ay eW ic

th

ly

th t Co

m

th

46

th

45 rv

Se

47

e m Ho

l Ho

46

th

45

m

nW ay Ed e

rS t tle Bu St

Pl u

er m um Pl

ay W

2

1/

ay W

St

p

er tw An

43

er

ld

St ay W

ay W

th

44

rd

ce

46

th

St

ce

n re

th

45

er

nn

Ba

w La

St n re

nn

Ha tfi e

M

oc od

W ay

Ha tfi

d el

St

ay eW ic

St

ay W

n to

t Co

na

ar

St

th 46

th 45 rv

Se

th

47 e

m Ho ly

l Ho

th

46

th

45 c Lo

ow

St

Ed en Wa y

Bu tle rS t

W ill ow

er m Pl um

ay W

St

ay W 43

W ill

p er tw An

2 1/

er

st 41

St

St

M

od

W ay

Ha tfi el

oc

St

43

ce

St n re

nn

ay eW u rg

w La

Ba

ow

d

St

th 47

ay W

ay W

th 44

rd 43 st 41

cu Ly

w La

Ba

ay W

ay eW ic

rv

Se

st

41

PS2.03

PROJECT SCOPE: TYPOLOGY 5,6,7

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

ay eW

u rg

ion

e m Ho

on tt Co

na ar

ion

ay eW u rg

+

ens ext

cu Ly

th 45 c Lo

ens ext

ay W lly Ho

x

cu Ly

+

th 46

ple du

W ill

TYPOLOGY 5

TYPOLOGY 6

TYPOLOGY 7


WHICH HOUSES ARE WE STUDYING? THE BOARDING HOUSE TYPOLOGY

113 11343rd 43rd Street

111 45th 111 45th Street

145 14544th 44th Street

133 45th Street 133 45th

156 15644th 44th Street

127 46th Street 127 46th

164 16444th 44thStreet

184 184 46th 46th Street

WHY? Of an average twenty five to thirty homes per block in Central Lawerenceville, 19% are of the same or

similar typology, to those studied in this document. Over 90 homes in the surrounding 16 blocks can benefit from the contained proposals for insulation and window replacement. Over a dozen of the aforementioned properties have sidelots, which could benefit from the other design proposals.

PS4.00

PROJECT SCOPE: EIGHT STUDY HOUSES

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

PROJECT SCOPE: EIGHT STUDY HOUSES

PS4.01


SITE UTILIZATION

These diagrams document the existing conditions of the site for each of these eight houses.

113 43RD STREET

addition on back

Lot Size: 2600 sq ft Parking: garage Fences: chainlink

drainage to street

20’ 20’

’ 30’ 30

’ 40’ 40

8’ ’ 8 8’ 8’

’ 52’ 52

brick-paved front yard

145 44TH STREET Lot Size: 2400 sq ft Parking: on grade Fences: none

gutter drains to garden

’ 40’ 40 ’ 60’ 60 20’ 20’

well-maintained side yard

8’ 8’ drainage to street; no front yard

PS5.00

PROJECT SCOPE: SITE UTILIZATION

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

68


20’

8’

156 44TH STREET

chainlink and wood fences

Lot Size: 3048 sq ft Parking: street Fences: wood + chainlink

68’

’ 52 24’

balcony addition

10’ ’ 8 well-maintained front yard

164 44TH STREET chainlink fenced side yard

Lot Size: 3048 sq ft Parking: garage Fences: chainlink

’ 18 ’ 44 two story deck addition

’ 60 24 ’

’ 10 ’ 8 front yard buffer space

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

PROJECT SCOPE: SITE UTILIZATION

PS5.01


111 45TH STREET Lot Size: 1076 sq ft Parking: street Fences: none

side porch

little setback

8’

connection to adjacent house

52 8’

20’

8’ drainage to street

52 8’

20’ 133 45TH STREET Lot Size: 2000 sq ft Parking: on grade Fences: brick + chainlink

brick wall

20

12

porch addition

68 20’

12

8’ ’

68 20’

PS5.02

PROJECT SCOPE: SITE UTILIZATION

20

chainlink fences

8’

drainage to basement

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

48


8’

20’

127 46TH STREET Lot Size: 2100 sq ft Parking: street Fences: concrete

concrete masonry wall

48

48

maintained backyard

52 8’

24’ 24’

52

side setback

8’

127 46TH STREET Lot Size: 2000 sq ft Parking: street Fences: chainlink

deck addition

18

20 ’

62 20’ 20’

8’

62

20

18

chainlink fences

8’ drainage to street

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

PROJECT SCOPE: SITE UTILIZATION

PS5.03


HOUSING CONDITIONS Listed Building Condition: Fair

113 43rd 43rd 113

Item

Condition

Front Stoop

Needs Replacement/Renovation (Heavy Wear/Shoddy Repairs)

a

d

Brick and Siding

No Changes Needed

b

c b a

New Windows

No Changes Needed

c

Old 3rd Story Window

Single Pane - Lots of Heat Loss - Needs Replacement

d

Back/Side Awning

Could Use Replacement

e

e

Listed Building Condition: Average Item

Condition

Gutter

Could Use Repair

a

Old Windows

Single Pane - Lots of Heat Loss - Needs Replacement

b

Back Stoop + Railing

Needs Replacement/Renovation (Heavy Wear/Shoddy Repairs)

c

Brick and Painting

No Changes Needed

d

Listed Building Condition: Average

145 44th 145 44th c a b d

156 156 44th 44th a c

Item

Condition

Brick and Painting

Back Paint Peeling - Re-Paint

a

b

New Windows

No Changes Needed

b

d

Rear Awning

Could Use Replacement

c

Side Railing

Old and Rusting - Could Use Replacement

d

Listed Building Condition: Average

164 16444th 44th c

Item

Condition

Brick and Painting

No Changes Needed

a

a

b d

Tall Windows

Single Pane - Lots of Heat Loss - Needs Replacement

b

Small Windows

Single Pane - Lots of Heat Loss - Needs Replacement

c

Brick Under AC Units

Water Damaged - Needs Repair

d

PS6.00

PROJECT SCOPEE: HOUSING CONDITION

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


111 45th 111 45th Living Area: 2,726 Ft

Listed Building Condition: Average

d

Item

Condition

a

Brick and Painting

No Changes Needed

a

b

Transom + Store Front Windows

No Changes Needed

b

c

Second Floor Balcony + Side No Changes Needed - Possible Zoning Violation Porch Dormer Windows w/Siding

No Changes Needed

c d

Listed Building Condition: Average

133 45th 133 45th Living Area: 2,170 Ft

a b c d

Item

Condition

Brick

Chimney w/Dramatic Lean - Structural Problems

a

Windows

New - No Changes Needed

b

Big Hole Above Door

Needs Repair

c

Roof Gutter

Drains to Basement

d

Listed Building Condition: Fair

127 46th 127 46th Living Area: 2,118 Ft

e c a b

Item

Condition

Brick and Stone

No Structural Issues But Cosmetically Flawed

a

Large Front Awning

No Changes Needed

b

Windows

Lots of Heat Loss Owner Suggested Change

c

Stairs

Steep w/No Railing

d e

Back Awning - Needs Replacement

184 46th 184 46th

Listed Building Condition: Average

Living Area: 2,300 Ft

d

Item

Condition

a

Brick and Paint

No Changes Needed

a

New Windows

No Changes Needed

b

Front Stoop

Excellent Quality

c

Back Deck

Newly Added

d

b c

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

PROJECT SCOPE: HOUSING CONDITION

PS6.01


PMN1.00

PROJECT NARRATIVE: AN INTRODUCTION

GC0.00 Cover Sheet IN1.00 Index : Table of Contents IN2.00 Index : Report Layout IN3.00 Index : General Use Notes IN4.00 Index : Keys and Definitions PN1.00 Project Narrative : An Introduction PN1.01 Project Narrative : Decision Process PN1.02 Project Narrative : Context PN1.03 Project Narrative : Comparative Typology PS1.00 Project Scope : Demographics PS1.01 Project Scope : Demographics PS1.02 Project Scope : Demographics PS1.03 Project Scope : Demographics PS1.04 Project Scope : Demographics PS1.05 Project Scope : Demographics PS2.00 Project Scope : Land Use and Zoning PS2.01 Project Scope : Land Use and Zoning PS2.02 Project Scope : Housing Location, Typologies PS2.03 Project Scope : Housing Location, Type 1 PS3.00 Project Scope : Housing Location, Type 2, 3, 4 PS3.01 Project Scope : Housing Location, Type 5, 6, 7 PS4.00 Project Scope : Eight Study Houses PS4.01 Project Scope : Eight Study Houses PS5.00 Project Scope : Site Utilization PS5.01 Project Scope : Site Utilization PS5.02 Project Scope : Site Utilization PS5.03 Project Scope : Site Utilization PS6.00 Project Scope : Housing Condition PS6.01 Project Scope : Housing Condition PS7.00 Project Scope : Case Study 1 Overview PS7.01 Project Scope : Case Study 1 Housing Condition PS7.02 Project Scope : Case Study 2 Overview PS7.03 Project Scope : Case Study 2 Housing Condition PS8.00 Project Scope : Zoning Deviations PS8.01 Project Scope : Zoning Deviations PS8.02 Project Scope : Zoning Deviations PS8.03 Project Scope : Zoning Deviations PS9.00 Project Scope : House Construction PS9.01 Project Scope : House Materials PS10.00 Project Scope : Heating Strategies PS10.01 Project Scope : Heating Strategies PS11.00 Project Scope : Environmental Data PS11.01 Project Scope : Environmental Data PS11.02 Project Scope : Environmental Data PS11.03 Project Scope : Environmental Data SC1.00 Site Context : General Site Modifications SC1.01 Site Context : General Site Modifications SC1.02 Site Context : General Site Modifications SC1.03 Site Context : General Site Modifications SC2.00 Site Context : Scalar Representations SC2.01 Site Context : Scalar Representations CN1.00 Contract Negotiations : The Players CN101 Contract Negotiations : The Responsibilities AT1.00 Adaptive Transformation 1: Building Envelope AT1.01 Adaptive Transformation 1: Building Envelope AT1.02 Adaptive Transformation 1: Building Envelope AT1.03 Adaptive Transformation 1: Building Envelope AT1.04 Adaptive Transformation 1: Building Envelope AT1.05 Adaptive Transformation 1: Building Envelope AT2.00 Adaptive Transformation 2: Rainwater Harvesting AT2.01 Adaptive Transformation 2: Rainwater Harvesting AT2.02 Adaptive Transformation 2: Rainwater Harvesting AT2.03 Adaptive Transformation 2: Rainwater Harvesting AT2.04 Adaptive Transformation 2: Rainwater Harvesting AT2.05 Adaptive Transformation 2: Rainwater Harvesting AT2.06 Adaptive Transformation 2: Rainwater Harvesting AT2.07 Adaptive Transformation 2: Rainwater Harvesting AT2.08 Adaptive Transformation 2: Rainwater Harvesting AT2.09 Adaptive Transformation 2: Rainwater Harvesting AT3.00 Adaptive Transformation 3: Roof Greenhouse AT3.01 Adaptive Transformation 3: Roof Greenhouse AT3.02 Adaptive Transformation 3: Roof Greenhouse AT3.03 Adaptive Transformation 3: Roof Greenhouse AT3.04 Adaptive Transformation 3: Roof Greenhouse AT3.05 Adaptive Transformation 3: Roof Greenhouse AT3.06 Adaptive Transformation 3: Roof Greenhouse AT3.07 Adaptive Transformation 3: Roof Greenhouse AT3.08 Adaptive Transformation 3: Roof Greenhouse AT3.09 Adaptive Transformation 3: Roof Greenhouse AT3.10 Adaptive Transformation 3: Roof Greenhouse AT3.11 Adaptive Transformation 3: Roof Greenhouse AT3.12 Adaptive Transformation 3: Roof Greenhouse AT3.13 Adaptive Transformation 3: Roof Greenhouse AT3.14 Adaptive Transformation 3: Roof Greenhouse AT3.15 Adaptive Transformation 3: Roof Greenhouse PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING AT3.16 Adaptive Transformation 3: Roof Greenhouse AT3.17 Adaptive Transformation 3: Roof Greenhouse CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


AT4.00 AT4.01 AT4.02 AT4.03 AT4.04 AT4.05 AT4.06 AT4.07 AT4.08 AT4.09 AT4.10 AT4.11 AT4.12 AT4.13 AT4.14 AT4.15 AT4.16 AT4.17 AS1.00 AS1.01 AS1.02 SD1.00 IMP1.00 IMP1.01 IMP1.02 IMP1.03 IMP2.00 IMP2.01 IMP2.02 IMP2.03 IMP3.00 IMP3.01 IMP3.02 IMP3.03 CA1.00 CA1.01 CA1.02 CA1.03 CA1.04 CA1.05 SP1.00 SP1.01 SP1.02 SP1.03 SP1.04 SP1.05

Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Assembly Sequence : Stages 1 Assembly Sequence : Stages 2 Assembly Sequence : Stages 3 Selective Demolition : Stages 1 Implementation : Logistics Implementation : Logistics Implementation : Logistics Implementation : Logistics Implementation : Critical Path Implementation : Critical Path Implementation : Critical Path Implementation : Critical Path Implementation : Hard Costs Implementation : Hard Costs Implementation : Soft Costs Implementation : Budget Code Analysis : Building Transformation Code Analysis : Building Transformation Code Analysis : Building Transformation Code Analysis : Building Transformation Code Analysis : Building Transformation Code Analysis : Building Transformation Specifications : Material Legend Specifications : Material Legend Specifications : Material Legend Specifications : Material Legend Specifications : Material Legend Specifications : Wall Types

C a s e S t u d y H o u ses PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

PROJECT NARRATIVE: AN INTRODUCTION

PMN1.00


CASE STUDY HOUSE 1 Item

Condition

1

Brick

No Changes Needed

2

Front Door

Broken Down and Deteriorating - Needs Replacement

3

Exterior Woodwork

Deteriorating with Large Gaps - Needs Replacement

4

Front Windows

Old Model Replacement Suggested

5

Roofing

Gaps Evident Around Edges Repairs Suggested

6

Back Elevated Door

No Longer Used Block Up/Add Back Porch

7

Glass Block @ Ground

Cracked Inset Louvers Need Replacement

8

Awnings

Fallen Off Replacement Suggested

9

Insulation

Home Completely Uninsulated Need Insulation

10

Attic Floor

Poor Condition Possible Need of Repair

11

Stone Stoop

Gaps at Connection to House - Need Repairs

Building Informaion Full Baths : 1 Condition : Fair (refer to IN4.00) Year Built : 1853 Half Baths : 0 Fireplaces : 3 Exterior Finish : Brick Roof Type : Shingle Use Code : Single Family Total Rooms : 6 Basement : Full Basement Style : Old Style Bedrooms : 3 Grade : D+ (refer to IN4.00) Stories : 2

SW-NE ORIENTATION

LIVING AREA : 1,940 sq. ft.

151 44TH STREET Parcel ID : 0080-P-0035-0000-00 Municipality : 109 Pittsburgh - 9th Ward Owner : Krynski, Judy McKnight

Allegheny County Office of Property Assessment Listed Building Condition: Fair (refer to IN4.00)

5 3

4

2

7 11

Existing Conditions

PS7.00

PROJECT SCOPE: CASE STUDY 1 OVERVIEW

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


2

3

7

4

10

6

5

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

11

PROJECT SCOPE: CASE STUDY 1 CONDITIONS

PS7.01


CASE STUDY HOUSE 2 Building Information Full Baths : 2 Condition : Very Poor (refer to IN4.00) Year Built : 1900 Half Baths : 1 Fireplaces : 0 Exterior Finish : Brick Roof Type : Roll Use Code : Two Family Total Rooms : 8 Basement : Full Basement Style : Multi-Family Bedrooms : 4 Grade : C- (refer to IN4.00) Stories : 2

SE-NW ORIENTATION

LIVING AREA : 2,744 sq. ft.

4919 BUTLER ST Parcel ID : 0080-G-00084-0000-00 Municipality : 109 Pittsburgh - 9th Ward Owner : Bernard, James J.

Item

Condition

1

Brick

Mortar and Brick Deteriorating Needs Repair

2

Windows

Most are Broken or Single Pane Need Replacement

3

Roofing

Gaps are Forming and Clear Water Damage - Needs Repairs

4

Exterior Wood Work

Rotting Needs Repair/Replacement

5

Chimney

Brick is Structurally Questionable Needs Repair

6

Foundation

Damaged at Ground Level Could Lead to Flooding

7

Insulation

House is Un-Insulated

Allegheny County Office of Property Assessment Listed Building Condition: Very Poor (refer to IN4.00)

5 2 3

4

1

6

Existing Conditions

PS7.02

PROJECT SCOPE: CASE STUDY 2 OVERVIEW

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


1

2

3

4

5

6

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

PROJECT SCOPE: CASE STUDY 2 CONDITIONS

PS7.03


ZONING DEVIATIONS This section of analysis explores the conditions where the two case study houses are in violation of existing zoning and building codes. The importance of understanding these violations becomes evident when proposing changes or alterations to the existing structure because any affected violations will have to be corrected. The Zoning code states that no house should exceed “3 stories or 40 ft.” However, many buildings of the typology being studied are built above this threshold. Many of these houses are over 100 years old, indicating that they may have been “grandfathered” in to the existing code.

Older Building With Height Over Maximum Height Restrictions for This Zone

New Building Slightly Shorter Than Older Adjacent Home - Newer Building Was Built to Code

Minimum Lot Size: 1200 sq ft Minimum Front Setback: 5 ft Minimum Rear Setback: 15 ft Minimum Exterior Sideyard Setback: 5 ft

184 46th 133 45th

Minimum Interior Sideyard Setback: 10 ft Maximum Height: 40 ft / 3 stories (All setbacks are from the property line unless otherwise stated)

Information Regarding Variance Application Available: http://www.city.pittsburgh.pa.us/cp/html/land_use_ control_and_zoning.html

Each Variance Will take 2-3 Months to Process for Approval A pre-application submission form may be submitted to apply for a design review, to schedule a pre-development advisory meeting, or to initiate a community meeting with a neighborhood planner. This can aid in deciding the correct course of action for any renovation or addition.

Building Height In Excess of 40’

These deviations are typical of Lawrenceville typologies. Many, if not most, of the properties in Lawrenceville will be in violation of local zoning code. If there are no violations - approval can be granted at the zoning counter : 200 Ross Street, 3rd Floor, Pittsburgh, PA 15219 133 45th Street is Much Taller If an exception is listed in the code it may be approved as an Administrator’s Exception with Than the Property Directly appropriate documentation and proof. Adjacent. This may include zoning violations While the Two Buildings are ofwhich are typical of the character of the community a Similar Style, the Age Can Clearly be read by the Zoning 903.03.E.2 (a) New development shall be allowed to use Contextual Setbacks Parameters and Contextual Building Heights. Many of these zoning deviations cannot be feasibly rectified, even if any new construction is done to a home. The Pittsburgh Zoning Board of Adjustment requires that the owner either bring the home up to code, or seek to be granted a zoning variance / special exception to the Zoning Ordinance.

PS8.00

PROJECT SCOPE: ZONING DEVIATIONS

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


A common breach of zoning code is the breaching of the minimum setback requirements for the backs and sides of houses/yards. A majority of these zoning violation properties are “grandfathered” in. The issues are excusable due to this, however when seen side by side with newer buildings up to code, clear distinctions can be made as to the age of the building. Improper Setbacks are some of the most frequent violations.

The Minimum Space from the Back of the Structure to the Street is 15’ - This Being Violated by 10’

The Minimum Space from the 111 45th to the Back of the Structure Street is 15’ - This Being Violated by 10’

111 45th

Receiving a zoning variance or exception simply requires that the violation not be an egregious use of property and not be a detriment to any aspect of the neighborhood. The process of obtaining a variance takes between 2 and 3 months. After a variance is filed for, it takes a month for a hearing to be scheduled. After the hearing the Zoning Board of Adjustment has 45 days to make a decision on each case. In order to have a case heard an owner must sign up at the Department of City Planning Zoning Office. Signing up will allow the Zoning Board of Adjustment to verify the need of a hearing and identify which variance or appeal will be considered. To sign up requires 5 copies of a survey or plot plan, a list of adjacent property owners, and a fee for each variance.

Request Requirements: 5 copies of survey/plan List of adjacent property owners (provided by Allegheny County Property Assessment Office) Fee per variance Check or money order, payable to Treasurer, City of Pittsburgh

The list of adjacent property owners will be provided upon request by The Allegheny County Property Assessment Office:

542 Forbes Avenue (at Ross Street), Room 303, Pittsburgh, PA 15219

The fee is $25 plus: • $200 for a Residential Dimensional Variance • $250 for a Residential Special Exception

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

PROJECT SCOPE: ZONING DEVIATIONS

PS8.01


ZONING DEVIATIONS Lot Size: 1940 S.F.

40’ Height Maximum

151 44TH STREET

Front Setback: 5 ft

34’ Building Height

Rear Setback: 4 ft w/shed Exterior Sideyard: 0 ft Interior Sideyard: 3ft Building Height: 34ft

The property is non-compliant with R1A-VH Zoning Requirements at the back lot line, and both side lot lines @ side yards. The 0’ setback on the exterior side yard could be modified if the adjacent property were purchased and developed. The 3’ setback is an issue that can’t be addressed in this modification The minimum space from the back of any structure to the alley or property line is 15’ - This is being violated by 11’. Eliminating the shed would put the property within zoning regulation. These violations require an Administrator’s Exception for zoning deviations which are accepted under zoning code 903.03.E.2(a)

Edge of Property - 0’ setback

5’ Setback Minimum

4’ From Rear Property Line to Shed

15’ Setback Minimum

3’ Setback to Edge of Property

10’ Setback Minimum

PS8.02

PROJECT SCOPE: ZONING DEVIATIONS

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


151 44TH STREET

Lot Size: 1940 S.F. Front Setback: 10 ft Rear Setback: 3 ft w/garage 20 ft to house Exterior Sideyard: 0 ft Interior Sideyard: 0 ft from property line (10’ to adjacent structure) Building Height: 36ft

0’ setback to edge of property

10’ Interior Sideyard Setback The property is non-compliant with R1A-VH Zoning Requirements at the back lot line, and the southern side lot line @ interior side yard. The 0’ setback on the exterior side yard could be modified if the adjacent property were purchased and developed. The minimum space from the back of any structure to the alley or property line is 15’ - This is being violated by 12’ If the garage is not counted, there are 20’ between alley and structure. 4’ setback to edge of property

5’ Exterior Sideyard Setback from House

The two primary properties will require an Administrator’s Exception for zoning deviations accepted under zoning code 903.03.E.2(a) The breaches in code should all fall under this situation, however if an Administrator’s Exception cannot be obtained a ZBA hearing must be scheduled.

4’ Setback to Edge of Property from Garage

15’ Setback Minimum

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

PROJECT SCOPE: ZONING DEVIATIONS

PS8.03


EXISTING HOUSE CONSTRUCTION ASPHALT -SHINGLED ROOF

UN-INSULATED ATTIC AND STORAGE SPACE 2X6 RAFTERS

SECOND FLOOR 2X4 WOOD-FRAMED STUD WALLS

2X6 JOISTS

FIRST FLOOR 2X4 WOOD-FRAMED STUD WALLS

SINGLE-PANE WOOD-FRAMED WINDOWS

SINGLE-PANE WOOD-FRAMED WINDOWS

ORIGINAL SANDSTONE FOUNDATION ADDITION CONCRETE FOUNDATION

PS9.00

PROJECT SCOPE: HOUSE CONSTRUCTION

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


A

C

EF

DBGH

MATERIAL DIVERSITY

ROOFING MATERIALS

G

H

BCDF

A

CORNICE MATERIALS

E

FGH

CD

AB

SIDING MATERIALS

CDFG

E

AH

B

FASCIA MATERIALS

AC

B

EFGH

D

FRONT FACADE MATERIALS

D

H

ABFG

C

D

E

WINDOW FRAME MATERIALS

GH

EF

B

AC

FOUNDATION MATERIALS

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

PROJECT SCOPE: HOUSE MATERIALS

A B C D E F G H

111 45TH ST 113 43RD ST 127 46TH ST 131 45TH ST 145 44TH ST 156 44TH ST 160 44TH ST 184 46TH ST

PS9.01


3

PLACES THIS HOUSE LOSES MOST OF IT’S HEAT, SLOWLY EMPTYING YOUR WALLET

The majority of the houses in the Lawrenceville area were built around the turn of the 20th century; historical maps even date some of the houses in our selected typology back as far as the 1860’s. In most of these cases, little has been done in terms of updating the building enclosure, and to this day the structures remain in their pristine historical drafty brick condition. But don’t blame the homes, or the masons that erected them, for at their time with seeming unlimited quantities of coal being mined daily to roar in the furnace, the prospect of a leaky roof or wall was non-existent. Times have changed, and the concept of unlimited energy has vanished; we now practice energy conservation. Thus, rather than erasing the past and manufacturing a new present, lets simply fix what we can to make our lives better in the easiest manner possible, and in the case of these houses, your own home, a simple seal will suffice. “Nay to the new condo, bring me the polyurethrane I say!”

UNINSULATE

1.

150F

D ROOF

OUTSIDE WINTER

2.

UNINSULATE D PART Y WALL S

3.

SINGLE PANE

WINDOWS

HEAT LOSS DU E TO LACK OF INSU LAT ION CRAEATES A DRAMATICAL GR ADIENT OF TEM PERATURES THRO UGHOUT THE HO ME, PROMPTING A RISE IN RESOUR CE CONSUMPT ION TO MEET TH E ADEQUATE HE AT QUOTA

600F ATTIC

650F 2ND FLOOR

700F 1ST FLOOR

750F

BASEMENT

DUQUESNE LIGH

T LINE 8.73 ce

nts/kWh

BOILER

ELECTRIC WAT ER BOILER CLOSED CIRC ULATION LOOP

MUNICIPAL W ATER LINE

CURRENT STRATEGY IN CASE STUDY HOUSES

PS10.00

PROJECT SCOPE HEATING STRATEGIES

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


COMBUSTION EXHAUST - HAZARDOUS

COAL DISAPPEARED AND TECHNOLOGY CHANGED THE FIREPLACE (paleolithic - present) Ever since we fell from the tree, or got kicked from the garden, and witnessed that quintessential lighting strike that sparked our pyromaniacal impulses that probably resulted in us burning half a continent, we have indeed domesticated this process and have managed to warm our toes in a relatively non destructive manner to this very day. The forestry industry has changed plenty since the days the entire northeast was wiped clean, and the cycling of planting and logging can virtually sustain us indefinitely. However the extra monetary cost and hassle in dealing with a heavy and space consuming material has slowly disinterested the general population, to the point were the distinguishable smell of burning wood that once permeated our cities during the winter months has given way to nothing. And the once communal hearth of warmness, has been replaced by a flat plane of electrically charged crystal molecules.

THE COAL FURNACE (1800s - 1940s)

STEAM AT 230 F

Heat from the combustion of fossilized remains converts water into steam that is then pumped through a series of copper that pipes, which themselves lead to the old heavy radiators that we commonly find in these Lawrenceville houses. This manner of heating homes was the widespread alternative to wood burning, and the general rule in areas such as Pittsburgh, were coal was being literally dug up from the house’s basement. By the beginning of the postwar construction boom, coal boilers were considered obsolete at a national level. Though in Pittsburgh there are accounts of their continued use up until the 50’s. It is also important to note that where this house in a different city or state in the same historical context, the furnace would have been geared towards the consumption of oil or kerosene. As those were the prevalent consumable resources in the rest of America.

THE NATURAL GAS BOILER (1940’s - present)

ELECTRIC BOILER (1970’s - present)

WATER AT 176 F

Via the thermoelectric effect, electric voltage is directly converted into a raise in temperature. With the rise of the great national power grid, and the seeming replacement of all that is mechanical with the digital, it was destined that human adaptation would conjure some update, and here it is ; complete abstraction from the physical reactions that in the past maintained room temperature. If your conception of reality is the mere bubble of your enclosure, then yes it is a completely “clean” resource and process. However the source of that energy is far from “clean”, and it is only up to us as the consumer market and citizens of a state to vote and choose a future that actually embodies this “greenness” we all seem to be fond of.

MUNICIPAL WATER SUPPLY

The first transcontinental pipelines were constructed in the 20’s, yet its widespread adoption did not occur until the energy crisis of the 70’s. When national broadcast jingles rapped about the wonders of “Cooking with Gas” and the United States President urged the public to seal off their fireplaces. It is certain that those were sad times for the lumberjacks and children of America come Christmas time. Though humour aside the irony remains in substituting wood and oil for gas because of their “hazardous” combustion by products and irresponsible acquisition practices, yet in retrospect gas is presently acquired in equally irresponsible manners, while the forestry industry has actually redeemed and engaged in a purely regenerative system.

CURRENT SYSTEM

WATER PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

GAS ELECTRICITY

PROJECT SCOPE: HEATING STRATEGIES

PS10.01


WIND & TEMPERATURE

by opening all windows you will permit interior circulation to expel the stagnant hot air

slowly suffocating the interior

and rises floor by floor

heat accumulates daily in the tall ceilings

we advice you to open up all of your windows and doors during the summer in order to let that cool summer breeze cleanse the inside of your home. Section through home, summer

the strong western wind flows around the building’s profile creating a suction force that sucks your house’s heat.

The heat inside the house has little trouble escaping the enclosure due to its porous nature

Section through home, winter

PS11.00 PMN1.00

PROJECT PROJECT SCOPE: NARRATIVE: ENVIRONMENTAL DATA AN INTRODUCTION

PITTSBURGH PITTSBURGH PROGRAM PROGRAM FOR FOR THE THE ADAPTIVE ADAPTIVE TRANSFORMATION TRANSFORMATION OF OF COMMUNITY COMMUNITY HOUSING HOUSING CARNEGIE CARNEGIE MELLON MELLON UNIVERSITY UNIVERSITY SCHOOL SCHOOL OF OF ARCHITECTURE ARCHITECTURE 48_550 48_550


SUMMER

N NNW NW

WNW

NNE NE

N NNW

ENE

NNE

NW

NE

W During the hot summer months, the interior of your home will likely rise up to 80 degrees. Luckily there are efficient strategies available to save money and cool your interior without the need of an air conditioner. Take into account that the predominant summer breezes blow in the same axial direction as the vast majority of the typology homes. Thus opening all apertures in this orientation will create a strong draft to vent all accumulated heat in the interior.

2

4

6

8

10

12

WNW

ENE

WSW

ESE

W

2

4

6

8

SW WSW

JULY

SSW

12

14 %

E

ESE

SSE

S

SW

ES SSE

N S

JULY NNW

WINTER

10

E

ES

SSW

NW

WNW

NNE NE

N NNW

ENE

NNE

NW

NE

W

2

4

6

8

10

12

WNW

14 %

E

ENE

WSW

ESE

W Pittsburgh’s cold temperatures and intense western winds are a menace to any home during the winter. In the case of the selected typology, a hundred years of water infiltration damage has left the enclosure of the homes in relatively bad shape. Once the winds blow continuously over the rooftops, and gusts channel through the streets in force, your walls are nothing but a sponge.

14 %

2

4

6

8

SW WSW

SSW

14 %

E

ESE

SSE

S SSW

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550 PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

12

ES

JANUARY SW JANUARY

10

ES SSE

S PROJECT NARRATIVE: AN INTRODUCTION PROJECT SCOPE: ENVIRONMENTAL DATA

PMN1.00 PS11.01


RAIN

HOW MUCH FALLS ON YOUR ROOF ANNUALLY?

if you were to collect all the rain that falls on your D1 roof per year, it would fill your first floor almost up to your waist

D1

JANUARY FEBRUARY MARCH APRIL

213.12 GALLONS 1825.92 GALLONS 5.76 GALLONS

MAY

2188.8 GALLONS

JUNE

69.12 GALLONS

JULY

552.96 GALLONS

AUGUST

218.88 GALLONS

SEPTEMBER

120.96 GALLONS

OCTOBER

PS11.02 PMN1.00

403.2 GALLONS

1296 GALLONS

NOVEMBER

1739.52 GALLONS

DECEMBER

1647.36 GALLONS

PROJECT NARRATIVE: SCOPEE: ENVIRONMENTAL AN INTRODUCTIONDATA

20

Average Number of Rainy Days

15 10 5 0

J

F

M

A

M

J

J

A

S

O

N

D

On those long rainy weeks, were the water is pouring down the sidewalks and any flat land has been transformed into a marsh, think for a second where all the water is going. As Lawrenceville is located on the shore of the Allegheny river, whenever there are heavy rains in the upstream region the volume of the river increases. This raise in the river’s depth overruns the municipal sewer lines, which in the case of a storm are already full. In the worst scenario the sewers start overflowing unto the streets themselves, thus slowly flooding the city as a whole. As has been the case countless times and the motive for major renovations to the municipal sewer infrastructure. Such is the graveness of the situation that the City of Pittsburgh and the Environmental Protection Agency, offer in conjunction a series of grants for the design and construction of exemplary storm water management systems on homes such as yours.

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


SOLAR ACCESS

good solar access at back of lot

good solar access on 3rd floor level The above shows the average possibility of sunlight

r

me

sum

0, 9:0

:00

, 15

00 12:

SW-NE ORIENTATION

151 44TH ST

adjacent vacant lots remain shaded throughout the year

00,

r 9:

te win

0, 2:0

1

00

15:

adjacent vacant lots remain shaded throughout the year

good Southern exposure

2

0, 1

:0 er 9

0

5:0

,1 :00

SE-NW ORIENTATION

mm

su

4919 BUTLER ST

adjacent vacant lots remain shaded throughout the year

00,

r 9:

te win

:00

, 15

00 12:

PITTSBURGH PITTSBURGH PROGRAM PROGRAM FOR FOR THE THE ADAPTIVE ADAPTIVE TRANSFORMATION TRANSFORMATION OF OF COMMUNITY COMMUNITY HOUSING HOUSING CARNEGIE CARNEGIE MELLON MELLON UNIVERSITY UNIVERSITY SCHOOL SCHOOL OF OF ARCHITECTURE ARCHITECTURE 48_550 48_550

The solar conditions are very typical of any urban neighborhood, Their angle ensures a relative smooth cycle between day and night, with mornings manifesting the street bedrooms, while the kitchen in the back receives the sunset, and vice versa depending on orientation.

PROJECT SCOPE: PROJECT NARRATIVE: ENVIRONMENTAL DATA AN INTRODUCTION

PS11.03 PMN1.00


PMN1.00

PROJECT NARRATIVE: AN INTRODUCTION

GC0.00 Cover Sheet IN1.00 Index : Table of Contents IN2.00 Index : Report Layout IN3.00 Index : General Use Notes IN4.00 Index : Keys and Definitions PN1.00 Project Narrative : An Introduction PN1.01 Project Narrative : Decision Process PN1.02 Project Narrative : Context PN1.03 Project Narrative : Comparative Typology PS1.00 Project Scope : Demographics PS1.01 Project Scope : Demographics PS1.02 Project Scope : Demographics PS1.03 Project Scope : Demographics PS1.04 Project Scope : Demographics PS1.05 Project Scope : Demographics PS2.00 Project Scope : Land Use and Zoning PS2.01 Project Scope : Land Use and Zoning PS2.02 Project Scope : Housing Location, Typologies PS2.03 Project Scope : Housing Location, Type 1 PS3.00 Project Scope : Housing Location, Type 2, 3, 4 PS3.01 Project Scope : Housing Location, Type 5, 6, 7 PS4.00 Project Scope : Eight Study Houses PS4.01 Project Scope : Eight Study Houses PS5.00 Project Scope : Site Utilization PS5.01 Project Scope : Site Utilization PS5.02 Project Scope : Site Utilization PS5.03 Project Scope : Site Utilization PS6.00 Project Scope : Housing Condition PS6.01 Project Scope : Housing Condition PS7.00 Project Scope : Case Study 1 Overview PS7.01 Project Scope : Case Study 1 Housing Condition PS7.02 Project Scope : Case Study 2 Overview PS7.03 Project Scope : Case Study 2 Housing Condition PS8.00 Project Scope : Zoning Deviations PS8.01 Project Scope : Zoning Deviations PS8.02 Project Scope : Zoning Deviations PS8.03 Project Scope : Zoning Deviations PS9.00 Project Scope : House Construction PS9.01 Project Scope : House Materials PS10.00 Project Scope : Heating Strategies PS10.01 Project Scope : Heating Strategies PS11.00 Project Scope : Environmental Data PS11.01 Project Scope : Environmental Data PS11.02 Project Scope : Environmental Data PS11.03 Project Scope : Environmental Data SC1.00 Site Context : General Site Modifications SC1.01 Site Context : General Site Modifications SC1.02 Site Context : General Site Modifications SC1.03 Site Context : General Site Modifications SC2.00 Site Context : Scalar Representations SC2.01 Site Context : Scalar Representations CN1.00 Contract Negotiations : The Players CN101 Contract Negotiations : The Responsibilities AT1.00 Adaptive Transformation 1: Building Envelope AT1.01 Adaptive Transformation 1: Building Envelope AT1.02 Adaptive Transformation 1: Building Envelope AT1.03 Adaptive Transformation 1: Building Envelope AT1.04 Adaptive Transformation 1: Building Envelope AT1.05 Adaptive Transformation 1: Building Envelope AT2.00 Adaptive Transformation 2: Rainwater Harvesting AT2.01 Adaptive Transformation 2: Rainwater Harvesting AT2.02 Adaptive Transformation 2: Rainwater Harvesting AT2.03 Adaptive Transformation 2: Rainwater Harvesting AT2.04 Adaptive Transformation 2: Rainwater Harvesting AT2.05 Adaptive Transformation 2: Rainwater Harvesting AT2.06 Adaptive Transformation 2: Rainwater Harvesting AT2.07 Adaptive Transformation 2: Rainwater Harvesting AT2.08 Adaptive Transformation 2: Rainwater Harvesting AT2.09 Adaptive Transformation 2: Rainwater Harvesting AT3.00 Adaptive Transformation 3: Roof Greenhouse AT3.01 Adaptive Transformation 3: Roof Greenhouse AT3.02 Adaptive Transformation 3: Roof Greenhouse AT3.03 Adaptive Transformation 3: Roof Greenhouse AT3.04 Adaptive Transformation 3: Roof Greenhouse AT3.05 Adaptive Transformation 3: Roof Greenhouse AT3.06 Adaptive Transformation 3: Roof Greenhouse AT3.07 Adaptive Transformation 3: Roof Greenhouse AT3.08 Adaptive Transformation 3: Roof Greenhouse AT3.09 Adaptive Transformation 3: Roof Greenhouse AT3.10 Adaptive Transformation 3: Roof Greenhouse AT3.11 Adaptive Transformation 3: Roof Greenhouse AT3.12 Adaptive Transformation 3: Roof Greenhouse AT3.13 Adaptive Transformation 3: Roof Greenhouse AT3.14 Adaptive Transformation 3: Roof Greenhouse AT3.15 Adaptive Transformation 3: Roof Greenhouse AT3.16 Adaptive Transformation 3: Roof Greenhouse PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING AT3.17 Adaptive Transformation 3: Roof Greenhouse

CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


AT4.00 AT4.01 AT4.02 AT4.03 AT4.04 AT4.05 AT4.06 AT4.07 AT4.08 AT4.09 AT4.10 AT4.11 AT4.12 AT4.13 AT4.14 AT4.15 AT4.16 AT4.17 AS1.00 AS1.01 AS1.02 SD1.00 IMP1.00 IMP1.01 IMP1.02 IMP1.03 IMP2.00 IMP2.01 IMP2.02 IMP2.03 IMP3.00 IMP3.01 IMP3.02 IMP3.03 CA1.00 CA1.01 CA1.02 CA1.03 CA1.04 CA1.05 SP1.00 SP1.01 SP1.02 SP1.03 SP1.04 SP1.05

Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Assembly Sequence : Stages 1 Assembly Sequence : Stages 2 Assembly Sequence : Stages 3 Selective Demolition : Stages 1 Implementation : Logistics Implementation : Logistics Implementation : Logistics Implementation : Logistics Implementation : Critical Path Implementation : Critical Path Implementation : Critical Path Implementation : Critical Path Implementation : Hard Costs Implementation : Hard Costs Implementation : Soft Costs Implementation : Budget Code Analysis : Building Transformation Code Analysis : Building Transformation Code Analysis : Building Transformation Code Analysis : Building Transformation Code Analysis : Building Transformation Code Analysis : Building Transformation Specifications : Material Legend Specifications : Material Legend Specifications : Material Legend Specifications : Material Legend Specifications : Material Legend Specifications : Wall Types

Th e P r o p o s al PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

PROJECT NARRATIVE: AN INTRODUCTION

PMN1.00


1. THE SEAL

2. THE SWALE

choose your own retrofits

TOTAL REVAMP

SC1.00

PROJECT CONTEXT: SITE MODIFICATION

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


3. THE GREENHOUSE

4. THE POD

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

PROJECT CONTEXT: SITE MODIFICATION

SC1.01


Population of Lawrenceville percentages

48% GROWING

FA M I LY

5-19 & 35-59

EXPANSION PLAN FOR FAMILY MEMBERS ADDITIONAL BATHROOMS / BEDROOMS OFFICE / WORKSHOP AT HOME

30%

ELDERLY 60+

COLLECTIVE RETIREMENT COMMUNITY ADDITIONAL AMMENITIES CARETAKER QUARTERS MEDICAL MODULE

22%

YOUNG

PROFESSIONAL

20-34

EXPANDED FLOOR AREA EXTERNAL BATHROOM & KITCHEN EXTERNAL INDIVIDUAL ACCESS OFFICE / WORKSHOP AT HOME

ANY RESALE M A R K E T

RENTAL RENOVATION PLAN FOR HOMEOWNERS EXTERNAL BATHROOM & KITCHEN EXTERNAL INDIVIDUAL ACCESS MAXIMIZE INTERIOR FLOORPLAN FOR UNITS MIXED USE ZONING

SC1.02

PROJECT CONTEXT: SITE MODIFICATION

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

PROJECT CONTEXT: SITE MODIFICATION

SC1.03


28 courses 33 courses 37 courses 9 courses

41 courses

20 courses

4 courses

3-1/2

SC2.00

PROJECT SCOPE: AN INTRODUCTION

4

5-1/2

4

3

10

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


8” 2”

4”

e

ul

the brick serves as the proportional module

ick

r eb

od

m

37 bricks

th

ow

d

4b

rick

2n

r sto

s

ow

nd

41 bricks

nd

i yw

r to

ts

1s

4b

i yw

rick

s

46 bricks

The brick served not only as a proportional building block but as a modular dimension that governed space layout and arrangement of elements. The very bricks of your house help tell the story of how your house was built, why the windows are the size that they are, and how the hosue is delineated on the inside. Because of this descriptive nature, the brick and its proportions were analyzed and applied to the facade elements to understand an underlying language and system that governed the design and construction of your row house.

10 b

nt fro

do

or

rick

s

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

PROJECT CONTEXT: SITE MODIFICATION

SC2.01


THE GENERAL CONDITIONS CONTRACT EXPLAINED

To play the game and benefit from the revamp strategies proposed, you must agree upon the General Conditions contract AIA 201. This is a legally binding document between yourself as the owner, us the architectural consultants, and the future contractor.

That is you; the home owner; the one with the monetary means and disposition to undergo a lengthy project that involves our participation. A project that will ultimately make your house a better place to live and work. It is also important to Remember that in this industry you are the customer, and the customer is always right. Therefore the series of contracts that will enable you to undergo this revamp are written in your favor and entitle you as the sovereign decision maker.

The architect designs, is responsible to finish all of the following; THE DRAWINGS - These are the graphic representations necessary to properly execute the project. they are included in the adaptive transformation sections. THE SPECIFICATIONS - the legalities involved that carefully set forth the required materials, services, and quality of the work performed in your home. all through INSTRUMENTS OF SERVICE - this covers the book you are currently holding, and all the unseen work it took to finish.

PMN1.00

CONTRACTUAL NEGOTIATIONS: THE PLAYERS AND THE GAME

This is the project and is borne from the collaboration of all three main members, The total construction or work involved in this case:

THE SEAL, THE SWALE, THE POD

The constructor essentially builds, and is responsible for the work, the services and construction required to complete the renovation. Includes all of the labor, materials and such. The contractor will also pay for the labor materials and all related expenses such as utilities and transportation needed for the proper execution of the work. The contractor must perform the work in accordance to this document, and cannot make changes to the outlined method without proper approval from you, and us in some minor cases that are previously laid out. He may appoint a representative to deal with you and us the architects, and a superintendant for managing your house during construction and all the people involved. The contractor is always required to maintain order and discipline among these people.

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


HIERARCHY & DIALOGUE IN THE A201 CONTRACT

Since the variables and decisions involved in the idealization and then actual construction of a project are infinite, the industry has evolved into the present hierarchical system that relieves you of the hassle from managing the majority of the process. Envision this system as a network of people working for you, everything is catered to your input and feedback. These people are tailoring your home, your environment, your life, they are custom fitting your territory based on your imagination, and of course bank account, which is required for the future livelihood of the people involved in the project and the future of the trade. To participate in this system, and engage in the custom-tailoring, then you must play by the rules, and know how to play the players. As owner you have plenty of rights, and certain requirements to fulfill. For example you are generally required to provide some basic information about your house to the architect and contractor. These would be the legal and physical conditions of your home, the available utilities, and physical dimensions. As to the selected houses in our typology, we have eased the owner from these requirements and have collected and digested this information for one to make sense of it in the scope of a renovation project. This information in addition to your input will be the basis for the architect to carry on his functions which

are further discussed below. At any moment you are entitled to appoint somebody to act as your representative and carry on certain decisions for you. At any point of the project you, or your representative, must respond with “reasonable promptness” to the inquires of the contractor. And we advise you to do so, for his output depends on your input. Sometimes the contractor is actually trying to cut costs and efficiently rework things, other times he is actually trying to extort you, unfortunately this is a human condition and little have we done in remediating it. As you have initiated the process, you can end it, at any time. The reality is that you will have to pay all the fees involved so far, as people’s time was invested in your life. Luckily the world is not filled with whimsical millionaires, and this legal move is taken seriously, only coming into play when the once in a lifetime nightmarish scenario occurs in which nothing is going on according to your wants, which are distilled in the drawings. So in the case that you arrive home one day to check on the greenhouse transformation and were expecting the view of a beautiful wood frame gently emerging from your house, to find that the russian constructor misunderstood your arm gestures and images. Building what appears to be the initial scaffoldings for the Baikonur

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

Cosmodrome growing from the top of the masonry structure (you really do not want a soviet space launch facility growing from your house). In this situation, or any like it, you can order the contractor to stop all activity and engage in a discussion to solve the matter. During negotiations with the contractor and the russian interpreter, you will hopefully arrive at a yea or nay moment before they start opening the fifth bottle of import vodka. After the “discussion” and the qualms of your liver, the contractor has ten days to act accordingly to his decision, whether it be clearing the site or continuing work. If the contractor fails to react beyond that legal time frame, you are entitled to charge the contractor for all the costs involved in remediating his failure. This move has its intricacies though, as it has to be run by the architect before hand, and his approval must be gained for you to claim these expenses from the contractor.

However in perspective this is not a common occurrence, and the proposals we have outlined for you are clearly noted and straightforward in order to facilitate the contractor’s task.

CONTRACTUAL NEGOTIATIONS: THE PLAYERS AND THE GAME

PMN1.00


PMN1.00

PROJECT NARRATIVE: AN INTRODUCTION

GC0.00 Cover Sheet IN1.00 Index : Table of Contents IN2.00 Index : Report Layout IN3.00 Index : General Use Notes IN4.00 Index : Keys and Definitions PN1.00 Project Narrative : An Introduction PN1.01 Project Narrative : Decision Process PN1.02 Project Narrative : Context PN1.03 Project Narrative : Comparative Typology PS1.00 Project Scope : Demographics PS1.01 Project Scope : Demographics PS1.02 Project Scope : Demographics PS1.03 Project Scope : Demographics PS1.04 Project Scope : Demographics PS1.05 Project Scope : Demographics PS2.00 Project Scope : Land Use and Zoning PS2.01 Project Scope : Land Use and Zoning PS2.02 Project Scope : Housing Location, Typologies PS2.03 Project Scope : Housing Location, Type 1 PS3.00 Project Scope : Housing Location, Type 2, 3, 4 PS3.01 Project Scope : Housing Location, Type 5, 6, 7 PS4.00 Project Scope : Eight Study Houses PS4.01 Project Scope : Eight Study Houses PS5.00 Project Scope : Site Utilization PS5.01 Project Scope : Site Utilization PS5.02 Project Scope : Site Utilization PS5.03 Project Scope : Site Utilization PS6.00 Project Scope : Housing Condition PS6.01 Project Scope : Housing Condition PS7.00 Project Scope : Case Study 1 Overview PS7.01 Project Scope : Case Study 1 Housing Condition PS7.02 Project Scope : Case Study 2 Overview PS7.03 Project Scope : Case Study 2 Housing Condition PS8.00 Project Scope : Zoning Deviations PS8.01 Project Scope : Zoning Deviations PS8.02 Project Scope : Zoning Deviations PS8.03 Project Scope : Zoning Deviations PS9.00 Project Scope : House Construction PS9.01 Project Scope : House Materials PS10.00 Project Scope : Heating Strategies PS10.01 Project Scope : Heating Strategies PS11.00 Project Scope : Environmental Data PS11.01 Project Scope : Environmental Data PS11.02 Project Scope : Environmental Data PS11.03 Project Scope : Environmental Data SC1.00 Site Context : General Site Modifications SC1.01 Site Context : General Site Modifications SC1.02 Site Context : General Site Modifications SC1.03 Site Context : General Site Modifications SC2.00 Site Context : Scalar Representations SC2.01 Site Context : Scalar Representations CN1.00 Contract Negotiations : The Players CN101 Contract Negotiations : The Responsibilities AT1.00 Adaptive Transformation 1: Building Envelope AT1.01 Adaptive Transformation 1: Building Envelope AT1.02 Adaptive Transformation 1: Building Envelope AT1.03 Adaptive Transformation 1: Building Envelope AT1.04 Adaptive Transformation 1: Building Envelope AT1.05 Adaptive Transformation 1: Building Envelope AT2.00 Adaptive Transformation 2: Rainwater Harvesting AT2.01 Adaptive Transformation 2: Rainwater Harvesting AT2.02 Adaptive Transformation 2: Rainwater Harvesting AT2.03 Adaptive Transformation 2: Rainwater Harvesting AT2.04 Adaptive Transformation 2: Rainwater Harvesting AT2.05 Adaptive Transformation 2: Rainwater Harvesting AT2.06 Adaptive Transformation 2: Rainwater Harvesting AT2.07 Adaptive Transformation 2: Rainwater Harvesting AT2.08 Adaptive Transformation 2: Rainwater Harvesting AT2.09 Adaptive Transformation 2: Rainwater Harvesting AT3.00 Adaptive Transformation 3: Roof Greenhouse AT3.01 Adaptive Transformation 3: Roof Greenhouse AT3.02 Adaptive Transformation 3: Roof Greenhouse AT3.03 Adaptive Transformation 3: Roof Greenhouse AT3.04 Adaptive Transformation 3: Roof Greenhouse AT3.05 Adaptive Transformation 3: Roof Greenhouse AT3.06 Adaptive Transformation 3: Roof Greenhouse AT3.07 Adaptive Transformation 3: Roof Greenhouse AT3.08 Adaptive Transformation 3: Roof Greenhouse AT3.09 Adaptive Transformation 3: Roof Greenhouse AT3.10 Adaptive Transformation 3: Roof Greenhouse AT3.11 Adaptive Transformation 3: Roof Greenhouse AT3.12 Adaptive Transformation 3: Roof Greenhouse AT3.13 Adaptive Transformation 3: Roof Greenhouse AT3.14 Adaptive Transformation 3: Roof Greenhouse AT3.15 Adaptive Transformation 3: Roof Greenhouse PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING AT3.16 Adaptive Transformation 3: Roof Greenhouse CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550 3: Roof Greenhouse AT3.17 Adaptive Transformation


AT4.00 AT4.01 AT4.02 AT4.03 AT4.04 AT4.05 AT4.06 AT4.07 AT4.08 AT4.09 AT4.10 AT4.11 AT4.12 AT4.13 AT4.14 AT4.15 AT4.16 AT4.17 AS1.00 AS1.01 AS1.02 SD1.00 IMP1.00 IMP1.01 IMP1.02 IMP1.03 IMP2.00 IMP2.01 IMP2.02 IMP2.03 IMP3.00 IMP3.01 IMP3.02 IMP3.03 CA1.00 CA1.01 CA1.02 CA1.03 CA1.04 CA1.05 SP1.00 SP1.01 SP1.02 SP1.03 SP1.04 SP1.05

Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Assembly Sequence : Stages 1 Assembly Sequence : Stages 2 Assembly Sequence : Stages 3 Selective Demolition : Stages 1 Implementation : Logistics Implementation : Logistics Implementation : Logistics Implementation : Logistics Implementation : Critical Path Implementation : Critical Path Implementation : Critical Path Implementation : Critical Path Implementation : Hard Costs Implementation : Hard Costs Implementation : Soft Costs Implementation : Budget Code Analysis : Building Transformation Code Analysis : Building Transformation Code Analysis : Building Transformation Code Analysis : Building Transformation Code Analysis : Building Transformation Code Analysis : Building Transformation Specifications : Material Legend Specifications : Material Legend Specifications : Material Legend Specifications : Material Legend Specifications : Material Legend Specifications : Wall Types

A d a p t iv e Tra nsf o r m a t io n 1 insulation and windows

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

PROJECT NARRATIVE: AN INTRODUCTION

PMN1.00


INSULATION AND WINDOW REPLACEMENT The addition of fiberglass batt insulation to the existing exterior walls and attic rafters will help to drastically reduce the heat loss of the house during the winter months, which significantly attributes to the high heating bills that owners often find themselves paying. Insulation is applied at all areas in the house where an exchange occurs between a heated, conditioned space and a non-conditioned space, such of the outside or basement. Batt Insulation will be applied to the inside of all four exterior walls, the floor joists directly below the first floor, and in the attic trusses. Insulating a structural brick house is very challenging and often cumbersome. However, the strategy presented in this proposal calls for a 4� secondary stud-wall to be constructed in the interior perimeter of the entire house. This stud wall will serve as an armature with which fiberglass insulation can be easily hung and will also provide builders and easy means of updated and rewiring electrical and other services in the house. The single-paned , regional windows will also be replaced with energy-efficient, doublepane windows to further reduce the infiltration of cold air during the winter.

AT1.00

ADAPTIVE TRANSFORMATION: BUILDING ENVELOPE

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

ADAPTIVE TRANSFORMATION: BUILDING ENVELOPE

AT1.01


INSULATION AND WINDOW REPLACEMENT PLAN

5

1

AT1.02

SECOND FLOOR SCALE: 1/8” = 1’-0”

5

1

AT1.02

AT1.02

FIRST FLOOR SCALE: 1/8” = 1’-0”

ADAPTIVE TRANSFORMATION: BUILDING ENVELOPE

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


GENERAL NOTES 1. These documents are the copyrighted intellectual property of Carnegie Mellon University and its authors. The documents are not to be reproduced or utilized for any purpose other than originally intended as stipulated on the cover sheet and titleblock. 2. None of the documents included in drawing index are intended to be considered in isolation of one another, all parties utilizing these documents for bidding, quantity survey, and/or construction shall consult the general notes and information located on this sheet and all other sheets before proceeding. 3. All work shall conform to the requirements of the Allegheny County Building Code, Fire Department regulations, utility company requirements, and the best trade practices. 4. Before commencing work, the Contractor shall file all required Certificates of Insurance with the Department of Buildings, obtain all required permits, and pay all fees required by governing Allegheny County agencies. 5. The Contractor shall verify all existing conditions in the field prior to commencing work, and shall report any discrepancies between drawings and field conditions to the Architect in writing. 6. Details necessary for proper construction of any part of the work shall be included as if they were indicated in the drawings. 7. The Contractor shall coordinate all work procedures with requirements of local authorities and building management. 8. The Contractor shall be responsible for the protection of all conditions and materials within the proposed construction area. The Contractor shall design and install adequate shoring and bracing for all structural or removal tasks. The Contractor shall have sole responsibility for any damage or injuries caused by or during the execution of the work. 9. The Contractor shall do all cutting, patching, repairing as required to perform all of the work indicated on the drawings, and all other work that may be required to complete the job. 10. The Contractor, upon completion of the work, shall arrange for Department of Buildings inspections and signoffs as required. 11. Work shall conform to PA Building Code and all applicable State and City Building Laws. KEY NOTES 1. Construct stud wall with 06100-01 2x4 lumber framing members. Stud wall should run along all exterior walls 2. Insert 07202-01 fiberglass batt insulation into stud wall with paper backing facing the interior of the house. 3. Apply 07272-01 Vapor Retardant paint to paper backing surface of fiberglass insulation 4. Install 09260-01 1/2” Gypsum Board to interior side of the stud wall. 5. Remove existing window and replace with 0852201 double-pane low-e windows

1

AT1.02

AXONOMETRIC CONSTRUCTION SEQUENCE SCALE: 1/8” = 1’-0”

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

ADAPTIVE TRANSFORMATION: BUILDING ENVELOPE

AT1.03


Install 3” fiberlgass batt insulation to stud wall cavities Install 9” fiberglass batt insulation to attic rafter cavities Apply vapor retardant paint on backing of fiberglass insulation Install gypsum board to interior of stud wall Replace existing windows with new double-pane windows

BASEMENT

Recess windows into new stud wall construction

FIRST FLOOR

Construct 2x4” Stud wall

SECOND FLOOR AND ATTIC

SECOND FLOOR AND ATTIC

Install 3” fiberlgass batt insulation to stud wall cavities Apply vapor retardant paint on backing of fiberglass insulation Install gypsum board to interior of stud wall Replace existing windows with new double-pane windows

BASEMENT

Recess windows into new stud wall construction

FIRST FLOOR

Construct 2x4” Stud wall

SECOND FLOOR AND ATTIC

FIRST FLOOR

Install 9” fiberlgass batt insulation to underside of first floor joist cavities

BASEMENT

FIRST FLOOR

Apply vapor retardant paint on backing of fiberglass insulation

SECOND FLOOR AND ATTIC

BASEMENT

AT1.04

ADAPTIVE TRANSFORMATION: BUILDING ENVELOPE

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


SECOND FLOOR AND ATTIC FIRST FLOOR BASEMENT

EXISTING INSULATIVE

IMPROVED INSULATIVE

R-VALUES

R-VALUES

ROOF

5.3

25.2

WINDOW

0.9

2.7

ENCOLSURE

1.2

21.1

DOOR

2.1

2.1

FLOOR

1.8

14.5

EXISTING ANNUAL

IMPROVED ANNUAL

HEATING COSTS

HEATING COSTS

$1,335

$653

The proposed changes in insulative values throughout the house should reduce the annual heating costs for the owner by over $600 dollars. These calculations are based on stardard condidtions and the assumption of average heating usage to 68 degrees Fahrenheit. As described in the chart below, the cost of insulating the house fully can be payed back within a 20 year cycle.

EXISTING

PROPOSED

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

ADAPTIVE TRANSFORMATION: BUILDING ENVELOPE

AT1.05


PMN1.00

PROJECT NARRATIVE: AN INTRODUCTION

GC0.00 Cover Sheet IN1.00 Index : Table of Contents IN2.00 Index : Report Layout IN3.00 Index : General Use Notes IN4.00 Index : Keys and Definitions PN1.00 Project Narrative : An Introduction PN1.01 Project Narrative : Decision Process PN1.02 Project Narrative : Context PN1.03 Project Narrative : Comparative Typology PS1.00 Project Scope : Demographics PS1.01 Project Scope : Demographics PS1.02 Project Scope : Demographics PS1.03 Project Scope : Demographics PS1.04 Project Scope : Demographics PS1.05 Project Scope : Demographics PS2.00 Project Scope : Land Use and Zoning PS2.01 Project Scope : Land Use and Zoning PS2.02 Project Scope : Housing Location, Typologies PS2.03 Project Scope : Housing Location, Type 1 PS3.00 Project Scope : Housing Location, Type 2, 3, 4 PS3.01 Project Scope : Housing Location, Type 5, 6, 7 PS4.00 Project Scope : Eight Study Houses PS4.01 Project Scope : Eight Study Houses PS5.00 Project Scope : Site Utilization PS5.01 Project Scope : Site Utilization PS5.02 Project Scope : Site Utilization PS5.03 Project Scope : Site Utilization PS6.00 Project Scope : Housing Condition PS6.01 Project Scope : Housing Condition PS7.00 Project Scope : Case Study 1 Overview PS7.01 Project Scope : Case Study 1 Housing Condition PS7.02 Project Scope : Case Study 2 Overview PS7.03 Project Scope : Case Study 2 Housing Condition PS8.00 Project Scope : Zoning Deviations PS8.01 Project Scope : Zoning Deviations PS8.02 Project Scope : Zoning Deviations PS8.03 Project Scope : Zoning Deviations PS9.00 Project Scope : House Construction PS9.01 Project Scope : House Materials PS10.00 Project Scope : Heating Strategies PS10.01 Project Scope : Heating Strategies PS11.00 Project Scope : Environmental Data PS11.01 Project Scope : Environmental Data PS11.02 Project Scope : Environmental Data PS11.03 Project Scope : Environmental Data SC1.00 Site Context : General Site Modifications SC1.01 Site Context : General Site Modifications SC1.02 Site Context : General Site Modifications SC1.03 Site Context : General Site Modifications SC2.00 Site Context : Scalar Representations SC2.01 Site Context : Scalar Representations CN1.00 Contract Negotiations : The Players CN101 Contract Negotiations : The Responsibilities AT1.00 Adaptive Transformation 1: Building Envelope AT1.01 Adaptive Transformation 1: Building Envelope AT1.02 Adaptive Transformation 1: Building Envelope AT1.03 Adaptive Transformation 1: Building Envelope AT1.04 Adaptive Transformation 1: Building Envelope AT1.05 Adaptive Transformation 1: Building Envelope AT2.00 Adaptive Transformation 2: Rainwater Harvesting AT2.01 Adaptive Transformation 2: Rainwater Harvesting AT2.02 Adaptive Transformation 2: Rainwater Harvesting AT2.03 Adaptive Transformation 2: Rainwater Harvesting AT2.04 Adaptive Transformation 2: Rainwater Harvesting AT2.05 Adaptive Transformation 2: Rainwater Harvesting AT2.06 Adaptive Transformation 2: Rainwater Harvesting AT2.07 Adaptive Transformation 2: Rainwater Harvesting AT2.08 Adaptive Transformation 2: Rainwater Harvesting AT2.09 Adaptive Transformation 2: Rainwater Harvesting AT3.00 Adaptive Transformation 3: Roof Greenhouse AT3.01 Adaptive Transformation 3: Roof Greenhouse AT3.02 Adaptive Transformation 3: Roof Greenhouse AT3.03 Adaptive Transformation 3: Roof Greenhouse AT3.04 Adaptive Transformation 3: Roof Greenhouse AT3.05 Adaptive Transformation 3: Roof Greenhouse AT3.06 Adaptive Transformation 3: Roof Greenhouse AT3.07 Adaptive Transformation 3: Roof Greenhouse AT3.08 Adaptive Transformation 3: Roof Greenhouse AT3.09 Adaptive Transformation 3: Roof Greenhouse AT3.10 Adaptive Transformation 3: Roof Greenhouse AT3.11 Adaptive Transformation 3: Roof Greenhouse AT3.12 Adaptive Transformation 3: Roof Greenhouse AT3.13 Adaptive Transformation 3: Roof Greenhouse AT3.14 Adaptive Transformation 3: Roof Greenhouse AT3.15 Adaptive Transformation 3: Roof Greenhouse AT3.16 Adaptive Transformation 3: Roof Greenhouse PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING AT3.17 Adaptive Transformation 3: Roof Greenhouse

CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


AT4.00 AT4.01 AT4.02 AT4.03 AT4.04 AT4.05 AT4.06 AT4.07 AT4.08 AT4.09 AT4.10 AT4.11 AT4.12 AT4.13 AT4.14 AT4.15 AT4.16 AT4.17 AS1.00 AS1.01 AS1.02 SD1.00 IMP1.00 IMP1.01 IMP1.02 IMP1.03 IMP2.00 IMP2.01 IMP2.02 IMP2.03 IMP3.00 IMP3.01 IMP3.02 IMP3.03 CA1.00 CA1.01 CA1.02 CA1.03 CA1.04 CA1.05 SP1.00 SP1.01 SP1.02 SP1.03 SP1.04 SP1.05

Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Assembly Sequence : Stages 1 Assembly Sequence : Stages 2 Assembly Sequence : Stages 3 Selective Demolition : Stages 1 Implementation : Logistics Implementation : Logistics Implementation : Logistics Implementation : Logistics Implementation : Critical Path Implementation : Critical Path Implementation : Critical Path Implementation : Critical Path Implementation : Hard Costs Implementation : Hard Costs Implementation : Soft Costs Implementation : Budget Code Analysis : Building Transformation Code Analysis : Building Transformation Code Analysis : Building Transformation Code Analysis : Building Transformation Code Analysis : Building Transformation Code Analysis : Building Transformation Specifications : Material Legend Specifications : Material Legend Specifications : Material Legend Specifications : Material Legend Specifications : Material Legend Specifications : Wall Types

A d a p t iv e Tra nsf o r m a t io n 2 rainwater harvesting

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

PROJECT NARRATIVE: AN INTRODUCTION

PMN1.00


RAINWATER HARVESTING

PUT RAIN TO WORK FOR YOU

The rainwater system feeds both into the sewer and into the home. The filtered water that feeds into the home can be used with typical grey water usages (for toilet water, the water that circulates in a radiator, and for water to be used in landscaping). These uses will all be facilitated by additional filtration systems within the pods being proposed as part of the last and most site altering adaptive transformation. Running this water through the pods (as rainwater delineators) gives an additional meaning to this project: TO PROTECT THE ENVIRONMENT TO MANAGE PREVIOUSLY UNUSED WATER EFFICIENTLY TO CREATE A MORE SUSTAINABLE AND THOUGHTFUL HOME

The rainwater harvesting system is capable of managing up to 500 gallons of water at any one time. On average the total rainfall for this lot amounts to 230 gallons a day. During storm situations, that amount could potentially double, leading to a near capacity event. In this case the water would be cycled into the existing sewer, but at a much slower pace than would normally occur, and at a smaller percentage. This benefits both the community and local ecosystems.

AT2.00

ADAPTIVE TRANSFORMATION: RAINWATER COLLECTION

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


RAIN WATER HARVESTING

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

ADAPTIVE TRANSFORMATION: RAINWATER COLLECTION

AT2.01


RAINWATER HARVESTING

Although to manage stormwater is not the primary objective of this project, it is necessary to implement this as a means to demonstrate methods of stormwater management in order to obtain a grant from the USDHUD (U.S. Department of Housing and Urban Development). The grant from the USDHUD would cover the costs of the entire project, making this an invaluable investment to pursue.

STORMWATER PROBLEM

STORM DRAIN

MANHOLE

STORM DRAIN

SEWER LINE

With the grant, the total cost of the project would be $0 If this grant is obtained, the cost benefits from the rainwater collection system will begin to take affect. Water Usage Calculation C=AxB A = Number of Occupants: 6 B = 240 gallons used daily per occupant Annual Water Usage - 525600 gallons @ ¢ .03 per gallon $1576 - 1 year supply of water Water Collection Calculation 1796 ft2 - yard 5258624 in2 Average Rain - 2.5 inch/month Convert to Gallons 2798 gallons a month 33587 gallons annually $100 Savings Annually It would take 2 lifetimes for the savings from the swale to pay for the construction of the swale. THIS TRANSFORMATION IS ONLY VIABLE WITH THE GRANT. WITH THE GRANT THE ENTIRE PROJECT IS SUBSIDIZED.

AT2.02

ADAPTIVE TRANSFORMATION: RAINWATER COLLECTION

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


+ SWALE

Stormwater Runoff is a very serious issue in the Pittsburgh area. The existing sewer system is old, and manages both waste sewage and stormwater runoff. SWALE

SWALE

SWALE

SWALE

SEWER LINE

This sewer system has an emergency overflow which leads directly into the Allegheny River. During a storm surge the amount of rainwater can exceed the capacity of the sewer system.This causes the system to overflow into the river. Both waste and rainwater. By utilizing swales, the speed at which water moves from the ground into the sewer system is greatly reduced. This allows the current system to work without being overloaded during storms. WITHOUT STORMWATER MANAGEMENT, SEWAGE WILL CONTINUE TO FLOW INTO THE ALLEGHENY RIVER DURING STORM SURGES.

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

ADAPTIVE TRANSFORMATION: RAINWATER COLLECTION

AT2.03


RAINWATER HARVESTING PLAN

66'-6"

80'-11 1/2"

?

BASEMENT 001 ? A.F.F

15453 - 3 15453 - 2

5

15 '-0"

15410 - 1

1'0" 4 5/16" 4 5/16 "

4

2

3

15453 - 1

1/AT2.06

AT2.04

ADAPTIVE TRANSFORMATION: RAINWATER COLLECTION

03300 - 1 2 AT208

02721 - 2

1

02721 - 1 1-4 AT209

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


GENERAL NOTES 1. These documents are the copyrighted intellectual property of Carnegie Mellon University and its authors. The documents are not to be reproduced or utilized for any purpose other than originally intended as stipulated on the cover sheet and titleblock. 2. None of the documents included in drawing index are intended to be considered in isolation of one another, all parties utilizing these documents for bidding, quantity survey, and/or construction shall consult the general notes and information located on this sheet and all other sheets before proceeding. 3. All work shall conform to the requirements of the Allegheny County Building Code, Fire Department regulations, utility company requirements, and the best trade practices. 4. Before commencing work, the Contractor shall file all required Certificates of Insurance with the Department of Buildings, obtain all required permits, and pay all fees required by governing Allegheny County agencies. 5. The Contractor shall verify all existing conditions in the field prior to commencing work, and shall report any discrepancies between drawings and field conditions to the Architect in writing. 6. Details necessary for proper construction of any part of the work shall be included as if they were indicated in the drawings. 7. The Contractor shall coordinate all work procedures with requirements of local authorities and building management. 8. The Contractor shall be responsible for the protection of all conditions and materials within the proposed construction area. The Contractor shall design and install adequate shoring and bracing for all structural or removal tasks. The Contractor shall have sole responsibility for any damage or injuries caused by or during the execution of the work. 9. The Contractor shall do all cutting, patching, repairing as required to perform all of the work indicated on the drawings, and all other work that may be required to complete the job. 10. The Contractor, upon completion of the work, shall arrange for Department of Buildings inspections and signoffs as required. 11. Work shall conform to PA Building Code and all applicable State and City Building Laws.

KEY NOTES 1 Rainwater collection drench to be site cast concrete. Formwork to connect trench to site cast retaining wall parallel to building. Pour in 5’-0” sections waterproofed and caulked to fit. Trench at 1’:30’ North to South. 2 5”x20” Metal grates to fit into opening with 1/4” gap at sides 3 Sub-terain cistern to be placed at minimum 5’ below grade. Plumbing to be coordinated with drench. 4 Overflow valve to connect from cistern to main plumbing line at height below street overflow valve at 8” from top of cistern. 5 3/4” Pipe to penetrate existing sandstone foundation with boring to fit to caulk. 1

AT204

RAIN WATER HARVESTING PLAN SCALE: 1/8” = 1’-0”

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

ADAPTIVE TRANSFORMATION: RAINWATER COLLECTION

AT2.05


RAINWATER HARVESTING PLAN

-2"

-4"

-6"

-8"

-10" -12" -14"

02200 - 1

AT2.06

ADAPTIVE TRANSFORMATION: RAINWATER COLLECTION

4

5

6

02900 - 5

03300 - 1

2

3 02721 - 2

02900 - 4

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

02721 - 1


GENERAL NOTES 1. These documents are the copyrighted intellectual property of Carnegie Mellon University and its authors. The documents are not to be reproduced or utilized for any purpose other than originally intended as stipulated on the cover sheet and titleblock. 2. None of the documents included in drawing index are intended to be considered in isolation of one another, all parties utilizing these documents for bidding, quantity survey, and/or construction shall consult the general notes and information located on this sheet and all other sheets before proceeding. 3. All work shall conform to the requirements of the Allegheny County Building Code, Fire Department regulations, utility company requirements, and the best trade practices. 4. Before commencing work, the Contractor shall file all required Certificates of Insurance with the Department of Buildings, obtain all required permits, and pay all fees required by governing Allegheny County agencies. 5. The Contractor shall verify all existing conditions in the field prior to commencing work, and shall report any discrepancies between drawings and field conditions to the Architect in writing. 6. Details necessary for proper construction of any part of the work shall be included as if they were indicated in the drawings. 7. The Contractor shall coordinate all work procedures with requirements of local authorities and building management. 8. The Contractor shall be responsible for the protection of all conditions and materials within the proposed construction area. The Contractor shall design and install adequate shoring and bracing for all structural or removal tasks. The Contractor shall have sole responsibility for any damage or injuries caused by or during the execution of the work. 9. The Contractor shall do all cutting, patching, repairing as required to perform all of the work indicated on the drawings, and all other work that may be required to complete the job. 10. The Contractor, upon completion of the work, shall arrange for Department of Buildings inspections and signoffs as required. 11. Work shall conform to PA Building Code and all applicable State and City Building Laws.

KEY NOTES 1 Two distinct species of native tree to be planted 10’ OC 2 Connect trench formwork to retaining wall. 3 5”x20” metal grate to fit to formwork with 1/4” -1/2” gap at sides. 4 3 Native species of shrub or bush to be planted at 3’-0”” OC 5 Ground cut and fill alterations to be done with shovel or small machinery to achieve moderate accuracy.

1 02900 - 3

02900 - 2

02900 - 1

1

AT206

6 Grass seed to be planted and allowed 3 months to develop root system.

LANDSCAPING PLAN SCALE: 1/8” = 1’-0”

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

ADAPTIVE TRANSFORMATION: RAINWATER COLLECTION

AT2.07


RAINWATER HARVESTING SECTIONS AND DETAILS

15453 - 3 15453 - 2

15453 - 1 02721 - 2 03300 - 1

?

1

AT208

RAINWATER SECTION SCALE: 1/8” = 1’-0”

1 15453 - 1 2

15453 - 3 15453 - 2

3

15410 - 1 2

AT208

AT2.08

ADAPTIVE TRANSFORMATION: RAINWATER COLLECTION

RAINWATER PLAN SCALE: 1/4” = 1’-0”

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


GENERAL NOTES

1'-8"

5"

1. These documents are the copyrighted intellectual property of Carnegie Mellon University and its authors. The documents are not to be reproduced or utilized for any purpose other than originally intended as stipulated on the cover sheet and titleblock. 2. None of the documents included in drawing index are intended to be considered in isolation of one another, all parties utilizing these documents for bidding, quantity survey, and/or construction shall consult the general notes and information located on this sheet and all other sheets before proceeding. 3. All work shall conform to the requirements of the Allegheny County Building Code, Fire Department regulations, utility company requirements, and the best trade practices. 4. Before commencing work, the Contractor shall file all required Certificates of Insurance with the Department of Buildings, obtain all required permits, and pay all fees required by governing Allegheny County agencies. 5. The Contractor shall verify all existing conditions in the field prior to commencing work, and shall report any discrepancies between drawings and field conditions to the Architect in writing. 6. Details necessary for proper construction of any part of the work shall be included as if they were indicated in the drawings. 7. The Contractor shall coordinate all work procedures with requirements of local authorities and building management. 8. The Contractor shall be responsible for the protection of all conditions and materials within the proposed construction area. The Contractor shall design and install adequate shoring and bracing for all structural or removal tasks. The Contractor shall have sole responsibility for any damage or injuries caused by or during the execution of the work. 9. The Contractor shall do all cutting, patching, repairing as required to perform all of the work indicated on the drawings, and all other work that may be required to complete the job. 10. The Contractor, upon completion of the work, shall arrange for Department of Buildings inspections and signoffs as required. 11. Work shall conform to PA Building Code and all applicable State and City Building Laws.

121"

4

AT209

GRATE PLAN SCALE: 3/4” = 1’-0”

2"

1'-8"

2"

5"

5

AT209

3

AT209

GRATE SECTIONS SCALE: 3/4” = 1’-0”

GRATE AXONOMETRIC SCALE: 3/4” = 1’-0”

6

4

5 7

KEY NOTES 1 Cistern to be placed at minimum 5’ below grade. 2 Overflow valve pipe to run from cistern to main sewer line below street. Valve to be at least 8” from top of cistern. 3 3/4” Pipe to penetrate existing sandstone foundation with boring diameter to fit caulking. 4 Sand to be applied and compressed at base of concrete formwork. 5 Retaining wall to be formed connected to trench. 6 Course gravel to be applied oover trench and grate. Fine gravel to be applied over course gravel. 7 3 Native species of shrub or bush to be planted at 3’-0”” OC.

detail 4 - ground water assembly section 6



AT209

TRENCH ASSEMBLY SECTION SCALE: 3/4” = 1’-0”

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

ADAPTIVE TRANSFORMATION: RAINWATER COLLECTION

AT2.09


PMN1.00

PROJECT NARRATIVE: AN INTRODUCTION

GC0.00 Cover Sheet IN1.00 Index : Table of Contents IN2.00 Index : Report Layout IN3.00 Index : General Use Notes IN4.00 Index : Keys and Definitions PN1.00 Project Narrative : An Introduction PN1.01 Project Narrative : Decision Process PN1.02 Project Narrative : Context PN1.03 Project Narrative : Comparative Typology PS1.00 Project Scope : Demographics PS1.01 Project Scope : Demographics PS1.02 Project Scope : Demographics PS1.03 Project Scope : Demographics PS1.04 Project Scope : Demographics PS1.05 Project Scope : Demographics PS2.00 Project Scope : Land Use and Zoning PS2.01 Project Scope : Land Use and Zoning PS2.02 Project Scope : Housing Location, Typologies PS2.03 Project Scope : Housing Location, Type 1 PS3.00 Project Scope : Housing Location, Type 2, 3, 4 PS3.01 Project Scope : Housing Location, Type 5, 6, 7 PS4.00 Project Scope : Eight Study Houses PS4.01 Project Scope : Eight Study Houses PS5.00 Project Scope : Site Utilization PS5.01 Project Scope : Site Utilization PS5.02 Project Scope : Site Utilization PS5.03 Project Scope : Site Utilization PS6.00 Project Scope : Housing Condition PS6.01 Project Scope : Housing Condition PS7.00 Project Scope : Case Study 1 Overview PS7.01 Project Scope : Case Study 1 Housing Condition PS7.02 Project Scope : Case Study 2 Overview PS7.03 Project Scope : Case Study 2 Housing Condition PS8.00 Project Scope : Zoning Deviations PS8.01 Project Scope : Zoning Deviations PS8.02 Project Scope : Zoning Deviations PS8.03 Project Scope : Zoning Deviations PS9.00 Project Scope : House Construction PS9.01 Project Scope : House Materials PS10.00 Project Scope : Heating Strategies PS10.01 Project Scope : Heating Strategies PS11.00 Project Scope : Environmental Data PS11.01 Project Scope : Environmental Data PS11.02 Project Scope : Environmental Data PS11.03 Project Scope : Environmental Data SC1.00 Site Context : General Site Modifications SC1.01 Site Context : General Site Modifications SC1.02 Site Context : General Site Modifications SC1.03 Site Context : General Site Modifications SC2.00 Site Context : Scalar Representations SC2.01 Site Context : Scalar Representations CN1.00 Contract Negotiations : The Players CN101 Contract Negotiations : The Responsibilities AT1.00 Adaptive Transformation 1: Building Envelope AT1.01 Adaptive Transformation 1: Building Envelope AT1.02 Adaptive Transformation 1: Building Envelope AT1.03 Adaptive Transformation 1: Building Envelope AT1.04 Adaptive Transformation 1: Building Envelope AT1.05 Adaptive Transformation 1: Building Envelope AT2.00 Adaptive Transformation 2: Rainwater Harvesting AT2.01 Adaptive Transformation 2: Rainwater Harvesting AT2.02 Adaptive Transformation 2: Rainwater Harvesting AT2.03 Adaptive Transformation 2: Rainwater Harvesting AT2.04 Adaptive Transformation 2: Rainwater Harvesting AT2.05 Adaptive Transformation 2: Rainwater Harvesting AT2.06 Adaptive Transformation 2: Rainwater Harvesting AT2.07 Adaptive Transformation 2: Rainwater Harvesting AT2.08 Adaptive Transformation 2: Rainwater Harvesting AT2.09 Adaptive Transformation 2: Rainwater Harvesting AT3.00 Adaptive Transformation 3: Roof Greenhouse AT3.01 Adaptive Transformation 3: Roof Greenhouse AT3.02 Adaptive Transformation 3: Roof Greenhouse AT3.03 Adaptive Transformation 3: Roof Greenhouse AT3.04 Adaptive Transformation 3: Roof Greenhouse AT3.05 Adaptive Transformation 3: Roof Greenhouse AT3.06 Adaptive Transformation 3: Roof Greenhouse AT3.07 Adaptive Transformation 3: Roof Greenhouse AT3.08 Adaptive Transformation 3: Roof Greenhouse AT3.09 Adaptive Transformation 3: Roof Greenhouse AT3.10 Adaptive Transformation 3: Roof Greenhouse AT3.11 Adaptive Transformation 3: Roof Greenhouse AT3.12 Adaptive Transformation 3: Roof Greenhouse AT3.13 Adaptive Transformation 3: Roof Greenhouse AT3.14 Adaptive Transformation 3: Roof Greenhouse AT3.15 Adaptive Transformation 3: Roof Greenhouse PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING AT3.16 Adaptive Transformation 3: Roof Greenhouse Adaptive Transformation 3: Roof Greenhouse CARNEGIE MELLON UNIVERSITY SCHOOL OFAT3.17 ARCHITECTURE 48_550


AT4.00 AT4.01 AT4.02 AT4.03 AT4.04 AT4.05 AT4.06 AT4.07 AT4.08 AT4.09 AT4.10 AT4.11 AT4.12 AT4.13 AT4.14 AT4.15 AT4.16 AT4.17 AS1.00 AS1.01 AS1.02 SD1.00 IMP1.00 IMP1.01 IMP1.02 IMP1.03 IMP2.00 IMP2.01 IMP2.02 IMP2.03 IMP3.00 IMP3.01 IMP3.02 IMP3.03 CA1.00 CA1.01 CA1.02 CA1.03 CA1.04 CA1.05 SP1.00 SP1.01 SP1.02 SP1.03 SP1.04 SP1.05

Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Assembly Sequence : Stages 1 Assembly Sequence : Stages 2 Assembly Sequence : Stages 3 Selective Demolition : Stages 1 Implementation : Logistics Implementation : Logistics Implementation : Logistics Implementation : Logistics Implementation : Critical Path Implementation : Critical Path Implementation : Critical Path Implementation : Critical Path Implementation : Hard Costs Implementation : Hard Costs Implementation : Soft Costs Implementation : Budget Code Analysis : Building Transformation Code Analysis : Building Transformation Code Analysis : Building Transformation Code Analysis : Building Transformation Code Analysis : Building Transformation Code Analysis : Building Transformation Specifications : Material Legend Specifications : Material Legend Specifications : Material Legend Specifications : Material Legend Specifications : Material Legend Specifications : Wall Types

A d a p t iv e Tra nsf o r m a t io n 3 rainwater harvesting

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

PROJECT NARRATIVE: AN INTRODUCTION

PMN1.00


ROOF GREENHOUSE PERSPECTIVE Although to manage stormwater is not the primary objective of this project, it is necessary to implement this as a means to demonstrate methods of stormwater management in order to obtain a grant from the USDHUD (U.S. Department of Housing and Urban Development). The grant from the USDHUD would cover the costs of the entire project, making this an invaluable investment to pursue. With the grant, the total cost of the project would be $0 If this grant is obtained, the cost benefits from the rainwater collection system will begin to take affect. The green house will utilize two types of passive tempering in its air movement systems. This space is meant to allow the owner to have a unique space atop their home. This space could be utilized in a variety of ways. It could be used to grow plants, as a patio, as a lounge space, as an exercise room, as a study, as a library, as a space one could stretch out in and enjoy life. The simple rough carpentry finish formally addresses the status and conditions of the home both before and after renovation.

AT3.00

ADAPTIVE TRANSFORMATION: ROOF GREEN HOUSE

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

ADAPTIVE TRANSFORMATION: ROOF GREEN HOUSE

AT3.01


HEATING WITH A GREEN HOUSE

Green House Effect During the cold winter months the green house will work as a generator of heat for the entire house. In even a mildly sunny environment a green house will collect heat from the sun’s rays as the day goes on. The air in the green house will heat up, creating a mass of warmth capping the house. This won’t only heat the attic, but will also work to insulate the top of the building. Heat loss through the roof will be almost non existent, heat gain will occur. If this hot air were to be stored during the day, at night a simple fan could be utilized to circulate the warm air down into the building. In the morning, closing the door to the green house will begin the process of storing up heat once more.

WINTER - HEATING

AT3.02

ADAPTIVE TRANSFORMATION: ROOF GREEN HOUSE

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


COOLING WITH A GREEN HOUSE

Stack Effect Hot air rises. The stack effect utilizes this principle. With the windows open in the green house, a north - south wind will push straight through the space. As hot air rises it will be caught by the flow of the green house breeze. This will generate in imbalance in pressure from the lower floors to the attic. This pressure system will force hot air through the building. The hot air moving up and out, a cool breeze from the outside will pass through the windows of the lower floors. This breeze will cool the house and create a significantly more pleasurable atmosphere during late spring and summer months.

SUMMER - COOLING

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

ADAPTIVE TRANSFORMATION: ROOF GREEN HOUSE

AT3.03


ROOF GREENHOUSE PERSPECTIVE 7.2 AT205

3 7.2 AT205

7 AT205

3 4 AT205

4 AT205

2.2 AT205

2.1 AT205

7.1 AT205

AT3.04

ADAPTIVE TRANSFORMATION: ROOF GREEN HOUSE

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


06100 - 1

08210 - 3

GENERAL NOTES 08900 - 1

2

4

3

06100 - 2

08900 - 2

08210 - 2

1

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

1. These documents are the copyrighted intellectual property of Carnegie Mellon University and its authors. The documents are not to be reproduced or utilized for any purpose other than originally intended as stipulated on the cover sheet and titleblock. 2. None of the documents included in drawing index are intended to be considered in isolation of one another, all parties utilizing these documents for bidding, quantity survey, and/or construction shall consult the general notes and information located on this sheet and all other sheets before proceeding. 3. All work shall conform to the requirements of the Allegheny County Building Code, Fire Department regulations, utility company requirements, and the best trade practices. 4. Before commencing work, the Contractor shall file all required Certificates of Insurance with the Department of Buildings, obtain all required permits, and pay all fees required by governing Allegheny County agencies. 5. The Contractor shall verify all existing conditions in the field prior to commencing work, and shall report any discrepancies between drawings and field conditions to the Architect in writing. 6. Details necessary for proper construction of any part of the work shall be included as if they were indicated in the drawings. 7. The Contractor shall coordinate all work procedures with requirements of local authorities and building management. 8. The Contractor shall be responsible for the protection of all conditions and materials within the proposed construction area. The Contractor shall design and install adequate shoring and bracing for all structural or removal tasks. The Contractor shall have sole responsibility for any damage or injuries caused by or during the execution of the work. 9. The Contractor shall do all cutting, patching, repairing as required to perform all of the work indicated on the drawings, and all other work that may be required to complete the job. 10. The Contractor, upon completion of the work, shall arrange for Department of Buildings inspections and signoffs as required. 11. Work shall conform to PA Building Code and all applicable State and City Building Laws.

ADAPTIVE TRANSFORMATION: ROOF GREEN HOUSE

AT3.05


ROOF GREENHOUSE PLANS 06100 - 1

08900 - 2

2

3

2

3

2

3

6.2 AT205

1.4 AT205

1.3 AT206 6 AT205

8.1 AT205

1

AT307

GREEN HOUSE CUT PLAN SCALE: 1/8” = 1’-0”

06100 - 2

06100 - 1

06100 - 3

3 08900 - 1 6.3 AT205

8 AT205

1.2 AT205

3

1.1 AT205 1 AT205 6.1 AT205

8.1 AT205

2

AT307

AT3.06

GREEN HOUSE ROOF PLAN SCALE: 1/8” = 1’-0”

ADAPTIVE TRANSFORMATION: ROOF GREEN HOUSE

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


GENERAL NOTES 1. These documents are the copyrighted intellectual property of Carnegie Mellon University and its authors. The documents are not to be reproduced or utilized for any purpose other than originally intended as stipulated on the cover sheet and titleblock. 2. None of the documents included in drawing index are intended to be considered in isolation of one another, all parties utilizing these documents for bidding, quantity survey, and/or construction shall consult the general notes and information located on this sheet and all other sheets before proceeding. 3. All work shall conform to the requirements of the Allegheny County Building Code, Fire Department regulations, utility company requirements, and the best trade practices. 4. Before commencing work, the Contractor shall file all required Certificates of Insurance with the Department of Buildings, obtain all required permits, and pay all fees required by governing Allegheny County agencies. 5. The Contractor shall verify all existing conditions in the field prior to commencing work, and shall report any discrepancies between drawings and field conditions to the Architect in writing. 6. Details necessary for proper construction of any part of the work shall be included as if they were indicated in the drawings. 7. The Contractor shall coordinate all work procedures with requirements of local authorities and building management. 8. The Contractor shall be responsible for the protection of all conditions and materials within the proposed construction area. The Contractor shall design and install adequate shoring and bracing for all structural or removal tasks. The Contractor shall have sole responsibility for any damage or injuries caused by or during the execution of the work. 9. The Contractor shall do all cutting, patching, repairing as required to perform all of the work indicated on the drawings, and all other work that may be required to complete the job. 10. The Contractor, upon completion of the work, shall arrange for Department of Buildings inspections and signoffs as required. 11. Work shall conform to PA Building Code and all applicable State and City Building Laws.

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

ADAPTIVE TRANSFORMATION: ROOF GREEN HOUSE

AT3.07


ROOF GREENHOUSE PLAN DETAILS

05090 - 1

06100 - 2

06100 - 1

06100 - 3

SCALE: 3” = 1’-0” detail 1 SCALE: 1 ½” = 1’-0”

06100 - 2 05090 - 2 06100 - 1

detail 1.1SCALE: 3” = 1’-0” SCALE: 1 ½” = 1’-0”

05090 - 2

05090 - 4 05090 - 2 06100 - 1

06100 - 3

SCALE: 1 ½” = 1’-0”

AT3.08

ADAPTIVE TRANSFORMATION: ROOF GREEN HOUSE

detail 1.2SCALE: 3” = 1’-0” PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


05090 - 5 05090 - 3 06100 - 2

SCALE: 1 ½” = 1’-0”

detail 1.3

SCALE: 3” = 1’-0”

GENERAL NOTES

SCALE: 1 ½” = 1’-0”

05090 - 6

detail 1.4

06100 - 2

05090 - 3

1. These documents are the copyrighted intellectual property of Carnegie Mellon University and its authors. The documents are not to be reproduced or utilized for any purpose other than originally intended as stipulated on the cover sheet and titleblock. 2. None of the documents included in drawing index are intended to be considered in isolation of one another, all parties utilizing these documents for bidding, quantity survey, and/or construction shall consult the general notes and information located on this sheet and all other sheets before proceeding. 3. All work shall conform to the requirements of the Allegheny County Building Code, Fire Department regulations, utility company requirements, and the best trade practices. 4. Before commencing work, the Contractor shall file all required Certificates of Insurance with the Department of Buildings, obtain all required permits, and pay all fees required by governing Allegheny County agencies. 5. The Contractor shall verify all existing conditions in the field prior to commencing work, and shall report any discrepancies between drawings and field conditions to the Architect in writing. 6. Details necessary for proper construction of any part of the work shall be included as if they were indicated in the drawings. 7. The Contractor shall coordinate all work procedures with requirements of local authorities and building management. 8. The Contractor shall be responsible for the protection of all conditions and materials within the proposed construction area. The Contractor shall design and install adequate shoring and bracing for all structural or removal tasks. The Contractor shall have sole responsibility for any damage or injuries caused by or during the execution of the work. 9. The Contractor shall do all cutting, patching, repairing as required to perform all of the work indicated on the drawings, and all other work that may be required to complete the job. 10. The Contractor, upon completion of the work, shall arrange for Department of Buildings inspections and signoffs as required. 11. Work shall conform to PA Building Code and all applicable State and City Building Laws.

SCALE: 3” = 1’-0”

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

ADAPTIVE TRANSFORMATION: ROOF GREEN HOUSE

AT3.09


SCALE: 1 ½” = 1’-0”

05090 - 4

06100 - 2

06100 - 1 05090 - 1

06100 - 3

detail 6

SCALE: 3” = 1’-0”

SCALE: 1 ½” = 1’-0”

08900 - 1

3

05090 - 2

05090 - 1

06100 - 1

06100 - 2

05090 - 4

06100 - 3

detail 6.1 SCALE: 3” = 1’-0”

05090 - 6 SCALE: 1 ½” = 1’-0”

05090 - 2

06100 - 2

detail 6.2

AT3.10

ADAPTIVE TRANSFORMATION: ROOF GREEN HOUSE

SCALE: 3” = 1’-0”

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


3

05090 - 2

05090 - 1

05090 - 4 06100 - 2

06100 - 3

SCALE: 1 ½” = 1’-0”

detail 6.3

SCALE: 3” = 1’-0”

GENERAL NOTES SCALE: 1 ½” = 1’-0”

06100 - 3

06100 - 2

06100 - 1

05090 - 1

05090 - 6

3

detail 8

1. These documents are the copyrighted intellectual property of Carnegie Mellon University and its authors. The documents are not to be reproduced or utilized for any purpose other than originally intended as stipulated on the cover sheet and titleblock. 2. None of the documents included in drawing index are intended to be considered in isolation of one another, all parties utilizing these documents for bidding, quantity survey, and/or construction shall consult the general notes and information located on this sheet and all other sheets before proceeding. 3. All work shall conform to the requirements of the Allegheny County Building Code, Fire Department regulations, utility company requirements, and the best trade practices. 4. Before commencing work, the Contractor shall file all required Certificates of Insurance with the Department of Buildings, obtain all required permits, and pay all fees required by governing Allegheny County agencies. 5. The Contractor shall verify all existing conditions in the field prior to commencing work, and shall report any discrepancies between drawings and field conditions to the Architect in writing. 6. Details necessary for proper construction of any part of the work shall be included as if they were indicated in the drawings. 7. The Contractor shall coordinate all work procedures with requirements of local authorities and building management. 8. The Contractor shall be responsible for the protection of all conditions and materials within the proposed construction area. The Contractor shall design and install adequate shoring and bracing for all structural or removal tasks. The Contractor shall have sole responsibility for any damage or injuries caused by or during the execution of the work. 9. The Contractor shall do all cutting, patching, repairing as required to perform all of the work indicated on the drawings, and all other work that may be required to complete the job. 10. The Contractor, upon completion of the work, shall arrange for Department of Buildings inspections and signoffs as required. 11. Work shall conform to PA Building Code and all applicable State and City Building Laws.

SCALE: 3” = 1’-0”

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

ADAPTIVE TRANSFORMATION: ROOF GREEN HOUSE

AT3.11


ROOF GREENHOUSE SECTION

05090 - 7 05090 - 1

06100 - 1

06100 - 2

05090 - 4

06100 - 3

SCALE: 1 ½” = 1’-0”

detail 8.1

SCALE: 3” = 1’-0”

05090 - 6

06100 - 2

05090 - 7

05090 - 2

SCALE: 1 ½” = 1’-0” 1

detail 8.2

AT3.12

ADAPTIVE TRANSFORMATION: ROOF GREEN HOUSE

4

SCALE: 3” = 1’-0”

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


10 AT205

GENERAL NOTES

5 AT205

06100 - 2

08900 - 2 08210 - 3

3 AT205

08210 - 2 9.1 AT205

4

08900 - 1 06100 - 1

2 AT205 7.1 AT205

1

AT3.13

1. These documents are the copyrighted intellectual property of Carnegie Mellon University and its authors. The documents are not to be reproduced or utilized for any purpose other than originally intended as stipulated on the cover sheet and titleblock. 2. None of the documents included in drawing index are intended to be considered in isolation of one another, all parties utilizing these documents for bidding, quantity survey, and/or construction shall consult the general notes and information located on this sheet and all other sheets before proceeding. 3. All work shall conform to the requirements of the Allegheny County Building Code, Fire Department regulations, utility company requirements, and the best trade practices. 4. Before commencing work, the Contractor shall file all required Certificates of Insurance with the Department of Buildings, obtain all required permits, and pay all fees required by governing Allegheny County agencies. 5. The Contractor shall verify all existing conditions in the field prior to commencing work, and shall report any discrepancies between drawings and field conditions to the Architect in writing. 6. Details necessary for proper construction of any part of the work shall be included as if they were indicated in the drawings. 7. The Contractor shall coordinate all work procedures with requirements of local authorities and building management. 8. The Contractor shall be responsible for the protection of all conditions and materials within the proposed construction area. The Contractor shall design and install adequate shoring and bracing for all structural or removal tasks. The Contractor shall have sole responsibility for any damage or injuries caused by or during the execution of the work. 9. The Contractor shall do all cutting, patching, repairing as required to perform all of the work indicated on the drawings, and all other work that may be required to complete the job. 10. The Contractor, upon completion of the work, shall arrange for Department of Buildings inspections and signoffs as required. 11. Work shall conform to PA Building Code and all applicable State and City Building Laws.

GREEN HOUSE ROOF PLAN SCALE: 1/8” = 1’-0”

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

ADAPTIVE TRANSFORMATION: ROOF GREEN HOUSE

AT3.13


ELEVATIONAL AND SECTIONAL DETAILS

detail 2

SCALE: 1 ½” = 1’-0”

06100 - 2

05090 - 1

detail 2.1

SCALE: 1 ½” = 1’-0”

06100 - 2 05090 - 6

detail 2.2

SCALE: 1 ½” = 1’-0”

06100 - 2 05090 - 2

detail 3

SCALE: 1 ½” = 1’-0”

06100 - 3 05090 - 7

06100 - 1 06100 - 2

AT3.14

ADAPTIVE TRANSFORMATION: ROOF GREEN HOUSE

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


05090 - 1 05090 - 2 05090 - 2

06100 - 2 SCALE: 1 ½” = 1’-0”

05090 - 3

detail 4.1

SCALE: 1 ½” = 1’-0”

detail 4

SCALE: 3” = 1’-0”

GENERAL NOTES

detail 5 06100 - 2

05090 - 6

06100 - 2

06100 - 3

SCALE: 3” = 1’-0”

05090 - 8

SCALE: 1 ½” = 1’-0”

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

1. These documents are the copyrighted intellectual property of Carnegie Mellon University and its authors. The documents are not to be reproduced or utilized for any purpose other than originally intended as stipulated on the cover sheet and titleblock. 2. None of the documents included in drawing index are intended to be considered in isolation of one another, all parties utilizing these documents for bidding, quantity survey, and/or construction shall consult the general notes and information located on this sheet and all other sheets before proceeding. 3. All work shall conform to the requirements of the Allegheny County Building Code, Fire Department regulations, utility company requirements, and the best trade practices. 4. Before commencing work, the Contractor shall file all required Certificates of Insurance with the Department of Buildings, obtain all required permits, and pay all fees required by governing Allegheny County agencies. 5. The Contractor shall verify all existing conditions in the field prior to commencing work, and shall report any discrepancies between drawings and field conditions to the Architect in writing. 6. Details necessary for proper construction of any part of the work shall be included as if they were indicated in the drawings. 7. The Contractor shall coordinate all work procedures with requirements of local authorities and building management. 8. The Contractor shall be responsible for the protection of all conditions and materials within the proposed construction area. The Contractor shall design and install adequate shoring and bracing for all structural or removal tasks. The Contractor shall have sole responsibility for any damage or injuries caused by or during the execution of the work. 9. The Contractor shall do all cutting, patching, repairing as required to perform all of the work indicated on the drawings, and all other work that may be required to complete the job. 10. The Contractor, upon completion of the work, shall arrange for Department of Buildings inspections and signoffs as required. 11. Work shall conform to PA Building Code and all applicable State and City Building Laws.

ADAPTIVE TRANSFORMATION: ROOF GREEN HOUSE

AT3.15


detail 7

SCALE: 3” = 1’-0”

SCALE: 1 ½” = 1’-0”

06100 - 3

06100 - 2

06100 - 1

detail 7.1

SCALE: 1 ½” = 1’-0”

detail 7.2

SCALE: 3” = 1’-0”

06100 - 3

05090 - 6

08900 - 2

05090 - 6

05090 - 7

05090 - 7

06100 - 1 SCALE: 1 ½” = 1’-0”

06100 - 2

AT3.16

ADAPTIVE TRANSFORMATION: ROOF GREEN HOUSE

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


detail 9

SCALE: 3” = 1’-0”

SCALE: 1 ½” = 1’-0”

06100 - 3 05090 - 7 05090 - 6 06100 - 1

06100 - 2

GENERAL NOTES

detail 9.1

SCALE: 3” = 1’-0”

SCALE: 1 ½” = 1’-0”

06100 - 2

05090 - 6 06100 - 1

05090 - 2 06100 - 2

detail 10

SCALE: 3” = 1’-0”

SCALE: 1 ½” = 1’-0”

06100 - 3 06100 - 1 05090 - 8

06100 - 2

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

1. These documents are the copyrighted intellectual property of Carnegie Mellon University and its authors. The documents are not to be reproduced or utilized for any purpose other than originally intended as stipulated on the cover sheet and titleblock. 2. None of the documents included in drawing index are intended to be considered in isolation of one another, all parties utilizing these documents for bidding, quantity survey, and/or construction shall consult the general notes and information located on this sheet and all other sheets before proceeding. 3. All work shall conform to the requirements of the Allegheny County Building Code, Fire Department regulations, utility company requirements, and the best trade practices. 4. Before commencing work, the Contractor shall file all required Certificates of Insurance with the Department of Buildings, obtain all required permits, and pay all fees required by governing Allegheny County agencies. 5. The Contractor shall verify all existing conditions in the field prior to commencing work, and shall report any discrepancies between drawings and field conditions to the Architect in writing. 6. Details necessary for proper construction of any part of the work shall be included as if they were indicated in the drawings. 7. The Contractor shall coordinate all work procedures with requirements of local authorities and building management. 8. The Contractor shall be responsible for the protection of all conditions and materials within the proposed construction area. The Contractor shall design and install adequate shoring and bracing for all structural or removal tasks. The Contractor shall have sole responsibility for any damage or injuries caused by or during the execution of the work. 9. The Contractor shall do all cutting, patching, repairing as required to perform all of the work indicated on the drawings, and all other work that may be required to complete the job. 10. The Contractor, upon completion of the work, shall arrange for Department of Buildings inspections and signoffs as required. 11. Work shall conform to PA Building Code and all applicable State and City Building Laws.

ADAPTIVE TRANSFORMATION: ROOF GREEN HOUSE

AT3.17


v

PMN1.00

PROJECT NARRATIVE: AN INTRODUCTION

GC0.00 Cover Sheet IN1.00 Index : Table of Contents IN2.00 Index : Report Layout IN3.00 Index : General Use Notes IN4.00 Index : Keys and Definitions PN1.00 Project Narrative : An Introduction PN1.01 Project Narrative : Decision Process PN1.02 Project Narrative : Context PN1.03 Project Narrative : Comparative Typology PS1.00 Project Scope : Demographics PS1.01 Project Scope : Demographics PS1.02 Project Scope : Demographics PS1.03 Project Scope : Demographics PS1.04 Project Scope : Demographics PS1.05 Project Scope : Demographics PS2.00 Project Scope : Land Use and Zoning PS2.01 Project Scope : Land Use and Zoning PS2.02 Project Scope : Housing Location, Typologies PS2.03 Project Scope : Housing Location, Type 1 PS3.00 Project Scope : Housing Location, Type 2, 3, 4 PS3.01 Project Scope : Housing Location, Type 5, 6, 7 PS4.00 Project Scope : Eight Study Houses PS4.01 Project Scope : Eight Study Houses PS5.00 Project Scope : Site Utilization PS5.01 Project Scope : Site Utilization PS5.02 Project Scope : Site Utilization PS5.03 Project Scope : Site Utilization PS6.00 Project Scope : Housing Condition PS6.01 Project Scope : Housing Condition PS7.00 Project Scope : Case Study 1 Overview PS7.01 Project Scope : Case Study 1 Housing Condition PS7.02 Project Scope : Case Study 2 Overview PS7.03 Project Scope : Case Study 2 Housing Condition PS8.00 Project Scope : Zoning Deviations PS8.01 Project Scope : Zoning Deviations PS8.02 Project Scope : Zoning Deviations PS8.03 Project Scope : Zoning Deviations PS9.00 Project Scope : House Construction PS9.01 Project Scope : House Materials PS10.00 Project Scope : Heating Strategies PS10.01 Project Scope : Heating Strategies PS11.00 Project Scope : Environmental Data PS11.01 Project Scope : Environmental Data PS11.02 Project Scope : Environmental Data PS11.03 Project Scope : Environmental Data SC1.00 Site Context : General Site Modifications SC1.01 Site Context : General Site Modifications SC1.02 Site Context : General Site Modifications SC1.03 Site Context : General Site Modifications SC2.00 Site Context : Scalar Representations SC2.01 Site Context : Scalar Representations CN1.00 Contract Negotiations : The Players CN101 Contract Negotiations : The Responsibilities AT1.00 Adaptive Transformation 1: Building Envelope AT1.01 Adaptive Transformation 1: Building Envelope AT1.02 Adaptive Transformation 1: Building Envelope AT1.03 Adaptive Transformation 1: Building Envelope AT1.04 Adaptive Transformation 1: Building Envelope AT1.05 Adaptive Transformation 1: Building Envelope AT2.00 Adaptive Transformation 2: Rainwater Harvesting AT2.01 Adaptive Transformation 2: Rainwater Harvesting AT2.02 Adaptive Transformation 2: Rainwater Harvesting AT2.03 Adaptive Transformation 2: Rainwater Harvesting AT2.04 Adaptive Transformation 2: Rainwater Harvesting AT2.05 Adaptive Transformation 2: Rainwater Harvesting AT2.06 Adaptive Transformation 2: Rainwater Harvesting AT2.07 Adaptive Transformation 2: Rainwater Harvesting AT2.08 Adaptive Transformation 2: Rainwater Harvesting AT2.09 Adaptive Transformation 2: Rainwater Harvesting AT3.00 Adaptive Transformation 3: Roof Greenhouse AT3.01 Adaptive Transformation 3: Roof Greenhouse AT3.02 Adaptive Transformation 3: Roof Greenhouse AT3.03 Adaptive Transformation 3: Roof Greenhouse AT3.04 Adaptive Transformation 3: Roof Greenhouse AT3.05 Adaptive Transformation 3: Roof Greenhouse AT3.06 Adaptive Transformation 3: Roof Greenhouse AT3.07 Adaptive Transformation 3: Roof Greenhouse AT3.08 Adaptive Transformation 3: Roof Greenhouse AT3.09 Adaptive Transformation 3: Roof Greenhouse AT3.10 Adaptive Transformation 3: Roof Greenhouse AT3.11 Adaptive Transformation 3: Roof Greenhouse AT3.12 Adaptive Transformation 3: Roof Greenhouse AT3.13 Adaptive Transformation 3: Roof Greenhouse AT3.14 Adaptive Transformation 3: Roof Greenhouse AT3.15 Adaptive Transformation 3: Roof Greenhouse AT3.16 Adaptive Transformation 3: Roof Greenhouse PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING AT3.17 Adaptive Transformation 3: Roof Greenhouse

CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


AT4.00 AT4.01 AT4.02 AT4.03 AT4.04 AT4.05 AT4.06 AT4.07 AT4.08 AT4.09 AT4.10 AT4.11 AT4.12 AT4.13 AT4.14 AT4.15 AT4.16 AT4.17 AS1.00 AS1.01 AS1.02 SD1.00 IMP1.00 IMP1.01 IMP1.02 IMP1.03 IMP2.00 IMP2.01 IMP2.02 IMP2.03 IMP3.00 IMP3.01 IMP3.02 IMP3.03 CA1.00 CA1.01 CA1.02 CA1.03 CA1.04 CA1.05 SP1.00 SP1.01 SP1.02 SP1.03 SP1.04 SP1.05

Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Assembly Sequence : Stages 1 Assembly Sequence : Stages 2 Assembly Sequence : Stages 3 Selective Demolition : Stages 1 Implementation : Logistics Implementation : Logistics Implementation : Logistics Implementation : Logistics Implementation : Critical Path Implementation : Critical Path Implementation : Critical Path Implementation : Critical Path Implementation : Hard Costs Implementation : Hard Costs Implementation : Soft Costs Implementation : Budget Code Analysis : Building Transformation Code Analysis : Building Transformation Code Analysis : Building Transformation Code Analysis : Building Transformation Code Analysis : Building Transformation Code Analysis : Building Transformation Specifications : Material Legend Specifications : Material Legend Specifications : Material Legend Specifications : Material Legend Specifications : Material Legend Specifications : Wall Types

A d a p t iv e Tra nsf o r m a t io n 4 the rental module

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

PROJECT NARRATIVE: AN INTRODUCTION

PMN1.00


THE RENTAL POD

AT4.00

ADAPTIVE TRANSFORMATION: RENTAL POD

a retrofitted shipping container stacked vertically to make use of its inherent structural capabilities. Placed next to the existing house to in order to expand livable floor area, the pods also have an independent greywater re-use system. Providing an entry, bathroom and kitchen to the upper two floors of the house, the pods cater to growing families and rental users.

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


An ADA ramp is integrated into the pod structure in order to allow access from the sidewalk to the first floor. This makes the pod a viable option for elderly assisted living in Lawrenceville. This option continues Lawrenceville’s front porch culture. The lowest level pod becomes a open space for outdoor living. This space is ADA accessible via a ramp from the existing kitchen. Renters or other occupants of the upper two floors access their units by an exterior stair.

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

ADAPTIVE TRANSFORMATION: RENTAL POD

AT4.01


STEP

1

the container structure is placed on concrete foundation piles. Offset by three feet, this type of foundation will have minimul impact on the sandstone foundation of the existing house. Soil tests will be necessary to proceed with construction.

STEP

2

Fitted-out shipping containers are dropped into place. These containers are welded together along their touching corner edges.

AT4.02

ADAPTIVE TRANSFORMATION: RENTAL POD

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


STEP

3

Balcony and stair elements are added to the steel container structure. The container doors are opened and utilized as structure for the front balconies.

STEP

4

Final connections are made between the existing house and the containers. Landscaping is added around the new front porch.

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

ADAPTIVE TRANSFORMATION: RENTAL POD

AT4.03


GARDEN DIFFUSES T ORRENT OF R AIN AND 1 ROOF THROUGH VARIOUS FILTERS CHANNELS THE WATER INTO THE FIRST CISTERN.

CISTERN FILLS UP AND PERPETUALLY OVERFLOWS 2 FIRST TO S ECOND CISTERN B ELOW, CODE R EQUIRES A LL BODIES O F WATER T O MOVE C OMPLETELY EVERY 72 HOURS. IN THE MEANTIME THE TOILET CAN BE USED

THIRD CISTERN F ILLS AND O VERFLOWS A CCORDINGLY, 3 THE TOILET PERFECTLY OPERABLE

A CCUMULATES A T BOTTOM C ISTERN, 4 EVERYTHING POSSIBILITY O F FILTRATION S YSTEM AND E XCHANGE WITH WATER BOILER FOR FULL REUTILIZATION.

WATER GOES TO BASEMENT CISTERN FOR SLOW 5 EXCESS REINTRODUCTION TO THE WATERSHED.

AT4.04

ADAPTIVE TRANSFORMATION: RENTAL POD

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


ROOF ASSEMBLY FLOOR ASSEMBLY

05500-01 06100-01

07210-01

06100-02

06200-01 06100-02

07210-01

06100-01 05500-01

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

ADAPTIVE TRANSFORMATION: RENTAL POD

AT4.05


1/AT4.12

3’-7 1/2”

4’-0”

20’-0”

3’-0”

8’-0”

4’-0”

5’-0”

10’-4”

1 AT4.06

Roof Plan

Scale: 3/16” = 1’-0”

AT4.06

ADAPTIVE TRANSFORMATION: RENTAL POD

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


GENERAL NOTES

4’-0”

1

2

03300-02

05120-01

05500-01

03300-02

1/AT4.10

06200-01

1. These documents are the copyrighted intellectual property of Carnegie Mellon University and its authors. The documents are not to be reproduced or utilized for any purpose other than originally intended as stipulated on the cover sheet and titleblock. 2. None of the documents included in drawing index are intended to be considered in isolation of one another, all parties utilizing these documents for bidding, quantity survey, and/or construction shall consult the general notes and information located on this sheet and all other sheets before proceeding. 3. All work shall conform to the requirements of the Allegheny County Building Code, Fire Department regulations, utility company requirements, and the best trade practices. 4. Before commencing work, the Contractor shall file all required Certificates of Insurance with the Department of Buildings, obtain all required permits, and pay all fees required by governing Allegheny County agencies. 5. The Contractor shall verify all existing conditions in the field prior to commencing work, and shall report any discrepancies between drawings and field conditions to the Architect in writing. 6. Details necessary for proper construction of any part of the work shall be included as if they were indicated in the drawings. 7. The Contractor shall coordinate all work procedures with requirements of local authorities and building management. 8. The Contractor shall be responsible for the protection of all conditions and materials within the proposed construction area. The Contractor shall design and install adequate shoring and bracing for all structural or removal tasks. The Contractor shall have sole responsibility for any damage or injuries caused by or during the execution of the work. 9. The Contractor shall do all cutting, patching, repairing as required to perform all of the work indicated on the drawings, and all other work that may be required to complete the job. 10. The Contractor, upon completion of the work, shall arrange for Department of Buildings inspections and signoffs as required. 11. Work shall conform to PA Building Code and all applicable State and City Building Laws.

KEY NOTES: 1) grade gravel on container roof towards drain, line with rubber mat 2) weld steel angle on both sides of container door

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

ADAPTIVE TRANSFORMATION: RENTAL POD

AT4.07


1/AT4.12

1 2

3’-0”

1 AT4.08

Second Floor Plan Scale: 3/16” = 1’-0”

AT4.08

ADAPTIVE TRANSFORMATION: RENTAL POD

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


GENERAL NOTES

2 2

2

7’-0”

1

3’-0”

1

06200-01 09590-01 07210-02

1/AT4.10

3’-0”

1. These documents are the copyrighted intellectual property of Carnegie Mellon University and its authors. The documents are not to be reproduced or utilized for any purpose other than originally intended as stipulated on the cover sheet and titleblock. 2. None of the documents included in drawing index are intended to be considered in isolation of one another, all parties utilizing these documents for bidding, quantity survey, and/or construction shall consult the general notes and information located on this sheet and all other sheets before proceeding. 3. All work shall conform to the requirements of the Allegheny County Building Code, Fire Department regulations, utility company requirements, and the best trade practices. 4. Before commencing work, the Contractor shall file all required Certificates of Insurance with the Department of Buildings, obtain all required permits, and pay all fees required by governing Allegheny County agencies. 5. The Contractor shall verify all existing conditions in the field prior to commencing work, and shall report any discrepancies between drawings and field conditions to the Architect in writing. 6. Details necessary for proper construction of any part of the work shall be included as if they were indicated in the drawings. 7. The Contractor shall coordinate all work procedures with requirements of local authorities and building management. 8. The Contractor shall be responsible for the protection of all conditions and materials within the proposed construction area. The Contractor shall design and install adequate shoring and bracing for all structural or removal tasks. The Contractor shall have sole responsibility for any damage or injuries caused by or during the execution of the work. 9. The Contractor shall do all cutting, patching, repairing as required to perform all of the work indicated on the drawings, and all other work that may be required to complete the job. 10. The Contractor, upon completion of the work, shall arrange for Department of Buildings inspections and signoffs as required. 11. Work shall conform to PA Building Code and all applicable State and City Building Laws.

KEY NOTES: 1) mount rail support onto wood structure below

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

ADAPTIVE TRANSFORMATION: RENTAL POD

AT4.09


20’-0”

1 AT4.10

3’-0”

Southwest Elevation Scale: 3/16” = 1’-0”

AT4.10

ADAPTIVE TRANSFORMATION: RENTAL POD

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


GENERAL NOTES

9’-0”

1

32’-3 3/4” T.O. P0D 3

07600-01

9’-6”

1

2 22’-9 3/4” T.O. POD 2

9’-6”

3

13’-3 3/4” T.O. POD 1

05500-01 05120-01

9’-6”

8’-0”

1. These documents are the copyrighted intellectual property of Carnegie Mellon University and its authors. The documents are not to be reproduced or utilized for any purpose other than originally intended as stipulated on the cover sheet and titleblock. 2. None of the documents included in drawing index are intended to be considered in isolation of one another, all parties utilizing these documents for bidding, quantity survey, and/or construction shall consult the general notes and information located on this sheet and all other sheets before proceeding. 3. All work shall conform to the requirements of the Allegheny County Building Code, Fire Department regulations, utility company requirements, and the best trade practices. 4. Before commencing work, the Contractor shall file all required Certificates of Insurance with the Department of Buildings, obtain all required permits, and pay all fees required by governing Allegheny County agencies. 5. The Contractor shall verify all existing conditions in the field prior to commencing work, and shall report any discrepancies between drawings and field conditions to the Architect in writing. 6. Details necessary for proper construction of any part of the work shall be included as if they were indicated in the drawings. 7. The Contractor shall coordinate all work procedures with requirements of local authorities and building management. 8. The Contractor shall be responsible for the protection of all conditions and materials within the proposed construction area. The Contractor shall design and install adequate shoring and bracing for all structural or removal tasks. The Contractor shall have sole responsibility for any damage or injuries caused by or during the execution of the work. 9. The Contractor shall do all cutting, patching, repairing as required to perform all of the work indicated on the drawings, and all other work that may be required to complete the job. 10. The Contractor, upon completion of the work, shall arrange for Department of Buildings inspections and signoffs as required. 11. Work shall conform to PA Building Code and all applicable State and City Building Laws.

4

03300-02

3’-9 3/4” T.O. PILE

0’-0” T.O. SIDEWALK

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

KEY NOTES: 1) attach steel cable piece to roof structure above 2) open container doors 3) pass steel cable through pipe structure on railing before tightening 4) re-inforce lower container as indicated

ADAPTIVE TRANSFORMATION: RENTAL POD

AT4.11


5’-8”

20’-0”

9’-6”

32’-3 3/4” T.O. P0D 3

9’-6”

22’-9 3/4” T.O. POD 2

9’-6”

13’-3 3/4” T.O. POD 1

3’-9 3/4” T.O. PILE 2’-7 1/2” T.O. F.F.

0’-0” T.O. SIDEWALK

1 AT4.12

Southeast Elevation Scale: 3/16” = 1’-0”

AT4.12

ADAPTIVE TRANSFORMATION: RENTAL POD

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


GENERAL NOTES 1. These documents are the copyrighted intellectual property of Carnegie Mellon University and its authors. The documents are not to be reproduced or utilized for any purpose other than originally intended as stipulated on the cover sheet and titleblock. 2. None of the documents included in drawing index are intended to be considered in isolation of one another, all parties utilizing these documents for bidding, quantity survey, and/or construction shall consult the general notes and information located on this sheet and all other sheets before proceeding. 3. All work shall conform to the requirements of the Allegheny County Building Code, Fire Department regulations, utility company requirements, and the best trade practices. 4. Before commencing work, the Contractor shall file all required Certificates of Insurance with the Department of Buildings, obtain all required permits, and pay all fees required by governing Allegheny County agencies. 5. The Contractor shall verify all existing conditions in the field prior to commencing work, and shall report any discrepancies between drawings and field conditions to the Architect in writing. 6. Details necessary for proper construction of any part of the work shall be included as if they were indicated in the drawings. 7. The Contractor shall coordinate all work procedures with requirements of local authorities and building management. 8. The Contractor shall be responsible for the protection of all conditions and materials within the proposed construction area. The Contractor shall design and install adequate shoring and bracing for all structural or removal tasks. The Contractor shall have sole responsibility for any damage or injuries caused by or during the execution of the work. 9. The Contractor shall do all cutting, patching, repairing as required to perform all of the work indicated on the drawings, and all other work that may be required to complete the job. 10. The Contractor, upon completion of the work, shall arrange for Department of Buildings inspections and signoffs as required. 11. Work shall conform to PA Building Code and all applicable State and City Building Laws.

6’-8�

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

ADAPTIVE TRANSFORMATION: RENTAL POD

AT4.13


AT4.14

ADAPTIVE TRANSFORMATION: RENTAL POD

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

ADAPTIVE TRANSFORMATION: RENTAL POD

AT4.15


AT4.16

ADAPTIVE TRANSFORMATION: RENTAL POD

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

ADAPTIVE TRANSFORMATION: RENTAL POD

AT4.17


GC0.00 IN1.00 IN2.00 IN3.00 IN4.00 PN1.00 PN1.01 PN1.02 PN1.03 PS1.00 PS1.01 PS1.02 PS1.03 PS1.04 PS1.05 PS2.00 PS2.01 PS2.02 PS2.03 PS3.00 PS3.01 PS4.00 PS4.01 PS5.00 PS5.01 PS5.02 PS5.03 PS6.00 PS6.01 PS7.00 PS7.01 PS7.02 PS7.03 PS8.00 PS8.01 PS8.02 PS8.03 PS9.00 PS9.01 PS10.00 PS10.01 PS11.00 PS11.01 PS11.02 PS11.03 SC1.00 SC1.01 SC1.02 SC1.03 SC2.00 SC2.01 CN1.00 CN101 AT1.00 AT1.01 AT1.02 AT1.03 AT1.04 AT1.05 AT2.00 AT2.01 AT2.02 AT2.03 AT2.04 AT2.05 AT2.06 AT2.07 AT2.08 AT2.09 AT3.00 AT3.01 AT3.02 AT3.03 AT3.04 AT3.05 AT3.06 AT3.07 AT3.08 AT3.09 AT3.10 AT3.11 AT3.12 AT3.13 AT3.14 AT3.15 AT3.16 AT3.17

Cover Sheet Index : Table of Contents Index : Report Layout Index : General Use Notes Index : Keys and Definitions Project Narrative : An Introduction Project Narrative : Decision Process Project Narrative : Context Project Narrative : Comparative Typology Project Scope : Demographics Project Scope : Demographics Project Scope : Demographics Project Scope : Demographics Project Scope : Demographics Project Scope : Demographics Project Scope : Land Use and Zoning Project Scope : Land Use and Zoning Project Scope : Housing Location, Typologies Project Scope : Housing Location, Type 1 Project Scope : Housing Location, Type 2, 3, 4 Project Scope : Housing Location, Type 5, 6, 7 Project Scope : Eight Study Houses Project Scope : Eight Study Houses Project Scope : Site Utilization Project Scope : Site Utilization Project Scope : Site Utilization Project Scope : Site Utilization Project Scope : Housing Condition Project Scope : Housing Condition Project Scope : Case Study 1 Overview Project Scope : Case Study 1 Housing Condition Project Scope : Case Study 2 Overview Project Scope : Case Study 2 Housing Condition Project Scope : Zoning Deviations Project Scope : Zoning Deviations Project Scope : Zoning Deviations Project Scope : Zoning Deviations Project Scope : House Construction Project Scope : House Materials Project Scope : Heating Strategies Project Scope : Heating Strategies Project Scope : Environmental Data Project Scope : Environmental Data Project Scope : Environmental Data Project Scope : Environmental Data Site Context : General Site Modifications Site Context : General Site Modifications Site Context : General Site Modifications Site Context : General Site Modifications Site Context : Scalar Representations Site Context : Scalar Representations Contract Negotiations : The Players Contract Negotiations : The Responsibilities Adaptive Transformation 1: Building Envelope Adaptive Transformation 1: Building Envelope Adaptive Transformation 1: Building Envelope Adaptive Transformation 1: Building Envelope Adaptive Transformation 1: Building Envelope Adaptive Transformation 1: Building Envelope Adaptive Transformation 2: Rainwater Harvesting Adaptive Transformation 2: Rainwater Harvesting Adaptive Transformation 2: Rainwater Harvesting Adaptive Transformation 2: Rainwater Harvesting Adaptive Transformation 2: Rainwater Harvesting Adaptive Transformation 2: Rainwater Harvesting Adaptive Transformation 2: Rainwater Harvesting Adaptive Transformation 2: Rainwater Harvesting Adaptive Transformation 2: Rainwater Harvesting Adaptive Transformation 2: Rainwater Harvesting Adaptive Transformation 3: Roof Greenhouse Adaptive Transformation 3: Roof Greenhouse Adaptive Transformation 3: Roof Greenhouse Adaptive Transformation 3: Roof Greenhouse Adaptive Transformation 3: Roof Greenhouse Adaptive Transformation 3: Roof Greenhouse Adaptive Transformation 3: Roof Greenhouse Adaptive Transformation 3: Roof Greenhouse Adaptive Transformation 3: Roof Greenhouse Adaptive Transformation 3: Roof Greenhouse Adaptive Transformation 3: Roof Greenhouse Adaptive Transformation 3: Roof Greenhouse Adaptive Transformation 3: Roof Greenhouse Adaptive Transformation 3: Roof Greenhouse Adaptive Transformation 3: Roof Greenhouse Adaptive Transformation 3: Roof Greenhouse Adaptive Transformation 3: Roof Greenhouse Adaptive Transformation 3: Roof Greenhouse


AT4.00 AT4.01 AT4.02 AT4.03 AT4.04 AT4.05 AT4.06 AT4.07 AT4.08 AT4.09 AT4.10 AT4.11 AT4.12 AT4.13 AT4.14 AT4.15 AT4.16 AT4.17 AS1.00 AS1.01 AS1.02 SD1.00 IMP1.00 IMP1.01 IMP1.02 IMP1.03 IMP2.00 IMP2.01 IMP2.02 IMP2.03 IMP3.00 IMP3.01 IMP3.02 IMP3.03 CA1.00 CA1.01 CA1.02 CA1.03 CA1.04 CA1.05 SP1.00 SP1.01 SP1.02 SP1.03 SP1.04 SP1.05

Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Assembly Sequence : Stages 1 Assembly Sequence : Stages 2 Assembly Sequence : Stages 3 Selective Demolition : Stages 1 Implementation : Logistics Implementation : Logistics Implementation : Logistics Implementation : Logistics Implementation : Critical Path Implementation : Critical Path Implementation : Critical Path Implementation : Critical Path Implementation : Hard Costs Implementation : Hard Costs Implementation : Soft Costs Implementation : Budget Code Analysis : Building Transformation Code Analysis : Building Transformation Code Analysis : Building Transformation Code Analysis : Building Transformation Code Analysis : Building Transformation Code Analysis : Building Transformation Specifications : Material Legend Specifications : Material Legend Specifications : Material Legend Specifications : Material Legend Specifications : Material Legend Specifications : Wall Types

I m p le m e n t a t ion


s-

STAGING AND DELIVERY STAGING AND DELIVERY

The staging and delivery must be The staging and delivery must be choreographed in a three part system that will choreographedwork in a cohesively three partwith system that will the planning phases of work cohesivelythe with the planning phases of project. the project.

Key Notes 1

The back gate must be removed to create a large enough property entrance to allow for recieving The back gate must be removed to create a large shipments of materials more easily and in a manner that will not block main public street. enough property entrance to allow for arecieving

shipments of materials more easily and in a 2 Tree needs to a bemain removed in order to lower the manner that will not block public street. terrain for the swale and in order to create enough room to operate machinery and store

Tree needs to bematerials. removed in order to lower the terrain for the swale and in order to create enough room toTree operate machinery storeto lower the 3 needs to be removedand in order terrain for the swale and in order to create materials. enough room to operate machinery and store

Tree needs to bematerials. removed in order to lower the terrain for the swale and in order to create 4 The front gate must be removed to allow larger enough room toshipments operate to machinery and store be delivered to the property, materials. primarily the shipping containers. The front gate must be removed to allow larger shipments to be delivered to the property, Time Approximation: primarily the shipping containers. 45 days - 2 months This stage will handle the wall and roof insulation installation, the installation of windows, the rewiring of the home, the Time Approximation: 45 days - 2roof months construction of the patio and greenhouse, and the start of the water collection system.

This stage will handle the wall and roof Some steps be taken toof set up t insulation installation, thewill installation he site for the following stages. This includes the windows, the rewiring of the home, the removal of fences and trees. construction of the roof patio and greenhouse, and the start of the water collection system. Some steps will be taken to set up t he site for the following stages. This includes the removal of fences and trees.

The initial stage is much less space intensive and only requires areas for scaffolding, trash, and materials. The scaffolding is not needed until the later part of the first phase, but will be needed thoughout the second phase. The back fence must be removed in order to accomodate for delivery of supplies. During this phase the stripping of parts of the house that are to be remodeled

will begin construction. Selective will take to accomodate for The initial stage is much less spacedemolitions intensive and onlyplace requires areas for scaffoldretrofits on materials. the existingThe house. ing, trash, and scaffolding is not needed until the later part of the first phase, but will be needed thoughout the second phase. The back fence The first removals will be in walls to be insulated and the windows to be mustreplaced. be removed in order to accomodate delivery of attic supplies. The later removels will mostly befor at the roof and to allow for the construction of the roof patio and greenhouse.

During this phase the stripping of parts of the house that are to be remodeled will begin construction. Selective demolitions will take place to accomodate for retrofits on the existing house. The first removals will be in walls to be insulated and the windows to be replaced. The later removels will mostly be at the roof and attic to allow for the construction of the roof patio and greenhouse.

AS1.00

ASSEMBLY SEQUENCE: STAGE 1

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


The second stage is essentially the start of the third phase of construction. The second phase can be completed with the original configuration, but due to timing overlaps, the second stage will be implemented as soon as external construction on the roof patio/greenhouse is completed. Time Approximation: 2 - 3 weeks

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

ASSEMBLY SEQUENCE: STAGE 2

AS1.01


The third stage calls for much more square footage for the delivery of the shipping containers, and the need of an aparatus that is capable of moving the containers. The shipping containers can be stacked upon eachother in the yard while the crane is positioned. This will accomodate for the resting postition of the containers and their destination in conclusion of construction. As soon as the main structural workings of the pods are complete, the crane can be removed from the site.

The thir delivery aparatu shippin yard wh the rest conclus workin from th

Time Approximation: 45 days - 2 Months

Time Ap

AS1.02

ASSEMBLY SEQUENCE: STAGE 3

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

SELECTIVE DEMOLITION: STAGE 1

SD1.00


1. Building Permits Dependant on your own project’s scope and your level of personal Involvement, these are the steps to follow. Contracts generally relieve owner of this responsibility, but it is good information to have

1. Zoning Counter 2. File Room 3. Engineer’s Counter 4. File Room To Bring

2. Grants These are carried out by the owner

Pittsburgh Party Wall Program AHS Energy & Green Retrofit

EPA Stormwater Program

3. Planning

Acquisition of Materials Accommodation

4. Construction Depending on scope of project, building permits for second lot may need to be applied for after purchase but before construction of an addition.

Insulate Existing Home Greenhouse Renovation Sidelot Purchase Water Remediation Building Permits for new addition Occupancy Permit for new structure

5. Inspection

POD Addition 1. Footer Inspection 2. Rough-in Inspections

3. Final Inspection

IMP1.00

IMPLEMENTATION DOCUMENTATION: LOGISTICS:

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


To apply for a building permit, the applicant must go the Zoning Counter on the 3rd floor, 200 Ross Street, Pittsburgh, PA 15219. Once zoning approval is received, the applicant will be instructed to proceed down the hall to the file room where a clerk will check for outstanding code violation notices. The applicant will then be directed down the hall to the engineer's counter where a plan review engineer will examine the application and any required plans. This takes 15 work days minimum The final stop is at the cashier, where payment is made by check or money order. A survey plan signed by a registered architect or contractor, the correct address of the site, owner’s name, address and contact information, a check or money order for the $25 Zone Processing Fee

See IMP 1.02 See IMP 1.02 See IMP 1.02

Order, locate, and coordinate construction materials, see specifications For duration of insulation renovation on existing home, family should make hotel or family arrangements for lodging

See IMP3.0 See IMP3.0 See IMP3.0 Required for a new or changed use of land and/or structure hereafter erected, structurally altered or enlarged or changed in use or to a greater intensity of use

See IMP3.1

To Bring A check or money order to pay for the permit. A Plot Plan

Occurs after trenches or ditches are evacuated, forms and reinforcement are in place and before footer is poured or constructed. Occurs after the completion and prior to the concealment of framing, fire blocking, and any other building component A final inspection when all work is complete. PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

IMPLEMENTATION DOCUMENTATION: LOGISTICS:

IMP1.01


2. Grants Pittsburgh Party Wall Program Insulate Existing Home

AHS Energy & Green Retrofit Greenhouse Renovation

EPA Stormwater Program Sidelot, Water Remediation, and POD

IMP1.02

IMPLEMENTATION DOCUMENTATION: LOGISTICS:

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


The Urban Redevelopment Authority of Pittsburgh has a program to rehabilitate exposed party walls. This is a grant program and qualified homeowners may receive up to $10,000 to repair the exterior wall. In order to determine your eligibility for the program, we must verify the annual gross household income for the year 2009. The following documentation is required to process all applications for the Pittsburgh PartyWall

What To Bring Two (2) most recent pay stubs and/or copies of your Social Security and pension verification for all members of the household. A copy of your 2008 Federal Income Tax Return or 2008 Property Tax/Rent Rebate Form.

The US Department of Housing and Urban Development is soliciting applications for funding for eligible property owners to make energy and green retrofit investments in the property, to ensure the maintenance and preservation of the property, the continued operation and maintenance of energy efficiency technologies, and the timely expenditure of funds under the Assisted Housing Stability and Energy and Green Retrofit Program. Grant covers renovation in cases of Solar Retrofits of Public Housing, Weatherization and Energy Efficiency Housing Rehabilitation, Public Housing Upgrades and Improvements Physical and financial analyses of the properties will be conducted to determine the size of each grant and loan. Incentives will be made available to participating owners. The terms of the grants or loans will include continued affordability agreements. Grant and loan funds must be spent by the receiving property owner within two years.

What To Know The terms of the grants or loans will include continued affordability agreements Grant and loan funds must be spent by the receiving property owner within two years. Full detail of how to apply, and grant and loan terms, will be published.

This grant seeks to assist local stormwater managers to alleviate the significant expense of construction, operation and maintenance of a municipal separate storm sewer system (MS4). This covers the costs of stormwater programs, increased by regulatory requirements (stormwater Phase I or Phase II), flooding concerns, water quality issues (including total maximum daily loads, or TMDLs) may be subsidized through a stormwater utility or various other methods. Stormwater management can be costly, but it is a good investment. There are new stormwater management techniques, referred to as low impact development (LID), that infiltrate, evapotranspire and reuse stormwater, thereby, preventing polluted runoff from happening. This helps to reduce the high costs of cleaning up the water quality impairments from the polluted runoff. Additional benefits from these techniques include increased ground water recharge, flood control, and healthy aquatic ecosystems through maintenance of base flow for streams.�

What To Know The average quarterly fee for stormwater management in a single-family home is $11, though some communities charge as little as $2 or as much as $40 per quarter to a single family home. PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

IMPLEMENTATION DOCUMENTATION: LOGISTICS:

IMP1.03


PICK AND CHOOSE PHASES . COMPLETE STRATEGY FULLY.

PHASE 1 2 Week Construction

PHASE 2 3 Week Construction

PHASE 3

REWIRING OF HOME ROOF INSULATION

1 WEEK

WALL INSULATION

1 WEEK

WINDOWS

2 DAYS

ROOF PATIO & GREENHOUSE

2 WEEKS

WATER COLLECTION

1 WEEK

LANDSCAPING

4 DAYS

RENTAL MODULE

2 WEEKS

1 DAY

4 Week Construction

After a four week period of process to build up funds and obtain permission from the local buiilding authority to proceed with construction, one of several suggested paths can be chosen.

1 DAY PRE CONSTRUCTION PROJECT PROJECT SELECTION AND CONTRACT PRE CONSTRUCTION SELECTION AND CONTRACT

1 DAY

Week Process 4 Week Process

IMP2.00

GRANT PROCUREMENT GRANT PROCUREMENT

4 WEEKS

4 WEEKS

LOAN APPLICATION LOAN APPLICATION

4 WEEKS

4 WEEKS

BUILDINGBUILDING PERMIT PERMIT

1 WEEK

1 WEEK

RENOVATION PERMIT PERMIT RENOVATION

1 WEEK

1 WEEK

IMPLEMENTATION CRITICAL PATH

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


These paths work to enable multiple types of home owners to participate in the implementation of the proposed adaptive transformation. Each path results in a different outcome both in physical form and in resultant affects on the financial and environmental aspects of the property.

It is important that the phases that are chosen to pursue are completed fully. Any of the phases only completed partially leaves a large gap in the design and can undermine the goals of each possible path. The suggested paths have been formulated in order to create the optimum results at construction completion.

It is important that the phases that are chosen to pursue are completed fully. Any of the phases only completed partially leaves a large gap in the design and can undermine the goals of each possible path. The suggested paths have been formulated in order to create the optimum results at construction completion.

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

IMPLEMENTATION CRITICAL PATH

IMP2.01


STRATEGY 3

LOAN APPLICATION - 4 WEEKS

W WINDOWS WINDOWS

WINDOWS WINDOWS

WINDOWS

WALL INSULATION

REWIRING OF HOME

WATER COLLECTION

ROOF INSULATION

WALL INSULATION

REWIRING OF HOME

WINDOWS

STRATEGY 3

GRANT PROCUREMENT - 4 WEEKS

WALL INSULATION

REWIRING OF HOME

WATER COLLECTION

STRATEGY 3

PROJECT SELECTION CONTRACTUAL AGREEMENT

WALL INSULATION

REWIRING OF HOME

WINDOWS

STRATEGY 2

WALL INSULATION

REWIRING OF HOME

WINDOWS

As a method to create revenue with low to no cost to a homeowner, the rental module and rainwater/stormwater gathering can be implemented alone. The rental unit generates revenue, the water collections helps procurement of government subsidies and grants

STRATEGY 2

WALL INSULATION

REWIRING OF HOME

WINDOWS

Strategy Two is a proposal version that does not include the rental module or the water collection and landscaping. This strategy would be a good choice for a single resident interested in improving the overall cost of the building, living conditions, and building efficiency.

ROOF INSULATION ROOF INSULATION ROOF INS

STRATEGY 2

WALL INSULATION

REWIRING OF HOME

ROOF INSULATION ROOF INSULATION ROOF INSULATION

STRATEGY 1

ROOF INSULATION ROOF INSULATION ROOF INSULATION

This strategy implements each aspect of the design proposal. Beginning with renovations to the existing structure to improve energy efficiency. This choice works to then install a roof patio and greenhouse, followed by the final steps to address the rental module and water collection/landscaping.

WATER COLLECTION

WALL INSULATION

BUILDING PERMIT APPLICATION - 1 WEEK RENOVATION PERMIT - 1 WEEK

IMP2.02

IMPLEMENTATION CRITICAL PATH

REWIRING OF HOME

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


WATER COLLECTION

ON

WATER COLLECTION

RENTAL MODULE ROOF PATIO & GREENHOUSE ROOF PATIO & GREENHOUSE

WATER COLLECTION

WATER COLLECTION

LANDSCAPING

BUILDING INSPECTION BUILDING INSPECTION RENTAL MODULE LANDSCAPING

ON

INSPECTION BUILDING INSPECTION ROOF PATIO & GREENHOUSE ROOF PATIO BUILDING & GREENHOUSE

ON

INSPECTION BUILDING INSPECTION ROOF PATIO & GREENHOUSE ROOF PATIO BUILDING & GREENHOUSE

ON

INSPECTION BUILDING INSPECTION ROOF PATIO & GREENHOUSE ROOF PATIO BUILDING & GREENHOUSE

ONRENTAL MODULE

WATER COLLECTION

ONRENTAL MODULE

WATER COLLECTION

ONRENTAL MODULE

WATER COLLECTION

LATION

LANDSCAPING

LANDSCAPING

Each line represents 1 day. The total work hours add up to the full length of this chart (with the exception of rewiring of the home, which depends on the condition of the wiring in each home.)

BUILDING INSPECTION BUILDING INSPECTION RENTAL MODULE LANDSCAPING

LANDSCAPING

BUILDING INSPECTION BUILDING INSPECTION RENTAL MODULE LANDSCAPING

LANDSCAPING

BUILDING INSPECTION BUILDING INSPECTION RENTAL MODULE LANDSCAPING

LANDSCAPING

RENTAL MODULE RENTAL MODULE WATER COLLECTION WATER COLLECTION ROOF PATIO & GREENHOUSE ROOF PATIO & GREENHOUSE

ME

LANDSCAPING

LANDSCAPING

BUILDING INSPECTION BUILDING INSPECTION

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

IMPLEMENTATION CRITICAL PATH

IMP2 .03


RENOVATION INSULATION CSI

07210-01 07210-01 09250-01 09900-01

Material

WINDOW REPLACMENT CSI

Price

Area

Mult

Material Man Hrs. $/hr

R-20 Fiberglass Floor Insul. $1.20/sf x1200sf x .98= $1411.20 R-13 Fiberglass Floor Insulation $1/sf x 2250sf x .98 = $2,205 Gypsum Board $.25/sf x 2259sf x .98 = $553.46 White Paint $.10/sf x 2259sf x .98 = $221.38 $4,391.04 Material

Price

Number Mult

08610-01 2’-8” x 6’-1” Alum. Double-Hung $300ea x 15 x .98

Mult

$60 $60 $60 $60

Mult

x x x x

1.0 1.0 1.0 1.0

116hrs or $2,400.00 Total: $15,761.04 PGH PartyWall Grant: -$10,000.00 Owner Expense/Loan: $5,761.00

Material

Wall Framing 2x6 R-30 Batt Insulation Curtainwall - Roof Curtainwall - Wall L Brackets Rafter Ties Post Ties Gypsum Board

$.50/sf x 740sf x .98 $1/sf x 200sf x .98 $7.55/sf x380sf x .98 $7.55/sf x 200sf x .98 $.25/ea x 48 x .98 $.40/ea x 48 x .98 $.25/ea x 48 x .98 $.25/sf x 200sf x .98

= = = = = = = =

$362.60 $200.00 $2811.62 $1479.80 $11.76 $18.86 $11.76 $49.00

8 3 16 8 2 2 2 8

x x x x x x x x

$60 $60 $60 $60 $60 $60 $60 $60

x x x x x x x x

09900-01 09590-01 09900-02 09900-02 09900-02 09900-02

White Paint Wood Flooring Railing for overlook Weatherproofing Caulk Steel Pipe 3/4”

$.10/sf x 200sf x .98 $4.10/sf x 100sf x .98 $10/sf x 36 sf x .98 $.10/sf x 640sf x .98 $.10/sf x 740sf x .98 $.20/sf x 20 lf x .98

= $19.60 = $723.25 = $352.80 = $62.72 = $72.52 = $150.00 $6,326.26

4 8 4 4 1 1

x x x x x x

$60 $60 $60 $60 $60 $60

x x x x x x

SIDELOT

Labor

= $1,800.00 = $600.00 = $1,200.00 = $960.00 $4,560.00

$4,410.00

CSI

06110-01 07210-03 08900-01 09250-01 05090-01 05090-02 05090-03 09250-01

Area

x x x x

Material Man Hrs. $/hr Mult Labor 40 x $60 x 1.0 $2,400.00 $4,410.00

GREENHOUSE Price

30 10 20 16

Material Man Hrs. $/hr

Mult

1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0

= = = = = = = =

1.0 1.0 1.0 1.0 1.0 1.0

= = = = = =

Labor

$480.00 $180.00 $960.00 $480.00 $480.00 $480.00 $480.00 $480.00

$240.00 $480.00 $240.00 $240.00 $60.00 $60.00 71 hours or $4,260.00 Total: $10,586.04 AHS Energy Retrofit Grant: -$10,586.04 Owner Expense: $0.00

PROPERTY 24’X120’ available via private purchase

$3/sf x 24ft x 120ft

Taxes, Fees. no less than 15% $8,640.00

LANDSCAPING CSI

Material

Price

Area

Mult

$1,296.00

Material Man Hrs. $/hr

Mult

Labor

02900-01 Grading and Landscape 02900-02 Trees, veg. various.

$2/sf x 2000sf x .98 = $3,920.00 $1/sf x 2000sf x .98 = $1,960.00

40 x $60 x 1.0 = $2,400.00 40 x $60 x 1.0 = $2,400.00

03300-01 03300-01 03300-01 03300-01 09900-01

$5/sf x 200sf $400 x 1 $250 x 1 $5/sf x 200sf $.10/sf x 2259sf

8 4 1 20 16

IMP3.00

Concrete Catchment 300 Gallon Cistern Water Filter Plumbing Pipe Insulation

x x x x x

.98 = $1000.00 .98 = $392.00 .98 = $245.00 .98 = $980.00 .98 = $221.38 $8,718.38

x x x x x

$60 $60 $60 $60 $60

x x x x x

1.0 1.0 1.0 1.0 1.0

= = = = =

$1,200.00 $240.00 $60.00 $1,200.00 $960.00 $6,060.00 Total: $24,714.38 EPA Stormwater Program: up to $24,714.38 Owner Expense: $0.00

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING IMPLEMENTATION DOCUMENTATION: HARD COSTS CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


POD ADDITION FOUNDATION AND BRIDGE CSI

Material

05500-01 20’ Shipping Container

Price

Area

Mult

Material Man Hrs. $/hr

Mult

Labor

$2500ea x (1-3) x .98= $8526.00

40 x $60 x 1.0 = $2,400.00

03300-01 12” Concrete Pile and Cap (4)

$5/sf x 4 x 30 x .98 =

20 x $60 x 1.0 = $1,200.00

51201-01 W8x30 Wideflange Beam

$7.20/lf x150x 30 x.98 = $1058.00 1 Container (1Story Porch) $10,172.00 2 Containers (2 Story) $18,692.00 3 Containers (3 Story) $27,224.00

*Permit, Taxes, Soil Test to be performed by contractor

INTERIOR CSI

Material

section prices single Container

06100-01 Wall Framing 2x4 07210-02 R-13 Fiberglass Insulation

Price

Area

Mult

$588.00

40 x $60 x 1.0 = $2,400.00 1 Container (1Story Porch) $6,000.00 2 Containers (2 Story) $8,400.00 3 Containers (3 Story) $10,600.00

Material Man Hrs. $/hr

Mult

Labor

$.50/sf x 800sf x .98 = $392.00 $.50/sf x 800 sf x .98 = $392.00

8 x $60 x 1.0 = $480.00 3 x $60 x 1.0 = $180.00

09250-01 Gypsum Board 08610-02 White Paint

$1/sf x 640sf x .98 = $627.20 $.10/sf x 640sf x .98 = $221.38

30 x $60 x 1.0 = $1,200.00 16 x $60 x 1.0 = $960.00

08210-02 09900-02 06410-01 06410-02

$350/ea x 2 $370/ea x 4 $6/sf x 80sf $.10/sf x 640sf

8 16 16 16

Wood frame door Double-hung window 6’6x2’4 Kitchen Cabinetry Bathroom Cabinetry

CSI

Material

section prices single Container

Plumbing Piping Water Heater Toilet, low-flow Tub, full size Wall hung ADA bath sink Low flow shower head Kitchen Sink Range Radiator

EXTERIOR STAIR CSI

Material

.98 .98 .98 .98

1 Container (1Story Porch) 2 Containers (2 Story) 3 Containers (3 Story)

PLUMBING HEATING 05500-01 15540-01 15540-02 15540-03 15540-04 15540-05 15540-06 15540-07 15540-08

x x x x

section prices single Container

= $697.00 = $1450.40 = $221.38 = $221.38 $5,135.56 $10,271.12 $15,806.68

x x x x

$60 $60 $60 $60

$960.00 $960.00 $960.00 $960.00 1 Container (1Story Porch) $7,620.00 2 Containers (2 Story) $15,240.00 3 Containers (3 Story) $22,860.00

Price

Area

Mult

Material Man Hrs. $/hr

Price

Flights Mult

Material Man Hrs. $/hr

$5/lf x 10ft $279/ea x 1 $250/ea x 1 $200/ea x 1 $200/ea x 1 $40/ea x 1 $150/ea x 1 $250/ea x 1 $250 x 1 x 30

x .98 x .98 x .98 x .98 x .98 x .98 x .98 x .98 x .98

= $196.00 = $263.00 = $243.00 = $196.00 = $196.00 = $39.20 = $600.00 = $600.00 = $245.00 1 Container (1Story Porch) $2,382.20 2 Containers (2 Story) $4,764.40 3 Containers (3 Story) $7,146.60

24 x 4 x 4 x 8 x 2 x .25 x 3 x 2 x 8 x

$60 $60 $60 $60 $60 $60 $60 $60 $60

x x x x

x x x x x x x x x

1.0 1.0 1.0 1.0

= = = =

Mult

Labor

Mult

Labor

1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0

= $1,440.00 = $240.00 = $240.00 = $480.00 = $120.00 = $15.00 = $180.00 = $120.00 = $480.00 1 Container (1Story Porch) $3,555.00 2 Containers (2 Story) $7,110.00 3 Containers (3 Story) $10,665.00

05500-01 Stair, full rail, 14 riser, w/landing $1900ea x 1 x .98 = $1,870.00

40 x $60 x 1.0 = $2,400.00

03300-01 Metal Roofing

$2/sf x 400 x .98 = $790.00

30 x $60 x 1.0 = $1,800.00

06110-02 2x6” Wood Studs

$.50/sf x 400 x .98 = $196.00 2 Containers (2 Story) $2,856.00 3 Containers (3 Story) $5,712.00

INTERIOR STAIR REMOVAL CSI

Material

06110-01 2x6” Wood Studs 06100-02 Plywood Sheathing 07210 -02 R13 Insulation Fiberglass 09590-01 Wood Flooring 1 Container (1Story Porch) 2 Containers (2 Story) 3 Containers (3 Story)

$17,689.56 $38,921.12 $59,465.56

Price

Area

Mult

8 x $60 x 1.0 = 2 Containers (2 Story) 3 Containers (3 Story)

Material Man Hrs. $/hr

Mult

$.50/sf x 200 x .98 = $98.00

3 x $60 x 1.0 =

$.50/sf x 200 x .98 = $98.00 $.50/sf x 200 x .98 = $98.00 $2/sf x 200 x .98 = $392.00 $686.00

3 x $60 x 1.0 = 8 x $60 x 1.0 = 16 x $60 x 1.0 =

1 Container (1Story Porch) 2 Containers (2 Story) 3 Containers (3 Story)

$480.00 $4,680.00 $9,360.00 Labor

$180.00 $180.00

$480.00 $960.00 $1,800.00

Total: $122,150.56 $17,175.00 $40,830.00 EPA Stormwater Program: up to $122,150.56 Owner Expense: $0.00 $62,685.00

Total Material and Labor Costs: $173,211.98

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING IMPLEMENTATION CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550 DOCUMENTATION: HARD COSTS

IMP3.01


COST ANALYSIS 1757 NASF x 5% GUF = 88sqft gross up = 1845 GASF

FEES: Permit Fees- $700 first $50,000, $8 each additional $10,000 of construction cost 2667 + .5(x) + 700 + [8(x-50000)/1000] - 225(x)=

SOFT COSTS Gross Up Factor Costs are done under the assumption of a lump sum contract based on gross assignable square feet. A gross up factor of 5% has been used as For the purposes of these costs. 151 44th St has 1757 sqft of livable area before rennovation, making a gross area square footage of 1845 sqft.

Development Fees: 10 % of total construction Impact Fees: 5 % of total construction Bonding: 5% of total construction Construction Contingency Extraction: 10 % of total construction A&E Consult: 20% of total construction Total: 50% of construction costs after permitting. 173,211cost/2667 = $/sq cost per unit $65=cpu Maximum budget based on a figure of $225/sqft. Maximum Total Construction Costs = 2667 gasf x $225/sf = $590,625.00

Planned work on the home increases the space by 600 square feet through rennovation. Additionally, part of the remodel includes relocating the stair to exist as part of the POD addition, infill of the stairs in the home will add another 182ft of livable space for a total of 2540 sqft, and a gasf of 2667sqft.

The Total Costs for this project are $173,211.98. Howver a standard Overhead of 10% is used. Additionally there is a contingency of 15%. These bring the total to $216,513.75 The home’s existing value is $39,400 The Cost per unit is $81.82sq/ft Permit Fee $833.21 Development Fees: $19,053.31 Impact Fees: $9,526.65 Bonding $9,526.65 CCE $19,053.31 A&E Consult $38,106.63 Total Fees: $109,090.09

Total

$325,603.84

Design Fee The Architect’s design fee is 20% of construction costs, or $65,129.60 of this, 39.5% goes to structural (11%), civil, mechanical/plumbing (24.4%), landscape, and other misc. fees. This brings the architect’s fee down to $45,584,42

IMP3.02

IMPLEMENTATION DOCUMENTATION: SOFT COST CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


Median Income 09: $28,406 Median Home Value: 08 51,042 Median Sale Price 08: $65,100

53,233

14.4%

Mortgage and Upkeep

Healthcare

41,950

$4110

28,406

The average Lawerenceville inhabitant makes about $28,406 a year, which after all of the necessary costs of living, leaves about $4110 of their yearly income at their disposal.

34,532 21,850 26,563

Available

BUDGET

We have purposefully sought used methods in this proposal that attempts to make these design guidelines accessible even at 40% of the median income.

Entertainment

GrantsMedian play aIncome large99-09 part in this process, Pittsburgh vs. C.L. without them, this type of construction could 1.8% increase/yr never be hoped for in the $11,360 a year income bracket.

Transportation

Central Lawrenceville Median Income 09: $28,406 Median Home Value: 08 51,042 Median Sale Price 08: $65,100

Food Graph info source: Us Dept of Labor Statistics Apr. 2009

Insurance

100% OF MED

80% OF MED

60% OF MED

$

$

$

28406

22720

~14.4%= $

66,562

DEALING WITH EXPENSES

~14.4%=

4110

$

3271

40% OF MED

17040

11360

$

~14.4%= $

~14.4%=

2453

1635

$

8364

5yr @ 2% = Central Lawrenceville $12525 Median Income 09: $28,406

16626

$

20901 100% OF MED

80% OF MED

60% OF MED

$

$

$

28406

GRANT POSSIBILITIES: ~14.4%= PITTSBURGH PARTY W$ALL PROGRAM

22720

~14.4%= $ UP $ TO

17040

40% OF MED

11360

$

~14.4%=

~14.4%=

66,562

53,233

10,000 $1635 $ 2453 4110 3271 Requirements: Exposed Party Wall LEAD-BASED PAINT HAZARD CONTROL GRANT UP TO$100,000

41,950

51,042

Requirements: Lead paint exposure. Cost matching requirement waived based upon demonstration of financial hardship.

5yr @ 2% =

ASSISTED HOUSING STABILITY ENERGY & GREEN RETROFIT GRANT 8364

28,406

Money for sustainable rennovation

5yr @ 2% = $

This type of design is possible however, Ljust EADIncome PAINTforRLawrenceville EMOVAL the AND RENNOVATION one must understand process The Median according to 2009 and data was $28,406, marking a 1.8 per year basedgrant on the provided. Of average spends all butren 1 of 99 up data to $100,000 for this, leadthe paint repair Pittsburgher AND any corresponding the savings availible in energy savings, what are considered necessary items for living, allowing for small amountFederal of entertainm Department of Housing and Urban aDevelopment Grant Lead-Based Paint Hazard Control (LBPHC) Grant Program and additional rentable space, and general Using the housing and Median we can grow the expected usable b +Lead Income Hazard Data, Reduction Demonstration (LHRD) Grantamount Program neighborhood improvement. year. Additionally, 4% should be added for yearly inflation. A median income home in La

it is found, willConditions have $4110 a year possible to go toward such a project. Over five years, t III.B.160%, (1) Documentation of Contributions from Property For resp the $20901. For 80%, and 40%, the numbers go to $16,626, $12,525,Owners. and $8,364 hazard control contributed by a homeowner or landlord, detailed d incurred by the homeowner or landlord will be necessary after awa However, there are many grants available, both at the federal and state level. On the nex performance of the grant. Owner contributions are limited to that w grant programs are outlined. verified by a third party, such as materials paid for and provided b owner paid and can substantiate via receipts/records. Labor contr verified by a third party and valued at market rates. Please note th responsible for providing the total leveraged dollars of proposed c owners if these contributions are not received during the period of

PITTSBURGH PARTY WALL PROGRAM

Median Home Value: 08 51,042 5yr$65,100 @ 2% = Median Sale Price 08:

5yr @ 2% = $

Housing Va 2.4% in

(5) Other. Applicants may include housing rehabilitation, property weatherization, green and healthy homes initiatives, health hazard conservation expenditures as leveraged resources for these activit with the lead hazard control work in the housing units or common a (Note that federal funds may be used as leverage, but not as matc Development Block Grant funds, which may be used as match and

5yr @ 2% =

34,532 21,850 26,563

eep

Central Lawrenceville

5yr @ 2% = $

12525

5yr @ 2% = $

16626

20901

The Urban Redevelopment Authority of Pittsburgh has a program to rehab exposed party walls. This is a grant program and qualified homeowners m LEAD PAINT REMOVAL AND RENNOVAT wall. receive up to $10,000 to repair granttheofexterior up to $100,000 for lead paint rep Department of Housing and Urba Conditions -In order to determine your eligibility for the program, we mustContro verify Lead-Based Paint Hazard income for the year 2009. The following is required +Lead documentation Hazard Reduction Demons the Pittsburgh PartyWall Program: Conditions (1) Documentation Contributions Two (2) most recent pay III.B.1 stubs and/or copies of yourofSocial Securityf all members of the household. hazard control contributed by a hom incurred by the homeowner or landl performance of the grant.Property Owner coT A copy of your 2008 Federal Income Tax Return or 2008 verified by a third party, such as ma owner paid and can substantiate via A full copy of your deed. verified by a third party and valued a responsible for providing the total le owners if these contributions are no ASSISTED HOUSING STABILITY ENERGY & GREEN RETROFIT AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 (5) Other. Applicants may include ho $250 Million allotted for: weatherization, green and healthy h Solar Retrofits of Public Housing conservation expenditures as levera Weatherization and Energywith Efficiency Housing the lead hazardRehabilitation control work in Public Housing Upgrades and Improvements (Note that federal funds may be used Conditions Development Block Grant funds, wh Grants and loans will be made available through HUD’s Office of Affo (OAHP) for eligible property owners to make energy and green retrof PITTSBURGH PARTY Wof ALL PROGRAM to ensure the maintenance and preservation the property, the cont maintenance of energy efficiency technologies, and the timely expend The Urban Redevelopment Authority of Pitt financial analyses of the properties will be conducted to determine the exposed party walls. This is a grant program Incentives will be made available to participating owners. The terms o receive up to $10,000 to repair the exteri continued affordability agreements. Grant and loan funds must be sp Conditions owner within two years. Full detail of how to apply, and grant and loan -Inthe order to determine yoursigned eligibility Housing Notice within 60 days of Recovery Act being intofo income for the year 2009. The followi the Pittsburgh PartyWall Program:

Two (2) most recent pay stubs and/or all members of the household.

A copy of your 2008 Federal Income T

Median Income 99-09 PittsburghRANT vs. C.L. OSSIBILITIES 1.8% increase/yr

G

Housing Values 00-08 2.4% increase/yr

P : PITTSBURGH PARTY WALL PROGRAM

UP TO

A full copy of your deed.

10,000

$

Requirements: Exposed Party Wall

LEAD-BASED PAINT HAZARD CONTROL GRANT UP TO$ Requirements: Lead paint exposure. matching requirement CARNEGIE MELLON UNIVERSITY SCHOOLCost OF ARCHITECTURE 48_550 waived based upon demonstration of financial hardship.

100,000

The Median Income for Lawrenceville according to 2009 data was $28,406, marking a 1.8% increase per year based on the 99 data SSISTED provided. Of this,OUSING the average Pittsburgher spends NERGY all but 14.4% on REEN TABILITY what are considered necessary items for living, allowing for a small amount of entertainment.

A

H

S

E

Money for sustainable rennovation

&G

RETROFIT GRANT

ASSISTED HOUSING STABILITY ENERGY &

AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 $250 Million allotted for: Solar Retrofits of Public Housing IMPLEMENTATION Weatherization and Energy Efficie Public Housing Upgrades and Im DOCUMENTATION: BUDGET Conditions Grants and loans will be made availabl (OAHP) for eligible property owners to to ensure the maintenance and preserv maintenance of energy efficiency techn

IMP3.03


PMN1.00

PROJECT NARRATIVE: AN INTRODUCTION

GC0.00 Cover Sheet IN1.00 Index : Table of Contents IN2.00 Index : Report Layout IN3.00 Index : General Use Notes IN4.00 Index : Keys and Definitions PN1.00 Project Narrative : An Introduction PN1.01 Project Narrative : Decision Process PN1.02 Project Narrative : Context PN1.03 Project Narrative : Comparative Typology PS1.00 Project Scope : Demographics PS1.01 Project Scope : Demographics PS1.02 Project Scope : Demographics PS1.03 Project Scope : Demographics PS1.04 Project Scope : Demographics PS1.05 Project Scope : Demographics PS2.00 Project Scope : Land Use and Zoning PS2.01 Project Scope : Land Use and Zoning PS2.02 Project Scope : Housing Location, Typologies PS2.03 Project Scope : Housing Location, Type 1 PS3.00 Project Scope : Housing Location, Type 2, 3, 4 PS3.01 Project Scope : Housing Location, Type 5, 6, 7 PS4.00 Project Scope : Eight Study Houses PS4.01 Project Scope : Eight Study Houses PS5.00 Project Scope : Site Utilization PS5.01 Project Scope : Site Utilization PS5.02 Project Scope : Site Utilization PS5.03 Project Scope : Site Utilization PS6.00 Project Scope : Housing Condition PS6.01 Project Scope : Housing Condition PS7.00 Project Scope : Case Study 1 Overview PS7.01 Project Scope : Case Study 1 Housing Condition PS7.02 Project Scope : Case Study 2 Overview PS7.03 Project Scope : Case Study 2 Housing Condition PS8.00 Project Scope : Zoning Deviations PS8.01 Project Scope : Zoning Deviations PS8.02 Project Scope : Zoning Deviations PS8.03 Project Scope : Zoning Deviations PS9.00 Project Scope : House Construction PS9.01 Project Scope : House Materials PS10.00 Project Scope : Heating Strategies PS10.01 Project Scope : Heating Strategies PS11.00 Project Scope : Environmental Data PS11.01 Project Scope : Environmental Data PS11.02 Project Scope : Environmental Data PS11.03 Project Scope : Environmental Data SC1.00 Site Context : General Site Modifications SC1.01 Site Context : General Site Modifications SC1.02 Site Context : General Site Modifications SC1.03 Site Context : General Site Modifications SC2.00 Site Context : Scalar Representations SC2.01 Site Context : Scalar Representations CN1.00 Contract Negotiations : The Players CN101 Contract Negotiations : The Responsibilities AT1.00 Adaptive Transformation 1: Building Envelope AT1.01 Adaptive Transformation 1: Building Envelope AT1.02 Adaptive Transformation 1: Building Envelope AT1.03 Adaptive Transformation 1: Building Envelope AT1.04 Adaptive Transformation 1: Building Envelope AT1.05 Adaptive Transformation 1: Building Envelope AT2.00 Adaptive Transformation 2: Rainwater Harvesting AT2.01 Adaptive Transformation 2: Rainwater Harvesting AT2.02 Adaptive Transformation 2: Rainwater Harvesting AT2.03 Adaptive Transformation 2: Rainwater Harvesting AT2.04 Adaptive Transformation 2: Rainwater Harvesting AT2.05 Adaptive Transformation 2: Rainwater Harvesting AT2.06 Adaptive Transformation 2: Rainwater Harvesting AT2.07 Adaptive Transformation 2: Rainwater Harvesting AT2.08 Adaptive Transformation 2: Rainwater Harvesting AT2.09 Adaptive Transformation 2: Rainwater Harvesting AT3.00 Adaptive Transformation 3: Roof Greenhouse AT3.01 Adaptive Transformation 3: Roof Greenhouse AT3.02 Adaptive Transformation 3: Roof Greenhouse AT3.03 Adaptive Transformation 3: Roof Greenhouse AT3.04 Adaptive Transformation 3: Roof Greenhouse AT3.05 Adaptive Transformation 3: Roof Greenhouse AT3.06 Adaptive Transformation 3: Roof Greenhouse AT3.07 Adaptive Transformation 3: Roof Greenhouse AT3.08 Adaptive Transformation 3: Roof Greenhouse AT3.09 Adaptive Transformation 3: Roof Greenhouse AT3.10 Adaptive Transformation 3: Roof Greenhouse AT3.11 Adaptive Transformation 3: Roof Greenhouse AT3.12 Adaptive Transformation 3: Roof Greenhouse AT3.13 Adaptive Transformation 3: Roof Greenhouse AT3.14 Adaptive Transformation 3: Roof Greenhouse AT3.15 Adaptive Transformation 3: Roof Greenhouse AT3.16 Adaptive Transformation 3: Roof Greenhouse PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING AT3.17 Adaptive Transformation 3: Roof Greenhouse

CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


AT4.00 AT4.01 AT4.02 AT4.03 AT4.04 AT4.05 AT4.06 AT4.07 AT4.08 AT4.09 AT4.10 AT4.11 AT4.12 AT4.13 AT4.14 AT4.15 AT4.16 AT4.17 AS1.00 AS1.01 AS1.02 SD1.00 IMP1.00 IMP1.01 IMP1.02 IMP1.03 IMP2.00 IMP2.01 IMP2.02 IMP2.03 IMP3.00 IMP3.01 IMP3.02 IMP3.03 CA1.00 CA1.01 CA1.02 CA1.03 CA1.04 CA1.05 SP1.00 SP1.01 SP1.02 SP1.03 SP1.04 SP1.05

Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Adaptive Transformation 4: The Rental Module Assembly Sequence : Stages 1 Assembly Sequence : Stages 2 Assembly Sequence : Stages 3 Selective Demolition : Stages 1 Implementation : Logistics Implementation : Logistics Implementation : Logistics Implementation : Logistics Implementation : Critical Path Implementation : Critical Path Implementation : Critical Path Implementation : Critical Path Implementation : Hard Costs Implementation : Hard Costs Implementation : Soft Costs Implementation : Budget Code Analysis : Building Transformation Code Analysis : Building Transformation Code Analysis : Building Transformation Code Analysis : Building Transformation Code Analysis : Building Transformation Code Analysis : Building Transformation Specifications : Material Legend Specifications : Material Legend Specifications : Material Legend Specifications : Material Legend Specifications : Material Legend Specifications : Wall Types

Spe ci f i c a t io n s a nd C o d e A n a ly sis PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

PROJECT NARRATIVE: AN INTRODUCTION

PMN1.00


INTERNATIONAL BUILDING CODE ANALYSIS

+

Code refers to the 2009 International Residential Building Code unless otherwise stated in the specific analysis.

SCOPE AND ADMINISTRATION GENERAL As stipulated in section R101.1 of the 2009 International Residential Code (IRC 2009), the code will apply to the alteration, repair, and construction of the houses and additions outlined in this report. As stipulated in section R102.7, the residence may retain occupancy unless alterations to the house cause unsafe conditions as laid out in the International Property Maintenance Code or the International Fire Code.

60 60 60 60 60 60 60 lbs/sq ft

lbs/sq ft

lbs/sq ft

lbs/sq ft

lbs/sq ft

lbs/sq ft

lbs/sq ft

PERMITS As stipulated in R105.1, the owner of the house must first apply for the required permits from the Pittsburgh Bureau of Building Inspection before any alterations are made (see IMP1.00 for permitting information).

CERTIFICATE OF OCCUPANCY As stipulated in R110.1 the house must not be occupied until an inspector from the Pittsburgh Bureau of Building Inspections issues a Certificate of Occupancy. However, as stipulated in R110.4, the residents can request a temporary certificate of occupancy that allows them to reside in the house while work is being conducted as long as the inspector from the Pittsburgh Bureau of Building Inspections deems the conditions safe (see ‌. for temporary certificate of occupancy information).

40 40 40 40 40 40

lbs/sq ft

lbs/sq ft

lbs/sq ft

lbs/sq ft

lbs/sq ft

lbs/sq ft

BUILDING PLANNING DESIGN CRITERIA As stipulated in R301.3, the maximum bearing wall floor height for the masonry construction of these houses is 12 feet plus a height of floor framing not to exceed 16 inches. As stipulated in R301.5, the minimum uniformly distributed live load for the pod structures will be 40 lbs/sq ft As stipulated in R301.6, The new greenhouse and roof structure shall be designed for a snow load of 60 lbs/ sq ft based on the Pittsburgh regional weather data.

CA1.00

CODE ANALYSIS: BUILDING USE

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


BUILDING PLANNING

CONTINUED

FIRE SEPARATION As stipulated in R302.10.1, the insulation and vapor barriers installed in all walls, floors, and roofs must not exceed a flame index of 25 as tested be ASTM E 84 or UL 723. As stipulated in R302.11, fireblocking is required to cut off all concealed draft openings, both vertical and horizontal. At openings around vents and ducts at floors and ceilings, an approved material must be installed that will resist the free passage of flame. As stipulated in R302.13, combustible insulation must be placed at least 3 inches from any recessed light fixtures.

LIGHT, VENTILATION, HEATING

30 s

q. ft ./

23% glazing

>

8%

As stipulated in R303.1, every room that is inhabited must have a window area of at least 8 percent of the room’s floor area. Natural ventilation shall be through windows, doors, and louvers to the outside.

ft. q.

130

s 30

sq. f

ft. q. s 5

1 t. = 2

1

3%

15

As stipulated in R303.2, a room shall be considered as a portion of an adjoining room when at least one-half of the area of the common wall is open and unobstructed and provides an opening of not less that one-tenth of the floor area of the interior room but not less than 25 square feet.

. . ft sq

glazing

6’ 6”

=

15 sq. ft.

>

3

sq. ft.

As stipulated in R303.3, Bathrooms must have a window area of at least 3 square feet unless artificial light and a mechanical ventilation system are installed.

MINIMUM ROOM AREAS As stipulated in R304.1, each living unit must have at least one habitable room of no less than 120 square feet.

2’

As stipulated in R304.2, all habitable rooms, except kitchens, must have a minimum floor area of 70 square feet and not less than 7 ft in any horizontal direction.

4”

As stipulated in R304.3, any area of a room that has a sloped ceiling less than 5 feet or a furred ceiling less than 7 feet from the finished floor will not be counted towards the habitable area for that room.

7’

As stipulated in R305.1, all habitable spaces such as bedrooms, hallways, bathrooms, and basements must have a minimum ceiling height of 7 feet.

KITCHENS, BATHROOMS As stipulated in R306.2, Each living unit in the house must have a kitchen with a sink. As stipulated in R307.2, walls above the bathtubs and showers must be finished with a nonabsorbent surface. These surfaces must rise at least six feet above the floor.

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

CODE ANALYSIS: BUILDING USE

CA1.01


BUILDING PLANNING

CONTINUED

GLAZING As stipulated in R308.4, safety, tempered glass must be provided in these hazardous locations: Glazing in panels of swinging and folding doors Glazing in an individual fixed or operable panel adjacent to a door were the nearest vertical edge is within a 24 inch arc of the door in a closed position and whose bottom edge is less than 60 inches above the floor.

30”

30”

Glazing adjacent to stairways and landings within 36 inches horizontally of a walking surface when the glazing is less than 60 inches above the walking surface

MEANS OF EGRESS

30”

EMERGENCY RESCUE As stipulated in R310.1, every sleeping room must have at least one operable emergency escape and rescue opening that has a maximum sill of 44 inches above the floor and a minimum clear opening of 5.7 square feet. The minimum opening height must be 24 inches and the minimum opening width must be 20 inches.

MEANS OF EGRESS

72”

As stipulated in R311.1, all portions of the living units must have a continuous and unobstructed path of vertical and horizontal egress travel to the outside. As stipulated in R311.2, at least one egress door will exist for each living unit. The door opening must be a minimum 32 inches wide, 78 inches tall, and be able to open a full 90 degrees. As stipulated in R311.3, there must be a landing on both sides of exterior doors, no less than 36 inches in depth. As stipulated in R311.5.1, the exterior stairs and landings attached to the pod must be positively anchored to the pod structures and have supporting structure.

36”

6’ 8”

<

7’ 72”

As stipulate in R311.6, the minimum width of a hallway must be no more than 3 feet. As stipulated by R311.7, stairways should be no less than 36 inches in clear width above the handrail and 31 ½ inches in clear width at and below the rail if there is a rail on one side or 27 inches where there are rails on both sides. It also states that there must be a minimum of 6 feet 8 inches in headroom above all stairs. A handrail must be provided on at least one side of any continuous run of four or more risers.

CA1.02

CODE ANALYSIS: BUILDING USE

36”

6’ 8”

<

7’

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


0”

ilt O S

URB—URBAN LAND-RAINSBORO COMPLEX Map Unit Setting Elevation: 700 to 1,100 feet Mean annual precipitation: 36 to 46 inches Mean annual air temperature: 41 to 62 degrees F Frost-free period: 130 to 176 days

BUILDING PLANNING

m

Loa

CONTINUED

9”

GUARDS m

As stipulate in R312.1, guard rails are required along all stairs and ramps that are more than 30 inches vertically from the floor or ground. These guards must be no less than 36 inches in height. The guards must also not have any spaces larger than 4 inches to prevent children from passing through the guards.

oa ilt L

A S

Description of Rainsboro Setting Landform: Terraces Landform position (two-dimensional): Toeslope Landform position (three-dimensional): Tread Down-slope shape: Linear Across-slope shape: Convex Parent material: Old alluvium

26”

ilt E S

m

Loa

AUTOMATIC FIRE SPRINKLERS

40”

As stipulated in R313.1, an automatic residential fire sprinkler system is not required when additions are made to an existing town or rowhouse that does not already have one installed.

m

Properties and qualities Slope: 0 to 8 percent Depth to restrictive feature: More than 80 inches Drainage class: Moderately well drained Capacity of the most limiting layer to transmit water: Moderately low to moderately high (0.06 to 0.60 in/hr) Depth to water table: About 19 to 30 inches Frequency of flooding: None Frequency of ponding: None Available water capacity: High (about 9.8 inches)

oa yL Cla

y nd

a B S 60”

dy

an ly s

C

vel Gra 72”

ck dro

Typical profile 0 to 9 inches: Silt loam 9 to 26 inches: Silt loam 26 to 40 inches: Silt loam 40 to 60 inches: Sandy clay loam 60 to 72 inches: Gravelly sandy loam

m

Loa

Be

SMOKE ALARMS As stipulated in R314.3, smoke alarms will be installed in every sleeping area, in the area directly outside the sleeping areas, basements, and habitable attics. As stipulated in R314.4, the smoke alarms must receive their primary power from the building wiring and be connected to a battery in the case of a power outage.

FOUNDATIONS GENERAL As stipulated in R401.3, the surface drainage must be diverted to a storm water sewer or other collection point. The lot must be graded so that water drains away from the foundation and the slope of the ground shall fall a minimum of 6 inches within the first 10 feet. As stipulated in R401.4, a soil test should be conducted if the soil is deemed questionable because of expansive, compressible, or shifting characteristics. This determination will come from the building official from the Pittsburgh Bureau of Building Inspections.

WALL CONSTRUCTION GENERAL As stipulated in R601.3, a vapor barrier is required on the interior side of frame walls to prevent water damage. This does not apply to basement walls and any portion of a wall that is below grade.

LEC

L CO ER

IN

RA

N TIO

ILL

GR

T WA

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

As stipulated in R602.3, studs in framed walls must be continuous from support at the sole plate to a support at the top plate. The studs must be capped with a double top plate to allow for overlapping at corner conditions. End joints in the plates must be offset at least 24 inches. As stipulated in R602.6, notching and drilling in nonbearing walls must not exceed 40% of the stud width.

CODE ANALYSIS: BUILDING USE

CA1.03


WALL CONSTRUCTION OFFSET TOP PLATE FOR CORNER OVERLAP

WINDOWS As stipulated in R310.1, every sleeping room must have at least one operable emergency escape and rescue opening that has a maximum sill of 44 inches above the floor and a minimum clear opening of 5.7 square feet. The minimum opening height must be 24 inches and the minimum opening width must be 20 inches.

PRE-FABRICATED HOMES PERMIT As stipulated in AE301.1, a pre-fabricated unit cannot be installed on a foundation until a permit is obtained from the Pittsburgh Bureau of Inspections. As stipulated in AE302.1, the application for prefabricated housing unit permit must: 1. Identify and describe the work to be covered by the permit for which application is made. 2. Describe the land on which the proposed work is to be done by legal description, street address or similar description that will readily identify and definitely locate the proposed building or work. 3. Indicate the use or occupancy for which the proposed work is intended. 4. Be accompanied by plans, diagrams, computations and specifications and other data as required in Section AE302.2. 5. Be accompanied by a soil investigation when required by Section AE502.2. 6. State the valuation of any new building or structure or any addition, remodeling or alteration to an existing building. 7. Be signed by permittee, or permittee’s authorized agent, who may be required to submit evidence to indicate such authority. As stipulated in AE502.3, footings of concrete must be solid material and have a minimum depth of 12 inches below grade.

ENERGY EFFICIENCY GUIDELINES As stipulated in N1102.1, the building thermal envelope shall meet these requirements.

PAINT-ON VAPOR BARRIER

FENESTRATION U-FACTOR

SKYLIGHT U-FACTOR

CEILING R-VALUE

WOOD FRAME WALL R-VALUE

MASS WALL R-VALUE

FLOOR R-VALUE

CRAWL SPACE R-VALUE

0.35

0.60

38

13

10

19

13

CA1.04

CODE ANALYSIS: BUILDING USE

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


GRAY WATER RECYCLING REGULATIONS As stipulated in AO101.1, gray water may be used for flushing of toilets, urinals, and landscape irrigation. As stipulated in AO101.10, the gray water will pass through a sand earth filter before entering the reservoir.

RESERVOIR

As stipulated in AO101.11, gray water will be collected in an approved reservoir constructed of durable, nonabsorbent, and non-corrosive material. The reservoir must be closed and gas-tight. As stipulated in AO101.12, the reservoir will be equipped with an overflow pipe that is the same diameter or larger than the influent pipe. The overflow must also be indirectly connected to the sanitary drainage system. As stipulated in AO102.1, the holding capacity of the reservoir shall be a minimum of twice the volume of water required to meet the daily flushing requirements of the fixtures supplied with gray water, but not less than 50 gallons.

OVERFLOW

COLLECTION TROUGH

As stipulated in AO102.2, gray water shall be disinfected by an approved method that uses one or more disinfectants such as chlorine, iodine or ozone that are recommended for use with the pipes, fittings and equipment by the manufacturer of the pipes, fittings and equipment. As stipulated in AO102.4, the gray water shall be dyed blue or green with a food grade vegetable dye before such water is supplied to the fixtures. As stipulated in AO103.2, a check valve, and a fullopen valve located on the discharge side of the check valve, shall be installed on the effluent pipe of the collection reservoir.

C=AXB A=3 B = 40

C = 3 X 40 C = 120 GAL

CALCULATION The system shall be sized in accordance with the demands per day per occupant based on the type of fixtures connected to the gray water system. The discharge shall be calculated by the following equation: C=AĂ—B A = Number of occupants: Number of occupants shall be determined by the actual number of occupants but not less than two occupants for 1 bedroom and one occupant for each additional bedroom. B = Estimated flow demands for each occupant: 25 gallons per day per occupant for showers, bathtubs and lavatories and 15 gallons per day per occupant for washing machines. C = Estimated gray water discharge based on the total number of occupants.

PITTSBURGH PROGRAM FOR THE ADAPTIVE TRANSFORMATION OF COMMUNITY HOUSING CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

CODE ANALYSIS: BUILDING USE

CA1.05


SPECIFICATIONS Division 1: S01010 Summary of the Work -Work Under Contract

A.The Work shall be as described in the Contained Drawings

-Products and Materials

A. The Architect has specified directly from suppliers products, material, and equipment described in this sheet that shall be incorporated into the Work. The Contractor shall be responsible for ordering delivery, storing, coordinating, and installing such Architectspecified products, material and equipment. B. The Contractor is responsible for assuring that all equipment received from the vendor is in good working order. When necessary, the Contractor shall arrange for replacement or repairs with the vendor in a timely manner so as not to affect the schedule.

Division 2: Sitework 02721 Trench Drains -01 Rainwater Collection Trench

A. Furnish and erect all Landscape elements based on drawings

-02 Metal Grate 02900

Landscaping -01 Trident Maple A. rubrum var. trilobum -02 Yellow Birch A. Betula alleghaniensis -03 Common Juniper A.Juniperus communis -04 Mountain Pepperbush A.Clethra acuminata

Trees and Shrubs: A. All plant materials shall be true to species or variety, shall be sound, healthy, vigorous, acclimated plants free from defects, disfiguring knots, sun-scald injuries, abrasions of the bark, plant diseases, insect eggs, borers and all other forms of infestations. They shall have normal, well-developed branch systems and vigorous, fibrous root systems. All materials shall be freshly dug, nurserygrown stock, and shall have been grown for a period of at least two years prior to installation, under the same climatic as at the location of the site. B. Planting Times Trees - Shrubs Deciduous Evergreen Ground Cover

Spring Fall March 1 - May 1 Oct. 15 - Dec. 1 April 1 - May 15 Sept. 1 - Oct. 1 April 15 - June 15

-05 Ninebark A.Physocarpus opulifolius -06 Ground Cover

Division 3: Concrete 03300 Cast-In-Place Concrete -01 1 Trench and Retention Wall -02 POD Concrete Pile

SP1.00

SPECIFICATIONS: DIV 1-3 SITEWORK, CONCRETE

Soil tests and Structural Viability: A. Soil testing for compaction and all studies must be carried out by contractor prior to construction, architect is in no way liable for structural viability of designs based on any representations contained on the construction documents.

CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


Division 5: Metals 05090 Metal Fastners -01 L Bracket, various dimensions. to match drawing notes. -02 Steel Rafter Tie, var. dim -03 Steel Post Tie, var. dim. 05120

Structural Steel -01 Various steel reinforcement for Skybridge, Ship Containers, Masonry Structural Span

05500

Metal Fabrications -01 Steel shipping container, 20’

A. Furnish and erect all structural steel as shown on Drawings. Provide shop painting and galvanizing as specified 1. Structural steel I shapes shall have a minimum yield strength of 50 ksi conforming to the provisions of ASTM A992. For other shapes not available in ASTM A992, steel shall have a minimum yield strength of 36 ksi conforming to the provisions of ASTM A36. 2. All work shall be erected plumb, square, and true to lines and levels in strict accordance with the structural requirements of the building. 3. Provide all machinery, apparatus, and staging required for the erection of steelwork in a thoroughly safe and efficient manner. Install, maintain and remove, without injury to other Work, such temporary bracing, scaffolding, etc. as may be necessary or required. Care shall be taken that no part of the structure is overloaded during construction. 4.Arrange for deliveries of material to facilitate the rapid and continuous progress of operation, but the site or streets adjacent to same shall not be used for the storage of material unless absolutely necessary and then only with special permission of the Authority and other authorities having jurisdiction. 5.Employ a Licensed Professional Engineer and Land Surveyor to ensure accurate erection of the steel 6.Do not alter or cut structural members without written approval of the Engineer of Record. B. Temporary Shoring and Bracing 7. Provide temporary shoring and bracing members with connections of sufficient strength to bear erection loads and guy wires to maintain structure plumb and in true alignment until completion of erection. Remove temporary work when permanent members and bracing are in place and final connections are made. C. Anchors Bolts 8. Furnish to the concrete and brick masons anchor bolts and other connectors required for securing structural steel to the foundation and other in-place concrete work, together with instructions, templates, etc. necessary for setting them. Anchor bolts are to be surveyed and any approved modifications made prior to placement of columns.

Division 6 - Wood and Plastics 06100

Rough Carpentry -01 2”x4” Stud

1. Roof and Wall Sheathing, Framing, and Subflooring to be 3/8” with 18” span

-02 Plywood Sheet var. thickness 06200

Finish Carpentry -01 Wood, various.

06410

A. Provide rough carpentry Work as indicated on the Drawings, as required for the completed Work of this Contract, and as specified herein.

Custom Casework

2.Where lumber is indicated or required to be fire-retardant treated, grade A lumber. 3. Do not use units of material with defects which impair the quality of the Work and units which are too small to fabricate the Work with minimum joints or with optimum joint arrangement. 4. Install Work accurately to required lines and levels with members plumb and true, accurately cut and fitted and securely fastened. Closely fit rough carpentry to other associated construction.

-01 Wood Cabinets

CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

SPECIFICATIONS: DIV 5-6 METALS, WOOD, PLASTIC

SP1.01


SPECIFICATIONS

5. Securely attach carpentry Work to substrates by anchoring and fastening as indicated, or, if not indicated, as required by the referenced standards. Select fasteners of size that will not penetrate through members where opposite side will be exposed to view or will receive finish materials. Make tight connections between members. Install fasteners without splitting wood; predrill as required. Set nail heads in exposed Work which is to be painted or stained and fill resulting holes. 6. Where material is cut to length, shaped or grooved after treatment, surfaces thereby exposed shall be protected by tightly butting them against noncombustible or fire-retardant treated material,

Division 7: 07210 Insulation -01 R-20 GreenFiber Natural Fiber Blow-In Insulation 6" cavity -02 3” R-13 Paper-backed fiberglass batt insulation

07600

Flashing and Sheet Metal -01 Flashing for Shipping Container, Bridge.

Division 8 - Doors and Windows 08210 Wood Doors 1

-01 Standard home dept 7’ frame with insulated door to be set in shipping container frame

2

-02 Standard sliding glass wood frame patio door, home depot source.

08610 1

2

Metal Windows -01 2’-8” x 6’-1” Aluminum Double-Hung, doublepane, low-e film coated replacement windows -03 2’-4” x 6’-6” Aluminum Double-Hung, doublepane, low-e film coated windows

08900 Glazed Curtain Wall

A. Provide all miscellaneous insulation (thermal and/or acoustic, rigid, blanket, or batt) not explicitly specified in other Sections. B. Provide miscellaneous building insulation where indicated on the Drawings, where required for proper completion of the Work 1. Foil-backed insulation: Type III, Class A, thickness and R-value as indicated on the Drawings. Density: 3 lbs./cubic foot minimum. R-value: 3.7 min. per inch of thickness. 3.Extruded polystyrene, rigid, ASTM C578 Type IV with R-value (aged) of 5.0/inch at 75oF mean temperature when tested in accordance with ASTM C518. a.Minimum compressive strength: 25 psi in vertical direction 4. Batt Type I, thickness as indicated on the Drawings. Density: 2.5 lbs./cubic foot minimum.

A. Provide door Work, complete with required accessories as indicated on Drawings and as specified herein as required for a complete installation. Work shall include, but is not limited to, the following: 2. Provide new pre-hung wood doors, factory-assembled, blocking, shims, preservative treatment, installation, and] caulking. 3. New windows shall duplicate existing windows in size, shape, and operation. All window component sections such as jamb, head, sill, sash, true muntins, and other miscellaneous components shall duplicate size, and profile of existing window components. A. Provide window Work, complete with required accessories as indicated on Drawings and as specified herein as required for a complete installation. Work shall include, but is not limited to, the following: 1. Removal of existing windows, including frames, sashes, existing cleaning anchors, accessories and other items as required for the proper installation of new windows. Contractor shall verify structural adequacy of remaining surrounding construction; repair, replace, re-anchor remaining construction as necessary to provide a structurally sound substrate for new windows. 2. Provide new double hung wood windows, factory-assembled, factory-glazed, including anchorage devices, blocking, shims, preservative treatment, factory applied prime and finish paint coats, and caulking.

3

-01 Glazed roof panel 28” oc curtainwall at greenhouse. metal bracket construction.

3. New windows shall duplicate existing windows in size, shape, and operation. All window component sections such as jamb, head, sill, sash, true muntins, and other miscellaneous components shall duplicate size, and profile of existing window components.

4

-02 Curtainwall at greenhouse wall, clear mullion.

4. Glass curtainwall to match design notes.

SP1.02

SPECIFICATIONS: DIV 7-8 INSULATION, DOOR/WINDOW CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


Division 9 - Finishes 09260 Gypsum Board Assemblies -01 Gypsum Wall Board

A. Provide all materials, labor and equipment to properly install the following Work: 1. Gypsum wallboard. 3. Gypsum board ceilings and soffits. 4. Tile backer board. 5. Non-load-bearing steel framing. 1. Prior to installation of the Work of this Section, carefully inspect the installed Work of all other trades and verify that all such Work is complete to the point where this installation may properly commence. 2. Do not install gypsum board in any location where it may be directly exposed to water. 3. Do not exceed 1/8” in 8 feet variation from plumb or level in any exposed line or surface except at joints between boards. Do not exceed 1/16” variation between planes or abutting edges or ends. Shim as required to comply with specified tolerances.

09310

Ceramic Tile -01 6” Square Dark Tile

09590

Wood Flooring

A. Provide all ceramic tile work indicated on the Drawings and as specified herein, including, but not limited to: glazed ceramic tile, unglazed quarry tile, ceramic mosaic tile, porcelain tile, all trim units, setting and grouting materials, waterproofing membrane for thin-set applications, and marble saddles. B. Coordinate wood flooring work with the work of all other Sections and trades who have items installed in or passing through the wood flooring.

-01 Bamboo Flooring 09900

Paint -01 Behr Low-VOC White Paint Interior -02 Behr Low-VOC Blue Paint Exterior

C. Paint exposed surfaces, except where the paint schedules indicate that a surface or material is not to be painted or is to remain natural. If the paint schedules do not specifically mention an item or a surface, paint the item or surface as directed by the Architect. If the schedules do not indicate color or finish, the Architect will select from standard colors and finishes available.

CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

SPECIFICATIONS: DIV 9: FINISHES

SP1.03


SPECIFICATIONS SPECIFICATIONS Division 15 - Mechanical 15410 Misc. Fixtures -01 Appliances -02 Closed loop plastic for greywater Division -02 7: Steel or copper pipe 07210 Insulation for toilet, sinks. -01 R-20 GreenFiber Natural Fiber Blow-In Insulation 6" cavity

15440

07600

15451

-02 3” R-13 Paper-backed fiberglass batt insulation Plumbing Fixtures

Flashing and Sheet Metal -01 Flashing for Shipping WaterContainer, Heaters Bridge.

15453 Pumping Apparatus and Tanks Division 8 - Doors and Windows 08210 -01 Wood Doors ONGA GPP40 Stainless Automatic Water Pump -01 Standard home dept 7’ 1 frame withpoly insulated -02 300 gallon waterdoor to be set in shipping cistern (sphere) container frame -03 20" Triple Action Filter -02 Standard sliding glass 2 wood frame patio door, home depot source. Division 16 - Electrical 08610 General Metal Windows 16010 Provisions for Electrical Work -01 2’-8” x 6’-1” Aluminum 1 Double-Hung, doublepane, low-e film coated replacement windows 2

-03 2’-4” x 6’-6” Aluminum Double-Hung, doublepane, low-e film coated windows

08900 Glazed Curtain Wall

5. Securely attach carpentry Work to substrates by anchoring and fastening as indicated, or, if not indicated, as required by the referenced standards. Select fasteners of size that will not penetrate through members where opposite side will be exposed to view or will receive finish materials. Make tight connections between members. Install fasteners without wood;piping predrill as required. Seton nail heads inand exposed which is toofbe A. Extentsplitting of plumbing work is indicated Drawings by theWork requirements painted or stained and fill resulting holes. this Section including but is not limited to the following: 1. Pipe 2. Fittings 3. Piping Joints 4. Sleeves for Pipes 5. Unions 8. Traps 9. Drain Bibbs 6. Where material is cut to length, shaped or grooved after treatment, surfaces thereby exposed shall bePolyethylene protected by(HDPE) tightlyPiping butting them againstpipe noncombustible or 1. High Density Manufactured shall be of smooth interior, fire-retardant treated material, annular exterior, corrugated polyethylene complying with the requirements for test methods, dimensions, and markings found in AASHTO M294 Type S or ASTM-D3350 for 12” – 60” diameters. A. Provide all miscellaneous insulation (thermal and/or acoustic, rigid, blanket, or batt) not 2. a. Black steel pipe and galvanized steel pipe shall be Grade A, seamless, electric explicitly specified in other Sections. resistance welded pipe, or type F furnace butt-welded, and shall be made in accordance with the current Edition of the ASTM A53. Pipe shall be free from scale, and rust, injurious B. Provide miscellaneous building insulation where indicated on the Drawings, where sand marks, blisters, scale pits, laminations, imperfect welds, or other defects that might required for proper completion of the Work affect its strength, appearance or ability to resist corrosion. 1. Foil-backed insulation: Type III, Class A, thickness and R-value as indicated on the B. Water Heater: Gas-fired, separate heater and tank assembly mounted on a skid shall Drawings. Density: 3 lbs./cubic foot minimum. R-value: 3.7 min. per inch of thickness. provide for the domestic hot water. The heater shall use atmospheric burners with minimum 4” W.C of inlet gas pressure. The thermal efficiency shall be at a minimum 81%. 3.Extruded polystyrene, rigid, ASTM C578 Type IV with R-value (aged) of 5.0/inch at 75oF mean temperature when tested in accordance with ASTM C518. 1.Insulation: The tank shall be insulated with a foam material that has a minimum R-value a.Minimum compressive strength: 25 psi in vertical of 13.4. The foam shall provide low standby energy loss and shall meet the efficiency direction requirements of ASHRAE 90. 4. Batt Type I, thickness as indicated on the Drawings. Density: 2.5 lbs./cubic foot C..Install all pumping apparatus as detailed on the Drawings, or as specified herein, or as minimum. recommended by the respective Manufacturer, to be completely operable for its intended use. A. Provide Work, complete with required as indicated on Drawings andUse as 1.Make all door required connections of pumps andaccessories air compressors to the piping systems. specified herein as required for pumps a complete installation. Work shall include, but is not flexible connectors to connect to piping. limited to, the following: D.Tanks and stands shall be delivered welded and tested while the area of installation 2. Provideaccessible new pre-hung woodinto doors, factory-assembled, blocking, shims, shall preservative remains for rigging place, on all new buildings. Contractor provide all treatment, and] caulking. equipmentinstallation, and materials required for setting tank and stand in place. 3. New windows shall existing windows in size, shape, operation. All window 1.Tanks and stands forduplicate installation in existing building may at theand option of the contractor component sections as jamb, be welded and testedsuch on the site. head, sill, sash, true muntins, and other miscellaneous components shall duplicate size, and profile of existing window components. 2.Make all piping connection as shown on drawings and install all appurtenances. A. window Work, complete with required accessories as indicated on Drawings and E. Provide labor, materials, tools, machinery, equipment, and services necessary to as specified herein as required for a complete installation. Work shall include, but is be not complete the Electrical Work under this Contract. All systems and equipment shall limited to, in the following: complete every aspect and all items of material, equipment and labor shall be provided for a fully operational system and ready for use. Coordinate the work with the work of the 1. Removal including existing cleaning anchors, other tradesofinexisting order towindows, resolve all conflictsframes, withoutsashes, impeding the job progress. accessories and other items as required for the proper installation of new windows. Contractor shall verify structural adequacy of remaining surrounding construction; repair, replace, re-anchor remaining construction as necessary to provide a structurally sound substrate for new windows. 2. Provide new double hung wood windows, factory-assembled, factory-glazed, including anchorage devices, blocking, shims, preservative treatment, factory applied prime and finish paint coats, and caulking.

3

-01 Glazed roof panel 28” oc curtainwall at greenhouse. metal bracket construction.

3. New windows shall duplicate existing windows in size, shape, and operation. All window component sections such as jamb, head, sill, sash, true muntins, and other miscellaneous components shall duplicate size, and profile of existing window components.

4

-02 Curtainwall at greenhouse wall, clear mullion.

4. Glass curtainwall to match design notes.

SP1.04

SPECIFICATIONS: DIV 14-16 MECH, PLUMB, ELECTRIC

CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550


WALL TYPES

4” x 6” wood stud 24” OC 5/8” GWB

3” R13 fiberglass batt

5” R20 fiberglass batt

5/8” GWB Existing brick exterior

Existing shipping container 4” x 6” wood stud 24” OC Cont bead clear sealant at seam

Insulation at Existing Brick Wall

Shipping Container Wall

4” wood studs 24” OC, 1 side single layer gypsum board and white paint, existing brick other side. 1 layer paperback batt insulation, 3”

4” wood studs 24” OC, 1 side single layer gypsum board and white paint, Steel Container other side. 1 layer paperback batt insulation, 3”

Cont bead clear sealant at seam Greenhouse curtainwall system Steel “T” mullion

4” x 6” wood stud 38” OC

Greenhouse Curtainwall 6” Wood studs with 1 layer of greenhouse light emissive glass, one side.

CARNEGIE MELLON UNIVERSITY SCHOOL OF ARCHITECTURE 48_550

SPECIFICATIONS: WALL TYPES

SP1.05