THE PERCEIVED CORE 500a_ Coreless Studio Jean Paul Broc


ARCH 500aL Student:

Instructor: Date Due:

Coordinator: Wahlroos-Ritter Date Submitted: 8/26/16

CONCEPT INTRODUCTION COMPREHENSIVE STUDIO DOCUMENTAITION: SUSTAINABLE SITE DESIGN Grade: HP P LP R

Page 2

FAT “CORE”-LESSNESS Coreless as the eradication of the traditional vertical core through a set of collossal structural boxes able to house not just mechanical and egress programs, but all “enclosed” activities along with circulation. The core is replaced by stacked boxes that take over 70% of the buildable space. These fat boxes then serve as the main structural members with a secondary system of clomuns locateed in the perimeter of the box. No walls are needed outside the boxes. Site response FAT ”CORE”-LESSNESS is a buffer from the two opposite zoning areas nearby: the massive developments on the north, and the low-density structures in the south. Through its scale and the use of the corner, FAT ”CORE”-LESSNESS tries to wall off the low density area from any big developments by using the straight wall, normally present between the lots, in the exterior. At the same time, the perforated facades normally seen from the street are used inside looking towards the low density zone, providing acess and visibility from that side, while blocking them from the developped areas.


ARCH 500aL Student:

Instructor: Date Due:

Coordinator: Wahlroos-Ritter Date Submitted: 8/26/16

COMPREHENSIVE STUDIO DOCUMENTAITION: SUSTAINABLE SITE DESIGN Grade: HP P LP R

Page 3

GREATER SAN FRANCISCO AREA

SOMA NEIGHBORHOOD

NATOMA AND MARY STREET


ARCH 500aL Student:

Instructor: Date Due:

Coordinator: Wahlroos-Ritter Date Submitted: 8/26/16

COMPREHENSIVE STUDIO DOCUMENTAITION: SUSTAINABLE SITE DESIGN Grade: HP P LP R

Page 4

DEVELOPED / RETAIL

INSTITUTIONS / HISTORIC

RESIDENTIAL

NEIGHBORHOOD IDENTITY


ARCH 500aL Student:

Instructor: Date Due:

Coordinator: Wahlroos-Ritter Date Submitted: 8/26/16

COMPREHENSIVE STUDIO DOCUMENTAITION: SUSTAINABLE SITE DESIGN Grade: HP P LP R

AREA SCALE / DENSITY

Page 5


ARCH 500aL Student:

Instructor: Date Due:

Coordinator: Wahlroos-Ritter Date Submitted: 8/26/16

COMPREHENSIVE STUDIO DOCUMENTAITION: SUSTAINABLE SITE DESIGN Grade: HP P LP R

Page 6

UNIQUE “EXTERIOR” FACADE

FLAT “INTERIOR” FACADE

FACADE EXAMINATION


ARCH 500aL Student:

Instructor: Date Due:

Coordinator: Wahlroos-Ritter Date Submitted: 8/26/16

COMPREHENSIVE STUDIO DOCUMENTAITION: SUSTAINABLE SITE DESIGN Grade: HP P LP R

SITE AXON AND CORE SCALES SITE AXON

Page 7


ARCH 500aL Student:

Instructor: Date Due:

Coordinator: Wahlroos-Ritter Date Submitted: 8/26/16

COMPREHENSIVE STUDIO DOCUMENTAITION: SUSTAINABLE SITE DESIGN Grade: HP P LP R

Page 8

MARY ST

PROPOSED PARK

GROUND LEVEL PLAN

PLAN ENTRANCES

NATOMA ST.


ARCH 500aL Student:

Instructor: Date Due:

Coordinator: Wahlroos-Ritter Date Submitted: 8/26/16

COMPREHENSIVE STUDIO DOCUMENTAITION: SUSTAINABLE SITE DESIGN Grade: HP P LP R

Page 9

MARY ST. PROPOSED PARK

ELEVATION ENTRANCES

NATOMA ST.


ARCH 500aL Student:

Instructor: Date Due:

Coordinator: Wahlroos-Ritter Date Submitted: 8/26/16

STRUCTURAL STRATEGIES COMPREHENSIVE STUDIO DOCUMENTAITION: SUSTAINABLE SITE DESIGN Grade: HP P LP R

STRUCTURE

Page 10


ARCH 500aL Student:

Instructor: Date Due:

Coordinator: Wahlroos-Ritter Date Submitted: 8/26/16

STRUCTURAL STRATEGIES COMPREHENSIVE STUDIO DOCUMENTAITION: SUSTAINABLE SITE DESIGN Grade: HP P LP R

PRIMARY BRACED STRUCTURE

Page 11


ARCH 500aL Student:

Instructor: Date Due:

Coordinator: Wahlroos-Ritter Date Submitted: 8/26/16

STRUCTURAL STRATEGIES COMPREHENSIVE STUDIO DOCUMENTAITION: SUSTAINABLE SITE DESIGN Grade: HP P LP R

SECONDARY STRUCTURE / BEAMS

Page 12


ARCH 500aL Student:

Instructor: Date Due:

Coordinator: Wahlroos-Ritter Date Submitted: 8/26/16

STRUCTURAL STRATEGIES COMPREHENSIVE STUDIO DOCUMENTAITION: SUSTAINABLE SITE DESIGN Grade: HP P LP R

TERTIARY PERIMETER STRUCTURE

Page 13


ARCH 500aL Student:

Instructor: Date Due:

Coordinator: Wahlroos-Ritter Date Submitted: 8/26/16

STRUCTURAL STRATEGIES COMPREHENSIVE STUDIO DOCUMENTAITION: SUSTAINABLE SITE DESIGN Grade: HP P LP R

VERTICAL POINT LOADS

Page 14

HORIZONTAL SECONDARY STRUCTURE


ARCH 500aL Student:

Instructor: Date Due:

Coordinator: Wahlroos-Ritter Date Submitted: 8/26/16

STRUCTURAL STRATEGIES COMPREHENSIVE STUDIO DOCUMENTAITION: SUSTAINABLE SITE DESIGN Grade: HP P LP R

Page 15

BRACING MECHANICAL CEILING 1/4” INSULATED GLASS W/ 1/2” AIRSPACE STRUCTURAL SILICONE 3/8” CONTINIOUS METAL ANGLES U-GLASS INSULATION 1-1/2” X 1-1/2” ZINC PLATED PERFORATED STEEL TUBE ALLUMINUM BENT SHEET 8mm HPL 2x30mm ALUMINUM SUPPORTING STUDS 70mm ALUMINUM THERMAL 48mm ALLUMINUM SUPPORTING STRUCTURE 2X13mm PLASTERBOARD

AIR SUPPLY W-21 I-BEAM 10” COLUMN LIGHTWEIGHT CONCRETE CONCRETE SLAB RADIANT TUBING


ARCH 500aL Student:

Instructor: Date Due:

Coordinator: Wahlroos-Ritter Date Submitted: 8/26/16

STRUCTURAL STRATEGIES COMPREHENSIVE STUDIO DOCUMENTAITION: SUSTAINABLE SITE DESIGN Grade: HP P LP R

MAIN STRUCTURAL COLUMNS PERIMETER COLUMNS SECONDARY MEMBERS

GROUND LEVEL PLAN

Page 16


ARCH 500aL Student:

Instructor: Date Due:

Coordinator: Wahlroos-Ritter Date Submitted: 8/26/16

STRUCTURAL STRATEGIES COMPREHENSIVE STUDIO DOCUMENTAITION: SUSTAINABLE SITE DESIGN Grade: HP P LP R

MAIN STRUCTURAL COLUMNS PERIMETER COLUMNS SECONDARY MEMBERS

LEVEL 2 PLAN

Page 17


ARCH 500aL Student:

Instructor: Date Due:

Coordinator: Wahlroos-Ritter Date Submitted: 8/26/16

CIRCULATION /SITE ACCESSIBILITY COMPREHENSIVE STUDIO DOCUMENTAITION: SUSTAINABLE DESIGN Grade: HP P LP R

EGRESS 1

Page 18


ARCH 500aL Student:

Instructor: Date Due:

Coordinator: Wahlroos-Ritter Date Submitted: 8/26/16

/ ACCESSIBILITY COMPREHENSIVE STUDIO DOCUMENTAITION: CIRCULATION SUSTAINABLE SITE DESIGN Grade: HP P LP R

EGRESS 2

Page 19


ARCH 500aL Student:

Instructor: Date Due:

Coordinator: Wahlroos-Ritter Date Submitted: 8/26/16

CIRCULATION /SITE ACCESSIBILITY COMPREHENSIVE STUDIO DOCUMENTAITION: SUSTAINABLE DESIGN Grade: HP P LP R

ELEVATOR

Page 20


ARCH 500aL Student:

Instructor: Date Due:

Coordinator: Wahlroos-Ritter Date Submitted: 8/26/16

/ ACCESSIBILITY COMPREHENSIVE STUDIO DOCUMENTAITION: CIRCULATION SUSTAINABLE SITE DESIGN Grade: HP P LP R

UNFOLDED ELEVATIONS

Page 21


ARCH 500aL Student:

Instructor: Date Due:

Coordinator: Wahlroos-Ritter Date Submitted: 8/26/16

CIRCULATION /SITE ACCESSIBILITY COMPREHENSIVE STUDIO DOCUMENTAITION: SUSTAINABLE DESIGN Grade: HP P LP R

EGRESS #2

EGRESS #1

Page 22


ARCH 500aL Student:

Instructor: Date Due:

Coordinator: Wahlroos-Ritter Date Submitted: 8/26/16

/ ACCESSIBILITY COMPREHENSIVE STUDIO DOCUMENTAITION: CIRCULATION SUSTAINABLE SITE DESIGN Grade: HP P LP R

EGRESS #2

EGRESS #1

Page 23


ARCH 500aL Student:

Instructor: Date Due:

Coordinator: Wahlroos-Ritter Date Submitted: 8/26/16

CIRCULATION /SITE ACCESSIBILITY COMPREHENSIVE STUDIO DOCUMENTAITION: SUSTAINABLE DESIGN Grade: HP P LP R

GROUND LEVEL PLAN

Page 24


ARCH 500aL Student:

Instructor: Date Due:

Coordinator: Wahlroos-Ritter Date Submitted: 8/26/16

/ ACCESSIBILITY COMPREHENSIVE STUDIO DOCUMENTAITION: CIRCULATION SUSTAINABLE SITE DESIGN Grade: HP P LP R

LEVEL 2 PLAN

Page 25


ARCH 500aL Student:

Instructor: Date Due:

Coordinator: Wahlroos-Ritter Date Submitted: 8/26/16

CIRCULATION /SITE ACCESSIBILITY COMPREHENSIVE STUDIO DOCUMENTAITION: SUSTAINABLE DESIGN Grade: HP P LP R

BASEMENT 2

LEVEL 3

Page 26


ARCH 500aL Student:

Instructor: Date Due:

Coordinator: Wahlroos-Ritter Date Submitted: 8/26/16

/ ACCESSIBILITY COMPREHENSIVE STUDIO DOCUMENTAITION: CIRCULATION SUSTAINABLE SITE DESIGN Grade: HP P LP R

BASEMENT 1

LEVEL 4

Page 27


ARCH 500aL Student:

Instructor: Date Due:

Coordinator: Wahlroos-Ritter Date Submitted: 8/26/16

CIRCULATION /SITE ACCESSIBILITY COMPREHENSIVE STUDIO DOCUMENTAITION: SUSTAINABLE DESIGN Grade: HP P LP R

LEVEL 5

LEVEL 7

Page 28


ARCH 500aL Student:

Instructor: Date Due:

Coordinator: Wahlroos-Ritter Date Submitted: 8/26/16

/ ACCESSIBILITY COMPREHENSIVE STUDIO DOCUMENTAITION: CIRCULATION SUSTAINABLE SITE DESIGN Grade: HP P LP R

LEVEL 6

LEVEL 8

Page 29


ARCH 500aL Student:

Instructor: Date Due:

Coordinator: Wahlroos-Ritter Date Submitted: 8/26/16

BUILDING ENCLOSURE COMPREHENSIVE STUDIO DOCUMENTAITION: SUSTAINABLE SITE DESIGN Grade: HP P LP R

CONCEPT OF GLASS BOX AND A READABLE CORE

Page 30


ARCH 500aL Student:

Instructor: Date Due:

Coordinator: Wahlroos-Ritter Date Submitted: 8/26/16

BUILDING ENCLOSURE COMPREHENSIVE STUDIO DOCUMENTAITION: SUSTAINABLE SITE DESIGN Grade: HP P LP R

Page 31

BRACING MECHANICAL CEILING 1/4” INSULATED GLASS W/ 1/2” AIRSPACE STRUCTURAL SILICONE 3/8” CONTINIOUS METAL ANGLES U-GLASS INSULATION 1-1/2” X 1-1/2” ZINC PLATED PERFORATED STEEL TUBE ALLUMINUM BENT SHEET 8mm HPL 2x30mm ALUMINUM SUPPORTING STUDS 70mm ALUMINUM THERMAL 48mm ALLUMINUM SUPPORTING STRUCTURE 2X13mm PLASTERBOARD

AIR SUPPLY W-21 I-BEAM 10” COLUMN LIGHTWEIGHT CONCRETE CONCRETE SLAB RADIANT TUBING


ARCH 500aL Student:

Instructor: Date Due:

Coordinator: Wahlroos-Ritter Date Submitted: 8/26/16

BUILDING ENCLOSURE COMPREHENSIVE STUDIO DOCUMENTAITION: SUSTAINABLE SITE DESIGN Grade: HP P LP R

GLASS CURTAIN ENVELOPE

Page 32


ARCH 500aL Student:

Instructor: Date Due:

Coordinator: Wahlroos-Ritter Date Submitted: 8/26/16

BUILDING ENCLOSURE COMPREHENSIVE STUDIO DOCUMENTAITION: SUSTAINABLE SITE DESIGN Grade: HP P LP R

ADDED HANDRAILS

Page 33


ARCH 500aL Student:

Instructor: Date Due:

Coordinator: Wahlroos-Ritter Date Submitted: 8/26/16

BUILDING ENCLOSURE COMPREHENSIVE STUDIO DOCUMENTAITION: SUSTAINABLE SITE DESIGN Grade: HP P LP R

UNFOLDED ELEVATIONS GLASS FACADE

UNFOLDED ELEVATIONS

Page 34


ARCH 500aL Student:

Instructor: Date Due:

Coordinator: Wahlroos-Ritter Date Submitted: 8/26/16

BUILDING ENCLOSURE COMPREHENSIVE STUDIO DOCUMENTAITION: SUSTAINABLE SITE DESIGN Grade: HP P LP R

UNFOLDED ELEVATIONS

Page 35


ARCH 500aL Student:

Instructor: Date Due:

Coordinator: Wahlroos-Ritter Date Submitted: 8/26/16

BUILDING ENCLOSURE COMPREHENSIVE STUDIO DOCUMENTAITION: SUSTAINABLE SITE DESIGN Grade: HP P LP R

SUPERSIZED CORE ELEMENTS

Page 36


ARCH 500aL Student:

Instructor: Date Due:

Coordinator: Wahlroos-Ritter Date Submitted: 8/26/16

BUILDING ENCLOSURE COMPREHENSIVE STUDIO DOCUMENTAITION: SUSTAINABLE SITE DESIGN Grade: HP P LP R

U-GLASS AND CORE WALL ENCLOSURE

Page 37


ARCH 500aL Student:

Instructor: Date Due:

Coordinator: Wahlroos-Ritter Date Submitted: 8/26/16

BUILDING ENCLOSURE COMPREHENSIVE STUDIO DOCUMENTAITION: SUSTAINABLE SITE DESIGN Grade: HP P LP R

GLASS FACADE

Page 38


ARCH 500aL Student:

Instructor: Date Due:

Coordinator: Wahlroos-Ritter Date Submitted: 8/26/16

BUILDING ENCLOSURE COMPREHENSIVE STUDIO DOCUMENTAITION: SUSTAINABLE SITE DESIGN Grade: HP P LP R

LAYERING OF 3 SYSTEMS

Page 39


ARCH 500aL Student:

Instructor: Date Due:

Coordinator: Wahlroos-Ritter Date Submitted: 8/26/16

ENVIRONMENTAL COMPREHENSIVE STUDIO DOCUMENTAITION: SUSTAINABLE SITESYSTEMS DESIGN Grade: HP P LP R

MECHANICAL SYSTEMS

MECHANICAL CORE AND AIR SUPPLY

Page 40


ARCH 500aL Student:

Instructor: Date Due:

Coordinator: Wahlroos-Ritter Date Submitted: 8/26/16

ENVIRONMENTAL SYSTEMS COMPREHENSIVE STUDIO DOCUMENTAITION: SUSTAINABLE SITE DESIGN Grade: HP P LP R

SUN / LIGHT DIRECTION

Page 41


ARCH 500aL Student:

Instructor: Date Due:

Coordinator: Wahlroos-Ritter Date Submitted: 8/26/16

ENVIRONMENTAL COMPREHENSIVE STUDIO DOCUMENTAITION: SUSTAINABLE SITESYSTEMS DESIGN Grade: HP P LP R

TRANSLUCENT U-GLASS CORE

Page 42


ARCH 500aL Student:

Instructor: Date Due:

Coordinator: Wahlroos-Ritter Date Submitted: 8/26/16

ENVIRONMENTAL SYSTEMS COMPREHENSIVE STUDIO DOCUMENTAITION: SUSTAINABLE SITE DESIGN Grade: HP P LP R

CONCRETE MASSIVE CORE

Page 43


ARCH 500aL Student:

Instructor: Date Due:

Coordinator: Wahlroos-Ritter Date Submitted: 8/26/16

ENVIRONMENTAL COMPREHENSIVE STUDIO DOCUMENTAITION: SUSTAINABLE SITESYSTEMS DESIGN Grade: HP P LP R

PROPOSED ADDED LOUVER SYSTEM (NOT IN FINAL DESIGN)

Page 44


ARCH 500aL Student:

Instructor: Date Due:

Coordinator: Wahlroos-Ritter Date Submitted: 8/26/16

ENVIRONMENTAL SYSTEMS COMPREHENSIVE STUDIO DOCUMENTAITION: SUSTAINABLE SITE DESIGN Grade: HP P LP R

Page 45

BRACING MECHANICAL CEILING 1/4” INSULATED GLASS W/ 1/2” AIRSPACE STRUCTURAL SILICONE 3/8” CONTINIOUS METAL ANGLES U-GLASS INSULATION 1-1/2” X 1-1/2” ZINC PLATED PERFORATED STEEL TUBE ALLUMINUM BENT SHEET 8mm HPL 2x30mm ALUMINUM SUPPORTING STUDS 70mm ALUMINUM THERMAL 48mm ALLUMINUM SUPPORTING STRUCTURE 2X13mm PLASTERBOARD

AIR SUPPLY W-21 I-BEAM 10” COLUMN LIGHTWEIGHT CONCRETE CONCRETE SLAB RADIANT TUBING


ARCH 500aL Student:

Instructor: Date Due:

Coordinator: Wahlroos-Ritter Date Submitted: 8/26/16

ENVIRONMENTAL COMPREHENSIVE STUDIO DOCUMENTAITION: SUSTAINABLE SITESYSTEMS DESIGN Grade: HP P LP R

SECTION PERSPECTIVE

Page 46


ARCH 500aL Student:

Instructor: Date Due:

Coordinator: Wahlroos-Ritter Date Submitted: 8/26/16

ENVIRONMENTAL SYSTEMS COMPREHENSIVE STUDIO DOCUMENTAITION: SUSTAINABLE SITE DESIGN Grade: HP P LP R

ALUMINUM SHEATS TO BLOCK LIGHT

U-GLASS TO DEFLECT LIGHT INSIDE THE CORE

DETAIL

Page 47


ARCH 500aL Student:

Instructor: Date Due:

Coordinator: Wahlroos-Ritter Date Submitted: 8/26/16

ENVIRONMENTAL COMPREHENSIVE STUDIO DOCUMENTAITION: SUSTAINABLE SITESYSTEMS DESIGN Grade: HP P LP R

Page 48

ASSEMBLY TO EXISTING STRUCTURE STEEL COPING

DETAIL A

PANEL SUPPORT FRAME

STEEL TUBE PERFORATED METAL PANEL

A

SUPPORT ANGLE BRACKET (welded) METAL SHEATHING PERFORATED

CONNECTION AT BOTTOM OF PANELS ANGLE ATTACHED TO PANEL SLIDES IN TO ANGLE ON STEEL TUBE

SLIDE-IN JOINT C

STAND-0FF

B

SUPPORT ANGLE ON PANEL (bolted)

SLIP JOINT

SUPPORT ANGLE BRACKET (welded)

VAPOR BARRIER

SHIMS

SHEATHING METAL STUD SHOTCRETE REBAR METAL STUD DRYWALL

SECONDAY INTERIOR FACADE DETAILS

CONTINUOUS SUPPORT ANGLE (bolted)

CONNECTION AT TOP OF PANELS BOLTED FROM ABOVE WHEN INSTALLED


ARCH 500aL Student:

Instructor: Date Due:

Coordinator: Wahlroos-Ritter Date Submitted: 8/26/16

ENVIRONMENTAL SYSTEMS COMPREHENSIVE STUDIO DOCUMENTAITION: SUSTAINABLE SITE DESIGN Grade: HP P LP R

DETAIL B

Page 49

DETAIL C

REINFORCED CONCRETE WALL ANCHOR BOLT STAND-OFF WELDED CONNECTION

STEEL TUBE

WELDED JOINT MAXIMUM GAP 3/4”

NUT METAL BASE PLATE

SLIP JIONT STEEL TUBE

STEEL REBARS


ARCH 500aL Student:

Instructor: Date Due:

Coordinator: Wahlroos-Ritter Date Submitted: 8/26/16

ORDERINGSITE SYSTEMS COMPREHENSIVE STUDIO DOCUMENTAITION: SUSTAINABLE DESIGN Grade: HP P LP R

TRADITIONAL CORE

XXL “FAT” CORE

Page 50

STACKED BOXES

ADDED PLATES


ARCH 500aL Student:

Instructor: Date Due:

Coordinator: Wahlroos-Ritter Date Submitted: 8/26/16

ORDERING SYSTEMS COMPREHENSIVE STUDIO DOCUMENTAITION: SUSTAINABLE SITE DESIGN Grade: HP P LP R

CORE GEOMETRY

Page 51


ARCH 500aL Student:

Instructor: Date Due:

Coordinator: Wahlroos-Ritter Date Submitted: 8/26/16

ORDERINGSITE SYSTEMS COMPREHENSIVE STUDIO DOCUMENTAITION: SUSTAINABLE DESIGN Grade: HP P LP R

BATHROOM SERVICES

Page 52


ARCH 500aL Student:

Instructor: Date Due:

Coordinator: Wahlroos-Ritter Date Submitted: 8/26/16

ORDERING SYSTEMS COMPREHENSIVE STUDIO DOCUMENTAITION: SUSTAINABLE SITE DESIGN Grade: HP P LP R

ACTIVATED CORE / FURNITURE

Page 53


ARCH 500aL Student:

Instructor: Date Due:

Coordinator: Wahlroos-Ritter Date Submitted: 8/26/16

ORDERINGSITE SYSTEMS COMPREHENSIVE STUDIO DOCUMENTAITION: SUSTAINABLE DESIGN Grade: HP P LP R

Page 54

CAFE

EXTERIOR

GROUND LEVEL PLAN

LOBBY


ARCH 500aL Student:

Instructor: Date Due:

Coordinator: Wahlroos-Ritter Date Submitted: 8/26/16

ORDERING SYSTEMS COMPREHENSIVE STUDIO DOCUMENTAITION: SUSTAINABLE SITE DESIGN Grade: HP P LP R

Page 55

EXTERIOR TERRACE

MEETING

WORK SPACE

CLASS

BLEACHER SEATING

KITCHEN EXTERIOR TERRACE

LEVEL 2 PLAN


ARCH 500aL Student:

Instructor: Date Due:

Coordinator: Wahlroos-Ritter Date Submitted: 8/26/16

ORDERINGSITE SYSTEMS COMPREHENSIVE STUDIO DOCUMENTAITION: SUSTAINABLE DESIGN Grade: HP P LP R

Page 56

WORK SPACE

AUDITORIUM MEETING

BASEMENT 2

WORK SPACE

LEVEL 3


ARCH 500aL Student:

Instructor: Date Due:

Coordinator: Wahlroos-Ritter Date Submitted: 8/26/16

ORDERING SYSTEMS COMPREHENSIVE STUDIO DOCUMENTAITION: SUSTAINABLE SITE DESIGN Grade: HP P LP R

Page 57

WORK SPACE

AUDITORIUM

BASEMENT 1

CLASS

WORK SPACE

LEVEL 4


ARCH 500aL Student:

Instructor: Date Due:

Coordinator: Wahlroos-Ritter Date Submitted: 8/26/16

ORDERINGSITE SYSTEMS COMPREHENSIVE STUDIO DOCUMENTAITION: SUSTAINABLE DESIGN Grade: HP P LP R

Page 58

WORK SPACE

WORK SPACE

LEVEL 5

WORK SPACE CLASS

LEVEL 7


ARCH 500aL Student:

Instructor: Date Due:

Coordinator: Wahlroos-Ritter Date Submitted: 8/26/16

ORDERING SYSTEMS COMPREHENSIVE STUDIO DOCUMENTAITION: SUSTAINABLE SITE DESIGN Grade: HP P LP R

Page 59

WORK SPACE KITCHEN

LEVEL 6

MECHANICAL

LEVEL 8