As ajnara sports city is on planning stage and construction is going to start very soon. Buyers remain concerned about its possession time. Possession time depends upon the construction speed and completion of the project. Ajnara group always try to give possession of its projects on time and in past have proved it in several of its old projects. Let’s have an insight in construction phases and process for developing at noida extension.
Ajnara Sports Villas would first start excavation of the land and would dig it out as per the master plan. After completing excavation architects and civil engineers would prepare the bed of steel which would be filled with concrete. This process is called raft casting and is the base of foundation. This raft is most important part of building as it helps buildings in resisting earthquake as well as they bear the load of buildings.
Ajnara Sports City the next stage would be of placing out the columns as per building floor layout and individual flat la