Portfolio_JHC 2023

Page 1

PORTFOLIO
Juan H. Cárdenas Jr.
Content McKinley Ave. Elementary School (LAUSD) Camp Fred Miller (LACDPW) San Gabriel Valley Aquatic Center 15 21 Covina Recreational Village 03 11 6th Street Grand 25 Griffin Ave. Elementary School (LAUSD) Sustainability 27 29 New Construction (Major Modernization) New Construction (Affordable Housing) Adaptive Reuse Seismic Retrofit Competition Entry Modernization

McKinley Ave. Elementary School (LAUSD)

Major Modernization

Los Angeles, California

Phase: RFP, SD,CD

Status: In Construction

SCOPE OF WORK:

CONSTRUCTION OF 2 NEW 2-STORY BUILDINGS & NEW OVERALL SITE MODERNIZATION

RFP - FINAL SITE PLAN

03 McKinley Ave Elementary School | Major Modernization
Kemp Bros Construction GGA Architects MCKINLEY AVENUE ELEMENTARY SCHOOL COMPREHENSIVE MODERNIZATION PROJECT Kemp Bros Construction GGA Architects MCKINLEY AVENUE ELEMENTARY SCHOOL COMPREHENSIVE MODERNIZATION PROJECT Major Modernization | McKinley Ave Elementary School 04 MAIN ENTRANCE RENDER INTERIOR
GENERAL
ADMINISTRATION
CORRIDOR RENDER MULTIPURPOSE ROOM RENDER
CLASSROOM RENDER
OFFICE RENDER

CLASSROOM BUILDING EXTERIOR RENDER

| GGA Architects MCKINLEY AVENUE ELEMENTARY COMPREHENSIVE MODERNIZATION 05 McKinley Ave Elementary School | Major Modernization
Kemp Bros Construction | GGA Architects Kemp Bros Construction SOUTH EXTERIOR RENDER
Major Modernization | McKinley Ave Elementary School 06
BUILT CLASSROOM BUILDING PHOTO BUILT SOUTH EXTERIOR PHOTO

WEST / MAIN ENTRANCE ELEVATION

EAST/ CAMPUS ELEVATION

NORTH/ CAMPUS ELEVATION

07 McKinley Ave Elementary School | Major Modernization
CLASSROOM BUILDING - SOUTH ELEVATION MCKINLEY BUILDING - WEST ELEVATION 78TH ST.
Major Modernization | McKinley Ave Elementary School 08
MCKINLEY BUILDING - EAST ELEVATION
DN UP 2-A 2-B 2-C 2-D 3A3.02 1 3A3.01 1 3A3.01 3 3A3.02 2 1 3A4.01 3A4.01 3A4.01 4 3A4.01 1 3A4.21 3 3A4.20 4 3A4.21 3A3.02 3 IDF ROOM 2-222A ELECTRICAL 2-222B GENERAL CLASSROOM -224 M&O ROOF ACCESS 2-222 GENERAL CLASSROOM 2-216 BUILDING TEACHING MATERIAL STORAGE 2-226 SMALL GROUP INSTRUCTION TEACHER'S WORKROOM 2-212 GENERAL CLASSROOM 2-214 TYPE SPECIAL ED. CLASSROOM 2-217 STORAGE 2-211A TYPE SPECIAL ED. CLASSROOM -211 CUSTODIAN 2-213 ALL GENDER STUDENT RESTROOM -215 STORAGE 2-205 GENERAL CLASSROOM 2-201 BOY'S RESTROOM -203 GIRL'S RESTROOM 2-209 FACULTY RESTROOM 2-218 GENERAL CLASSROOM 2-202 GENERAL CLASSROOM 2-204 GENERAL CLASSROOM -210 STAIR 2-B CORRIDOR 2-200A ELEVATOR 2-A 2-204 2-203 2-209 2-205 2-202 2-201 2-212 2-211 2-211A 2-217A 2-222 2-228 2-216 2-222A 2-222B 2-214A 2-202A 2-217 2-226 2-224 2-214 2-210 2-215 2-213 2-218 2 3A4.21 3 3A4.21 1 3A4.22 1 3A4.20 GENERAL CLASSROOM -228 X2 A4 A2 A3 A4 E3 A3 F1 C3 E2 E3 X1 X1 C2 C2 A4 A2 B2 B2 C2 B2 B2 C2 A2 A2 A4 C4 A4 A2 A2 A2 A2 A4 A4 A4 A4 A2 A2 A3 A2 B2 A5 B2 A4 X1 X1 X1 X1 X1 X1 C2 A4 C2 C2 C2 A2 C2 C2 A4 C2 A2 A2 E3 A1 A2 A2 A1 A1 A2 A2 A1 A2 A1 A1 A2 B2 B1 B2 B1 A2 D2 D2 3A7.01 2 F1 C2 A2 A2 C4 A3 C2 C2 C2 A2 3A7.02 2 4 3A4.20 STAIRS 2-A 3A5.02 3A3.02 4 2-E FACULTY RESTROOM 2-220 A4 A4 2-220 3 3A4.22 ST-1A ST-1B C3 A3 A2 A5 8' 9" 12' 4" 10' 5" 7' 1" 12' 4" EQ EQ ST-4 ST-4 ST-5 ST-3 ST-3 PH 2-200A E6 ST-6A ST-6B ST-6C ST-6D 1 3A4.23 2 3A4.23 A2 A3 C2 X1 X1 X1 A2 F1 C2 C2 C4 X1 X1 A4 X2 X3 X2 D2 X3 X2 D2 X3 X2 A4 X2 X1 X2 C2 D2 X2 X3 X2 X3 X2 F1 X2 X1 X1 X1 C3 C3 X1 C2 X4 C2 C2 C2 5 3A4.23 1/2" 1'-0" 3A5.06 3A5.06 3A5.05 1 (SIM.) 3A5.10 1 6' 8" 8' 9" 12' 4" 8' 9" 12' 4" 8' 9" 12' 4" 8' 9" 12' 4" 3' 3" 140' 1/2" 46' 11" 43' - 9" 32' 1/2" 27' 4" 80' 2" 9' 2 1/2" 12' 2 1/2" 6' 7" 6' 7" 3' 5" C2 C2 C2 C2 8" 3A5.05 2 C3 B2 4" 1' - 4" 30' 1" 29' - 2 1/2" 10 1/2" 7" 16' 7 1/2" 30' 2" 29' 1 1/2" 9" 4 1/2" 19' 11" 29' 1" 16' 10" 28' 8" 9' 2 1/2" 33' 2 1/2" TYP. 3' 1" 1' - 4 1/2" 8 1/2" 30' 0 1/2" 13' 8" 14' 9 1/2" 31' 3" 16' 10 1/2" 30' - 10" 11' 6" B.O. DECK 12' 0" B.O. DECK 5' 10" 2' 7 1/2" 0704 0703 0703 0771 0571 0126 33A2.41 SEE C3 A4 13A5.05 SEE FOR TYP. CLASSROOM (SIM.) (MIR.) 13A5.05 SEE FOR TYP. CLASSROOM (SIM.) 13A5.05 SEE FOR TYP. CLASSROOM ALIGN 13A5.07 SEE FOR TYP. WORKROOM CORRIDOR 2-200 CORRIDOR 2-200 TYP. ALIGN 8' 9" 12' 4" C2 FD FD FD 3A9.23 3A9.23 1 3A9.56 21 3A9.56 21 MIR. 3A9.56 16 3A9.22 11 3A9.22 11 3A9.22 11 3A9.22 3A9.22 3A9.22 3A9.22 24 3A9.22 20 3A9.22 11 3A9.23 3A9.22 19 3A9.22 17 3A9.23 2 3A9.21 23 3A9.22 24 SIM. MIR. C2 3A9.22 3A9.21 17 SIM. 3A9.22 SIM. 3A9.22 10 3A9.22 1 3A9.22 21 3A9.22 3 3A9.22 23 SIM. C2 C2 C2 X1 3A9.23 3A9.23 SIM. 3A9.23 3 SIM. 3A9.23 SIM. 3' 6" 0557 0560 C2 C2 A4 C2 D2 D2 T.O. PARAPET 14' 8" 5 3A4.21 FEC FEC FEC FEC FEC FEC FEC FEC FEC FEC FEC FEC FEC FEC 2 3A4.25 2 3A4.24 3 3A4.24 3A4.24 1 3A4.24 1 3A4.25 0566 0566 FD 0566 E7 (SIM.) 23A5.06 SEE FOR TYP. CLASSROOM (MIR.) C2 C3 C2 0954 0954 0954 0954 0954 5' 9" 6' 0" 5' 6" 3' 5" 5' 2" 9" 3' 11" 2" 5' 7" 6" 6 1/2" 3' 10" 3' 3" 10" 4' 5 1/2" TYP. 3' 3" 3' 2" 5' - 10" 7" 3' 6 1/2" 2' 8" 2' 8" 4' 0" 3' 3" TYP. 90 C L R 93 4 S 6' 4" 5' 6" 6' 0" 8" 94 10' 9" 18' 4 1/2" 4' 4" 2" 16' 10 1/2" 11' 1" 4' 1" 44' 1"9 34" 51 2 15 11 511 2 1 2 4' 1/2" 3' 9 1/2"4 702 11 04 1 1' 6" 10 8' - 2" 8' 4" 29" 2' 1/2" 2' 4" 1 1/2"3 2' 0" 3" 4" TYP. 2' 1" 21 2 1/2" 4" 9 1/2" 7 51 1 22 682 12 30 21 1' 4" 3 3 4 C3 C3 0954 TYP. TYP. C2 3A3.01 44 44 44 44 UP UP UP UP 1-A.1 1-B 1-C 1-D 1-1.4 1-1 1-5.1 1-6 1-7 4A3.01 3 4A3.02 4 1-4.8 4 4A4.03 4 4A4.03 3 4A4.10 4A5.12 1 4A5.14 1 4A5.11 1 / MATCH LINE 1 4A2.11B 1-A.3 1-A 1-C.3 1-C.4 1-B.8 1-3.7 1-A.8 1-3 4A5.13 2 1-2 1-5 1-4.2 1-4 1-6.7 1-5.4 1-B.2 2 4A4.03 1 4A4.11 2 4A4.10 1 4A4.10 1 4A4.13 11' 2" 14' 0" 19' - 4" 3' - 10" 2' - 11"23' - 6" 3' 2"10' - 6" 16' 7 1/2" 21' - 6 1/2" 10' - 8 1/2" 1' 8" 11' 10" 6' 3" 19' 3" 2' 6" 6' 6" 18' 0" 8' 5"2' 1" A2 B3 A2 A2 A2 A2 E2 A2 B2 B2 A2 A2 A3 A2 A2 A2 A2 A2 A2 A2 A2 A1 A2 E2 C3 A3 A2 A3 A2 F1 F1 A2 A2 A2 C2 A2 A3 A2 A2 A2 X1 X1 X1 X1 X1 X1 X1 X1A C3 A2 A2 X1 A3 F1 A2 A2 A2 A2 C3 A2 A2 A2 A1 A2 C2 2 4A4.13 1 4A4.14 G1 A4 A4 E4 E4 A1 A1 F1 1-111A 1-111 1-113 1-115 1-117 1-118 1-109 1-114 1-116 1-105A 1-105 1-107 1-106 1-106D 1-103 1-105B 1-101A 1-119 1-102 PH 1-124 1-124C 1-124F 1-124E PH 1-124G PH 1-124H 1-124A 1-124B 1-124J C3 C3 A2 C3 A2 4A9.82 1 4A7.01 4 4A5.01 1 ST-2 ST-1 ST-3 ST-4 ST-5 D1 D1 C6 4A3.03 2 FEC FEC 4A3.02 3 X1A C3 C3 C3 X1 A2 C3 4A7.11 5 H2 H4 ST-7 C3 C3 FEC C3 C2 A2 A2 X1 A2 A1 X1 X1 X1 A3 A2 C2 X1 A2 C3 C3 C3 C3 C3 C3 C3 C3 C2 C3 C3 C3 C3 C3 C3 1-124D C3 C2 C2 C2 C2 C2 C2 C2 C2 69' 0" D6 PH 1-100B C3 40' 4 1/2" 1-120 1-122 1' 0" 1' 0 1/2" 154' - 6 1/8" 1' 3 1/8" 19' 5" 8' 6" 3' 2" 1' 8 1/2" 9' 4" 8' 6" 1' 6" 19' 8" 1' 2" 9' 2"4' 8" 8' 2" 8'8" 9' 8" 14' 11" 14' - 1" 12' - 10" 11' 4" 2' - 3 1/2" 5' 6" 2' 0" 1' 1 1/2" 25' 10" 1' - 5 1/2" RESTROOM 1-107 SUPPLY REPRO LOUNGE 1-111 CUSTODIAN 1-109 ITINERANT 1-115 SPEECH THERAPY 1-118 GENERAL STORAGE 1-124A MUSIC ROOM STORAGE 1-124B IT 1-114 SECURED STORAGE 1-116 FIRST AID NURSE OFFICE 1-106 MEN'S RESTROOM 1-120 WOMEN'S RESTROOM 1-122 EXAM 1-106C RESTROOM 1-106D PUBLIC WAITING 1-101 LIFT ROOM 1-124C MULTI-PURPOSE ROOM 1-124 ELEV. MACHINE 1-119 COT 1-106A ELEC. 1-124E CUSTODIAN 1-124D ADMIN RESTROOM 1-111A RESTROOM 1-105A CONFERENCE ROOM 1-103 PRINCIPAL'S OFFICE 1-105 SUPPLY REPRO LOUNGE 1-111 ASSISTANT PRINCIPAL'S OFFICE 1-113 COORDINATOR'S OFFICE 1-117 MUSIC PUBLIC RESTROOM 1-101A 9 1/2" C3 1 4A4.17 2 4A4.14 CLERICAL FRONT OFFICE 1-102 B2 A2 A2 A2 A2 A2 A2 STAIR 1-A X1A X1 4A9.21 17 4A9.21 18 4A9.21 18 4A9.21 19 4A9.21 20 4A9.21 21 4A9.21 22 FEC 2 4A4.17 1-100 CORRIDOR 1-100A CORRIDOR 1-100 X1 X1A X1A 0557 X1 C2 C2 C2 C2 C2 C3 C2 C2 C2 C3 X1A X1A X1A X1 X1 C2 4A3.03 1 4A3.02 1 4A9.23 7 SIM. 4A9.23 7 SIM. 4A7.11 1 0808 4A5.13 1 10" 1-101 1-101B C2 1' 5 1/2" 7' 11" 12' 1" 1/8" = 1'-0" 1 FIRST FLOOR PLAN A 09 McKinley Ave Elementary School | Major Modernization
BUILDING SECOND FLOOR PLAN MAIN BUILDING FIRST FLOOR PLAN A
CLASSROOM

ACOUSTICALLY SEALED WINDOW

METAL FLASHING -PAINT TO MATCH STOREFRONT FRAME, PROVIDE BACKER PLATE SET IN BED OF SEALANT

SILICONE CAULK ALL JOINTS

6" ALIGN BOTH SIDES AL BO SID

SELF ADHERING FLASHING MEMBRANE, EXTEND ABOVE TOP OF MTL FLASHING

J-BEAD WEEP STRIPPED SELF ADHERED FLASHING MEMBRANE

20 44

EDGE OF FLASHING TYP.

GALV. METAL FLASHING, PROVIDE BACKER PLATE BED OF SEALANT AT CORNERS

GLAZING PER WINDOW

GLAZING PER WINDOW SCHEDULE

BACK DAM

SEALANT

GLAZING PER WINDOW SCHEDULE

BACK

SEALANT W/ WEEP

EXTERIOR

GALV. METAL FLASHING SET IN FULL BED OF SEALANT, SEAL ALL PENETRATIONS THROUGH FLASHING -PAINT TO MATCH WINDOW FRAME

PLASTER TRIM

WHERE REQUIRED 2 " 44 EXTERIOR GLAZING PER WINDOW SCHEDULE GALV.

SELF ADHERING SHEET WATERPROOFING (LAP OVER WATER RESISTIVE BARRIER

EXTERIOR CEMENT PLASTER OVER MTL LATH

WATER & AIR BARRIERS

GYP SHEATHING

INSULATION PER WALL ASSEMBLY

GYP. BD.

GLAZING PER WINDOW

SECURITY SCREEN WHERE OCCURS

SEALANT

BACK DAM

EXTERIOR INTERIOR

GALV. METAL FLASHING SET IN FULL BED OF SEALANT, SEAL ALL PENETRATIONS THROUGH FLASHING -PAINT TO MATCH WINDOW FRAME

SELF ADHERING SHEET WATERPROOFING (LAP OVER WATER RESISTIVE BARRIER

EXTERIOR CEMENT PLASTER OVER MTL LATH

WATER & AIR BARRIERS

DAM 2"MIN. 6OVERLAP "MIN. 12"=1'-0" SLOPE

DENSGLASS SHEATHING

GYP. BD.

SEALANT W/ WEEP 44

EXTERIOR

GALV. METAL FLASHING FULL BED OF SEALANT, PENETRATIONS THROUGH FLASHING -PAINT TO MATCH WINDOW FRAME

PLASTER TRIM

SELF ADHERING SHEET WATERPROOFING (LAP WATER RESISTIVE BARRIER

EXTERIOR CEMENT PLASTER OVER MTL LATH

WATER & AIR BARRIERS

GYP SHEATHING

INSULATION PER WALL

GYP. BD.

GYP SHEATHING WINDOW BLIND WHERE SECURITY SCREEN WHERE OCCURS 3A9.56
SEALANT 44
PLASTER TRIM
ACOUSTICALLY SEALED WINDOW
AT CORNERS NOTE: STOREFRONT ARE A DEFERRED APPROVAL ITEM PER 3G0.01 3A9.56 24 SCALE: SCALE: 3" = 1'-0" 3" = 1'-0" 3" = 1'-0" WINDOW SILL AT PLASTER 13 SCALE: 3" = 1'-0" ACOUSTICALLY SEALED WINDOW 14 SCALE: WINDOW SILL AT PLASTER - 2" FRAME 17 SILL & JAMB @ INT. WALL FURR-OUT 18 44 FIRST FLOOR 0' - 0" SECOND FLOOR 14' - 6" ROOF 29' - 0" 2-C 59 " 5 '0 " 96 " EXTERIOR COVERED WALKWAY CORRIDOR 0901 0518 0901 0906 1/4 / 1 -0 0568 0704 0542 0906 GENERAL CLASSROOM GENERAL CLASSROOM 0950 0950 0727 0543 2314 2316 0544 2 68 3A9.30 7 3A9.30 1 3A9.30 22 TYP. 3A9.30 21 TYP. 0541 0514 3A9.40 16 0518 9 " 3A9.55 13 3A9.56 5 3A9.56 6 3A9.56 13 60 M A X 1/2" = 1'-0" 3 WALL SECTION
EXTERIOR PLASTER OVER MTL LATH AIR AND WATER BARRIER GYP. BD PLASTIC SHEET AIR BARRIER GRID LINE 2-8.5 CEILING, REFER TO CEILING PLAN DRIP EDGE GYP SHEATHING, TYP. SEALANT & BACKER ROD .063" ALUMINUM BRAKE METAL, FASTENED W/ #10X1" SS FLAT HEAD SCREW @ 8" O.C. CORRIDOR EXTERIOR BATT INSULATION GYP. SHEATHING MTL STUD FRAMING 2% SLOPE DN 3A9.30 16 O.H. HIGH TEMP. SELF ADHERING MEMBRANE 1/4" Ø WEEP HOLES @ 2' O.C. BRACE PER STRUCTURAL REFER TO B/3S6.12 FOR FRAMING 1' - 6" 6 1/2" 11 1/2" 20 ROOFING 063" ALUMINUM BRAKE METAL, FASTENED W/ #10X1" SS FLAT HEAD SCREW @ 8" O.C. HOT-AIR WELDED ROOFING FLASHING STRIP DECK EDGE SUPPORT FRAMING ROOFING BOARD GRID LINE 2-8.5 DRIP EDGE GYP SHEATHING, TYP. SEALANT & BACKER ROD GALV. MTL PANEL, PTD EXTERIOR CEMENT PLASTER SOFFIT RIGID INSULATION TO BUILD UP ROOF SLOPE ROOF DECK 4% SLOPE DN RIDGE SLOPE (VARIES) DN STEEL FRAMING, REFER TO STRUCTURAL. PLASTIC SHEET AIR BARRIER REFER TO 1/3S6.22 FOR CANOPY FRAMING GYP SHEATHING, TYP. 6 1/2" 1' - 6" PER CEILING PLAN 2" 1/2" 54 54 4 SCALE: 1 1/2" = 1'-0" CANOPY @ EXTERIOR WALL 15 3" = 1'-0" EXTERIOR PLASTER TO MTL PANEL 16 SCALE: 1 1/2" = 1'-0" CANOPY @ STAIR W/ ROOF CURB 14 3 2 3" = 1'-0" PLASTER AT LAPPED STUDS 20 Major Modernization | McKinley Ave Elementary School 10
SHIMS,
@ TEACHING WALL
SECTIONS & DETAILS

Covina Recreational Village

Adaptive Reuse

Covina, California

Phase: Conceptual Design

Status: On-going (CD)

SCOPE OF WORK:

Adaptive reuse of 2 existing warehouses to recreational village consisting of a Cafe, Library, Fitness Center & Gymnasium. Site is directly adjacent to Covina Metrolink Station.

369 SF MEETING ROOM RR (M) 117 SF A-G -RR-SHW RR (F) 514 SF MULTIPURPOSE 5578 SF LIBRARY TRANSFORMER 7105 SF DOG PARK DOG AGILITY CENTER 971 SF K9 TRAINING STRUCTURE COVERED SEATING 195 SF RR 119 SF A-G -RR -SHW WEST BUILDING SEE NOTES -A. 516 SF MULTIPURPOSE ROOM 248 SF MEETING ROOM 4294 SF OPEN FITNESS AREA GATEWAY (N) COVERED CANOPY 514 SF COMPUTER LAB 410 SF COFFEE KIOSK STACKS OUTDOOR LIBRARY KIOSK 516 SF MULTIPURPOSE ROOM 245 SF MEETING ROOM 1589 SF OUTDOOR FITNESS AREA COVINA HISTORICAL WALK OUTDOOR LIBRARY SEATING OPEN COMPUTER AREA CARDIO WEIGHT OPEN OPEN 1360 SF POCKET PARK (NATIVE FLOWER SHRUB GARDEN)
11 Covina Recreational Village | Adaptive Reuse NORTH WEST AERIAL VIEW
OVERALL SITE PLAN
PROPOSED
282 SF RESTROOM (W) 282 SF RESTROOM (M) 42 PARKING STALLS CELL TOWER CLIMBING TOWER 3381 SF ROCK CLIMBING LOCKERS 337 SF STAFF OFFICE EAST BUILDING CENTER SEE NOTES -C. 1ST STREET PEDESTRIAN FOOTBRIDGE OVER METROLINK TRACKS OFFICE WORKROOM STORAGE LOBBY RECEPTION BREAKROOM KITCHEN CONFERENCE ROOM STAFF OFFICE STAFF OFFICE OFFICE OFFICE 183 SF RECEPTION LOBBY 329 SF OFFICE STORAGE Parks & Recs Offices CARDIO FITNESS Adaptive Reuse | Covina Recreational Center 12 SOUTH WEST AERIAL VIEW

CAFE & SEATING PERSPECTIVE

EXTERIOR SEATING PERSPECTIVE

13 Covina Recreational Village | Adaptive Reuse
ROCK CLIMBING WALL / PEDESTRIAN BRIDGE PERSPECTIVE

DOG PARK PERSPECTIVE

GYM EXTERIOR PERSPECTIVE

GYM INTERIOR PERSPECTIVE

Adaptive Reuse | Covina Recreational Center 14

Camp Fred Miller (LACDPW)

Modernization

Malibu, California

Phase: SD

Status: On-going

SCOPE OF WORK:

Renovation of all existing buildings & overall site. Construction of 2 new prefabricated staff lodging buildings. New fire access for code compliance.

FRED MILLER - SD PACKAGE

COUNTY OF LOS ANGELES

April 27th 2023

3 4 4 5 15 14 16 18 20 21 23 19 13 17 2
CAMP
15 Camp Fred Miller (LACDPW) | Modernization

EncinalCanyonRoad

EncinalCanyonRoad

Key Notes

Key Notes

Services Zone Staff Housing Zone

Sports

Fire Lane Restroom Building Camp Kilpatrick Youth Dorms West Site Garden Culinary Garden Terrace Planters
Healing Garden Viewing Area Existing Classroom Building Meditation Circle
with Shade Trees Softball Field Running Track
and Sloped Walk/Access to Field Fitness Station Basketball Courts Handball Courts Shade Structure Staff Terrace with Amenities Staff Lodging Counseling and Community Outreach Building Multi-Use Area 1 2 3 4 20 21 22 23 24 25 26 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Administration Building Security Check In Surveillance Building C a m p E n t r a n c e 1 3 4 26 21 21 22 6 7 8 9 10 11 12
Native
Planting
Stairs
24 25
Relationships
Zone - Relationships, Optimism
Zone - Nurturing,
Zone - Potential, Growth,
Gathering
Cultivation
Growth
0’ 40’’ 80’ 160’ SD SITE LANDSCAPE SITE Fire Lane Restroom Building Camp Kilpatrick Youth Dorms West Site Garden Culinary Garden Terrace Planters
Healing Garden Viewing Area Existing Classroom Building Meditation Circle
with Shade Trees Softball Field Running Track Stairs and Sloped Walk/Access to Field Fitness Station Basketball Courts Handball Courts Shade Structure Staff Terrace with Amenities Staff Lodging Counseling and Community Outreach Building Multi-Use Area 1 2 3 4 20 21 22 23 24 25 26 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Administration Building Security Check In Surveillance Building C a m p E n t r a n c e 1 3 4 5 26 21 21 22 6 7 8 9 10 11 12
Native
Planting
24 25 Services Zone
Housing Zone
Zone - Potential, Growth, Relationships
Zone - Relationships, Optimism Cultivation Zone - Nurturing, Growth
Staff
Sports
Gathering
0’ 40’’ 80’ 160’ 320’
PLAN
SITE PLAN Modernization | Camp Fred Miller (LACDPW) 16
SD A1.01 SITE
LANDSCAPE
REF. SD A3.01 1 6' - 9" 8' - 8" 7' - 9" 9' - 4" 10' - 4" 10' 4" 11' 6" 5' 9" 7' 7" SD A3.02 2 1 SD A3.10 2 SD A3.10 3 SD A3.10 D B A 1. 2. 2.5 3. 4. 53' 5" 6' 6" 6' - 4" 11' 6" 23' 5" 34' - 4" 32' - 8" 30' 10" 11' - 4" 4' 11" 6' - 9" 7' 7" 7'7" 12' - 11" 10' - 0" 11' 4" MINDFUL. ROOM MINDFUL. ROOM VRF VRF 1005 2207 0304 0304 0501 0501 0804 0804 0804 0804 0806 0805 0806 0601 0807 148' - 8" 24' - 0" 68' - 8" 56' - 0" 146 SF IDF/ STORAGE 114 SF ELECTRICAL 112 SF LOBBY 81 SF CONTROL ROOM 73 SF OFFICE 88 SF OFFICE 97 SF OFFICE 97 SF OFFICE 1601 SF COMMUNITY DAY VISITING ROOM 1248 SF MULTI-PURPOSE ROOM 458 SF OPEN OFFICE 77 SF OFFICE 75 SF OFFICE 77 SF OFFICE 736 SF VOCATIONAL TRAINING 162 SF CONFERENCE ROOM 2204 2204 43 SF JAN. 51 SF WATER HEATER 39 SF LAC. 0805 0805 1006 2204 0234 0814 MATERIAL LEGEND EXISTING KEYPLAN CAMP FRED MILLER -SD SET COUNTY OF LOS FLOOR PLAN -EXISTING KITCHEN/DINING BLDG 0234EXISTING CONCRETE DECK TO 0804NEW INTERIOR STOREFRONT SYSTEM W/ SECURITY GLAZING PER BSCC REQUIREMENTS & PRIVACY CURTAIN. 0805NEW WINDOWS WITH SECURITY GLAZING PER BSCC REQUIREMENTS. 0806NEW DOOR LEVEL 1 - EXIST. K/D 1730' - 6" 2. 2.5 T.O. C.M.U. - EXIST. K/D 1739' - 2" 1601 SF COMMUNITY DAY VISITING ROOM 77 SF OFFICE 75 SF OFFICE 77 SF OFFICE 736 SF VOCATIONAL TRAINING LEVEL 1 - EXIST. K/D 1730' - 6" T.O. C.M.U. - EXIST. K/D 1739' - 2" KEYPLAN 3 April 27th 2023 SD A3.10 COUNTY OF LOS ANGELES SECTIONS -EXISTING KITCHEN/DINING BLDG 1 EXISTING KITCHEN/DINING -SECTION 1 LEVEL 1 - EXIST. K/D 1730' - 6" 2 SD A3.10 3 SD A3.10 1. 2. 2.5 3. 4. T.O. C.M.U. - EXIST. K/D 1739' - 2" 0411 0502 0532 0805 0814 0503 0213 2 3/32" = 1'-0" 2 EXISTING KITCHEN/DINING BLDG -SOUTH ELEVATION 17 Camp Fred Miller (LACDPW) | Modernization KITCHEN & DINING BUILDING KITCHEN & DINING PLAN EXTERIOR ELEVATION BUILDING SECTION
REF. 15' - 6" 7' - 7" 7' - 7" 7' - 8" 11' - 7" 11' - 7" 11' - 6" 19' - 4" 7'7" 7' 6" 15'6" 19' - 4" 7' - 9" 7' - 7" 7' - 7" 10'2" 15'6" 15' - 1" 15' - 2" 11'0" 12' - 0" SD A3.03 1 SD A3.03 2 1 SD A3.11 2 SD A3.11 6 5 2 1 D. C. B. JAN 1 23 4 56 78 91011 12 13 14 15 16 17 18 VRF VRF 3 4 2201 7' - 7" 7' - 7" 4' 11" 7' - 4" 12'0" 179 SF COMPUTER ROOM 531 SF LOUNGE/ KITCHEN 56 SF LAC. 56 SF R.R. 105 SF RESTROOM 105 SF RESTROOM 69 SF UTILITY 46 SF UTILITY 37 SF STORAGE 179 SF DORM. 117 SF DORM. 117 SF DORM. 118 SF DORM. 166 SF DORM. 173 SF DORM. 177 SF DORM. 146 SF DORM. 145 SF DORM. 86 SF DORM. 86 SF DORM. 87 SF DORM. 0814 0805 4 0806 2217 T.O. C.M.U. - EXIST. A/D 1734' - 2" LEVEL 1 - EXIST. A/D 1725' - 6" 2 SD A3.11 3 SD A3.11 6 5 2 1 3 4 0411 0805 0532 0502 2 SD A3.11 3 SD A3.11 6 5 2 1 3 4 179 SF COMPUTER ROOM 531 SF LOUNGE/ KITCHEN 87 SF DORM. 37 SF STORAGE 86 SF DORM. 86 SF DORM. 69 SF UTILITY 105 SF RESTROOM 56 SF LAC. 56 SF R.R. 105 SF RESTROOM 3/32" = 1'-0" 1 EXISTING ADMIN/DORM BLDG -SECTION 1 Modernization | Camp Fred Miller (LACDPW) 18
DORM BUILDING ADMINISTRATION / DORM PLAN
ELEVATION
SECTION
ADMINISTRATION /
EXTERIOR
BUILDING

CLASSROOM BUILDING PERSPECTIVE

NEW STAFF HOUSING BUILDING PERSPECTIVE

PROPOSED EXTERIOR CANOPY / SECURITY BOOTH

19 Camp Fred Miller (LACDPW) | Modernization
Modernization | Camp Fred Miller (LACDPW) 20
CLASSROOM VIEW COMMUNITY ROOM VIEW
STAFF LOUNGE/KITCHEN VIEW

San Gabriel Valley Aquatic Center

Competition Entry

La Puente, California

SCOPE OF WORK:

Design for a new Aquatic center building, a new competition size pool & small leasure pool.

21 San Gabriel Valley Aquatic Center | Competition Entry
EAST
AERIAL
                                                                                                                                                                      LEGEND ENTRY PLAZA PEDESTRIAN ACCESS PUBLIC VEHICULAR ACCESS DELIVERY ACCESS Competition Entry | San Gabriel Valley Aquatic Center 22 WEST AERIAL VIEW SITE PLAN

WALKING PATH PERSPECTIVE

23 San Gabriel Valley Aquatic Center | Competition Entry
POOL BUILDING FLOOR PLAN POOL VIEW PERSPECTIVE

ENTRANCE PLAZA PERSPECTIVE

Competition Entry | San Gabriel Valley Aquatic Center 24
SEATING AREA
PERSPECTIVE

6th Street Grand

Affordable Housing

Montebello, California

Phase: CD

Status: On-going

SCOPE OF WORK:

New Construction of a 4-Story building consisting of 63 residential units with associated building support, service programs & amenity spaces.

First Floor 205.30' Second Floor 216.30' Fourth Floor 236.80' Third Floor 226.55' 247.05' PROPERTY LINE PROPERTY LINE MURAL ALLEY (E)RESIDENTIAL BUILDING 44' 9" 1 2 3 4 5 6 7 8 10 6' 0" 9 46' 3" 52' 3" 7' 0" 10' 3" 10' 3" 10' 3" 11' 0" 3' 0" 4' 6" 0' 6" 25 6th Street Grand | Affordable Housing
West Aerial Render West Exterior Elevation
DN UP UP UPUP A3.02 2 A3.01 1 A3.01 1 A4.01 1 A4.01 A4.01 COURTYARD ROOF TERRACE 1-BEDROOM TYPE 2 201 2-BEDROOM TYPE 1 2-BEDROOM TYPE 1 203 3-BEDROOM TYPE 1 204 1-BEDROOM TYPE 3 205 1-BEDROOM TYPE 1 206 3-BEDROOM TYPE 3 207 3-BEDROOM TYPE 1 221 1-BEDROOM TYPE 1 208 1-BEDROOM TYPE 1 209 1-BEDROOM TYPE 1 220 1-BEDROOM TYPE 1 210 2-BEDROOM TYPE 1 219 3-BEDROOM TYPE 1 211 2-BEDROOM TYPE 1 218 3-BEDROOM TYPE 1 212 1-BEDROOM TYPE 1 217 1-BEDROOM TYPE 1 214 1-BEDROOM TYPE 1 215 1-BEDROOM TYPE 1 216 STORAGE 223 TRASH RM. STAIR A 225 8' 8 1/2" 26' 1/2" 24' 5" 24' 1/2" 27' 1/2" 12' 1/2"3' 11" 120' 9" 26' 6 1/2" 43' 4 1/2" 33' 10" 43' 6 1/2" 27' 1/2" 5' 5" 24' - 5 1/2" 33' 5 1/2" 33' 11" 6' 1/2" 7' 10 1/2" 24' 5 1/2" 44' 0" 5' - 3" 27' 3" 1 A4.02 116' 9" ELEV. 2-BEDROOM TYPE 3 213 A6.03 12 2 A4.02 2 A4.02 1 2 3 4 5 6 7 8 10 3' 11" A B C D F H 9 E 1 A4.03 1 A4.03 A7.01 3 A7.04 1' 4" 48' 7" 24' 6 1/2" 24' 6 1/2" 24' 9" 42' 10 1/2" 33' 1/2" 44' - 0" 27' 3" 3' 1/2" 24' 5" 24' 11 1/2" 9' 7" 27' 3" 6' 1/2" 33' - 5 1/2" 33' 4 1/2" 25' 0" 5' 5" 27' 1/2" IDF 228 A3.02A 1 8' 3" 13' 1" 7' 3" 16' - 2" 8' 4" 23' 10" 0" 27' 3" 5' 2 1/2" 1' 3"9' - 7" A7.02 2 DAS 230 15' 2 3/4" 12' 1/2" 25' 6 1/2" 1' 8 1/2" 28' 3" 34' 1" 27' 2" 14' 1" 7' 1/2" A4.11 27' 1/4" STAIR B 229 1 A2.21A / 1 A2.21D / 1 A2.21B 1 A2.21C 1 A2.21A 1 A2.21B 1 A2.21C 1 A2.21D A3.03 6 4 24' 10" 9' 1/2" 7' 5" 10' 6" 8' 8" 7' 8" 3' 7" 5' 4" 11' 6" 3' 1" 2' 0" 11' 2" 5' 4" 16' 3 1/2" 5' 4" 11' 4" 10' 9 1 /2"5' 4"7' 1/2"2' 8" 16' - 1 1/2" 5' 4" 10' - 8 1/2" 24' - 10" 5' 4" 14' 0" 7' 10 1/2" 9' - 9 1/2" 27' 3" 8' 11" 11' 0 1/2" A3.03 8' 2"3' 0" 7' 7" 12' - 1 1/2" 8' 9 1/2" 3' 0" 20' 2 1/2" 8' 0"2' 8 1/2" 7' 6" 2' - 0" 14' 7" 7' 1" 57' 6" 8' 9" 13' 8" 9' 7" 14' 4 1/2" 36' 3 1/2" 33' 7" 33' 5" 44' 0" 5' 4" 17' 2 1/2" 16' 1/2" 5' 4" 11' 1/2" 13' 6" 5' 4" 1' 5 3/4" 2' 10" 27' 3" 2' 10" 3' 4" 1' 6" 1' 0" 27' 3 15/32" 5' 1/2" 27' 1/2" 5' 2 1/2" 2' 5" 24' 10" 5' 1/2" 1' 6" 10' 1/2" 2' 5" 9' 11 3/4" 8' 4" 5' 4" 22' 1/2" 5' - 4" 33' 11 1/2" 5' 4" 11' 5" 6' 10 1/2"5' 4" 16' 8" 5' - 4" 19' 1 1/2" 5' 4" 22' 4 1/2" 5' 4" 14' 1/2" 10' 0" 33' - 5 1/2" 33' - 5 1/2" 24' 11" 11' 1/2"5' 4" 19' 2 1/2" 5' 4"8' 1/2" 1' 6" 1' 6" 9' 6 1/4" 8 1/2" 0796 0796 8 1/2" 4' 7 1/2" 11 1/4" 2' 5" 2' 5" 2' 5" 2' 0" 1' 0" 4' 1/2" 4' 3" 1' 2" 1' 10" 1' 0" 1' 9" 4' 8" 4' 6" 1' 9 1/2" 3' 0"2' - 4" EQ EQ 3' 5" 2' - 7 1/2" EQEQ 2' 5" 2' 0" EQEQ 6' 0" 2' 8"2' 0" 4' - 0" 3' 10" 3' 4" EQ EQ 3' - 0" BEDROOM 1 CLOSET LIVING ROOM DINING/KITCHEN BATHROOM 5' 4" 7' 10 1/2" 28' 10 1/2" 28' 5" STORAGE 14' 8 1/2" 13' 8 1/2" 27' - 3" 1' - 4" 10' - 9" 15' - 2" 8' - 5 7/8" 6' 8 1/8" 12' 1" 7' 1/2" 2' 11"4' 9" 13' 8 1/2" 24'5" 11' 2 1/2" 13' 2 1/2" 27' - 3" A6.01 1 4' 0" 5' 0" U01 1/4" = 1'-0" 3 TYPICAL UNIT PLAN -1 BEDROOM -TYPE 3 BEDROOM 1 BEDROOM 2 BEDROOM 3 CLOSET CLOSET BATHROOM KITCHEN/DINING LIVING ROOM CLOSET BATHROOM 50' 1" 1' 6" 11' 10" 27'3" 10'10 1/2" 2' 5 1/2" 13'11" 25' 6 1/2" 1' 8 1/2" 11' - 5" 14' 7" 10' 8 31/32" 2' 5" 12' 3" STORAGE 27'3" 6' - 4 1/2" 4' 11" 6' - 6" 8' 9 1/2" 5' 4" 6' - 3" 1' - 4" 15' - 4" 11' 1" A6.02 8 4' - 0" 5' 2" 2' - 0" 34' 5 1/2" 4' 0" 5'0" U01 3 Affordable Housing | 6th Street Grand 26
Second Floor Plan
Rooftop Terrace Second Floor Exterior Courtyard
Typical Unit Plan - 1B Type 2 Typical Unit Plan - 3B Type 3

Griffin Ave Elementary School (LAUSD)

Seismic Retrofit

Los Angeles, California

Phase: CD 100%

Status: On-going

SCOPE OF WORK:

Seismic Retrofit to Main building & ADA upgrades to auditorium, circulation paths and restrooms

UP DN DN DN DN DN UP UP DN DN DN DN 1 2 3 4 5 6 A A.2 A.3 B C D E E.2 E.3 F A5.02 2 A5.01 2B A5.02 4 E2 E2 A5.01 106 E1 10' 0" CLASSROOM 3 101 AUDITORIUM 104 PLATFORM 104A STAFF WORKROOM 5 1/2 107 CLASSROOM 6 108 TOILET 106 COORDINATOR OFFICE 117 STAFF TOILET 118 PRINCIPAL 116 CLERICAL 115 RECEPTION 113 CLERK 114 TOILET 119 NURSE 111 TOILET 112 LIBRARY 110 COAT ROOM 102 STORAGE 103 0605 CORRIDOR 112 3 A4.11 4 A4.11 2 A4.11 1 A4.11 1 A4.12 2 A4.12 3 A4.12 4 A4.12 4 A4.11 1 A4.11 2 A4.11 3 A4.11 105 SLOPE 2% MAX SLOPE 4% MAX SLOPE 4% MAX 1' 2" 1' 0" SLOPE 4% MAX 1' 0" 1' - 0" 0965 0965 0965 0965 (TYP) 0226 11 A9.80 (EXIST.) 2243 11 A9.80 2' - 0" 15 A9.80 JAN. 100A CLOSET 111A A5.01 1 A5.03 1A A5.03 2A RAMP DN STORAGE 104B 1 A4.13 0828 0828 0828 0828 0963 0963 0963 0963 1062 (EXIST.) 1090 A5.01 2 A5.01 3 867 SF 44 20 1 G CLASSROOM 5 105 0985 (ER) 0854 E2 E2 2C 1/8" = 1'-0" 2 FIRST FLOOR PLAN DN DN 1 2 3 4 5 6 A A.2 A.3 B C D E E.2 E.3 F 0235 CLASSROOM 7 203 CLASSROOM 8 202 CLASSROOM 9 201 TEACHERS ROOM 8 1/2 205 CLOSET 207 JANITOR 204 TOILET 206 3 A4.11 4 A4.11 2 A4.11 1 A4.11 1 A4.12 2 A4.12 3 A4.12 4 A4.12 1 A4.11 3 A4.11 4 A4.11 2 A4.11 (EXIST.) 0274 9 A9.80 8 A9.80 TYP. TYP. CORRIDOR 200 1/2" 1'-0" 1/2" 1'-0" 1/2" 1'-0" 1/2" 1'-0" 3/8 /1-0" 3/8 /1-0 3/8 /1-0 3/8 /1-0 3/8 /1-0" 3/8" /1-0 3/8 /1-0" 3/8 /1-0 (TYP) 0706 1/2" 1'-0" (TYP) 0726 (TYP) 0703 0745 12' - 9 1/2" 9' - 5 1/2" 3/8 /1-0 (TYP) 2240 (TYP) 0703 13' 6" 2' 0" 41' 5 1/2" 19' 7 1/2" 2' - 0" 2' 0" 0705 0704 2' 0" 2' 0" 10' 0 1/2" 11' 6 1/2" 2' 0" 2' 0" 19' 7 1/2" 14' 8 1/2" 18' 9" 0705 0704 0745 (EXIST.) 0273 (EXIST.) 0273 (EXIST.) 0273 0853 (TYP) 0706 0729 A9.40 5 TYP. 6 A9.40 TYP. 0172 0963 0963 0172 0963 0963 0963 0963 0172 1062 14' 8" 14' 3 1/2" T.O. ROOF T.O. ROOF 14' - 5" T.O. ROOF 14' 8" 14' 4 1/2" 14' 3 1/2" T.O. ROOF T.O. ROOF T.O. ROOF 1/8" = 1'-0" 1 SECOND FLOOR PLAN 27 Griffin Ave. Elementary School | Seismic Retrofit
FLOOR PLAN SECOND FLOOR / PARTIAL ROOF PLAN
FIRST
EXISTING DOWNSPOUT EXISTING CONDUCTOR HEAD EXISTING SCREEN EXISTING GUNITE O/ MASONRY WALL EXISTING 4" GALV. PIPE EXISTING 4" DRAINAGE ELBOW PVC ROOFING MEMBRANE FOAM ROOF DRAIN DOME ROOF STRUCTURE SEE PLUMB. DWG FOR PIPE SIZE & CONNECTION. 2" METAL COPING SHAPED FOAM SHAPED FIRE TREATED WOOD 2X NAILER A9.40 7 SCALE: 1 1/2" = 1'-0" ROOF DRAIN AT PARAPET 6 DN 3 0220 0216 0218 0221 (R) 0222 2B A5.02 0223 0224 (EXIST.) 0277 0268 0272 11 A9.80 A5.02 1A 0211 ± 4' - 2" ± 47 VERIFY W/ LIFT MANUF. VERIFY W/ LIFT MANUF. 1/4" = 1'-0" 1 104 AUDITORIUM DEMO CHAIRLIFT PLAN DN SD 1407 1B A5.02 2B A5.02 47 0272 A9.02 19 7' - 2" 6' - 1" E1 0860 5' - 1" 4' - 2" 3" A5.02 2A 0277 0884 ± 8 1 2 " 1 " 0629 VERIFY W/ LIFT MANUF. 0998 1/4" = 1'-0" 2 104 AUDITORIUM CHAIRLIFT PLAN 0216 0602 0218 0222 0221 0224 STAGE 1/4" = 1'-0" 1A 104 AUDITORIUM DEMO ELEVATION 2B A5.02 1407 0224 (ER) 0616 0695 0694 STAGE 0694 1/4" = 1'-0" 2A 104 AUDITORIUM ELEVATION OR OR ACE 1 AL AUDITORIUM 0317 0236 0206 0317 0259 0963 0936 0244 0244 1058 0236 0206 0291 0232 0291 REFER TO 3/S301 FOR STRUCTURAL INFORMATION 0317 0236 0206 0353 1301 1302 2328 0526 0903 0425 0692 0236 0550 0425 0425 0991 0244 0991 0921 0291 0553 1057 1057 1058 1057 0972 REFER FOR INFORMATION 3/4" = 1'-0" 3 WALL SECTION #23 Seismic Retrofit | Griffin Ave. Elementary School 28 AUDITORIUM DEMO CHAIRLIFT PLAN AUDITORIUM CHAIRLIFT PLAN AUDITORIUM DEMO ELEVATION AUDITORIUM ELEVATION WALL SECTION NEW ROOF DRAIN @ EXISTING PARAPET

PV Study & Shade Option Analysis

PV Options + Estimates

Villa Esperanza Phase II 7/6/2022 VILLA II - PV Cost Analysis Panel Amount 58 Panels Energy Capacity 24.36 Kw Utility Savings (1yr) $8,200 Utility Savings (10yr) $82,000 Utility Savings (20yr) $164,000 Installation Price $85,000 - $110,000 Federal (ITC) 22% 2023 $18,700 - $24,200 Final Price $66,300 - $85,800 Payback Period 8 - 10 years Villa II Maximized PV Install Panel Amount 18 Panels Energy Capacity 7.56 Kw Utility Savings (1yr) $2,550 Utility Savings (10yr) $25,500 Utility Savings (20yr) $51,000 Installation Price $26,000 - $34,000 Federal (ITC) 22% 2023 $5,700 - $7,400 Final Price $20,300 - $26,600
Period 8
10 years GGA+ Goal PV Install VILLA III Western Shade Villa Eastern
Payback
-
Sustainability
29 Sustainability
PV OPTIONS + ESTIMATES

Shade Options Analysis (SDA/ASE)

Villa Esperanza Phase III - Case Management

Option 5 - 60% SDA/ 37% ASE Option 6 - 41% SDA/ 21% ASE Option 7 - 40% SDA/ 18%

Options Analysis (SDA/ASE)

Phase III - Finance Office

Shade Options Analysis (SDA/ASE)

Villa Esperanza Phase III - Finance Office

2. Using option 4 with half of system as opaque panels and bringin in option 3 fin shading proved to be best reduction. Option 7 takes the shade fins to a

Shade Options Analysis (SDA/ASE)

Eastern Shading Options

Esperanza Phase III - Finance Office

Option 1 - 42% SDA/ 15% ASE

Shading Options

#

Option 2 - 42% SDA/ 15% ASE

15% ASE 15% ASE (PASS W/NARRATIVE)

Option 1 - 42% SDA/ 15% ASE 15% ASE (PASS W/NARRATIVE)

Option 2 - 42% SDA/ 15% ASE

Conclusion:

Conclusion:

1. With inclusion of overhang canopys extending from massing, the eastern shading performs adequately and will provide ample daylight as well as glare mitigation.

Conclusion:

1. With inclusion of overhang canopys extending from massing, the eastern shading performs adequately and will provide ample daylight as well as glare mitigation.

1. With inclusion of overhang canopys extending from massing, the eastern shading performs adequately and will provide ample daylight as well as glare mitigation.

2. Without inclusion the east facing office fails ASE at a high glare value.

2. Without inclusion the east facing office fails ASE at a high glare value.

Daylight + Shading Options Analysis Western Shading Options Option 1 - 64% SDA/ 46% ASE Option 2 - 61% SDA/ 41% ASE Option 3 - 63% SDA/ 43% ASE Option 4 - 43% SDA/ 21% ASE Option 5 - 60% SDA/ 37% ASE Option 6 - 41% SDA/ 21% ASE Option 7 - 40% SDA/ 18% ASE 18% ASE (PASS W/NARRATIVE) # OF GLARE HOURS (>1000lux) pass 40% SDA 3/17/2022 III - Daylight + Shading Options Analysis never daylit mostly daylit pass
Western Shading Options Option 1 - 64% SDA/ 46% ASE Option 2 - 61% SDA/ 41% ASE Option 3 - 63% SDA/ 43% ASE Option 4 - 43% SDA/ 21% ASE Option 5 - 60% SDA/ 37% ASE Option 6 - 41% SDA/ 21% ASE Option 7 - 40% SDA/ 18% ASE 18% ASE (PASS W/NARRATIVE) # OF GLARE HOURS (>1000lux) pass 40% SDA 3/17/2022 Shading Options Analysis never daylit mostly daylit pass Options ASE ASE ASE ASE
18% ASE
W/NARRATIVE) # OF GLARE HOURS (>1000lux) pass
ASE
(PASS
Eastern
# OF GLARE HOURS (>1000lux) pass
never daylit mostly daylit pass
42% SDA
OF GLARE HOURS (>1000lux) pass
2. Without inclusion the east facing office fails ASE at a high glare value. Sustainability 30
15% ASE
Thank You

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.