Jui Apte_folio of selected works_2022

Page 1

+

+

P F I

RT L

+

+

Jui Apte Selected works 2018 ////// 2022


Jui Apte | 2022

+

+

TABLE OF CONTENT

EDITORIAL WELCOME

01. THORTON WEEKEND HAVEN | VIC

04

Detail 9 Architects, VIC Australia - 2022

02. BARKLY STREET ARCADE, ARARAT | VIC

10

Detail 9 Architects, VIC Australia - 2022

03. TAYLOR BAY HOUSE | VIC

16

vouch for and authenticate my skills and experience as well as my can-do attitude. I am contactable any time on 0490 349 235.

22

In this current post-COVID19 market, I am ready to be a differencemaker contributing my “package of strengths” to the table:

Detail 9 Architects, VIC Australia - 2022

03. BENWERREN RETREAT, YARRA VALLEY | VIC Detail 9 Architects, VIC Australia - 2022

03. YG RESIDENTIAL | AEROTROPOLIS

28

Bureau UA, NSW, Australia - 2021

02. GEORGE, SUSSEX ST APARTMENTS

42

Bureau UA, NSW, Australia - 2021

03. THE NEED FOR REWILDING

48

Masters Thesis - 2020

04. 26 DEGREE STREET

62

Masters Studio - 2019

05. LE PONDICHERRY BLUES

92

Bachelors Thesis - 2018

06. AEGIS Masters Studio - 2020

I am an award winning 2020 Architecture Graduate keen to talk to recruiters and employers about current and upcoming job opportunities. I am ready to relocate anywhere in Australia to follow my dream. I have all my referees ready to

96

- I recently returned to tertiary studies to continuously improve myself and completed a Master of Design Innovation & Technology. As part of my studies, I successfully completed group and individual projects, where I achieved a HIGH DISTINCTION average across all my subjects. This underlines my readiness to step into a new role, knowing I have a robust appreciation of contemporary tools, processes, standards and regulations used within the Australian Industry. - My Master’s Project, AEGIS has won several accolades, and was picked up as a Finalist representing RMIT University at the Bio-Design Challenge 2020, New York. Aegis has also won the ‘Best project in the student category for the 2020-2021 Victorian Premier’s Design Awards. The formal recognition of my work is a testimony to my genuine passion and interest for

- I also possess 2+ years’ real world experience. Currently, I work as an architect at ‘Detail 9 Architects’ a boutique architecture firm which is based in Canterbury, VIC. After successfully completing my Masters of Design Innovation & Technology, (where I won an award for academic excellence), I entered the workforce as a Graduate Architect for Bureau UA, NSW, Australia. I handled residential and commercial projects throughout the entire project design development stage. This experience complements my other experience working as a Project architect at Deepak Apte & Associates, Junior Architect for APA Studio and as a Summer Intern for SK Architects. - I possess excellent skills using AutoCAD, ArchiCAD, Revit and Rhino to perform design work alongside other applications- MS Office 365, Adobe Design Suite and other rendering programs. I have used these programs as part of my work and award-winning studies, underlining my job-ready capabilities. Overall, I hope to impress upon company decision makers that my “duality” as a commercially-minded and technical-proficient Architecture Graduate sets me apart as an excellent investment who is ready to grow with the brand.​​​​​​​

design and architecture.

Page 2 | Portfolio

Portfolio | Page 3


Jui Apte | 2022

+

01

THORTON WEEKEND HAVEN | THORTON Detail 9 Architects | 2022

Nestled in the Victoria bush landscape, less than 2 hours from Melbourne is the ideal location for a country weekend retreat. Our clients’ brief was simple, a weekend haven, low-maintenance, with the ability to accommodate guests when needed. Collaborating with our clients, interior designer Mardi Doherty and landscape designer Jela Ivankovic-Waters was key to delivering this beautiful home, which sits thoughtfully within its idyllic bush setting.

Page 4 | Portfolio

The site had its challenges, being set amongst rolling hills. The home is cut into the hillside and designed as three separate pavilions linked by floating glazed bridges. Builder, Hedger Constructions expertly managed the construction, working with the consultant team to successfully deliver the clients’ vision.

Portfolio | Page 5


Jui Apte | 2022

An expansive deck links the pavilions and provides a generous outdoor space, connecting the beautiful garden to the home, a key element for our clients.

Page 6 | Portfolio

Portfolio | Page 7


Jui Apte | 2022

100 X 100 X 13 MM THICK tIENTO mOROCCAN tILES

crazy Paving Floor Tile

Solid Timber Floorboards

100mm Concrete block in smooth Alabaster

Timber V groove Panelling 90 mm wide spacing with 3mm grove Painted in dulux Col. Hog Bristle

BATHROOM FINISHES

LOUNGE FINISHES

cross section

Oriented to maximise not only the thermal performance, but also frame the expansive bush landscape. Each room features large 3/82 Rollasons Rd windows providing uninterrupted views of the different aspects of the location.

Thornton House COLORBOND® steel Woodland Grey® in LYSAGHT LONGLINE 305® profile

Dining + Kitchen with an open truss structure resembling a warehouse style architecture

Chic tile finishes for the kitchen Austral 100mm Architec Honed blocks in Alabaster

Modwood decking - Silver Gum 137mm boards

Page 8 | Portfolio

The key element of the living - fireplace resembling a warehouse style chimney

floor plan

Portfolio | Page 9


Jui Apte | 2022

+

01

BARKLY STREET ARCADE | ARARAT Detail 9 Architects | 2022

The Ararat rural council has come up with a project of refurbishing the Barkly st Arcade in Ararat to create a spill out space for the commerce movement in the area. The design of the arcade is a careful amalgamation of consciously designed table seatings, revamping the roof structure & creating a transition space for the workers around the area. The arcade features the following 1. Arcade roof covered with vines to cover up the ‘not so good looking’ form of the roof.

Page 10 | Portfolio

2. Seatings of different form – like the one we discussed the other day – planter, conc/wooden seating. A central seating placed on equal intervals that provides for table seating with embedded greens & wastebins 3. Planters hanging from the walls on either sides keeping the light box positions in mind. 4. Patches of rainwater absorbing bluestone pavement with a little of hard & soft landscape elements like sand, pebbles and desert bush plants. 5. LED vintage style festoon lights hanging from the roof throughout the arcade for night light up

Portfolio | Page 11


6

14 m long loading zone

floor plan

Barkly St

Carpark

Barkly St

1. 2100x1000mm Soil bed with a planter 2. 4000x1000 planter seat Barklypavement St 3. Water absorbing Bluestone with shrubs 4. Combination of table, seat and planter 5. Hanging planters 6. Pre-approved mural lightboxes 7. 600x600 bluestone pavers 8. Running bond pavers

Carpark

cross section

Page 12 | Portfolio

Portfolio | Page 13

Carpark

3

7

5

Jui Apte | 2022


Jui Apte | 2022

Existing condition

1. 2100x1000mm Soil bed with a planter 2. 4000x1000 planter seat 3. Water absorbing Bluestone pavement with shrubs 4. Combination of table, seat and planter 5. Hanging planters 6. Pre-approved mural lightboxes 7. 600x600 bluestone pavers 8. Running bond pavers

Existing condition

Detail Plan

Areas of opportunity

Carpark

Barkly St

section a-a

Page 14 | Portfolio

Portfolio | Page 15


Jui Apte | 2022

+

01

TAYLOR BAY HOUSE | VICTORIA Detail 9 Architects | 2022

Our clients were keen to upgrade their dated mid-century home to reflect modern family life, whilst retaining the character of the architecture. The site provided quite the challenge, it has beautiful sweeping views across the outer east of Melbourne, however it is very steep.

Page 16 | Portfolio

The house also had several entry points, however no real sense of a focal point ‘front door’. One of the key goals was to improve access from the driveway to a formal front entry. More living space for growing children and guest accommodation for overseas visitors were also on the wish list.

Portfolio | Page 17


Jui Apte | 2022

new corrugated metal roof sheeting, profie and finish to match existing

4,990

treated pine sleeper retaining wall to extent shown on plan (to be confirmed)

living

balustrade as detailed

meals

kitchen

GW-05

D-01

. n.g.l

1,200 varies

900

1,150 dp

selected timber decking on timber sub-structure to engineer's details

WB-03

excavate for required sub-floor clearances in accordance with the BCA

floor structure and footings to structural engineer's details n.g.l.

building section 01 1:50

S 204 legend:

legend

floor finishes legend

lished

UP

4

-0 5

-0 5 W

remove existing kitchen and pantry fixtures and fittings laundry

bathroom

EW

ED

wc

laundry

2400

GW-02

ED

laundry

sd

bedroom 4 2700

stair

bedroom 3

3

2

2

2

1

2

EW

existing access hatch to mezzanine

4

ED

ED

ex. deck

robe

r

r

u.n.o. = unless noted otherwise

5

up

bathroom 2

pwdr

bedroom 2

bedroom 4 (carpet)

7

stair 6

bedroom 3

EW

S-02

ex

make good to ceiling where existing walls demolished and to suit new works

8

11 x 0.181 = 1.990

bedroom 4

5

S-01

c/b

bathroom 1

Use 4.5mm 'hardieflex' eaves lining with paint finish

ffl 295.51 EW

9

4

ED

GD-01

wc

ex. deck

robe

10

3 1

EW

DD GD-01

EW

GD-02

GD-02 8 7

stair 6 ED

up

ED

r

r

lounge

All dimensions set out from finished wall surfaces u.n.o.

up

ffl 295.51

bedroom 3

new sheet metal verandah roof at pitch to suit existing eaves line (nom. 11° pitch)

2

Paint finish to new linings and exposed timber rafters, fascias and barge boards to match existing residence.

EW

ex. deck EW

9

hp

remove existing vanity bench, cupboard, shower, fixtures and fittings

ffl 296.46

GD-01

s

pantry

robe

10

2

sd

Provide selected cornices to all ceilings.

GW-01

kitchen

bedroom 3

living

Dedicated GPOs. o - oven, ref - fridge, hwu - hot water unit, rh = rangehood, a/c - air conditioner, dw - dishwasher, wm - washing machine - dryer

W ED

ED

3,570

w/o

DW

r

r

demolish walls shown dashed including wall over exisitng fridges and pantry from mezzanine level up to underside of roof

new exposed beam at junction between existing roof and new roof to structural engineer's details

ra kin g

pantry 2400

Ceilings to be 10mm flush plasterboard throughout with a paint finish u.n.o. Use moisture resistant grade plasterboard to 'wet areas'.

bedroom 2

up

GW-01

ffl 295.51 EW dw

ED

EW

ex. deck

f

remove existing window

3,655

90

form opening in wall and mezzanine floor to suit new stairs

May 2022 back existing exposed rafters cutWD04 to suit intersection with new roof

EW

1,065

90 610

f

r

r

g out of

Revision :

2

2

Dimensions to centre lines of light fittings,mechanical grilles, etc. u.n.o.

ED

Date :

REM

ref

weatherproof DGPO

Provide all carpentry required by bulkheads & infills over joinery, doors, recesses, etc.

S-02

pwdr

990

REM/MC/FAB/JDA

Chkd :

G

S-01

c/b

ffl 295.56

ED

Drawn : dw

Sheet Size : A3

notes :

ED

11 x 181 = 1,990

up

ED

GD-02

remove existing window

refer to flooring note

2

A204

bedroom 1

EW

bedroom 2

1:50

Scale :

S-02 Sheet No. : ra kin g

Allow to make good to existing ceilings where walls are demolished and/or new walls are to be constructed.

lounge (carpet)

bathroom 1

EW

ffl 296.46

GW-02

EW

ov Section 01 rh

kit ch en

6 5

GW-03

90

a/c

4, 75 9

G

1,790

meals

ffl 296.46

bedroom 2

2 Phil & Alison Anthony

Drawing :

m ea ls

90 m ea ls 1,125

ct/ov rh fr hwu

living (carpet)

90

DW

reta ining wall = 19 00 hi gh

12 11

3

UP

2

5 4 3 2 1

1

10 9 8 7 6

90

46 0

10

12 11

-0 4 W G

5, 05 0

kit ch en

90

3, 20 0

4 -0 D

875

G

GW-03

9

reta ining wall = 19 00 hi gh

reta ining wall = 19 00 hi gh

5 -0

3 -0

setb ack line from bou nda ry

W

D G

pwdr

Client :

exhaust fan

ffl 295.56 shwr

S-01

dry dw wm/dry

S-01

fp

S-02

wc

467 Taylor Bay Road, Taylor Bay

2

2wp

extent of existing floor

ED

EW

ED

deck

Proposed Alterations and Additions

Address :

ex

90

ffl 295.56

c/b

SL

ED

bathroom 1

Note : remove flooring to shaded rooms in existing residence - refer to Floor Finishes Plan.

ED DD

data point

S-02

04-05-2022

Name :

bedroom 1

c/b

vb EW

d

19-04-2022

90% WORKING DRAWINGS

up

extent of existing floor

fp

tv

all related documents pertaining to this selected skylight or Solatube document are subject to copyright pendant light fitting laws. All content within these documents sealed recessed LV downlight shall remain the Intellectual Property of Detail 9 600mm surface mounted fluorescent batten Architects. external motion sensor light dimensions with manual override All written to take precedence over scaled light switch dimensions. All levels and double GPO dimensions to be confirmed prior to tv outlet commencement of works on site.

p

ffl 295.56

ED

bathroom 1

demolish existing shower and toilet, fixtures and fittings + infill door and make good wall to match existing

INTERNAL ELEVATIONS

lounge

c/b

vb

03

0 21 5,

living

bedroom 1

ED

EW

debris. otice of at adjacent llowing

infill wall to existing window opening

lounge

bestos is to be nt regulations

10-11-2021

(tile)

(tile) pantry up

form opening in floor for new stairs

bedroom 1

50% COMPLETE ISSUE + COMMENTS

ceiling access panel - flush mounted This document and

2

4 -0 D

demolish existing verandah complete, including decking and balustrade to suit new works

DW

02

a

ffl 295.51

3 -0

DW

sky 27-10-2021

www.detail9architects.com.au

D G

DW

up

form opening in wall for new window

ts have been

90

3 -0

ection of en taken and devices have approved by

pantry

50% COMPLETE ISSUE

04

98 Canterbury Rd Canterbury Vic 3126

G

0 51 1,

D

G

obtained from

demolish existing stairs

DW

set out point outside corner of existing timber stud wall framing

timber decking to client's selection

01

deckGSPublisherVersion 0.0.100.45

ffl 295.56

up

until : ating to the

tiled floor to client's selection

ffl 295.51

90

90

total floor area of existing dwelling: 151.2m2 total of extended floor area to dwelling: 56.4m2 (37%)

ffl 295.56

3,6 60

S-02

S-01

G

If any part of the alteration is an extension to an existing building, the relevant authorities may only consent to partial compliance in respect of the extension if the floor area of the extension is not greater than the lessor of (a) 25% of the floor area of the existing building; or (b) 1000m2.

5 53 5,

remove existing path

ectrical ply to a e property ty's d approval. pection by the ere required, ctures before services or diversion, moval of after removal

5 -0

demolish existing stairs

W

3,4 10

up

G

sh and remove dant services nts that of the

Regulation 233 - (where applicable) The regulation applies to alterations to an existing building and if the proposed alterations, together with any other alterations completed or permitted within the previous 3 years represent more than half the original volume of the building, the entire building must be brought into conformity with these Regulations.

B Env Design B Arch RAIA Registered Architect (Vic)

carpet floor to client's selection

DATE

8

90

29 3.

0

90

orks on site

demolished rty, including

existing slate floor to be retained

bbq

part of existing luding all ices and as

ded around the e, including any ures required o the site. on period, quivalent of 725, current

S-01

REVISION

7

new door

ISSUE

m ea ls

new window

GD

ffl 294.83

-0 4

B/GW

ow

cordance with

ex. car parking

ceiling height above floor smoke detector (hard wired)

sd

existing tiled floor to be retained

ffl 294.83

2700

concrete

W

existing window

ex. car parking

G

existing door

existing carpet floor to be retained

concrete

reta ining wall = 19 00 hi gh

294

ED EW

ffl 294.83

PRELIMINARY

ex. car parking

proposed walls

.0

concrete

kit ch en

existing wall to remain

ex. car parking

ished

EW

bathroom 2

bathroom 2 ED

laundry

shwr vb

up t

wm/ dr

EW

t

EW

vb

up

up

EW EW

up

up

existing water tank

existing water tank

demolition plan A 101

Page 18 | Portfolio

ISSUE

REVISION

01

50% COMPLETE ISSUE

27-10-2021

02

50% COMPLETE ISSUE + COMMENTS

DATE

10-11-2021

03

INTERNAL ELEVATIONS

19-04-2022

04

90% WORKING DRAWINGS

04-05-2022

This document and all related documents pertaining to this document are subject to copyright laws. All content within these documents shall remain the Intellectual Property of Detail 9 Architects. All written dimensions to take

up

Proposed Alterations and additions

Address :

467 Taylor Bay Road, Taylor Bay

Client :

Phil & Alison Anthony

existing & demo grd floor plan 1:100

B Env Design

existing water tank

proposed floor plan A 104

PRELIMINARY Name :

REVISION

01

50% COMPLETE ISSUE

27-10-2021

02

50% COMPLETE ISSUE + COMMENTS

DATE

10-11-2021

03

INTERNAL ELEVATIONS

19-04-2022

04

90% WORKING DRAWINGS

04-05-2022

This document and all related documents pertaining to this document are subject to copyright laws. All content within these documents shall remain the Intellectual Property of Detail 9 Architects.

Name :

Proposed Alterations and additions

Address :

467 Taylor Bay Road, Taylor Bay

Client :

Phil & Alison Anthony

proposed grd floor plan 1:100

B Env Design

existing water tank

finishes floor plan A 106

reflected ceiling plan A 107

floor finishes plan 1:100

PRELIMINARY

PRELIMINARY ISSUE

2

wm/dry

EW

EW

remove existing laundry fixtures and fittings

RY

shwr/ bath

ISSUE

REVISION

01

50% COMPLETE ISSUE

27-10-2021

02

50% COMPLETE ISSUE + COMMENTS

DATE

10-11-2021

03

INTERNAL ELEVATIONS

19-04-2022

04

90% WORKING DRAWINGS

04-05-2022

This document and all related documents pertaining to this document are subject to copyright laws. All content within these documents shall remain the Intellectual Property of Detail 9 Architects.

Name :

Proposed Alterations and additions

Address :

467 Taylor Bay Road, Taylor Bay

Client :

Phil & Alison Anthony

B Env Design

ISSUE

REVISION

01

50% COMPLETE ISSUE

27-10-2021

02

50% COMPLETE ISSUE + COMMENTS

10-11-2021

03

INTERNAL ELEVATIONS

DATE

19-04-2022

04

90% WORKING DRAWINGS

04-05-2022

This document and all related documents pertaining to this document are subject to copyright laws. All content within these documents shall remain the Intellectual Property of Detail 9 Architects.

Name :

Proposed Alterations and additions

Address :

467 Taylor Bay Road, Taylor Bay

Client :

Phil & Alison Anthony

reflected ceiling plan

Portfolio | 1:100 Page 19


Jui Apte | 2022

*Note Confirm on site (cos) all figured dimensions prior to commencement of works

carcasses to be melamine finish - refer to Finishes & Fixtures Schedule. all exposed faces of joinery to be finished in selected material - refer to Finishes & Fixtures Schedule.

500

500

120 380

2,100

800 500 900

tiled shower shelf recess

s tap1

1,200

tap3 shwr sh

1:50 1,100

3

1:50

Bathroom

internal elevation 01 Bathroom 2 plan A

1800 100

1:50

1:50IE

1:50

03

PRELIMINARY

01

as

900

as

900

as

50% COMPLETE ISSUE

27-10-2021

02

50% COMPLETE ISSUE + COMMENTS

10-11-2021

03

INTERNAL ELEVATIONS

19-04-2022

documents pertaining to this document are subject to cbtcopyright laws. All content within these cbt the documents shall remain cbtDetail 9 Intellectual Property of Architects.ISSUE

PRELIMINARY

GSPublisherVersion 0.0.100.37

02 50% COMPLETE ISSUE + COMMENTS 10-11-2021 Address : 467 Taylor Bay Road, Taylor Bay 03 INTERNAL ELEVATIONS 19-04-2022 PhilRoad & Alison Anthony Client98: Canterbury This document and all related REVISION DATE 500

PRELIMINARY

as

0

ffl 269.46

600

1,200

eq eq eq

2,700

500 1800 100

Bathroom 01 2 elevation Bathroom 2 elevation IE elevation IE internal 02 01

1:50

404

Page 20 | Portfolio

v

fixed ffl &269.46 swing panel frameless clear glazed shower scree

100

2,400

800 660 1,535 40

2,700

600 100

760 40

100

100

500

2,100

120 380

900

900

600

42 140 452

770

760

1800 30

800

PRELIMINARY

internal elevation 02

PRELIMINARY

1800

770

30

2,100 shwr screen

IE 06

30

2200 2,700

c

600

eq eq eq

40

PRELIMINARY

500

vty p1

2200 2,700

2,700

500

tp

1:50

100

1:50 960

2700

vty

glazed shower screen

p1

Bathroom 2 plan

800 660

cbt

2700

950 cbt

dr dr dr

950

tp dr

555

cooktop

1:50

fixed & swing panel

tiled showerframeless clear shelf recess

770

A 404

Bathroom ele

IE 06

100

drawings to be read in conjunction with the Fittings & Fixtures Schedule.

555

555

cbt 1:50

as

dr dr dr dr

align with window

B

500

fw

380 120 2,100

800

900

IE 02

350

1,200

bath

1,200

500 1800

1:50

wt1

tile legend: shwr: shower wc: toilet suite fs fs shwr: trh: toiletIE roll holder elevation 1:50 sr shelf toBathroom sitwc: under shower toilet suite vanity EW-02 fs fsvty: window sill trh: toilet roll holder 01 b: basin vty: vanity fs fsh/twl: heated towel rail p1 b:p1 basin sh wall tap t2 wt: h/twl: heated towel rail shwr wall tap sr: shower rose wt: sr: shower rose tp1 w/m: washing machine tp3 tp1 vb w/m: washing machine wt1 dry: dryer dry: dryer cbt fr: fridge tile fr: fridge dr dr frz: freezer frz: trh wc trhfreezer s: sink dr dr s: sink bath wt1 tp: tap tp: tap drtop of tiling to wc dishwasherdr dw: dishwasher ffl 269.46 dw: rh: rangehood fflrangehood 269.46 align with window rh: ffl 269.46 ct: cooktop ct: cooktop frame p1 ov: p1 oven make toilet goodas toscheduled wall ov: oven ckr: cooker after joinery removed ckr: cooker internal elevation 01 cbt: cabinet cbt: cabinet as: adjustable shelf fixed &p1 swing panel as: adjustable shelffs: fixed shelf tiling to Bathroom 2 elevation frameless clear fs: fixed shelf sh: top ofshelf 1:50 IE window dr: align with drawer sh: shelf glazed shower screen trh trhelevation rail elevationhr: frame 1:50 dr: drawer Bathroom wc hanging 01 IE Bathroom IE cupboard hr: hanging rail tocpd: shelf sit under f/p: fireplace sr 02 03 cpd: cupboard st:sill stone EW-02 wc window f/p: fireplace ffl 269.46 pb: plasterboard ffl 269.46 st: stone pb: plasterboard sh DOO - 007 toilet as scheduled

30 175 120

2,700

2,400

1,010

500 1800

80 355

20

760 40

100

2,400

2200 2,700

900

900 760 100

42 140 452

2700

175 120

950

50

900

IE Kitchen elevation internal elevation 04 04 Kitchen elevation 1:50

770

80

as

PRELIMINARY

100

as

cbt

355

INTERNAL ELEVATIONS

20

cpd dr dr drffl 295.56 dr

window

50% COMPLETE ISSUE + COMMENTS

325

03top bench

760 42 140

t2

42 140 100 760 30 452

450

W-05

50% COMPLETE ISSUE

2,100 1,425

as

p1

1 cbt shwr as fs shwr: shower fs sr cbt p1 *Note wc: toilet suite cbt cbt wt1 Confirm on site (cos) sr tp1 as as r/h as as fs fs fs fs as W-05 trh: toilet roll holder cbt tp1 ISSUE tp3 p1 p1 int/fr all figured REVISION vb fw wt1 bath vty: vanity cbtselected fs as as as as shwr This document and all related as ISSUEdimensions REVISION DATE prior to tr int/fr This document and fs all related DATE b: basin asand Additions Proposed A Name : Proposed Alterations Name : tap3 int/fr shwr selected documents pertaining to this documents pertaining to this 01 50% COMPLETE ISSUE t2 t2 commencement of t2 h/twl: heated towel rail dr 1:50 dr 27-10-2021 Bathroom elevation Bathroom elevation document arewt1 subject to copyright as Bathroom elevation 1:50 as wall tapas 01 works 50% COMPLETE ISSUE 27-10-2021 document are subject to copyright int/fr wt1 1:50 IE IE IE wt: s oven Address : tap1 sr 467 Taylor Bay Road, Taylor Bay laws. All content within these : 467 Taylor laws. All content within t2 sr: shower bench rose 02 these 50% Address COMPLETE ISSUE + COM tap1 dr tap3 dr 03 tp tp cooktop documents shall remain the 10-11-2021 tp top bench top 05 02 documents shall remain the 02 50% COMPLETE ISSUE + COMMENTS 10-11-2021 bath wt1 tap1 w/m: washing machine tap3 Intellectual Property of Detail 9 sh Phil & Alisonoven Anthony Client : Intellectual Property of Detail 9 oven dr cpd dr dr dr cbt Architects.cbt dry: dryer dr Phil & Aliso Client : ELEVATIONS tp 19-04-2022 dr dr 03 INTERNAL bench top trh trh Architects. 03 INTERNAL ELEVATIONS 19-04-2022 s wc dr fr: fridge dr ffl 269.46 dr dr dr asSheetas as dr as Kitchen Details Drawing : bins dw oven dr No. : A400 1,640 1,100shwr dr 98 Canterbury Road frz: freezer 98 Canterbury Road Bathroom Alldrwritten dimensions to take dr dr dr Drawing : dr s dr dr bath s: precedence over scaled dimensions. All Scale dimensions to take as: dr sink Drawn as 1 : 50 bins Canterbury VIC 3126All written make Apr 2022 Date : Canterbury VIC 3126 dw dr dr dr dr dr wc dr : dr REM/MC/JDA cpd good to All wall vty tp: tap levels and dimensions to be confirmed precedence over scaled dimensions. fflvty 295.56 ffl 295.56 ffl 295.56 dr 1 : 50 ffl 269.46 ffl 269.46 Scale : dr ffl 269.46 ffl 269.46 prior to commencement of works on ffl 269.46 dw: dishwasher 03 9078 8590 levels and dimensions be confirmed 03 9078 8590 after tojoinery removed ffl 269.46 dr 03 dr A3 Revision : Sheet Size : cpd site. rh: rangehood prior to commencement of works on ffl 295.56 ffl 295.56 www.detail9architects.com.au A3 Sheet Size : www.detail9architects.com.au toilet as scheduled ct: cooktop site. GSPublisherVersion 0.0.100.37 This document and all related ISSUE REVISION DATE Propose Name : GSPublisherVersion 0.0.100.37 ov: oven documents pertaining to this 1:50 1:50 1:50 1:50 cooker elevation IE Kitchen elevation IEckr: Kitchen IE Kitchen elevation 01 50% COMPLETE ISSUE 27-10-2021 document are subject to copyright cbt: cabinet Address : 467 Tay 03 laws. All content within these 02 01 1:50 1:50 shelf IE Kitchen elevation as: adjustable IE Kitchen elevation documents shall remain the 02 50% COMPLETE ISSUE + COMMENTS 10-11-2021 fs: fixed shelf 03 Intellectual Property of Detail 9 01 Phil & A Client : sh: shelf Architects. 03 INTERNAL ELEVATIONS 19-04-2022 1:50 drawer 1:50 1:50 1:50 dr: IE Bathroom elevation IE Bathroom elevation IE Bathroom elevation IE Bathroom elevation 98 Canterbury Road hr: hanging rail Bathroo Drawing : 05 02 04 03 cpd: cupboard All written dimensions to take Canterbury VIC 3126 f/p: fireplace precedence over scaled dimensions. All Scale : 1 : 50 This document and all related ISSUE REVISION DATE 03 9078 8590 and Additions Proposed Alterations Name : st: stone levels and dimensions to be confirmed documents pertaining to this pb: plasterboard prior to commencement of works on 01 50% COMPLETE ISSUE 27-10-2021 document are subject to copyright www.detail9architects.com.au This document and all related ISSUE REVISION DATE A3 Sheet Size : Proposed Alterations and Additions Name : site. Address : 467 Taylor Bay Road, Taylor Bay laws. All content within these fs

50

as

as

r/h

2

3

2,100 shwr screen

legend:

fs

as

45 50 525

int/fr

as

2,100

fs REVISION

as

1

drawings to be read in conjunction with the frame all laminate to be finished with matching edges. Fittings & Fixtures Schedule. legend:

internal elevation 01590

2

sr

joinery.

1,690

dr dr dr dr

ffl 269.46

shadowlines to be set back flush with carcass

490

400

A

2,700

03

tile1:50

600

42 140 452

1,200

Fittings & Fixtures Schedule.

555

p1

site.

500

300 300

drawings to be read inelevation conjunction with theplan internal elevation Kitchen A 03 IE Kitchen

1:50

2,700

fsISSUE

as

100

42 140 452 100 760

IE 02

900

500 900

fs

01

8 Canterbury Road anterbury VIC 3126 3 9078 8590 ww.detail9architects.com.au ffl 295.56

900

levels and dimensions to be confirmed prior to commencement of works on all laminate to be finished with matching edges.

cbt

as

fs

02

IE 01

Kitchen plan

A 400

Kitchen elevation 1:50

600

kitchen plan

600 1,500

as*Note cbt dr dr dr notes: bench Confirm on site (cos) dr dr dr as asall figured top carcasses to be melamine finish refer to dr dr dr t2 This document and all related ISSUE dimensions REVISIONprior to Finishes & Fixtures Schedule.DATE Int/fr dr documents dr pertaining to this dr commencement offfl 295.56 oven 01 50% COMPLETE ISSUE 27-10-2021 document are subject to copyright works tp all exposed faces of joinery to be finished in bench top laws. All content within these material - refer to Finishes cpd & FixturesBathroom remain the cpddocuments shallelevation 02 dr 50% COMPLETE ISSUEselected + COMMENTS 10-11-2021 1:50 IE Schedule. Intellectual Property of Detail 9 s dr Architects. dw as 03 INTERNAL ELEVATIONSKitchen elevation 19-04-2022 bins dr 1:50 IE shadowlines to be set back flush with01 dr carcass 1,000 to take 20mm) and finished to match600 surrounding dr dr670 04 ffl(or295.56 All written dimensions cpd355 joinery. precedence over scaled dimensions. All

GSPublisherVersion 0.0.100.37

1:50

cooktop 600

bathroom Bathroom 2 plan

770

20

ffl 295.56 1,000

670

355

dr

98 Canterbury Road dr Canterbury VIC 3126 03 9078 8590 www.detail9architects.com.au

325

dining

Bathroom oven plan

1,500

1,100

re-use existing timber wall lining on new wall tap3 shwr

100

as

cpd

ffl 269.46

p1

as dr as as cpd A asBathroom plan as as shwr: shower 403 int/fr wc: toilet suite fireplace fs fs trh: toilet roll holder stone vty: vanity 1:50 window plasterboard IE Kitchen elevation fs fs b: basin 03 t2 h/twl: heated towel rail wt1 cbt wt: wall tap cbt cbt 300 1250 tiled sr: shower shower rose cbt shelfw/m: recess washing machine cbt dry: dryer cbtint/fr p1 fr: fridge frz: freezer ffl 295.56 s: sink Proposed Alterations and Additions Name : tp: tap ffl 269.46 dw: dishwasher Address : 467 Taylor Bay Road, Taylorrh: Bay rangehood 1:50 Bathroom Kitchen elevationelevation ct: cooktop IE IE Phil & Alison Anthony Client : ov: oven 04 06 390 800 ckr: cooker wt1 Kitchen Details Drawing : Sheet No. : A400 cbt: cabinet as: adjustable shelf 1 : 50 Apr 2022 Date : Scale : Drawn : fs: REM/MC/JDA fixed shelf tr sh: shelf elevation IE : Bathroom 03 A3 Revision Sheet Size : dr: drawer hr: hanging rail 05 1:50 cpd: cupboard cpd f/p: fireplace ffl 269.46 st: stone bathroom pb: plasterboard legend:

tr

960

s tap1 wt1

tr

1,640

shadowlines to be set back flush with carcass selected material - refer to Finishes & Fixtures (or 20mm) and finished toSchedule. match surrounding joinery. Bathroom elevation 1,640 IE

770

as

as

window

drawings to be read in conjunction with the s Fittings & Fixtures Schedule. bins as dw dr

590

*Note notes: shwr tap3 site (cos) all Confirm exposedonfaces of joinery to be finished in tr all figured carcasses melamine finish - refer to selected material Finishesto&be Fixtures dimensions prior -torefer toFinishes & Fixtures sr Schedule.tap1 Schedule. commencement of works all exposed faces of joinery to be finished in

100

A as 403

355

oven cpd

1,690

tp all laminate to be finished with matching edges.

800

269.46 (or 20mm) and finished surrounding top of tiling to all laminate01 to be fflfinished with matching edges.to match

110

mr

p1

sr390 tap1

ffl 269.46 404 carcasses to be melamine finish - refer to Finishes & Fixtures Schedule.

30 175 120

1250 selected int/fr

01

110

1,780

fw

bath

shwr

existing timber wall lining to remain

notes:

600

1,780

shadowlines to be set back flush with carcass (or 20mm) and finished to match surrounding joinery.

3

shsr

1:50

tiled shower shelf recess

int/fr

600

300

as

plan

cbt cbt cbt

1

bathroom 02 plan tap3

tap3

403

100

Int/fr

500

tiled shower shelf recess

oven

cpd

600

internal elevation 01

1:50

all exposed faces of joinery to be finished in Bathroom selected material - refer to Finishes A & Fixtures Schedule.

2,700

600 1,500

80 355

wc tap3

80

300 300

as

sr

shwr

carcasses to be melamine finish - refer to Finishes & Fixtures Schedule.

325

600

tr

20

as

bench top

as

1

dw

1,500

cpd

4

notes:

450

Kitchen elevation

PRELIMINARY

W-05

600

tp

2 4 3 1

IE 02

r/h

s

ffl 296.46

Kitchen elevation

IE 04 as

dr binsdr

600

3830 cos

1:50

5 bench top bench cpd top dr dr

bathroom

dining 6

325

ffl 295.56

t2

5030

100 760

ffl 295.56

cooktop

vty

W-05

kitchen

cpd

cbt

3830 cos

fs

b

760 40

fs

fs

b

100

fs

1:50 window bench top

300 300

04

555

shelf

1,000

5030

May 2022

500

Revision :

900

Date :

REM

bench top

n plan

400 timber servery

REM/FAB/MC/ JDA

Chkd :

1250

cpd

670

Kitchen plan

A Sheet No. : A104

Drawn :

450

A3

600 1,010

Int/fr

1:100

300

Sheet Size :

900

300

Proposed Ground Floor Plan

Scale :

600

oven

600 1,500

Phil & Alison Anthony

Drawing :

42 140 452

600

300 300

1,500

Client :

600

600

900

900

All written dimensions to take precedence over scaled dimensions. All levels and dimensions to be confirmed prior to commencement of works on site.

42 140 452

04-05-2022

760

10-11-2021 19-04-2022

90% WORKING DRAWINGS

100

50% COMPLETE ISSUE + COMMENTS INTERNAL ELEVATIONS

04

Proposed Alterations and additions 467 Taylor Bay Road, Taylor Bay

450

02 03

98 Canterbury Rd, Canterbury Vic 3126 www.detail9architects.com.au

Name : Address :

760 42 140

27-10-2021

100

50% COMPLETE ISSUE

500

01

This document and all related documents pertaining to this document are subject to copyright laws. All content within these documents shall remain the Intellectual Property of Detail 9 Architects.

2,400

DATE

900

REVISION

600

dw B Env Design B Arch RAIA Registered Architect (Vic)

ISSUE

shower toilet suite toilet roll holder vanity basin *Note heated towel rail Confirm on site (cos) wall tap all figured shower rose dimensions prior to washing machine commencement re-use existing timber of dryer works wall lining on new wall fridge freezer dining sink p1 tap dishwasher rangehood cooktop wt1 oven sr cooker cabinet adjustable shelf fixedtrshelf shelf drawer ffl 295.56 hanging rail tap3 shwr fs fs cupboard

760 42 140

as

shwr: wc: r/h as fs fs trh: 700 110 500 vty: 900 fs fs b: t2 600 300 timber servery h/twl: wt: sr: c/b cooktop w/m: existing timber wall dr dr dr cbt dry: cbt lining to remain shelf as fr: dr dr dr frz: dr dr dr as as as kitchen s: dr dr dr selected tp: as as as int/fr dw: bench t2 rh: top ct: ovenbench ov: top bench top 1:50 ckr: oven dr cbt: cpd as: dr dr as trh bins fs: dr dr sh: cooktop s 3 dr dr: 2 ffl 295.56 hr: as 2 as as as tp cpd: 4 3 1 as f/p: as as r/h as st: r/h int/fr dw pb: Kitchen elevation 1:50 IE

2

re-use existing timber wall lining on new wall

bathroom

100

as

legend:

fs

350

int/fr 2260

fs

as

1:50

2,100

as

760 42 140

500

as

3815 cos

as

proposed grd floor plan 1:100

A 104

as

1,000

PRELIMINARY

GSPublisherVersion 0.0.100.45

55

670

355

100

tp

2 4 3 1

600

600

existing water tank

900

s

2,400

600

bins

Kitchen elevation

1,200

IE 04

760 40

cpd

up

drawings to be read in conjunction with the Fittings & Fixtures Schedule.

100

cpd

all laminate to be finished with matching edges.

Int/fr

500

EW

EW

oven

2,400

vb

up

2,700

ED

shwr/ bath

1800

EW

300 300

bathroom 2

t

2,100

2

1

laundry

600

wc

wm/ dr

GD-01

ED

EW

bathroom existing timber wall lining to remain

bathroom

100

ffl 295.56

3

cbt

100

5 4

up

900

11 x 181 = 1,990

ED

dr cbt dr dr dr

c/b b

bathroom 01 plan

t2

600600

GW-01

bedroom 4

7

stair 6

bedroom 3

1250

bench top

3,570

9 8

300

600 1,500

dining

ex. deck EW

10

100

GD-02

90

90 610

robe

ffl 295.51

bench top

600

up

ED

r

r

600

EW

kitchen

1,500

cpd

3,655

fs

600

GW-02

ffl 296.46

990

bench top b

top of ti align wi frame

110 500

700

shower vty toilet suite toilet roll holder vanity basin heated towel rail 3815 cos wall tap ffl 296.46 6 2260 700 110 500 shower 5 4 rose washing machine 1 dryer tr fridge bench top freezer c/b trh sink b b sr shwr tap vty 3 dishwasher wc 2 rangehood tap3 cooktop oven cooker cabinet ffl 296.46 6 tiled shower adjustable 5 4shelf shelf recess fixed shelf 1 shelf tr 1,780 110 1,690 drawer hanging rail trh cupboard sr shwr fireplace 3 stone wc 2 plasterboard

50

1,065

bedroom 2

fs

fs

shwr: wc: trh: vty: b: h/twl: wt: sr: w/m: dry: fr: frz: s: tp: dw: rh: ct: ov: ckr: cbt: as: fs: sh: dr: hr: cpd: f/p: st: pb:

2,100

EW

ED

pwdr 90 1,790

2,400

wc shwr

fs

500

ffl 295.56

as

carcasses to be melamine finish - refer to Finishes & Fixtures Schedule. window all exposed faces of joinery to be finished in selected material - refer to Finishes cooktop & Fixtures Schedule. cbt dr dr shadowlines to be setdrback flush with dr carcass (or 20mm) and finished to match surrounding dr dr joinery. dr dr

legend:

500

ED

r/h

fs

1,010

600 600

S-02

bathroom 1

EW

dw

as

fs

600

fp

c/b

vb

tp

2 4 3 1

r/h

S-01

as

600

lounge ED

450

-0 5 W G

4,7 59

extent of existing floor

timber servery

3830 cos

90

5030

1,125

875 GW-03

90

infill wall to existing window opening

bedroom 1

00

*Note as Confirm on site (cos) int/fr all figured dimensions prior to commencement of works

as

900

3 -0 D

living

as notes: as

900

m ea ls G

up

as

760

10 5,2

90

s

100

4 -0 D

G

10 1,5

cooktop

pantry

960

tr

45 50 525

UP

90

bins

deck

ffl 295.56

2,100 1,425

12

10 9 8 7 6

4 3 2 1

46 0

90

ki tc he n

90

3,2 00

cpd

ffl 295.51

90

90

total floor area of existing dwelling: 151.2m2 total of extended floor area to dwelling: 56.4m2 (37%)

2260

drawings to be read in conjunction with the Fittings & Fixtures Schedule.

S-02

5

G

35 5,5

5 -0

W

W

5,0 50

11

-0 4

G

If any part of the alteration is an extension to an existing building, the relevant authorities may only consent to partial compliance in respect of the extension if the floor area of the extension is not greater than the lessor of (a) 25% of the floor area of the existing building; or (b) 1000m2.

up

500

reta ining wall = 190 0 hig h

bbq

500

90

bench top

90

S-01

590

3815 cos

900

new door

Regulation 233 - (where applicable) The regulation applies to alterations to an existing building and if the proposed alterations, together with any other alterations completed or permitted within the previous 3 years represent more than half the original volume of the building, the entire building must be brought into conformity with these Regulations.

800

all laminate to be finished with matching edges.

760 42 140

new window

GD

concrete

ffl 294.83

600

B/GW

bench top

ex. car parking

2,400

existing door existing window

600

existing wall to remain proposed walls ED EW

390

shadowlines to be set back flush with carcass (or 20mm) and finished to match surrounding joinery.

dining

350

kitchen

legend:

1,200

shelf

1,500

timber servery

notes:

2,700

300

45 50 525 50 2,100 50 1,425 50 555

300 300

600

2,700

900

documents shall remain the Intellectual Property of Detail 9 Architects.

Client : Drawing : top of

Phil & Alison Anthony

Details tilingKitchen to

Portfolio | Page 21 ISSUE

Sheet No. :

A400

REVISION

Bath


Jui Apte | 2022

+

01

BENWERREN RETREAT | YARRA VALLEY Detail 9 Architects | 2022

Nestling amongst the beautiful hills of Yarra Junction, Benwerren is a lovely old rambling guest house. Complete with an open log fire and a picturesque setting on two acres of land with the Little Yarra River running by. It’s the ideal place to heal, reflect and find restoration.

practical support in the form of ‘time out’ in a peaceful environment, whilst ministering to the physical, educational, emotional and spiritual well-being of women and children.

Benwerren serves and strengthens families by supporting women and children in need. Providing

Page 22 | Portfolio

Portfolio | Page 23


Jui Apte | 2022

Wall cladding -Weatherex weather groove natural 150mm - Paint finish - Dulux “Kahlua Milk/Army Issue”

Solid roof - Colourbond custom orb in “Woodland Grey”

new dining room extension

Windows/doors Aluminium in “Woodland Grey”

Transluscent roof Polycarbonate

proposed floor plan

existing floor plan north west sleeping wing

new roof over deck

existing roof beyond

bed 8

bed 5

bed 7

bed 6

All material selection comply with BAL 12.5

north west sleeping wing

open verandah

bed 8

bed 5

bed 7

bed 6

East Elevation

Wall cladding -Weatherex weather groove natural 150mm - Paint finish - Dulux “Pure Zeal/Goanna Grey”

Note: BAL 12.5 Refer to the report prepared by R.W. Rathbone on the Bushfire Attack Level Assessment Report dated 22/2/22

open verandah

enclosed verandah

enclosed verandah

bathroom

enclosed verandah

open verandah

open verandah

enclosed verandah

lounge room

bed 4

bathroom

lounge room

bed 4

play room

play room

ridge height r.l. main residence

bed 9

main residence bed 9

5

4

opportunity room

3

devotional room

2

1

5

4

3

2

1

bed 10

bed 10

devotional room

office South Elevation

new window

step

female toilets

opportunity room

new double door to devotional room

office

step

female toilets

f

f fernery and rain garden

S-04 proposed screening plants

rainwater chain obscure glass window access to fernery

rainwater chain

total dining room 44area m2

wood fired central heating unit

dining room

unisex wc baby change

kitchen

kitchen dining room extension

out

18 m2

new covered deck 12 m2

RL 125.825

laundry

existing path

RL 125.875

new stair

flyscreens to sliding door

male toilets

stoke

new window wall extended above to meet new roof

ffl

male toilets

lin

e

of

oak

tree

ca

no

stoke py

curtains to interior

S-01

laundry RL 125.875

child-safe gate

dp

RL 124.500

roof over

r.l.

N

TOWN PLANNING ISSUE

new deck

0.

B Env Design B Arch RAIA Registered Architect (Vic)

REVISION

TP01

concept plan - for client review

TP02

town planning submission

DATE This document and all related documents

01/07/2021 and Existing Demo Plan pertaining to this document are subject to 03/05/2022

copyright laws. All content within these documents shall remain the intellectual property of Detail 9 Architects. All written dimensions to take precedence over scaled dimensions. All levels and dimensions to be confirmed prior to commencement of works on site.

98 Canterbury Rd Canterbury Vic 3126 www.detail9architects.com.au

Project :

Benwerren

Address :

30 Benwerren Road, Yarra Junction

Client :

Benwerren Board

Drawing :

Existing floor plan B Env Design B Arch FAB/JDA Drawn : RAIA A3 REM Chkd : (Vic) Registered Architect

Scale : Sheet Size :

GSPublisherVersion 0.0.100.100

existing structure

new extension cos

TP 002

TOWN PLANNING ISSUE

REVISION

DATE

1:120

TP01

concept plan - for client review

01/07/2021

TP02

town planning submission

03/05/2022

Sheet: A.02.2 98 Canterbury Rd Date : VicMay Canterbury 31262022

This document and all related documents pertaining to this document are subject to copyright laws. All content within these documents shall remain the intellectual property of Detail 9 Architects. All written dimensions to take precedence over scaled dimensions. All levels and dimensions to be confirmed prior to commencement of works on site.

Revision : TP02 www.detail9architects.com.au

concept plan - extended dining room + deck

Project :

Benwerren

Address :

30 Benwerren Road, Yarra Junction

Client :

Benwerren Board

Drawing :

Proposed floor plan

Sheet:

TP002

Scale :

1 : 50

Drawn :

FAB/JDA

Date :

May 2022

Sheet Size :

A3

Chkd :

REM

Revision :

TP02

GSPublisherVersion 0.0.100.100

existing structure proposed extention

SE 01

west elevation

1:100

PRELIMINARY Page 24 | Portfolio

ISSUE

REVISION

DATE

A

concept plan - for client review

01/07/2021

This document and all related documents pertaining to this document are subject to copyright laws. All content within these documents shall remain the intellectual property of Detail 9

Project :

Benwerren

Address :

30 Benwerren Road, Yarra Junction

Client :

Benwerren Board

Portfolio | Page 25


Jui Apte | 2022

Existing condition

Wall cladding -Weatherex weather groove natural 150mm - Paint finish - Dulux “Kahlua Milk/Army Issue”

Existing condition

Note: BAL 12.5 Refer to the report prepared by R.W. Rathbone on the Bushfire Attack Level Assessment Report dated 22/2/22

Wall cladding -Weatherex weather groove natural 150mm - Paint finish - Dulux “Pure Zeal/Goanna Grey”

All material selection comply with BAL 12.5

proposed extention

ridge height r.l.

r.l. 125.82

r.l. 124.50

west elevation

south elevation existing structure

new extension cos

existing structure

TOWN PLANNING

E 001

ISSUE

Page 26 | Portfolio B Env Design B Arch RAIA

98 Canterbury Rd Canterbury Vic 3126

REVISION

DATE

TP01

concept plan - for client review

01/07/2021

TP02

town planning submission

03/05/2022

This document and all related documents pertaining to this document are subject to copyright laws. All content within these documents shall remain the intellectual property of Detail 9 Architects. All written dimensions to take precedence over scaled dimensions. All levels and dimensions to be confirmed prior to commencement of works on site.

Project :

Benwerren

Address :

30 Benwerren Road, Yarra Junction

Client :

Benwerren Board

ISSUE

REVISION

DATE

Drawing :

elevation

concept plan - for client review

01/07/2021

town planning submission

03/05/2022

Scale :

Drawn :

FAB/JDA

TOWN PLANNING Sheet:

A.03.3

TP01

Date :

May 2022

TP02

This document and all related documents pertaining to this document are subject to copyright laws. All content within these documents shall remain the intellectual property of Detail 9

Project :

Benwerren

Address :

30 Benwerren Road, Yarra Junction

Client :

Benwerren Board

south elevation

Portfolio | Page 27

1:50


Jui Apte | 2022

+

01

YG RESIDENTIAL | AEROTROPOLIS Bureau UA - 2021

YG Residential is a new Australian design, construction and development business focusing on delivering design innovation, affordability and sustainable prefabricated modular solutions to the residential market-place for all types of housing, including suburban housing, urban housing, one-off high quality bespoke houses to affordable houses, social housing and disaster relief housing, student housing, aged care housing, build to rent and build to sell apartments, serviced apartments and hotels. The business has developed residential product lines using the MM system to undertake contracts for the largest apartment building or the smallest single house using a combination of new and recycled materials with renewable energy solutions and construction methods that allow entire buildings to be taken apart and reused to create a new benchmark for environmental sustainability. The system has the following objectives 1. Open system of design and construction capable

of being staged, assembled, modified, changed, increased and decreased one room or module at a time. 2. Universal system capable of being used for every residential building. 3. Diverse system of internal configurations and external envelopes 4. Affordable system capable of being less expensive than a typical house and apartment building construction cost. 5. Upgradeable system ordered to specification for design, appearance, size, materials, technological and environmental features. 6. Highest environmental and sustainable design practices and credentials. 7. Ordered online or in showroom. 8. Delivered to a customer faster than a typical house and apartment building. 9. Options for using recycled and reconstituted structural and non-structural materials. 10. Options for use of plantation and sustainably sourced organic materials.

Project Name : YG Residential | Example apartment - Victoria Street, NSW Office Name : Bureau UA Page 28 | Portfolio

Website

: http://bureau-ua.com.au

Portfolio | Page 29


Jui Apte | 2022

The system has been designed together with a unique construction system and offers a solution to all forms of housing using one consistent universal, prefabricated and modular solution to be applicable across all residential typologies. In achieving this solution it will be able to find the appropriate industrial and manufacturing scale to deliver cost savings and achieve affordability across all forms of residential outcomes.

Commercial + Ground floor

Typical six apartment floorplate

It will be available to first home owners, home owners, developers, governments, relief and aid organizations alike. It will provide governments and developers the ability of ordering large quantities of affordable and high quality housing to solve short, medium and long term housing requirements in any location in the world.

Typical four apartment floorplate

Retractable roof with solar panels

Project Name : YG Residential Office Name : Bureau UA Website

: http://bureau-ua.com.au

Page 30 | Portfolio

Portfolio | Page 31


Jui Apte | 2022

Multipurpose room

Ensuite Bedroom Multipurpose room/study Kitchen/Dining

Kitchen/ dining

Living room Bedroom

One Bedder apartment

Bedroom

Living room

Ensuite bedroom Study Kitchen/ Dining

Bedroom

Living room

Bedroom

Three Bedder apartment

Three Bedder apartment

Project Name : YG Residential

Project Name : YG Residential

Office Name : Bureau UA

Office Name : Bureau UA

Website

Website

: http://bureau-ua.com.au

Page 32 | Portfolio

Kitchen/ Dining Multipurpose room Bedroom

Living room

Study

One Bedder + multipurpose room apartment

: http://bureau-ua.com.au

Portfolio | Page 33


Jui Apte | 2022

Building assembly module by module

Project Name : YG Residential Office Name : Bureau UA Website

Page 34 | Portfolio

: http://bureau-ua.com.au

Portfolio | Page 35


Jui Apte | 2022

+

YG INNOVATION CENTRE | AEROTROPOLIS Bureau UA - 2021

Project Name : YG Residential | Innovation Centre Office Name : Bureau UA Website

: http://bureau-ua.com.au

Page 36 | Portfolio

Portfolio | Page 37


Jui Apte | 2022

SITE CONTEXT This is the current status of the Aerotropolis site according to the NSW planning controls. We will update the drawings as and how changes occur as the details develop.

17200 4300

Sydney Science park

103200 146200 4300 17200 17200 17200

The Aerotropolis is set to provide

4300 12900 4300 12900 4300 12900 4300 12900 4300 12900 4300 12900 4300 12900 4300 12900 4300 12900 4300 12900 4300 12900 4300 12900 4300 17200 200000

17200

240000

60,000 new homes and 200,000 Sydney Science park

new job opportunities. A new "hi-tech" city - Bradfield, with an area that spans more than 100ha will be at the core of the Aerotropolis. The city will be as iconic as the current city centres of Sydney & Parramatta.

Project Name : YG Residential | Innovation centre Office Name : Bureau UA Website

: http://bureau-ua.com.au

Page 38 | Portfolio

Portfolio | Page 39


Jui Apte | 2022

The system has been designed together with a unique construction system and offers a solution to all forms of housing using one

consistent universal, prefabricated and modular solution to be

applicable across all residential typologies. In achieving this solution it will be able to find the appropriate industrial and manufacturing scale to deliver cost savings and achieve affordability across all forms of residential outcomes. It will be available to first home

owners, home owners, developers, governments, relief and aid

organizations alike. It will provide governments and developers the Project Name : Office Name : Bureau UA Website

: http://bureau-ua.com.au

Page 40 | Portfolio

ability of ordering large quantities of affordable and high quality

housing to solve short, medium and long term housing requirements in any location in the world. The innovation centre is specifically and carefully designed in order to manufacture the MM module system.

Portfolio | Page 41


Jui Apte | 2022 +

02

GEORGE - SUSSEX STREET APARTMENTS HAYMARKET, NSW Bureau UA - 2021

The George - Sussex Street apartments is a built to rent project that sites on top of the Central Baptist Church, Geouge st, Haymarket, and The Charlie Chan’s. The design is a careful amalgamation of a new space deciated to the church overlooking an atrium, office spaces upto level five and the rest of the levels of residential one bedder, two bedder and three bedder apartments.

Page 42 | Portfolio

Portfolio | Page 43


Jui Apte | 2022

Proposed ground floor plan

Proposed level 1-3 floor plan

Proposed level 5-6 floor plan

Proposed level 7-19 floor plan

SUSSEX STREET

SUSSEX STREET

SUSSEX STREET

NEW CHURCH NSA -254.43m²

FEMALE TOILETS

NEW CHURCH NSA -254.43m² MALE TOILETS

EXISTING CENTRAL BAPTIST CHURCH

EXISTING CHARLIE CHAN

NSA

ATRIUM VOID ABOVE

1 BE D NSA - 50m

2 BE D - 81. 30m

²

NSA

²

3 BE D - 113 .03

1 BED NSA - 69.74m²

FEMALE TOILETS

1 BED NSA - 69.74m²

2 BED NSA - 103.75m²

1 BED NSA - 50m²

2 BED NSA - 81.30m²

MALE TOILETS CONCIERGE EXISTING CENTRAL BAPTIST CHURCH

RESIDENTIAL LOBBY

EXISTING CHARLIE CHAN

ATRIUM VOID ABOVE

ATRIUM ENTRY

CONCIERGE EXISTING CHEMIST RESIDENTIAL LOBBY RETAIL1 50m²

RE-ADJUSTED TITLE AREA

1 BE D NSA - 50m

²

1 BE D NSA - 50m

²

NSA

ATRIUM ENTRY

EXISTING CHEMIST

GEO

RGE

GROUND LEVEL

STR

EET

3 BE D - 115 .70

m² 2 BED NSA - 103.75m²

RESIDENTIAL ENTRY

2 BED NSA - 103.75m²

2 BED NSA - 103.75m²

1 BED NSA - 50m²

RETAIL1 50m²

RE-ADJUSTED TITLE AREA

RESIDENTIAL ENTRY

GEO

RGE

New GFA

STR

EET

667.45m²

Nett Area Breakdown GROUND LEVEL 315.06m² New Church Area New GFA 667.45m² 50.12m² Retail 1 Nett Area Breakdown Residential lobby 152.18m² 315.06m² New Church Area 99.66m² Atrium 50.12m² Retail 1 Existing Chemist 45.61m² Residential lobby 152.18m² Re-adjusted Chemist Torrens title.

Atrium

99.66m²

Existing Chemist

45.61m²

GEO

RGE

STR

EET

SCENARIO 3 TYPICAL LEVEL

L7-19 (13 LEVELS)

TOTAL

GFA

1,340.89m²

17,431.57m²

NSA

1,195.81m²

15,545.53m²

15 per level

195

APTS/LEVEL

NSA/GFA Efficiency - 89.18%

Re-adjusted Chemist Torrens title.

Page 44 | Portfolio

Portfolio | Page 45


Jui Apte | 2022

RL 63.80m RL 63.10m RL 60.06m RL 57.02m RL 53.98m RL 50.94m RL 47.90m RL 44.86m RL 41.82m RL 38.78m RL 35.74m RL 32.70m RL 29.66m RL 26.62m RL 23.58m RL 20.54m RL 17.50m RL 14.00m RL 10.50m RL 7.00m RL 3.50m RL 0.00m

Page 46 | Portfolio

Portfolio | Page 47


Jui Apte | 2022

+

Page 48 | Portfolio

03

THE NEED FOR REWILDING Masters Thesis Project - 2020

With more than one million described extant species, insects are the most diversified animal taxa on the planet. Through their capacity to pollinate flowers, transform biomass, regulate pest populations, recycle nutrients, disperse seeds, and provide food, insects are arguably Earth’s most important contributors of biodiversity. While insects lie on the bottom of the food chain humans will cease to exist if insects disappear. However rapid urbanisation has caused a threat to the less dominant species and there is an urgent need to reorient the way humans relate to each other and to the other species.

“The Need for Rewilding” aims to act as a catalyst in creating a space for engagement with nature and other non-human species in an otherwise hostile urban landscape and to provide ecological and educational experience for humans by letting them reconnect with nature. It intents on creating a concept of urban voids that can be used as an impetus for the revitalisation of environment and ecosystems.

Portfolio | Page 49


Jui Apte | 2022

Page 50 | Portfolio

Portfolio | Page 51


Jui Apte | 2022

Page 52 | Portfolio

Portfolio | Page 53


Jui Apte | 2022

Page 54 | Portfolio

Portfolio | Page 55


Jui Apte | 2022

Page 56 | Portfolio

Portfolio | Page 57


Jui Apte | 2022

Page 58 | Portfolio

Portfolio | Page 59


Jui Apte | 2022

Page 60 | Portfolio

Portfolio | Page 61


Jui Apte | 2022

+

04

26 DEGREE STREET Masters Studio - 2019

A combination of rising temperatures and high

Streets laid with these moss tiles over canopies create

humidity is already predicted to make parts of the

a cooler urban environment.

Melbourne inhabitable due to climate change.

The evidence of such small-scale programs remains

It is also predicted that temperatures will rise by 10

anecdotal. But now, studies around the world are

degrees celcius in most Victorian cities by century’s

accumulating evidence that the benefits of turning

end. No wonder, the calls for cooling cities are growing.

those 1% into 100% could be transformative and could

26 degree street has the potential to make streets of

save many lives every year from climate change.

Melbourne more bearable.

People can enjoy much healthy and cooler open

This solution aims to tackle urban heat island effect.

spaces. The 26 degree street will bring natural street cooling and ensure pedestrian comfort and well being in the city streets.

Page 62 | Portfolio

Portfolio | Page 63


Jui Apte | 2022

Project Name : 26 degree street

Page 64 | Portfolio

Portfolio | Page 65


Jui Apte | 2022

H&M

myer

zara

royal arcade

areas of opprtunity

north elevation - Bourke Street Mall

Page 66 | Portfolio

south elevation - Bourke Street Mall

Portfolio | Page 67


Jui Apte | 2022

Page 68 | Portfolio

Portfolio | Page 69


Jui Apte | 2022

Page 70 | Portfolio

Portfolio | Page 71


Jui Apte | 2022

Page 72 | Portfolio

Portfolio | Page 73


Jui Apte | 2022

Page 74 | Portfolio

Portfolio | Page 75


Jui Apte | 2022

Page 76 | Portfolio

Portfolio | Page 77


Jui Apte | 2022

Page 78 | Portfolio

Portfolio | Page 79


Jui Apte | 2022

Page 80 | Portfolio

Portfolio | Page 81


Jui Apte | 2022

Page 82 | Portfolio

Portfolio | Page 83


Jui Apte | 2022

Page 84 | Portfolio

Portfolio | Page 85


Jui Apte | 2022

Page 86 | Portfolio

Portfolio | Page 87


Jui Apte | 2022

Page 88 | Portfolio

Portfolio | Page 89


Jui Apte | 2022

Page 90 | Portfolio

Portfolio | Page 91


Jui Apte | 2022

+

05

LE PONDICHERRY BLUES Bachelor Thesis project - 2017

India is one of the largest peninsulas in the world with water surrounding it from 3 sides -The Arabian Sea to the west, Indian Ocean to the south and Bay of Bengal to the east. The country has a coastline of 7500km. With such a huge amount of water comes the rich marine life thats hidden in the depths of the oceans. Urbanisation and progressive developent

has caused a lot of ill effects on the ocean waters, one majorly being ocean dumping.

Page 92 | Portfolio

The factory effluents, garbage is being dumped in the water directy without treating. This has led to the reduction of dissolved oxygen content necessary for marine life. Many a species are near extinction or have become extinct. Le Pondicherry blues is an attempt to be a small contribution towards preserving the marine life and evoking importance of its conservation to the visitors.

Portfolio | Page 93


Jui Apte | 2022

Page 94 | Portfolio

Portfolio | Page 95


Jui Apte | 2022

Page 96 | Portfolio

Portfolio | Page 97


Jui Apte | 2022

+

06

AEGIS

Biodesign Challenge 2020 entry | Victorian premier’s Design Awards Winner

Aegis is designing an innovative isolation gown along with an integrated system of medical waste disposal. The gown is made of a newly developed biotextile consisting of woven fibres and starch-based biopolymers, protecting wearers without costing the environment. The collection and anaerobic digestion of used gowns could then partially power both

Page 98 | Portfolio

Aegis and medical facility operations, resulting in further environmental benefits through energy savings. Through the use of emerging biotechnology and circular economy thinking, Aegis proposes a breakthrough PPE design for a more resilient healthcare industry.

Portfolio | Page 99


Jui Apte | 2022

Page 100 | Portfolio

Portfolio | Page 101


Jui Apte | 2022

Page 102 | Portfolio

Portfolio | Page 103


Jui Apte | 2022

Portfolio | Page 105


Jui Apte | 2022

Portfolio | Page 107


Thank You.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.