Habitat futura aranzadi aldayjover

Page 1

PAISAJES SOCIO-ECOLÓGICOS VISIONES ARQUITECTÓNICAS - VISIONES PROPIEDAD Jesús Arcos -

Madrid, 24 de marzo de 2015 www.aldayjover.com


BumbleBeaver


Equilibrio


>1956 >2007

196.000 inhabitants 8.300 inhabitants/km2


Flood during the final works of construction of 1st phase, April 2013. Before the peak (14:00 h)


RESOURCE AND THREAD; The flood, Dirk Vellert, 1421


WALLED RIVER View of the Tiber and the Isola Tiberina

DAM OR SPILLWAY Morganza spillway, Mississippi


ROOM FOR THE RIVER The Netherlands 2008-2014: Overdiepse Polder (Brabantse Delta)


Mississippi


RECUPERACIÓN DE LAS RIBERAS DEL GÁLLEGO ZUERA 2001

PARQUE DEL AGUA, EXPO ZARAGOZA 2008 www.aldayjover.com


PARQUE DEL MEANDRO DE ARANZADI


MIEMBROS DEL EQUIPO Arquitectura y Paisajismo aldayjover arquitectos Iñaki Alday, arquitecto Margarita Jover Biboum, arquitecta

ARANZADI MEANDER PARK PAMPLONA. 2013

Colaboradores Arquitectura y Paisaje Jesus Arcos, Arquitecto Jefe de Proyecto; Catalina Salvà, Marilena Lucivero, Andreu Meixide, Susana Mitjans, Marta Castañé, Hector Ortín, Raquel Villa, arquitectos colaboradores; Francisco Mesonero, paisajista e ingeniero agrónomo; Júlia Salvia, estudiante de arquitectura; Cecilia Vinyolas, documentación; Davide Vason, infografía; Paisajismo y Agronomía Roser Vives Delàs, Ing Agrónomo y Paisajista Ingeniería hidráulica ABM Servicios de Ingeniería y Consulting David Maruny ICCP David Solans ICCP Estructuras Consultores BIS Arquitectos David García, Arquitecto Ingeniería instalaciones PyP Proyectos y Promoción de Ingeniería SL Ernesto Calvo, Ingeniero Industrial Iluminación Artec3 Maurici Ginés Instalaciones Especiales: Depuración ASEPMA Medioambiente Jochen Scheerer Presupuesto Benedicto Gestión de Proyectos Fernando Benedicto, arquitecto técnico


Initial state 2009


IDEAL SECTION OF A MEANDER RIPARIAN FOREST AND ROOM FOR THE RIVER’S FLOWS.

CONDITION BEFORE PARK’S CONSTRUCTION


Initial state 2009. The agricultural garden


February the 12th, 2009 flood. 400 m3/sc, 12 years



ELEVATED PATHS IN BANKS WITH STEEP SLOPES EXISTING WALLS OF PROTECTION AGAINST FLOOD EXISTING PERMEABLE WALLS

TERRAIN’S DRAIN LOWER AREAS IN RELATION TO SURROUNDINGS

CONDITION BEFORE PARK’S CONSTRUCTION


A. B. C. D-H.

Bosque de Ribera Huerta Bosque de Crecida Jardines


FLOODABLE FOREST.

VEGETABLE GARDENS

PEDESTRIAN CONECTION OVER THE RIVER




Left: Flood during the final works of construction of 1st phase, April 2013. Before the peak (14:00 h) Flood, February 2015


Aerial from the edge of the meander. 1st phase, October 2013


June 2013 Entrance of water from the river into the floodable forest (Park under construction)

2014 Walls catching rocks at the entrance of the floodable forest


Groups of shrub vegetation in more erodible sloped areas


Rainwater and filtration ponds in the floodable forest


Plazas and pedestrian pathways with permeable pavement in floodable squares and paths.


Darkness in the forest thanks to minimized illuminated areas



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.