UpCycling NATO
A r t h u r L A C H A R D - J u l i e n VA N D E V O O R D E Space Speculation - 3 Juin 2014
1. General analysis
1. General analysis
Location : Haren 50°52ʹ33.8ʺN 04°25ʹ27.9ʺE
1. General analysis
Ferraris map 1777
1. General analysis
Vandermaelen map : 1846-54
1. General analysis
Site : the Brussels AirďŹ eld
orthophotoplan 1930-35
1. General analysis
Site : Germans have added an airport runway
orthophotoplan 1953
1. General analysis
orthophotoplan 1971
Site : Airport moved to Zaventhem Connected to the city by Boulevard LĂŠopold III The NATO headquarters was build along
1. General analysis
Site : between two regions
orthophotoplan 2004
1. General analysis
STIB depot New NATO headquarters Fields
Old NATO headquarters
Belgian Army headquarters
1. General analysis
2016 : move NATO
1. General analysis
move the Stib depot ?
1. General analysis
Haren
Evere
and let Haren reconnect to Evere
1. General analysis ZEMU : zone d’entreprises en milieu urbain ? to a programmatic mix ... a metabolic oportunity
Thematics
1. General analysis
Haren STIB Depot 30 000 m² 1500 employees associated with this site Bus Depot Tram Depot STIB auxiliary functions education, printing house
1. General analysis
Tram depot
Brussels Tram depot
1. General analysis
Haren depot Brussels depots
Bus and metro depots
1. General analysis
Haren depot Tram lines
3
4
25 55
Tram
62 Depot
14 lines of 225m 120 Trams
2. Project
2.3 Data Center
2. Project
2.3 Data Center
2. Project
2.4 Hydroponic Greenhouses ex: Ferme LUFA Ferme Lufa MontrÊal 3 000 m² 1 500 Baskets / Week 30 employees (5 to collect) and 400Kg of compost / Week sold or given to neighboring farmers
2. Project
2.4 Hydroponic Greenhouses ex: Ferme LUFA 25 varieties of vegetables, sprouts, herbs without pesticides «Biocontrol» by bumblebee and ladybugs urban agriculture, local food help reducing the carbon footprint
a «hot» greenhouse
a «cold» greenhouse
for fast growing plants salads, herbs, chard
Possibility of varying varieties
2. Project
2. Project
2.1 NATO Recycling
X 1000
X 2100
V = 2 m³ P=5t
V = 1.3 m³ P = 2.5 t
X 1000
X 3700
V = 1.5 m³ P = 3.75 t
V = 0.4 m³ P=1t
X 200
2. Project 50.000 tonstonnes of concrete Près de 50'000 de béton Soit 20'000 m m³ 3deof déchet ! or 20.000 waste X1 V = 10000 m³ P = 25000 t
2. Project
2.1 NATO Recycling
2. Project Incineration
Recycling
Crushed Concrete
2. Project
2.2 STIB depot existing lines
Lignes existantes
2. Project
2.2 STIB depot proposed lignes
Extension of the tram line 62 Cemetery Jette - Uplaces Extension Nort-South metro by light railway De Lijn line Tram Heist-op-den-Berg - Brussel north station
2. Project
2.2 STIB depot proposed lignes
Amount of car on the road +
-
2. Project
2.2 Light Railway North-South metro going to Zaventhem (Brussels airport) Surface movement in areas of low density
2. Project
2.2 STIB Bus depot Access Circulations
1
2
3
4
1
Depots (2 levels)
2
Hall maintenance
3
Mechanical workshop & body details
4
training arĂŠa
2. Project
2.2 STIB Tram depot
Access 1
Depot and maintenance
3 Mechanical workshop & body details
2
Loading docks
4 Test track
2 1 3
4
2. Project
2.2 STIB depot
offices and auxiliary functions
2 1 3
1 Vertical circulation and services 2 Parking (groundfloor and 1st storey) 3 Offices and training center ( 2nd storey)
2. Project
2.2 STIB depot relay Parking
2
1
1
Relay Parking
2
Extension on the parking buses during the day
2. Project
2.2 STIB depot Data Center
1
1
Data Center
2. Project
2.2 STIB depot
Structure
2. Project
2.2 STIB depot
2. Project
2.3 Data Center
2. Project
2.3 Data Center
2. Project
2.3 Data Center
2. Project
2.3 Data Center
2. Project
2.3 Data Center
2. Project
2.4 Hydroponic Greenhouses
Haren Stib farm
105 000 m² 52 500 Baskets / Week 200 employees and 14 000 Kg of compost / Week sold or given to neighboring farmers
2. Project
2.4 Hydroponic Greenhouses
Distribution
70 collection points in Metro stations by metro-cargo 150 Baskets / Day / Station 10 500 Baskets / Day delivered by metro cargo
2. Project
2.4 Hydroponic Greenhouses
Haren Stib farm
2. Project
2.4 Hydroponic Greenhouses
Haren Stib farm
2. Project
2.4 Hydroponic Greenhouses
Haren Stib farm
2. Project
2.4 Hydroponic Greenhouses
Haren Stib farm
2. Project
2.4 Hydroponic Greenhouses
Haren Stib farm
2. Project
2.4 Hydroponic Greenhouses
Haren Stib farm
2. Project
2.4 Hydroponic Greenhouses
Haren Stib farm
2. Project
2.4 Hydroponic Greenhouses
Haren Stib farm
2. Project
2.4 Hydroponic Greenhouses
Haren Stib farm
2. Project
2.4 Hydroponic Greenhouses
Haren Stib farm
2. Project
2.4 Hydroponic Greenhouses
Haren Stib farm
2. Project
2.4 Hydroponic Greenhouses
basin macrophytes
Lagoon
mixed basin
basin microphytes
2. Project
2.5 Public space
2. Project
2.5 Public space
2. Project
2.5 Public space
2. Project
2.5 Public space
2. Project
2.5 Public space
2. Project
2.5 Public space
2. Project
2.5 Public space
2. Project
2.5 Public space
2. Project
2.5 Public space
2. Project
2.5 Public space
2. Project
Hot water
2.6 Housing
Wastewater
Clean water
2. Project
Conclusion
2. Project
Conclusion
2. Project
Conclusion
2. Project
Conclusion
2. Project
Conclusion
2. Project
Conclusion
2. Project
Conclusion
2. Project