Jurijs Kostirko_selected works_2014

Page 1

SELECTED WORK JURIJS KOSTIRKO 2013/2014


TABLE OF CONTENT JURIJS KOSTIRKO

CV 01

3/14 4/14

STUDIO PUBLICATION

STRELKA RELOCATION

02

6/14 HOTEL IN OLD RIGA

03

7/14 LIBRARY COMPETITION

04

8/14 SPORT CENTER

05

9/14 PROJECT EXHIBITION

06

12/14 ART/ LIGHT OBJECT

07

13/14


CV

JURIJS KOSTIRKO

PERSONAL DATA

WORK EXPERIENCE

birth data

04/06/1987 Riga, Latvia

e-mail

juris.kostirko@gmail.com

LinkedIn

http://ru.linkedin.com/pub/jurijskostirko/93/397/a3

STRELKA INSTITUTE 09/2013 - 07/2014 Strelka is post graduate education program which is focused on uban invironment of Moscow. I was working as a researcher/ architect on several city scale projects.

telephone

PALAST ARCHITEKTS

+371 28 32 78 70 (lv) +7 916 326 05 30 (ru)

EDUCATION 09/2013 - 07/2014 Post graduate education program STRELKA INSTITUTE FOR MEDIA, ARCHITECTURE AND DESIGN Moscow, Russia 09/2010 - 07/2012 Bachelor’s degree Constructing Architect and Building Planning and Management VIA UNIVERSITY COLLEGE Horsens, Denmark 09/2008 - 07/2012 Bachelor’s degree Architects assistant RIGA BUILDING COLLEGE Riga, Latvia 09/2004 - 07/2008 Higher education Architect technician RIGA BUILDING COLLEGE Riga, Latvia

07/2012 - 09/2013

After graduating a bachelor’s degree I started to work in architectural and design studio as an architect. During this time period I was engaged in several architectural project where I was responsible for design and construction detail solution, documentation preparation, project approval and site supervision. OWN PRACTICE

07/2008 - till now

While studying I started to work as a freelancer for private clients, other architects and interior designers, with other young architects participated in several architectural competitions. In the year 2009 me and my partner established architectural heritage measurement firm where we act as subcontractors for other companies. BPB

11/2006 - 11/2009

During my education as an architectural technician I started to work at BPB which is architectural practice based in Riga. That was my first experience in architectural firm where I learned thing which are impossible to obtain in education system. I develop teamwork skills, learned architectural softwares and construction methods. DEPO DIY

10/2005 - 11/2006

ACHIEVEMENTS Office studio publication 2014 Research, project, publication

Office Next Moscow 2014

pavilion design, construction and management

Future urbanism. An interview with Dr. Robert Biel on developing agriculture in urban condition 2014 http://futureurbanism.strelka.com/interview/food-production-incity-and-urban-agriculture/

09/1995 - 06/2004 Primary school GRAMMAR SCHOOL OF NORDIC LANGUAGES Riga, Latvia

Depo DIY is one of the largest construction material retailer in Latvia. I worked there as a salesman/consultant where I developed my communication skills with clients and got bigger knowledge about available construction materials in the market.This working experience helped me in my future education and practical work.

LANGUAGES

SOFTWEARS

RECOMMENDATION

AutoCAD Adobe InDesing Adobe Illustrator Adobe Photoshop Google SketchUp MS Office

For more detailed information about my skills, abilities and working ethics it is possible to receive a copy of recommendation letter or contact personally: Andreas Klok Pedersen Partner at BIG Varvara Melnikova CEO at Strelka Institute for Media, Architecture and Design Marcis Tretjakovs Senior architect at Palast Architekts

Speaking

Writing

Reading

Latvian Russian English

INTERESTS architecture/ engineering/ design/ furniture design/ modeling/ industrial design/ wood crafts/ infographics/ photography/ music/ hiking/ cycling/ cooking/ hunting

Positivus festival 2013.

Winning proposal. Light-art object design, construction and management

3/14


01

STUDIO PUBLICATION PROJECT INFO PROJECT NAME LOCATION YEAR STATUS COLLABORATION

OFFICES 2014 RESEARCH/ PUBLICATION Andreas Klok Pedersen/ Studio director Varvara Melnikova/ Project leader Sofia Savelyeva/ Research coordinatior Anna Golovkina/ Researcher Luba Russkikh/ Researcher Elina Pechonova/ Researcher Edijs Vucens/ Researcher Linda Andersson/ Researcher Liva Dudareva/ Researcher Asen Chumov/ Researcher Eduardo Cassina/ Researcher Olga Poletkina/ Researcher Georgy Aygunyan/ Researcher

DESCRIPTION The work of the studio lasted three months. The first part included a series of interviews with experts on the subject as well as statistical mapping, fieldwork and case studies. Several hypotheses were then introduced. The overall aim has been to discover the most pressing challenges, paradoxes, problems or untapped opportunities in the corporate world of Moscow. The research report “Offices� summarizes the studio work and presents ideas and projects that should help the city make office space - and office culture more flexible and diverse, relevant to contemporary technological developments and the most advanced business models, and to city life itself. - Andreas Klok Pedersen, Varvara Melnikova

WEB PAGE

(ENG) http://issuu.com/ strelkainstitute/docs/strelka_ book_5_office_eng_all (RU) http://issuu.com/ strelkainstitute/docs/strelka_ book_5_office_ru_all http://strelka.com

4/14


01

PROJECT EXHIBITION PROJECT INFO PROJECT NAME LOCATION YEAR STATUS COLLABORATION AREA MADE PHASES

79 IDEAS FOR OFFICES MOSCOW, RUSSIA 2014 EXEBITION PROJECT/ PROJECT PUBLICATION AND PRESENTATION MATERIAL

presentation material (beer coster) idea #79 “office box”

DESCRIPTION Project “79 ideas for offices” is a collection of different scale ideas for offices. It presents a combination of large and small solutions for office constructions, stationery equipment and office furniture.The proposals were based on a collection that had been gathered of real life office complaints and real time observation as well as brainstorming sessions with various categories of people.This project will make you laugh but at the same time think seriously about daily routine in the office. Project was developed as a part of studio publication and made in collaboration with Asen Chumov and Georgy Aygunyan.

presentation material (beer coster) idea #03 “modular office”

As a final projects presentation material was decided to make a two color (black & cyan) posters in a classical newspaper format. Poster had to have title that represents projects essence, description and visual material that is able to show a project. For visual material that can represent the “79 ideas for offices” project was made a isometric picture that shows a city from bird view. In picture it is possible to see many ideas that were developed during project design phase. As additional material for the exhibition were made 18 different beer/ cup costers on whom are illustrated some of project ideas on the one side and on the other side description for particular office idea. These costers were free for the public so visitor could take them and use in their daily routine. two color project poster for the exebition

presentation material (beer coster) idea #75 “gym chair”

5/14


02

STRELKA RELOCATION PROJECT INFO

DESCRIPTION The brief of the tender was to relocate the institute to another place in Moscow, so Strelka can move to that place in the year 2015. It was crucial to save existing functions of organization (Institute; bar; bookstore; office; public space; KB Strelka) an add new functions according to the wishes of the designers. New location had to have potential for future development where Strelka could play crucial role in territorial development of an area, like it did with existing location.

kb

office

institute

public space

view from the bridge

GROUND FLOOR PLAN

MOVEMENT MAP

fully developed

bar

scenario #1

LONG SECTION

scenario #2 scenario #3 scenario #4 scenario neutral zones

existing program of strelka

existing lined program of strelka

SCENARIO SCHEMA

new program of strelka

QUALITY FULLY DEVELOPED

Strelka with its innovative approach to explore urban spaces and its practice of initiating great public events will be able to fill up this gap and to draw public attention to the potential of the Moscow river.

TIME

UNDEVELOPED

The proposal was to choose the Moscow river as a place to house Strelka Institute for Media, Architecture and Design in the future. Not one specific locality somewhere in the higher or lower part of the stream, but the whole river by itself. As the Moscow river is the most spacious territory among all abandoned urban spaces in Moscow. “Aquartecture” has not been developed here and the river for most Muscovites seems to be a kind of blind spot. For better understanding of movement logistics, team made a map based on the research about future riverbank development. And created movement scenarios for floating Strelka structure.

view on the long side facade

POORLY DEVELOPED

AREA MADE PHASES

STRELKA RIVER MOSCOW, RUSSIA 2014 OUTLINE PROPOSAL Asen Chumov Georgy Aygunyan Kirill Lebedev 3125 m2 OUTLINE PROPOSAL

GOOD DEVELOPED

PROJECT NAME LOCATION YEAR STATUS COLLABORATION

15

21

DEVELOPMENT SCENARIOS

1 1-3 YEARS

3-10 YEARS

10-20 YEARS

BAR strelka

public space/ summer strelka

strelka office

KB strelka office

institute

2

3 4

6/14


03

HOTEL IN OLD RIGA

4. stāva plāns

PROJECT INFO HOTEL RIGA, LATVIA 2013 BUILT Juris Berzins/ Palast Architekts 4340 m2 SCHEME DESIGN/ DD1/ DD2/ SITE SUPERVISION

G*

1

F 4

*

80

50

302

5

285

t 419

0

5

124 5

0

2.1

350 5

DK

160

-1

0

0

300

2.1

150 00 8

0 204

0 121

0

417

0 260

150

5

238

400

660

2.1

150

5 172

475

100 150

460

350

150

DK

690 300

2.1

238

0 102

-2

5

5 169

0 421 0 100

200

800

0

675

201

DK

0

-2

2.1

0 100 165 0 255

D

0

2.1

K-1

150

0

151

200 0

190

0

451

5 184

0

0

100 0 80

50

300

2.1

-1

200

0

-2

DK

0

40

0

ee str

190 0

940

DK0 5

407

200

0

0

100

5

162

0 170

5

162

5 150 43 0

415

121

5

595

6

0 100 0 16 180

312 0

120

0

134

0

0

8*

2.1

377 5

-1

DL

5

0

120

0

6

60

3

25 60

0

2.1

100

0

140

0

285

7/14

164

200

0

150

0

205

412

-2

5

0 140

490

950

400 2.10

100

DK

230

800

93.0

°

150

0

150

550

5

352

0

150

219

330

575

275 650

5

375

75 0

0 2.1

100

-2

DL

5

290

5

298

-1

DL

105

0

2.1 2.1

5 137

5 267 0 120

170

260

800

180

0 2.1

0

0

0 100

150

905

800

300

150

0

180 0

170

-1 DL

0

5 231 199

845

0

850

900

900

425

251

800

182

0

0 432 0 10

445

50

-1 1095

150

5

211

100 0 100 0 100 100 300

100

0 170

400 0 440

150

-1

-1 DK0

2.1

800

2.1

D

40 150

DL

4

0

0

5

L-2

5

0

275

5

315

0

2.1

150 0

192

5 183

2.1

0 180

0 105 -1

0

110

0 2.1

183

200

5

175

5

110

150

150 400

319

0 100 105

-1

-1 0 100

5

150

DK

DL

800 0 15

5 478 400

300

400 5

510

0

100

175

0

170

0 120

0 200

00

30

155

5

199

150

100

5

395

0

2.1

150

*

-2

DK

150

180

150

0

2.1

5 170 0 255 000 1

150

0 180 0 284 6380

150

100 350 0 343

0 100

150

150

-1

20

0

150

2

D

DK

800

0 170

5

-2 DL

2.1

L-2

2.1

DL

0

5

0

915

3

200

0

395

0

260

300 102

11

1

800

5

188

400

0

300

1

120

680

595

020

2.1

DL

105

5

0

366

-2 DL 0 105

800

-2

0 180

0 195

0 2.1

DK

150

320

800

2

255 995

396

Building’s external walls are made of aerated concrete blocks that are insulated and plastered. Whole load bearing structure of a building is made of reinforced concrete. Separation walls are made of plastered aerated concrete blocks.

025

150

97

150

75

0

300

200

2.1

DK

0 170 0

0

103

350

8*

5

0

320

300

8

33

995

275 5

8*

414

de Au

t ee str

397

A*

ju

H

0

41

-2

170

2.1

DL

0

0

0

210

416

00

305

275

0

-2

5

202 5

B

150

3

150

300

0 40

ju

5 0 100

le Ka

415

0

140

0

312

C

150

275

0

5

5

67

*

60

3 26

236

50

D

4TH FLOOR PLAN

400

ROOF AND PARTITION DECK DETAIL

00

2345

5

256

300

30

33

In re-construction project both building where connected together and design for hotel and restaurant needs. Even though building where connected their unique identity was capped in their eclectic and neo gothic facades.

Building opened it doors in the end of October 2013. Hotel has 140 rooms and it can host approximately 300 people at the same time. Restaurant which is located on the first floor can provide space for 90 persons at once. Building has it own courtyard which work as a recreational area for hotel visitors. Total floor area of a building is 4340 m2.

2

E

corner of Kaleju Audeju streets

DESCRIPTION Project is located in the old town of Riga on the corner of Kaleju and Audeju streets. This is a reconstruction project of a two buildings which were built in the beginning of 19th century. Historically these buildings where two individual structures. Both were occupied by dwellers of old Riga.

*

4 39

11

PROJECT NAME LOCATION YEAR STATUS COLLABORATION AREA MADE PHASES


04

-1ST FLOOR PLAN

LIBRARY COMPETITION GROUND FLOOR PLAN

PROJECT INFO PROJECT NAME LOCATION YEAR STATUS COLLABORATION AREA MADE PHASES

BAUSKAS LIBRARY BAUSKA, LATVIA 2013 COMPETITION/ 3RD PLACE Asen Chumov 2541 m2 OUTLINE PROPOSAL

1ST FLOOR PLAN

external view from south-east facade

DESCRIPTION Project location is Bauska, which is a city with 20 000 citizens in South part of Latvia. Task was to design a multi-functional library for citizens of Bauska and surrounding areas. Client wanted to combine library (for all age groups) with business HUB, cafeteria, youth center and offices for administration. It was necessary to create a space where could be possible to fit 150 persons during lectures and more than 200 000 books had to find place in the building.

main library interior view

children’s library interior view LONG SECTION

Designed building has 2541 m2 of total floor area. It has 3 floors and public area outside. North part of a building is occupied by technical rooms and offices. Middle part is for library purposes, but south side is for public events and youth center. Shape of a building was influenced from existing architectural identities in close surrounding - on the North side there is ald city center with pitched roof buildings, but on the South side there are modern building with flat rooftops. Building copied these two characteristics from surrounding and twist it’s rooftop from pitched to flat roof. Library project has specially designed ventilated brickwork facade on the South side of a building. North part of a building has classical brickwork, but on East and West facades of a structure is uses movable blind system for better insulation control. WEB PAGE

http://www.a4d.lv/lv/projekti/ bauskas-biblioteka-kvites/

CROSS SECTION 1

CROSS SECTION 2

WEST SIDE FACADE PANORAMA VIEW FROM OLD CITY CENTER

SHAPE DEVELOPMENT SCHEME

NORTH SIDE FACADE

SOUTH SIDE FACADE

PANORAMA VIEW FROM NEW CITY CENTER Design decisions were made according to analisis that were made during pre design phase. Footprint rectangular. Facades reflects the city. South aligns with neighbours.

8/14


05

PLOT LOCATION ON THE CITY MAP

SPORT CENTER PROJECT INFO PROJECT NAME LOCATION YEAR STATUS COLLABORATION AREA MADE PHASES

BAUSKAS SPORT CENTER BAUSKA, LATVIA 2012 DIPLOMA PROJECT 3412 m2 OUTLINE PROPOSAL/ SCHEME DESIGN/ DD1/ DD2 external view to south-west facade

DESCRIPTION The idea of the project was to create public building which will be able to improve active and self care life for inhabitants of the area. One of the main points is to integrate “new generation” architecture in Bauska region – building shows solution in sustainable architecture, it also gives fresh and modern look for district. Concept of architecture of the building is that one structure is at the same time two separated buildings above the ground level. Shape of the building was designed in due to respect neighbor buildings, main roads and pathways. During design phase all nature and surroundings characteristics were analized to create open and light feeling on the plot. Building has multifunctional purpose, it has 4 different sport activities (swimming pool, squash, fitness and yoga room) and 3 additional functions that are sport shop and cafeteria.All these functions are distributed on 3 floors with total floor area 3412 m2. As a load bearing structure is made of steel frame which is filled with aerated concrete blocks. Foundation is made of reinforced concrete. Facade is plastered and covered with movable perforated blind system, that can be moved according to the sun movement.Inner facade is glazed and decorated with colorful movable blind system.

SHAPE DEVELOPMENT SCHEME external view to north-east facade

rectangle - the main shape of the structure.

two elements main shape is divided in two parts with curved internal surfaces.

roof surface modeling rising up and pulling down corners.

City is located between two rivers which are becoming in one.

Two river idea is used in project as two building connection together.

Fruit from outside is simple but when you cut it shows you color.

Cutted fruit idea gives fresh and welcoming look of the building.

9/14


05

SPORT CENTER

10/14


05

SPORT CENTER

12/14


06

EXHIBITION PAVILION PROJECT INFO PROJECT NAME LOCATION YEAR STATUS COLLABORATION AREA MADE PHASES

STRELKA PAVILION MOSCOW, RUSSIA 2014 BUILT Luba Russkikh Sofia Savelyeva 9 m2 DESIGN PROPOSAL/ CONSTRUCTION/ MANAGEMENT

Strelka pavilion at “Office next Moscow” exhibition

black textile roof

DESCRIPTION The pavillion was made as a part of “Office next Moscow forum” exhibition. The main goal of the pavillion was to exhibit made researches, projects and make commercial for Strelka institute. interior furniture

The pavillion had two material exhibition surfaces. First and the main one was outer pavillion wall surfaces. The second was inner pavillion area where tv with a movie of a project was playing in the loop. Inner space had also a furniture for better movie watching. Main structural material for Strelka pavillion was 50x50mm wooden elements which were painted in red (Strelka brand color). Wooden structure contained from two closed walls and two opened walls with entrance doors. The whole structure area was 9m2 with the height of 2,5m. Wooden wall elements were connected with flat steel angles on the corners for better structural stiffness. The interior of the pavillion was covered with black textile for better light conditions for inner visual exhibition.

pavilion structure

Strelka pavilion at “Office next Moscow” exhibition

exhibition material Strelka logo

modifying logo

structural module structural elements pavilion’s wall structure

structure’s isometric view

12/14


07

ART/LIGHT OBJECT PROJECT INFO PROJECT NAME LOCATION YEAR STATUS COLLABORATION AREA MADE PHASES

LIGHT BULB SALACGRIVA, LATVIA 2013 BUILT Asen Chumov DESIGN PROPOSAL/ CONSTRUCTION/ MANAGEMENT

DESCRIPTION Project was made as a part of open air music festival Positivus in Salacgriva, Latvia. The brief was to design an art and light object that will be interactive and at the same time will engage with festival visitors. The proposal was to built a large scale (1,6m height and 1,2m wide) light bulb that will be hanged in the tries 2m from the ground surface. The bulb could be turned on only when person stand on red switch under the bulb. Bulb was made from transparent polycarbonate round slices with integrated LEDs in it. Switch button was designed from plywood with custom made spring and electrical switch system inside of it.

object proposal collage

photo of working object at Positivus festival

13/14


juris.kostirko@gmail.com +371 283 278 70


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.