Justin Spec DESIGN PORTFOLIO 2016
call : 613.791.5590 email : justin.spec@gmail.com send : 3991 St Laurent Blvd / H2W 1Y4 / Montreal, QC
Curriculum Vitae Professional Experience ARCHITECTURAL INTERN, Leonard Koman Architect
2015
Completed schematic designs, presentation drawings, marketing plans, working drawings, and tenant area certification plans for private sector commercial, industrial, and residential projects. Co-ordinated with clients and consultants regarding both design and technical issues. Conducted multiple site visits involving field measuring and photography.
URBAN DESIGNER, Fotenn Consultants Inc.
2012 : 2014
Responsible for a broad range of urban design and visual communication tasks including conceptualizing and drafting site plans, visualization of prominent architectural projects and public spaces, detailed massing schemes, masterplanning, graphic analysis, highest-andbest-use investigations, sun-shadow studies, and the preparation of presentations.
ON-SITE QUALITY CONTROL INSPECTOR, Minto Group Inc.
2010 : 2011
Conducted quality control inspections of single houses, towns, and low-rise condos throughout the construction and finishing process. Interacted with trades and owners to ensure timely completion of work according to drawings and code. Filled in for both framing and finishing foremen, detailed new construction methods, and trained new QC inspectors.
Education M.ARCH, McGill University, Montreal B.A.S. (High Distinction), Carleton University, Ottawa Public Realm Course, Simon Fraser University, Ottawa
2014 : 2015 2008 : 2012 2014
Skillset Revit, AutoCad, Rhino (Grasshopper / T-Splines / Weaverbird), SketchUp, VRay, Photoshop, Illustrator, InDesign, Word, Excel, Outlook. Utilizing a CNC machine or laser cutter to realize architectural models. Hand-modelling, sketching, drafting.
Table of Contents
CFB SHILO Shilo, Manitoba 2013
05
01 04 02
CENTRETOWN STATION Ottawa, Ontario 2015
770 SOMERSET Ottawa, Ontario 2014
SCHOOL OF CONSTRUCTION Granada, Nicaragua 2015
07
SOLSTICE PAVILION Rovaniemi, Finland 2012
03
SALIX OUTPOST Victoria, Australia 2014
CULTURAL INCUBATOR Beijing, China 2014
06 08
WORK SAMPLES Various Locations 2015
01
Centretown Station Redevelopment Ottawa, Ontario
2015
This project proposes a mixed-use redevelopment of Ottawa’s existing inter-city bus terminal site. The contextually-sensitive design responds to the adjacent four-lane highway, the varying scales of existing built form, and future developments as proposed by city policy. The building aims to establish a gateway and landmark for visitors and residents alike, as well as spurring surrounding development on this stagnating portion of Catherine Street.
01
CONTEXT ANALYSIS
MORPHOLOGICAL DIAGRAMS Ramped bus circulation for porous pedestrian connections at grade and increased boarding security. Docking at second storey.
Sloped public roof for community access and connection to reen ace e ect ar in urban scales adjacent to site.
Introduction of new greenspaces to provide enjoyable waiting areas and community engagement.
Twisted penthouse to view Parliament Hill. Tower integrated into podium at base. Tangible exterior shift in interior programme. Parametric relationship with highway.
Abundant interior circulation to cater to variety of visitors and programmes.
Concrete structure to adapt to open spaces of terminal with deep beams.
terior n tem to re ond to ite conditions and reveal interior functions.
Pedestrian-friendly hard and soft landscaping featuring a community-oriented greenspace.
01
01
01
01
CIRCULATION ANALYSIS
01
02
School of Construction and Agriculture Granada, Nicaragua
2015
The proposed school advocates for an immersive learning environment, the utilization of natural, local materials, and a revived cultural identity. The majority of students and staff live on site, fostering a close-knit community. Students will contribute to their physical surroundings through adaptable, semi-open spaces, which act as a framework for experimentation. The curriculum is intrinsically intertwined with the local climate’s dramatic seasonal variation.
02
02
EXPLODED HOUSING BLOCK
EXPLODED STUDY HALLS 02
VENT BLOCK DESIGN
SOUTH ELEVATION
EAST-WEST SECTION
INSPIRATION, INTERIOR CONDITION, USE AS PLANTERS
02
02
03
Cultural Incubator Beijing, China
With F. Giraldeau and S. St-Denis
2014
This masterplanning and design project envisions a mixed-use, mega-block scale development. In the creation of high-density, livable spaces the proposal accomodates the internal relationships between diverse uses and the dynamic interaction with the immediate urban context. A curved podium contrasts rigid residential towers to establish uniquely interesting spaces. Additionally, the project provides high-demand facilities for interdisciplinary artistic endeavors and collaborations.
03
MASTERPLAN
LANDSCAPING
INSTITUTIONAL ELEMENTS INCUBATOR UNITS
RESIDENTIAL TOWERS
SITE PLAN
03
SECOND STOREY
FOURTH STOREY
03
03
04
770 Somerset Ottawa, Ontario
With Dynar Architect + Associates Inc.
2014
Fotenn was approached to revise the design and prepare the urban analysis and graphics of an existing mixed-use proposal in order to submit to the Urban Design Review Panel. A design was produced to emphasize the prominent corner lot, breaking down larger masses to achieve a scale appropriate to the surrounding context. A simplified, bolder, and more urban scheme was proposed to house residential units, a restaurant, below-grade parking, and a grocer.
04
PUBLIC ENTRANCE RESIDENT ENTRANCE
GROCER
INTERIOR AMENITY SPACE EXTERIOR AMENITY SPACE
RESTAURANT
PLAN AT GRADE
CONTEXTUAL ELEVATION - SOMERSET STREET
SECOND STOREY
PUBLIC ROOF GARDEN
SIXTH STOREY
ROOF PLAN
CONTEXTUAL ELEVATION - LEBRETON STREET 04
05
CFB Shilo Shilo, Manitoba
2013
Fotenn was engaged by DND / CFHA to provide a report and associated drawings to assess the development potential existing at CFB Shilo to support additional residential housing units. Following review of the existing CFHA guidelines, site visits on base, and meetings with base engineers, housing managers, and municipal planning staff, this plan and the corresponding imagery were prepared to plan for density, streetscaping, accessibility, parking, and housing form .
05
06
Salix Outpost (Competition) With C. Moise
Victoria, Australia, 2014
This competition entry for a small, rural cabin is designed to blur the lines between a structure and its natural environment. It is an interactive shelter literally woven into the terrain with willow elements to shelter, shade, and direct views. Visitors leave their unique mark weaving living willow branches through structural cables.
07
Solstice Pavilion (Competition) With K. Tousant
Rovaniemi, Finland, 2012
This competition entry serves as a gathering place for outdoor enthusiasts. The project’s form is inspired by the dramatically changing relationship between sun and horizon in northern Scandinavia, and is equipped with the amenities for typical solstice celebrations. Programmatic elements are layered vertically in accordance to time of day they are used.
FIREPIT
DINING AREA
SAUNA SLEEP CABIN
07
08
Work Samples
Various Locations, 2015
These drawings are a small sample of the work completed while employed as an architectural intern. During my employment I produced schematic designs, presentation drawings, marketing plans, working drawings, and tenant area certification plans using Revit and AutoCad in addition to coordinating with clients and consultants.
D07-12-14-0
T/O GIRTS (H.P.)
PREFINISHED METAL FLASHING: BF
124' -
123' - 6 T/O GIRTS (H.P.) 3/4" W1a EXTERIOR WALL @ OFFICE (11 1/2") R1
R1 R1
T/O 120' PURLINS - 6" (L.P.) T/O PURLINS (L.P.)
PREFIN METAL GUTTER
ENDFRAME RAFTER BY ROBERTSON BUILDING SYSTEMS
PREFIN METAL FLASHING
URLINS
120' -
PREFIN METAL GUTTER PREFIN METAL GUTTER BY ROBERTSON BUILDING SYSTEMS PREFIN METAL FLASHING PREFIN METAL FLASHING Z-PURLINS
W2 EIFS EXTERIOR WALL @ OFFICE (1'-6 1/2") EIFS SYSTEM - 1 GUTTER 1/2" EPS - SEE SPECIFICATIONS PREFIN METAL BY ROBERTSON VAPOUR PERMEABLE AIR BARRIER MEMBRANE BUILDING SYSTEMS (HENRY 'AIR-BLOC 17MR' OR EQ.) ON 1/2" DGGMETAL SHEATHING C/W TAPED JOINTS PREFIN FLASHING TAPE:BAKOR 'BLUESKIN' BREATHER TYPE, 12" WIDE, SELF-ADHESIVE, VAPOUR PERMEABLE 6" 18 GA. ST. ST. @ 16" O.C. 1/2" DGG SHEATHING W1 3" RIGID INSULATION (R15) 2 7/8" AIR SPACE EXTERIOR 3 5/8" ST. ST. @ 16" O.C. 3 1/2" MINERAL WOOL INSULATION (R13.5) 7/8" GALVANIZED STEEL HORIZONTAL 20 GAUGE FURRING CHANNELS 16" O.C. 6 MIL POLY. VAPOUR BARRIER 1/2" PTD GWB
Z-PURLINS
Z-PURLINS BY ROBERTSON BUILDING SYSTEMS
EXTERIOR
EXTERIOR
EXTERIOR EXTERIOR
EXTERIOR
WAREHOUSE LOFT
W1
7'-2"
1'-2 1/4"
24'-0"
4'-0"
10'-10"
10'-9 7/8"
9'-0"
2'-8" 6"
5'-0"
1'-8" 2'-0"
MIN.
2'-0" MIN.
3" RIGID SM PERIMETER INSULATION
FREE DRAINING BACKFILL AS PER GEOTECHNICAL REPORT
2 A7 1 A8
ENGINEERED BACKFILL AS PER GEOTECHNICAL REPORT
ENGINEERED BACKFILL AS PER GEOTECHNICAL REPORT
1 PRE-ENG. WALLEIFS SECTION DOOR TYPICAL WALL@SECTION 1/2" = 1'-0" 1/2" = 1'-0" SCALE A6 SCALE
TYICAL PRE-ENG. ENDWALL SECTION SCALE 1/2" = 1'-0"
2'-0"
MIN. ENGINEERED BACKFILL AS PER GEOTECHNICAL REPORT
FREE DRAINING BACKFILL FIRESTOPPING - N/A THIS PROJECT
1
1.1
2
3
4
5
6
ENGINEERED BACKFILL AS PER GEOTECHNICAL REPORT
AS PER GEOTECHNICAL
ENGINEERED BACKFILL AS PER GEOTECHNICAL REPORT
TYPICAL OFFICE WALL SECTION SCALE 1/2" = 1'-0"
Suite 301, 1300 Carling Avenue OTTAWA, Ontario K1Z 7L2 Phone (613) 729-2211 Fax (613) 729-1558 E-mail: lkoffman@travelnet.com
FIRESTOP ALL FLOOR REPORT / WALL W3 / PARTITION FIRE SEPARATIONS AT ALL ROOF DECKS, BEAMS JOISTS, FLANKING WALLS, PENETRATIONS, ETC. WITH ULC APPROVED MATERIALS & SYSTEMS. NO GAP TO BE GREATER THAN 2 INCHES. ALL GAPS LESS THAN 5/8" - CAULK. ALL GAPS GREATER THAN 5/8" - EMPLOY COMPRESSED MINERAL WOOL FILL AND APPROVED SEALING MATERIAL BOTH SIDES. STANDARD OF ACCEPTANCE: FREE DRAINING BACKFILL MINERAL WOOL - HILTI THERMAFIBER (64 KG/M3) AS PER GEOTECHNICAL CAULK/SEALANT REPORT - HILTI CP606, HILTI CP601S OR - HILTI FS ONE
OWNER
REIMER WORLD PROPERTY CORP.
ENGINEERED BACKFILL AS PER GEOTECHNICAL REPORT PROJECT
STEEL STUD SYSTEMS DESIGN 1. SEE SPECIFICATIONS DIVISION 9. 2. ALL STUD SIZES, SPACINGS, SPANS, ETC. HEREIN ARE TO BE VERIFIED BY THE SUBTRADES DESIGN ENGINEER. ANY REQUIRED DESIGN CHANGES THAT DIFFER FROM SPECIFICATIONS HEREIN SHALL BE INCLUDED IN THE SUBTRADE'S COST OF WORK, 3 EIFSSTEEL. WALL SECTION INCLUDING ANY MISCELLANEOUS
3 PRE-ENG. VESTIBULE SECTIONWALL SECTION @ O/H DOOR = 1'-0" 1/2" = 1'-0" A7 1/2" SCALE SCALE
2 A6 2 A8
LEONARD KOFFMAN ARCHITECT
W3a R1 STANDING SEAM METAL ROOF 1 3/4" PREPAINTED 24 GA. GALVANIZED STEEL STANDING SEAM ROOF PANELS ON DRAPED BUILDING INSULATION C/W FOIL VB INTEGRAL ON 10" METAL PURLINS -SEE ROBERTSON DRAWINGS
W3
FREE DRAINING BACKFILL FREE DRAINING ASBACKFILL PER GEOTECHNICAL AS PER GEOTECHNICAL REPORT REPORT
3" RIGID SM PERIMETER 3" INSULATION RIGID SM PERIMETER INSULATION
3"
TYPICAL ROOF CONSTRUCTIONS
3" RIGID SM PERIMETER INSULATION
W3
FREE DRAINING BACKFILL AS PER GEOTECHNICAL REPORT
100' - 0"
2'-0"
F2 MEZZANINE FLOOR STONE 3/4" T&G OSB OR PLYWOOD ON RETAININ 2x WOOD BLOCKING ON EARTH G WALL TJI PRE-ENG WOOD JOISTS -SEE STRUCTURAL DRAWINGS 10" BATT INSULATION (R38) 6 MIL POLY. VAPOUR BARRIER 1/2" GWB CEILING ON 1x WOOD FURRING 1'-1"
3"
2'-0" MIN. 5'-0"
MIN. 5'-0"
FREE DRAINING BACKFILL AS PER GEOTECHNICAL REPORT
W3
USED FOR CONSTRUCTION UNTIL SIGNED BY THE ARCHITECT. COPYRIGHT RESERVED. THIS DRAWING IS THE EXCLUSIVE PROPERTY OF LEONARD P KOFFMAN ARCHITECT AND SHALL NOT BE USED WITHOUT TH ARCHITECT'S CONSENT.
5'-4"
T/O LOADING GRADE
ENGINEERED BACKFILL AS PER GEOTECHNICAL REPORT
W3
PERTINENT CODES AND BY-LAWS.
DO NOT SCALE DRAWINGS. F1 F1 THIS DRAWING MAY NOT BE
TYPICAL FLOOR CONSTRUCTIONS 100' - 0" T/O GROUND FLOOR
2'-0"
JUNE 18, 2015
DIMENSIONS SITE AND REPORT ALL ERRORS SILL GASKET AND PTON PLY BETWEEN SILL GASKET AND AND/OR PT PLYFURRINGS OMISSIONS TO THE ARCHITECT. HORIZONTAL BETWEEN VERTICAL ALL CONTRACTORS MUST COMPLY WITH ALL FURRINGS
F1 CONCRETE SLAB REINFORCED POURED CONCRETE SLAB ON GRADE -SEE STRUCTURAL
3" RIGID SM PERIMETER INSULATION
1'-1"
2'-0"
2'-0"
F1
OWNER SUPPLIED DOCK LEVELER BY NORTHERN DOCK SYSTEMS
JUNE 18, 2015
TENDER
IT IS THE RESPONSIBILITY OF THE APPROPRIATE CONTRACTOR TO CHECK AND VERIFY ALL
P2 GENERAL PARTITION (7") PREFINISHED METAL SILL, 1/2" PTD GWB BOTH SIDES OF PREFINISHED METAL SILL, - COLOUR TOTO MATCH SIDING MATCH SIDING 2x6- COLOUR WOOD STUDS @ 16" O.C. 3" BATT INSULATION 6 MIL POLY. VAPOUR BARRIER FLOOR TO GWB @ U/S TJI's U/N
W3a
3"
96' - 0"
MIN. 5'-0"
- COLOUR TOTO MATCH - COLOUR MATCH SIDING SIDING
6"
6" 3'-5"
2'-0" 4'-0"
2'-0"
MIN.
4'-0" MIN. 5'-0"
TYPICAL PAIR OF DOCK BUMPERS PER O/H DOOR AS SELECTED BY EARTH OWNER
STONE RETAININ G WALL
3" RIGID SM 3" PERIMETER RIGID SM PERIMETER INSULATION INSULATION
ISSUED FOR THE PURPOSE OF:
PERMIT
OFFICE LUNCH ROOM GWB RETURN ALL AROUND CONSTRUCTION
MIN. 5'-0"
6'-8"
8'-0"
2'-0" 2'-0"
FLASHING MEMBRANE (HENRY 'AIR-BLOC No. DATE DESCRIPTION LF' OR EQ.) ON 5/8" PT. PLYWOOD REVISIONS: BLOCKING SCREWED TO ST.ST.@ HEADER, JAMBS & SILL
P1a GENERAL PARTITION (7") 1/2" PTD GWB BOTH SIDES OF 2x6 WOOD STUDS @ 16" O.C. METAL 3" BATTPREFINISHED INSULATION PREFINISHED METAL FLOOR TO GWB @ U/STRIM, TJI's U/N TRIM,
BOLLARD, - SEE DETAIL
F1
6" 6"
1 1/2"
6" 4'-0"
3" BATT INSULATION FLOOR TO GWB @ U/S TJI's U/N
VESTIBULE
F1
T/O GROUND FLOOR 100' - 0" T/O T/OGROUND GROUND FLOOR 100' - 0" FLOOR
MEETING ROOM
SEE ALSO NOTES BELOW FOR 'FIRESTOPPING' AND 'STEEL STUD SYSTEMS DESIGN'
SHIM & FOAM WINDOW FRAME ASAS SHIM & FOAM WINDOW FRAME REQUIRED, REQUIRED, P1 GENERAL PARTITION (4& 5/8") INSTALL FOAM BACKER ROD INSTALL FOAM BACKER ROD & 1/2" PTD GWB BOTH SIDES OF WEATHERPROOF SEALANT ALL WEATHERPROOF SEALANT ALL AROUND, INSIDE & OUT 2x4 WOOD STUDS @ 16" AROUND, INSIDE &O.C. OUT
SILL GASKET AND PT PLY BETWEEN VERTICAL FURRINGS
- 0" LOADING T/O LOADING 96' - 0" 96'T/O GRADE GRADE
MIN. 5'-0"
TERMINAL MANAGER'S OFFICE
PREFINISHED METAL TRIM, - COLOUR TO MATCH SIDING
100' - 0"
FREE DRAINING BACKFILL AS PER GEOTECHNICAL REPORT
10'-9 7/8"
10'-10"
WAREHOUSE
TYPICALMETAL PARTITION CONSTRUCTIONS PREFINISHED FLASHING, PREFINISHED METAL FLASHING, - COLOUR TOTO MATCH SIDING - COLOUR MATCH SIDING
OWNER SUPPLIED - O/H DOORS BY NORTHERN DOCK SYSTEMS (MANUAL OPERATION)
8'-6"
10'-11 1/4"
PREFINISHED METAL FLASHING, - COLOUR TO MATCH SIDING GARAGE DOOR COMPRESSION SEAL SUPPLIED AND INSTALLEDSHIM BY & FOAM DOOR FRAME AS W1a REQUIRED, NORTHERN DOCK SYSTEMS INSTALL FOAM BACKER ROD & WEATHERPROOF SEALANT ALL AROUND, INSIDE & OUT
F1 F1
1'-1"
1'-2 1/4"
24'-0" 1'-2 1/8"
SILL GASKET AND PT PLY BETWEEN HORIZONTAL FURRINGS
100'GROUND - 0" T/O GROUND FLOOR - 0"GROUND T/O FLOOR 100' - 0" 100'T/O FLOOR
W3a
W3a FOUNDATION WALLS 16" REINFORCED CONCRETE AS PER STRUCTURAL DWGS. 3" RIG. SM. INSULATION, ADHERED TO INTERIOR PERIMETER W1a W2 FROM U/S FLOOR SLAB TO 2'-0" BELOW FINISHED GRADE
W2
SILL GASKET AND PT PLY BETWEEN HORIZONTAL FURRINGS
3" RIGID SM PERIMETER INSULATION
W3 FOUNDATION WALLS 10" REINFORCED CONCRETE AS PER STRUCTURAL DWGS. 3" RIG. SM. INSULATION, ADHERED TO INTERIOR PERIMETER FROM U/S FLOOR SLAB TO 2'-0" BELOW FINISHED GRADE
P1
GENERAL OFFICE
2'-0"
3" RIGID INSULATION (R15) 3 5/8" ST. ST. @ 16" O.C. 6 MIL POLY. VAPOUR BARRIER 1/2" PTD GWB
VENTED ALUMINUM SOFFIT
PREFINISHED W2 STEEL LINER PANEL
F1
WAREHOUSE
20'-0"
PREFIN METAL FLASHING, COLOUR - CRIMSON RED PREFIN METAL FLASHING COLOUR - CRIMSON RED PREFINISHED STEEL LINER PANEL
1'-2 1/2"
GARAGE DOOR COMPRESSION SEAL SUPPLIED AND INSTALLED BY NORTHERN DOCK SYSTEMS
F2
10 1/8"
WAREHOUSE
F2
T/O WAREHOUSE LOFT 112' - 0" T/O WAREHOUSE LOFT
1'-2 1/4"
112' - 0"
3'-6"
1'-2 1/8"
13'-4" 23'-6"
T/O WAREHOUSE LOFT
OWNER SUPPLIED - DOCK LEVELER BY NORTHERN DOCK SYSTEMS
A6
SB-10
7
8
SCALE 1/2" = 1'-0"
APEX MOTOR EXPRESS TRUCK TERMINAL 1599 ST. LAURENT BLVD. OTTAWA, ONTARIO @ OFFICE WINDOW DRAWING TITLE
1. ALL CONTRACTORS READ AND COMPLY 3 SHALL OFFICE WALL SECTION WITH SB-10 PROJECT INFORMATION DETAILED FORMS 1/2" = 1'-0" IDENTIFIED IN THEA8 LIST OFSCALE CONTRACT DOCUMENTS ON DRAWING A0.
9
10
WALL SECTIONS @ WINDOW
11
12 DRAWN
283'-3"
DATE
JS
30'-11"
30'-6"
24'-0"
24'-0"
24'-0"
30'-0"
24'-0"
24'-0"
24'-0"
24'-0"
23'-10"
SCALE
JUNE 04/15
PROJECT NORTH
AS NOTED PROJECT N째
1408 CONCRETE PAD FOR GENERATOR 5' x 10' +/- (TO SUIT) SEE CIVIL
REVISION N째
10'-0"
2'-0" 8'-0" 3'-6"
3'-3"
44
43
4 2
A PORTAL FRAME AND STORAGE CROSS BRACING ABOVE; SEE STRUCTURAL
W1a
DRIVER LUNCH ROOM/ LOCKERS
OFFICE LUNCH ROOM
3 A6 73'-6"
2 A6
40
39
3'-0" 2'-4" 2'-4" 3'-0" 8'-0" 3'-4" 8'-0"
38
37
9'x9' OVERHEAD DOOR SUPPLIED AND INSTALLED BY NORTHERN DOCK SYSTEMS
YELLOW SAFETY STRIPE FOR SAFE PEDESTRIAN TRAVEL AREA
MALE WR 2 MALE WR 1
2'-0" 8'-0" 3'-6"
1'-6" 9'-0"
2'-0" 8'-0"
4'-6"
8'-0"
34
33
32
3 1
30
29
28
27
26
9 A1
25
TYPICAL DOCK LEVELER AND DUMPERS, - SEE DETAIL 3/A7
9'x9' OVERHEAD DOOR SUPPLIED AND INSTALLED BY NORTHERN DOCK SYSTEMS PORTAL FRAME AND CROSS BRACING ABOVE; DOCK LEVELER SEE STRUCTURAL SUPPLIED AND INSTALLED BY NORTHERN DOCK SYSTEMS NOTE: PIT BOXES TO BE INSTALLED BY GENERAL CONTRACTOR
9'x9' OVERHEAD DOOR SUPPLIED AND INSTALLED BY NORTHERN DOCK SYSTEMS
TYPICAL BOLLARDS AT OVERHEAD DOORS, - SEE DETAIL 2/A1
G04
24
23
F.F.E. = 100'-0" (71.2 GEODETIC)
W1 22 NOTE: ROBERTSON TO PROVIDE FULL VERTICAL LIFT BACKING FOR O/H DOOR INSTALLATION (SPRING PAD MOUNTS TO BE PROVIDED BY DOOR INSTALLER)
GENERAL OFFICE
PORTAL FRAME AND CROSS BRACING ABOVE; SEE STRUCTURAL
3 A8
1'-5"
2 A5
2
3
4
5
6
7
8
8'-0"
5'-0"
8'-0"
2'-4"
2'-6"
5 A5
8'-0" 3'-6" 2'-0"
9'-0" 1'-6"
8'-0" 4'-0" 8'-0" 2'-0"
1 1
1 2
1 3
1 4
15
9'x9' OVERHEAD DOOR SUPPLIED AND INSTALLED BY NORTHERN DOCK SYSTEMS
1 7
16
1 8
1 9
21
G05
2'-0"
8'-0" 4'-0" 8'-0" 2'-0"
2'-0"
A
1 A5
1 A8
B
3 A5
C
20
3 A10
W1
LINE OF CANOPY ABOVE
3'-4"
1 0
9
DOCK LEVELER SUPPLIED AND INSTALLED BY NORTHERN DOCK SYSTEMS NOTE: PIT BOXES TO BE INSTALLED BY GENERAL CONTRACTOR
9'x9' OVERHEAD DOOR SUPPLIED AND INSTALLED BY NORTHERN DOCK SYSTEMS
G06
1
3 A1
W1a
GROUND FLOOR PLAN SCALE 1/16" = 1'-0"
GARAGE DOOR COMPRESSION SEAL SUPPLIED AND INSTALLED BY NORTHERN DOCK SYSTEMS
G07
C
2 A8
9'x9' OVERHEAD DOOR SUPPLIED AND INSTALLED BY NORTHERN DOCK SYSTEMS
TERMINAL MANAGER'S OFFICE
SALES MEETING OFFICE ROOM
1 A1
2'-0" 2'-0" 8'-0" 4'-0" 8'-0"
SB-10 NOTE: TEMPERATURE IN WAREHOUSE TO BE MAINTAINED AT 10째C MAX
W1a
PORTAL FRAME AND CROSS BRACING ABOVE; SEE STRUCTURAL
2'-0" 2'-0" 8'-0" 4'-0" 8'-0"
WAREHOUSE
UNISEX UNIVERSAL WR
1 A6
35
36
TYPICAL 8'x9' OVERHEAD DOOR SUPPLIED AND INSTALLED BY NORTHERN DOCK SYSTEMS GARAGE DOOR COMPRESSION SEAL SUPPLIED AND INSTALLED BY NORTHERN DOCK SYSTEMS
VESTIBULE
4 A1
2'-0" 3'-6" 8'-0"
G03
9'x9' OVERHEAD DOOR SUPPLIED AND INSTALLED BY NORTHERN DOCK SYSTEMS
P2
1'-6" 9'-0"
8 A1
W1
G01
W2
3 A5
7 A1
G02
LINE OF CANOPY ABOVE
B
4 1
2'-0" 2'-0" 8'-0" 4'-0" 8'-0"
8'-0" 4'-0" 8'-0"
1 A5
2'-0" 2'-0" 8'-0" 4'-0" 8'-0"
7'-8" 3'-5"
36'-9"
4 A6
1'-6" 9'-0"
LINE OF CANOPY ABOVE
3'-4" 7'-9"
2'-0" 2'-2" 2'-6" 9'-0" 3'-4" 8'-0"
3'-6"
6 A1
UTILITY & NETWORKING
5 A1
A7
3 A7
8'-0" 4'-0" 8'-0"
18'-0"
1 A2
2 A7
3'-9"
1 A7
2'-0"
1'-6 1/2"
12'-0"
DRAWING N째
2'-0"
48'-0"
4 A5
5 A5
3'-8"
12' WIDE CONCRETE RAMP UP
2 A5
2'-0"5'-0"
CONCRETE PAD FOR GARBAGE CONTAINER 12' x 18' +/- (TO SUIT) SEE CIVIL
36'-9"
EERED BACKFILL AS PER ECHNICAL REPORT
F2
PREFIN METAL FLASHING, COLOUR - CRIMSON RED
W2a
W1 FRONT ENTRANCE CANOPY: 2-PLY MOD BIT ON 5/8" PT. PLY ON 2x10 PT FRAMING
20'-0"
PREFIN METAL FLASHING COLOUR - CRIMSON RED
VARIES, 20'-0" TO 23'-0 3/4"
112' - 0"
11'-6"
W1 W1 W2a
PROJECT SPECIFIC
16'-10"
WAREHOUSE LOFT
- ADJUSTABLE - ABOVE FINISHED FLOOR - BARRIER FREE - BOTH SIDES - CONTROL JOINT - COMPLETE WITH - DOOR/FRAME/HARDWARE - EQUAL - EXISTING - FIRE RESISTANCE RATING - GOOD ONE SIDE - INTERIOR DESIGN - NOT IN CONTRACT - NOT TO SCALE - ON CENTRES - OVERHEAD - PAINTED - PRESSURE TREATED 120' - 6" - UNDER COUNTER - UNLESS NOTED OTHERWISE - UNDERSIDE - WATER RESISTANT
ACT - ACOUSTICAL TILE Z-PURLINS BY ROBERTSON BUILDING ALUM - ALUMINUM SYSTEMS- CONCRETE CONC CL. - CLEAR ANODIZED ANOD CT - CERAMIC TILE DGG - DENS-GLASS GOLD EIFS - EXTERIOR INSULATED WAREHOUSE LOFT FINISHING SYSTEM FD - FLOOR DRAIN WAREHOUSE LOFT GWB - GYPSUM WALL BOARD HM - HOLLOW METAL W2a W2a EIFS EXTERIOR WALL @ WAREHOUSE LOFT (1'-6 1/2") PGWG - POLISHED GEORGIAN EIFS SYSTEM - 1 1/2" EPS - SEE SPECIFICATIONS WIRED GLASS VAPOUR PERMEABLE AIR BARRIER MEMBRANE PSF - PRESSED STEEL FRAME (HENRY 'AIR-BLOC 17MR' OR EQ.) ON EXTERIOR RB - 4" RUBBER BASE 1/2" DGG SHEATHING C/W TAPED JOINTS RD - ROOF DRAIN TAPE:BAKOR 'BLUESKIN' BREATHER TYPE, F2 F2 RWL - RAIN WATER LEADER 12" WIDE, SELF-ADHESIVE, VAPOUR PERMEABLE SCW - SOLID CORE WOOD 6" 18 GA. ST. ST. @ 16" O.C. ST.ST. - STEEL STUDS 112' - 0"1/2" DGG T/OSHEATHING WAREHOUSE LOFT 112' - 0"
WAREHOUSE LOFT EXTERIOR
F.R.R. G1S I.D. N.I.C. R1 N.T.S. O/C O/H PTD PT U/C U/N U/S WR
10'-10"
120' - 6"
R1
1 1/2" PREPAINTED GALVANIZED STEEL SIDING PANELS (ROBERTSON) MECHANICALLY FASTENED TO Z-GIRTS 10" METAL HORIZONTAL Z-GIRTS (SEE ROBERTSON DWGS) DRAPED BUILDING INSULATION C/W FOIL VB INTEGRAL (R20) 7 1/2" BATT INSULATION TO FILL CAVITY (R26) 7/8" GALVANIZED STEEL VERTICAL 20 GAUGE FURRING CHANNELS 6"1/2" PTD T/O PURLINS (L.P.) GWB
2'-0"
120'PURLINS - 6" T/O PURLINS (L.P.) - 6"PURLINS T/O (L.P.) 120' - 6" 120'T/O (L.P.)
W1 PRE-ENG EXTERIOR WALL W/SIDING (11 3/4") COLOUR TO MATCH EIFS, B/S ON 'PEEL & STICK' WATERPROOF 1 1/2" PREPAINTED GALVANIZED STEEL SIDING PANELS CJ MEMBRANE (BAKOR 'BLUESKIN (ROBERTSON) MECHANICALLY FASTENED TO Z-GIRTS SA') C/W 10 1/4" METAL HORIZONTAL Z-GIRTS (SEE ROBERTSON DWGS) ON 5/8" PT. PLYWOOD D/F/H 0"DRAPED T/O ENTRANCE FACADE BUILDING INSULATION C/W FOIL VB INTEGRAL (R20) EQ PREFINISHED GALVANIZED STEEL LINER PANELS, EX TO 8'-0" HIGH
VARIES
T/O ENTRANCE FACADE
123' - 6 3/4"
ADJ A.F.F.
TYPICAL EXTERIOR WALL CONSTRUCTIONS
4" TO 1'-6"
124' - 0"
VARIES
R1
GENERAL LEGEND
1
MIN.
VARIES
(H.P.)
C
PREFINISHED METAL FLASHING: COLOUR TO MATCH EIFS, ON 'PEEL & STICK' WATERPROOF MEMBRANE (BAKOR 'BLUESKIN SA') ON 5/8" PT. PLYWOOD R1
PREFINISHED METAL FLASHING: COLOUR TO MATCH EIFS, ON 'PEEL & STICK' WATERPROOF MEMBRANE (BAKOR 'BLUESKIN SA') ON 5/8" PT. PLYWOOD
T/O ENTRANCE FACADE R1
PREFIN METAL GABLE TRIM BY ROBERTSON BUILDING T/O GIRTS SYSTEMS
T/O GIRTS (H.P.) 123' - 6 3/4"
TYPICAL WALL, PARTITION, FLOOR & ROOF CONSTRUCTIONS
A 1
C
4" TO 1'-6"
124' - 0" 123' - 6 3/4"
1
4" TO 1'-6"
A
12
8'-0" 3'-0" 2'-4"
1 A10
3'-4"
8'-0" 2'-4"
3'-0"
9'-0" 1'-6"
3'-6" 8'-0" 2'-0"
8'-0" 4'-0" 8'-0" 2'-0"
2'-0"
8'-0" 4'-0" 8'-0" 2'-0"
2'-0"
8'-0" 3'-6" 2'-0"
9'-0"
8'-0"
4'-6"
8'-0"
1'-6" 2'-0"
4 A5
08
Profile
Beach volleyball player / bookworm / ping-pong expert / Toronto-based Ottawa Senators fan / Olympics enthusiast / summer cyclist / aspiring poolshark / dog person / cottage goer / skier and boarder / drummer
call : 613.791.5590 email : justin.spec@gmail.com send : 3991 St Laurent Blvd / H2W 1Y4 / Montreal, QC
Thank you for your consideration. Justin Spec