*ADA PIPE RAIL IS TYPICAL INNER CIRCUMFERENCE OF THE PUBLIC PORTION OF THE MAIN DOCK. THE SIMPLE PIPE RAIL SHALL RECEIVED BRAIDED CABLES AT 4" O.C.
5 A 2.3
*BOTTOM C-CHANNEL SHALL NOT EXCEED 4" FROM SEA BED S-1
12' - 0"
4' - 0"
G-1
CONCRETE FILLER.
1' - 6"
*ELECTICAL CONDUIT IS RUN THROUGH TOP AND BOTTOM SECURITY FENCE RAIL.
4' - 0"
1' - 0"
4' - 0"
1' - 6"
1' - 9"
1' - 6"
FIBERGLASS PANEL 4 A 2.3
1' - 9"
24' - 0"
4' - 0"
OutterPen 3' - 6"
4' - 0"
1' - 0" 8"
1' - 9"
1' - 0"
12" C-CHANNEL: ELEVATION VARIES TO FOLLOW SEA BED
4' - 0"
CHAIN LINK MESH
5
A 2.2
A-1
1' - 4"
1' - 0"
12" PILE
G-2
S-1
SeaLevel 0' - 0"
8"
8"
1' - 0"
8"
3 A 2.3
1' - 0"
DOLPHIN HABITAT (CORAL WORLD ST. THOMAS, VI) 2013
SHOWN: 24'-0" DOCK CHANNEL. EACH DOCK CHANNEL SECTION (TYP) SHALL RECEIVE (8) 48" X 48" FIBERGLASS PANELS.
NOTE: SHOWN: 12'-0" DOCK CHANEL
CONCRETE FILLER. G-1
SEA BED 8
5
DOCK TYPICAL SECTION
4
CO DOCK TYPICAL
A 2.3