PT. MARI TEAM INDONESIA




PT. MARI TEAM INDONESIA is a full-service structural and miscellaneous steel fabricator. We can take your project from the architectural drawings stage to the stage of fabricated steel ready to be erected in the field. And we have a group of experienced workers who will provide a quality product and ontime delivery.
1. Main Office: Ruko Permata Hijau Blok C No.8, Batuaji, Batam, Kepulauan Riau - INDONESIA (29425)
2. Yard Office & Facilities :
World Wide Equipment SEA – Tathong Batam Jalan Tamalatea, Tanjung Sengkuang, Kota Batam Kepulauan Riau – INDONESIA (29453)
US
Mobile/WA : +62-822-91010097, +62-822-83012199
Email : pt.mariteam@gmail.com irwan@mariteam.co.id aji@mariteam.co.id
QA/QC MANAGER CHAIRUL
COMMISSIONER
MANAGING DIRECTOR
The management of PT. MARI TEAM INDONESIA is committed to providing high quality product services that satisfy our customer by:
• MDR (Manufacturing Data Record) shall completed maximum 1 month after delivery
• Request inspection from production will be follow up and performed by QC Inspector on the same day
• Welder repair rate max. 5%
QUALITY KPI
1 Documentation (Revised submission with client comments)
2 Documentation (MDR Completion)
3 Weld Repair Rate (Project Repair Rate)
5 Correction Action Report
6 Non-Conformance Report
Number of revised reports submitted to CONTRACTOR/ Number of planned revised document submission x 100%
93% Monthly
Number of MDRs completion within 4 weeks after job completed/ number of MDRs expected to be completed x 100% ≥ 93% Monthly
Length of rejected weld in project/ Length of weld project examined x 100% ≤ 5% Monthly
Number of CAR closed in 1 month/ Number of CAR issued x 100%
Number of NCR closed in 1 month/ Number of NCR issued x 100%
90% Monthly
90% Monthly
DISSIMILAR WELDING
TRIPLATE FABRICATION
TRIPLATE FABRICATION
CUTTER SUCTION MAINTENANCE
GRILLAGE STRUCTURE
GRILLAGE STRUCTURE
4. HEAVY EQUIPMENT/
(80T, 100T, 250T, 275T, 280T)
1. Welder SMAW/FCAW/GTAW = 20
2. Fitter = 25
3. General Worker/ helper = 30
4. Supervisor = 2
5. Foreman = 4
6. Blaster/ painter = 10
7. Scaffolder = 12
1. Generator Set = 2 units
2. Welding Machine = 24 set
3. Air Compressor = 1 unit
4. Gouging Machine = 3 units
5. Scaffolding
6. Blasting & Painting Equipment = Complete
7. Plasma Manual Cutting = 1 unit