Athabasca OIlsands Lease Map September 2011

Page 1

ATHABASCA OILSANDS LEASE MAP - SEPTEMBER 2011

PUTTING YOU ON SOLID GROUND

Oil Sands

INNOVATIVE SOIL STABILIZATION SOLUTIONS

Engineering Analysis Is Key To Optimization

& Heavy Oil

Performance

Performance Performance Performance under Pressure under Pressure Performance Performance under Pressure

underPressure Pressure ConstruCtion & FabriCation oF oilsands and Heavy oil FaCilities under under Pressure ConstruCtion & FabriCation oF oilsands and Heavy oil pits FaCilities Reduce borrow by 50%, reduce matting need,

Thermal Energy Inc. (TES) is an experienced, well-established, and Heavy oil FaCilities NORTHGATE TES CARES ConstruCtion &Services FabriCation oF oilsands reduce gravel required by 90%, improve productivity and Thermal Energyfabrication Services Inc. (TES)company is an experienced, well-established, multi-disciplined assembly, & construction ConstruCtion & FabriCation oF oilsands and Heavy oil FaCilities 510262ConstruCtion ConstruCtion 458099 812947 & FabriCation oF oilsands and Heavy oil FaCilities Thermal Energy Services Inc. (TES) isfabrication an experienced, well-established, money! Call today for your free consultation. & FabriCation oF oilsands and Heavy oilAnD FaCilities • SAGD FAcilitieS contrActor • SteAm GenerAtor inStAllAtion rentAlSsavecompany multi-disciplined assembly, & construction

NORWEST 761456

Thermal Energy Services Inc. (TES) is an experienced, well-established,

SERVICES • Appraisals • Reserves Assessment • Reservoir Simulation • Engineering Analysis

multi-disciplined assembly, fabrication & construction company

1-800-490-7192 SAGDFAcilitieS FAcilitieScontrActor contrActor • SteAm GenerAtor inStAllAtion AnD rentAlS ••SAGD • SteAm GenerAtor inStAllAtion AnD rentAlS Derrick Drive, Devon, Alberta T9G2A1 • SAGD FAcilitieS contrActor • SteAm12 GenerAtor inStAllAtion AnD rentAlS www.thermalenergy.ca

www.thermalenergy.ca

17

24

24

59

40

78

74

89 57 94 20 22

24

59

83

66

90

57 47 57

26

24 77

90 90

90

43

2

28

7 101

83

22

55

73

81

85

7

33

7

74

22

25

25

25

25

24

55

48

5

7

7

14

40

40 25

25

48

39

34 68

78

43

55

90

27

55

24

83

90

74 85

90

813

26 48 85

78

112

83

25

62

25

25

25

25

12 70

48

48 19

85

22

12

25

25

2

25

26

55

79

24 26

22

86

20 22 20 90 25 43

90

19

6 90

19

86

43

43

88

22

7

88 50 22

96

26

22

50

25

79

96 50

86 24

7

22 86 50

19 90

87

25

96

78

22

90

96

90

86

22

90

97

27 25

7

95 96

35

22

74

27

881 8

95 25

25

25

40

96

86

8

3

22

7

78

27

7

LEGEND

3

68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90

2

NORTHPINE NORWEGIAN O&G OILSANDS OSUM PAN PACIFIC PARAMOUNT PATCH PENGROWTH PENN PERPETUAL PETROBANK PETRO-CANADA PETROLAND PETROLEO PLUNKETT POPLAR PROTERRA RANGER REGENT SANDSTONE SASKATOON SCOTT

1 5M 26

25

91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112

24

SENTINEL SHELL SILVERBIRCH SIRIUS SOUTHERN STANDARD STATOIL STONE STRATA SUNCOR SUNSHINE SYNCRUDE TECK TOTAL TOWNSHIP TRAFALGAR TRAFINA VALUE WEST WESTERN LAND WHITECAP WINDFALL

23

22

21

20

19

Equal percentage leaseholders 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

ALBERTA OILSANDS & CONNACHER BOUNTY & GRIZZLY BP CANADA & DEVON BP CANADA & HUSKY CANADIAN NATURAL & CENOVUS CANADIAN NATURAL & DEVON CANADIAN NATURAL & HUSKY CANADIAN NATURAL, KOCH & SUNCOR CANADIAN NATURAL & PARAMOUNT CANOL & PERPETUAL CHEVRON, MARATHON & SHELL CHEVRON & SHELL CONOCOPHILLIPS & TOTAL IMPERIAL, JAPAN, NEXEN & SUNCOR IMPERIAL & NEXEN MURPHY & SHELL SILVERBIRCH & TECK

18

43

Edmonton, AB: 6111 - 91 Street NW, T6E 6V6 Phone: 780.944.9333 Fax: 780.944.9500 Toll Free: 1.800.563.2946

Calgary, AB: 2nd Floor, 816 - 55 Avenue NE, T2E 6Y4 Phone: 403.209.3500 Fax: 403.245.8666 Toll Free: 1.800.387.2446

Construction

Phase 2B

45,000

TBD

Approved

Phase A

60,000

2017

Announced

Phase 3

80,000

TBD

Approved

Phase B

60,000

TBD

Announced

Phase 1

110,000

2012

Construction

Phase 2

235,000

TBD

Approved

100,000

TBD

Application

Phase 1A

100,000

2010

Operating

Phase 1B

100,000

TBD

Approved

Commercial

155,000

2002

Operating

Expansion & Debottlenecking

115,000

TBD

Approved

Phase 1

100,000

2018

Application

Phase 2

100,000

TBD

Application

Phase 1

80,000

2020

Announced

Phase 2

80,000

TBD

Announced

Phase 3

80,000

TBD

Announced

Phase 4 Equinox

50,000

TBD

Announced

Millennium Debottlenecking

23,000

2008

Operating

Millennium Mine

294,000

1967

Operating

North Steepbank Extension

180,000

2012

Construction

25 14

Steen River

Zama Lake

Mount Watt

Whitesand Peace River Point

Fitzgerald

John D'Or Lake Claire Prairie

Fort Chipewyan

Chinchaga Bison River Lake

Wadlin Lake

Namur Lake

Bitumount

Clear Hills

Peerless

Algar Lake

Fort McMurray

Pelican

Winefred Lake

Grande Prairie Wapiti

Mount Robson

Peace River

Winagami Lesser Slave Lake

Iosegun Lake

Whitecourt Tawatinaw Sand River

Edson

Wabamun Lake

Edmonton Vermilion

Rocky Mountain House

Red Deer

Calgary

Drumheller Oyen

Brazeau

12

11

10

Reading Alberta LSD Numbers

Alberta Bistcho Lake

13

­ anadian C Natural Resources Limited

Tp 56

19 18 7 6

Wainwright

Gleichen

Medicine Hat

Lethbridge

Foremost

9

8

7

6

5

Alberta Oilsands Deposits

4

3

2

TBD

Approved

165,000

2016

Approved

120,000

TBD

Application

100,000

2016

Approved

Aurora South Train 2

100,000

2018

Approved

Base Mine Stage 1 & 2 Expansion

290,700

1978

Operating

Stage 3 Expansion

116,300

2006

Operating

100,000

2018

Approved

20 17 8 5

21 16 9 4

22 15 10 3

Peace River

Section

23 14 11 2

24 13 12 1

Fort McMurray

­ onocoPhillips C Canada Limited­

16 9 8 1

Legal Subdivision 40 acres

Peace River

Edmonton

Calgary Cold Lake

Cold Lake

600

2011

Operating

Gemini holds itself accountable for the solutions we provide.

Ponoka, AB p 403.783.3365

­ Devon Canada Corporation­

Phase 1

43,333

2016

Application

Phase 2

43,333

TBD

Announced

Phase 3

43,334

TBD

Announced

Phase A

35,000

TBD

Application

Phase B

15,000

TBD

Announced

Algar Pod 2

10,000

2010

Operating

Expansion

24,000

TBD

Application

100,000

TBD

Announced

57,250

TBD

On Hold

Phase 2

57,250

TBD

On Hold

CAPACITY

START-UP

10,000 4,500

2016 2012

­ rizzly Oil G Sands Ulc

Application

12,000

2015

Announced

Phase 2

25,000

2018

Announced

35,000

2021

2007

Operating

­ arvest H Operations Corp.­

Announced

30,000

2020

Announced

10,000

2002

Operating

Phase 1B

8,000

2002

Operating

Phase C

40,000

2011

Construction

Phase D

40,000

2013

Construction

Phase E

40,000

2014

Approved

Phase F

40,000

2016

Approved

Phase G

40,000

2017

Approved

Phase H

40,000

2019

Application

TBD

Application

2004

Operating

35,000

2006

Operating

Stage 3

62,500

2011

Operating

Stage 3-6 Debottleneck

23,000

TBD

Application

Stage 4

62,500

2013

Construction

Stage 5

62,500

2018

Approved

Stage 6

62,500

2019

Approved

Phase 1

50,000

2015

Application

Subsequent Phases

200,000

TBD

Application

Mackay River Phase 1

35,000

2014

Application

Phase 2

40,000

2017

Application

Phase 3

40,000

2019

Application

Phase 4

35,000

TBD

Application

Phase 1

10,000

2014

Application

Pilot

N/Q

2007

Operating

Phase 1

5,000

2013

Application

­ uncor Energy S Inc.

Phase 2

5,000

2014

Application

10,000

2013

Construction

Phase 2

20,000

2015

Application

755

2011

40,000

TBD

Application

Phase 2

40,000

TBD

Application

Phase 1

33,000

2002

Operating

Phase 2

40,000

2016

Announced

MacKay River

Application

Phase 2

20,000

TBD

Application

35,000

2014

1,000

TBD

WorleyParsons is a leading global provider of professional services to the thermal and mineable oil sands industry. Our services cover the full asset spectrum both in size and lifecycle – from conceptual engineering to full EPC delivery, including self-perform fabrication and construction.

TBD

OPERATOR

PROJECT NAME

LOCATION

RECOVERY METHOD

Athabasca Oil Sands Corp.

Horizontal Heater Test

095-18W4

E

Blackpearl Resources Inc.

Athabasca

076-18W4

SAGD

081-22W4

EOR

081-23W4

EOR

081-22W4

EOR

073-07W4

SAGD

082-20W4

EOR

Athabasca

073-06W4

EOR

Brintnell

082-20W4

EOR

Foster Creek

070-04W4

SAGD

Pelican Lake

082-23W4

SAGD

Athabasca

n/a

E

Christina Lake

076-06W4

SAGD

Great Divide

082-12W4

SAGD

Algar

082-11W4

SAGD

Surmont

083-06W4

SAGD

Surmont Pilot

083-07W4

SAGD

Jackfish 1

075-06W4

SAGD

Jackfish 2

075-07W4

SAGD

Enermark Inc.

Kirby

076-08W4

SAGD

E-T Energy Ltd.

Athabasca

090-10W4

E

Harvest Operations Corp.

BlackGold

076-07W4

SAGD

Sunrise

095-07W4

SAGD

McMullen Thermal Conduction Pilot

078-25W4

E

Hangingstone

084-11W4

SAGD

Germain

085-22W4

SAGD

Saleski SAGD Pilot

085-19W4

E

Mackay River Pilot

090-14W4

SAGD

GRIPE

n/a

E

Christina Lake

077-05W4

SAGD

Nexen Inc.

Long Lake

085-07W4

SAGD

Petrobank Energy And Resources Ltd.

Whitesands

077-08W4

E

Shell Canada Limited

Athabasca

091-23W4

E

Southern Pacific Resource Corp.

STP-McKay

091-14W4

SAGD

Leismer

078-10W4

SAGD

Athabasca

081-09W4

SAGD

Mackay River

093-12W4

SAGD

Firebag

095-06W4

SAGD

Dover

093-13W4

SAGD

Meadow Creek

084-09W4

SAGD

Sunshine Oilsands Ltd.

Harper

095-24W4

CSS

Total E&P Joslyn Ltd.

Joslyn Creek

095-12W4

SAGD

Value Creation Inc.

Terre de Grace

096-13W4

SAGD

Approved Approved

2010

Athabasca Canadian Natural Resources Limited Kirby

Operating

­ unshine S Oilsands Ltd.

Phase 1

10,000

2013

Announced

Phase 2

10,000

TBD

Announced

Phase 2 Expansion

10,000

TBD

Announced

Phase 3

20,000

TBD

Announced

Phase 3 Expansion

10,000

TBD

Announced

11,000

1999

Phase 1

10,000

2014

Announced

Phase 2

20,000

2017

Announced

20,000

Phase 1 5,000 30,000

2012 2014

2020

Announced

West Ells

Operating

Construction Announced

T­ otal E&P Canada Ltd.

5,000

2012

Application

Phase 2

5,000

2013

Application

Phase 3

40,000

2018

Announced

Phase 4

40,000

2024

Announced

Operating

Phase 2

22,000

2009

Operating

­ alue V Creation Inc.

Joslyn Phase 2

10,000

2006

Suspended

Phase 1

40,000

TBD

Announced

Phase 2

40,000

TBD

Announced

Pilot

Phase 2B

35,000

2013

Construction

Phase 3A

50,000

2016

Application

TriStar

Phase 3B

50,000

2018

Application

Pilot

50,000

2020

10,000

1,000

TBD

2012

Approved

Application

Phase 1

50,000

2018

Announced

Phase 2

50,000

TBD

Announced

Hangingstone 2012

Announced

Operator

Fort Hills

96-10/11W4; 979/10W4; 98-10W4

SM, BE

Kearl Lake

02-09-097-07W4

SM, BE

40,000

TBD

Approved

40,000

TBD

Approved

Imperial Oil

2008

Operating

Phase B Debottleneck

6,000

2003

Operating

Phase C Stage 1

10,000

2005

Operating

Phase 3

72,000

TBD

Announced

Phase C Stage 2

20,000

2007

Operating

Phase 4

72,000

2018

Announced

Phase D

30,000

2009

Operating

Phase E

30,000

2009

Operating

72,000

TBD

Shell Canada Energy

TBD

Muskeg River

Approved Shell Canada Limited Suncor Energy Inc.

Hoole TBD

Announced

CONTINUED IN NEXT COLUMN

Recovery method

Calumet River

Long Lake South Phase 2 Operating

Location

Canadian Natural Resources Limited

Long Lake South Phase 1

2001

Field or area

96-11/12W4; E9613W4; 97-11W4; E97-12W4; 1, 2, 12-97-13W4

Fort Hills Energy Corporation

72,000

Connacher Oil And Gas Limited

Devon NEC Corporation

Husky Oil Operations Limited Japan Canada Oil Sands Limited Laricina Energy Ltd.

Meg Energy Corp.

Statoil Canada Ltd.

Suncor Energy Inc.

Application

MininG PROjects - location detail

500

Cenovus FCCL Ltd.

Mackay Operating Corp.

Terre de Grace 2008

Cenovus Energy Inc.

ConocoPhillips Canada Resources Corp.

Thickwood

Phase 2 Expansion

3,000

Commercial

40,000

Carbonate Pilot

Application

Phase 1 Pilot

Phase 2

40,000

Phase 2

Hangingstone Pilot

Phase 1

sands industry

Legend Lake

2014

Demonstration Plant

20M+ manhours in the oil

in situ projects LOCATION detail

Phase 1

Construction

20,000

Phase 2

40+ years of experience

Harper

Phase 1

Expansion

Phase 1

Meadow Creek

Phase 1

32,900+ personnel

www.worleyparsons.com

Lewis

BlackGold

24,000

CONTINUED IN NEXT COLUMN

20,000

35,000

Phase A

­ aramount P Resources Ltd.

Leismer Northwest

Stage 2

Long Lake

­Nexen Inc.

Application

Stage 1

Surmont

N-Solv Corporation

TBD

Operating

Phase 3C

Phase 1A

20,000

WORLEY 439817

Firebag

Christina Lake

­ EG Energy M Corporation­

Leismer Expansion

2007

Operating

Announced

Operating

25,000

2011

2020

Application

2010

Cogeneration and Expansion

1,800

15,000

TBD

10,000

Announced

Pilot

Construction

20,000

Leismer Demonstration

2016

Commercial

2013

Leismer

TBD

Announced

45,000

Application

Application

2013

Application

TBD

2015

10,700

2016

20,000

35,000

Phase 1

40,000

Hangingstone

Phase 3

Commercial Demonstration Phase 1

Kirby (North)

Application

Announced

Germain

Announced

TBD

TBD

Saleski 2018

40,000

40,000

Grouse 50,000

Corner Expansion

Phase 1

Pilot

L­ aricina Energy Ltd.

Application

Operating

Hangingstone

2024

2015

2011

Tamarack

60,000

40,000

35,000

Announced

Announced

Corner

Phase 2

2019

2026

Announced

Chard

25,000

60,000

Announced

TBD

Operating

Phase 3

Phase 2

2015

12,000

2007

Announced

Announced

12,000

Phase 2B

35,000

2016

2022

Phase 2A

Phase 1

25,000

60,000

Construction

Application

Phase 2

Phase 1

2012

Application

Approved

­

12,000

TBD

TBD

Operating

Phase 1

TBD

50,000

2011

On Hold

20,000

Phase 4

500

TBD

40,000

Application

Pilot

TBD

Pilot

Thornbury Expansion

Phase 1

J­ apan Canada Oil Sands Limited

Disclosed

Thornbury

Approved

Announced

TBD

Operating

TBD

TBD

90,000

1997

50,000

40,000

Subsequent Phases Grosmont

1,200

Phase 3

Commercial

Application

Pilot

Approved

Application

2013

Application

2016

TBD

10,000

TBD

50,000

1,000

Phase 1

20,000

Phase 2

I­ vanhoe Energy Inc.

Operating

Leismer South

Hangingstone 2013

2006

Construction

Construction

12,000

1,900

May River

2015

2014

Announced

Pilot

83,000

60,000

2014

On Hold

Phase 2

Sunrise 12,000

TBD

Operating

Phase 1

Phase 1 Demonstration

1,900

2007

Air Injection Pilot

­ usky Energy H Inc.

Expansion

27,000

McMullen

Announced

REGULATORY STATUS

Phase 1

Algar Lake

Announced

Phase 1

10,000

­Statoil

Poplar Creek

REGULATORY STATUS

START-UP

Kai Kos Dehseh

Dover

Northern Lights Mine Phase 1

­ outhern S Pacific Resource Corp.­

Kirby - Pike

­ over D Operating Corp.

CAPACITY

PROJECT/PHASE

STP-McKay

Jackfish

Foster Creek

13 14 15 12 11 10 5 6 7 4 3 2

Pilot

Royal Dutch Shell plc­

Surmont

Christina Lake

Cenovus Energy Inc.

Announced

Pod 1

Joslyn South Mine

Leismer

1

TBD

Commercial

Aurora South Train 1

Phase 2

Athabasca

Alberta

31 32 NWSW NESE 34 35 36 30 29 28 27 26 25

Connacher Oil And Gas Limited

Operating

25,000

Phase 2

60,000

Great Divide

Kirby (South)

eg 01-23-056-03W4 Quarter Section

2007

Phase 1

Commercial

15

4,000

Debottleneck

PROJECT/PHASE

Phase C

Telephone Lake Borealis

Fort Hills

Phase 1

48

17

16

Cenovus Energy Inc.

Muskeg River

Phase 1

­ etrobank P Energy And Resources Ltd.

Narrows Lake

Expansion

Steepbank Debottleneck Phase 3

OPERATOR

Grand Rapids

Kearl

Phase 1

27

R3

7/18/11 3:02 PM

2011/12

Birch Mountain

68

GRIZZLY HARVEST HERITAGE HUSKY IMPERIAL INTEGRITY IVANHOE JAPAN JOSLYN KEPPOCH KOCH LARICINA MADISON MARATHON MAVERICK MAXIMUM MEG ENERGY MERIDIAN MINERAL MSL ENVIRONMENTAL NEXEN NORTHERN ALBERTA NORTH PEACE

4

5,000

Blackrod BlackPearl Resources Inc.

69

45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67

5

Tranche 2

Hangingstone Pilot

70

6

Fourth Meridian

CANADIAN COASTAL CANADIAN FOREST CANADIAN LANDMASTERS CANADIAN NATURAL CAVALIER CENOVUS CENTENNIAL CHARTER CHEVRON CHINOOK CINDER CNPC CONNACHER CONOCOPHILLIPS CONTIGUOUS CRETACEOUS DEEP DEERGARDEN DEVON E-T ENERGY EXPECTED EXXONMOBIL FORT HILLS

7

Operating

Announced

Phase 1

Fifth Meridian

366337AB ALBERTA OILSANDS ALLIED ALPINE ALTERREN ANDORA ANTELOPE AOSC ARSENAL ATHABASCA BANCROFT BAYTEX BLACKJACK BLACKPEARL BLACKROCK BOUNTY BP CANADA BRIO BRISTOL BRITT BRONCO

8

25

Sixth Meridian

rscrental.com » 800-222-7777

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44

9

2007

2019

Gregoire Lake

71

Stop by a branch near you, visit us online, or call our 24/7 customer care center to learn more.

PRIMARY LEASEHOLDERS

10

39

­ thabasca Oil A Sands Corp.

74

8

25

112

22

n/a

25,000

Experimental Combustion Pilot

27

3

27

27

46

40

90

63

78

98

13

79 25 55

61

97

27

27

7

22

Tranche 1

Phase I

Phase 3

43

50 96

7

Approved

Dover West Clastics

72

18

No matter where the job takes you, count on RSC as the one-stop solution for your equipment and tool needs. Maximize jobsite efficiency and productivity with Total Control®, our comprehensive, web-based fleet management system that can save you time and money — up to one-third on your rental costs. And get the job done for your customers as well as the environment by utilizing E2T®, our groundbreaking equipment emissions tracking solution.

junewarren-nickles.com

79

25

75

79

90

Alberta Oilsands Inc

50

90 90 50

86 96 22

43 22

43 96

43

50

22 50 96

90

96

79

98

7

88

40

98

22

24

25

43

55

22

27

98

5

50

11

11-RSC-1253-AthabascaAd FINAL.indd 1

79

2013/14

Dover West Leduc Carbonates

27

16

112

35

25

97

98

22

27

75 79

98 112

112

16 16 25 43

65

98

35

22 97

10,000

Clearwater West

69

29

97

OPERATOR

25

97

14

7

56

4

Phase 2A

55

98

49

45

88

24

Approved

Pilot

100

57

24

35

86

19

90

22

61 14

97

15

25

20

8

62

14

101

25

50

25

RSC 531749

7

13 52

49

97

Approved

2017

In Situ - Recovery schemes (existing and planned detail)

73

25 83 25

83 25

109

19

90

48

63

65

104

34 14

22 111

20 85

56

2016

35,000

­E-T Energy Ltd.

74

74 48

32

96

40

32

32

111

74

27

50

35

48

112

40

90

20

20 59

90

59

SLAVE LAKE

82

107

107

55

55

32

34

50

75

78

24

99 98

32 59

97

52

35

52

56

25

56 96

34

881

14

97

14

14

35

22

14

T­ otal E&P Canada Ltd.

76

2

24

48

60

35

32

101 27

24

25 78

56

16

34

98

26

27

26

65 65

65

35,000

Phase 1

77

60 25 73 90 1 48

28

25

107

LESSER SLAVE LAKE PROVINCIAL PARK

22

60

90

25

24

101

98 98

100

16

111

50

14

12

34

70

14

25

34

98

14 56

22

25

45

32

7

21

25

80

98

Conklin (Whitesands)

Phase H

Joslyn North Mine

78

39

76

76

64

74

73 54

45

8

­ yncrude S Canada Ltd.

Approved

Phase G

Mildred Lake/Aurora North & South

79

55

55

98

45

98

56

34

49

27

754

39

25

25

25

97

2014

Operating

Phase 1

80

88

25

49

30,000

2008

Voyageur South

95

81

25

25

49

Suncor Energy Inc.

98

45

74

3

2

25

65

52

98

81 45 55

73

SilverBirch Energy Corporation

Phase F

135,000

Frontier

50

98

27

25

101

73

108

1 65

98

55

22

73

49

10

16

101

10

74 40 37 35 7

108

108

45

95

55 2

74 37 35

59

101

27

101

74

39

90

25

98

55

19

40

27

25

25

55

90

21

25

2

89

74

40

45 45

FORT MCMURRAY 101 2

45

22

90

96

28

37

108

82

25

21 25

21

55

25

25

21 25

2 22

56

112

45 10 56 55

90

25

55

21

25

26

26

45

55

45 45

37

55

73

45

56

56 37

89

55

25

56 45

55

98

55

98 37

55

90

25

25 21

21 25

78

20

25

56

55

45

47

27

45

33

45

37

55

73

25

48

28

91

43

90

56

55

42

51 53

Dawson Creek, BC p 250.782.7114

Lloydminster, SK p 403.255.2006

REGULATORY STATUS

Phase 1

83

55

20

23 48

15

25

25

9

28

96

25

29

22

45 98 95

55

11

96

90

403.212.1214

sales@geminicorp.ca www.geminicorp.ca

START-UP

REGULATORY STATUS

Base Operations

84

12

25

20

15

2

98

96

41

10

108

16

51

55

90

95

33

106

25

3

55

101

7 96

28

55

35

95

53

discover the power of us

f

CAPACITY

START-UP

Pierre River

85

12

96

43

43

92

11

55

86

25

75

106

63

11

95

33

94 26

100

58

45

55

45

74

20 10 48 94

55

15

15

98

26

101

55

22

78

72 112

55

2

101

16

12

89

96

43

10 48 72

101

16

16

16

94

92

47

26

16

78

58

96

26

98

58

55

16 16

71

Shell Albian Sands

87

12

45

14

26

33

58

14

112

110

55

90

101

16

16

73 101

27

100

100

78

37

14

14 101

55

49

102

96

55

14

45

33

105

55

14

14

98

25

45

14

4

88

12

14 45

55

102

16

Safety and quality are core values at Gemini and a fundamental part of every project.

Corporate Business Development Field Offices: Office: Fort Saskatchewan, AB p 780.998.5460 400, 839 – 5th Avenue SW Calgary, AB T2P 3C8 Sherwood Park, AB p 780.416.1112 p 403.255.2006

PROJECT/PHASE

CAPACITY

PROJECT/PHASE

Jackpine

89

16

45

14

98

96

55

112

37

4014

Imperial Oil Limited

55

27

55

45 78

71

98

Canadian Natural Resources Limited

90

96

10

92

25

22

OPERATOR

Horizon

48

25

100 26 100 30

55

90 48

30

16

55

45

98

19

686

67

55

98

30

104

55

83

74

90

73

9

16

77

110

90 55

45 101

83

112

45

22

89 67 55 89 55 89 55

7

16 12

45

77

55

14

67

112

78

45

104

16 37 45

49

102

45

104

37

25

45

49

112

91

90

55

28 90

10

112

57

101

24

48

TM

55

101

48

92

16

24 104

59

32

112

“The Piling Connection”

19

89 32

45

22

110

90

40

66

112

28

104

30

43

101

55

98

90

37

55

83

98

44

17

93

OPERATOR

92

6

24

7

24

22

90

28

100

45

Mining - Recovery schemes (existing and planned detail)

93

36

40

73 55

83

96

94

38

66

24

24

98

73

56

25

6

Platinum Grover

89

101

37

55

104

GEMINI 468902

ATHABASCA OILSANDS LEASE MAP 2011

95

40

90

57

112

25

90

22

20

22

40

40

7

89

110

92

90

90

94

59 90

27 59

24

22

17

90

104

96

40

55

Our “Fit for Purpose” solutions are completed successfully through planning, quality and safety programs, and applying scalable project management teams.

SEPTEMBER

97

48

112

17

62

90

108

100 108

98

7

89

40

7

90

103 99

24

90

35

90

84

45

73

108

73

100

7

98 104

90

22

90

58

90 90

112

11 12

98

55

17

Gemini delivers “Fit for Purpose” solutions that increase capital efficiency.

101

24

90

10

101

105

98

102

12

90

11

112

112

92

90

103

90

98

11

26

24

• Economic Forecasts • Management • Coal Bed Methane • Unconventional Resources

Tel: 403.266.8680 Fax: 403.266.1887 e-mail: degolyercal@demac.com www.demac.com

(403) 262-2737 info@caresltd.ca

11

88

• Petrophysical Studies • Geophysical Studies • Geological Studies • SAGD Modelling/Evaluations

DeGolyer and MacNaughton Canada Limited 1430, 311 - 6 Avenue SW Calgary, AB Canada T2P 3H2

www.thermalenergy.ca 1-800-490-7192 www.thermalenergy.ca 1-800-490-7192 12 Derrick Drive, Devon, Alberta T9G2A1 www.thermalenergy.ca 12 Derrick Drive, Devon, Alberta T9G2A1

90

Our Firm’s suite of engineering analysis services addresses drilling, completions, fluid injection, cycling waterflood technology, production and deliverability design considerations.This analysis is applied to conventional, heavy oil, coalbed methane and oil shale reservoirs.

DeGolyer and MacNaughton is recognized the world over as the leading-edge provider in oil and gas consulting.

multi-disciplined assembly, fabrication & construction company Thermal Energy ServicesThermal Inc. (TES) is an experienced, Energy Inc.well-established, (TES) is company an experienced, well-established, •Services SAGD FAcilitieS contrActor • SteAm GenerAtor inStAllAtion AnD rentAlS multi-disciplined assembly, fabrication & construction www.thermalenergy.ca multi-disciplined assembly, fabrication & construction • SAGD FAcilitieScompany contrActor • SteAm GenerAtor inStAllAtion AnD rentAlS

1-800-490-7192 1-800-490-7192 Derrick Drive, Devon, Alberta T9G2A1 12 12 Derrick Drive, Devon, Alberta T9G2A1 1-800-490-7192 12 Derrick Drive, Devon, Alberta T9G2A1

Gemini is a professional services firm designing, building and maintaining energy and industrial facilities.

Engineering Analysis Enhances Results.

Syncrude Canada Ltd.

95-10W4

SM, BE, OBU

BE

SM, BE

W6, W7, N&SW18, 19, 30, 31-95-8W4; 95-9W4

SM, BE

Mildred Lake

23-92-10W4

SM, BE, OBU

Fort Hills/Kearl Lake

94/95-8W4; 969/10/11W4

SM, BE

Mildred Lake

6-93-10W4

SM, BE, OBU

Jackpine River

RECOVERY METHOD LEGEND CSS E

Commercial Steam Stimulation Experimental

EOR

Enhanced Oil Recovery

HLR

Hydrocarbon Liquid Recovery

OBU

Oilsands Bitumen Upgrading

PP SAGD SM

If you would like additional copies of this chart or have questions/comments, please call 1.800.563.2946 or email mapping@junewarren-nickles.com. Every precaution has been taken to prevent errors or omissions and the publisher assumes no responsibility for damages caused by any errors or omissions.

Bitumen Extraction

Primary Production Steam Assisted Gravity Drainage Surface Mining


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.