Athabasca Oilsands Lease Map 2012

Page 1

LEaN NOT MEaN

Engineering excellence

from concept through closure

AMEC is a supplier of consultancy, engineering and project management services to the world’s oil and gas, minerals and metals, clean energy, environment and infrastructure markets. We design, deliver and maintain landmark projects employing over 27,000 people in around 40 countries worldwide.

Available immediately from inventory

As SAGD specialists, PROJEX brings over 1,000,000 hours of experience and proven rigor to oil sands thermal engineering projects. What we don’t bring is red tape and bureaucracy. We’d welcome the chance to show you the PROJEX difference. Give us a call at 403.705.4100.

INDUSTRY LEADER

Toll Free:

1 800 528 9899

IN WELL SERVICING for 30 years

“Performance Excellence – Second to None”

IN-SITU HEAVY OIL EXPERTS

Fleet of 103 service rigs inclusive of:

We are a leading service provider to Alberta’s unconventional oil and gas industry, having worked on virtually every major oil sands lease in Canada since 1991, and more than 20 years of experience developing in situ projects and deep-reserve extraction.

EXPERIENCE • EXCELLENCE • EXECUTION

• Mobile Singles

• Skidded Doubles

• Mobile Doubles

• Slant rigs

www.ensignenergy.com

www.projex.ca

Lease or Purchase

Engineering | Design | Procurement | Project Management

Calgary sales 403.265.6361

info@sprung.com

GRANDE PRAIRIE • NISKU • RED DEER • BROOKS • ARDMORE • LLOYDMINSTER • ESTEVAN

www.sprung.com/oilgas

AMEC – world skills on your doorstep.

OILSANDS MINING PROJECTS

IN SITU PROJECTS - SOUTH ATHABASCA REGION

OPERATING PROJECTS - NORTH ATHABASCA REGION

OPERATING IN SITU PROJECTS - SOUTH ATHABASCA REGION

OPERATOR NAME Canadian Natural Resources Limited Shell Albian Sands

PROJECT NAME Horizon Horizon Jackpine Muskeg River

Suncor Energy Inc.

Base Operations

Syncrude Canada Ltd.

Mildred Lake/Aurora North & South

PHASE NAME Phase 1 Tranche 2 Phase 1A Commercial Millennium Debottlenecking Millennium Mine North Steepbank Extension Steepbank Debottleneck Phase 3 Base Mine Stage 1 & 2 Expansion Stage 3 Expansion

CAPACITY (BBL/D) 135,000 5,000 100,000 155,000 23,000 294,000 180,000 4,000 290,700 116,300

LOCATION 16-36-096-12W4 16-36-096-12W4 16-22-095-09W4 10-15-095-10W4 09-23-091-09W4 09-23-091-09W4 08-27-092-09W4 08-27-092-09W4 06-15-093-11W4 07-15-096-10W4

BUDGET (C$MILLIONS) 9,700

YEAR PRODUCTION START 2008 2012 2010 2002 2008 1967 2012 2007 1978 2006

1,800

400

PROJECTS UNDER CONSTRUCTION

Imperial Oil Limited

PROJECT NAME

PHASE NAME Phase 1 Phase 2

Kearl

Hot Plays Cardium Map 4.25x4.25 Color advt 033012:Hot Plays Cardium Map 4.25x4.25 Color Advt 033 WITH REGULATORY APPROVAL PROJECTS OPERATOR NAME

PROJECT NAME

Canadian Natural Resources Limited Horizon Imperial Oil Limited Shell Albian Sands

Kearl Jackpine Muskeg River

Suncor Energy Inc. Syncrude Canada Ltd. Total E&P Canada Ltd.

Fort Hills Mildred Lake/Aurora North & South Joslyn North Mine

PHASE NAME Phase 2A Phase 2B Phase 3 Phase 3 Debottleneck Expansion Phase 1B Expansion & Debottlenecking Debottleneck Phase 1 Aurora South Train 1 Aurora South Train 2 Phase 1

CAPACITY (BBL/D) 110,000 110,000

CAPACITY (BBL/D) 10,000 45,000 80,000 70,000 100,000 100,000 115,000 25,000 165,000 100,000 100,000 100,000

LOCATION 02-09-097-07W4 10-20-096-07W4

LOCATION 16-36-096-12W4 16-36-096-12W4 16-36-096-12W4 10-20-096-07W4 16-22-095-09W4 16-22-095-09W4 10-15-095-10W4 16-09-097-10W4 16-09-097-10W4 10-22-095-08W4 10-22-095-08W4 07-31-095-11W4

BUDGET (C$MILLIONS) 10,900 8,900

BUDGET (C$MILLIONS)

YEAR PRODUCTION START 2012 2015

YEAR PRODUCTION START 2014 TBD TBD 2020 2017 TBD TBD TBD 2016 2016 2018 2018

9,000

PROJECTS WITH REGULATORY APPLICATION FILED OPERATOR NAME

PROJECT NAME

Shell Albian Sands

Pierre River

Suncor Energy Inc.

Voyageur South

Teck Recources Limited

Frontier

PHASE NAME Phase 1 Phase 2 Phase 1 Phase 1 Phase 2 Phase 3 Phase 4 Equinox

CAPACITY (BBL/D) 100,000 100,000 120,000 75,000 80,000 80,000 40,000

LOCATION 00-00-097-10W4 00-00-097-10W4 10-22-091-10W4 00-00-100-11W4 00-00-100-11W4 00-00-100-11W4 00-00-098-11W4

BUDGET (C$MILLIONS)

YEAR PRODUCTION START 2018 TBD TBD 2021 2024 2027 2030

4,400 14,500 8,400

ANNOUNCED PROJECTS OPERATOR NAME

800.661.6689 www.cleanharbors.com

PROJECT NAME

Joslyn South Mine

PHASE NAME Phase 4 Phase 5 Phase 1

CAPACITY (BBL/D) 145,000 162,000 100,000

YEAR PRODUCTION START TBD TBD TBD

LOCATION 16-36-096-12W4 16-36-096-12W4 00-00-094-11W4

PROJECT NAME Poplar Creek Firebag MacKay River Harper

PHASE NAME Pilot Cogeneration and Expansion Stage 1 Stage 2 Stage 3 Phase 1 Carbonate Pilot

Dover Operating Corp. Husky Energy Inc. Southern Pacific Resource Corp. Suncor Energy Inc. Sunshine Oilsands Ltd.

PROJECT NAME MacKay River Sunrise STP-McKay Firebag West Ells

PHASE NAME Phase 1 Phase 1 Phase 1 Stage 4 A Phase 1

PROJECT NAME

BP p.l.c.

Terre de Grace

Dover Operating Corp.

MacKay River

Husky Energy Inc.

Sunrise

Suncor Energy Inc.

Firebag

Sunshine Oilsands Ltd.

West Ells

TECHNOLOGY ET-DSP SAGD SAGD SAGD SAGD SAGD CSS

CAPACITY (BBL/D) 1,000 25,000 35,000 35,000 62,500 33,000 1,000

LOCATION 00-00-090-09W4 00-00-095-06W4 00-00-095-06W4 00-00-095-06W4 00-00-095-06W4 00-00-093-12W4 11-21-095-24W4

BUDGET (C$MILLIONS)

Athabasca Oil Corporation

Cenovus Energy Inc.

PHASE NAME Pilot Phase 2 Phase 3 Phase 4 Phase 2 Phase 3 Phase 4 Stage 5 Stage 6 A Phase 2

2007 2007 2004 2006 2011 2002 2011

4,400 175

MEG Energy Corporation

Christina Lake

Nexen Inc. Statoil

Long Lake Kai Kos Dehseh

TECHNOLOGY SAGD SAGD SAGD SAGD SAGD

CAPACITY (BBL/D) 35,000 60,000 12,000 62,500 5,000

LOCATION 00-00-091-14W4 00-00-095-07W4 00-07-091-14W4 00-00-095-06W4 00-00-095-17W4

BUDGET (C$MILLIONS) 1,300 2,500 440 2,000 480

YEAR PRODUCTION START 2014 2014 2012 2013 2013

TECHNOLOGY SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD

CAPACITY (BBL/D) 10,000 40,000 40,000 35,000 50,000 50,000 50,000 62,500 62,500 5,000

LOCATION 00-28-096-13W4 00-00-091-14W4 00-00-091-14W4 00-00-091-14W4 00-00-095-07W4 00-00-095-07W4 00-00-095-07W4 00-00-095-06W4 00-00-095-06W4 00-00-095-17W4

BUDGET (C$MILLIONS) 4,000

YEAR PRODUCTION START TBD 2017 2019 TBD 2016 TBD TBD 2018 2019 2014

1,900

620

Phase 1 Demonstration Phase 2 Demonstration

TAGD TAGD

Dover West Sands & Clastics

Phase 1

SAGD

12,000

00-00-092-18W4

480

2015

Phase A Phase B Phase 1 Subsequent Phases Phase 1 Phase 1 Phase 2 Demonstration Pilot Phase 1 Expansion Phase 2A Phase 2B Stage 3-6 Debottleneck Phase 1 Phase 2 MR2 Phase 1 Phase 1

SAGD SAGD SAGD SAGD ET-DSP SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD

45,000 45,000 50,000 200,000 10,000 20,000 20,000 12,000 1,720 6,000 12,000 6,000 23,000 40,000 40,000 40,000 10,000 10,000

00-00-094-03W4 00-00-094-03W4 00-00-092-15W4

1,000

00-00-090-09W4 00-22-090-09W4 00-22-090-08W4 00-20-091-15W4 00-09-093-07W4 00-00-091-14W4 00-00-091-14W4 00-00-091-14W4 00-00-095-06W4 00-00-091-07W4 00-00-091-07W4 00-00-092-12W4 00-00-096-18W4 00-00-090-18W4

175 820

TBD TBD 2015 TBD 2014 2013 TBD 2016 2013 TBD 2015 TBD TBD TBD TBD 2016 2016 2015

Telephone Lake Borealis

Dover Operating Corp.

Dover Poplar Creek

Ivanhoe Energy Inc.

Tamarack

Marathon Oil Corporation Oak Point Energy Ltd.

Birchwood Lewis

Southern Pacific Resource Corp.

STP-McKay Firebag

Suncor Energy Inc.

Lewis MacKay River Legend Lake Thickwood

PHASE NAME

TECHNOLOGY

LOCATION 00-00-095-18W4 00-00-095-18W4

BUDGET (C$MILLIONS)

YEAR PRODUCTION START 2014 TBD

2,500

510 150 100

419 375

OPERATOR NAME

PROJECT NAME Birch

Athabasca Oil Corporation BP p.l.c. Canadian Natural Resources Limited E-T Energy Ltd. Husky Energy Inc. SilverWillow Energy Corporation

OPERATOR NAME Canadian Natural Resources Limited Cenovus Energy Inc. ConocoPhillips Canada Limited Devon Canada Corporation Grizzly Oil Sands ULC Harvest Operations Corp.

PROJECT NAME Kirby (South) Christina Lake Foster Creek Surmont Jackfish Algar Lake BlackGold

Husky Energy Inc.

McMullen

Laricina Energy Ltd.

Germain

MEG Energy Corporation

TECHNOLOGY

LOCATION

Christina Lake

OPERATOR NAME

Nexen Inc.

Statoil

Hangingstone East

Foster Creek

BlackPearl Resources Inc.

Blackrod Grouse

Canadian Natural Resources Limited

Kirby (North) Kirby (South)

Cenovus Energy Inc.

Pelican Lake Grand Rapids

Connacher Oil And Gas Limited

Great Divide

Harvest Operations Corp. Japan Canada Oil Sands Limited Koch Exploration Canada Corporation

BlackGold Hangingstone

Laricina Energy Ltd. Nexen Inc.

Statoil

Muskwa Germain Saleski Long Lake

Kai Kos Dehseh

45

6,100 300

TECHNOLOGY

73

73

152

59

132

152 73

132

73

19

132

131 71

59

73

59

CAPACITY (BBL/D)

LOCATION

BUDGET (C$MILLIONS)

YEAR PRODUCTION START

SAGD

45,000

00-00-073-07W4

1,250

2013

Phase D Phase E Phase F Phase 2 Phase 3 Phase 1 Phase 1 Air Injection Pilot— Experimental Phase 1 Commercial Demonstration Phase 2B

SAGD SAGD SAGD SAGD SAGD SAGD SAGD

40,000 40,000 45,000 109,000 35,000 5,650 10,000

00-00-076-06W4 00-00-076-06W4 00-00-070-03W4 00-00-083-07W4 11-24-075-07W4 00-00-085-12W4 00-00-076-07W4

2,700 2,000 2,490 1,200 220 500

2012 2013 2014 2015 2015 2013 2014

AIRINJ SC-SAGD SAGD

755

00-35-078-25W4

15

2012

5,000

00-30-085-22W4

435

2013

35,000

00-00-076-04W4

1,400

2013

PHASE NAME Halfway Creek Exploratory Program Phase F Phase G Phase G Phase H Phase 1 Phase 2 Phase 3 Phase 2 Phase 3A Phase 3B Phase 3C Long Lake South (Kinosis) Phase 1 Long Lake South (Kinosis) Phase 2 Phase 2 Corner Leismer Commercial Leismer Expansion Phase 1 Phase 2

TECHNOLOGY

CAPACITY (BBL/D)

LOCATION

BUDGET (C$MILLIONS)

Gardiner Lakes

101 132 71

10,000

00-00-086-10W4

2014

SAGD SAGD SAGD SAGD SAP SAP SAP SAGD SAGD SAGD SAGD

50,000 50,000 40,000 40,000 43,333 43,333 43,334 5,650 50,000 50,000 50,000

00-00-076-06W4 00-00-076-06W4 00-00-070-03W4 00-00-070-03W4 00-00-077-06W4 00-00-077-06W4 00-00-077-06W4 00-00-085-12W4 00-29-076-04W4 00-32-077-06W4 00-00-077-06W4

2016 2017 2015 2016 2016 TBD TBD 2014 2016 2018 2020

SAGD

40,000

00-00-084-07W4

SAGD

40,000

SAGD SAGD SAGD SAGD SAGD SAGD

72,000 40,000 10,000 20,000 40,000 40,000

185 500

TBD TBD

00-00-084-06W4 00-00-080-08W4 00-00-079-10W4 00-00-079-10W4 00-00-084-08W4 00-00-084-08W4

132

PHASE NAME Phase 1 Pilot Phase 1 Phase 1 Phase 2 Phase 3 Commercial Phase 1 Phase 2 Phase 2 Phase A Phase B Phase C Expansion 1A Expansion 1B Phase 2 Expansion Pilot

TECHNOLOGY SLP-SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAP SAP SAGD SAGD SAGD SAGD SAGD SAGD

Phase 2 Phase 3 Phase 4 Phase 1 Phase 3 Corner Expansion Hangingstone Leismer Northwest Leismer South Thornbury Thornbury Expansion

CAPACITY (BBL/D) 4,350 12,000 20,000 30,000 30,000 50,000 40,000 40,000 15,000 60,000 60,000 60,000 12,000 12,000 20,000 35,000 10,000

SC-SAGD SC-SAGD SC-SAGD SC-SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD

30,000 60,000 60,000 10,700 72,000 40,000 20,000 20,000 20,000 40,000 20,000

92

TBD 2017 TBD TBD TBD TBD

Namur Lake

LOCATION 00-22-088-08W4 00-00-086-09W4 00-00-076-18W4 00-00-076-18W4 00-00-076-18W4 00-00-074-12W4 00-00-074-08W4 00-00-074-08W4 00-00-073-07W4 00-00-083-21W4 00-00-083-21W4 00-00-083-21W4 00-00-081-11W4 00-00-081-11W4 00-00-076-07W4 00-00-084-11W4

350

1,530

600 540 1,700

00-14-084-23W4 00-00-085-22W4 00-00-085-22W4 00-00-085-22W4 00-00-084-19W4 00-00-084-06W4 00-00-080-08W4 00-00-083-10W4 00-00-079-11W4 00-00-077-10W4 00-00-080-12W4 00-00-080-08W4

YEAR PRODUCTION START TBD 2014 2016 2018 2021 2018 2016 2019 2020 2017 TBD TBD 2014 2016 2015 2016 2015

1,500

2015 TBD TBD 2014 TBD TBD TBD TBD TBD TBD TBD

660

133

74

41

41, 91 66, 91 91, 133

74, 91

92

91

100

42

21

142

45 96, 154

21

Provincial parks

134

124

18

71

96

74, 91

124 152 92 101 71

142, 154

74, 144

22, 144

51, 154

145

124

115

88

124 124

75

92

1, 60

140

59

1, 60

152

92

1, 60

143 1, 60

124

75

106

143

106

61

115

1, 60

152

101

89

92

140

95, 121

92

137

95, 121

143

103

52 143

86

138

74

140

138

86

71

118

71 132

74

132

Phase 2 Phase 2 Phase 3 Phase 1 Phase 2 Phase 3 Phase 4

SAGD SAGD SAGD SAGD SAGD SAGD SAGD

Commercial

SAGD

30,000

00-00-078-07W4

Phase 1

SAGD

10,000

00-00-081-24W4

Phase 2

SAGD

30,000

00-00-081-24W4

TBD

Phase 3

SAGD

30,000

00-00-081-24W4

TBD

Phase 4

SAGD

30,000

00-00-081-24W4

TBD

Christina Lake

Phase H

SAGD

40,000

00-00-076-06W4

2019

Foster Creek

Phase I

SAGD

45,000

00-00-070-03W4

2017

Alberta Oilsands Inc.

Clearwater West

Athabasca Oil Corporation

Hangingstone

Canadian Natural Resources Limited

Gregoire Lake

Canadian Natural Resources Limited

Leismer

Cenovus Energy Inc.

2016

Phase 2

SAGD

10,000

00-00-096-18W4

TBD

Phase 2 Expansion

SAGD

10,000

00-00-096-18W4

TBD

Phase 3

SAGD

20,000

00-00-096-18W4

TBD

Phase 3 Expansion

SAGD

10,000

00-00-096-18W4

Phase 2

SAGD

20,000

00-00-090-18W4

620

2018

Phase 2 Expansion

SAGD

20,000

00-00-090-18W4

620

2021

Suncor Energy Inc.

A Phase 3

SAGD

20,000

00-00-095-17W4

2018

Surmont Energy Ltd.

B Phase 1

SAGD

20,000

00-00-095-17W4

2020

B Phase 2

SAGD

20,000

00-00-095-17W4

TBD

C Phase 1

SAGD

30,000

00-00-095-17W4

TBD

Devon Canada Corporation

Laricina Energy Ltd.

Hoole

LOCATION 00-22-088-08W4 00-00-087-10W4 00-00-087-10W4 00-00-086-08W4 00-00-086-08W4 00-00-086-08W4 00-00-086-08W4

BUDGET (C$MILLIONS) 1,500

YEAR PRODUCTION START 2016 2017 2019 2024 TBD TBD TBD 2020

700

2015

SAGD

35,000

00-00-074-06W4

2016

1B

SAGD

35,000

00-00-074-07W4

2017

1C

SAGD

35,000

00-00-074-07W4

2018

Phase 2

IN SITU

10,700

00-00-084-19W4

2017

Phase 3

IN SITU

60,000

00-00-084-19W4

2020

Phase 4

IN SITU

60,000

00-00-084-19W4

2023

Phase 5

IN SITU

60,000

00-00-084-19W4

2026

Phase 1

SAGD

60,000

00-00-081-05W4

2018

Phase 2

SAGD

60,000

00-00-081-05W4

Demonstration Plant

BEST

500

00-00-084-12W4

Phase 4

SAGD

72,000

00-00-084-06W4

TBD

Phase 5

SAGD

72,000

00-00-084-06W4

TBD

Phase 6

SAGD

72,000

00-00-084-06W4

TBD

Chard

Phase 1

IN SITU

40,000

00-00-080-05W4

TBD

Wildwood

Phase 1

SAGD

12,000

00-20-082-08W4

2015

ATS-1

SAGD

15,000

00-25-089-08W4

2016

ATS-2

SAGD

30,000

00-00-089-08W4

2019

ATS-3

SAGD

30,000

00-00-089-08W4

2022

Saleski

Surmont

N-SOLV Corporation

Dover

Value Creation Inc.

TECHNOLOGY

1A Pike

MEG Energy Corporation

Nexen Inc.

PHASE NAME

Long Lake

Advanced TriStar

TBD 50

2012

118

74, 117

2

2

101

138

101

92

86

118

132

118

43 118 55

43

38

101

74, 104

142

72

95

74, 104

74, 104

118

103

69

74

74, 104 76 74, 104

74, 104

76

45

76, 104

76

74, 119

87

143

74, 119

30

45

83

30

119

13

143

76

80

101

118

32

74

104

8

74

7 65

132

83 103 24 24

71

25

103

36

59

36

77 74

74

65

44

105

79

71 58

36

84

74

95

152

74

95

54

101

132

73

132 73

141 45

101

126

101

138 80 107 80 70 132 70 107 80 70

101

124

95

132

107

75 95

127 121

74

152

74

74 74 124 74

127 150

124 132

95

63 114 95

63

152 69 95

69

74

95

148

132

53

132 10

75, 95

70

132

138 97

2A

74

152

87

130

74

71

67

130 97 71 97

128 73

138

97 71 97 138 102 71 71 132 97 102 138 97 132 138 132 138 97 71

135 92 45 139 45 45

135

139 76

139

92

4

3

Steen River

Zama Lake

Fort Chipewyan Bitumount

Clear Hills

Peerless

Algar Lake

Fort McMurray

Pelican

Winefred Lake

Mount Robson

Peace River

33

Winagami Lesser Slave Lake

Fourth Meridian

Namur Lake

Fifth Meridian

Wadlin Lake

Wapiti

Iosegun Lake

Whitecourt Tawatinaw Sand River

Edson

Wabamun Lake

Edmonton Vermilion

Brazeau

Rocky Mountain House

Red Deer

Calgary

Drumheller Oyen

658

imvprojects.com

John D'Or Lake Claire Prairie

Chinchaga Bison River Lake

Grande Prairie

Edmonton, AB: 220-9303 34 Avenue NW T6E 5W8 Phone: 780.944.9333 Fax: 780.944.9500 Toll Free: 1.800.563.2946

Mount Watt

Fitzgerald

76

31 30 661 19 18 7 6

Tp 56

2

1 5M 26

25

74, 88

132

92

74

138

76, 88

92, 74

33

129

Cross Lake Provincial Park

Wainwright

Gleichen

Medicine Hat

Lethbridge

Foremost

20 17 8 5

21 16 9 4

22 15 10 3

23 14 11 2

24 13 12 1

Calgary, AB: 2nd Flr-816 55 Avenue NE T2E 6Y4 Phone: 403.209.3500 Fax: 403.245.8666 Toll Free: 1.800.387.2446

77 76 75

Bitumen extraction solvent technology

N

CSS

Cyclic steam stimulation

Y

ET-DSP

Electro-thermal dynamic stripping

N

SAGD

Steam assisted gravity drainage

Y

SAP

Solvent aided process

N

SC-SAGD

Solvent-cyclic steam assisted gravity drainage

N

22

21

881

102

74 73 72 71 70

76 Heart Lake

c as

55

Athabasca

20

69

858

19

Lac La Biche

36

663

63 138

Athabasca

76

Alberta Fort McMurray Long Lake Provincial Park

827

661

Primrose Lake

Siebert Lake

855

76

Marie Lake

Pinehurst Lake

Cold Lake Cold Lake North

892

76

76

866

881

28

Moose Lake

867

Cold 827 Lake

67 66 65

59

151

Calgary

Cold Lake Provincial Park

Wolf Lake

55

Edmonton

Peace River

Legal Subdivision 40 acres 769

Missawawi Lake

Lakeland Provincial Park Beaver Lake

63

Alberta Oilsands Deposits

663

881

18

68

Touchwood Lake

Flat Lake

812

64 63

Cold Lake Provincial Park

Cold Lake South

55

62

897

Cold Lake

Need to get maximum value from your reservoir?

SLP-SAGD TAGD

Solvent co-injection steam assisted gravity drainage

N

Thermal assisted gravity drainage

N

Baker Hughes can help.

bakerhughes.com/canada

Let us draw on an unmatched portfolio of technology and expertise to craft a solution that advances your reservoir performance.

Bonnyville

660

17

16

15

14

13

12

11

10

9

8

7

6

5

61

659

4

3

2

If you would like additional copies of this chart or have questions/comments, please call 1.800.563.2946 or email mapping@junewarren-nickles.com. Every precaution has been taken to prevent errors or omissions and the publisher assumes no responsibility for damages caused by any errors or omissions.

1

SHARED LEASEHOLDERS 1 - 25% ATHABASCA, 25% IMPERIAL, 25% JAPAN, 25% NEXEN

27 - 63% IMPERIAL, 25% NEXEN, 12% JAPAN

2 - 50% BOUNTY, 50% GRIZZLY

28 - 37.33% IMPERIAL, 33.33% NEXEN, 29.34% STATOIL

3 - 40% BOUNTY, 40% GRIZZLY, 20% SOUTHERN

29 - 50% IMPERIAL, 50% TECK

4 - 50% BP CANADA, 50% DEVON

30 - 95% IMPERIAL, 5% WILLISCHILD

5 - 50% BP CANADA, 50% HUSKY

31 - 75% JAPAN, 25% NEXEN

6 - 75% BP CANADA, 25% VALUE

32 - 80% KEPPOCH, 20% PAN PACIFIC

7 - 61.88% CANADIAN NATURAL, 26.68% AVENEX, 5.72% SEDNA, 5.72% TRAFINA

33 - 33.34% KOCH, 33.33% CANADIAN NATURAL, 33.33% SUNCOR

8 - 50% CANADIAN NATURAL, 50% CENOVUS

34 - 60% LARICINA, 40% OSUM

9 - 55% CANADIAN NATURAL, 45% DEVON

35 - 60% MARATHON, 20% CHEVRON, 20% SHELL

10 - 50% CANADIAN NATURAL, 50% DEVON

36 - 50% MUTINY, 45% ALBERTA PETROLEUM, 5% CHASE

11 - 50% CANADIAN NATURAL, 50% HUSKY

37 - 65% NEXEN, 35% OPTI

12 - 50% CANADIAN NATURAL, 50% PARAMOUNT

38 - 75% PETRO-CANADA, 25% NEXEN

13 - 50% CANOL, 50% PERPETUAL

39 - 60% SHELL, 20% CHEVRON, 20% MARATHON

14 - 60% CENOVUS, 30% CANADIAN NATURAL, 10% SUNCOR

40 - 33.34% SHELL, 33.33% CHEVRON, 33.33% MARATHON

15 - 60% CHEVRON, 20% MARATHON, 20% SHELL

41 - 50% SILVERBIRCH, 50% TECK

16 - 50% CHEVRON, 50% SHELL

42 - 50% SINOCANADA, 50% TOTAL

17 - 50% CONOCOPHILLIPS, 50% TOTAL

43 - 80% SOUTHERN, 20% BOUNTY

18 - 60% CRETACEOUS, 40% AOSC

44 - 88% STATOIL, 12% IMPERIAL

19 - 66.67% DEVON, 33.33% MIDDLEFIELD

45 - 80% STONE, 20% SUPERNOVA

20 - 73.5% EXALL, 18% CHAIR, 6% CANDEN, 2.5% LMP-RESOURCE

46 - 50% SUNCOR, 25% JAPAN, 25% NEXEN

21 - 50% EXXONMOBIL, 50% IMPERIAL

47 - 75% SUNCOR, 25% NEXEN

22 - 70.96% IMPERIAL, 29.04% EXXONMOBIL

48 - 66.67% SUNCOR, 33.33% NEXEN

23 - 50% IMPERIAL, 25% JAPAN, 25% NEXEN

49 - 75% SUNDANCE, 25% BOUNTY

24 - 25% IMPERIAL, 25% JAPAN, 25% NEXEN, 25% SUNCOR

50 - 50% TECK, 25% EXXONMOBIL, 25% IMPERIAL

25 - 75% IMPERIAL, 25% NEXEN

51 - 38.25% TOTAL, 36.75% SUNCOR, 15% OCCIDENTAL, 10% INPEX

26 - 50% IMPERIAL, 50% NEXEN

52 - 80% TRAFALGAR, 20% PERPETUAL

100% LEASE OWNERSHIP

59

er

2

16 9 8 1

776

R3

23

Peace River

Section 13 14 15 12 11 10 5 6 7 4 3 2

78

128

119

33

132

Lac La Biche

24

663

32 NWSW NESE 34 35 36 29 28 27 26 25

79

64

69 132

128

b

ha

At

2

eg 01-23-056-03W4 Quarter Section

80

iv

aR

Reading Alberta LSD Numbers Whitesand Peace River Point

81

76 74

59

Riv sca Bistcho Lake

a Wood Group company

junewarren-nickles.com

5

Alberta

IMV Projects is a proud supporter of the Canadian energy industry

www.worleyparsons.com

6

82

74

63

7

83

132

138

97 71

74

74

59

127

71

92

130

59

97

68

74

70 71 70 132 74 102

69 69 102

152

152

115 115 74 102

102

138

88

88

127

57

74

112

121

84

139

26

24

54

74

85

109

71 36

74

44

IMV Projects staff

BEST

86

103

30

8

Canadian Energy Research Institute (CERI)

N

87

74

24

74

88

101

115

143

88

89

92

115

74

119

45

90

97

115

74

91

74, 104

49

138

92

75

142

74, 103

74, 104

93

140

140

69

Sixth Meridian

WorleyParsons is a leading provider of professional services to the thermal and mineable oil sands industry. Our services cover the full asset spectrum both in size and lifecycle—from creation of new assets, through full EPC delivery including fabrication and construction, to services that sustain and improve operating assets.

Air injection

74, 118

101

aba

Select. Define. Execute.

94

55

140

74

132

140 138

92,154 154

71

131

74

Did you know that employment in Canada’s oil sands is expected to grow to 905,000 jobs by 2035?

AIRINJ

95

COMMERCIAL Y/N

92

74

55

Growing together

NAME

92,154

92,154 103,154

131

101

101

92

92

89 103 100,154 103,154 132 98,154 100,154 89, 154 92,154 152

92

71, 95

60, 117

135

101

100

Discover the power of us. www.geminicorp.ca

115

142, 144

1, 18 1, 18 18 18 60 1, 18 118 1, 60

1, 60

115

101

1, 18

1, 60

60

92

45

CAPACITY (BBL/D) 25,000 35,000 35,000 60,000 30,000 30,000 30,000

PROJECT NAME

ACRONYM

143

132

45

OPERATOR NAME

IN SITU OILSANDS RECOVERY TECHNOLOGY GUIDE

96

144

142 142 15

18

18

97

124

39, 154

100

132

95, 154

Our strategy is to combine our engineering expertise with our field service capabilities to increase efficiency and accountability, which is important to us and the success of our clients.

98

133 74 140 21 74 19 137 132 101 18 22 73 107 132 136 116 92 118 140 118 101 145 132 3 144 15 131 76 105 6 92 143 101 143 19 152 145 103 51 74 39 71 70 5 18 15 18 60 15 143 107 131 92 92 3 77 152 71 74 15 131 121 73 105 101 144 5 132 101 76 15 18 145 92 92 142 69 77 71 88 18 136 77 70 101 3 73 101 96 92 121 124 101 116 151 121 71 88 73 144 105 94 105 92 18 152 101 131 81 142 151 152 140 92 60 138 121 136 75 152 81 152 86 132 132 88 82 140 82 140 142 74 82 105 69 60 142 63 152 143 106 137 149 60 92 151 133 146 137 142 73 75 143 101 92 101 98 121 151 101 89 119 101 86 152 132 76 90 94 Fort 94 138 92 140 137 McMurray 95 136, 95 101 60, 95 686 82 103 75 149 147 132 84 92 143 103 119 94, 73 137 149 101 101 95 82 Peerless 101 60 133 86 143 143 43 Lake 101 59 69 55 138 55 101 132 103 82 40 95 131 120 137 117 101 43 96 86 149 140 92 71 60, 95 95, 136 137 74 Graham 132 101 117 138 Lake 70 101 79, 95 117 74 96 139 43 60 92 95 74 140 140 75 60 92 74 Gordon 56 77 37 138 101 77 Willow 55 Lake 101 74 95 92 Gipsy Lake 43 Lake 117 143 37 77 37 43 74 101 77 101 74 140 138 55 92 117 77 74 143 78 34 140 74 Garson 47 Lake 103 77 92 119 74 12 9 101 37 31 48 117 99 71 142 140 70 77 101 143 74 140 37 97 122 127 37 103 84 103 63 124 140 92 84 24 881 76 71 122 139 Muskwa 74 Lake 62 121 153 76 74 140 83 84 99 139 37 67 84 17 84 92 101 74 59 76 119 North 108 119 99 99 Wabasca 82 83 Lake 140 74 56 119 80 145 24 83 84 139 24 80 25 102 74 74 74 46 27 92 92 85 59 139 74 119 83 37 140 754 23 84 95 South 84 Wabasca 139 138 74 74 130 25 114 Lake 74 28 92 80 24 143 101 73 11 59 71 97 87 113 119 Nipisi Lake 87 59 103 95 71 65 73 45 76 143 73 63 37 75 74 76 139 74 111 88 76 143 132 73 76 76 54 76 143 87 88 84 37 71 73 74 65 76 139 148 74 69 71 118 121 108 132 92 87 84 76 103 76 101 139 88 76 130 71 20 95 71 71 97 71 45 93 73 123 74 148 76 148 75 84 88 71 140 73 84 121 88 84 101 128 73 76 152 43 92 74 Winefred 4 Lake 74 110 101 59 Lesser 138 33 129 75 121 102 Slave Lake 71 121 74 69 101 813 Lesser Provincial Park 4 128 128 Slave Lake 128 74 95 124 71 124 74 71 43 74 71 84 97 132 74 102 59 138 74 109 Fawcett Lake 45 128 59 74 124 97 Slave 74 69 102 Lake 138 75 102 Calling 121 59 Lake 76 14 2 132 74 102 71

Secondary road

99

21

22, 133

Primary gravel road

50

29

42

42

66

Divided highway Primary paved road

118 142 149

Gemini is an innovative professional services firm that provides engineering, fabrication and maintenance solutions for energy and industrial facilities across Western Canada.

Surface mineable boundary

101

50

41

132

101 77

18

140

BUDGET (C$MILLIONS) 180

6

41

132

143

143

131

60

118

21

21

149

Alberta government Athabasca Oilsands Region boundary

102

101

41

125

133

61

YEAR PRODUCTION START

SAGD

1,600

133, 154

106

71

132

133

35

132

92

ANNOUNCED IN SITU PROJECTS - SOUTH ATHABASCA REGION

00-00-098-03W4

West Ells

650 1,050

Phase 1

PROJECT NAME Clearwater West Hangingstone

12,000

Thickwood

Meadow Creek

Alberta Oilsands Inc. Athabasca Oil Corporation

SAGD

TBD

Long Lake

OPERATOR NAME

Pilot

600

326 200 1,400

IN SITU PROJECTS WITH REGULATORY APPLICATION FILED - SOUTH ATHABASCA REGION

Audet

Birch Mountain

800

2011 2002 2008 2011 2001 2003 2005 2007 2009 2009 2011 2010 2007 2007 1997 2007 2011 1999 2011 2008 2009 2008 2010

132

16

106

145

140

40

41

140

92

132

2

Poplar Creek Saleski

Terre de Grace

PHASE NAME

PROJECT NAME

Kai Kos Dehseh

YEAR PRODUCTION START TBD TBD TBD TBD TBD 2022 2026 2016 2016

02-36-076-18W4 00-00-076-06W4 00-00-076-06W4 00-00-076-06W4 00-00-070-04W4 00-00-070-03W4 00-00-070-03W4 00-00-070-03W4 00-00-070-03W4 00-00-070-03W4 00-00-083-21W4 00-00-082-11W4 00-00-082-12W4 00-00-083-06W4 00-00-083-07W4 00-00-075-06W4 00-00-075-06W4 00-00-084-11W4 00-00-084-19W4 00-00-076-04W4 00-00-076-04W4 00-00-084-06W4 00-00-079-10W4

YEAR PRODUCTION START

IN SITU PROJECTS WITH REGULATORY APPROVAL - SOUTH ATHABASCA REGION

SAGD SAGD SAGD SAGD SAGD SAGD SAGD ET-DSP IN SITU

Dover West Sands & Clastics

00-00-100-15W4 00-00-092-18W4 00-00-092-18W4 00-00-096-12W4 00-00-096-12W4 00-00-097-19W4 00-00-097-17W4 00-00-090-09W4 00-00-088-19W4

BUDGET (C$MILLIONS)

SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD

LOCATION

143

152

Phase 1 Phase 2 Phase 3 Phase 1 Phase 2 Phase 1 Phase 2 Phase 2 Carbonate Pilot

Legend Lake

Sunshine Oilsands Ltd.

PHASE NAME

CAPACITY (BBL/D) 12,000 35,000 35,000 40,000 40,000 60,000 60,000 40,000

Pilot Phase 1A Phase 1B Phase C Phase A Phase B Debottleneck Phase C Stage 1 Phase C Stage 2 Phase D Phase E Pilot Algar Pod 2 Pod 1 Phase 1 Pilot Phase 1 Phase 2 Pilot Pilot Phase 1 Pilot Phase 2A Phase 1 Leismer Demonstration

TECHNOLOGY

88

Cavalier Energy Inc.

ANNOUNCED IN SITU PROJECTS - NORTH ATHABASCA REGION

PHASE NAME

BUDGET (C$MILLIONS) 25

IN SITU PROJECTS UNDER CONSTRUCTION - SOUTH ATHABASCA REGION

Suncor Energy Inc.

Dover West Carbonates (Leduc)

PROJECT NAME

E-T Energy Ltd.

Sunshine Oilsands Ltd.

canadianoilsandsnavigator.com

Hangingstone Saleski

YEAR PRODUCTION START

CAPACITY (BBL/D) 6,000 6,000

OPERATOR NAME

canadianoilsandsnavigator.com

Japan Canada Oil Sands Limited Laricina Energy Ltd.

Christina Lake

IN SITU PROJECTS WITH REGULATORY APPLICATION FILED - NORTH ATHABASCA REGION

• Key performance indicators • Company-specific capital expenditures

Jackfish

MEG Energy Corporation

OPERATOR NAME

Visit the oilsands with the click of a button.

Devon Canada Corporation

Cenovus Energy Inc.

IN SITU PROJECTS WITH REGULATORY APPROVAL - NORTH ATHABASCA REGION

• Operating project details development • Project timelines

Surmont

OPERATING IN SITU PROJECTS - NORTH ATHABASCA REGION

OPERATOR NAME

• and upcoming • Operating project locations

ConocoPhillips Canada Limited

Christina Lake

IN SITU PROJECTS UNDER CONSTRUCTION - NORTH ATHABASCA REGION

Lease ownership

Great Divide

Algar Lake

Sunshine Oilsands Ltd.

Explore the Athabasca oilsands region using the new interactive Canadian Oilsands Navigator.

Pelican Lake Grand Rapids Connacher Oil And Gas Limited

Grizzly Oil Sands ULC

Suncor Energy Inc.

See the heart of the oilsands like you’ve never seen it before!

Foster Creek

IN SITU PROJECTS - NORTH ATHABASCA REGION

E-T Energy Ltd.

www.ch2mhill.com/oilsands

Cenovus Energy Inc.

Narrows Lake

OPERATOR NAME

Your EPC team for the Oilsands

Blackrod Christina Lake

Athabasca Oil Corporation

Canadian Natural Resources Limited Horizon Total E&P Canada Ltd.

BlackPearl Resources Inc.

PROJECT NAME

CAPACITY (BBL/D) 800 10,000 8,800 40,000 24,000 6,000 10,000 20,000 30,000 30,000 600 10,000 10,000 27,000 1,200 35,000 35,000 11,000 1,800 3,000 22,000 72,000 10,000

152

133

er

amec.com/sectors/oil_sands

OPERATOR NAME

OPERATOR NAME

132

146

LEGEND

16

41

140

60

103

© 2012 Baker Hughes Incorporated. All Rights Reserved. 35756

61

75

60

132

133

132

ca River

61

132

140

61

104

Athabas

Our approach to safety and sustainability is an important element of who we are and is closely linked to our sense of responsibility to all stakeholders.

Ath

ATHABASCA OILSANDS LEASE MAP - NOVEMBER 2012

Engineered Fabric Building Solutions

53 - 366337AB

88 - DEVON

123 - PETROLEO

54 - 658903AB

89 - E-T ENERGY

124 - PLUNKETT

55 - ALBERTA OILSANDS

90 - EXXONMOBIL

125 - POPLAR

56 - ALLIED

91 - FORT HILLS

126 - PROSPER

57 - ALPINE

92 - GRIZZLY

127 - PROTERRA

58 - ALTERREN

93 - HARVEST

128 - RANGER

59 - ANTELOPE

94 - HERITAGE

129 - REGENT

60 - ATHABASCA

95 - HUSKY

130 - SANDSTONE

61 - BANCROFT

96 - IMPERIAL

131 - SASKATOON

62 - BASM

97 - INTEGRITY

132 - SCOTT

63 - BAYTEX

98 - IVANHOE

133 - SHELL

64 - BLACKJACK

99 - JAPAN

134 - SILVERBIRCH

65 - BLACKPEARL

100 - JOSLYN

135 - SINO WESTERN

66 - BLACKROCK

101 - KOCH

136 - SIRIUS

67 - BOUNTY

102 - LANDSOLUTIONS

137 - SOUTHERN

68 - BRIO

103 - LARICINA

138 - STANDARD

69 - BRISTOL

104 - LEGACY

139 - STATOIL

70 - BRITT

105 - MADISON

140 - STONE

71 - CANADIAN COASTAL

106 - MARATHON

141 - STRATA

72 - CANADIAN FOREST

107 - MAVERICK

142 - SUNCOR

73 - CANADIAN LANDMASTERS

108 - MEG ENERGY

143 - SUNSHINE

74 - CANADIAN NATURAL

109 - MERIDIAN

144 - SYNCRUDE

75 - CAVALIER

110 - MINERAL

145 - TOTAL

76 - CENOVUS

111 - MSL ENVIRONMENTAL

146 - TOWNSHIP

77 - CENTENNIAL

112 - NORTHPINE

147 - TRAFALGAR

78 - CHALLENGER

113 - NORWEGIAN

148 - TRAFINA

79 - CHARTER

114 - O & G RESOURCE GROUP LTD

149 - VALUE

80 - CHINOOK

115 - OAK POINT

150 - WEST

81 - CINDER

116 - OILSANDS

151 - WESTERN LAND

82 - CNPC

117 - OSUM

152 - WINDFALL

83 - CONNACHER

118 - PAN PACIFIC

153 - ZONEDA

84 - CONOCOPHILLIPS

119 - PARAMOUNT

154 - UNKNOWN

85 - CONTIGUOUS

120 - PENN

86 - CRETACEOUS

121 - PERPETUAL

87 - DEER GARDEN

122 - PETROLAND


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.