102
Oak Point Energy Ltd.
107
Lewis
Suncor Energy Inc.
21
Firebag
Sunshine Oilsands Ltd.
90 154
Thickwood West Ells
Phase 1 Demonstration
TAGD
6,000
Pilot Dover Experimental Pilot Dover North Phase 1 Dover North Phase 2 Dover South Phase 3 Dover South Phase 4 Dover South Phase 5 Phase 2 Phase 3 Phase 4 Phase 2A Phase 2B Pilot Stage 5 Stage 6 Phase A1 Phase A2
SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD
10,000 2,000 50,000 50,000 50,000 50,000 50,000 40,000 40,000 35,000 70,000 70,000 1,720 62,500 62,500 10,000 5,000
Production start
CNOOC Limited
31 48 40 12 23 56
Grouse Kirby Hoole Christina Lake Foster Creek Long Lake
2016 4,000 2,500
1,900 65
375
TBD 2017 2016 2018 2021 2023 2025 2018 2020 2022 2018 2020 TBD 2018 2019 2015 TBD
Devon Canada Corporation
50
Pike
Grizzly Oil Sands ULC
60
May River
Canadian Natural Resources Limited Cavalier Energy Inc. Cenovus Energy Inc.
113
Koch Exploration Canada, L.P.
26
Laricina Energy Ltd.
84
MEG Energy Corp.
142
OSUM Oil Sands Corp.
Muskwa Germain
Surmont Sepiko Kesik
Projects with regulatory application filed Project number
Operator
102 Athabasca Oil Corporation 100
Project name Dover West Carbonates (Leduc) Dover West Sands & Clastics
88
Telephone Lake
Grizzly Oil Sands ULC
136
Thickwood
Husky Energy Inc.
117
Saleski
Imperial Oil Limited
134
Aspen
Ivanhoe Energy Canada Inc.
87
Tamarack
Marathon Oil Corporation Prosper Petroleum Ltd. SilverWillow Energy Corporation
109 152 118
Birchwood Rigel Audet
Southern Pacific Resource Corp.
79
STP-McKay
21 58 51
Firebag MacKay River Legend Lake
Suncor Energy Inc. Sunshine Oilsands Ltd.
Technology
Capacity (bbls/d)
Budget ($ millions)
Production start
Project number 111
Get it done.
Athabasca Oil Corporation
100
Project name Birch Dover West Sands & Clastics
BP p.l.c.
89
Terre de Grace
Canadian Natural Resources Limited
5
Birch Mountain
Cenovus Energy Inc.
132 133
East McMurray Steepbank
E-T Energy Ltd.
N/A
Poplar Creek*
Koch Exploration Canada, L.P.
153 54
Suncor Energy Inc.
51 90
Sunshine Oilsands Ltd.
154 *Terminated
Dunkirk Lewis Legend Lake Thickwood
West Ells**
Phase 2 Demonstration
TAGD
6,000
TBD
Surmont Energy Ltd.
114
Wildwood
SAGD
12,000
480
2016
Value Creation Inc.
115
Advanced TriStar
Phase A Phase B Phase 1 Phase 2 Carbonate Pilot Phase 1 Phase 2 Phase 3 Phase 1 Phase 2 Demonstration Phase 1 Pilot Phase 1 Expansion Phase 2A Phase 2B Stage 3-6 Debottleneck MR2 Phase A1
SAGD SAGD CSS/SAGD CSS/SAGD CSS SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD
45,000 45,000 6,000 6,000 3,000 45,000 45,000 45,000 20,000 20,000 12,000 10,000 12,000 6,000 12,000 6,000 23,000 20,000 10,000
1,000
TBD TBD 2017 TBD 2017 2020 TBD TBD 2017 TBD 2017 2017 2018 2016 2018 2018 TBD 2017 2016
220 200 300 7,000
820 510 390 550 150 100
419
Phase name Phase 1 Phase 2 Phase 3 Phase 4 Phase 5 Phase 1 Phase 2 Phase 1 Phase 2 Phase 1 Phase 1 Phase 1 Phase 2 Phase 1 Phase 2 Phase 1 Phase 2 Phase A2 Phase B1 Phase B2 Phase A2 Phase B Phase A3 Phase B Phase C1 Phase C2
Technology SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD ET-DSP ET-DSP SAGD SAGD IN SITU IN SITU SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD
Capacity (bbls/d)
Budget ($ millions)
12,000 35,000 35,000 35,000 35,000 40,000 40,000 60,000 60,000 30,000 30,000 10,000 40,000 30,000 30,000 40,000 40,000 30,000 30,000 30,000 30,000 30,000 30,000 20,000 30,000 30,000
175 600
620 620
Production start TBD 2019 2020 2022 2024 TBD TBD 2019 2023 TBD TBD TBD TBD 2018 TBD TBD TBD TBD TBD TBD 2017 2021 2018 2025 TBD TBD
**Suspended while seeking additional financing
quinncontracting.ca | 403.855.8900
BlackPearl Resources Inc. Canadian Natural Resources Limited
We’re here to help.
ConocoPhillips Canada
© 2014 United Rentals, Inc.
563
Phase F
SAGD
50,000
Phase F
SAGD
45,000
Phase G
SAGD
40,000
2015
Phase H
SAGD
40,000
2016
45,000
Technology
101
Hangingstone
Phase 1
12
Christina Lake
23
Foster Creek
28 83
Grand Rapids Long Lake Great Divide Surmont Jackfish Algar Lake McMullen Hangingstone Pilot Germain Saleski
11
Christina Lake
46
Kai Kos Dehseh
800 2,700
6,100 200 326 1,400 650 1,050 240 15 410 45
1,400 300
Project number
Cenovus Energy Inc.
2011 2013 2002 2008 2011 2012 2013 2001 2003 2005 2007 2009 2009 2011 2008 2007 2010 1997 2007 2007 2011 2014 2012 1999 2013 2011 2008 2009 2013 2010
2016 2,000
2014
Narrows Lake
Phase A
SAP
CNOOC Limited
56
Long Lake
Kinosis (K1A)
SAGD
40,000
ConocoPhillips Canada
83
Surmont
Phase 2
SAGD
109,000
2,490
2015
Devon Canada Corporation
42
Jackfish
Phase 3
SAGD
35,000
1,400
2014
Harvest Operations Corp.
6
BlackGold
Phase 1
SAGD
10,000
460
2015
Japan Canada Oil Sands Limited
32
Hangingstone
Expansion
SAGD
20,000
1,400
2016
MEG Energy Corp.
11
Christina Lake
Phase 3A
SAGD
50,000
500
2016
1,600
Project number 48 12
Cenovus Energy Inc.
27
65
Project name Kirby Christina Lake
Grand Rapids
Narrows Lake
3,800
450
1,200
500
Project name
Gregoire Lake
Hoole
Capacity (bbls/d)
Budget ($ millions)
Technology
Phase 1
SAGD
60,000
TBD
Phase 2
SAGD
60,000
TBD
Phase 3
SAGD
30,000
TBD
Phase 4
SAGD
30,000
TBD
Phase 2
SAGD
35,000
1,400
TBD
Phase 3
SAGD
35,000
1,300
TBD
23
Foster Creek
Future Optimization
SAGD
15,000
TBD
West Kirby
Phase 1
SAGD
30,000
TBD
130
Winefred Lake
Phase 1
SAGD
30,000
TBD
Phase 4
SAGD
72,000
TBD
56
Long Lake
Phase 5
SAGD
72,000
TBD
Phase 6
SAGD
72,000
TBD
ConocoPhillips Canada
83
Surmont
Devon Canada Corporation
135
Jackfish East
75
Laricina Energy Ltd.
10
Suncor Energy Inc.
Saleski
Chard
Phase 3 - Tranche 1
SAGD
45,000
2020
Phase 3 - Tranche 2
SAGD
45,000
TBD
Phase 3 - Tranche 3
SAGD
45,000
TBD
Expansion
SAGD
20,000
2018
Phase 2
IN SITU
30,000
2017
Phase 3
IN SITU
60,000
2020
Phase 4
IN SITU
60,000
2023
Phase 5
IN SITU
60,000
2026
Phase 6
IN SITU
60,000
TBD
Phase 1
IN SITU
40,000
TBD
Technology
Capacity (bbls/d)
1,450
Production start
KN1 - Kirby North
SAGD
40,000
Optimization (Phases C,D,E)
SAGD
22,000
2017 2015
Phase G
SAGD
50,000
2017
Phase A
SAP
60,000
2017
Phase B
SAP
60,000
TBD
Phase C
SAP
60,000
TBD
Phase B
SAP
45,000
TBD
Phase C
SAP
40,000
TBD
149
90 89 88 87 86 85
92
72
UPGRADERS North Athabasca region Operator
BP p.l.c.
Canadian Natural Resources Limited
Project number 89
41
87
4
63
Project name
Terre de Grace
Horizon
Tamarack
Base Operations
Mildred Lake/ Aurora
Phase name
Technology
Status
Capacity (bbls/d)
Budget ($ millions)
Production start
Pilot Phase 1 Phase 2 Phase 1 Reliability— Tranche 2 Phase 2A Phase 2B Phase 3 Phase 4 Phase 5 Phase 1 U1 and U2 Millennium Vacuum Unit Millennium Coker Unit Base Plant Stage 1 and 2 Debottleneck Stage 3 Expansion (UE-1) Stage 3 Debottleneck
ADC USP ADC USP ADC USP UPG
Approved Announced Announced Operating
8,400 33,600 33,600 110,000
2,200
TBD TBD TBD 2009
UPG
Under construction
5,000
1,090
2014
UPG UPG UPG UPG UPG HTL UPG
Under construction Under construction Under construction Announced Announced Regulatory application filed Operating
12,000 45,000 80,000 125,000 140,000 34,784 225,000
550 190
2015 2016 2017 TBD TBD 2017 1967
UPG
Operating
35,000
425
2005
UPG
Operating
97,000
2,300
2008
UPG
Operating
250,000
1978
UPG
Operating
100,000
2006
UPG
Announced
75,000
TBD
South Athabasca region Operator
CNOOC Limited
Value Creation Inc.
Project number
56
Project name
Long Lake
115
Advanced TriStar
92
TriStar
Phase name
Technology
Status
Capacity (bbls/d)
Phase 1 Phase 2 Phase 3 Phase 4 Phase 5 Phase 6 ATS-1 ATS-2 ATS-3 Pilot
ORCRUDE ORCRUDE ORCRUDE ORCRUDE ORCRUDE ORCRUDE ADC USP ADC USP ADC USP ADC USP
Operating Approved Regulatory application filed Announced Announced Announced Regulatory application filed Regulatory application filed Regulatory application filed Approved
58,500 58,500 58,500 58,500 58,500 58,500 12,750 25,500 25,500 820
Budget ($ millions)
Production start 2009 TBD TBD TBD TBD TBD 2016 2018 2020 TBD
MINING PROJECTS
85
91
686
89
72
132
88
Peerless Lake
116
87
127
Operator
84 83
Canadian Natural Resources Limited Imperial Oil Limited Shell Canada Limited
Phase name
Capacity (bbls/d)
41 47 43 64
Horizon Kearl Jackpine Muskeg River
4
Base Operations
Phase 1 Phase 1 Phase 1A Commercial Millennium Mine Steepbank Debottleneck Phase 3 Millennium Debottlenecking North Steepbank Extension Base Mine Stage 1 and 2 Expansion Stage 3 Expansion
135,000 110,000 100,000 155,000 294,000 4,000 23,000 180,000 290,700 116,300
Syncrude Canada Ltd.
63
Mildred Lake/Aurora
Budget ($ millions) 9,700 12,900 1,800
400 8,400
Production start 2008 2013 2010 2002 1967 2007 2008 2012 1978 2006
Projects under construction Operator
Project number
Project name
Canadian Natural Resources Limited
41
Horizon
Imperial Oil Limited Suncor Energy Inc. Syncrude Canada Ltd.
47 22 63
Kearl Fort Hills Mildred Lake/Aurora
Phase name
Capacity (bbls/d)
Reliability—Tranche 2 Phase 2A Phase 2B Phase 3 Phase 2 Phase 1 Centrifuge Tailings Management
5,000 12,000 45,000 80,000 110,000 160,000 N/A
Budget ($ millions)
8,900 15,120 1,900
Production start 2014 2015 2016 2017 2015 2017 TBD
Operator Imperial Oil Limited
Shell Canada Limited Suncor Energy Inc. Syncrude Canada Ltd.
Project number
Project name
47
Kearl
43
Jackpine
Phase name
Production start
80,000
2020
Phase 4 Debottleneck
45,000
TBD
Phase 1B
100,000
TBD
Expansion
100,000
2017
115,000
TBD
20,000
TBD
Aurora SouthTrain 1
100,000
2016
Aurora SouthTrain 2
100,000
2018
Muskeg River
Expansion and Debottlenecking
22
Fort Hills
Debottleneck
Mildred Lake/Aurora
Budget ($ millions)
Phase 3
64
63
Capacity (bbls/d)
98
92
92
81 80 79 78 77
83
120
149 125
Muskwa Lake
82
150
74 73 72 71 70 69 68
123
North Wabasca Lake
81
7
99
125
79
73
84
73
84
85
88
126
19
73
73
73 75
64
92
82
92 54
149
54
62 22 72 23 62
84
127
59
92 92
Lesser Slave Lake Provincial Park
72 62
62
62
46
98
144
98
149
149
92
123 117 127
Fawcett Lake
85
74 92
120
106
Slave Lake
63
120
73
73
92
73
66
71
73
2A
68
6
5
4
MINING PROJECTS CONTINUED
Project number 95
24
73
3
2 1
26
25
24
23
22
Project name Voyageur South
Frontier
Phase name Phase 1
21
Capacity (bbls/d)
Budget ($ millions)
Production start
120,000
4,400
TBD
74,600
2021
84,000
14,500 Cross Lake Provincial Park
2024
79,300
61 60 59
Project number
33
Project name
41
Horizon
63
Mildred Lake/Aurora
661 Syncrude Canada Ltd.
39,400
Phase name
55
Athabasca
Phase 4
145,000
TBD
Phase 5
162,000
TBD
Mildred Lake Mine Extension (MLX)
TECHNOLOGY LEGEND Accelerated decontamination, ultra-selective pyrolysis (upgrading)
AIRINJ
Air injection
BEST
Bitumen extraction solvent technology
C-SAGD
Cyclic steam assisted gravity drainage
CSS
Cyclic steam stimulation
ET-DSP
Electro-thermal dynamic stripping
HTL
Heavy-to-light upgrading process
s ba
19
MINING
Truck and shovel mining
ORCRUDE
Primary upgrading process
SAGD
Steam assisted gravity drainage
SAP
Solvent aided process
SC-SAGD
Solvent cyclic steam assisted gravity drainage
124
94 70
94 94 133 127 94 105
133
59
124 68 72 127
117
124
133
89
73
32
50% IMPERIAL, 50% NEXEN
145
28
50% IMPERIAL, 50% TECK
29
63% IMPERIAL, 25% NEXEN, 12% JAPAN
30
75% IMPERIAL, 25% NEXEN
31
95% IMPERIAL, 5% WILLISCHILD
32
25% IMPERIAL, 25% JAPAN, 25% NEXEN, 25% SUNCOR
33
75% JAPAN, 25% NEXEN
34
80% KEPPOCH, 20% PAN PACIFIC
35
60% LARICINA, 40% OSUM
36
60% MARATHON, 20% CHEVRON, 20% SHELL
37
66.67% MARATHON, 33.33% SHELL
38
65% NEXEN, 35% OPTI
39
75% PETRO-CANADA, 25% NEXEN
40
60% SHELL, 20% CHEVRON, 20% MARATHON
41
33.34% SHELL, 33.33% CHEVRON, 33.33% MARATHON
42
50% SILVERBIRCH, 50% TECK
43
50% SINOCANADA, 50% TOTAL
44
80% SOUTHERN, 20% BOUNTY
45
88% STATOIL, 12% IMPERIAL
46
80% STONE, 20% SUPERNOVA
47
66.67% SUNCOR, 33.33% NEXEN
48
75% SUNCOR, 25% NEXEN
49
50% SUNCOR, 25% JAPAN, 25% NEXEN
50
50% TECK, 25% EXXONMOBIL, 25% IMPERIAL
51
38.25% TOTAL, 36.75% SUNCOR, 15% OCCIDENTAL, 10% INPEX
52
80% WHITECAP, 20% PERPETUAL
91
Gordon Lake
17
60
89
10
73
105
73
75
131
75, 85
6
6
3
21
59
75
73, 85
75
42
6
70
75
59
104 100% MAVERICK
55
100% ALBERTA OILSANDS
105 100% MEG ENERGY
56
100% ALLIED
106 100% MERIDIAN
57
100% ALPINE
107 100% MINERAL
58
100% ALTERREN
108 100% MSL LAND
59
100% ANTELOPE
109 100% NORTHPINE
60
100% ATHABASCA
110 100% NORWEGIAN
61
100% BANCROFT
111 100% O & G RESOURCE GROUP LTD
62
100% BASM
112 100% OAK POINT
63
100% BAYTEX
113 100% OSUM
64
100% BLACKPEARL
114 100% PAN PACIFIC
65
100% BLACKROCK
115 100% PARAMOUNT
105
66
100% BOUNTY
116 100% PENN
75
67
100% BRIO
117 100% PERPETUAL
68
100% BRISTOL
118 100% PETROLAND
69
100% BRITT
119 100% PETROLEO
70
100% CANADIAN COASTAL
120 100% PLUNKETT
71
100% CANADIAN FOREST
121 100% POPLAR
72
100% CANADIAN LANDMASTERS
122 100% PROSPER
73
100% CANADIAN NATURAL
123 100% PROTERRA
74
100% CAVALIER
124 100% RANGER
75
100% CENOVUS
125 100% ROLAND
76
100% CENTENNIAL
126 100% SANDSTONE
77
100% CHARTER
127 100% SCOTT
78
100% CHINOOK
128 100% SHELL
79
100% CNPC
129 100% SILVERBIRCH
80
100% CONNACHER
130 100% SINO-WESTERN
81
100% CONOCOPHILLIPS
131 100% SIRIUS
82
100% CONTIGUOUS
132 100% SOUTHERN
83
100% CRETACEOUS
133 100% STANDARD
84
100% DEERGARDEN
134 100% STATOIL
85
100% DEVON
135 100% STOMP
86
100% E-T ENERGY
136 100% STONE
87
100% EXXONMOBIL
137 100% STRATA
88
100% FORT HILLS
138 100% SUNCOR
89
100% GRIZZLY
139 100% SUNSHINE
90
100% HARVEST
140 100% SYNCRUDE
91
100% HERITAGE
141 100% TECK
92
100% HUSKY
142 100% TOTAL
93
100% IMPERIAL
143 100% TOWNSHIP
94
100% INTEGRITY
144 100% TRAFINA
95
100% IVANHOE
145 100% VALUE
96
100% JAPAN
146 100% WEST
97
100% JOSLYN
147 100% WESTERN LAND
98
100% KOCH
148 100% WHITECAP
99
100% LANDSOLUTIONS
149 100% WINDFALL
73
85
3
124
50
48
73
103 100% MARATHON
130 11
135
Winefred Lake
3
14
23
6
5
4
3
68 67
Divided highway
66
Flat Lake
Touchwood Lake
Lac La Biche
Missawawi Lake
Lac La Biche
Beaver Lake
663
36
63 73
75
64 63
75
16
59
Cold Lake
Peace River 55
126
14
13
Cold Lake 892 North Athabasca
Cold Lake South
881
867
28
Moose Lake
147
15
12
11
10
9
660
Bonnyville
Edmonton 659
Primary road
Secondary road
Bo
w
River
Major river
UPG
Bitumen upgrading
Lloyd Lake
Perennial lake
Cold Lake Provincial Park
Fort Marie Lake McMurray
Pinehurst Lake
866
62
Surface mineable boundary
Siebert Lake Wolf Lake
65
855
Primrose Lake
Lake Magog
Intermittent lake
Calgary
Provincial park
Thermal assisted gravity drainage
1
ALBERTA OILSANDS DEPOSITS
663 Lakeland Provincial Park
881
55 73
Alberta government Athabasca
Project
2
858
Township section
999
7
69
r
2
827
75
881
Blue Lake
Major lake
Cold Lake Provincial Park
Cold 55 Lake 897
Heavy Oil: • SAGD/CCS/Cold Flow Horizontal • Coring Projects Conventional/Unconventional: • Horizontal wells in WCSB • Vertical wells • Disposal Wells/Salt Caverns/Water wells • Operations Geology Consultants Geoscience Consulting: • Property evaluations
British Columbia | Alberta | Saskatchewan | Manitoba | International
100% 658903AB
75
p:| 403.861.6753 e:| afran@telusplanet.net www.serpaconsulting.com
Put Our Experience To Work for You
Wellsite Geology Experts: Over 5000 wells completed since 1980
100% 366337AB
75
12
90
85
107
133
6
Alex Francoeur, P. Geol.
54
75
75 73
105
75 73, 89
89
105
zeeco.com
53
58 85 75
Burners | Flares | Thermal Oxidisers | Vapour Control Aftermarket: Parts, Service & Engineered Solutions
100% LEASE OWNERSHIP
75
134
38
70
44
98
65
Heart Lake
Long Lake Provincial Park
999
TAGD
Gipsy Lake
110
127
75
73
46
50% IMPERIAL, 25% JAPAN, 25% NEXEN
27
134
89 46 75 55 46 134 46
105
89
75
110
55
89
31
94
99 10570
151, 93, 138
127 112
18
Oilsands Region boundary
Production technology undisclosed; will use drilling and enhanced recovery
105
26
38
46
66
70
21
99
ve
Ri
827
2023
776
IN SITU
70 94
70
59
133
105
32
89
126
105 136
124
70 94 94 133 99 70 133
63
661 769
127
133
Paved highway
Production start
($ millions)
73
70
Unpaved highway
663Budget
Capacity (bbls/d)
72
99
133
105
2030
658
ADC USP
99 124
134
105 73
94 70 94
City
812 2027
8,400
70
149
37.33% IMPERIAL, 33.33% NEXEN, 29.34% STATOIL
26
84
11
127
21
70
63
20
LEGEND
Phase 2
44
59
ha
Phase 1
Phase 3
74
73 99 70 99 69 69 127 98 105 124 73 99 70 53 69 127 69 68 68 99 10 124
21 105
73 98
38
105
105
57
112
73
Announced projects
Canadian Natural Resources Limited
127
73
105
136
134
72
70.96% IMPERIAL, 29.04% EXXONMOBIL
25
75
92
At
2
81
75 105 70
99
ca
Phase 4 Equinox
Operator
98
105
17
114
49
46
21
105
74
149
70
63 62
73
123
73
66
77
100
72
139
50% HUSKY, 50% VALERO
24
105
83
134
30
30 45
23
75
Garson Lake
96
106
72
32
38
29
27 25
50% HUSKY, 50% PETROLEO
75
46
30
72.5% EXXONMOBIL, 27.5% IMPERIAL
22
56
881
96
134
80 100 32
113
73
94
84
Operator
68 92
111
74
144 92, 74 144
92
105
149
Projects with regulatory application filed
65
149
127 73 67 102
7
63 92
127
Calling Lake
2
8
146
68
113
32
134
142
70 113
70
100
68
72
9
73
127
813
81
70
123
133
73
85
62 117
120
115
139 75
81
92
120
80
113
50% EXXONMOBIL, 50% IMPERIAL
21
98
136
47
134
28
73.5% EXALL, 18% CHAIR, 6% CANDEN, 2.5%
20
44
134
138
62
38 81
81
19
132
73
38 96
60% CRETACEOUS, 40% AOSC
132
93
39
48
80
80
113
74
7
119
80
100
50% CONOCOPHILLIPS, 50% TOTAL
18
38
138 63
113
133 78 64 64 78 69 94 75 69 75 64 78
37 32
33
96
44
38
1
93
Willow 29 Lake
101
38
112
80
94
64
92
89
73, 114
73
136
32
70
139
72 127
89
111
117
98
98
92
59
75
54
73
117
73
67
72
136
59
59
72
114
89
139
92
73
117
80
46
136
70
64
63 22
133
100
115
75
115
73
8 64
92
109
75 Lesser Slave Lake
103
144
149
74
59 9
73
46
76
98
22 73
136
89
98
114
73 85
55
89
89
105 31
34 101
44
44
114 55
92
60
98
127
118
73
89
60% CHEVRON, 20% MARATHON, 20% SHELL
17
44
139
139
114 114
145
89
89
50% CHEVRON, 50% SHELL
16
75
69 55
98
135
136
136
73
South Wabasca Lake
73
92
72
101
89
55
136
98
99
127
98
75
73, 139
72
133
104
68
76
98
75
73
73
78 77
754
73
139
82
108
84
Nipisi Lake
13
73
139
83
135
98
100
15
115
145
132
151
60
55
136 98
89
100 83 89
135
149
115
75
75
73, 115
73
133
142
113
83
89, 151
100
70
89, 151
89
98
112
40
73, 115
98
73
89
113
27
73 101
73 56
115 139
73 101
92
98
79
132
60% CENOVUS, 30% CANADIAN NATURAL, 10% SUNCOR
75
87
100, 151
100
89
54
97, 151
87
Fort 86 McMurray
136
136
114
98
114 74
73, 113
89
89
98
98
73
35
76
101, 73
127
133
73
73
83 98
83
92, 77
76
132
95
86, 151
86
98
41
133
73
139
115
84
73 101 75
73 100
75
59 133
73
73
98 132
79
133
95, 151
149
98
131
138
133
98
4
140, 138 97
100
127
73
75
73
117
125
73
73 101
118
79
80
68
98
62
100 113
69
104
26 76
73
114
73
76
2
12
71
139
56
73
113
76
136 133
73
84
98
81
95
132
136
136
98
92
59 79
61
138
50% CANOL, 50% PERPETUAL
14
98
63
61
89
98
148
132 103
79
93 112
138
75
136
132
89
139
117
60, 92
69
2
133
136
127, 72
59 133
113
73
89
52
113, 60
73
103
90
115
113
2
139
64 Project name
60, 92
92
113
85
98
117
149 127
139
109 79
60,18
60
153
131, 92
128
133
86
139
138
140
140, 138
61.88% CANADIAN NATURAL, 26.68% AVENEX, 5.72% SEDNA, 5.72% TRAFINA
50% CANADIAN NATURAL, 50% PARAMOUNT
88
138
55% CANADIAN NATURAL, 45% DEVON
8
13
75
4
66.67% CANADIAN NATURAL, 33.33% SUNCOR
7
120
118
75
21
6
50% CANADIAN NATURAL, 50% HUSKY
92, 151
134 107
140, 138
33 58 63
117
103
133
92
139
60, 139 139
89
139
83
43
140
140
1
98
60, 114
60
127
Teck Resources Limited Project number
79
74
60,18
100 60, 139
147
98
127 Graham Lake
143
98
149
139
73 147
115
127
89
73
16
98
64
140
138 138 75
117
89
89 60,18
60
136
128
139
72
90
149
138
149
Suncor Energy Inc.
Operating projects
102
127
18
60, 139
60
136
74
127
91
89
89
40
82
75% BP CANADA, 25% VALUE
12
89
4
51, 73, 40
73
1
16
142
17
98
139
120
120
127
140
51, 40 97
138, 151
50% BP CANADA, 50% HUSKY
5
11
20
138, 151
112
85 59
75
TBD
Budget ($ millions)
93
46
Projects with regulatory approval Phase name
91
98 89 117 89 98
138
69
131
Production start
Phase name
131
CNOOC Limited
2017
Projects with regulatory approval Canadian Natural Resources Limited
Cenovus Energy Inc.
Suncor Energy Inc.
2015
1,400
102
88
82
Production start
65
Operator
40
Cavalier Energy Inc.
Production start
Projects under construction Athabasca Oil Corporation
Aerial | Earthmoving | Material Handling | Pumps Power & HVAC | Trench Safety | Tools | Technology
12,000
Phase name
27 56
Foster Creek
1 103 37 26 75
Operator
UnitedRentals.com | 800.UR.RENTS
SAGD
Project name
Christina Lake
42
Statoil Canada Ltd.
Budget ($ millions)
SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD AIRINJ SAGD C-SAGD C & SC-SAGD SAGD SAGD SAGD SAGD
Grizzly Oil Sands ULC Husky Energy Inc. Japan Canada Oil Sands Limited
MEG Energy Corp.
Capacity (bbls/d)
Pilot KS1 - Kirby South Phase 1A Phase 1B Phase C Phase D Phase E Phase A Phase B Debottleneck Phase C Stage 1 Phase C Stage 2 Phase D Phase E Pilot Phase 1 Pod One Algar Pilot Phase 1 Phase 1 Phase 2 Phase 1 Thermal Conduction Pilot Pilot Phase 1 CDP Experimental Pilot Phase 1 Pilot Phase 2A Phase 2B Leismer Demonstration
Devon Canada Corporation
Laricina Energy Ltd.
25 1,250
Blackrod Kirby
7 48
23
Remote jobsites. Tight timelines & budgets. 24/7 operations.
800 40,000 10,000 8,800 40,000 40,000 40,000 24,000 6,000 10,000 20,000 30,000 30,000 600 72,000 10,000 10,000 1,200 27,000 35,000 35,000 5,500 755 11,000 5,000 1,800 3,000 22,000 35,000 10,000
Technology
Cenovus Energy Inc.
Connacher Oil and Gas Limited
Budget ($ millions)
Phase name
12
CNOOC Limited
Capacity (bbls/d)
Project name
29
Canadian Natural Resources Limited
Syncrude Canada Ltd.
Project number
Project number
Operator
Suncor Energy Inc.
Operating projects
455
Announced projects
Ivanhoe Energy Inc.
IN SITU PROJECTS - SOUTH ATHABASCA REGION Operator
Kai Kos Dehseh
Phase 1
Announced projects Operator
46
Statoil Canada Ltd.
1,530
72
117
120
100, 73
Cenovus Energy Inc.
Phase name
800
2017 2018 2015 2018 2021 2018 2022 2017 2019 2019 TBD 2016 2017 2018 2016 TBD 2015 2018 TBD TBD TBD TBD TBD 2018 2020 TBD TBD TBD TBD TBD TBD 2015 2016 2018 2020
94
89
24
112
Budget ($ millions)
40,000 30,000 20,000 30,000 30,000 50,000 60,000 10,000 50,000 50,000 72,000 35,000 35,000 35,000 6,000 6,000 10,000 30,000 60,000 60,000 41,000 41,000 41,000 30,000 30,000 40,000 20,000 20,000 20,000 40,000 20,000 12,000 15,000 30,000 30,000
92
60
51
51
93
47
50% BP CANADA, 50% DEVON
4
50% CANADIAN NATURAL, 50% CENOVUS
105
Sunrise
Blackrod
SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SC-SAGD SC-SAGD SC-SAGD SAGD SAGD SAGD CSS/SAGD CSS/SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD
104
85
18
5
89
142
102 154
128
20
50% BOUNTY, 50% GRIZZLY
3
50% CANADIAN NATURAL, 50% DEVON
129
115
82
7
Phase 2 Phase 3 Phase 1 Phase 2 Phase 3 Commercial KN2 - Kirby North Phase 1 Phase H Phase J Phase 3 1A 1B 1C Phase 1 Phase 2 Pilot Phase 2 Phase 3 Phase 4 Phase 1 Phase 2 Phase 3 Phase 1 Phase 2 Corner Expansion Hangingstone Leismer Northwest Leismer South Thornbury Thornbury Expansion Phase 1 ATS-1 ATS-2 ATS-3
89
127
128, 24
73, 140
102
Husky Energy Inc.
Capacity (bbls/d)
Hangingstone
Technology
139
98
142
22
40% BOUNTY, 40% GRIZZLY, 20% SOUTHERN
2
10
20
138
1
9
20
46
88
41
127
MacKay River
Technology
Phase name
Production start
100
16
139
1
142
136
59
101
Athabasca Oil Corporation
Project name
Budget ($ millions)
85
149
117
135
152
51
89
88, 73
89
73
100
Dover
Operator
Capacity (bbls/d)
149
98
114
136
132
112
17 Brion Energy Corporation
Project number
BlackPearl Resources Inc. Phase name
50
95
136
114
76 127
149
89
TriStar
93
120
18
43
50
28
43
145
43
88
128, 88
73
138
42
151, 141 88, 65
114
50
20
128
73
122
126
102
BP p.l.c.
Dover West Carbonates (Leduc) Terre de Grace
92
75
18
122
135
131
104 127
139
127
5
136
Athabasca Oil Corporation
Project name
Value Creation Inc.
Projects with regulatory application filed
72
149
59
135
85
96
72
126
Project number
Operator
Meadow Creek
5
20
145
114
121
128 141
88, 73
126
Projects with regulatory approval
62
89
127
127
2015 2014 2015
Suncor Energy Inc.
85 120 135
117, 92
1,300 2,800 525
Kai Kos Dehseh
200 540 520
94
72
97
92, 131
35,000 60,000 5,000
46
Statoil Canada Ltd.
600
TBD TBD TBD TBD TBD TBD 2016 2018 2020 2017 TBD TBD TBD TBD TBD
95
117, 92
SAGD SAGD SAGD
Christina Lake
40,000 72,000 12,000 12,000 5,500 20,000 10,700 50,000 50,000 40,000 10,000 20,000 40,000 40,000 1,000
Production start
149
Phase 1 Phase 1 Phase A1
Technology
Production start
11
SAGD SAGD SAGD SAGD SAGD SAGD C-SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD SAGD
Budget ($ millions)
120
MacKay River Sunrise West Ells**
Phase name
Budget ($ millions)
MEG Energy Corp.
Kinosis (K1B) Phase 2 Expansion 1A Expansion 1B Phase 2 Phase 2 Phase 1 Phase 3B Phase 3C Corner Leismer Commercial Leismer Expansion Phase 1 Phase 2 Pilot
Capacity (bbls/d)
136
Brion Energy Corporation 59 Husky Energy Inc. 82 Sunshine Oilsands Ltd. 154 **Suspended while seeking additional financing
Project name
Capacity (bbls/d)
Algar Lake BlackGold Saleski
Technology
137
Project number
Great Divide
Phase name
Namur Lake
127
122
Projects under construction
Long Lake
1 6 75
127
60
141
151, 141
127
Project name
Grizzly Oil Sands ULC Harvest Operations Corp. Laricina Energy Ltd.
127
Gardiner Lakes
123 117 149
4,400 1,700 175
2012 2013 2004 2006 2007 2011 2012 2002 2014
37
98
141
24
36
135
130
468 70
28
Connacher Oil and Gas Limited
59
104
12,000 500 35,000 35,000 25,000 42,500 42,500 33,000 5,000
Production start
136
128
141
103
102
Budget ($ millions)
149 127
59
142
127
117
SAGD BEST SAGD SAGD SAGD SAGD SAGD SAGD SAGD
Capacity (bbls/d)
98
136 103
127
139
127
149
102
Phase 1 Demonstration Plant Stage 1 Stage 2 Cogeneration and Expansion Stage 3 Stage 4 Phase 1 Debottleneck
Technology
72
99
Riv er
58
Operator
56
72
143
15
111
135
127
98 100
42
136
128
15
127
136
60
60
149
sca
21
Suncor Energy Inc.
STP-McKay Dover Firebag Firebag Firebag Firebag Firebag MacKay River MacKay River
Phase name
127
aba
79 33
Southern Pacific Resource Corp.
Project number
Operator CNOOC Limited
Project name
74
99 101
97
66
66
100 102
IN SITU PROJECTS - SOUTH ATHABASCA REGION CONTINUED
Operating projects Project number
60
127
Athabas ca River
101 103
96
Operator
SHARED LEASE OWNERSHIP
Ath
ATHABASCA OILSANDS LEASE MAP - SEPTEMBER 2014
ATHABASCA OILSANDS LEASE MAP SEPTEMBER 2014 IN SITU PROJECTS - NORTH ATHABASCA REGION
Update numbers based on Vivek’s supplied Label file in the Content Raw folder. Colours can stay the same, but don’t have to remain attached to the same company as last year. If you want to change up all the colours, or some to differentiate them more, feel free, but not necessary.
100 100% LARICINA
150 100% ZONEDA
101 100% LEGACY
151 100% UNKNOWN
FAST
FIND IT
Need a drill collar? Need a hotel in High Level? Need safety personnel? Need a control valve? Need plant maintenance? Need a warehouse? Need a tarp? Need hydraulic repair? Need to meet compliance standards?
ALL THE SMALL PARTS AND BIG PLAYERS ARE FOUND ON Utilize an ever-expanding database of Canadian oilfield service and supply companies (and a powerful set of search filters) to access 11,000 companies in over 1,300 categories. COSSD.COM
INFORMATION GIVES YOU AN EDGE A continuous stream of timely oilpatch news articles Topical data sets and statistics gathered by our researchers Personalized news streams and notifications with MyDOB Access to news on the go with your tablet or smartphone Not a subscriber yet?
Email today to get a free two-week trial:
SUBSCRIPTIONS@DAILYOILBULLETIN.COM
dailyoilbulletin.com
102 100% MADISON
Please note: Only the first phase of each project is shown on the map.
Remote Location WoRk FoRce Housing / oFFices DeaLeR FLeet RequiRements moDuLaR constRuction
LoDge Locations CONKLIN, ALBERTA Conklin lodge - 1 km west of Conklin Corner
Waddell lodge - 9 kms west of Conklin Corner - 14 kms north on Waddell Road JanVieR, alBeRTa keTTle CReek lodge - Km 227 on Hwy 881 BUCkingHoRSe lodge - Mile 175 on Alaska Hwy SieRRa lodge - Km 92 east of Fort Nelson, BC RingBoRdeR CaMP - North of Fort St. John, BC
BUILT TO DELIVER
Together, We’re Taking Energy Further
TM
Delivering what we promise
Nalco Champion, an Ecolab company, offers a singular focus on providing specialty chemistry programs and
Change is constant. As such, the need for agile solutions is key. Constant communication with our customers, along with constant innovation has made WorleyParsons the 40-year veteran of the Alberta oil sands. Greenfield and brownfield, big and small—we are the global EPC authority of choice because of the most important constant of all—we deliver what we promise.
related services for upstream, midstream and downstream oil and gas operations. Through onsite problem solving and the application of innovative technologies, we deliver sustainable solutions to overcome complex challenges in the world’s toughest energy frontiers. Together, we’re taking energy further. Visit nalcochampion.com to learn more.
EVENT PARTNER S:
LIFTING AND HEAVY HAUL SOLUTIONS PROVIDER OF CHOICE
EARN MORE BUSINESS.
Throughout the energy corridor of western North America Toll Free 1-855-560-5050 www.ncsg.com
Find your link in Canada’s energy supply chain by attending the 2014 Canadian Energy Supply Chain Forum. For more information, visit SUPPLYCHAINFORUM.CA
12345 - 121 Street • Edmonton, AB T5L 4Y7 P 780.448.9222 • F 780.454.7900
1-866-878-3130
www.phoenixindustrial.ca ISO 9001 14001 18001
VISIBILITY VALUE ACCOUNTABILITY Prince Rupert, BC • Terrace/Kitimat, BC • Fort St. John, BC • Tumbler Ridge, BC • Grande Prairie, AB
1.800.207.9818 northgateindustries.com junewarren-nickles.com
FROM PLANNING TO PROGRESSIVE TURNOVER
www.worleyparsons.com
Edmonton, AB: 220-9303 34 Avenue NW T6E 5W8 Phone: 780.944.9333 Fax: 780.944.9500 Toll Free: 1.800.563.2946
Calgary, AB: 2nd Flr-816 55 Avenue NE T2E 6Y4 Phone: 403.209.3500 Fax: 403.245.8666 Toll Free: 1.800.387.2446
SUPPLYCHAINFORUM.CA
FABRICATION MODULARIZATION CONSTRUCTION MAINTENANCE
If you would like additional copies of this chart or have questions/comments, please call 1.800.563.2946 or email mapping@junewarren-nickles.com. Every precaution has been taken to prevent errors or omissions and the publisher assumes no responsibility for damages caused by any errors or omissions.
Fort McMurray, AB • Edmonton, AB • Wabasca, AB • Bonnyville, AB • Nisku/Leduc, AB Calgary, AB • Regina, SK • Soda Springs, ID • Billings, MT • Sidney, MT • Midland, TX