Oilsands Review Project Status February 2013

Page 1

P R O J E C T STATUS

project status

02 13

Athabasca Region Industrial Heartland Region Cold Lake Region

Sourced from company releases, the Energy Resources Conservation Board and the Daily Oil Bulletin, with files from Strategy West. For changes and updates, please contact Deborah Jaremko at djaremko@junewarren-nickles.com. Disclaimer: Oilsands Review accepts no liability for errors or inaccuracies in the information provided in this report.

For more detailed project data, visit oilsandsreview.com. To explore projects in the Athabasca oilsands region using our interactive web tool, visit the Canadian Oilsands Navigator at navigator.oilsandsreview.com.

CURRENT PROJECT

CAPACITY

START-UP

REGULATORY STATUS

Peace River Region Northwestern Saskatchewan

NORTH ATHABASCA REGION

SASKATCHEWAN REGION

SOUTH ATHABASCA REGION

INDUSTRIAL HEARTLAND REGION

COLD LAKE REGION

NEW Export Pipelines

PEACE RIVER REGION

CURRENT PROJECT

NORTH ATHABASCA REGION — MINING

New information this month

CAPACITY

REGULATORY STATUS

START-UP

Fort Hills

Updated: Dec 2012

Suncor and partner Total continue to review development timelines for Fort Hills.

Canadian Natural Resources Limited Horizon

Updated: Dec 2012

­

Debottleneck

Canadian Natural says it continues its strategy of staged expansion to 250,000 barrels per day and work remains on track. Projects currently under construction are trending at or below estimates.

­

Phase 1

­

Phase 1

­

Voyageur South

­

25,000

TBD

165,000

2016

Approved Approved Updated: May 2012

135,000

2008

Operating

Phase 2A

10,000

2014

Construction

­

Phase 2B

45,000

TBD

Approved

­

Phase 3

80,000

TBD

Approved

­

­

Tranche 2

5,000

2012

Operating

Syncrude has announced it is embarking on a new mine extension project at Mildred Lake, which will be known as the MLX project. Canadian Oil Sands says MLX will leverage investment in the two mine trains currently being constructed, enabling Syncrude to extend the life of Mildred Lake mining operations by about a decade. Project scoping is underway, and pending regulatory approval, construction and spending would commence in the next 10 years.

Imperial Oil Limited •

Kearl

Updated: Jan 2013

Imperial Oil says that start-up of Kearl is underway—which was supposed to start operating in December—but is delayed due to cold weather and earlier issues with transportation of modules from Korea. ­

Phase 1

110,000

2013

Construction

­

Phase 2

110,000

2015

Construction

­

Phase 3 Debottleneck

70,000

2020

Approved

Jackpine

­

Expansion

100,000

2017

Application

­

Phase 1A

100,000

2010

Operating

­

Phase 1B

100,000

TBD

Approved

Muskeg River Commercial

­

Expansion & Debottlenecking

­

Pierre River

Phase 1

120,000

TBD

Application

Syncrude Canada Ltd. Mildred Lake/Aurora

Updated: Oct 2012

­

Aurora South Train 1

100,000

2016

Approved

­

Aurora South Train 2

100,000

2018

Approved

­

Base Mine Stage 1 & 2 Expansion

290,700

1978

Operating

­

Stage 3 Expansion

116,300

2006

Operating

Frontier

Updated: Dec 2012

A decision from the federal joint review panel on the Jackpine project is expected in May 2013.

­

­

Teck Resources Limited

Shell Albian Sands •

Suncor considers Voyageur South to be a “longer-term” project and has not confirmed a start-up date.

­

Phase 1

75,000

2021

Application

­

Phase 2

80,000

2024

Application

­

Phase 3

80,000

2027

Application

Operating

­

Phase 4 Equinox

40,000

2030

Application

Approved

Total E&P Canada Ltd.

Updated: Nov 2012 155,000 115,000

2002 TBD

Updated: Aug 2012

A joint review panel of the Canadian Environmental Assessment Agency and Energy Resources Conservation Board has been established to review the proposed Pierre River mine project. The timeline for the joint review panel to submit its report is 550 days (18 months) from coming into force in July 2012. ­

Phase 1

100,000

2018

Application

­

Phase 2

100,000

TBD

Application

Suncor Energy Inc. Base Operations

Updated: Oct 2012

Teck says it received the final supplemental information requests relating to the Frontier regulatory application in Q3/2012 and anticipates responding in early 2013.

Updated: Dec 2012

­

Joslyn North Mine

Updated: Jul 2012

Project partner Suncor Energy says submit development plans will be submitted to the companies’ respective boards of directors for a sanctioning decision in 2013. ­

Phase 1

100,000

2018

Approved

NORTH ATHABASCA REGION — IN SITU Athabasca Oil Corporation Birch

Updated: Dec 2012

AOS says $28.9 million was spent at Birch in the first nine months of 2012, mainly on drilling of one water and 22 delineation wells. In addition, the company shot 54 square kilometres of 3D seismic. Winter delineation drilling and seismic programs are being evaluated for 2013.

Suncor says it has started up its new Millennium Naphtha Unit and has run it at full rates. The unit is expected to stabilize secondary upgrading capacity and provide flexibility during maintenance activ­ ities for secondary upgrading units in the future.

­

­

Millennium Debottlenecking

2008

Operating

­

Millennium Mine

294,000

1967

Operating

AOS says regulatory approval for the demonstration project is anticipated imminently. The design basis memorandum is complete and the engineering design specification work is well underway. Construction is also ongoing on a TAGD-related heater assembly facility near Strathmore, Alta.

­

North Steepbank Extension

180,000

2012

Operating

­

Phase 1 Demonstration

6,000

2015

Application

­

Steepbank Debottleneck Phase 3

4,000

2007

Operating

­

Phase 2 Demonstration

6,000

TBD

Application

40 OILSANDS REVIEW | February 2013

23,000

Phase 1

12,000

TBD

Dover West Carbonates (Leduc)

Announced Updated: Dec 2012


P R O J E C T S TAT U S

CURRENT PROJECT

CAPACITY

START-UP

Dover West Sands & Clastics

REGULATORY STATUS

Updated: Dec 2012

In the first nine months of 2012, AOS acquired approximately 30,000 acres of oilsands leases contiguous to its existing Dover West assets. The company says its Dover West Sands project could now eventually support development up to 270,000 barrels per day. Regulatory approval and internal sanction for the first 12,000-barrel-per-day phase are expected in 2013. AOS says it is leveraging work done on FEED for its Hangingstone project for Dover West. ­

Phase 1

12,000

2015

Application

­

Phase 2

35,000

2018

Announced

­

Phase 3

35,000

2020

Announced

­

Phase 4

35,000

2022

Announced

­

Phase 5

35,000

2024

Announced

CURRENT PROJECT

Updated: May 2012

Pilot

10,000

TBD

Approved

REGULATORY STATUS

Thickwood

Updated: Dec 2012

At the end of Q3/2012 Grizzly part owner Gulfport Energy said a regulatory application for the Thickwood project was expected by year-end 2012. ­

Phase 1

6,000

2017

Application

­

Phase 2

6,000

TBD

Application

Husky Energy Inc. Saleski

Updated: Dec 2012

Husky plans to submit a regulatory application for the Saleski project in 2013. ­

Carbonate Pilot

TBD

2016

Sunrise

Terre de Grace

BP says that ongoing appraisal activities include delineation drilling, seismic acquisition and appraisal of water sources. ­

START-UP

Grizzly Oil Sands ULC

BP p.l.c. ­

CAPACITY

Announced Updated: Dec 2012

Husky says Sunrise continues to meet its construction milestones and remains on schedule for first oil in 2014. All significant contracts for Phase 1, including the central processing facility, have now been converted to lump sum payment. Over 85 per cent of the project costs are now fixed. Planning, design and engineering for the next phase of development continues. ­

Phase 1

60,000

2014

Construction

­

Phase 2

50,000

2016

Approved

­

Phase 3

50,000

TBD

Approved

­

Phase 4

50,000

TBD

Approved

40,000

TBD

Canadian Natural Resources Limited ­

Birch Mountain

Updated: Jul 2012

Canadian Natural says geological scoping is underway. ­

Phase 1

60,000

2019

Announced

­

Phase 2

60,000

2023

Announced

Cenovus Energy Inc. ­

East McMurray

­

Phase 1

­

Steepbank

­

Phase 1

Telephone Lake Borealis

Updated: Aug 2012 30,000

TBD

Announced Updated: Aug 2012

30,000

TBD

Announced Updated: Dec 2012

Cenovus says it continues to progress the Telephone Lake regulatory application while it operates its dewatering pilot, with water production and air injection proceeding as planned. ­ ­

Phase A Phase B

45,000 45,000

TBD TBD

Application Application

Dover Operating Corp. Dover

Updated: Dec 2012

Athabasca Oil Corporation is planning a likely sale of its stake in the Dover project to partner (and Dover OpCo owner PetroChina) once the previously determined decision trigger mechanism of regulatory approval is granted. ­

Dover North Phase 1

50,000

2016

Application

­

Dover North Phase 2

50,000

2018

Application

­

Dover South Phase 3

50,000

2020

Application

Imperial Oil Limited ­

Aspen

­

Phase 1

Updated: Sep 2012 Announced

Ivanhoe Energy Inc. Tamarack

Updated: Dec 2012

Ivanhoe is responding to a third round of supplemental information requests from regulators regarding its project application. Approval is now anticipated in 2013. ­

Phase 1

20,000

2016

Application

­

Phase 2

20,000

TBD

Application

Marathon Oil Corporation ­

Birchwood

Updated: Jul 2012

Marathon said that based on results of completed appraisal drilling, a regulatory application would be filed in 2012. ­

Demonstration

12,000

2016

Application

N-Solv Corporation ­

Dover

Updated: Jun 2012

Reports are that first results from a $60-million N-Solv field test are expected in spring 2013. ­

Demonstration Plant

500

2013

1,720

2013

Construction

Oak Point Energy Ltd. ­

Dover South Phase 4

­

Dover South Phase 5

­

Mackay River

50,000 50,000

2022 2024

Application

­

Lewis

Application

­

Pilot

Updated: Apr 2012

Updated: Mar 2012 Application

SilverWillow Energy Corporation Audet

ERCB project approval granted January 2012. Dover OpCo says construction is underway.

Updated: Dec 2012

­

Phase 1

35,000

2014

Construction

­

Phase 2

40,000

2017

Approved

SilverWillow says engineering consultants have been selected to prepare preliminary engineering design and cost estimates for Audet production facilities and infrastructure, to conduct environmental baseline studies and to provide support for the regulatory application, which is expected to be filed in the second half of 2013.

­

Phase 3

40,000

2019

Approved

­

Approved

Southern Pacific Resource Corp.

­

Phase 4

35,000

TBD

­

E-T Energy Ltd. ­

Poplar Creek

Updated: Oct 2012

E-T Energy has reinstated Bruce McGee as CEO based on his technological expertise as it works on pilot operations to support a new commercial project application. Its previous application was denied by the ERCB in 2012. ­

Experimental Pilot

­ ­

Pilot

12,000

2016

STP-McKay

Announced

Updated: Oct 2012

Southern Pacific says operations are progressing as planned, with the first of the well pairs now being converted from steam circulation to bitumen production. ­

Phase 1

­

Phase 1 Expansion

12,000

2012

Operating

6,000

2014

Application

1,000

2007

Operating

Phase 1

10,000

TBD

Announced

­

Phase 2A

12,000

2017

Application

Phase 2

40,000

TBD

Announced

­

Phase 2B

6,000

2017

Application

FEbruary 2013 | OILSANDSREVIEW.COM 41


P R O J E C T S TAT U S

CURRENT PROJECT

CAPACITY

START-UP

REGULATORY STATUS

CURRENT PROJECT

Suncor Energy Inc. ­

CAPACITY

START-UP

West Ells

Firebag

Updated: Dec 2012

Suncor reports it has achieved first oil from Firebag Stage 4, approximately three months ahead of schedule. Production has now reached 130,000 barrels per day. ­

Cogeneration and Expansion

25,000

2007

Operating

­

Stage 1

35,000

2004

Operating

­

Stage 2

35,000

2006

Operating

­

Stage 3

42,500

2011

Operating

­

Stage 3-6 Debottleneck

23,000

TBD

Application

­

Stage 4

42,500

2012

Operating

­

Stage 5

62,500

2018

Approved

­

Stage 6

62,500

2019

Approved

­

Lewis

­

Phase 1

40,000

TBD

­

Phase 2

40,000

TBD

­

MacKay River

­

MR2

40,000

2016

Application

­

Phase 1

33,000

2002

Operating

Updated: Dec 2012

Sunshine says construction on West Ells remains on schedule and on budget. The access road is now complete and ready for heavy hauls, and pilings for the central processing facility have commenced. Some of the major equiptment is in transit. Civil construction of the central processing facility is 40 per cent complete, with facilities engineering 75 per cent complete. The first SAGD well pair has been spudded. ­

A Phase 1

5,000

2013

Construction

­ ­

A Phase 2

5,000

2014

Approved

A Phase 3

20,000

2018

Announced

­

B Phase 1

20,000

2020

Announced

­

B Phase 2

20,000

TBD

Announced

­

C Phase 1

30,000

TBD

Announced

SOUTH ATHABASCA REGION — IN SITU Alberta Oilsands Inc. Clearwater West

Updated: Nov 2012

­

Phase 1 Pilot

Application

­

Phase 2

Sunshine Oilsands Ltd. ­

Harper

Updated: May 2012

Sunshine says that steam cycle injection operations at Harper have proved thermally induced oil mobility.

Updated: Dec 2012

Alberta Oilsands says it has restructured key consultants to consolidate costs as it pushes to permit the Clearwater project. The company has retained Petrospec Engineering to spearhead and project manage the ongoing project application process with regulators.

Application

Updated: Nov 2012

REGULATORY STATUS

4,350

TBD

Application

25,000

2016

Announced

Athabasca Oil Corporation Hangingstone

Updated: Dec 2012

AOS has sanctioned the first phase of its $536 million Hangingstone SAGD project at a projected cost of $44,700 per flowing barrel. SAGD drilling is expected to commence mid-2013. ­

Phase 1

12,000

2014

Construction

­

Phase 2

35,000

2017

Announced

­

Phase 3

35,000

2019

Announced

BlackPearl Resources Inc. ­

Carbonate Pilot

1,000

2011

Legend Lake

Operating Updated: Dec 2012

Sunshine says regulatory approval for Legend Lake is anticipated in the first half of 2013. ­

A Phase 1

10,000

2016

Application

­

A Phase 2

20,000

TBD

Announced

­

B Phase 1

20,000

TBD

Announced

Thickwood

Updated: Dec 2012

Sunshine says FEED for Thickwood is approximately 10 per cent complete. Approval is anticipated in the first half of 2013. ­

A Phase 1

10,000

2015

Application

Blackrod

Updated: Dec 2012

BlackPearl says its Blackrod SAGD pilot continues to operate in-line with expectations. Regulatory approval has been received to drill a second horizontal well pair, which will be done Q1/2013. The project management team for the first commercial phase is being assembled and will determine the EPC contractor as one of its initial decisions. ­

Phase 1

20,000

2015

Application

­

Phase 2

30,000

2018

Application

­

Phase 3

30,000

2021

Application

­

Pilot

800

2011

Operating

Canadian Natural Resources Limited ­

Gregoire Lake

Updated: Jul 2012

Canadian Natural says geological scoping is underway. ­

A Phase 2

20,000

2018

Announced

­

B Phase 1

20,000

2021

Announced

Engineered Fabric Building Solutions

­

Phase 1

40,000

2021

Announced

­

Phase 2

40,000

2025

Announced

Fitness Facilities

Available immediately from inventory. Lease or purchase.

Calgary, Alberta

www.sprung.com/oilgas 42 OILSANDS REVIEW | February 2013

1.403.601.2292 Toll Free:

1.800.528.9899


P R O J E C T S TAT U S

CURRENT PROJECT

CAPACITY

START-UP

Grouse

REGULATORY STATUS

Updated: Dec 2012

Canadian Natural says timing of Grouse has been adjusted to accommodate the potential inclusion of recently acquired lands adjacent to the company’s Kirby area and provide a more balanced capital expenditures profile going forward. First steam at Grouse is now expected between 2017 and 2019. ­

Commercial

50,000

TBD

Kirby North

CAPACITY

START-UP

Foster Creek

REGULATORY STATUS

Updated: Dec 2012

Phase F is now approximately 65 per cent complete, and Cenovus says progress continues to be made on G and H. The company plans to submit a regulatory application for Phase J in 2013. ­

Future Optimization

15,000

TBD

Announced

­

Phase A

24,000

2001

Operating

­

Phase B Debottleneck

6,000

2003

Operating

­

Phase C Stage 1

10,000

2005

Operating

­

Phase C Stage 2

20,000

2007

Operating

­

Phase D

30,000

2009

Operating

Application Updated: Dec 2012

Canadian Natural has budgeted approximately $205 million for Kirby North in 2013 to progress detailed engineering, order modules and construct camp facilities. Project sanction is targeted for the first half of 2013. To accomodate the acquisition of lands adjacent to the Kirby area that Canadian Natural may include in the project, first steam at Phase 1 is now anticipated in 2016. ­

Phase 1

40,000

2016

Application

­

Phase 2

40,000

2019

Application

Kirby South

CURRENT PROJECT

Updated: Dec 2012

­

Phase E

30,000

2009

Operating

Canadian Natural says construction of Phase 1 continues to progress ahead of plan and is now 74 per cent complete, with 89 per cent of capital expenditures committed.

­

Phase F

45,000

2014

Construction

­

Phase 1

40,000

2013

Construction

­

Phase G

40,000

2015

Approved

­

Phase 2

20,000

2020

Application

­

Phase H

40,000

2016

Approved

­

Phase J

50,000

2019

Announced

Narrows Lake

Cavalier Energy Inc. Hoole

Updated: Dec 2012

Cavalier submitted the regulatory application for the first phase at Hoole in November 2012. Assuming regulatory approval and favourable market conditions, construction is expected to begin in 2014, with first production in 2015. ­

Phase 1

10,000

2015

Application

­

Phase 2

30,000

TBD

Announced

­

Phase 3

30,000

TBD

Announced

­

Phase 4

30,000

TBD

Announced

Cenovus Energy Inc. •

Christina Lake

Updated: Dec 2012

Site preparation is underway, with construction of the Phase A plant scheduled to begin in Q3/2013. ­

Phase 1

45,000

2017

Construction

­

Phase 2

45,000

TBD

Approved

­

Phase 3

40,000

TBD

Pelican Lake Grand Rapids

Approved Updated: Dec 2012

Cenovus says it anticipates regulatory approval for the commercial Grand Rapids pilot in 2013. ­

Phase A

60,000

2017

Application

­

Phase B

60,000

TBD

Application

­

Phase C

60,000

TBD

Application

600

2011

Updated: Jan 2013

Phase E is about 65 per cent complete, and Phase F construction is advancing. Engineering and design work is underway for Phase G, and Cenovus plans to file the regulatory application for Phase H in 2013. ­

Future Optimization

12,000

TBD

Announced

­

Pilot

­

Phase 1A

10,000

2002

Operating

­

West Kirby

­

Phase 1B

8,800

2008

Operating

­

Phase 1

­

Winefred Lake

­

Phase 1

­

Phase C

40,000

2011

Operating

­

Phase D

40,000

2012

Operating

­

Phase E

40,000

2013

Construction

Operating Updated: Aug 2012

30,000

TBD

Announced Updated: Aug 2012

30,000

TBD

Announced

Connacher Oil and Gas Limited ­

Algar

Updated: Oct 2012

­

Phase F

50,000

2016

Approved

­

Phase G

50,000

2017

Approved

Connacher has sold two subsidiaries for proceeds of approximately $200 million, which the company says positions it to “execute a meaningful capital program” including projects designed to increase production and improve netbacks at Algar and Great Divide Pod 1. This could increase production by as much as 5,000 barrels per day over the next 15–24 months.

­

Phase H

50,000

2019

Announced

­

Pod 2

Long on expertise, short on bureaucracy

10,000

2010

Operating

experience • exceLLence • execution

As SAGD specialists, PROJEX brings proven rigor to oil sands thermal engineering projects. What we don’t bring is red tape and bureaucracy. Give us a call. We’d welcome the chance to show you the PROJEX difference. Contact Scott Rempel at 403.705.4151.

FEbruary 2013 | OILSANDSREVIEW.COM 43


P R O J E C T S TAT U S

CURRENT PROJECT

CAPACITY

START-UP

REGULATORY STATUS

CURRENT PROJECT

Hangingstone Pilot

Connacher received regulatory approval for the two-phase, 24,000-barrel-per-day expansion at Great Divide in September 2012. The company says the approval allows it to advance its evaluation of project costs, timing and financing alternatives.

­

Pilot

­

Approved

­

­

Great Divide

Expansion 1A

Updated: Oct 2012

12,000

2014

CAPACITY

START-UP

REGULATORY STATUS

Updated: Dec 2012 11,000

1999

Operating

Koch Exploration Canada Corporation Muskwa

Updated: Jun 2012

­

Expansion 1B

12,000

2016

Approved

Koch’s Canadian subsidiaries are seeking a strategic investor to advance development and monetize certain oilsands interests including the Muskwa asset.

­

Pod 1

10,000

2007

Operating

­

ConocoPhillips Canada Limited ­

Pilot

10,000

2015

Application

Laricina Energy Ltd.

Surmont

Germain

Updated: Oct 2012

Updated: Dec 2012

­

Phase 1

27,000

2007

Operating

Laricina says Germain construction continues on time and on budget. Detailed engineering is complete, approximately 60 per cent of modules have been installed and 80 per cent of module fabrication is complete. Regulatory consultation for the 150,000-barrel-per-day expansion is continuing as planned, and approval is anticipated in 2013.

­

Phase 2

109,000

2015

Construction

­

Phase 1 CDP

­

Pilot

1,200

1997

Operating

­

ConocoPhillips Canada says engineering for Surmont 2 is expected to be complete and the majority of materials and equipment delivered to site by year end, in anticipation of peak construction in 2013.

Devon Canada Corporation ­

Jackfish

Updated: Oct 2012

Devon says ramp-up of Jackfish 2 is now approximately two-thirds complete, while construction of the Jackfish 3 project is now approximately 40 per cent complete. ­

Phase 1

35,000

2007

Operating

­

Phase 2

35,000

2011

Operating

­

Phase 3

35,000

2015

Construction

­

Jackfish East

­

Expansion

20,000

2018

­

Pike

Updated: Sep 2012 Announced Updated: Jul 2012

Devon filed the regulatory application for all three phases of the Pike project in June 2012. The company says facility construction and SAGD drilling for the first phase will begin in late 2013 or early 2014, pending corporate approvals. The company has also submitted its environmental impact assessment report for the project. ­

1A

35,000

2016

Application

­

1B

35,000

2017

Application

­

1C

35,000

2018

Application

Grizzly Oil Sands ULC Algar Lake

Updated: Dec 2012

Construction on the first phase at Algar reportedly remains on track for commissioning in Q1/2013 with first production by mid-year. ­

Phase 1

5,500

2013

Construction

­

Phase 2

5,500

2014

Approved

May River

Updated: Dec 2012

Grizzly says it anticipates full-field development of its May River asset to ultimately produce more than 75,000 barrels per day using SAGD and its ARMS development model. Part owner Gulfport Energy says 20–25 core holes will be drilled at May River this winter, following which sufficient exploration will have occured to submit the SAGD application. ­

Phase 1

6,800

TBD

Announced

­

Phase 2

6,800

TBD

Announced

Harvest Operations Corp. BlackGold

Updated: Dec 2012

5,000

2013

Construction

Phase 2

30,000

2015

Application

­

Phase 3

60,000

TBD

Application

­

Phase 4

60,000

TBD

Saleski

Application Updated: Dec 2012

Laricina has filed a project update to the Saleski Phase 1 regulatory application to reflect the change of well configuration to a single horizontal well cyclic SAGD from a dual-well SAGD process. ­

Experimental Pilot

­

Phase 1

1,800

2011

Operating

10,700

2015

Application

MEG Energy Corp. •

Christina Lake

Updated: Dec 2012

MEG anticipates it will increase production at Christina Lake by about 20 per cent in 2013 compared to 2012 thanks to its RISER initiative (which includes enhanced modified steam and gas push), and start-up of Phase 2B in the second half of the year. ­

Phase 1 Pilot

3,000

2008

Operating

­

Phase 2A

22,000

2009

Operating

­

Phase 2B

35,000

2013

Construction

­

Phase 3A

50,000

2016

Approved

­

Phase 3B

50,000

2018

Approved

­

Phase 3C

50,000

2020

Approved

Surmont

Updated: Dec 2012

MEG’s environmental impact assessment report for Surmont was filed in late October, while the regulatory application was filed in September. Public consultation is ongoing. ­

Phase 1

41,000

2018

Application

­

Phase 2

41,000

TBD

Application

­

Phase 3

41,000

TBD

Application

Nexen Inc. •

Long Lake

Updated: Dec 2012

CNOOC’s bid to acquire Nexen has been approved by the Canadian government and is expected to close imminently.

Harvest says 15 SAGD well pairs have now been drilled, and engineering is now 80 per cent complete. The site has been cleared and graded and now piling and foundation work is underway. Phase 2 of the project is now in the regulatory process, with approval now anticipated in 2013.

­

Long Lake South (Kinosis) Phase 1

40,000

TBD

Approved

­

Long Lake South (Kinosis) Phase 2

40,000

TBD

Approved

­

Phase 1

10,000

2014

Construction

­

Phase 1

72,000

2008

Operating

­

Phase 2

20,000

TBD

Application

­

Phase 2

72,000

TBD

Approved

­

Phase 3

72,000

TBD

Application

­

Phase 4

72,000

TBD

Announced

Husky Energy Inc. McMullen

Updated: Dec 2012

Husky says that 32 slant wells have been drilled for primary production development at McMullen. The company says the air injection pilot is continuing as planned, with further testing planned for Q4/2012. ­

Air Injection Pilot-Experimental

755

2012

Operating

Japan Canada Oil Sands Limited •

Hangingstone

Updated: Dec 2012

Osum Oil Sands Corp. Sepiko Kesik

Updated: Dec 2012

Alberta Environment has issued the proposed terms of reference for the Sepiko Kesik project. Sepiko Kesik would use SAGD in Grosmont bitumen carbonate formation.

Japan Canada Oil Sands owner JAPEX has sanctioned the Hangingstone expansion project. Project partner Nexen is expected to sanction its share of the development early in 2013.

­

Phase 1

30,000

2018

Announced

­

­

Phase 2

30,000

TBD

Announced

Expansion

44 OILSANDS REVIEW | February 2013

35,000

2016

Application


P R O J E C T S TAT U S

CURRENT PROJECT

CAPACITY

START-UP

REGULATORY STATUS

Statoil ­

Corner

CAPACITY

START-UP

REGULATORY STATUS

Devon Canada Corporation

Kai Kos Dehseh

Updated: Oct 2012

Statoil says its next projects will be an expansion to Leismer, and the Corner project. Corner will be sanctioned late in 2013 or early in 2014. The company has appointed a new president of its Canadian operations, Stale Tungesvik. ­

CURRENT PROJECT

40,000

2017

Approved

­

Walleye

Updated: Jun 2012

Devon filed its regulatory application for Walleye in June 2012. The company says construction will start in 2013. ­

Phase 1

9,000

2016

10,000

TBD

30,000

2006

Application

Husky Energy Inc. ­

Corner Expansion

40,000

TBD

Application

­

Caribou

­

Hangingstone

20,000

TBD

Application

­

Demonstration

­

Leismer Commercial

10,000

TBD

Approved

­

Tucker

­

Phase 1

­

Leismer Demonstration

10,000

2010

Operating

­

Leismer Expansion

20,000

TBD

Approved

­

Leismer Northwest

­ ­ ­

Updated: May 2012 Operating

Imperial Oil Limited Cold Lake

Updated: Dec 2012

Imperial says that the Nabiye expansion is progressing on schedule. Facility construction is underway and drilling has commenced on two production pads.

TBD

Application

Leismer South

20,000

TBD

Application

­

Phase 1-10

110,000

1985

Operating

Thornbury

40,000

TBD

Application

­

Phase 11-13

30,000

2002

Operating

Thornbury Expansion

20,000

TBD

Application

­

Phase 14-16

40,000

2014

Construction

­

Chard

­

Phase 1

­

Meadow Creek

­ ­

Updated: Nov 2012 40,000

TBD

Announced

Phase 1

40,000

TBD

Approved

Phase 2

40,000

TBD

Approved

Updated: Nov 2012

Wildwood

Updated: Oct 2012

Surmont filed its regulatory application in early October, almost exactly one year after being incorporated as a company. Phase 1

Osum Oil Sands Corp. ­

Taiga

Updated: Oct 2012

Osum received regulatory approval for the 35,000-barrel-per-day Taiga project. The company says it is now considering financing options. ­

Phase 1

23,000

2016

Approved

­

Phase 2

22,000

2017

Approved

Pengrowth Energy Corporation

Surmont Energy Ltd.

­

Approved

20,000

Suncor Energy Inc.

­

Updated: Nov 2010

12,000

2015

Application

Lindbergh

Updated: Dec 2012

Pengrowth’s board of directors has committed $55 million for critical path-related, long-lead equipment for the Lindbergh project thanks to encouraging pilot performance. More details on the timing and scope of the commercial project are expected early in 2013. ­

Phase 1 Commercial

12,500

2015

Application

­

Phase 2 Commercial

17,500

2016

Announced

Value Creation has submitted an environmental assessment report for the Advanced TriStar project.

­

Pilot

1,200

2012

Operating

­

ATS-1

15,000

2016

Application

Royal Dutch Shell plc

­

ATS-2

30,000

2018

Application

­

ATS-3

30,000

2020

Application

TriStar

­

Pilot

Value Creation Inc. Advanced TriStar

Updated: Dec 2012

Updated: Oct 2012 1,000

2014

Application

COLD LAKE REGION — IN SITU Cold Lake

Updated: Dec 2012

Baytex says it will build facilities and drill one SAGD well pair in 2013. Following successful oper­ ations of this pilot, the company will proceed with construction of the 5,000-barrel-per-day first commercial phase in 2014. ­

Commercial

5,000

2016

Approved

­

Pilot

1,200

TBD

Approved

Birchwood Resources Inc. ­

Sage

Updated: Jun 2012

Birchwood has released its public disclosure document and has held an open house with area residents, some of whom were concerned by the development. ­

Pilot

5,000

2015

Announced

Canadian Natural Resources Limited Primrose & Wolf Lake

Updated: Dec 2012

Canadian Natural has completed additional pad drilling at Primrose on schedule and drilled on budget. These wells are expected to come on production in 2013. ­

Primrose East

Orion

Updated: Jun 2012

Shell is looking to sell the Orion property, reportedly to focus on in situ operations at Peace River. ­

Phase 1

10,000

2007

Operating

­

Phase 2

10,000

TBD

Approved

PEACE RIVER REGION — IN SITU Andora Energy Corporation

Baytex Energy Corp. •

­

32,000

2008

Sawn Lake

Updated: Dec 2012

Andora Energy majority owner Pan Orient Energy says activities are currently underway to commence steam injection at Sawn Lake in Q2/2013, with production anticipated in Q4/2013. ­

SAGD Demonstration

1,400

2013

Approved

Baytex Energy Corp. •

Cliffdale

Updated: Dec 2012

Subject to regulatory approvals, Baytex anticipates development of a new 15-well thermal module to begin in Q1/2013, building on the 10-well module that has been operating since Dec. 2011. ­

Pilot

1,900

2010

TBD

TBD

Operating

Murphy Oil Company Ltd. ­

Cadotte

­

Pilot

­

Seal/Cadotte

­

Pilot

Updated: Nov 2012 Application Updated: Nov 2012 TBD

2012

Operating

Northern Alberta Oil Ltd. Sawn Lake

Operating

Updated: Dec 2012

­

Primrose North

30,000

2006

Operating

­

Primrose South

45,000

1985

Operating

Company owner Deep Well Oil & Gas says WorleyParsons has launched preliminary engineering work on the Sawn Lake pilot project. The work will include a pilot plan, process flow diagrams, material balances for hydrocarbons, sulphur and water, description of the capacity and content of emissions.

­

Wolf Lake

13,000

1985

Operating

­

CSS Pilot

700

TBD

Approved

FEbruary 2013 | OILSANDSREVIEW.COM 45


P R O J E C T S TAT U S

CURRENT PROJECT

CAPACITY

START-UP

REGULATORY STATUS

CURRENT PROJECT

CAPACITY

START-UP

Fort Hills

Penn West Petroleum Ltd. Harmon Valley South

Updated: Dec 2012

Updated: Dec 2012

Suncor and partner Total continue to review development timelines for Fort Hills.

Penn West and its partner have received regulatory approval to proceed with the Harmon Valley South pilot.

­

Phase 1

145,000

TBD

­

Pilot

­

Phase 2 & 3

145,000

TBD

­

Seal Main

­

Commercial

­

Pilot

TBD

TBD

Approved

Voyageur Upgrader 3

Updated: Sep 2012 Application

Suncor and partner Total have agreed to an immediate minimum spend program on Voyageur. A go/no-go decision on the project is now expected in Q1/2013.

75

2011

Operating

­

Phase 1

127,000

2016

Approved

­

Phase 2

63,000

TBD

Approved

Dawson

Updated: Jul 2012

­

Experimental THAI Demonstration

10,000

2013

Construction

­

Phase 2

10,000

TBD

Announced

Royal Dutch Shell plc

Syncrude Canada Ltd. ­

Mildred Lake/Aurora

­

Base Plant Stage 1 & 2 Debottleneck

­

Stage 3 Debottleneck

­

­

Stage 3 Expansion (UE-1)

Peace River

Updated: Dec 2011

12,500

1986

Operating

­

Carmon Creek - Phase 1

40,000

2015

Application

­

Carmon Creek - Phase 2

40,000

2018

Application

Southern Pacific Resource Corp. ­

Red Earth

Updated: Oct 2012

Updated: Oct 2012

Syncrude has announced it is embarking on a new mine extension project at Mildred Lake, which will be known as the MLX project. Canadian Oil Sands says MLX will leverage investment in the two mine trains currently being constructed, enabling Syncrude to extend the life of Mildred Lake mining operations by about a decade. Project scoping is underway, and pending regulatory approval, construction and spending would commence in the next 10 years.

Alberta’s environmental assessment director has deemed complete Shell Canada’s environmental impact assessment report for the Carmon Creek expansion. Cadotte Lake

On Hold Updated: Dec 2012

2015

Petrobank says it is awaiting regulatory approval to initiate cold production on its two well demonstration project to condition the reservoir prior to THAI operations.

­

On Hold

10,000

Petrobank Energy and Resources Ltd. ­

REGULATORY STATUS

250,000

1978

Operating

75,000

TBD

Announced

100,000

2006

Operating

SOUTH ATHABASCA REGION — UPGRADER Nexen Inc. •

Long Lake

Updated: Dec 2012

CNOOC’s bid to acquire Nexen has been approved by the Canadian government and is expected to close imminently.

Southern Pacific has yet to release its future development plans for the Red Earth project.

­

Phase 1

58,500

2008

Operating

­

Commercial

­ ­

10,000

TBD

Announced

­

Phase 2

58,500

TBD

Approved

Pilot

1,000

2009

Operating

­

Phase 3

58,500

TBD

Application

Pilot Expansion

3,000

TBD

Announced

­

Phase 4

58,500

TBD

Announced

Value Creation Inc.

NORTH ATHABASCA REGION — UPGRADER

Advanced TriStar

BP p.l.c. ­

Terre de Grace

Updated: May 2012

Updated: Dec 2012

Value Creation has submitted an environmental assessment report for the Advanced TriStar project.

BP says that ongoing appraisal activities include delineation drilling, seismic acquisition and appraisal of water sources.

­

ATS-1

12,750

2016

Application

­

­

ATS-2

25,500

2018

Application

25,500

2020

Pilot

8,400

TBD

Approved

Canadian Natural Resources Limited

­

ATS-3

TriStar

Canadian Natural says it continues its strategy of staged expansion to 250,000 barrels per day and work remains on track. Projects currently under construction are trending at or below estimates.

­

Pilot

­

Phase 1

INDUSTRIAL HEARTLAND REGION — UPGRADER

­

Horizon

Updated: Dec 2012

Application Updated: Oct 2012

840

2014

Application

114,000

2009

Operating

Phase 2A

10,000

2014

Construction

­

­

Phase 2B

45,000

TBD

Approved

Project partners North West Upgrading and Canadian Natural Resources have sanctioned the project, with above-ground construction to begin in spring 2013.

­

Phase 3

80,000

TBD

Approved

­

Phase 1

77,000

2016

Approved

­

Tranche 2

5,000

2012

Operating

­

Phase 2

77,000

TBD

Approved

­

Phase 3

77,000

TBD

Approved

158,000

2003

Operating

91,000

2011

Operating

North West Upgrading Inc.

Ivanhoe Energy Inc. Tamarack

Updated: Dec 2012

Ivanhoe is responding to a third round of supplemental information requests from regulators regarding its project application. Approval is now anticipated in 2013. ­

Phase 1

34,784

2016

Application

Suncor Energy Inc. Base Operations

Updated: Dec 2012

Suncor says it has started up its new Millennium Naphtha Unit and has run it at full rates. The unit is expected to stabilize secondary upgrading capacity and provide flexibility during maintenance activ­ ities for secondary upgrading units in the future.

Redwater Upgrader

Updated: Nov 2012

Shell Albian Sands ­

Scotford Upgrader 1

­

Commercial

­

Expansion

Updated: Jul 2012

Value Creation Inc. ­

Heartland

Updated: Dec 2012

Construction was suspended in September 2008. Value Creation says it remains committed to the project and is seeking a development partnership.

­

Millennium Coker Unit

97,000

2008

Operating

­

Phase 1

46,300

TBD

On Hold

­

Millennium Vacuum Unit

35,000

2005

Operating

­

Phase 2

46,300

TBD

Approved

­

U1 and U2

225,000

1967

Operating

­

Phase 3

46,300

TBD

Approved

46 OILSANDS REVIEW | February 2013


S TAT I S T I C S

02 13 statistics Taking a close look at the inputs to and outputs of the oilsands industry. For suggestions or data contributions, please contact Deborah Jaremko, djaremko@junewarren-nickles.com.

North American Carbon Steel Prices

Bitumen Royalty Valuation at Hardisty, Alta.: $C/m3

Condensate

985 kg/m 3 3.5% sulphur bitumen Brent**

$140 $120

$80 $60 $40 $20

Dec

Nov

Oct

Sep

Aug

Nov

Sep

Aug

Jul

Jun

May

Apr

Mar

Oct

Trade

300 250 200 150 100 50

Nov

Oct

Sep

Aug

Jul

Jun

May

Dec 3

Apr

Oct 1

Mar

Sep 3

Feb

0

May 1 Jun 1 Jul 2 2012

Jan 2012

$0

Construction

350

Dec 2011

wtd price (US$/bbl)

$100

Forestry, fishing, mining, oil and gas

SOURCE: ALBERTA HUMAN RESOURCES AND EMPLOYMENT

West Texas Intermediate*

Light sour

$20

Alberta Labour Force Statistics SOURCE: FLINT HILLS RESOURCES LTD./ ENERGY INFORMATION ADMINISTRATION * WTI spot price at Cushing, OKLA. **Europe spot price

Cold Lake blend

$40

$0

Monthly Crude Oil Prices: May 2012 – Dec. 2012 Bow River

$60

Nov

Oct

Sep

Aug

Jul

Jun

Apr

May

Mar

Feb

Jan 2012

Dec 2011

$100

1015.0 kg/m3 bitumen

$80

Feb

$200

$100

Jan 2012

$300

Calculated using NetThruPut Monthly WCS Index

Dec 2011

$400

SOURCE: CANADIAN ASSOCIATION OF PETROLEUM PRODUCERS

SOURCE: CANADIAN ASSOCIATION OF PETROLEUM PRODUCERS

$500

Western Canadian Select

Jul

Bitumen Royalty Valuation at Hardisty, Alta.: $US/bbl

$600

$0

$600

Jun

Dec

Nov

Oct

Sep

Jul

Aug

Jun

May

Apr

Mar

Feb

Jan 2012

0

$700

May

$1.00 $0.50

$800

Apr

$1.50

Mar

$2.00

Reinforcing Bar

$900

Feb

$2.50

number of people (unadjusted, thousands)

C$/GJ

$3.00

Structural Sections and Beams

$1,000

Jan 2012

$3.50

Hot Rolled Coil

SOURCE: MEPS International

$4.00

SOURCE: NATURAL GAS EXCHANGE INC.

Monthly averages to December 21, 2012

US$/tonne

Natural Gas: Spot Prices at AECO Trading Hub in Alberta

FEBRUARY 2013 | OILSANDSREVIEW.COM 47


S TAT I S T I C S

Public Offerings of Crown Oilsands Rights Athabasca Sale Month

Hectares

Hectares

Peace River $/Hectare

Hectares

$/Hectare

0

$0.00

0

$0.00

5,888

$27.18

Aug 2011

768

$15.89

1,024

$340.25

0

$0.00

Sep 2011

924

$279.79

0

$0.00

0

$0.00

Oct 2011

0

$0.00

584

$379.37

0

$0.00

Nov 2011

NO PUBLIC OFFERING NOTICES

Dec 2011

29,108

$1,913.50

0

$0.00

0

$0.00

Jan 2012

0

$0.00

128

$560.50

512

$613.18

Feb 2012

0

$0.00

1,152

$621.19

0

$0.00

44,800

$16.02

0

$0.00

1,792

$44.47

0

$0.00

0

$0.00

1,536

$1,052.00

512

$138.13

768

$101.04

9,165

$44.16

Jun 2012

0

$0.00

701

$737.35

0

$0.00

Jul 2012

11,816

$258.84

1,024

$339.49

0

$0.00

Aug 2012

512

$273.47

256

$1,227.49

0

$0.00

Sep 2012

832

$119.14

512

$2,123.33

1,024

$115.96

Oct 2012

0

$0.00

256

$317.97

0

$0.00

Nov 2012

1,024

$136.70

256

$2,876.76

0

$0.00

Mar 2012* Apr 2012 May 2012**

Dec 2012

SOURCE: government of alberta

Jul 2011

Cold Lake $/Hectare

NO PUBLIC OFFERING NOTICES

*Includes Athabasca region oilsands permits from Mar. 24 sale. **Includes Peace River region permits from May 2 sale.

FirstEnergy Oilsands, Integrated and Large Cap Indexes Integrated

Large Cap

Source: FirstEnergy Capital Corp.

Oilsands

140

120

100

80

La

In 60

O

Dec*

Nov

Oct

Sep

Aug

Jul

Jun

May

Apr

Mar

Feb

Jan 2012

Dec

Nov

Oct

Sep

Aug

Jul

Jun

May

Apr

Mar

Feb 2011

40

*Recorded until Dec. 19, 2012.

Index launched Jan. 1, 2007. FirstEnergy complimentary indexes are available daily on the homepage at firstenergy.com. FirstEnergy Capital Corp. is a member of the Canadian Investor Protection Fund and IIROC.

48 OILSANDS REVIEW | FEBRUARY 2013


S TAT I S T I C S

Thermal Oilsands Project Steam to Oil Ratios (Steam Injected:Oil Produced)

8.0

Baytex Energy Corp. Cliffdale Pilot

141.80 (Aug) 138.07 (Sep)

BlackPearl Resources Inc. Blackrod Canadian Natural Resources Limited Primrose & Wolf Lake

7.0

Cenovus Energy Inc. Christina Lake

steam injected:oil produced

Cenovus Energy Inc. Foster Creek Cenovus Energy Inc. Pelican Lake Grand Rapids

6.0

Connacher Oil and Gas Limited Algar Connacher Oil and Gas Limited Great Divide ConocoPhillips Canada Limited Surmont

5.0

ConocoPhillips Canada Limited Surmont Pilot Devon Canada Corporation Jackfish Husky Energy Inc. Tucker

4.0

Imperial Oil Limited Cold Lake Japan Canada Oil Sands Limited Hangingstone Pilot MEG Energy Corp. Christina Lake

3.0

Nexen Inc. Long Lake Pengrowth Energy Corporation Lindbergh Pilot

2.0

Royal Dutch Shell plc Orion Royal Dutch Shell plc Peace River

Statoil Leismer Suncor Energy Inc. Firebag Suncor Energy Inc. MacKay River

0

Apr 2012

May 2012

Jun 2012

Jul 2012

Aug 2012

SOURCE: ERCB

Southern Pacific Resource Corp. STP-McKay

1.0

Sep 2012

Alberta Crude Bitumen and Synthetic Crude Production 2010-12 Source: Alberta Energy Resources conservation Board

Crude bitumen

Synthetic crude

40,000

35,000

30,000

20,000

15,000

10,000

5,000

Jul

Aug

Jun

May

Apr

Mar

Feb

Jan 2012

Dec

Oct

Nov

Sep

Aug

Jul

Jun

Apr

May

Feb

Mar

Dec

Jan 2011

Oct

Nov

Sep

Aug

Jul

Jun

Apr

May

Mar

0 Feb 2010

million barrels

25,000

FEBRUARY 2013 | OILSANDSREVIEW.COM 49


S TAT I S T I C S

Bitumen Synthetic Plant Operations: External Energy

Bitumen Synthetic Plant Operations: Oilsands

(10 3 m3)

Gas

(MWh)

Electric

(10 3 m3)

(MWh)

Albian Sands

purchased

74,608.0

47.0

74,747.3

1,391.0

generated

0.0

121,320.0

0.0

110,064.0

CNRL Horizon

purchased

59,073.4

4,650.9

60,615.3

1,564.0

generated

0.0

72,863.0

0.0

73,832.0

Imperial Oil purchased (Kearl Mine) generated

--

888.0

--

2,950.0

--

0.0

--

0.0

purchased

7,375.2

43,485.3

3,612.3

7,215.3

(Nexen)

generated

0.0

78.4

0.0

78.4

Shell Jackpine

purchased

24,145.0

29,721.0

21,738.3

23,957.0

generated

0.0

0.0

0.0

0.0

Shell Scotford

purchased

160,567.3

6,278.5

162,671.3

27,635.1

generated

0.0

89,127.4

0.0

90,125.4

purchased

109,012.0

89,846.0

106,387.0

116,039.0

OPTI

Suncor

generated

0.0

218,392.0

0.0

234,094.0

purchased

33,032.0

0.0

35,355.1

0.0

generated

0.0

59,260.9

0.0

59,138.9

purchased

162,055.7

30,775.1

166,080.1

35,481.3

(Mildred Lake) generated

0.0

195,480.0

0.0

178,878.6

Syncrude (Aurora)

Syncrude Williams Energy

purchased

921.9

2,573.9

797.7

2,410.4

generated

0.0

0.0

0.0

0.0

August 2012 Barrels

Grade*

September 2012 Barrels

Grade*

Albian Sands mined

62,000,958.9

11.14%

58,249,113.1

11.08%

processed

48,683,470.4

10.69%

51,120,402.2

10.69%

46,027,855.4

11.56%

38,176,216.0

11.31%

46,147,891.5

11.36%

38,584,995.4

11.08%

CNRL Horizon mined processed Jackpine Mine mined

32,289,764.2

11.95%

27,621,844.2

12.19%

processed

36,252,889.9

11.66%

28,995,434.9

11.36%

mined

111,724,996.2

11.20%

86,069,277.8

11.10%

processed

111,724,996.2

11.20%

86,069,277.8

11.10%

mined

74,880,106.1

11.21%

65,518,171.5

11.01%

processed

74,880,106.1

11.21%

65,518,171.5

11.01%

mined

62,078,870.2

10.43%

57,536,568.2

11.27%

processed

63,782,698.7

10.41%

63,175,100.3

11.11%

Suncor

SOURCE: ALBERTA ENERGY RESOURCES CONSERVATION BOARD

September 2012

Electric

SOURCE: ALBERTA ENERGY RESOURCES CONSERVATION BOARD

August 2012 Gas

Syncrude (Aurora)

Syncrude (Mildred Lake)

* Grade is a measurement of mass per cent bitumen in oilsands.

Alberta Crude Bitumen Production (non-primary) Commercial in situ schemes production rates per calendar day (bbls/d), listed in descending order of production for last month of data set

t Cenovus Energy Inc. rCanadian Natural Resources Limited Suncor Energy Inc.

August 2012

September 2012

Three-Month Average

153,769.5

150,573.0

148,508.7

Foster Creek

127,433.5

125,968.6

124,213.1

125,871.69

Primrose/Wolf Lake

90,924.2

93,110.6

116,455.8

100,163.56 112,524.51

I

1

117,657.8

114,970.2

58,100.2

62,693.1

71,266.1

64,019.79

Jackfish

55,007.5

53,206.8

29,385.4

45,866.56

Surmont

21,077.2

22,734.5

26,398.3

23,403.34

Leismer

16,267.3

16,959.8

16,469.9

16,565.68

Long Lake

33,751.8

15,461.6

14,639.5

21,284.30

Great Divide

5,330.6

5,253.2

10,698.3

7,094.07

Christina Lake

31,211.9

30,242.7

9,910.9

23,788.48

Tucker

9,464.3

9,424.7

9,646.7

9,511.87

Peace River

4,559.5

7,867.9

7,568.5

6,665.31

Hilda Lake/Orion

2,518.4

3,697.8

4,547.5

3,587.92

Hangingstone

5,825.0

4,743.1

4,534.3

5,034.15

Lindbergh pilot

1,239.1

1,191.3

1,400.7

1,277.04

Cliffdale pilot

402.5

277.4

493.1

391.0

ConocoPhillips Canada Limited

Surmont pilot

488.7

530.2

406.3

475.09

Suncor Energy Inc.

MacKay River

31,747.2

18,427.3

308.2

16,827.55

Blackrod

305.7

339.0

282.4

309.0

I

Seal Main pilot

452.9

367.3

281.8

367.32

I

Cenovus Energy Inc.

Grand Rapids pilot

213.2

150.3

182.4

181.99

Southern Pacific Resource Corp.

STP-McKay

---

55.4

53.5

36.29

Baytex Energy Corp.

Harmon Valley pilot

15.7

34.0

38.4

29.4

E-T Energy Ltd.

Poplar Creek

ConocoPhillips Canada Limited

Connacher Oil and Gas Limited

t MEG Energy Corp. rHusky Energy Inc. Shell Canada Limited t Shell Canada Limited rJapan Canada Oil Sands Limited Pengrowth Energy Corporation

rBaytex Energy Corp.

rBlackPearl Resources I Penn West Petroleum Limited

r

rConnacher Oil and Gas Limited Murphy Oil Company Ltd.

I

TOTAL

50 OILSANDS REVIEW | FEBRUARY 2013

Firebag

150,950.43

104,945.5

t Statoil Canada Ltd. rNexen Inc.

I

July 2012

Christina Lake

t Cenovus Energy Inc. rDevon Canada Corporation

I

Project Cold Lake

Algar Seal/Cadotte pilot

I

1

I

1

I

1

I

1

5.0

8.2

8.8

7.34

5,830.7

6,376.0

---

4,068.88

27.7

6.3

---

11.32

760,914.9

747,357.9

712,668.9

740,313.89

I I

I I

I

I

SOURCE: ALBERTA ENERGY RESOURCES CONSERVATION BOARD

Operator Imperial Oil Limited


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.